SPL-2017-00015-CHB Easement for Recycled Water Line

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The City of Corona’s Department of Water and Power (DWP) is requesting implementation of its Proposition 1–funded Reclaimed Water Distribution System Project, which includes the overall installation, operation and maintenance of approximately 73,400 lineal feet of 8-inch to 20-inch diameter recycled water pipelines, and two 2.1 million-gallon recycled water storage tanks. It is anticipated that the Project would be implemented in five phases. Phase 1, the only portion requiring Federal/Corps approval, would include approximately 2,000 lineal feet of 20-inch diameter recycled water pipeline to be installed on Federal land, and 5,000 feet total between the Western Riverside County Regional Wastewater Authority’s facilities at 14634 River Road in the City of Eastvale to its intersection with Bluff Street in the City of Norco

The City of Corona’s Department of Water and Power (DWP) is requesting implementation of its Proposition 1–funded Reclaimed Water Distribution System Project, which includes the installation, operation and maintenance of approximately 73,400 lineal feet of 8-inch to 20-inch diameter recycled water pipelines and two 2.1 million-gallon recycled water storage tanks.Phase 1 is the only portion requiring Federal/Corps approval (easement) andincludesapproximately 2,000 lineal feet of 20-inch diameter recycled water pipeline to be installed on Federal land outgranted by Riverside County Open Space District and locatedbetween the Western Riverside County Regional Wastewater Authority’s facilities near River RoadDrive,City of Eastvale. The waterline would continue on City streets to an existing facility at Bluff Street,City of Norco, and the water then sent to Corona for use in parkland irrigation. A draft Environmental Assessment is attached to this notice and the public is invited to providecomments or ask for more information, by sending to carvel.h.bass@usace.army.milor by calling 213-452-3392 during the time period December 21, 2017-January 22, 2018.

U.S.ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT Draft FINDING OF NO SIGNIFICANT IMPACT Approval for Easement to Construct, Operate, and Maintain a Recycled Water Line Prado Flood Risk Management Basin Riverside County CA I have reviewed the attached Environmental Assessment (EA) which was prepared to describe and analyze effects should the U.S. Army Corps of Engineers (Corps) approve the proposal by the City of Corona, a Recreation lessee, for a 25-year easement, across recreationoutgranted land which the Corps controls. The easement would allow the City to construct, operate, and maintain a segment of a buried, 20-inch recycled water line within the Prado Dam Flood Control Basin, from Western Riverside County Regional Wastewater Authority (WRCRWA)'s Treatment Plant to Baron Road, City of Eastvale. After leaving Federal land, the line would enter City streets and extend to a location in Norco where Corona would receive the water for use in its recreational parkland, much of which is also Federal land under the Corps recreation outgrant to Corona. The Corps will issue a 25-year easement to City of Corona to build, operate, and maintain the proposed waterline segment, which crosses Federal land at the Crossroads Riverview Park which is operated (presently not in operation) by a concessionaire with Riverside County Open Space District under a recreation outgrant from the Corps. Corona's purpose in contacting the Corps was to obtain permission to construct the initial segment of the proposed waterline, which originates and ends on non-Federal property but would cross Corps-controlled areas. Corona, as a member-partner within the WRCRWA, sought a feasible route from the Treatment Plant to facilities, in Norco, where Corona could receive water for its irrigation purposes. The water will benefit Corps-owned parkland which is managed under Corona's Recreation license with the Corps. The purpose of the draft EA, submitted for public review during December 21, 2017 January 22, 2018, was to determine whether Proponent's request for approval of the proposed line would result in significant environmental impacts which might require development of an Environmental Impact Statement. A No-Action Alternative as part of baseline conditions analysis was evaluated in the EA, and several additional alternatives, examined in previous CEQA documentation were also described herein, but discarded from further analysis, in comparison with the Preferred Alternative. Resources identified as potentially affected by the Proposed Action are described in the EA. The State Historical Office and Tribes, and the U.S. Fish and Wildlife Office were consulted. Although no significant adverse impacts were identified, environmental commitments listed in the EA are expected to continue to avoid and minimize adverse impacts associated with any proposed operations. The proposal does not contribute significantly to cumulative or other impacts.

I have determined that implementation of the Proposed Action (Preferred Alternative) as requested by the Proponent is in compliance with Section 106 of the National Historic Preservation Act, the Endangered Species Act, Migratory Bird Treaty Act and other Federal laws and Executive Orders described in this EA, and that there are no significant adverse impacts on any federal resources resulting from approval and implementation of the Preferred Action/Onsite Alternative requested by the Proponent. After consideration of the significant factors and all pertinent environmental legislation, and in addition to comments received and other coordination with concerned agencies, as discussed in the EA, I have determined that implementation of the Preferred Onsite Alternative requested by the Proponent, together with the environmental commitments and mitigation requirements, will not significantly affect the quality of the human environment nor would there be significant adverse environmental effects. Therefore, an Environmental Impact Statement will not be required and the Preferred Onsite Alternative is approved for implementation pursuant to 33 CFR 230.11.

Prepared by:

________________________ Carvel Bass Ecologist, Civil Works Branch Asset Management Division

________________________ Date

Approval Recommended by:

________________________ Cheryl L. Connett Chief, Asset Management Division Real Estate Contracting Officer

________________________ Date

Approval by:

________________________ Kirk E. Gibbs Colonel, U.S. Army Commander and District Engineer

_________________________ Date

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

DRAFT ENVIRONMENTAL ASSESSMENT

EASEMENT FOR THE WRCRWA RECYCLED WATER LINE WRCRWTP TO BLUFF STREET, NORCO, CA

PRADO DAM BASIN, CORONA RIVERSIDE COUNTY, CALIFORNIA

U.S. Army Corps of Engineers Los Angeles District December, 2017 1

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

1 Introduction The City of Corona's Department of Water and Power (DWP) is requesting implementation of its Proposition 1­funded Reclaimed Water Distribution System Project, which includes the overall installation, operation and maintenance of approximately 73,400 lineal feet of 8-inch to 20-inch diameter recycled water pipelines, and two 2.1 million-gallon recycled water storage tanks. It is anticipated that the Project would be implemented in five phases. Phase 1, the only portion requiring Federal/Corps approval, would include approximately 2,000 lineal feet of 20-inch diameter recycled water pipeline to be installed on Federal land, and 5,000 feet total between the Western Riverside County Regional Wastewater Authority (WRCRWA facilities, a regional water treatment plant, to cross River Road (Figure 1-1). As shown on Figure 1-1, the Proposed Project area includes mixed uses (e.g., residential, commercial and open space). It is accessible via River Road from State Route 91. The Federal portion of this proposal is shown, below, from its exit at the treatment plant's mid-eastern area then extending on Federal land, until leaving Federal land and the scope of this document, traveling eastward to reach Baron Drive and then River Road, and terminating at Bluff Street in Norco (see Bluff Street in Figures 2.2.2-1 and 2.3.2-1).

Figure 1-1 Recycled Water Line Preferred Alignment (purple) on Federal land, showing southeast exit from treatment plant

As seen above, the proposed alignment would exit the WRCRWA Wastewater Treatment Plant site and would cross Federal lands administered by the U.S. Army Corps of Engineers (Corps) between the Treatment Plant site and Baron Drive, a distance of approximately 2,000 lineal feet. The pipeline would then follow public street rights-of-way (Baron Drive and River Road) to the intersection of River Road and Bluff Street. At the Santa Ana River crossing, the pipeline would be installed within an existing, dedicated space within the River Road Bridge structure.

2

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment The crossing of federal land west of River Road Bridge requires that DWP acquire an easement from the Corps. The granting of the easement would be considered a Federal action. Additional phases of the proposed construction activity involves no Federal land and will not be considered here. The National Environmental Policy Act (NEPA) requires that Federal agencies consider potential environmental consequences of implementation of proposed actions. (The same requirement is triggered when a Proposed Project requires a Federal permit and/or is aided by Federal funding.) NEPA's intent is to ensure that project proponents protect environmental quality through informed Federal decisions. The Council of Environmental Quality (CEQ) was established under NEPA for the purpose of implementing and overseeing Federal policies as they relate to this process. In 1978, the CEQ issued Regulations for Implementing the Procedural Provisions of the National Environmental Policy Act (40 CFR §1500-1508, 1978). These regulations indicate that an Environmental Assessment (EA) be prepared to:

Briefly provide sufficient analysis and evidence for determining whether to prepare an environmental impact statement (EIS) or a Finding of No Significant Impact (FONSI);

Aid in an agency's compliance with NEPA when an EIS is necessary; and

Facilitate preparation of an EIS when one is necessary.

Further, to comply with other relevant environmental requirements (e.g., Endangered Species Act (ESA), National Historic Preservation Act (NHPA), Clean Air Act (CAA), Clean Water Act (CWA), etc.,) in addition to NEPA, and to assess potential environmental impacts, the impact assessment and decision-making processes for the proposed action involves thorough examination of all environmental issues pertinent to the Proposed Project. Specific to U.S. Army programs, compliance with NEPA is effectively ensured by implementing policies and procedures outlined in Army Regulations (AR) 200-1, Environmental Protection and Enhancement Regulations, 200-2-2, Procedures for Implementing NEPA, and in 33 Code of Federal Regulations, Part 230, et seq. The Corps is the Lead Agency for this draft EA (dEA) because the Proposed Project area involves facilities and land controlled by the Corps. The dEA evaluates the potential environmental impacts that could result from implementation of the Proposed Project, which is described in Section 1.2. Reasonable alternatives to the Proposed Project have been considered during the planning process (see Chapter 2) and potential environmental consequences of these alternatives have been included in the evaluation (see Section 2.2).

Section 1.1 Project Authority, Purpose, and Scope Authority The United States Corps of Engineers (USACE) pursuant to 10 U.S.C. 2667 (Lease) and/or 10 U.S.C. 2668 (Easement for Right-of-Way) is authorized to permit non-Federal entities the right to use Federal lands if the proposed use is determined to be compatible with the Federal project, laws, regulations and serve the interests of the public and/or the Federal government. Purpose and Need 3

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment The City of Corona holds a Recreation outgrant with the USACE, in its western areas on Federal land associated with Prado Dam which is operated for flood risk management by the Corps. These outgranted areas, which are owned by the Federal government, include a number of City parks as well as the Corona Municipal Airport, all of which use recycled water in their landscape irrigation. In other words, both Federal (Corps-owned) and non-Federal (Corona-owned) lands will benefit from access to additional recycled water for the local parklands. To conserve potable water, and to provide recycled water necessary to facilitate City park irrigation needs, the construction of additional recycled water facilities is necessary. Corona is requesting a new easement for this waterline to cross Federal open space on land currently leased for Recreation (Crossroads Riverview Park) by Riverside County, to connect at Corona's existing recycled waterline connection in Norco, Riverside County, CA. The proposed waterline path would closely parallel Norco's existing buried waterline which also runs from the treatment plant to Baron Drive. The background for the City's need in requesting a Corps easement, is that consistent with WRCRWA's Resolution No. 97-38, each member agency (such as the City of Corona) shall have the right to take delivery of and use recycled water from WRCRWA's facilities, an amount of recycled water treated and produced by WRCRWA's facilities as determined by WRCRWA annually, not to exceed the amount of reclaimable wastewater delivered by the member agency to WRCRWA's facilities for treatment less any amount consumed during the course of the operations of WRCRWA's facilities. The Corps' land management purpose is to review such proposals as the current one, for the easement to install, operate and maintain such a pipeline as described, for consistent and appropriate Corps land use. The Federal need is to determine whether the request is in the interest of the public and the Corps (/Federal government), and to process the request to occupy/use Federal lands in a way that prioritizes compatibility with the existing Federal Flood Risk Management Project (Santa Ana River Mainstem Project, including Prado Basin and Dam). The purpose of this draft Environmental Assessment (dEA) is to evaluate any potential impacts associated with the United States Army Corps of Engineers (USACE/Corps) granting the requested recycled waterline easement, to City of Corona, and in subsequent construction, use, and maintenance of the recycled waterline as proposed. City of Corona's stated purpose in this matter is to:

Decrease the amount of recycled water that cannot be beneficially used within the service area of the WRCRWA, of which the City of Corona is a member agency.

