You can copy from here when filling out the rest of the page.
Duval County. Jacksonville Port Authority, Mr. David Stubbs. Jacksonville, Florida.
PROJECT PURPOSE:
Basic: The basic project purpose is shoreline stabilization.
Overall: The overall project purpose is shoreline stabilization at the Jaxport Authority.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Jacksonville Port Authority
Attn: Mr. David Stubbs
2831 Tallyrand Avenue
Jacksonville, Florida 32206
WATERWAY AND LOCATION: The project would affect waters of the United States, including wetlands, associated with Wynns Creek. The project site is located at 9884 August Drive, Section 23, Township 1 South, Range 27 East, Jacksonville, Duval County, Florida.
Directions to the site are as follows: From Interstate-95 take Exit 362A onto Interstate- 295 and head east. Take Exit 41 onto Zoo Parkway and head west. Turn left at the intersection of Zoo Parkway and August Drive. The project site is on the right-side of the road.
APPROXIMATE CENTRAL COORDINATES: Latitude 30.409444°
Longitude -81.578938°
PROJECT PURPOSE:
Basic: The basic project purpose is shoreline stabilization.
Overall: The overall project purpose is shoreline stabilization at the Jaxport Authority.
EXISTING CONDITIONS: The wetland system consists of a saltwater system known as Wynn’s Creek. The onsite vegetation consists of slash pine (Pinus elliottii), water oak (Quercus nigra), cabbage palm (Sabal palmetto) and Juncus (Juncus effusus). The existing area surrounding the project area consists of gravel parking and a navigation port.
PROPOSED WORK: The applicant seeks authorization to discharge fill material into 0.82-acre of saltwater marsh and tidal waterways to facilitate shoreline stabilization.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
The applicant stated, “Wetland impacts have been avoided and minimized to the fullest extent practicable while accomplishing the needed improvements. The project was designed to maximize the use of existing living shoreline adjacent to the proposed riprap placement. The placement of riprap is preferable to other potential stabilization materials such as a concrete wall or sheet piles. Large portions of riprap will be submerged during high tide events, providing habitat for organisms such as barnacles, crabs, crustaceans, and oysters that serve as a prey base for larger fauna. Additionally, riprap minimizes wave energy deflection that would occur if a concrete wall or sheet pile structure were used in the stabilization of the shoreline. This deflection of wave energy benefits proximal vegetation that could potentially be destroyed by the continued re- direction of waves off of concrete or sheet pile walls. The water quality of adjacent wetlands and waters will be protected through the use of standard Best Management Practices (BMPs) such as silt fences and/or floating turbidity barriers as appropriate.”
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
The applicant stated, “In order to offset proposed salt marsh wetland impacts, the applicant proposes off-site salt marsh wetland creation on applicant-owned property. The details of this proposed wetland creation plan are being finalized and will follow under separate cover. According to the attached UMAM documentation, creation of 0.2-acre of salt marsh wetlands will provide adequate compensation for proposed impacts.”
CULTURAL RESOURCES:
The Corps has determined the permit area has been extensively modified by previous work and there is little likelihood a historic property may be affected.
ENDANGERED SPECIES:
West Indian Manatee (Trichechus manatus): The Corps has determined the proposed project may affect, but is not likely to adversely affect the West Indian Manatee, Wood Stork, loggerhead sea turtle, green sea turtle, leatherback sea turtle, Kemp Ridley sea turtle, hawksbill sea turtle, smalltooth sawfish, Atlantic sturgeon, and shortnose sturgeon. The Corps will request U.S. Fish and Wildlife/National Marine Fisheries Service concurrence with this determination pursuant to Section 7 of the Endangered Species Act.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 0.82-acre of tidal wetlands, including near-shore vegetated areas and open waters utilized by various life stages of shrimp, snapper, and grouper. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the St. Johns River because the installation of the riprap would create habitat for shrimp, snapper, and grouper. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Jacksonville Permits Section, Post Office Box 4970, Jacksonville, Florida 32232-0019 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Brad Carey, in writing at the Jacksonville Permits Section, Post Office Box 4970, Jacksonville, Florida 32232-0019; by electronic mail at brad.j.carey@usace.army.mil; or, by telephone at (904) 232-2405.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
POST OFFICE BOX 4970
JACKSONVILLE, FLORIDA 32232-0019
December 20, 2017
REPLY TO
ATTENTION OF
Regulatory Division
North Permits Branch
Jacksonville Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-1994-03114 (SP-BJC)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Jacksonville Port Authority
Attn: Mr. David Stubbs
2831 Tallyrand Avenue
Jacksonville, Florida 32206
WATERWAY AND LOCATION: The project would affect waters of the United States,
including wetlands, associated with Wynns Creek. The project site is located at 9884
August Drive, Section 23, Township 1 South, Range 27 East, Jacksonville, Duval
County, Florida.
