County: Seminole. APPLICANT: Five Points Connector Roadway. Sanford, Florida. PROJECT PURPOSE: Basic: Redevelopment. Overall: To expand and improve facilities on currently owned property by consolidating offsite facilities onto the current Seminole County 5 Points Government Complex.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Five Points Connector Roadway and Regional Stormwater Pond
C/o Jean Jreij
Seminole County
200 West County Home Road
Sanford, Florida 32773
WATERWAY & LOCATION: The proposed project will impact wetlands that discharge to Lake Jesup and is situated north of the intersection of County Home Road and South Orlando Drive (U.S. 17/92) in Sections 14 and 15, Township 20 South, Range 30 East, Seminole County, Florida.
Directions to the site are as follows: From Jacksonville take I-95 south and exit onto Interstate 4 toward Orlando. Before Orlando take the Lake Mary exit onto Lake Mary Boulevard and go east to State Road 17/92 and go south approximately 1 mile. The project site is on the west side of the road.
APPROXIMATE CENTRAL COORDINATES
Latitude 28.7455 North
Longitude -81.2982 West
PROJECT PURPOSE:
Basic: Redevelopment
Overall: To expand and improve facilities on currently owned property by consolidating offsite facilities onto the current Seminole County 5 Points Government Complex.
EXISTING CONDITIONS: The Five-Points Connector Roadway and Regional Stormwater Pond project currently supports seven (7) land use types/vegetative communities. These land use types/vegetative communities were identified utilizing the Florida Land Use, Cover and Forms Classification System, Level III (FLUCFCS, FDOT, January 2004) (Figure 5). The on-site upland land use types/vegetative communities are classified as Institutional (170), Pine – Mesic Oak (414), Mixed Hardwoods (438), Spoil Area (743), Auto Parking Facility (818). The on-site wetland/surface water land use types/vegetative communities are classified as Streams & Waterways (510) and Willow & Elderberry (618).
PROPOSED WORK: The applicant is proposing to dredge and or fill 9.9 acres of wetlands which discharge to Lake Jesup to create a regional stormwater pond for the redevelopment and expansion of the Seminole County Five Points Government Complex and the construction of a connector road.
AVOIDANCE AND MINIMIZATION INFORMATION: The applicant has indicated that the project cannot be located at any other location within the surrounding parcels or even within the Seminole County Government Complex itself. Based upon the existing development, the project’s topography, its existing and future drainage basins/drainage areas, the required/designed treatment volume, control elevations, and permanent pool elevations, as well as the dictated roadway alignment and geometry requirements, it is not believed that the project’s proposed impacts could be either avoided or minimized beyond the currently proposed design.
COMPENSATORY MITIGATION: The applicant has proposed the purchase of 5.45 forested mitigation credits from a federally approved mitigation bank.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The property is located within the United States Fish and Wildlife Service’s (FWS) Consultation Area for the Everglades Snail Kite (Rostrhamus sociabilis plumbeus), Florida Scrub-jay (Aphelocoma coerulescens), Eastern Indigo Snake (Drymarchon corais couperi) and Wood Stork (Mycteria americana). Based on applicant’s wildlife surveys, habitat preferences for these species, location of the project site and surrounding development, the Corps has determined that the project as proposed would have no effect on the Snail Kite or Scrub Jay.
The Corps completed an evaluation of the project based upon the August 13, 2013 updated addendum to the January 2010 North and South Florida Ecological Services Field Offices Programmatic Concurrence for use with the Eastern Indigo Snake. Use of the Key for the Eastern Indigo Snake resulted in the following sequential determination: A (not in open water or salt marsh.) >B (conditioned for use of the Service’s standard Protection Measures for the Eastern Indigo snake during site preparation and project construction.) >C (no gopher tortoise burrows, hole, cavities, or other refugia where a snake could be buried or trapped and injured during project activities.) = (Not Likely to Adversely Affect (NLAA) with the applicant adherence to the standard protection measures for the Eastern Indigo Snake. Based upon the NLAA determination for the Eastern Indigo Snake no further coordination is required.
The Corps also completed an evaluation of the project based upon the September 2008 Central and North Peninsular Florida Ecological Services Field Offices Programmatic Concurrence for use with the Wood Stork. Use of the Key for the Wood Stork resulted in the following sequential determination: A (Project more than 2,500 feet from a colony site) >B (Project impacts SFH) > C (Project impacts to SFH are greater than 0.5 acres) > D (Impacts to SFH are within CFA) > E (Project provides SFH Compensation) =NLAA (Not Likely to Adversely Affect). Upon Corps receipt of a general concurrence issued by the Jacksonville Ecological Services Field Office (JAFL) through the Programmatic Concurrence on this key, “NLAA” determinations for projects made pursuant to this key require no further consultation with the JAFL.
ESSENTIAL FISH HABITAT (EFH): The project involves impacts to an inland freshwater wetlands within an interior county. A review of the National Marine Fisheries Service EFH Habitat Protection Mapper Web site the project does not occur in the vicinity of EFH designated by the South Atlantic Fishery Management Council of NMFS. The Corps has determined that the proposed project will not have an impact on EFH.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: The project is currently under review by the St. Johns River Water Management District.
COMMENTS regarding the application should be submitted in writing to the District Engineer at the above address within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Jim Carr at the letterhead address, by electronic mail at james.l.carr@usace.army.mil , or by telephone at 321-504-3771, extension 26.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
COCOA REGULATORY FIELD OFFICE
400 HIGHPOINT DRIVE, SUITE 600
COCOA, FLORIDA 32926
REPLY TO
ATTENTION OF
December 20, 2017
Regulatory Division
North Permits Branch
Cocoa Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-2017-02396 (IP-JLC)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Five Points Connector Roadway and Regional Stormwater Pond
C/o Jean Jreij
Seminole County
200 West County Home Road
Sanford, Florida 32773
WATERWAY & LOCATION: The proposed project will impact wetlands that discharge to
Lake Jesup and is situated north of the intersection of County Home Road and South
Orlando Drive (U.S. 17/92) in Sections 14 and 15, Township 20 South, Range 30 East,
Seminole County, Florida.
Directions to the site are as follows: From Jacksonville take I-95 south and exit onto
Interstate 4 toward Orlando. Before Orlando take the Lake Mary exit onto Lake Mary
Boulevard and go east to State Road 17/92 and go south approximately 1 mile. The
project site is on the west side of the road.
APPROXIMATE CENTRAL COORDINATES
Latitude 28.7455 North
Longitude -81.2982 West
PROJECT PURPOSE:
Basic: Redevelopment
Overall: To expand and improve facilities on currently owned property by
consolidating offsite facilities onto the current Seminole County 5 Points Government
Complex.
EXISTING CONDITIONS: The Five-Points Connector Roadway and Regional
Stormwater Pond project currently supports seven (7) land use types/vegetative
communities. These land use types/vegetative communities were identified utilizing the
Florida Land Use, Cover and Forms Classification System, Level III (FLUCFCS, FDOT,
January 2004) (Figure 5). The on-site upland land use types/vegetative communities
are classified as Institutional (170), Pine Mesic Oak (414), Mixed Hardwoods (438),
Spoil Area (743), Auto Parking Facility (818). The on-site wetland/surface water land use
types/vegetative communities are classified as Streams & Waterways (510) and Willow
& Elderberry (618).
PROPOSED WORK: The applicant is proposing to dredge and or fill 9.9 acres of
wetlands which discharge to Lake Jesup to create a regional stormwater pond for the
redevelopment and expansion of the Seminole County Five Points Government
Complex and the construction of a connector road.