Increase the amount of recycled water that can be beneficially used thereby decreasing the amount of potable water that is currently being used for non-potable uses.

Decrease the amount of imports from the State Water Project and Colorado River Aqueduct.

Improve the reliability of landscape irrigation water supplies at Corona's landholdings, both Federal and nonFederal holdings.

The City of Corona's stated need for the Proposed Project is that the pipeline is the critical link to the supply of reclaimed water for its reclaimed water distribution system. While other potential routes do exist between the Treatment Plant 4

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment water source and Corona's existing connector location in Norco, each of those alternatives has major and disadvantageous constraints when compared with the proposed route introduced in this draft EA. Examples of these constraints include the need for significantly longer pipeline construction footprints on additional private or public lands as well as restricting construction to significantly more constrained spaces within the Treatment Plant's water source location itself. Scope of Analysis This Environmental Assessment (EA) analyzes likely effects of the proposal by comparing a No Action Alternative, with the proposed action, which would provide for an easement on USACE-owned properties that would ultimately be used for development of the recycled waterline. This analysis is offered to the interested public to solicit input on the project and would be made available for review and public input for 30 days. Comments regarding this proposal should be addressed to the USACE at the address provided on the accompanying public notice information. Following the 30-day review period, the USACE's Asset Management Division will determine if an Environmental Impact Statement (EIS) will be required or if a Finding of No Significant Impact (FONSI) can be issued.

1.2 Proposed Project Description ­ Federal Action As proposed (Preferred Alternative), the Federal Action consists of the Corps granting a 25-year easement to the project proponent (City of Corona DWP), because the City's preferred route would cross Federal land controlled by the Corps. The waterline would originate from within the Western Riverside Wastewater Treatment Plant and then cross adjacent Federal land currently leased for Recreation (Crossroads Riverview Park) by Riverside County, then follow and continue on non-Federal, public street rights-of-way to an existing connection location in Norco, CA near City of Corona's northwest boundary. This proposed easement of approximately 2,000 lineal feet would allow the City of Corona to construct, operate and maintain an essential link in its reclaimed water distribution system. (Note that the Riverview Park and the proposed project footprint area is generally closed to the public, except for rare, special events held elsewhere in the Park).

2 Alternatives This section presents alternatives which were considered, including the Preferred Action Alternative and a No-Action Alternative which are carried forward for analysis, as well as alternatives which will not be carried forward. To best meet the City's Purpose and Need, a portion of the pipeline would cross Federal land controlled by the Corps and this Preferred Alternative would consist of the Corps granting an easement to the proponent, City of Corona DWP. The maintenance of Federal lands now managed in recreational parkland and sports fields by Corona, would benefit from this new source of recycled wastewater for its annual irrigation needs.

2.1 No Action Alternative

5

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment CEQ regulations implementing NEPA require that a No Action Alternative be analyzed to provide a baseline for comparison with action alternatives. The No Action Alternative identifies and describes the potential environmental impacts of the status quo (i.e., if the Corps did not grant the easement for the construction, operation and maintenance of the proposed 20-inch diameter reclaimed water pipeline across Federal land). However, because CEQ regulations stipulate that the No Action Alternative be analyzed, to assess environmental consequences that may occur if the Proposed Project is not implemented, this alternative is also carried forward for analysis in this dEA. Under the No Action Alternative, the proposed 20-inch diameter pipeline would not be constructed, operated and maintained via an easement to cross Federal lands. In this case, there would be no construction or maintenance footprint on the approximately up to 2,000 lineal feet of Federal land, as proposed. Corona would be faced with different constraints in its ability to construct a pipeline to utilize this valuable source of reclaimed water. Corona has already submitted this proposal to a CEQA analysis and because of the constraints, indicated below, both the City and Treatment Plant would be limited in developing a significantly feasible alternate to the Preferred Alternative. Under the No Action Alternative, with no use of Federal land, the City would be less able to supply its customers with reclaimed water and may have to meet future demands using additional, more expensive potable water, which is mostly imported from the State Water Project and the Colorado River Aqueduct.

2.2 Description of Action Alternatives The following three (3) action alternatives were initially evaluated for the Proposed Project.

2.2.1 Preferred Alternative (or Alternative 1) The Preferred Alternative (shown previously on Figure 1-1) consists of approximately 2,000 lineal feet of Federal land to be used for a total 5,000 lineal feet (LF) of 20 inch-diameter recycled water pipeline to be installed from the Western Riverside County Regional Wastewater Treatment Plant to the City's existing reclaimed water distribution system at the intersection of River Road and Bluff Street; see Bluff Street in Figure 2.2.2-1. With the exception of the bridge crossing, the pipeline would be installed through open-cut techniques. At the bridge crossing location, the pipeline would be placed within an existing dedicated space located within the bridge structure. The City is requesting a 20-foot wide, approximately 2,000-foot long, permanent easement from the Corps for the construction, operation and maintenance of the reclaimed water line in this corridor. It is also requesting an additional 20-foot wide temporary construction easement, largely on the existing, unused asphalt road (see Figure 1-1) for installation of the reclaimed water line. The actual trench would be approximately 5 feet wide by 7 to 8 feet deep. A plan and profile drawing of the pipeline across federal lands is provided on Figure 2.2.1-1. Within this portion of the (inactive) Crossroads Park, a portion of the temporary construction easement would partially overlie an existing, littleused asphalt roadway which also parallels a second, similar, existing buried waterline which City of Norco constructed and maintains. The legal descriptions, for the two lines (existing and proposed) are distinct; and Corona and Norco have consulted on developing the proposed line in this area.

6

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

Figure 2.2.1-1 Plan/Profile of Preferred Alternative Crossing Federal Land (Riverview Park), Riverside Co.

2.2.2 Alternative 2 The City of Corona's Department of Water and Power fully analyzed a similar but different alignment for the pipeline between the Western Riverside County Regional Wastewater Treatment Plant and Baron Road. That alignment is shown below on Figure 2.2.2-1. This alternative was fully analyzed in the July 2016 CEQA document (Initial Study and Mitigated Negative Declaration for the Proposition 1 ­ Reclaimed Water Distribution System) as the Phase 1 Project (WRCRWA Reclaimed Water Pipeline) and would avoid Federal land by taking a different route (northeastern) to exit the Wastewater Treatment Plant, if this would be practical and permissible within the Plant itself. However, in contrast with the Preferred Alternative's exit area, Plant managers determined there was no other route, without crossing many other, conflicting internal utility lines within the Plant, whereby a new pipeline could exit the plant at this location as easily as Alternative 1. Because of internal constraints, it is less feasible to actually construct a new line to exit the Plant's northeastern (or other) location. As shown in Figure 1-1, exiting from the Plant as proposed, from the southeast, is a superior route when Plant operations are considered.

7

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

Figure 2.2.2-1 Alternative 2, showing northeast exit from treatment plant but requiring more complex internal plant piping

Thus, Alternative 2 was dropped from further consideration due to impracticality of its construction within the Treatment Plant itself, for it would severely impact existing facilities.

2.2.3 Alternative 3 The City also examined the possibility of exiting the Treatment Plant at the southeast corner of the property and paralleling the westerly property line to River Road and then (as in Alternatives 1 and 2) following Baron Drive and River Road to its intersection with Bluff Street (Figure 2.2.3-1). Although this alternative to exit the Plant is technically feasible, it would add approximately 3,700 lineal feet of pipeline to the alignment and require the acquisition of an easement from private property owners. Therefore, although this alternative alignment would eliminate the need to utilize Federal lands, it was dropped from further consideration due to the extra time and uncertainty involved to acquire the necessary easements as well as higher additional costs associated with additional lengths of pipeline construction.

8

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

Figure 2.2.3-1 Alternative 3: blue line avoids Federal land by going W then N to Baron Dr. (purple shows approximate preferred alignment)

2.3 Preferred Alternative The Preferred Alternative is preferred because it would impose the fewest new environmental impacts and is considerably shorter than Alternative 3, the only other technically feasible alternative. Also, as shown on Figure 1-1, the Federal land route includes existing encroachments (i.e., roads, private 2-inch diameter water line, and the City of Norco's 12-inch diameter recycled water line). This existing utility corridor has already been disturbed. The alignment was also reviewed by the State Office of Historical Preservation which agreed that mitigation measures may be incorporated to ensure that the project will not adversely affect historic properties. .

9

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

2.3.1 Description The Preferred Alternative consists of the Corps granting an easement to the City of Corona to construct, operate and maintain a 20-inch diameter reclaimed water pipeline across Federal land, City of Eastvale, Riverside County. As discussed previously, the requested easement includes a 20-foot wide permanent easement and an additional 20-foot wide temporary construction easement for laydown or other non-ground-disturbing activities. As previously shown on Figure 1-1, the WRCRWA Recycled Water Pipeline would extend across Federal land for approximately 2,000 feet, extending a total of approximately 5,000 lineal feet from the Western Riverside County Regional Wastewater Treatment Plant, located in the City of Eastvale, to the intersection of River Road and Bluff Street, located in the City of Norco. The subject proposed water pipeline would generally parallel a roadway and the City of Norco's existing 20-inch diameter pipeline easement, across the Riverview parkland, from the Treatment Plant to Baron Street. It would then follow Baron Street in an easterly direction to its intersection with River Road. It would then follow River Road in a southerly direction to its intersection with Bluff Street. The pipeline would be a 20-inch diameter ductile iron, Class 350 pipe, fully restrained, dual-wire bonded, cement mortar lined, encased in 2 layers of 8-mil, color purple, polyethylene encasement. It would be installed by the open-trench method with the exception of the river crossing where it would be installed in a dedicated space in the bridge structure.

2.3.2 Construction The anticipated overall flow and sequence of construction activity is described below and includes determining the locations for tying new pipe into existing pipe via potholing, open-trench linear excavation for installation of the new pipeline, hydrostatic testing and tie-in to existing lines, backfill of the trench, and site restoration. (Equipment anticipated to be used for construction activities is described below.) Construction contractors would ensure that the proposed material laydown yard (Figure 2.3.2-1), which is not on Federal land, and all workspaces are clear and ready for construction, by removing brush, trees, large rocks, and other obstructions from the work areas. No sensitive or protected species would be removed under the Preferred Alternative. Topsoil and organic surface material along the alignment would be stripped and stored in the laydown area until the project is complete and the site is ready for restoration.

10

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

+ Figure 2.3.2-1 Proposed Laydown Area

The trench width would be approximately five feet to accommodate the 20-inch-diameter pipe. To maximize safe conditions and minimize confusion among interagency staff, all project field activities would be communicated to and reviewed by the Corps Asset Management staff, including its Operations Branch, prior to initiation. In addition, the City of Corona would provide a Corps-approved construction safety plan, including site safety and communications management aspects, prior to Corps issuance of the real estate easement and any other approvals. Pipe would be delivered to the proposed laydown yard and would be inspected to ensure it meets industry and federal government safety standards. The sections (i.e., joints) of pipe would be strung out along the easement according to the designed material specification (e.g., diameter, wall thickness, grade, and coating). Bending individual joints of pipe would be done where required. The pipe would be positioned along the designed centerline of the trench, aligning it to facilitate welding pipe joints together above the trench. After welding, the weld quality would be inspected for inconsistencies using various inspection techniques (e.g., radiographic or ultrasonic testing), and repair or replacement would be performed if joints fail to meet acceptance requirements of industry specifications. A corrosion-resistant epoxy coating would be applied to the weld areas and to any area where the factory-applied coating has become damaged. Side-boom tractors would then lower the welded joints of pipe into the trench. The new pipeline would be covered with imported and original topsoil to return the site as near to the original condition as possible. The trench would be backfilled with zero slack slurry to provide a minimum of 12 inches of coverage over the top of the pipe. Native soil would then be used to complete backfilling of the trench and would be graded to the site's original contours. All excess soil would be removed from the site. After installation, the new pipeline would be hydrostatically tested to ensure its structural integrity and validate its Maximum Allowable Operating Pressure. This process involves filling the new pipeline segment with water and 11

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment pressurizing the pipe to an applicable pressure for a certain length of time. After a successful test, the new pipeline segment would be tied in and connected to the existing pipeline. Construction equipment involved in project implementation would include the following: Equipment Air Compressors Concrete Saws Cranes Excavators Off Highway Trucks Pavement Breakers Pavers Plate Compactors Sweeper/Scrubbers Tractors/Loaders/Backhoes Water Trucks

Number 1 1 1 1 1 1 1 1 1 1 1

Horsepowera 78 81 226 163 400 126 131 8 64 98 189

Load Factorb 0.48 0.73 0.29 0.38 0.38 0.42 0.36 0.43 0.46 0.37 0.38

Hours per Day 4.0 1.0 1.0 6.0 4.0 1.0 1.0 1.0 1.0 6.0 2.0

Notes: 1 2011 2

OFFROAD default values. Percentage of the engine's maximum horsepower rating that the equipment actually operates.