Directions to the site are as follows: From Interstate-95 take Exit 362A onto Interstate295 and head east. Take Exit 41 onto Zoo Parkway and head west. Turn left at the
intersection of Zoo Parkway and August Drive. The project site is on the right-side of
the road.
APPROXIMATE CENTRAL COORDINATES: Latitude 30.409444°
Longitude -81.578938°
PROJECT PURPOSE:
Basic: The basic project purpose is shoreline stabilization.
Overall: The overall project purpose is shoreline stabilization at the Jaxport Authority.
EXISTING CONDITIONS: The wetland system consists of a saltwater system known
as Wynn's Creek. The onsite vegetation consists of slash pine (Pinus elliottii), water
oak (Quercus nigra), cabbage palm (Sabal palmetto) and Juncus (Juncus effusus). The
existing area surrounding the project area consists of gravel parking and a navigation
port.
PROPOSED WORK: The applicant seeks authorization to discharge fill material into
0.82-acre of saltwater marsh and tidal waterways to facilitate shoreline stabilization.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
The applicant stated, "Wetland impacts have been avoided and minimized to the fullest
extent practicable while accomplishing the needed improvements. The project was
designed to maximize the use of existing living shoreline adjacent to the proposed
riprap placement. The placement of riprap is preferable to other potential stabilization
materials such as a concrete wall or sheet piles. Large portions of riprap will be
submerged during high tide events, providing habitat for organisms such as barnacles,
crabs, crustaceans, and oysters that serve as a prey base for larger fauna. Additionally,
riprap minimizes wave energy deflection that would occur if a concrete wall or sheet pile
structure were used in the stabilization of the shoreline. This deflection of wave energy
benefits proximal vegetation that could potentially be destroyed by the continued redirection of waves off of concrete or sheet pile walls. The water quality of adjacent
wetlands and waters will be protected through the use of standard Best Management
Practices (BMPs) such as silt fences and/or floating turbidity barriers as appropriate."
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
The applicant stated, "In order to offset proposed salt marsh wetland impacts, the
applicant proposes off-site salt marsh wetland creation on applicant-owned property.
The details of this proposed wetland creation plan are being finalized and will follow
under separate cover. According to the attached UMAM documentation, creation of
0.2-acre of salt marsh wetlands will provide adequate compensation for proposed
impacts."
CULTURAL RESOURCES:
The Corps has determined the permit area has been extensively modified by previous
work and there is little likelihood a historic property may be affected.
ENDANGERED SPECIES:
West Indian Manatee (Trichechus manatus): The Corps has determined the proposed
project may affect, but is not likely to adversely affect the West Indian Manatee, Wood
Stork, loggerhead sea turtle, green sea turtle, leatherback sea turtle, Kemp Ridley sea
turtle, hawksbill sea turtle, smalltooth sawfish, Atlantic sturgeon, and shortnose
sturgeon. The Corps will request U.S. Fish and Wildlife/National Marine Fisheries
Service concurrence with this determination pursuant to Section 7 of the Endangered
Species Act.
2
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposal would impact approximately
0.82-acre of tidal wetlands, including near-shore vegetated areas and open waters
utilized by various life stages of shrimp, snapper, and grouper. Our initial determination
is that the proposed action would not have a substantial adverse impact on EFH or
Federally managed fisheries in the St. Johns River because the installation of the riprap
would create habitat for shrimp, snapper, and grouper. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and
coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Jacksonville
Permits Section, Post Office Box 4970, Jacksonville, Florida 32232-0019 within 21 days
from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Brad Carey, in writing at the Jacksonville Permits Section, Post Office Box 4970,
Jacksonville, Florida 32232-0019; by electronic mail at brad.j.carey@usace.army.mil; or,
by telephone at (904) 232-2405.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impact including cumulative impacts of the proposed activity on the