AVOIDANCE AND MINIMIZATION INFORMATION: The applicant has indicated that
the project cannot be located at any other location within the surrounding parcels or
even within the Seminole County Government Complex itself. Based upon the
existing development, the project's topography, its existing and future drainage
basins/drainage areas, the required/designed treatment volume, control elevations,
and permanent pool elevations, as well as the dictated roadway alignment and
geometry requirements, it is not believed that the project's proposed impacts could
be either avoided or minimized beyond the currently proposed design.
COMPENSATORY MITIGATION: The applicant has proposed the purchase of 5.45
forested mitigation credits from a federally approved mitigation bank.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties
within the permit area. By copy of this public notice, the Corps is providing information
for review. Our final determination relative to historic resource impacts is subject to
review by and coordination with the State Historic Preservation Officer and those
federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The property is located within the United States Fish and
Wildlife Service's (FWS) Consultation Area for the Everglades Snail Kite (Rostrhamus
sociabilis plumbeus), Florida Scrub-jay (Aphelocoma coerulescens), Eastern Indigo
Snake (Drymarchon corais couperi) and Wood Stork (Mycteria americana). Based on
applicant's wildlife surveys, habitat preferences for these species, location of the project
site and surrounding development, the Corps has determined that the project as
proposed would have no effect on the Snail Kite or Scrub Jay.
The Corps completed an evaluation of the project based upon the August 13, 2013
updated addendum to the January 2010 North and South Florida Ecological Services
Field Offices Programmatic Concurrence for use with the Eastern Indigo Snake. Use of
the Key for the Eastern Indigo Snake resulted in the following sequential determination:
A (not in open water or salt marsh.) >B (conditioned for use of the Service's standard
2
Protection Measures for the Eastern Indigo snake during site preparation and project
construction.) >C (no gopher tortoise burrows, hole, cavities, or other refugia where a
snake could be buried or trapped and injured during project activities.) = (Not Likely to
Adversely Affect (NLAA) with the applicant adherence to the standard protection
measures for the Eastern Indigo Snake. Based upon the NLAA determination for the
Eastern Indigo Snake no further coordination is required.
The Corps also completed an evaluation of the project based upon the September 2008
Central and North Peninsular Florida Ecological Services Field Offices Programmatic
Concurrence for use with the Wood Stork. Use of the Key for the Wood Stork resulted
in the following sequential determination: A (Project more than 2,500 feet from a colony
site) >B (Project impacts SFH) > C (Project impacts to SFH are greater than 0.5 acres)
> D (Impacts to SFH are within CFA) > E (Project provides SFH Compensation) =NLAA
(Not Likely to Adversely Affect). Upon Corps receipt of a general concurrence issued
by the Jacksonville Ecological Services Field Office (JAFL) through the Programmatic
Concurrence on this key, "NLAA" determinations for projects made pursuant to this key
require no further consultation with the JAFL.
ESSENTIAL FISH HABITAT (EFH): The project involves impacts to an inland
freshwater wetlands within an interior county. A review of the National Marine Fisheries
Service EFH Habitat Protection Mapper Web site the project does not occur in the
vicinity of EFH designated by the South Atlantic Fishery Management Council of NMFS.
The Corps has determined that the proposed project will not have an impact on EFH.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: The project is currently under review by
the St. Johns River Water Management District.
COMMENTS regarding the application should be submitted in writing to the District
Engineer at the above address within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Jim
Carr at the letterhead address, by electronic mail at james.l.carr@usace.army.mil , or by
telephone at 321-504-3771, extension 26.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
3
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
4
Legend
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN,
Esri Japan, METI,
China
(Hong Kong),
Esriand
(Thailand),
TomTom,
Five Esri
Points
Connector
Roadway
Regional
Stormwater Pond
MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
2002 E. Robinson St. Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Five Points Connector Roadway and
Regional Stormwater Pond
Seminole County, Florida
Figure 1
Location Map
²
2,700
Project #: 865-03
Produced By: SEB
Date: 2/2/2016
Feet
Legend
Five Points Connector Roadway and Regional Stormwater Pond
2002 E. Robinson St. Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Five Points Connector Roadway and
Regional Stormwater Pond
Seminole County, Florida
Figure 2
2015 Aerial Photograph
²
280
Project #: 865-03
Produced By: SEB
Date: 2/2/2016
Feet
Legend
Five Points Connector Roadway and Regional Stormwater Pond
Properties To Be Acquired By Seminole County
Properties Currently Owned By Seminole County
2002 E. Robinson St. Orlando, FL 32803
Ph: 407-894-5969 Fax: 407-894-5970
www.bio-techconsulting.com
Five-Points Complex Connector Roadway
Seminole County, Florida
Figure 3
Seminole County Properties
²
410
Feet
Project #: 865-03
Produced By: SEB
Date: 11/27/2017
Five Points Government Center
Land Use Master Plan
GRAPHIC SCALE
FLEET/WAREHOUSE
Courthouse Drive
JUDICIAL/CIVIL
CAMPUS
U.
S.
17
-9
2
CORRECTIONS
CAMPUS
ard
College Boulev
JUDICIAL/
CRIMINAL
CAMPUS
Law Enforcement
Memorial
EOC/SHERIFF/
PUBLIC SAFETY
CAMPUS
POND
Boulevard
ints
Po
e
v
Fi
PUBLIC
WORKS
CAMPUS
Five Points Government Center
7-
92
Land Use Master Plan
U.
S.
1
CULTURAL
CAMPUS
PROPOSED USES
COUNTY SERVICES
CAMPUS
FIRE
STATION
#35
Corrections Campus
County Services Campus
Cultural Campus
EOC / Sheriff / Public Safety Campus
Fire Station #35
Fleet / Warehouse
Judicial / Civil Campus
Judicial / Criminal Campus
Open Space / Ponds
Public Works Campus
Road ROW's
TOTAL
APRIL 2006
ACREAGE
23.1 AC
10.9 AC
10.2 AC
10.8 AC
3.6 AC
10.3 AC
15.4 AC
15.9 AC
16.1 AC
6.8 AC
14.2 AC
137.3 AC
Figure 4
Conceptual Final
Master Plan
SITE BENCHMARK #20
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
NORTHING = 1604319.14
EASTING = 560369.70
ELEVATION = 51.02
SITE BENCHMARK #18
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
NORTHING = 1604145.05
EASTING = 560273.93
ELEVATION = 45.99
STATION = 306+31.21
OFFSET = 254.72' LT
W-36
W-26
W-27
W-28
W1-42
W-29
N
R/W LINE
W-33
W-24
SITE BENCHMARK #18
SET NAIL & DISC
STAMPED "SSMC TRAV.PT."
W1-44
W-31
W-32
0
50
200
O
38
O
NORTHING = 1603951.24
EASTING = 560940.06
ELEVATION = 45.17
W-23
24
SITE BENCHMARK #15
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
305
W-22
O
14
W1-45
O
SITE BENCHMARK #17
SET NAIL & DISC
STAMPED "SSMC TRAV.PT."
16
W1-46
STATION = 200+06.97
OFFSET = 137.88' LT
W-21
NORTHING = 1603922.49
EASTING = 561130.27
ELEVATION = 43.55
STATION = 205+07.21
OFFSET = 534.40' LT
SITE BENCHMARK #14
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
NORTHING = 1603556.26
EASTING = 560499.38
ELEVATION = 41.00
W-19
SITE BENCHMARK #11
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
W-18
NORTHING = 1603819.51
EASTING = 560203.85
ELEVATION = 45.39
STATION = 303+13.15
OFFSET = 353.34' LT
O
12
W-47
O
O
10
12
R/W LINE
O
12
W-48
W-50
W-49
W-51
STATION = 201+57.87
OFFSET = 24.78' LT
W-17
Feet
EA
SE
O
RB ME
SE
N
39 T
M
I
NO 40
LE
PA
GE
C
O
UNT 0
0
Y, 03
FL
O
RI
DA
STATION = 204+26.42
ELEVATION = 472.10' LT
NORTHING = 1603655.56
EASTING = 560339.07
ELEVATION = 43.06
W-20
NORTHING = 1603936.90
EASTING = 560242.91
ELEVATION = 45.69
STATION = 304+26.62
OFFSET = 304.04' LT
W-52
5:
59:
38 PM
SITE BENCHMARK #8
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
SHEET 1
5
W-15
W-54
W-14
W-55
W-9
W-8
W-11
W-7
W-4
W-5
W-56
0
0
2
W-59
20
5
W-60
W-1
W-68
W-61
W-67
P
T
W-62
T
A
.