There would also be two heavy-duty trucks delivering equipment and supplies to the site as well as two pickup trucks utilized by inspectors. In addition, 10 vehicles would be utilized by construction workers commuting to and from the site. Operation of the trucks would be limited to the construction easement or public street rights-of-way. The Preferred Alternative would be constructed over a period of approximately 150 construction days of which approximately 60 days would include work on Federal lands. It is anticipated that construction would commence as soon as the Corps issues the easement to the City of Corona. Approximately 10 workers would be on-site at any one time.

2.3.3 Operations and Maintenance Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline en route to its distribution points. Following the construction phase, and entering the operations and maintenance phases, activity would generally cease and no personnel or routine daily activities would be associated with the site except as otherwise described in the easement language for this Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. Maintenance personnel would confine their activities to the permanent easement for the recycled water pipeline.

12

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

2.4 Alternatives Considered but Eliminated from Further Consideration As described and for reasons provided, above, Alternatives 2 and 3 were eliminated from further consideration, and the environmental analysis in this EA focuses on the Preferred Alternative and the comparative No Action Alternative. The following sections consider the No Action and the Preferred Action Alternatives, both carried forward for analysis.

3 Environmental Impacts and Analysis This section presents the environmental analyses for the Preferred Alternative versus the No Action Alternative.

3.1 Land Use 3.1.1 Baseline Conditions The WRCRWA Recycled Water Line is located within the Santa Ana River Basin in the Cities of Eastvale and Norco in Riverside County. The pipeline would be mostly located within public street rights-of-way; however, a portion of it would cross federal lands controlled by the Corps as part of the Santa Ana River Mainstem Project. 3.1.1.1 Santa Ana River Mainstem Project The Santa Ana River Mainstem Project stretches a distance of approximately 75 miles along the Santa Ana River from its headwaters in San Bernardino County to its mouth at the Pacific Ocean in Orange County. Two main elements of the Santa Ana River Mainstem Project are Seven Oaks Dam in San Bernardino County and Prado Dam in Riverside County. The purpose of the project is to provide flood protection to property and residents along the Santa Ana River. The Preferred Alternative would consist of an underground 20-inch diameter recycled water pipeline which would have no effect on flood control and would therefore be consistent with the Santa Ana River Mainstem Project.

3.1.2 Significance Thresholds For the purposes of this analysis, implementation of the Preferred Alternative would result in a significant effect on land use if it would:

result in the physical division of an established community; conflict with any established, applicable land use plan, policy or regulation of an agency with jurisdiction over the Proposed Project area; or require changes in land use as a result of implementing the alternatives that are considered to be incompatible with the existing land uses at and adjacent to the proposed facilities.

3.1.3 Alternative Analysis

13

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment 3.1.3.1 No Action Alternative Should the Corps not issue the requested easement, the City would not construct the WRCRWA Reclaimed Water Pipeline upon any federal lands. Therefore, the No Action Alternative would not involve any construction activities reviewable under NEPA. The City of Corona may or may not utilize its reclaimed water allotment from the Western Riverside County Regional Wastewater Reclamation Facility and there would be no changes to the existing federal land uses. Specifically, the No Action Alternative would not conflict with any applicable federal land use plan, policy or regulation; or result in changes that would be incompatible with existing land uses at and adjacent to the proposed facilities. 3.1.3.2 Preferred Alternative 3.1.3.2.1 Construction

Construction of the Preferred Alternative would not physically divide an established community because the pipeline would be underground and would be located within the Corps' easement or within public street rights-of-way. Although the pipeline would be constructed mostly within public street rights-of-way, a portion of it would cross federal lands under the control of the Corps. Therefore, it will be necessary for the City of Corona to acquire an easement from the Corps to place the pipeline in this location. Project-related activities are compatible with the existing land use (public street rights-of-way). Construction activities associated with the Preferred Alternative would be short-term and temporary (i.e., lasting approximately 150 construction days) and not interfere with any activities on adjoining federal lands controlled by the Corps. The Preferred Alternative would not conflict with any federal or local applicable land use plan, policy, or regulation or result in changes in land use that would be incompatible with the existing land uses at and adjacent to the proposed facilities. Based on the above, the Preferred Alternative would not result in significant effects on land use. 3.1.3.2.2 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline en route to its distribution points. Following the construction phase, no personnel or daily activities would be routinely associated with the Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such, land use impacts associated with operations and maintenance would be negligible and would not approach any of the significance thresholds previously identified.

14

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment 3.1.4 Environmental Commitments Based on the analysis of potential impacts to land use conditions at and in the vicinity of the Proposed Project, no significant impacts are anticipated; therefore, no mitigation measures or other environmental commitments are proposed.

3.2 Geology and Soils 3.2.1 Baseline Conditions In general, the Project area is underlain by three distinct geologic units; 1) bedrock composed of sediments of Ladd, Silverado, Santiago, Vaqueros-Sespe and Puente Formations; 2) remnants of a widespread terrace of ancient river deposits; and 3) recent alluvium on the floor of the canyons tributary to the Prado Flood Control Basin dating from the Quaternary, Tertiary and Cretaceous periods. The bedrock consists of 3 to 60 million-year old sedimentary rock formations of interbedded conglomerates, sandstones, siltstones and claystones. Southeast of WRF #1 exists a lower bedrock plateau known as the Gavilan Hills. This unit has been uplifted, tilted and folded by movement of the Whittier-Elsinore fault zone, and most beds are steeply inclined at angles greater than 45°. Quaternary Age (less than 2 million years old) terrace deposits overlie and form a cap on the bedrock. Borings indicate that these deposits are more than 40 feet thick. The terrace deposits consist of well-to-poorly consolidated silt, sand and gravel with some boulders. The alluvial deposits, which were deposited during the last 10 million years, are strewn across the floors of the canyons tributary to Prado Flood Control Basin. The alluvial deposits consist mostly of unconsolidated sand with some clay, silt, gravel, cobbles and boulders removed from the mountains as the result of stream erosion and weathering. The maximum known thickness of alluvium is in excess of 35 feet. In general, the alluvium in the upper valley is coarse nearby its source in the upper mountains and becomes less coarse and permeable the farther it is deposited downstream. However, lenses of sand and gravel are present near Prado Dam, at the mouth of the upper valley. 3.2.1.1 Earthquake Faults/Seismicity Several major geologic fault systems are contained in the Southern California region. These faults include the San Andreas, San Jacinto, Sierra Madre, Newport-Inglewood, Whittier- Elsinore and Chino fault systems. The San Gabriel, San Bernardino and San Jacinto Mountains were formed during the late Tertiary and Quaternary periods by both vertical and horizontal movements along the Sierra Madre, San Andreas and San Jacinto faults. Less severe faulting and folding formed the Chino Hills and the Santa Ana Mountains in the Corona vicinity. The largest of the faults affecting the region is the San Andreas Fault, which extends northwest to southeast from the Mojave Desert through Cajon Pass along the southern border of the San Bernardino Mountains through San Gorgonio Pass. Land west of the fault is tending to drift northward relative to land east of it at a rate of approximately one-half to two inches per year.

15

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment The San Jacinto fault branches from the San Andreas zone in the San Gabriel Mountains and extends southsoutheastward into the Imperial Valley. During this century the San Jacinto fault has been the source of seven earthquakes ranging in magnitude from 6.0 to 7.1 on the Richter scale. The Sierra Madre fault system is one of the few east-west lying faults in Southern California. The fault runs along the southern base of the San Gabriel Mountains. The Newport-Inglewood fault extends northwest to southeast along the coastline. The fault stretches from West Los Angeles on the north to the ocean offshore from Newport Beach. The 1933 Long Beach earthquake which measured 6.3 on the Richter Scale occurred on this fault. The Whittier-Elsinore fault system passes through the Santa Ana Canyon about two miles downstream from the Prado Dam. Although considered relatively active, no earthquake greater than 6.0 on the Richter scale has occurred on this fault since 1900. The Elsinore fault system also includes numerous other faults in the Chino Basin that have exhibited seismic activity. The Chino fault, which is a part of the Whittier-Elsinore fault system, parallels Chino Creek along the eastern flank of the Chino Hills and crosses Prado Basin just northeast of Prado Dam. Although no major seismic activity has occurred on the fault recently, the Chino fault zone exhibits signs of being seismically active. Because of this, the fault poses the threat of a potentially catastrophic earthquake. Future earthquakes could cause ground rupture along the Chino fault itself. 3.2.1.1.2 Soils Based on the NRCS USDA Web Soil Survey, the pipeline alignment is underlain by the following soil units: Dello loamy fine sand, Dello loamy sand, Grangeville fine sandy loam, Grangeville loamy fine sand, Grangeville sandy loam, Ramona very fine sandy loam, and Terrace escarpments.

3.2.2 Significance Thresholds A significant geology and soils impact would occur if the Proposed Project:

Significantly increases local soils' exposure to wind and water erosion or loss of topsoil either or- of off-site.

Significantly alters the physical or chemical quality of sediments or soils.

Triggers or accelerates geological processes such as erosion or sedimentation brought about by disturbance of landforms.

3.2.3 Alternative Analysis 3.2.3.1 No Action Alternative If the No Action Alternative were selected, the City of Corona would not use federal land to construct the recycled water pipeline. Therefore, no impacts to geology and soils would occur under the No Action Alternative and conditions would remain as described in Section 3.2.1. 16

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment 3.2.3.2 Preferred Alternative 3.2.3.2.1 Construction

During construction, there would be no permanent or long-term impact on the existing topography or landforms because the topography of the area is generally flat and activities associated with project implementation would be short term and temporary. Conditions would return to those similar to the baseline conditions upon completion of construction. Where excavation occurs along the pipeline alignment, soil would be re-compacted to minimize future erosion. Sedimentation rates would continue, unchanged, in the project area. Furthermore, the site would be subject to the same seismic activity, earthquake fault zones, and areas of liquefaction as under baseline conditions. Therefore, construction activities associated with the Proposed Project would not have significant impacts to local or regional geology and soils, or with regard to any associated risk factors. 3.2.3.2.2 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline en route to its distribution points. Following the construction phase, no personnel or daily activities would be routinely associated with the Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such geology and soils impacts associated with operations and maintenance would be negligible and would not approach any of the significance thresholds previously identified.

3.2.4 Environmental Commitments Based on the analysis of potential impacts to geology and soils conditions at and in the vicinity of the Proposed Project, no significant impacts are anticipated; therefore, no mitigation measures or other environmental commitments are proposed.

3.3 Hydrology and Water Quality 3.3.1 Baseline Conditions 3.3.1.1 Flood Plain Management The Project Area is within FEMA Floodway Areas Zone AE and X. Zone AE is defined as the channel of a stream plus any adjacent floodplain areas that must be kept free of encroachment so that the 1% annual chance flood can be carried without substantial increases in flood heights. Zone X is defined as areas of 0.2% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile and areas protected by levees from 1% annual chance flood.

17

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment 3.3.1.2 Hydrology The Prado Basin is the dominant water feature in the Project Area. It was formed by Prado Dam which is a flood control and water conservation project constructed and operated by the Corps. The original construction was completed in April 1941. It is located at the upper end of the Lower Santa Ana River Canyon, which is a natural constriction controlling 2,255 square miles of the 2,450 square-mile Santa Ana River Watershed. Prado Dam has an existing storage capacity of 362,000 acre-feet (af). It provides flood control between the invert elevation of 460 feet to the spillway elevation of 566 feet. Recent construction included an inlet structure to allow a maximum release of 30,000 cfs. The surface area of the reservoir was also increased to 10,256 acres. The Santa Ana River is the main drainage entering the Prado Basin. Other drainages tributary to the Prado Basin include Cucamonga Creek, Chino Creek and Temescal Creek. The U.S. Geological Survey measures flows in the Santa Ana River in the greater Project Area. The upstream station is at Riverside Narrows and the downstream station is at Prado. These flows for the 1970-71 through 2014-15 water years as reported by the Santa Ana River Watermaster are summarized on Figure 3-1. During the 44-year period of record, the average flows at Riverside Narrows have been 96,807 acre-feet per year and at Prado Dam have been 211, 277 acre-feet per year.