public interest. That decision will reflect the national concern for both protection and
3
utilization of important resources. The benefits, which reasonably may be expected to
accrue from the proposal, must be balanced against its reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered
including cumulative impacts thereof; among these are conservation, economics,
esthetics, general environmental concerns, wetlands, historical properties, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion
and accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food, and fiber production, mineral needs, considerations of property ownership,
and in general, the needs and welfare of the people. Evaluation of the impact of the
activity on the public interest will also include application of the guidelines promulgated
by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or
the criteria established under authority of Section 102(a) of the Marine Protection
Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is
found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
4
LEGEND
Approximate Project Area - 1.08 ac.±
Western Extent
Lat: 30° 24' 36.93" N (30.410258 dd)
Long: 81° 34' 51.57" W (-81.580992 dd)
Section:
Township:
Range:
0
23
1 South
27 East
2,000 '
Eastern Extent
Lat: 30° 24' 34.81" N (30.409669 dd)
Long: 81° 34' 43.18" W (-81.578661 dd)
Copyright:© 2013 National Geographic Society, i-cubed, Esri, HERE, DeLorme, MapmyIndia, ©
OpenStreetMap contributors
DPMT: Shoreline Stabilization
USGS Topographic
Quadrangle Map
8711 Perimeter Park Blvd.,
Suite 1
Jacksonville, FL 32216
(904) 285-1397
mail@ersenvironmental.com
Duval County, Florida
Source: 7.5' USGS Eastport, FL Topographic Quadrangle; ArcGIS Online (USA Topo Maps)
By: NEE
Project No.:
171111
Exhibit No.:
1
Date:
Rev. Date:
10-9-17
®
X:\GIS Projects\2017\17111\mxd\17111_location_10-9-17.mxd
SOILS LEGEND
LEGEND
7 - Arents, nearly level
768 - Tisonia mucky peat, very frequently flooded
Approximate Project Area - 1.08 ac.±
99 - Water
USDA-NRCS Soil Survey Classifications
99
68
7
Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors, Source: Esri, DigitalGlobe,
GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User
Community
0
100 '
8711 Perimeter Park Blvd.,
Suite 1
Jacksonville, FL 32216
(904) 285-1397
mail@ersenvironmental.com
DPMT: Shoreline Stabilization
Soils Map
Duval County, Florida
Source: ArcGIS Online Imagery, USDA-NRCS soil survey classifications (data obtained from NRCS)
By: NEE
Project No.:
17111
Exhibit No.:
2
Date:
Rev. Date:
10-9-17
®
X:\GIS Projects\2017\17111\mxd\17111_soils_10-9-17.mxd
FLUCFCS LEGEND
NOTE: Depicted FLUCFCS classifications and
boundaries are approximate. This map
is intended to be used for illustrative
purposes only.
425 - Temperate Hardwoods
510 - Streams and Waterways
642 - Saltwater Marshes
642
510
.
!
1B
1A
.
!
425
642
642
LEGEND
425
Approximate Project Area - 1.08 ac.±
.
!
2A
.
!
!
.
2B
USACE Data Point Location
510
.
. !
!
642
3B 3A
FLUCFCS Classification Boundaries
Approximate Uplands - 0.26 ac.±
Approximate Wetlands - 0.15 ac.±
Approximate Surface Waters - 0.67 ac.±
0
100 '
Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors
8711 Perimeter Park Blvd.,
Suite 1
Jacksonville, FL 32216
(904) 285-1397
mail@ersenvironmental.com
Source: 2009 Infrared Aerials (SJRWMD); ArcGIS Online Data (World Transportation)
DPMT: Shoreline Stabilization
FLUCFCS Map
Project No.:
17111
Exhibit No.:
3
Date:
By: NEE
Rev. Date:
10-9-17
®
X:\GIS Projects\2017\17111\mxd\17111_ACOE_flucfcs_10-9-17.mxd
Wetland Impact 1
0.06 ac.±
LEGEND
Approximate Project Area
Surface Water Impacts 0.67 ac.±
Wetland Impacts - 0.15 ac.±
SW Impact 1
0.44 ac.±
Wetland Impact 2
0.02 ac.±
SW Impact 2
0.23 ac.±
Wetland Impact 3
0.03 ac.±
Wetland Impact 4
0.04 ac.±
Service Layer Credits: Esri, HERE, DeLorme,
MapmyIndia, © OpenStreetMap contributors
Source: Esri, DigitalGlobe, GeoEye, Earthstar
Geographics, CNES/Airbus DS, USDA, USGS,
AeroGRID, IGN, and the GIS User Community
0
8711 Perimeter Park Blvd.,
Suite 1
Jacksonville, FL 32216
100 '
Source: ArcGIS Online Imagery
(904) 285-1397
mail@ersenvironmental.com
DPMT: Shoreline Stabilization
Wetland Impact Map
By: NEE
Project No.:
17111
Exhibit No.:
4
Date:
Rev. Date:
10-9-17
®
X:\GIS Projects\2017\17111\mxd\17111_impact_10-9-17.mxd
5'-0"
5'-0"
11'-0"
11' Berm (Min.)
1'-0"
2'
6"
1'-0"
RUBBLE RIP RAP
(STANDARD BANK AND SHORE PROTECTION)
1.5 Max.
1
10'-0"
= 1.06
Pavement
5'-0"
1'-0"
(Min.)