SITE BENCHMARK #5
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
NORTHING = 1603366.73
EASTING = 560676.28
ELEVATION = 41.30
STATION = 203+74.88
OFFSET = 166.54' RT
W-63
NORTHING = 1603542.99
EASTING = 561101.68
ELEVATION = 45.41
STATION = 206+63.13
OFFSET = 220.04' LT
W-65
W-64
SHEET 1
6
ECT
J
END PRO
5
9
.
3
+5
6
0
A.2
ST
15
15
15
15
15
15
18
18
SITE BENCHMARK #2
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
SITE BENCHMARK #4
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
18
18
18
18
18
18
18
NORTHING = 1603138.31
EASTING = 560457.83
ELEVATION = 49.92
SITE BENCHMARK #3
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
NORTHING = 1603306.74
EASTING = 560728.40
ELEVATION = 41.67
STATION = 205+08.45
OFFSET = 200.88' RT
SITE BENCHMARK #7
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
REAGAN CENT
ER
18
STATION = 200+79.46
OFFSET = 387.84' RT
S
W-66
NORTHING = 1603224.95
EASTING = 560773.40
ELEVATION = 45.06
STATION = 206+21.80
OFFSET = 235.16' RT
O
20
SITE BENCHMARK #1
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
NORTHING = 1603096.84
EASTING = 560728.80
ELEVATION = 50.62
STATION = 206+71.58
OFFSET = 361.35' RT
ENGINEER OF RECORD:
E.
ED,P.
J
N
.MU
NS
A
RS
FU
6
4
4
1
.5
ATE NO
C
FI
ERTI
NEER C
I
NAL ENG
O
FESSI
PRO
PEGASUS ENGINEERING, LLC
8/21
/201
7
W-58
W-2
15
STATION = 203+06.19
OFFSET = 81.72' RT
W-57
W-3
W-6
ECT
J
N PRO
BEGI
8
2
.
2
+1
0
0
A.2
ST
SITE BENCHMARK #6
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
NORTHING = 1603457.78
EASTING = 560643.25
ELEVATION = 41.53
NORTHING = 1603510.84
EASTING = 560572.48
ELEVATION = 41.22
STATION = 202+26.66
OFFSET = 26.93' RT
W-10
W-13
12
W-
2
0
5
+
5
9
.8
6
STA. 202+40.13
C/L CONST.
EX
MPL
S CO
NT
I
VE PO
FI
ADWAY =
R RO
O
NNECT
CO
STA. 300+00.00
B/L POND
6
7
5
8
.
8
3
5
3
0
6
NG = 1
HI
RT
NO
5
4
1
5
.
3
8
5
0
6
NG = 5
I
EAST
W-53
13
202+40.
PC STA.
SITE BENCHMARK #9
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
NORTHING = 1603606.64
EASTING = 560421.71
ELEVATION = 41.78
STATION = 200+84.96
OFFSET = 81.84' LT
00
200+00.
POT STA.
W-16
SITE BENCHMARK #10
SET NAIL & DISC
STAMPED "SSMC TRAV.PT."
NORTHING = 1603747.37
EASTING = 560257.61
ELEVATION = 41.57
STATION = 302+36.54
OFFSET = 306.17' LT
DESCRIPTION
W1-43
W-30
SITE BENCHMARK #12
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
REVISIONS
STATION = 203+85.02
ELEVATION = 742.43' LT
W-34
W-25
NORTHING = 1604054.59
EASTING = 560267.97
ELEVATION = 46.36
STATION = 305+41.63
OFFSET = 268.66' LT
BY
W-35
1
7
-9
2
SITE BENCHMARK #13
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
W-41
CO
RRECT
I
O
NAL
FACILITY
U
S
PT STA. = 205+59.86
e
= NC
2
0
7
+
3
4
.4
5
PC STA. = 202+40.13
DATE
SITE BENCHMARK #19
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
NORTHING = 1604240.36
EASTING = 560927.60
ELEVATION = 44.62
CENTER
J
O
HN E.PO
L
K
T
A
.
= 400.00
CRI
MI
NAL J
UST
I
CE
W-37
S
R
SEMI
NO
L
E CO
UNT
Y
W-39
W-40
P
O
T
= 319.73
STATION = 200+96.21
OFFSET = 796.14' LT
E
L
SHEET
S2
0
,
2
1
W-38
Y
WA
= 168.96
STATION = 203+18.21
OFFSET = 830.87' LT
STATION = 202+47.88
OFFSET = 889.33' LT
R
GE
IN
SL
T
NORTHING = 1604364.31
EASTING = 560749.86
ELEVATION = 43.60
N:
\Project
s\SMC1
6029 Fi
ve Poi
nt
s\1
1
1
1
1
1
1
1
256\roadway\PLAYRD01
.
dgn
PI STA. = 204+09.09
0
0
.
0
+2
9
0
.3
POT STA
CURVE DATA CL011
SITE BENCHMARK #22
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
SITE BENCHMARK #21
SET 5/8" IRON ROD
STAMPED "SSMC TRAV. PT."
NORTHING = 1604426.67
EASTING = 560529.70
ELEVATION = 41.19
ENGINEERING DIVISION
ROAD NAME
COUNTY CIP NO.
9
TE 30
,SUI
34
AD 4
1WEST STATE RO
30
8
0
DA 327
RI
O
S,FL
NG
NTER SPRI
WI
FIVE POINTS COMPLEX
0
7
7
.27
N NO
O
ZATI
RI
F AUTHO
ATE O
C
FI
ERTI
C
CONNECTOR ROADWAY
00265503
Figure 5
FIVE POINTS COMPLEX
CONNECTOR ROADWAY
PROJECT LAYOUT SHEET
SHEET
NO.
14
ET
NL
E I
T
A
T GR
A
L
F
95
1.
OP=4
T
18
=39.
V
N
I
S
10
=40.
NV
N I
H
S-313
L
L
D WA
HEA
30
0.
OP=4
T
95
=36.
NV
N I
REMOVE EXIST.
HEADWALL
W-39
CONST. 88 LF OF
24" PIPE
SEMINOLE COUNTY
CRIMINAL JUSTICE
CENTER
S-321
W-40
15"
A
45
4.
OP=4
T
86
=38.
NV
18" RCP
NW I
15
=38.
NV
NE I
82
=41.
NV
I
W-38
CONST. 65 LF
OF 24" PIPE
P
6" RC
RC
P
E
NHOL
A
RY M
A
T
NI
SA
67
3.
OP =4
T
90
=40.
NV
I
N
82
=40.
NV
SW I
R 100
E
24"
RCP
24
"
8
"
S-311
S-310
CONST. 18 LF OF
L
L
18" PIPE
D WA
EA
P
V
C
S
REMOVE EXIST.
HEADWALL
24" RCP
8" PVC
CONST. 20 LF OF
24" PIPE
W-37
RCP
15
1:
6
1:
1
0
0
B-6
2
1:
REMOVE EXIST.
18" PIPE
02
=38.
NV
I
W-26
W-29
86
8.