18

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment 700,000

600,000

Flow, acre-feet per year

500,000

400,000

300,000

200,000

100,000

0

Water Year Riverside Narrows

Prado

Figure 3-1 Average Monthly Flows in the Santa Ana River at Riverside Narrows and at Prado Dam

3.3.1.3 Surface Water Quality The Water Quality Control Plan for the Santa Ana River (Basin Plan) includes numerous narrative water quality objectives that apply to all inland surface waters. In addition, the following numerical objectives apply to the base flow1 in Reach 3 of the Santa Ana River. These are as follows: Constituent

Total Dissolved Solids

Hardness

Sodium

Chloride

Total Inorganic Nitrogen

Sulfate

Chemical Oxygen Demand

Boron

Objective (mg/l)

700

350

110

140

10a

150

30

0.75

a Total

1

nitrogen, filtered sample.

Base flow is defined in the Basin Plan as the combination of wastewater, rising water, and non-point sources.

19

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment 3.3.1.4 Prado Basin Management Zone The flood plain behind Prado Dam has unique hydraulic characteristics. Chino Creek, Cucamonga Creek (which flows into Mill Creek) and Temescal Creek join the Santa Ana River behind the dam. Flood control operations at the dam, coupled with an extremely shallow groundwater table and an unusually thin aquifer, significantly affect these surface flows, as well as subsurface flows in the area. Depending on how the dam is operated, surface waters may or may not percolate behind the dam. There is little or no groundwater storage in the flood plain behind the dam. Any groundwater in storage is forced to the surface because the foot of Prado Dam extends to bedrock and subsurface flows cannot pass through the barrier created by the dam and the surrounding hills. Given these characteristics, this area is designated as a surface water management zone, rather than a groundwater management zone. The Prado Basin Management Zone is generally defined by the 566-foot elevation above mean sea level. It extends from Prado Dam up Chino Creek, Reach 1A and 1B to the concrete-lined portion near the road crossing at Old Central Avenue, up the channel of Mill Creek (Prado Area) to where Mill Creek becomes named as Cucamonga Creek and the concrete-lined portion near the crossing at Hellman Road, up what was formerly identified as Temescal Creek, Reach 1A (from the confluence with the Santa Ana River upstream of Lincoln Avenue) (this area is indistinguishable because of shifting topography and is now considered a part of the Prado Basin Management Zone), and up the Santa Ana River, Reach 3 to the 566-foot elevation (just west of Hammer Avenue). The Prado Basin Management Zone encompasses the Prado Flood Control Basin, which is a created wetlands as defined in the Basin Plan. Orange County Water District's wetlands ponds are also located within the Prado Basin Management Zone. (CRWQCB, SAR 1995).

3.3.2 Significance Thresholds A significant impact to hydrology or water quality would occur if implementation of the Proposed Project:

Substantially alters the existing drainage pattern of the site or area, including the alteration of the course of a stream or river, in a manner that would result in a substantial increase in erosion or siltation on- or offsite.

Substantially alters the existing drainage pattern of the site or area, including the alteration of the course of a stream or river, in a manner that would result in a substantial reduction in the quality or quantity of surface water. Substantially alters the existing drainage pattern of the site or area, including the alteration of the course of a stream or river, or substantially increases the rate or amount of surface runoff in a manner that would result in flooding on- or offsite, or provide substantial additional sources of polluted runoff.

Increases substantial erosion or sedimentation relative to existing conditions.

Encounters groundwater during excavation activities and causes changes to groundwater levels and/or groundwater quality.

3.3.3

Alternatives Analysis

3.3.3.1 No Action Alternative If the No Action Alternative were selected, the City of Corona would not construct, operate or maintain the proposed 20

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment recycled water pipeline on federal land, as proposed. No impacts to hydrology or water quality would occur under the No Action Alternative and conditions would remain as described in Section 3.3.1. 3.3.3.2 Preferred Alternative 3.3.3.2.1 Construction

Construction of the Preferred Alternative would not alter the existing drainage pattern of the Project area and would have no impact on State or local flood plain protection standards because any ground disturbance would be temporary and the land surface would be restored as close as possible to its existing contours. The proposed pipeline would cross the Santa Ana River within the River Road Bridge structure and no work would be performed in the channel or on the bank of the channel. Implementation of the Preferred Alternative would not negatively affect the natural or beneficial values of the floodplain. It would also not induce floodplain development or increase risks to public safety, because the proposed pipeline would be located underground or within the River Road Bridge structure. Implementation of the Preferred Alternative would not introduce hazards within the floodplain because proposed project elements do not include flood-vulnerable structures. If groundwater were to be encountered during excavation for the pipeline, appropriate permits would be obtained and appropriate measures [e.g., dewatering, etc.] would be implemented. In any event, if groundwater is encountered during excavation activities, the Preferred Alternative would not cause changes to groundwater levels and/or groundwater quality because of the short-term nature of potential temporary dewatering that would be implemented to facilitate installation of the pipeline span foundation. Groundwater quality is not anticipated to be impacted because the installation of the pipeline would be installed in such a manner to prevent negative impacts to the groundwater. No facilities would be installed within jurisdictional waters; therefore, the Proposed Project would be exempt from the notification requirements associated with Nationwide Permit No. 12 (NWP `1), which addresses permitting requirements with regard to utilities. Overall, construction of the Preferred Alternative would not result in significant impacts to hydrology or water quality. 3.3.3.2.2 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline en route to its distribution points. Following the construction phase, no personnel or daily activities would be routinely associated with the Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such hydrology and water quality impacts associated with operations and maintenance would be negligible and would not approach any of the significance thresholds previously identified. 21

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment 3.3.4 Environmental Commitments In order to further reduce any potential impacts, environmental commitments for Proposed Project implementation would include using industry-standard erosion control materials and techniques as appropriate to this site. However, the Preferred Alternative would not alter existing drainage patterns so no additional methods are required.

3.4

Air Quality

3.4.1 Baseline Conditions Ambient air quality is affected by both the rate and location of pollutant emissions and by meteorological conditions that influence the local and regional dispersal of pollutants. Atmospheric conditions such as wind speed and direction and air temperature gradients combined with local topography provide the link between air pollutant emissions and air quality. The proposed Project is within the South Coast Air Basin (SCAB), which incorporates approximately 12,000 square miles, consisting of four counties (i.e., San Bernardino, Riverside, Los Angeles, and Orange) including some portions of what used to be the Southeast Desert Air Basin that includes the Beaumont-Banning area. Nearly half of California's population, which generates about one-third of the State's total criteria pollutant emissions, lives within the SCAB. Planning for the attainment and maintenance of both federal and State air quality standards in the Project area is the responsibility of the South Coast Air Quality Management District (SCAQMD). 3.4.1.1 Air Pollutants Pollutants regulated by the State and federal Clean Air Acts fall within three categories:

criteria air pollutants toxic air contaminants, and global warming and ozone depleting gases.

Pollutants in each of these categories are monitored and regulated differently. Criteria air pollutants are measured by sampling concentrations in the air; toxic air contaminants are measured at the source and in the general atmosphere, and global warming and ozone-depleting gases are not monitored but are subject to federal and regional policies that call for their reduction and eventual phaseout (www.aqmd.gov, 10/18/06). California's landmark global warming legislation, AB 32, requires that the State's greenhouse gas emissions be reduced to 1990 levels by 2020. Emission trading is being considered for achieving the requirements of AB 32 (www.aqmd.gov, 4/21/07).

3.4.1.1.1 Criteria Air Pollutants

Criteria air pollutants are defined as those pollutants for which the federal and state governments have established air quality standards for outdoor or ambient concentrations to protect public health. Those standards have been set at levels to protect the human health with an adequate margin of safety. The following paragraphs describe the source 22

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment and health effects of the criteria pollutants as described in SCAQMD's Appendix I, Health Effects, to its Draft Final 2016 Air Quality Management Plan (SCAQMD, December 2016). In addition, Table 3-1 below lists the primary emission sources of the criteria pollutants and some of the harmful effects of the pollutants. Table 3-1

Air Pollutant

Ozone (O3)

Ambient Air Quality Standards and Key Health and Welfare Effects Federal Standard State Standard (NAAQA) (CAAQS) Key Health & Welfare Effects# Concentration, Averaging Time, Concentration, Year of NAAQS Review Averaging Time (a) Pulmonary function decrements and localized lung 0.070 ppm, 8-Hour (2015) injury in humans and animals; (b) Risk to public health 0.075 ppm, 8-Hour (2008) 0.070 ppm, 8-Hour implied by alterations in pulmonary morphology and 0.09 ppm, 1-Hour host defense in animals; (c) Increased mortality risk; (d) 0.08 ppm, 8-Hour (1997) Increased respiratory related hospital admissions and 0.12 ppm, 1-Hour (1979) emergency room visits; (e) Vegetation damage;

Fine Particulate Matter (PM2.5)

35 µg/m3, 24-Hour (2006) 12.0 µg/m3, Annual (2012) 15.0 µg/m3, Annual (1997)

12 µg/m3, Annual

Respirable Particulate Matter (PM10))

150 µg/m3, 24-Hour (1997)

50 µg/m3, 24-Hour 20 µg/m3, Annual

Carbon Monoxide (CO)

35 ppm, 1-Hour (1971) 9 ppm, 8-Hour (1971)

20 ppm, 1-Hour 9.0 ppm, 8-Hour

Nitrogen Dioxide (NO2)

100 ppb, 1-Hour (2010) 0.053 ppm, Annual (1971)

0.18 ppm, 1-Hour 0.030 ppm, Annual

75 ppb, 1-Hour (2010)

0.25 ppm, 1-Hour 0.04 ppm, 24-Hour

0.15 µg/m3, rolling 3-month average (2008)

1.5 µg/m3, 30-day average

Sulfates (PM10) (SO4)

N/A

25 µg/m3, 24-Hour

Hydrogen Sulfide (H2S)

N/A

0.03 ppm, 1-hour

Sulfur Dioxide (SO2) Lead (Pb)

(a) Exacerbation of symptoms in sensitive patients with respiratory or cardiovascular disease; (b) Decline in pulmonary function or growth in children; (c) Increased risk of premature death; (d) Increased risk of lung cancer; (e) increased asthma-related hospital admissions; (f) increased school absences and lost work days; (g) possible link to reproductive effects; (h) visibility reduction (a) Aggravation of angina pectoris and other aspects of coronary heart disease; (b) Decreased exercise tolerance in persons with peripheral vascular disease and lung disease; (c) Possible impairment of central nervous system functions; (d) Possible increased risk to fetuses. (a) Potential to aggravate chronic respiratory disease and respiratory symptoms in children with asthma; (b) Increased airway responsiveness in asthmatics; (c) Contribution to atmospheric discoloration. Respiratory symptoms (bronchoconstriction, possible wheezing or shortness of breath) during exercise or physical activity in persons with asthma. (a) Learning disabilities; (b) Impairment of blood formation and nerve conduction; (c) cardiovascular effects, including coronary heart disease and hypertension. (a) Decrease in lung function; (b) Aggravation of asthmatic symptoms; (c) Vegetation damage; (d) Degradation of visibility; (e) Property damage. Exposure to lower ambient concentrations above the standard may result in objectionable odor and may be accompanied by symptoms such as headaches, nausea, dizziness, nasal irritation, cough, and shortness of breath.

Notes:

ppm = parts per million by volume; Ppb = parts per billion by volume (0.01 ppm = 10 ppb) Standards in bold are the current, most stringent standards; there may be continuing obligations for former standards State standards are "nottoexceed" values based on State designation value calculations Federal standards follow the 3-year design value form of the NAAQS Source: SCAQMD, December 2016.