Elevation Varies
Refer to Plans
1.5 Max.
Elevation varies
6'-0" (Min.)
to ¡ Splice
1.5 Max.
1
Filter
Fabric
Splice
1
Elevation Varies
Refer to Plans
5'
0"
Pavement
MHWL = 1.06
Articulating Concrete Block as per
manufacturer's specifications
Minimum Thickness = 9.1"
5'-0"
Standard Bank and Shore
1'-0"
1.5
1
9'-0"
Bedding Stone
Elevation Varies
Refer to Plans
(Bottom of Slope)
5'
0"
2'
6"
MHWL
Filter Fabric
5'-0"
7'-6"
Elevation Varies
Refer to Plans
(Bottom of Slope)
WYNN'S CREEK SLOPE PROTECTION
WYNN'S CREEK SLOPE PROTECTION BID OPTION
N.T.S.
N.T.S.
NOTE:
NOTE:
1.The Articulating Concrete Block shall meet the following parameters:
1. REFER TO FDOT STANDARD SPECIFICATIONS SECTIONS 530 AND 985 FOR SIZE DISTRIBUTION OF BANK AND SHORE
RIP-RAP.
- Block permeability parameter
-Block stability factor
-Block stability upgrade factor
-Block buoyant specific gravity
2. OVERLAY RIP-RAP ON STANDARD FDOT BEDDING STONE AND D-2 (REVETMENT STANDARD) GEO TEXTILE PER
FDOT STANDARD SPECIFICATIONS SECTIONS 530 AND 985.
0.667
2.5
2.5
1.22
FLOATING TURBIDITY BARRIER.
REFER TO STORMWATER POLLUTION
PREVENTION PLAN FOR DETAILS.
N
0
10
MATCH EXISTING
EL. -14.2 +/N 2209418.00
E 473723.00
MATCH EXISTING EL.
N 2209770.97
E 472955.01
40
Feet
MATCH EXISTING
EL. -13.6 +/N 2209400.00
E 473727.00
MATCH EXISTING
EL. -14.0 +/N 2209403.00
E 473753.00
MATCH EXISTING EL.
N 2209464.00
E 473710.00
MATCH EXISTING
HEADWALL LOCATION
CONCRETE BARRIER WALL
BOTTOM OF
SLOPE
FLOATING TURBIDITY BARRIER.
REFER TO STORMWATER POLLUTION
PREVENTION PLAN FOR DETAILS.
MATCH EXISTING
EL. -9.8 +/N 2209645.13
E 472992.47
0
C4 000
00
0.
EL. 8.0 +/N 2209724.80
E 472901.15
MATCH EXISTING
EL. -6.8 +/N 2209542.00
E 473091.00
W
MATCH EXISTING
EL. -4.0 +/N 2209507.00
E 473147.00
S
'
N
N
Y
K
E
E
R
C
N 2209453.48
E 473665.29
11
'(
TY
P.
)
)
.
P
Y
T
'(
1
1
MATCH EXISTING EL.
N 2209404.00
E 473836.00
WETLAND LINE
N 2209344.31
E 473861.58
EL. 7.0'
N 2209363.52
E 473630.18
MATCH EXISTING
EL. -5.7 +/N 2209501.00
E 473245.00
0
5
GA 000
00
0.
EL. 7.0'
N 2209363.52
E 473630.18
N 2209478.09
E 473248.82
GUARDRAIL
EL. 7.0'
N 2209336.38
E 473755.56
EL. 7.0'
N 2209335.11
E 473738.54
EL. 8.0'
N 2209608.56
E 472961.90
WETLAND LINE
GUARDRAIL
EL. 7.5'
N 2209550.82
E 473013.79
EL. 7.5'
N 2209505.37
E 473075.59
DESCRIPTION
EL. 7.5'
N 2209431.06
E 473133.79
DESIGNED BY:
REVISIONS
DATE
OP
DR
F
OF
0
3
GA 000
00
0.
DAMES POINT MARINE TERMINAL
CRUISE PARKING RELOCATION
SK
BY
APVD
DRAWN BY:
AC
Bid Set
Not For Construction
CHECKED BY:
JB
JACKSONVILLE PORT AUTHORITY
APPROVED BY:
SK
castroa
10/9/2017
1:12:40 PM
WYNN'S CREEK
SLOPE PROTECTION
SHEET
DATE
22
OCT. 2017
CONTRACT
NO.
C-1575A
\\Jaxfile01\transportation\P\1010003000 JAXPORT GEC 2015\1010003012 - DPMT Cruise Parking Relocation\D. - CADD Files\roadway\PLAN_SLOPE PROTECTION.DGN