+9
07
.4
A
ST
13
B-
B
E
W-30
100
UGE
GA
VT
W-33
Feet
IRR
170.04 RT
4
W1-4
Y
DAR
NDARY
D BOU
BO
UN
DA
RY
W ETLAN
W
ET
LA
ND
W-24
W-32
W-31
CC
307+43.74
O
14
58.35 LT
5
W1-4
17'
WE
TL
AN
D
N
5:
59:
52 PM
4
0
°4
3
'1
4
"E
5
4
5
.6
7
'
R/
W
W-57
2
B-
W-59
BO
UN
DA
RY
4
B-
5
0
.0
0
'
4
0
°4
3
'1
4
"E
N
E
T
T
GA
S
G
UM
B
F
O
1
0
.0
0
'
5
2
9
.7
2
'
4
9
°1
6
'4
6
"W
4
0
°4
3
'1
4
"E
N
VA
UL
T
M
U
4
AB-
W-58
W-3
W-6
S-108
3
AB-
R
N:
\Project
s\SMC1
6029 Fi
ve Poi
nt
s\1
1
1
1
1
1
1
1
256\drai
nage\PDPLRD02.
dgn 8/21
/201
7
W-4
W-5
A
W-7
10
0
18"
CM P
1:15
W-8
W-11
S-317
W-56
0
0
1
4
0
2
G
UM
6" PV
C
VA
UL
T
Y
AR
D
N
U
O
B
D
AN
TL
E
W
R
ET
NL
E I
T
RA
TG
A
L
F
12
43.
OP=
28
T
0.
4
=
NV
E I
2
AB-
L
L
D WA
HEA
11
0.
OP=4
T
84
.
R
C
= 36
NV
P NE I
S
L
GA
L
WA
D
HEA
21
2.
=4
OP
T
40
18" RCP
=38.
NV
NW I
36
8.
=3
D
NV
W I
HEA
L
L
WA
24
"
1
9
8
.0
3
'
4
0
°4
3
'1
4
"E
N
S-106
W-9
L
L
D WA
HEA
15 W-12
8.
OP=3
T
34
=36.
NV
SW I
N
D
AR
Y
N
U
B
O
ND
AR
Y
BO
U
S-104
1:6
W-10
W-13
ET
NL
I
CONST. 83 LF OF
DBL. 48" PIPE
GRAVEL PARKING AREA
WE
TL
AN
D
1
BBO
UN
DA
RY
UM
8
0
R
DARY
BO UN
W ET
LAND
10
B
F
O
R 531
10
0
40
3
R
W-55
1:2
W-15
VA
UL
T
Y
R
A
D
CONST. 87 LF OF
30" PIPE
UM
N
205+59.86
400.00 RT
US
Y
1
OT 7H 92
E
R
S
)
U
S-318
S-320
S-102
1
AB-
CONST. TYPE B FENCE
(6' HEIGHT)
W-54
CC
(B
O
B
35
9.
0+6
.40
STA
PC
405.05 LT
300+96.59
36" PIPE
S-302
CONST. 92 LF OF
24" PIPE
W
D
S-301
PR
C
CC
300+86.19
364.30 RT
238.74 RT
301+51.00
W
ET
LA
ND
REMOVE EXIST 24" PIPE
AND HEADWALL
CONTROL
STRUCTURE
D
N
A
TL
E
7
B-
E
T
RA
TG
A
L
F
40
41.
88
OP=
8.
T
=3
NV
I
SE
MILLING AND RESURFACING
CC
302+03.01
W-14
W-52
R
2
8
0
W
ST
A
.4
02
+6
0.
53
LEGEND
W-53
302+06.10
381.98 RT
112.14 LT
CONST. 74 LF OF
48" PIPE
H
E
TO AD
P
W
=
A
I
N
V= 38 LL
.2
3
2
3
.8
2
CO
CC
ND
A
L
WET
S-303
36"
RCP
DI
AM
N CR
ETER
ETE
BA
SE
2'
R
CC
W-16
W-51
B
FO
5
2
213.23 LT
10
B-
CS-1
ND
A
L
WET
CC
P
PRA
RI
CONST. 59 LF OF
24" PIPE
DESCRIPTION
OND
B/L P
CC
303+16.85
W-18
67
=38.
NV
I
REVISIONS
B
5
43.
5
42.
Y
DAR
254.51 LT
.5
2
4
.5
3
4
R
C
P
S-304
STABILIZED MAINTENANCE BERM
ND
A
L
WET
RCP
36"
S-316
UM
O
BF
0
8
1
303+97.67
W-19
W-17
1
8
"
W-50
12
9
B-
5
3
7
3
4
40
R
C
P
CPP
24"
L
L
D WA
HEA
88
9.
OP=3
T
53
=36.
NV
E I
MASTER STORMWATER POND
POND BOTTOM EL. 25.0
CC
99
.
46
4+
0
4
.
TA
S
0
PC
0
2
29
8.
R
+8
3
40
.
TA
S
PT
ET
NL
E I
T
A
T GR
A
L
F
34
5.
OP=4
T
94
9.
=3
V
N
NW I
81
=39.
NV
SE I
CPP
24"
UM
O
BF
W-49
R
1
8
"
12
W-48
1
40
R
C
P
RR
I
8
B-
UN
Y
GENC
EMER
OUT
PUMP
E
RET
CONC
Y
WA
L
L
SPI
RR
I
ER
MET
A
I
2' D
SE
E BA
RET
CONC
W-47
S
12
RCM
ER
MET
A
I
2' D
SE
E BA
RET
CONC
O
S
B
5
40
1
8
"
S-315
L
L
D WA
HEA
62
0.
OP=4
T
77
=36.
NV
NE I
O
BO
VT
PV
C
L
L
D WA
HEA
94
9.
OP=3
T
63
=36.
NV
W I
10
NEL
PA
ROL
CONT
S
12
"
W-20
ET
NL
E I
T
A
T GR
A
L
78
F
1.
OP=4
T
75
=39.
NV
NE I
94
.
6
=3
NV
SW I
O
E
TL
AN
E
REMOVE EXIST. HEADWALL
CONST. 220 LF OF
24" PIPE
O
LAND
W ET
AR
37
35
25
2
1:
1:
15
ON
I
T
A
T ST
F
I
L
CC
303+73.47
448.22 RT
REMOVE EXIST. MANHOLE
AND 2 EXIST. MES AND
EXIST. 30" RCP
W-21
1:
2
C
PV
E
NHOL
A
RY M
A
T
NI
14
6.
SA
OP=4
T
02
=37.
NV
N I
84
=36.
NV
SE I
CW L
6
40
"
12
LIFT
STATION
LI
NE
R
C
P
1
8
"
R1
80
28
=40.
NV
I
C
PV
B/L ESLINGER
WAY
44.37 RT
"
12
REMOVE EXIST.
HEADWALL
AND 12" PVC
S-306
15
1:
O
BF
S
GA
S
86
=40.
NV
I
11
B-
305+43.43
NDARY
D BOU
PT
C
8" PV
CC
W-22
W ETLAN
UM
ASPHALT PARKING AREA
IRR
6
W1-4
6
1:
T
UL
A
V
UM
371.58 RT
O
16
CONST. 76 LF OF
30" PIPE
30
"R
CP
D
305+09.86
IRR
CWL
305
C
8" PV
G
S
E
NHOL
A
RY M
A
T
NI
37
6.
SA
OP=4
T
87
=37.
NV
N I
09
=37.
NV
E I
97
.
6
=3
NV
S I
CC
12
B-
ND
A
L
WET
1:
6
RCP
30"
PVC
23
8.
+4
06
4
A.
ST
L
L
D WA
HEA
93
5.
OP=4
T
1
90
2
=44.
NV
" SE I
P
V
C
88
=42.
NV
I
RCP
W-23
W ETLAN D B
O UNDARY
E
NHOL
A
RY M
A
T
NI
82
6.
SA
0"
OP=4 3
T
72
=37.
NV
W I
85
=37.