3.4.1.1.1.1 Ozone (O3)

Ozone (O3) is one of a number of substances called photochemical oxidants that are formed when reactive organic compounds and nitrogen oxides, both byproducts of the internal combustion engine, react in the presence of ultraviolet 23

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment sunlight. Outdoor ozone exposures have been associated with a range of negative human health effects. The strongest evidence for negative health impacts are on the respiratory system, and are measured by decreased lung function and increased cell injury. In addition, the 2013 ISA also concluded that there was a likely causal relationship between shortterm ozone exposures and cardiovascular effects (such as changes in heart function, and increased systemic inflammation and oxidative stress) as well as respiratory mortality. Although the specific mechanisms of action for ozone effects on various health endpoints have not been fully identified there is evidence of the important roles of oxidation of key enzymes and proteins, inflammatory responses, changes in immune response, and modification and activation of neural reflex pathways (U.S. EPA 2013 in SCAQMD, December 2016). 3.4.1.1.1.2 Particulate Matter

Air borne particulates are a complex group of pollutants that vary in physical, chemical, and biological dimensions. Physically, particles can vary by size, surface area and roughness, shape, and mass. Chemically, they vary by chemical composition. Biologically, they can vary by toxicity. In addition, particles vary by source, and can come from anthropogenic (man-made, such as from combustion of fuels, or fractional abrasion) or "natural" (plants for example, pollen, and spores) origins. There are also differences in the composition and sources of particles in the different size ranges that may have implications for health effects. The particles in the coarse fraction (PM 2-5 ­ 10) are mostly produced by mechanical processes. These include automobile tire wear, industrial processes such as cutting and grinding, and resuspension of particles from the ground or road surfaces by wind and human activities, such as agricultural, mining, and construction operations, which may be particularly in rural areas. In contrast, particles smaller than 2.5 microns are mostly derived from combustion sources, such as automobiles, trucks, and other vehicles exhaust, as well as from stationary combustion sources. The particles are either directly emitted or are formed in the atmosphere from gases that are emitted. Components from material in the earth's crust, such as dust, are also present, with the amount varying in different locations. A considerable body of scientific evidence from epidemiologic, controlled human exposure, and toxicological studies support the causal determinations for particulate matter and several categories of health endpoints, with the strongest evidence supporting a causal relationship for PM2.5 exposures with cardiovascular effects and mortality. Specific cardiovascular effects include cardiovascular deaths, hospital admissions for ischemic heart disease and congestive heart failure, changes in heart rate variability, and markers of oxidative stress, and makers or atherosclerosis. The scientific evidence also supported a likely causal relationship for PM2.5 exposure with respiratory effects such as hospital admissions for COPD or respiratory functions, asthma development, asthma or allergy exacerbation, lung cancer, impacts on lung function, lung inflammation, oxidative stress, and airway health effects in humans. Young children, older adults, and people with pre-existing respiratory or cardiovascular health conditions arfe among those who may be more susceptible to the adverse effects of PM. 3.4.1.1.1.3 Carbon Monoxide

Carbon monoxide (CO) is a gaseous air pollutant that has a high affinity to bond with oxygen-carrying proteins (hemoglobin and myoglobin). The resulting reduction in oxygen supply in the bloodstream is responsible for the toxic 24

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment effects on CO, which are typically manifested in the oxygen-sensitive organ systems. The effects have been studied in controlled laboratory environments involving exposure of humans and animals to CO, as well as in population-based studies of ambient CO exposure effects. People with deficient blood supply to the heart (ischemic heart disease) are known to be susceptible to the effects of CO. Protection of this group is the basis of the existing National Ambient Air Quality Standards for CO at 35 ppm for one hour and 9 ppm averaged over 8 hours. The health effects of ambient CO have been recently reviewed by the U.S. EPA, with the strongest evidence supporting a likely causal link between short-term CO exposures and cardiovascular outcomes, although studies have linked both short-term and long-term CO exposures to several other health outcomes (U.S. EPA 2010 in SCAQMD, December 2016). 3.4.1.1.1.4 Nitrogen Dioxide

Nitrogen dioxide (NO2) is a gaseous air pollutant that serves as an indicator of gaseous oxides of nitrogen, such as nitric oxide (NO) and other related compounds (NOx). These gases can undergo photochemical reactions to form ground-level ozone, and are important contributors to ozone pollution levels in the SCAB. Evidence of the health effects of NO2 is derived from human and animal studies, which link NO2 with respiratory effects such as decreased lung function and increases in airway responsiveness and pulmonary inflammation (U.S. EPA 2016 in SCAQMD, December 2016). The U.S. EPA in 2010 retained the existing standard of 100 ppb (0.1 ppm) averaged over one hour. The standard was designed to protect against increases in airway reactivity in individuals with asthma based on controlled exposure studies, as well as respiratory symptoms observed in epidemiological studies. The revised standard also requires additional monitoring for NO2 near roadways. 3.4.1.1.1.5 Sulfur Dioxide

Sulfur dioxide (SO2) is a gaseous air pollutant that has been linked to a variety of respiratory effects, such as decreased lung function and increased airway resistance. Controlled laboratory studies involving human volunteers have clearly identified asthmatics as a very sensitive group to the effects of ambient SO 2 exposures. Healthy subjects have failed to demonstrate any short-term respiratory functional changes at exposure levels up to 1.0 ppm over 1-3 hours. In exercising asthmatics, brief exposure (5-10 minutes) to SO2 levels between 0.2 to 0.6 ppm can result in increases in airway resistance and decreases in breathing capacity. The response to SO2 inhalation is observable within two minutes of exposure, increase further with continuing exposure up to five minutes, then remains relatively steady as exposure continues. SO2 exposure is generally not associated with any delayed reactions or repetitive asthmatic attacks (U.S. EPA 2008 in SCAQMD, December 2016). In 2010, the U.S. EPA SO2 air quality standard was set at 75 ppb (0.075 ppm) averaged over one hour to protect against acute asthma attacks in sensitive individuals. In epidemiological studies of children and adults, associations of short-term variations in SO2 levels with increases in respiratory symptoms, emergency department visits, and hospital admissions for respiratory-related causes have been reported. There is uncertainty as to whether SO2 is associated with the effects or whether other co-occurring pollutants may explain the observed effects, although some studies indicated that the SO2 effects remained even after accounting for the effects of other pollutants, including PM2.5. Coupled with the human clinical studies, these data suggest that SO2 can trigger asthmatic episodes in individuals with pre-existing asthma (U.S. EPA 2008 in SCAQMD, December 2016). 3.4.1.1.1.6 Lead

25

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment Lead (Pb) is a toxic air contaminant that is recognized to exert an array of deleterious effects on multiple organ systems. There are a number of potential public health effects at low level exposures, and there is no recognized lower threshold for health effects (U.S. EPA 2013a in SCAQMD, December 2016). The health implications are generally indexed by blood levels which are related to lead exposures both from inhalation as well as from ingestion. Effects include impacts on population IQ as well as heart disease and kidney disease. The initial air quality standard for lead was established by the U.S. EPA in 1978 at a level of 1.5 µg/m3 averaged over a calendar quarter. U.S. EPA revised the NAAQS for lead in 2008 to a level of 0.15 1.5 µg/m3 averaged over a rolling three-month period to protect against lead toxicity. The U.S. EPA has recently reviewed the health effects of ambient lead exposures in conjunction with an Integrated Science Assessment and a review of the NAAQS for lead (U.S. EPA 2013a, U.S. EPA 2013C in SCAMD, December 2016). Lead can accumulate and be stored in the bone, and this lead in bone can be released into the blood when the bone is metabolized, which happens naturally and continuously. Blood lead is the most common measure of lead exposure and it represents recent exposure and may be an indicator of total body burden of lead (U.S. EPA 2013a in SCAQMD, December 2016). 3.4.1.1.2 Toxic Air Pollutants

Toxic air pollutants (TAPs) are those pollutants that are known or suspected of causing cancer or other serious health effects. Some TAPs are immediately dangerous to human health even in small quantities; some TAPs cause health problems if the exposure extends over a longer period of time. The degree to which a TAP affects a person's health depends on many factors, including the quantity of the pollutant the person is exposed to, the duration and frequency of exposures, the toxicity of the chemical, and the person's state of health and susceptibility. Scientists estimate that millions of tons of TAPs are released into the air each year. Some air toxics are released from natural sources such as volcanic eruptions and forest fires. However, most originate from manmade sources, including both mobile sources (e.g., cars, trucks and buses) and stationary sources (e.g., factories, refineries, power plants and small businesses). In addition, many routine activities around the home, such as using gas-powered lawn mowers and tools, or using volatile paints and solvents release TAPs into the atmosphere. The list of TAPs in the Clean Air Act is a long one (275 names) and includes some familiar names such as benzene. Examples of other TAPs include percholoroethylene, methylene chlorine, toluene, dioxin, and metals such as mercury, chromium and lead compounds. 3.4.1.2 Ambient Air Quality The California Air Resources Board (ARB) provides ambient air quality data for most air basins in the State. A summary of the data available for the greater project area is provided in Tables 3-2, 3-3, 3-4 and 3-5.

26

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment Table 3-2 Ozone Trends Summary National Standards Days > Standard 8-hr Observations 1-hr Observations 1-hr 8-hr 0.070 Std. 0.075 Std. EENED1 0.12 0.070 0.075 1-Yr 3-Yr Max. D.V.² Max. D.V.² Max. D.V.² Year Coverage Riverside-Rubidoux 2016 1 69 47 0.142 1.1 1.1 0.122 0.104 0.094 0.104 0.094 96 2015 1 55 39 0.132 1.0 0.7 0.122 0.105 0.093 0.105 0.093 97 2014 1 66 41 0.141 1.1 0.7 0.122 0.014 0.063 0.014 0.063 96 2013 0 36 26 0.123 0.0 1.8 0.126 0.103 0.098 0.103 0.098 93 2012 1 70 47 0.126 1.1 2.1 0.126 0.102 0.098 0.102 0.098 93 2011 4 90 67 0.128 4.2 1.8 0.127 0.115 0.095 0.115 0.095 93 2010 1 74 47 0.128 1.1 3.1 0.126 0.098 0.097 0.098 0.097 90 2009 0 54 36 0.116 0.0 3.4 0.135 0.106 0.099 0.106 0.099 88 2008 8 55 64 0.146 8.2 6.1 0.135 0.116 0.107 0.116 0.107 99 2007 2 66 46 0.131 2.0 4.4 0.140 0.111 0.105 0.111 0.105 99 Ambient Standard 0.12 0.070 Notes: All concentrations expressed in parts per million. The national 1-hour ozone standard was revoked in June 2005. Statistics related to the revoked standard are shown in italics or italics. National exceedances shown in orange. An exceedance is not necessarily a violation. Daily maximum 8-hour averages associated with the National 0.070 ppm standard exclude those 8-hour averages that have first hours between midnight and 6:00 am, Pacific Standard Time. Daily maximum 8-hour averages associated with the National 0.070 ppm standard include only those 8-hour averages from days that have sufficient data for the day to be considered valid. Daily maximum 8-hour averages associated with the National 0.075 ppm standard may come from days that don't have sufficient data for the day to be considered valid, provided the daily maximum 8-hour average itself includes sufficient data to be considered valid. ¹ EENED = Estimated Expected Number of Exceedance Days ² D.V. = National Design Value * There was insufficient (or no) data available to determine the value. Source: arb.ca.gov, 06/19/2017 Table 3-3 Ozone Trends Summary State Standards Days > Standard 1-Hour Observations 1-Hour 8-Hour Max. EPDC¹ D.V.² Year Riverside-Rubidoux 2016 33 71 0.142 0.1277 0.13 2015 31 59 0.132 0.1258 0.13 2014 29 69 0.141 0.1242 0.12 2013 13 38 0.123 0.1330 0.13 2012 27 70 0.126 0.1329 0.13 2011 52 62 0.128 0.1297 0.13 2010 31 84 0.128 0.1320 0.13 2009 25 57 0.116 0.1322 0.13 2008 54 89 0.146 0.1412 0.14 2007 31 69 0.131 0.1377 0.14 Ambient Standard 0.09 Notes: All concentrations expressed in parts per million. State exceedances shown in green. An exceedance is not necessarily a violation. ¹ EPDC = Expected Peak Day Concentration ² D.V. = State Designation Value *There was insufficient (or no) data available to determine the value.

Max. 0.105 0.106 0.105 0.104 0.102 0.115 0.099 0.101 0.116 0.111 0.070

8-Hour Averages EPDC¹

D.V.²

Year Coverage

0.1069 0.1058 0.1047 0.1161 0.1142 0.1128 0.1138 0.1187 0.1245 0.1233

0.106 0.106 0.105 0.115 0.111 0.111 0.113 0.116 0.117 0.117

96 95 95 92 92 91 88 86 99 98

Source: arb.ca.gov, 06/19/2017

27

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

Year 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007

Notes:

Table 3-4 PM10 Trends Summary Annual Average 3-yr Average Nat'l State Nat'l State Riverside-Rubidoux 38.1 * 35 45 32.2 40.0 34 45 36.3 44.8 35 45 33.2 34.6 34 35 34.5 33.4 34 34 33.5 32.5 35 42 33.1 33.8 41 42 40.0 41.9 -42 46.5 44.8 54 57 59.5 57.0 55 57 -20

Est. Days > Std. Nat'l State 0.0 0.0 0.0 0.0 0.0 * 0.0 0.0 0.0 3.1 Ambient Standard

* 92.2 124.7 30.2 51.7 30.3 42.7 120.1 140.4 201.9

High 24-hr Average Nat'l State 84.0 69.0 100.0 135.0 67.0 82.7 75.0 86.8 115.0 559.0 150

170.5 107.4 122.7 199.2 82.6 79.0 72.0 78.0 108.0 540.0 50

Year Coverage

96 100 100 100 100 0 100 0 100 100

All concentrations expressed in micrograms per cubic meter (µg/m3). The national annual average PM10 standard was revoked in December 2006 and is no longer in effect. Statistics related to the revoked standard are shown in italics or italics. State exceedances shown in green. National exceedances shown in orange. An exceedance is not necessarily a violation. Statistics may include data that are related to an exceptional event. State and national statistics may differ for the following reasons: State statistics are based on California approved samplers, whereas national statistics are based on samplers using federal reference or equivalent methods. State statistics for 2002 and later are based on local conditions. National statistics are based on standard conditions. State criteria for ensuring that data are sufficiently complete for calculating valid annual averages are more stringent than the national criteria.

*There was insufficient (or no) data available to determine the value. Source: Air Resources Board 2017 (arb.ca.gov 6/19/2017)

Table 3-5 PM2.5 Trends Summary Year

Est. Days >Nat'l '06 Std.

2016 5.1 2015 10.3 2014 5.3 2013 6.2 2012 7.1 2011 4.2 2010 4.2 2009 13.5 2008 15.0 2007 * Ambient Standard

Notes:

Annual Average Nat'l

State

12.6 11.9 12.5 12.5 13.5 13.6 13.2 15.2 16.4 19.0

12.8 15.3 16.8 17.1 17.6 13.5 17.9 17.1 * 19.8 12

Nat'l Ann. Std. D.V.1 * * * 13.2 13.4 14.0 14.9 16.9 18.1 19.6

State Ann. D.V.2

Nat;l '06 Std. 98th Percentile

Riverside-Rubidoux 17 32.0 17 38.1 18 39.3 18 34.6 18 33.7 18 31.0 18 32.0 20 39.6 20 41.0 21 54.3

Nat'l '06 24-Hr. Std D.V.1 36 37 36 33 32 34 38 45 50 56

High 24-Hour Nat'l

State

51.5 54.7 48.9 60.3 38.1 50.8 46.5 54.4 57.6 75.6 35

60.8 61.1 50.6 170.8 182.2 70.0 59.2 54.4 57.6 75.6 --

Year Coverage

97 93 83 96 96 97 97 95 92 81

All concentrations expressed in micrograms per cubic meter (µg/m3). State exceedances shown in green. National exceedances shown in orange. 1 D.V. = State designation value.

28

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment D.V. = National design value. *There was insufficient (or no) data available to determine the value. Source: Air Resources Board 2017 (arb.ca.gov 6/19/2017) 2

The ARB has designated the SCAB as non-attainment for the State ozone, PM10 and PM2.5 standards. In addition, the U.S. Environmental Protection Agency has designated the South Coast Air Basin as non-attainment for the federal ozone, PM10 and PM2.5 standards. 3.4.1.3 Greenhouse Gases and Climate Change Greenhouse gases (GHGs) are any of various gases that absorb infrared radiation, trap heat in the atmosphere and contribute to the greenhouse effect. These various gases are produced from natural processes and human activities. The accumulation of GHGs in the atmosphere influences the long-term range of average atmospheric temperatures to cause global climate change. In 2013, the most recent year for which data are provided, annual statewide GHG emissions in California were 459.28 million metric tons of CO2-equivalent (CARB, 2015). On 18 December 2014, the CEQ released updated draft guidance on how and when federal agencies should account for the effects of GHG emissions and climate change impacts under NEPA. The guidance uses projected GHG emissions as a proxy for assessing an action's potential climate change impacts. The guidance also directs agencies to consider the direct, indirect, and cumulative effects of the GHG emissions from an action, and take into account the effects of connected actions. The CEQ recommended that emissions equal to or greater than 25,000 metric tons annually should be included in NEPA assessments (CEQ, 2014). A Final Guidance in consideration of Greenhouse Gases and Climate Change was provided by CEQ, in August, 2016.

3.4.2 Significance Thresholds Impacts would be considered significant if the proposed project:

Exceeds General Conformity Rule de minimis thresholds.

Exceeds any SCAQMD daily Regional Significance Thresholds.

Conflicted with or delayed achievement of air quality standards, as set forth in the State Implementation Plan (SIP).

3.4.3 Alternative Analysis 3.4.3.1 No Action Alternative If the No Action Alternative were selected, the City of Corona would not construct the recycled water pipeline on federal land. No impacts to air quality would occur from federal land activities, under the No Action Alternative, and conditions would remain as described in Section 3.4.1. If alternative routes, as described earlier, were developed then air quality impacts could well be higher, based on larger lineal project footprints.

29

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment Preferred Alternative

3.4.3.1 3.4.3.1.1

Construction

The South Coast Air Quality Management District has suggested threshold criteria for determining significance with respect to construction and operational air quality impacts. Those threshold criteria are shown in Table 3.4.3.1.1-1. Table 3.4.3.1.1-1 Threshold Criteria for Determining Significance Threshold Criteria, pounds per day Pollutant Construction Operation Carbon Monoxide (CO) 550 550 Sulfur Dioxide (SO2) 150 150 Nitrogen Oxides (NOX) 100 55 Particulates (PM10) 150 150 Particulates (PM2.5) 55 55 Volatile Organic Compounds (VOC) 75 55 Lead (Pb) 3 3 Toxic Air Contaminants (TACs), Odor and GHG Thresholds TACs Maximum Incremental Cancer Risk 10 in 1 million (including carcinogens and non-carcinogens) Cancer Burden > 0.5 excess cancer cases (in areas 1 in 1 million Chronic and Acute Hazard Index 1.0 (project increment) Odor Project creates an odor nuisance pursuant to SCAQMD Rule 402 GHG 10,000 MT/yr CO2eq for industrial facilities Source: SCAQMD CEQA Handbook, 1993, revised March 2011

These threshold criteria are used in this dEA in determining significance of air quality impacts. During Phase 1 of its Proposition 1 ­ Reclaimed Water Distribution Facilities Project, DWP plans to construct the WRCRWA Reclaimed Water Pipeline. That 20-inch diameter pipeline would extend approximately 5,000 lineal feet from WRCRWA's facilities at 14634 River Road to the intersection of River Road and Bluff Street. Due to the fact that the actual date of construction is not known at this time, a "worst-case" scenario2 is analyzed for the air quality impacts associated with future construction. The following assumptions were utilized in estimating the air emissions from construction equipment for the WRCRWA Reclaimed Water Pipeline Project:

Trenching would progress at an average rate of 100 lineal feet per day.

Approximately 0.05 acres per day would be disturbed during pipeline installation.

There would be approximately 2 heavy-heavy duty diesel trucks moving supplies to the site and removing asphalt and other waste materials from the site. It is anticipated that each truck would travel approximately 100 miles per day.

2

Although construction may not start until after January 1, 2017, that start date was used in this air quality analysis to provide a "worst case" scenario. Due to the phasing out of older equipment, increased regulatory requirements, and new technology, the emissions factors decrease somewhat on an annual basis.

30

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

There would be approximately 2 pickup trucks traveling to and from the site by inspectors. Mileage for each pickup would be approximately 100 miles per day.

Approximately 10 construction workers would be involved in excavation and other pipeline installation activities at the site on the peak day of activities. Mileage for worker commuters would be approximately 50 per day.

In addition to the truck traffic and worker commute traffic discussed above, the following construction equipment would be on the job site: Equipment Air Compressors Concrete Saws Cranes Excavators Off Highway Trucks Pavement Breakers Pavers Plate Compactors Sweeper/Scrubbers Tractors/Loaders/Backhoes Water Trucks

Number 1 1 1 1 1 1 1 1 1 1 1

Horsepowera 78 81 226 163 400 126 131 8 64 98 189

Load Factorb 0.48 0.73 0.29 0.38 0.38 0.42 0.36 0.43 0.46 0.37 0.38

Hours per Day 4.0 1.0 1.0 6.0 4.0 1.0 1.0 1.0 1.0 6.0 2.0

Notes: 1 2011 2

OFFROAD default values. Percentage of the engine's maximum horsepower rating that the equipment actually operates.

K.S. Dunbar & Associates, Inc., developed an Excel Spreadsheet model, based on the California Air Resources Board's 2011 OFFROAD emission factors, that calculates estimated emissions from construction activities. That model was used to estimate construction related emissions from off-road heavy construction equipment. Based on construction occurring in 2017, the model generated estimated construction emissions as shown in Table 3.4.3.1.1-2 (detailed model results are contained in Appendix A)3. Table 3.4.3.1.1-2 Estimated Maximum Day Emissions from Off-Road Heavy Construction Equipment (pounds per day)a ROG CO NOx SOx PM10 PM2.5 Construction Year 2017 1.54 15.90 17.42 0.02 0.16 0.14 Threshold Limitsb 75 550 100 150 150 55 Localized Significance Thresholdsc N/A 887 148 N/A 12 4

CO2 2,318 N/A N/A

CH4 0.66 N/A N/A

a Use

of particulate traps reduces PM10 and PM2.5 by 85% and oxidation catalysts reduces NOx by 15%. Construction-related threshold limits developed by SCAQMD to determine significance. c Localized threshold limits developed by SCAQMD to determine significance at construction sites of up to 1 acre and the nearest receptor within 50 meters of the construction site. b

As can be seen by the data in Table 3.4.3.1.1-2, emissions from heavy construction equipment during pipeline construction would not exceed SCAQMD's construction-related threshold limits or localized threshold limits. Should the construction period be delayed, the emissions from heavy construction equipment would be less due to technology improvements and phasing out of older equipment. Therefore, the emissions shown are considered the worst-case scenario. 3

31

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment There would also be two heavy-duty trucks traveling to and from the job site as well as two pickup trucks utilized by inspectors at the job site. Based on the assumption that each heavy-duty truck and pickup travels 100 miles per day, exhaust emissions would be as shown in Table 3.4.3.1.1-3.

Equipment

ROG 0.08 0.01 0.09

On-Road Trucks Pickups Totals

Table 3.4.3.1.1-3 Estimated Maximum Day Emissions from On-Road Vehicles Pollutant (pounds per day) CO NOx SOx PM10 0.29 2.62 0.01 0.03 0.12 0.03 0.00 0.02 0.41 2.65 0.01 0.05

PM2.5 0.02 0.01 0.03

CO2 713 217 930

CH4 0.01 0.01 0.02

Vehicles owned by construction workers would be an additional source of air pollutants. An estimate of emissions based on 10 worker vehicles per day of which 100 percent are pickup trucks (gross vehicle weight of 8,500 pounds or less) with an average round trip of 50 miles is presented in Table 3.4.3.1.1-4.