NV
NE I
30" RCP
8"
7
40
363.24 LT
P
V
C
PVC
E
NHOL
A
GE M
NA
I
35
6.
DRA
OP=4
T
02
=41.
NV
NE I
E
L
B
I
CESS
NA
=I
NV
08
SE I
=40.
NV
SW I
05
=41.
NV
I
W
306+06.75
24
8
"
8"
S-305
CC
ET
NL
E I
T
A
T GR
A
L
F
85
5.
OP=4
T
36
=41.
NV
N I
33
=41.
NV
E I
ET
NL
E I
T
A
T GR
A
L
F
90
4.
OP=4
T
23
=42.
NV
SW I
POINT
O
ER
MET
A
I
2' D
SE
E BA
RET
CONC
308.80 RT
FACILITY EXPANSION
38
O
R 100
306+28.50
T
UL
A
V
FUTURE CORRECTIONAL
30"
RCP
S
CC
S-308
P
RC
ET
NL
E I
T
A
T GR
A
L
F
13
7.
OP=4
T
55
=41.
NV
N I
51
=41.
NV
E I
28
=41.
NV
S I
30" RCP TO REMAIN
BY
E
3
W1-4
30"
RCP
30"
"
12
PVC
8
40 E
8"
PC
E
NHOL
A
RY M
A
T
NI
73
7.
SA
OP=4
T
51
=38.
NV
N I
33
=38.
NV
S I
DATE
S
A BA
N
IT SE
A
A
V
R D
D
IC
O
IN DI Y
IT TIO SE N
Y
E
W
N
TH AL ER XP
E
A
M
S RI
T
E
A
H
N
W
N
O
L
O AS H O U L CE
C
,
D
L
A
T
TE U N E
I HA HE
A
D
B N
V
L
TH E
E
A
TO IS
N
R3
00
0 20
PUMP
T
UL
A
ND
V
WI
W-34
W-25
12
'
20
'
F-1
MAINTENANCE BERM
ROL
CONT
ER
T
A
OR W
F
RCP
ER
ING
SL
REMOVE EXIST. INLET
AND 18" RCP
33
'
15
'
409
Y
WA
S-307
N
15' STABILIZED
R
307+23.45
S-322
CONST. 70 LF OF
18" PIPE
CC
2
W1-4
BO UN
69
7.
09+5
TA.4
POT S
W-28
W-27
0
0
1
BO
UN
DA
RY
LAND
W ET
CONST. 102 LF OF
30" PIPE
W-35
S-314
RCP
18"
S-312
87
5.
08+7
TA.4
PT S
WE
T
L
AN
D
W-36
20
'12
'3
3'
R
S-309
15
'
W-41
JOHN E. POLK
CORRECTIONAL FACILITY
3
B-
ND
A
L
WET
W-2
20
5
W-60
Figure 6
S-101
S-300
ENGINEER OF RECORD:
DAVID W. HAMSTRA, P.E.
PROFESSIONAL ENGINEER CERTIFICATE NO. 38652
PEGASUS ENGINEERING, LLC
ENGINEERING DIVISION
ROAD NAME
COUNTY CIP NO.
301 WEST STATE ROAD 434, SUITE 309
WINTER SPRINGS, FLORIDA 32708
FIVE POINTS COMPLEX
CERTIFICATE OF AUTHORIZATION NO. 27770
CONNECTOR ROADWAY
00265503
FIVE POINTS COMPLEX
CONNECTOR ROADWAY
P
O
N
DD
E
T
A
I
LS
H
E
E
T
SHEET
NO.
20
43
41
39
43
8
93
3
41
39
38
38
DARY
36
36
BO UN
NDARY
D BOU
W ETLAN
LAND
W ET
9
3
1
4
3
7
B-6
45
LI
NE
R/
W
5
4
5
.6
7
'
5:
59:
55 PM
4
0
°4
3
'1
4
"E
N
H
E
TO AD
P
W
=
A
I
N
V= 38 LL
.2
3
2
3
.8
2
N
4
0
°4
3
'1
4
"E
5
0
.0
0
'
6" PV
C
36"
RCP
CO
0
4
38
E
T
N:
\Project
s\SMC1
6029 Fi
ve Poi
nt
s\1
1
1
1
1
1
1
1
256\drai
nage\PDPLRD03.
dgn 8/21
/201
7
44
T
42
DARY
GA
S
G
4
2
1
9
8
.0
3
'
UM
BO UN
4
0
°4
3
'1
4
"E
N
4
9
°1
6
'4
6
"W
VA
UL
T
UM
B
F
O
1
0
.0
0
'
44
34
34
N
44 4
4
4
1
40
3
42
4
0
°4
3
'1
4
"E
B
O
D
N
36
7
3
ND
A
L
WET
W-60
S-108
41
38
A
38
42
4 4
0 1
41
42
42
42
38
4
4
36
38
42
20
5
45
3
9
9
3
DAVID W. HAMSTRA, P.E.
PEGASUS ENGINEERING, LLC
ENGINEERING DIVISION
ROAD NAME
COUNTY CIP NO.
301 WEST STATE ROAD 434, SUITE 309
WINTER SPRINGS, FLORIDA 32708
CERTIFICATE OF AUTHORIZATION NO. 27770
VA
UL
T
M
4
5
35
9.
0+6
.40
STA
PC
ENGINEER OF RECORD:
DESCRIPTION
PROFESSIONAL ENGINEER CERTIFICATE NO. 38652
UM
VA
UL
T
4
AB-
39
36
3
B-
W-2
1
4
4
2
W-58
36
3
AB-
B
FO
ND
AR
Y
BO
U
4
3
4
BW-3
W-6
3
6
39
4
1
3
7
18"
CM P
BO
UN
DA
RY
3
8
3
6
41
4
0
42
3
7
WE
TL
AN
D
W-59
35
3
8
3
8
43
4
3
4
0
2
4
3
1
40
WE
TL
AN
D
39
34
17'
37
D
HEA
L
L
WA
4
6
39
3
8
37
W-5
S-317
0
0
.
1
4
W-57
S-106
2
B-
4
6
39
W-11
1:15
W-4
40
4
30
9
18" RCP
L
L
D WA
HEA
21
2.
OP =4
T
40
=38.
NV
NW I
36
8.
NV =3
W I
W-7
43
G
UM
L
L
D WA
HEA
11
0.
39
OP=4
T
84
.
= 36
NV
NE I
W-8
W-56
39
42
S-101
38
S
GA
Y
AR
D
N
U
O
B
D
AN
TL
E
W
38
2
AB-
41
R
C
P
S-104
4
3
W-9
37
42.00
24
"
1:6
W-10
W-13
L
L
D WA
HEA
15
8.
12
OP=3
T
34 W=36.
NV
SW I
42
41
4
1
.
5
0
ET
NL
E I
T
RA
TG
A
L
F
12
3.
OP=4 0.
28
T
=4
NV
E I
3
7
1
BBO
UN
DA
RY
36
ET
NL
E I
T
RA
TG
A
L
F
40
1.
88
OP=4
8.
T
=3
NV
I
SE
S-300
3
3
W
ET
LA
ND
GRAVEL PARKING AREA
40.40
44
W-14
1
AB-
2
4
ST
A
.4
02
+6
0.
53
4
1
.
2
5
W-55
1:2
S-102
7
3
37
S-320
S-301
W-15
U
35
B
F
O
39
41
4
2
4
4
5
3
4
0
.
6
0
US
Y
1
OT 7H 92
E
R
S
)
33
9
3
4
2
CONSTRUCT SWALE
S-318
42
(B
36
E
TL
AN
34
36
40
37
W
4
0
.