ROG 0.02

CO 0.29

Table 3.4.3.1.1-4 Construction Worker Commute Vehicle Emissions Pollutant (pounds per day) NOx SOx PM10 PM2.5 0.07 0.01 0.04 0.02

CO2 543

CH4 0.03

Installation of the pipeline would create fugitive dust emissions. It is estimated that fugitive dust emissions from construction activities on disturbed soil approximate 5 pounds per acre per day (PM10) with no mitigation. However, the application of water as required would reduce the emissions by 61 percent. As stated above, it is anticipated that approximately 0.05 acres would be disturbed each day. Therefore, the resulting PM10 emissions would be estimated at 0.1 pounds per day. SCAQMD also estimates that the PM2.5 emissions in fugitive dust are equal to 21 percent of the PM10 emissions in fugitive dust (SCAQMD, October 2006). Therefore, the PM2.5 emissions would equal 0.02 pounds per day. The total estimated daily emissions from the construction of WRCRWA Reclaimed Water Pipeline Project are shown in Table 3.4.3.1.1-5.

Source Construction Equipment On-Road Vehicles Worker Commutes Fugitive Dust Total Threshold Limitsb Localized Thresholdsc

Table 3.4.3.1.1-5 Total Estimated Construction Emissionsa Pollutant (pounds per day) ROG CO NOx SOx PM10 1.54 0.09 0.02 0.00 1.65 75 N/A

15.90 0.41 0.29 0.00 16.6 550 887

17.42 2.65 0.07 0.00 20.14 100 148

0.02 0.01 0.01 0.00 0.04 150 N/A

0.16 0.05 0.04 0.10 0.35 150 12

PM2.5 0.14 0.03 0.02 0.02 0.21 55 4

CO2 2,318 930 543 0.00 3,791 N/A N/A

CH4 0.66 0.02 0.03 0.00 0.71 N/A N/A

Use of particulate traps reduces PM10 and PM2.5 by 85% and oxidation catalysts reduces NOx by 15%. Construction-related threshold limits developed by SCAQMD to determine significance. c Localized significant thresholds developed by SCAQMD to determine localized significance, based on a work area of up to 1 acre and a 50-meter distance to the nearest receptor. a b

32

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment As shown in Table 3.4.3.1.1-5, the total estimated emissions from construction of the WRCRWA Reclaimed Water Pipeline would not exceed the construction-related threshold limits for significance or the localized thresholds. 3.4.3.2.2 Greenhouse Gases and Climate Change

Under the Proposed Action, construction activities associated with the pipeline would result in short-term GHG emissions from heavy equipment and construction worker vehicles. However, the total amount of GHG emissions associated with the Proposed Project (310 metric tons per year) would not approach the 25,000-metric ton threshold provided by CEQ. Consequently, the Proposed Action would result in less than significant impacts related to GHG and climate change. 3.4.3.2.3 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or daily activities would be routinely associated with the Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such air quality and greenhouse gas impacts associated with operations and maintenance would be negligible and would not approach any of the significance thresholds previously identified.

3.4.4 Environmental Commitments Although there were no significant impacts to air quality identified, the City of Corona committed to including the following best management practices as part of its Mitigation Monitoring and Reporting Program adopted for this Project: DWP will:

Appoint a construction relations officer to act as a community liaison concerning on-site construction activities including resolution of issues related to PM10 generation.

Add the following best management practices in its contract documents for this project: The contractor shall:

Utilize electricity from power poles instead of from temporary diesel or gasoline power generators, when feasible.

Require the use of 2010 and newer diesel haul trucks (e.g., material delivery trucks and soil import/export) and if the lead agency determines that 2010 model year or newer diesel trucks cannot be obtained the contractor shall use trucks that meet EPA 2007 model year NOx emissions requirements. 33

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

Require that all on-site construction equipment meet EPA Tier 3 or higher emissions standards according to the following: All off-road diesel-powered construction equipment greater than 50 hp shall meet the Tier 4 emission standards, where available. In addition, all construction equipment shall be outfitted with BACT devices certified by CARB. Any emissions control device used by the contractor shall achieve emissions reductions that are no less than what could be achieved by a Level 3 diesel emissions control strategy for a similarly sized engine as defined by CARB regulations. A copy of each unit's certified tier specification, BACT documentation, and CARB or SCAQMD operating permit shall be provided at the time of mobilization of each applicable unit of equipment.

Maintain construction equipment engines by keeping them properly tuned and maintained according to manufacturer's specifications.

Use alternative fuels or clean and low-sulfur fuel for equipment.

Idle trucks in accordance with the Airborne Toxic Control Measure (ACTM) to Limit Diesel Fueled Commercial Motor Vehicle Idling and other applicable laws.

Spread soil binders on site, where appropriate, unpaved roads and staging areas.

Water site and equipment as necessary to control dust.

Sweep all streets at least once per day using SCAQMD Rule 1186 certified street sweepers or roadway washing trucks if visible soil materials are carried to adjacent streets.

Conduct operations in accordance with SCAQMD Rule 403 requirements.

If necessary, wash off trucks leaving the site.

Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at least two feet of freeboard in accordance with the requirements of California Vehicle Code (CVC) Section 23114.

3.5 Noise 3.5.1 Baseline Conditions The ambient noise level of a region is the total noise generated within the specific environment and is usually composed of sounds emanating from natural and manmade sources. Noise levels monitored in a region tend to have wide spatial and temporal variation due to the great diversity of contributing sources. This is especially true for the greater Project area with its blend of open space, agricultural, commercial and industrial land uses. Characterization of the Project area noise levels is difficult due to the lack of actual field measurements. The federal land in question is an existing sloped uninhabited open space near the River Road corridor, which due to traffic would 34

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment be louder than the field. Very little noise measurement data are available for the Project area in general. However, typical noise levels for areas like the Project area are in the range of 45 to 55 dB(A). Generally, the noise levels in the Project area are affected by natural and manmade sources. However, the sound levels are more strongly influenced by human rather than natural sound sources. Within the Project area, the major sources of noise include adjacent vehicular traffic and aircraft flyovers

3.5.2

Significance Thresholds

Noise effects would be considered significant if they result in any of the following:

Expose sensitive receptors to noise levels above thresholds established by the Cities of Eastvale and Norco, the US Department of Housing and Urban Development (HUD), and/or the US EPA.

Result in a substantial temporary or periodic increase in ambient noise levels in the proposed project area above levels existing without the Proposed Project.

Result in a substantial permanent increase in ambient noise levels in the proposed project area above levels existing without the Proposed Project.

Alternative Analysis 3.5.2.1 No Action Alternative If the No Action Alternative were selected, the City of Corona would not construct the recycled water pipeline on federal land as proposed. No impacts to noise would occur under the No Action Alternative and conditions would remain as described in Section 3.5.1. 3.5.2.2 Preferred Alternative 3.5.3.1.1 Construction

The analysis of noise impacts resulting from any project must consider both the construction and operational phases. However, due to the nature of this Project, very little additional noise would be associated with the operational phase. Therefore, the following noise analysis concentrates on the construction of the recycled water pipeline. Operation of equipment used during construction would temporarily increase noise levels, during work hours in daylight, to well in excess of ambient noise levels. The construction noise would vary with the particular construction stage in progress due to the different pieces of construction equipment being used. Table 3.5.3.1.1-1 lists equipment expected to be used during construction and identifies the number of pieces of equipment typically used, their utilization factor, and their reference sound level at a distance of 50 feet.

35

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment Table 3.5.3.1.1-1 Construction Equipment List and Reference Sound Levels Equipment

Number Required

Horsepower Rating

Utilization Factor

1 1 1 1 2 1 1 1 1 1 1 2 2

78 81 226 163 400 131 126 8 64 98 189 N/A 225

0.48 0.73 0.29 0.38 0.38 0.36 0.42 0.43 0.46 0.37 0.38 1.00 1.00

Air Compressor Concrete Saw Crane Excavator Off-Highway Trucks Pavement Breaker Paver Plate Compactor Sweeper Tractor/Loader/Backhoe Water Truck Pickups On-Road Trucks

Nominal Noise Level, Leq at 50 feet dB(A) 78 78 81 81 84 86 77 83 82 78 82 72 82

As shown above, noise associated with construction could be locally significant during the construction period. However, the exact degree of impact on the surrounding community would depend on the type of equipment being used at any one time, the distance from the equipment, and the hours of operation as well as (in the case of local wildlife activities) the specific time of year. It is anticipated that noise levels associated with construction would range from 72 to 84 dB(A) within 50 feet of the equipment being used. These noise levels would be further attenuated by the distance to the nearest receptor. 3.5.3.2.3 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or daily activities would be routinely associated with the Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such noise impacts associated with operations and maintenance would be negligible and would not approach any of the significance thresholds previously identified.

3.5.4 Environmental Commitments In its July 2016 Mitigation Monitoring and Reporting Program adopted for this Project, the City of Corona committed to the following: DWP will add the following best management practices in its standard construction specifications:

36

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

All equipment used during construction shall be muffled and maintained in good operating condition. All internal combustion engines shall be fitted with well-maintained mufflers in accordance with manufacturers' recommendations.

IN addition, allowances to project scheduling in light of local wildlife (see below) may also be adopted as needed to reduce impacts to a less than signirficant level.

3.6 Biological Resources, Including Listed Species 3.6.1 Baseline Conditions Prior to conducting the following habitat assessment, staff biologist Travis J. McGill conducted a literature review and records search for sensitive biological resources potentially occurring on or within the vicinity of the project site. Previously recorded occurrences of special-status plant and wildlife species and their proximity to the Project site were determined through a query of the California Department of Fish and Wildlife's (CDFWs) CNDDB Rarefind 5, the California Native Plant Society's (CNPS) Electronic Inventory of Rare and Endangered Vascular Plants of California, Calflora Database, compendia of special-status species published by CDFW, and the United States Fish and Wildlife Service (USFWS) species listings and the Western Riverside County MSHCP and associated technical documents. Standard field guides and texts on sensitive and non-sensitive biological resources were reviewed for habitat requirements, as well as the following resources:

Annual Prado Basin least Bell's vireo survey data (2017), Orange County Water District biologists;

Google Earth Pro historic and aerial imagery;

United States Department of Agriculture (USDA) Natural Resource Conservation Service (NRCS) Web Soil Survey;

USFWS Critical Habitat designations for Threatened and Endangered Species; and

Western Riverside County MSHCP and RCIP Conservation Summary Report.

The literature review provided a baseline from which to inventory the biological resources potentially occurring on the Project site. Additional recorded occurrences of these species found on or near the Project site were derived from database queries. The CNDDB ArcGIS database was used, in conjunction with ArcGIS software, to locate the nearest occurrence and determine the distance from the Project site. 3.6.1.1 Habitat Assessment/Field Investigation Following the literature review, the staff biologist inventoried and evaluated the extent and conditions of the plant communities found within the pipeline alignment and proposed laydown area and, in addition, identified any jurisdictional features, riparian/riverine habitat, as well as natural corridors and linkages that may support the movement of wildlife through the area. Special attention was given to any sensitive habitats and/or undeveloped areas, which 37

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment have higher potentials to support sensitive flora and fauna species. Areas providing suitable habitat for burrowing owl were closely surveyed for signs of presence during the habitat assessment. Areas providing suitable habitat for burrowing owl were closely surveyed for suitable burrows during the habitat assessment, consisting of natural and non-natural substrates in areas with low, open vegetation. Methods to detect the presence of burrowing owl included direct observation, aural detection, and signs of presence including pellets, white wash, feathers, or prey remains. The location of remnant and occupied burrows/nests were documented, if found. All plant and wildlife species observed, as well as dominant plant species within each plant community, were recorded. Wildlife detections were made through observation of scat, trails, tracks, burrows, nests, and/or visual and aural observation. In addition, site characteristics such as soil condition, topography, hydrology, anthropogenic disturbances, indicator species, condition of on-site plant communities, and presence of potential jurisdictional drainage and/or wetland features as well as riparian/riverine areas were noted. 3.6.1.1.1 Existing Site Conditions

The pipeline alignment ranges in elevation from 550 feet above mean sea level to 580 feet above mean sea level and generally slopes from north to south. Based on the NRCS USDA Web Soil Survey, the pipeline alignment is underlain by the following soil units Dello loamy fine sand, Dello loamy sand, Grangeville fine sandy loam, Grangeville loamy fine sand, Grangeville sandy loam, Ramona very fine sandy loam, Terrace escarpments, and water. The area south of the Santa Ana River is primarily composed of residential developments, while the area north of the Santa Ana River is composed of a mix of residential developments, wastewater facilities, agricultural and livestock land uses, and undeveloped vacant lots. The section of the Santa Ana River that the River Road Bridge crosses over supports a southern cottonwood willow riparian forest plant community. 3.6.1.1.1.1 Vegetation