8
0
1
4
43
38
41
0
4
4
5
CONST. TYPE B FENCE
(6' HEIGHT)
4
5
W-54
38
33
4
4
4
3
3
9
7
B-
39
Y
R
A
D
4
4
U
N
D
AR
Y
5
2
9
.7
2
'
35
37
34
4
4
W ET
LAND
35
3
6
3
6
41
39
42
46
4
8
39
3
8
DARY
UN
BO
38
37
LAND
39
W ET
38
43
41
46
DI
AM
N CR
ETER
ETE
BA
SE
15
1:
NDARY
D BOU
W ETLAN
2
1:
36
36
40
1:
2
43
44
B
5
43.
5
42.
37
35
25
3
6
305
6
1:
38
37
38
39
37
44
CW L
1:
6
45
42
1
:2
37
39
41
W ETLAN D BOUND
ARY
41
42
7
4
46
47
1:
15
3
4
41 40
39
44 45
43
R
C
P
1
8
"
P
V
C
8
"
30"
RCP
6
4
2'
41.00
0
4
RCP
30"
43
42
3
6
37
45
4
4
42
4
40
44
45
4
4
44
45
3
4
4
3
36
46
37
B
4
4
5
40
40
3
4
47
7
40
35
46
RCP
36"
4
3
6
40
3
5
4
0
35
4
4
43
41
33
3
8
32
32
N
S-303
W-16
PR
C
S-302
REVISIONS
3
3
34
33
89
U
0
1
.
1
4
O
B
67
=38.
NV
I
5
7
.
1
4
STABILIZED MAINTENANCE BERM
C
O
BF
W-53
D
P
PRA
RI
43
3
6
N
A
TL
E
1
8
"
R
C
P
MILLING AND RESURFACING
ND
A
L
WET
43
41.20
34
W
.5
2
4
.5
3
4
44
S-304
LEGEND
5
2
W-17
45
EXIST. ASPHALT
CURB (TO REMAIN)
10
B-
S-316
UM
0
6
.
1
4
CS-1
D
L PON
B/
5
3
7
3
PT
46
4
3
45
42.00
34
33
43
44
ND
A
L
WET
W-18
E
RET
CONC
Y
WA
L
L
SPI
41
42
36
29
8.
+8
3
40
.
TA
S
4
1
.
4
0
34
34
PC
39
36
3737
44
39
4
3
ND
A
L
WET
CPP
24"
41
39
4
2
3
4
37
MASTER STORMWATER POND
POND BOTTOM EL. 25.0
W-52
41
3
6
W-19
42
42
41
W-51
36
9
B35
R
C
P
5
3
40
39
W-49
L
L
D WA
HEA
88
9.
OP=3
T
53
=36.
NV
E I
4
4
O
BF
38
RR
I
RR
I
ER
MET
A
I
2' D
SE
E
T
1BA
RE
4
CONC
41
CPP
24"
W-50
41
37
37 W-48
UM
44
43
4342
O
12
36
1
8
"
4
4
.
0
0
RCM
44
ER
MET
A
I
2' D
SE
E BA
RET
CONC
12
42
42
R
C
P
99
6.
+4
4
40
.
TA
S
47
1
8
"
ET
NL
E I
T
A
T GR
A
L
F
34
5.
OP=4
T
94
=39.
NV
NW I
81
=39.
NV
SE I
4
1
4
0
W-47
49
48
47
46
B/L ESLINGER
WAY
O
39
46
46
O
C
L
L
D WA
HEA
62
0.
OP=4
T
77
=36.
NV
NE I
40
Y
GENC
EMER
OUT
PUMP
L
L
D WA
HEA
94
9.
OP=3
T
63
=36.
NV
W I
3
4
39
S
S
PV
C
33.94
12
44
10
O
8
B-
W-20
34.06
44
ET
NL
E I
T
A
T GR
A
L
78
F
1.
OP=4
T
75
=39.
NV
NE I
94
=36.
NV
SW I
44
S-315
44
38
38
12
"
44
S
45
NEL
PA
ROL
CONT
W-21
ASPHALT PARKING AREA
46
39
E
VT
34.18
34.30
39
38
8
3
46
AR
46
36
45
C
PV
ON
I
T
A
T ST
F
I
L
N.T.S.
38
44
"
12
LIFT
STATION
SECTION C-C
6
W1-4
44
43 42
44
C
PV
E
NHOL
A
RY M
A
T
NI
14
6.
SA
OP=4
T
02
=37.
NV
N I
84
=36.
NV
SE I
46
42
43
"
12
4
6
R1
80
46
43
28
=40.
NV
I
88
=42.
NV
I
IRR
41
O
BF
S
GA
S-306
16
37
P
V
C
UM
PT
41
86
=40.
NV
I
42
UM
S
1
2
"
T
UL
A
V
30
"R
CP
41
C
8" PV
G
47
C
8" PV
11
B-
W-22
42
D
36
PVC
46
8"
23 46
8.
+4
06
.4
A
ST
L
L
D WA
HEA
93
5.
OP=4
T
90
=44.
NV
SE I
CWL
36
30" RCP
46
S
E
NHOL
A
RY M
A
T
NI
37
6.
SA
OP=4
T
87
=37.
NV
N I
09
=37.
NV
E I
97
=36.
NV
S I
E
NHOL
A
RY M
A
T
NI
82
6.
SA
OP=4
T
72
=37.
NV
W I
85
=37.
NV
NE I
O
36
ET
NL
E I
T
A
T GR
A
L
F
85
5.
OP=4
T
36
=41.
NV
N I
33
=41.
NV
E I
40
PVC
E
NHOL
A
GE M
NA
I
35
6.
DRA
OP=4
T
02
=41.
NV
NE I
E
BL
I
CESS
NA
=I
NV
08
.
0
SE I
=4
NV
SW I
05
=41.
NV
I
W
30" RCP
4'
46
IRR
ND
A
L
WET
39
40
38
8"
47
24
41
12
B-
43
O
38
O
4
7
1
:2
ER
MET
A
I
2' D
SE
E BA
RET
CONC
6
4
S-305
41
36
3
6
42
42
41
44
43
47
5
W1-4
41
69
7.
09+5
TA.4
POT S
8
4
6
4
3
4
S
A BA
N
IT SE
A
A
V
R D
D
IC
O
IN DI Y
2
IT TIO SE N
Y
E
W
N
TH AL ER XP
E
A
M
S RI
T
E
A
H
N
W
N
O
L
O AS H O U L CE
C
,
D
L
A
T
TE U N E
4 H H
I
A
D
B N 1 AV E
L
TH E
E
A
TO IS
N
44
36
42
S-308
42
46
37
W-23
ET
NL
E I
T
A
T GR
A
L
F
90
4.
OP=4
T
23
=42.
NV
SW I
SOD
O
14
7
3
41
52
B
E
6
3
44
49
EXIST. GROUND
44
33
'
12
'
20
' 4
W-24
W-32
8
3
W-31
45
39
47
46
15
'
8
3
37
39
39
38
RCP
39
BO
UN
DA
RY
45
44
30"
39
W-25
W
ET
LA
ND
EXIST. FENCE
39
RCP
IRR
4
W1-4
13
B-
46
44
43 42
46
30"
W-33
40
3
W-30
7
VT
43
409
38
3
W1-4
S-322
36
51
50
48
PVC
Y
WA
8
ER
40
ING
L
ES
3
7
3
8
W-29
100
Feet
T
UL
A
ND
V
WI
UGE
GA
E
S-314
37
35
T
UL
A
V
48
BY
ROL
CONT
ER
T
A
OR W
F
PUMP
S
48
DATE
0 20
40
W-34
41
W-28
36
52
48
4
9
P
RC
ET
NL
E I
T
A
T GR
A
L
F
13
7.
OP=4
T
55
=41.
NV
N I
51
=41.
NV
E I
28
=41.
NV
S I
38
42
40
39
02
=38.
NV
I
37
2
W1-4
4
1
38
41
51
47
8"
"
12
2
4
7
4
45
E
NHOL
A
RY M
A
T
NI
73
7.
SA
OP=4
T
51
=38.
NV
N I
33
=38.
NV
S I
W-27
44
BO
UN
DA
RY
39
41
42
39
W-26
86
.
98
7+
40
.
A
ST
PC
RCP
18"
JOHN E. POLK
CORRECTIONAL FACILITY
S-307
39
W-35
4
6
40
43
W-36
45
A
42
40
8
"
42
43
41
45
4
7
46
46
51
48
42
S-312
44
36
24"
RCP
6" RCP
49
44
43
42
WE
T
L
AN
D
4
3
42
43
4
4
49
43.5
N
43
W-41
38
48
47
47
46
46
W-37
51
50
SEMINOLE COUNTY
CRIMINAL JUSTICE
CENTER
W-40
52
44
S-313
W-39
42
43
41
87
5.
08+7
TA.4
PT S
41
1
4
S-309
44
45
44
RCP
44
43
21
44
82
=41.
NV
I
44
48
48
47
15"
L
L
D WA
HEA
45
4.
OP=4
T
86
=38.
NV
NW I
15
=38.
NV
NE I
18" RCP
ET
NL
E I
T
A
T GR
A
L
F
95
1.
OP=4
T
18
=39.
NV
S I
10
=40.
NV
N I
42
43
RC
P
S-311
L
L
WA
30
0.
OP=4
T
95
=36.
NV
N I
4HEAD
5
W-38
43
41
24
"
E
E
NHOL
A
RY M
A
T
NI
SA
67
3.
OP =4
T
90
=40.
NV
I
N
82
=40.
NV
SW I
6
4
P
V
C
S
S-310
24" RCP
C
8" PV
S-321
FIVE POINTS COMPLEX
CONNECTOR ROADWAY
00265503
Figure 7
FIVE POINTS COMPLEX
CONNECTOR ROADWAY
P
O
N
DG
R
A
D
I
N
GS
H
E
E
T
SHEET
NO.
21
D
"
8
1
P
C
R
RC
P
VAULT
SW
I
NV= 42.
23
TOP= 44.
90
NW
HEAD
R
C
P
W ALL
2
4
"
TOP= 44.
45
I
NV= 38.
86
I
NV= 41.
82
18" RCP
NE I
NV= 38.
15
FLAT GRATE I
NLET
W - 22
W - 23
W - 25
GRAVEL PARKI
NG
CONCRETE (TYPI
CAL)
W - 26
N
E
A
H
T E
V S
,
E
E HA HI B
C
T
N
O
T
IE LD IN
R
E
E OU E
L
P
X SH O L AB
E
N
H
R
U
N
N
O WE MA S
D
A TE
D SE L
W
A
E
A
S Y
T OC
N
A
B AR TIO H A L
T
IT DI
N
A AD ITY
S
IN
IC
V
W - 24
W - 27
B-12
W ETLAND
TOP= 41.
95
I
NV= 40.
10
S I
NV= 39.
18
N
W - 28
NG
PARKI
GRAVEL
I
NV= 38.
02
FLAT GRATE I
NLET
E
6:
00:
00 PM
GATE
C
V
P
I
NV= 40.
86
30
"
"
8
C
V
P
W - 29
S
I
NV= 40.
90
= 43.
67
N
I
NV= 40.
82
TOP
SANI
TARY M ANHOLE
SW
A
P
P
R
O
X
IM
A
TE
0
W
2
A
/
TE
0
2
R
/
2
L
0
IN W - 30
1
E
6
A
E
S
L
E
L
V
O
A
TI
C
A
O
TE
N
D
=
O
3
N
6
.8
"
2
1
C
PV
12"
GE
ED
C
V
P
OF
NT
ME
VE
PA
B-7
"
8
1
P
C
R
D
N
LA
ET
W
RY
DA
N
U
BO
B-2
D
B
O
U
N
D
AR
Y
B-13
W
E
TL
AN
W - 37
NT
EME
V
A
F P
E O
EDG
D
TE
A
C
O
L
S
.8
A
6
3
E
N
I
=
L
R ON
TE TI
A
A
V
W
E
L
E
TE
A
6
M
I
1
X
0
O
2
R
/
P
2
P
0
A
/
2
0
18" RCP
N
O
D
AR
Y
TOP= 41.
95
S I
NV= 38.
20
W - 39
W ALL
I
NV= 36.
95
TOP= 40.
30
HEAD
N
W - 41
W - 35
B-11
W ETLAND
W
ET
LA
N
W - 32
D
ND
AR
Y
U
BO
W 1- 42
Y
AR
ND
W - 62
W - 63
PB-7
W - 64
20
5
D
AN
TL
WE
W - 33
W - 34
BO
U
W - 57
B-4
W - 58
W - 66
W - 65
B-9
W - 56
W - 59
W - 60
I
RR
I
RR
16
O
SE
M
M
U
I
N
L
O
LE TI
PL
CO E
S
U
TO
N
RY
TY
CL
B
ER U I
LD
K
I
N
O
G
F
CO
U
W 1- 43
W 1- 44
W 1- 45
2' DI
AM ETER
CONCRETE BASE
W 1- 46
W - 47
W - 48
RT
S
O
14
=
E
CONTROL
GAUGE
WI
ND
W ATER
VAULT
PUM P
FOR
12
O
W ALL
W - 49
SI
GN
COURT HOUSE PARKI
NG
W - 52
W - 50
W - 51
HEDGE
6" BOX CURB
COURT HOUSE PARKI
NG
W - 53
E I
NV= 36.
53
TOP= 39.
88
HEAD
12
O
CONCRETE BASE
2' DI
AM ETER
PAVEM ENT
ASPHALT
I
RR
VT
LA
NDSC
API
NG
ON
36.
8
LI
NE AS LOCATED
W - 54
W ETLAND
02/02/2016 ELEVATI
ON
APPROXI
M ATE W ATER
W - 55
AB-4
W - 61
B-5
AB-5
SHEET
FLAT GRATE I
NLET
W ETLAND
W - 31
W - 36
W - 40
W - 38
N
T
L
W
AL
K
N:
\Project
s\SMC1
6029 Fi
ve Poi
nt
s\1
1
1
1
1
1
1
1
256\drai
nage\PDPLRD04.
dgn 8/21
/201
7
I
NV= 41.
05
I
NV= 40.
08
30" RCP
"
8
B-8
2
1:
SW
W
S
W - 21
W ETLAND
B-1
6
1:
N
NE I
NV= 41.
02
TOP= 46.
35
DRAI
NAGE M ANHOLE
SE I
NV= I
NACESSI
BLE
I
NV= 37.
72
TOP= 46.
82
SANI
TARY M ANHOLE
W
NE I
NV= 37.
85
8" PVC
I
NV= 40.
28
W - 20
N
D
AR
Y
15
1:
S I
NV= 41.
28
W ALL
SE I
NV= 44.
90
TOP= 45.
93
HEAD
DRY POND
CONTROL PANEL
OUT
EM ERGENCY
PUM P
W - 19
U
15" RCP
I
NV= 41.
55
TOP= 47.
13
FLAT GRATE I
NLET
E I
NV= 41.
51
N
O
24
38
O
30" RCP
VAULT
UM
GAS
BFO
I
NV= 42.
88
E
S
LI
FT STATI
ON
VT
AR
S
W - 18
B-10
B
O
N
U
B-3
B
O
U
A
V
LT
ASPHALT PARKING AREA
NO.
E.
,P.
TRA
MS
D W.HA
I
V
DA
8" PVC
PV
C
W - 17
W - 16
D
W- 9
U
D
W - 67
U
A
V
CONNECTOR ROADWAY
S
12
"
SE I
NV= 39.
81
I
NV= 39.
94
TOP= 45.
34
T
AL
PH
NT
AS
ME
VE
PA
FLAT GRATE I
NLET
NW
ASPHALT
PAVEM ENT
CURB
RI
PRAP
I
NV= 38.
67
E
TL
AN
W - 10
W- 7
W- 8
B
O
W- 3
ET
LA
N
D
E
P
R
E TO
V
S
O
C S
U
B
0
7
7
.27
N NO
O
ZATI
RI
F AUTHO
ATE O
C
FI
ERTI
C
COUNTY CIP NO.
ROAD NAME
CU
RB
22
FIVE POINTS COMPLEX
00265503
8
0
DA 327
RI
O
S,FL
NG
NTER SPRI
WI
FUTURE CORRECTIONAL
ASPHALT
CURB
W
D
AR
Y
W - 13
W - 11
W
D
W- 6
W
15
9
TE 30
,SUI
34
AD 4
1WEST STATE RO
30
BO
X
6"
Feet
E
D
P
G
A
V E
E
M OF
E
N
T
ASPHALT
PAVEM ENT
W - 14
W ALL
AB-2
I
NV= 36.
34 W - 12
TOP= 38.
15
HEAD
SW
W- 4
W- 5
ET
LA
N
AB-3
W- 2
W - 68
W- 1
15
TY
R
N
VE
U
R
PA
O
L
TE
C
TE
W AL
RE
EN
S
:
C
LE
NC
NG
N
O IN T S
CO
NI
I
G
N
TA
SI M I PO O N
RE
I
SE
AT
VE
FI ER
P
O
FLAG POLE
G
VA
U
L
T
1:15
Figure 8
BO
UN
DA
RY
ENGINEERING DIVISION
2
5
6
.38
ATE NO
C
FI
ERTI
NEER C
I
NAL ENG
O
FESSI
PRO
ASPHALT
R
C
P
36.
84
PB-6
G
15
IN
AP
C
S
D
PB-8
N
LA
15
15
U
M
SEMINOLE COUNTY
CRIMINAL JUSTICE
CENTER
RY
ND BOUNDA
A
L
T
WE
5
.
3
4
WETLAND BOUNDARY
FIVE POINTS COMPLEX
CONNECTOR ROADWAY
WETLAND IMPACTS
PEGASUS ENGINEERING, LLC
AB-1
2
4
"
GAS
W ALL
TOP= 40.
11
HEAD
NE I
NV=
HEAD
W ALL
DRY POND
PB-4
W ALL
I
NV= 45.
59
43.
03'
O
F
CO
N
CR
ET
P
E
AV
W
EM
AL
K
EN
T
G
R
A
V
E
L
WE
T
LA
ND
O
F
O
F
D
ED
G
E
E
D
G
E
G
R
A
V
E
L
G
R
A
V
E
L
W - 15
G
UM
W ALL
I
NV= 38.
40
= 42.
21
I
NV = 38.
36
TOP
W
HEAD
NW
15
CONCRETE
SPI
LLW AY W I
TH
DI
SAPATER
DRY POND
SW
TOP= 49.
03
HEAD
DSC
APE
D
GRAVEL PARKING AREA
B
F
O
D
A
R
Y
N
U
B
O
C
U
R
B
E
N
T
E
T
L
A
N
W
P
A
V
E
M
35
1:2
CO
N
CR
ET
E
L
E
V
DGE OF GRA
E
F
O
18" RCP
SI
GN
PB-1
W ALL
18" RCP
LAN
S89°
59'
46"E
18
UM
P
AK
R
I
N
G
B
O
X
6"
R
ES
ER
VE
D
5
2
9
.7
2
'
E
D
G
E
200
HEAD
I
NV= 46.
29
TOP= 50.
24
LT
A
T
H
EN
SP
A
EM
V
A
P
I
NV= 45.
84
UM
1:6
W
E
TL
AN
D
CO 2'
DI
NC
RE AME
TE
TE
BA R
SE
N
4
0
°4
3
'1
4
"E
AL
K
W
5
.
2
4
B
O
U
N
D
AR
Y
G
AG
SAS
CWL
BO
U
N
DA
RY
3
4
3
.5
0
'
37
W
ET
LA
N
D
N
4
0
°4
3
'1
4
"E
ASPHALT
W
CONCRETE
TOP= 49.
97
NE I
NV= 45.
71
SW
N00°
00'
14"E
R/W LINE
PAVEM ENT
18" RCP
PB-2
PB-5
15
ASPHALT
PAVEM ENT
LANDSCAPED
FLAT GRATE I
NLET
V
A
UL
T
PAVEM ENT
= 49.
64
T
UL
VA
OHL
PB-3
18
E
D
G
E
JOHN E. POLK
CORRECTIONAL FACILITY
NLET
E I
FLAT GRAT
40
TOP= 41.
88
NV= 38.
SE I
TOP
E I
NV= 46.
74
ASPHALT
PAVEM ENT
GROUND FEED
UM
SI
GN
EDGE OF PAVEM ENT
6" BOX CURB
6" BOX CURB
O
ENGINEER OF RECORD:
REVISIONS
FLAT GRATE I
NLET
WI
TH
BFO
18
LT
A NT
H
P ME
S
A VE
A
P
UM
25
B
F
BO
F
G
R
A
V
E
L
A
P SP
A
V HA
E
L
M
E T
N
T
ECT
J
END PRO
5
9
.
3
+5
6
0
A.2
ST
REAGAN CENTER
COMPLEX
E
N
T
P
AV
E
M
CONNECTOR RD.
6" RCP
24"
RCP
B
F
O
E
N
T
P
AV
E
M
MASTER STORMWATER POND
POND BOTTOM EL. 25.0
POINTS COMPLEX
8" PVC
50.
00'
C/L CONST. FIVE
ON
WE
T
L
A
ND BOUNDA
RY
O
F
B
LANDSCAPED
ASPHALT
PAVEM ENT
EDGE OF PAVEM ENT
BFO
RC
P
B/L POND
24
"R
CP
20
'
12
'
152.
5'
O
F
B
FO
VA
UL
T
E
D
G
E
17'
24"
RCP
T
R
A
S
C
H
A
N
3
4
3
.5
0
'
A
LK
W
DESCRIPTION
BY
DATE
N
4
0
°4
3
'1
4
"E
C
O
N
C
R
E
TE
C
O
N
C
R
E
TE
(B US
Y
O 17
T H 9
E 2
R
S
)
R/W LINE
RC
P
I
S
L
AN
D
5
0
3
EXIST. POND
CM
P
18
"
15
'
WET
L
A
ND
BOU
NDA
RY
100
0 20
FACILITY EXPANSION
9
0
3
VAULT UM
A
L
K
W
18
"
G
R
AS
S
18
"
C
O
N
C
R
E
TE
C
O
N
S
C
P
I
LL RE
T
W
A E
Y
RC
P
18
"
25
B-6
NT
ME
E
V
DGE OF PA
E
CWL
33
'
DGE OF
E
NT
ME
E
V
PA
1:
2
RY
UNDA
ND BO
A
L
WET
37
35
NLET
E I
FLAT GRAT
12
TOP= 43.
28
NV= 40.
E I
ECT
J
N PRO
BEGI
8
2
.
2
+1
0
0
A.2
ST
AP
PR
02
OX
/0
I
M
2/
AT
E
20
W
16
AT
ER
EL
EV
AT LI
N
I
ON E A
S
=
L
36 OC
AT
.
8
ED
Y
NGER WA
I
ESL
1:
6
T
1:
15
5
.
43
5
.
42
A
S
P
A P
H
V
E
A
M
L
E T
N
RC
P
30
"
POINT
WETLAND IMPACT = 9.90 ACRES
LIFT
STATION
PAVEM ENT
LEGEND
C
PV
12"
"
8
1
P
C
R
UM