The proposed pipeline alignment would run within a previously disturbed area with scattered individual ruderal plants, and in an existing paved road and a dedicated space in the River Road Bridge. No plant communities would be affected from installation of the proposed pipeline. Because the pipeline will be installed in a dedicated space in the River Road Bridge, no impacts to the riparian habitats associated with the Santa Ana River will occur. The proposed laydown area is located within a vacant parcel on the southeast corner of the intersection of River Road and Bluff Street. The vacant parcel supports a disturbed land cover type that has been subject to routine weed abatement activities, stockpiling activities, and agricultural land uses. 3.6.1.1.1.2 Wildlife

Because the vacant federal land has been used for various outdoor recreation group activities, the specific pipeline alignment provides limited habitat for wildlife species except those adapted to a high degree of human presence and development. Because the proposed pipeline will be installed within the existing paved road and a dedicated space in the River Road Bridge, wildlife species are not expected to be directly impacted from installation of pipeline. However, riparian vegetation several hundreds of feet south of the proposed line will contain nesting birds during the biological season. 38

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment The majority of the wildlife observed during the habitat assessment consisted of avian species including red-tailed hawk (Buteo jamaicensis), killdeer (Charadrius vociferus), American crow (Corvus brachyrhynchos), house finch (Haemorhous mexicanus), northern mockingbird (Mimus polyglottos), house sparrow (Passer domesticus), California towhee (Pipilo crissalis), black phoebe (Sayornis nigricans), Anna's hummingbird (Calypte anna), and lesser goldfinch (Spinus psaltria). 3.6.1.1.1.3 Nesting Birds

The River Road Bridge and plant communities adjacent to the pipeline alignment provides suitable nesting, foraging, and cover habitat for year-round and seasonal avian residents, and migrating songbirds that could occur in the area. No nesting birds or breeding behaviors were observed during the field survey. 3.6.1.1.1.4 Migratory Corridors and Linkages

Habitat linkages provide connections between larger habitat areas that are separated by development. Wildlife corridors are similar to linkages, but provide specific opportunities for animals to disperse or migrate between areas. A corridor can be defined as a linear landscape feature of sufficient width to allow animal movement between two comparatively undisturbed habitat fragments. Adequate cover is essential for a corridor to function as a wildlife movement area. It is possible for a habitat corridor to be adequate for one species yet still inadequate for others. Wildlife corridors are features that allow for the dispersal, seasonal migration, breeding, and foraging of a variety of wildlife species. Additionally, open space can provide a buffer against both human disturbance and natural fluctuations in resources. Although the proposed pipeline alignment crosses over the Santa Ana River, which is a regional wildlife movement corridor, the pipeline will be installed within the existing paved road and a dedicated space in the River Road Bridge and will not impact any native plant communities or the Santa Ana River. As a result, installation of the pipeline is not expected to disrupt or have any adverse effects on any migratory corridors or linkages associated with the Santa Ana River. 3.6.1.1.1.5 Jurisdictional Areas

There are three key agencies that regulate activities within inland streams, wetlands, and riparian areas in California. The Corps Regulatory Branch regulates discharge of dredge or fill materials into "waters of the United States" pursuant to Section 404 of the CWA and Section 10 of the Rivers and Harbors Act. Of the State agencies, the CDFW regulates alterations to streambed and bank under Fish and Game Code Sections 1600 et seq., and the Regional Board regulates discharges into surface waters pursuant to Section 401 of the CWA and the California Porter-Cologne Water Quality Control Act. The Santa Ana River is a relatively permanent water that drains into the Pacific Ocean (a Traditional Navigable Water) that would be considered jurisdictional "waters of the United States" or "waters of the State" and fall under the regulatory authority of the United States Army Corps of Engineers (Corps), Regional Water Quality Control Board (Regional Board), and the California Department of Fish and Wildlife (CDFW). Impacts to the Santa Ana River would require a Clean Water Act (CWA) Section 404 permit from the Corps, CWA Section 401 Water Quality Certification from the

39

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment Regional Board, and/or a Section 1602 Streambed Alteration Agreement (SAA) from CDFW. No other drainage features were observed within alignment of the proposed recycled water pipeline. The proposed pipeline will be installed outside of the jurisdictional limits of the Santa Ana River. As a result, no regulatory agency approvals are anticipated. In addition, no jurisdictional features were observed within the proposed laydown area. .3.6.1.1.1.6 Sensitive Biological Resources The CNDDB, CNPS, and the USFWS IPaC were queried for reported locations of special-status plant and wildlife species as well as sensitive natural plant communities occurring within the Corona North USGS 7.5-minute quadrangle and within the vicinity of the proposed pipeline alignment. Specifically, the CNDDB was queried within a 2-mile buffer of the proposed pipeline alignment due to the site's isolation from undisturbed native habitat and existing development on and surrounding the Project site. This assessment evaluated the conditions of the habitat(s) within the boundaries of the Project site to determine if the existing plant communities have the potential to provide suitable habitat(s) for special-status plant and wildlife species. The CNDDB and CNPS were queried for reported locations of listed and sensitive plant and wildlife species as well as sensitive natural plant communities in the Corona North and Corona South USGS 7.5-minute quadrangles. A search of published records of these species was conducted within these quadrangles using the CNDDB Rarefind 5 online software. The CNPS Inventory of Rare and Endangered Vascular Plants of California and MSHCP supplied information regarding the distribution and habitats of vascular plants in the vicinity of the Project site. The habitat assessment was used to assess the ability of the plant communities found on-site to provide suitable habitat for relevant special-status plant and wildlife species. The literature search identified eleven (11) special-status plant species thirty (30) special-status wildlife species, and seven (7) sensitive habitats as having potential to occur within the Corona North and Corona South quadrangles. Special-status and wildlife species were evaluated for their potential to occur within the Project boundaries based on habitat requirements, availability and quality of suitable habitat, and known distributions. Species determined to have the potential to occur within the general vicinity are presented in Attachment C, Potentially Occurring Special-Status Biological Resources, and discussed below. 3.6.1.1.1.6.1 Special-Status Plants

According to the CNDDB and CNPS, eleven (11) special-status plant species have been recorded in the Corona North and Corona South quadrangles (refer to Attachment C). No special-status plant species were observed on-site during the habitat assessment. Based on habitat requirements for specific species and the availability and quality of on-site habitats, it was determined that the no special-status plant species are expected to occur within the pipeline alignment because it will be installed within the existing paved road and dedicated space within the River Road Bridge. Due to the heavily disturbed nature of the proposed laydown area, no special-status plant species are expected to occur on that site.

40

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment 3.6.1.1.1.6.2 Special-Status Wildlife

According to the CNDDB, thirty (30) special-status wildlife species have been reported in the Corona North and Corona South quadrangles (refer to Attachment C). No sensitive wildlife species were observed on-site during the habitat assessment. Based on habitat requirements for specific species and the availability and quality of on-site habitats, it was determined that the proposed pipeline alignment and laydown area do not provide suitable habitat for any of the special-status wildlife species known to occur in the area. Several hundred feet to the south, the least Bell's vireo (vireo bellii pusillus) is known to populate the nearby suitable habitat and so measures to avoid adverse effects, provided below, would be taken in consultation with the U.S. Fish and Wildlife Service. This proposed work on Federal land would be implemented during Sept. 15-March 15 of the calendar year which allows the Corps and Service to concur on a May Affect, Not Likely to Adversely Affect the vireo or other sensitive species. 3.6.1.1.1.6.3 Special-Status Plant Communities

The CNDDB lists seven (7) special-status plant communities as being identified within the Corona North and Corona South quadrangles: Southern California Arroyo Chub/Santa Ana Sucker Stream, Southern Coast Live Oak Riparian Forest, Southern Cottonwood Willow Riparian Forest, Southern Interior Cypress Forest, Southern Riparian Forest, Southern Sycamore Alder Riparian Woodland, and Southern Willow Scrub. No special-status plant communities occur within the pipeline alignment. However, a Southern Cottonwood Willow Riparian Forest plant community is found adjacent to the Project site within the Santa Ana River. No impacts to the Santa Ana River or its habitats will occur. 3.6.1.1.1.6.3 Critical Habitat

Under the federal Endangered Species Act, "Critical Habitat" is designated at the time of listing of a species or within one year of listing. Critical Habitat refers to habitat or a specific geographic area that contains the elements and features that are essential for the survival and recovery of the species. Maintenance of these physical and biological features requires special management considerations or protection, regardless of whether individuals or the species are present or not. In the event that a project may result in take or adverse modification to a species' designated Critical Habitat, a project proponent may be required to engage in suitable mitigation. However, consultation for impacts to Critical Habitat is only required when a project has a federal nexus (i.e. occurs on federal land, is issued federal permits [e.g. Corps Section 404 permit, or Corps Section 408 permit], or receives any other federal oversight or funding). If a project does not have a federal nexus, Critical Habitat consultations are not required. The proposed alignment crosses over the Santa Ana River, which has been designated as Critical Habitat for southwestern willow flycatcher (Empidonax trailli extimus), Santa Ana sucker (Catostomus santaanae), and least Bell's vireo (vireo bellii pusillus). However, the pipeline will be installed in open spaces, within the existing paved road, and in dedicated space in the River Road Bridge and will not impact any native wildlife or plant communities or the Santa Ana River. Therefore, no impacts to federally designated Critical Habitat will occur from implementation of the proposed project. Absent other factors or issues, this is No-Effect to listed species and no Adverse Modification to Critical Habitat. 3.6.1.1.2 Western Riverside County MSHCP

The Proposed Project is located within the Cities of Riverside and Norco Area Plan and Eastvale Area Plan of the MSHCP, but is not located within any Criteria Cells or MSHCP Conservation Areas. However, the proposed alignment

41

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment is located immediately adjacent to Existing Core A and MSHCP designated Public/Quasi-Public Lands associated with the Santa Ana River. 3.6.1.1.2.1 Section 6.1.2 Riparian/Riverine Areas and Vernal Pools 3.6.1.1.1.1.1 Riparian/Riverine Areas

As identified in Section 6.1.2 of the MSHCP, Protection of Species Associated with Riparian/Riverine Areas and Vernal Pools, riparian/riverine areas are defined as areas dominated by trees, shrubs, persistent emergent plants, or emergent mosses and lichens which occur close to or are dependent upon nearby freshwater, or areas with freshwater flowing during all or a portion of the year. Conservation of these areas is intended to protect habitat that is essential to a number of listed or special-status water-dependent fish, amphibian, avian, and plant species. If all impacts to riparian/riverine habitat cannot be avoided, a Determination of Biologically Equivalent or Superior Preservation (DBESP) must be developed to address the replacement of lost functions of habitats in regards to the listed species. This assessment is independent from considerations given to "waters of the U.S." and "waters of the State" under the CWA and the California Fish and Game Code. The Santa Ana River and associated riparian vegetation also qualify as riparian/riverine habitat under the Section 6.1.2 of the MSHCP. The extent of the riparian/riverine habitat within the Santa Ana River is synonymous with the jurisdiction of CDFW. As a result, any alteration or loss of riparian/riverine habitat would require the preparation of a (DBESP) under the MSHCP. This analysis is separate from any regulatory approvals/permitting by the Corps, Regional Board, and CDFW. However, the proposed alignment will be installed entirely outside of the Santa Ana River and associated plant communities. As a result, a DBESP will not be required for installation of the proposed pipeline. 3.6.1.1.1.1.2 Vernal Pools and Fairy Shrimp Habitat

One of the factors for determining the suitability of the habitat for fairy shrimp would be demonstrable evidence of seasonal ponding in an area of topographic depression that is not subject to flowing waters. These astatic pools are typically characterized as vernal pools. More specifically, vernal pools are seasonal wetlands that occur in depression areas without a continual source of water. They have wetland indicators of all 3 parameters (soils, vegetation, and hydrology) during the wetter portion of the growing season but normally lack wetland indicators of hydrology and/or vegetation during the drier portion of the growing season. Obligate hydrophytes and facultative wetlands plant species are normally dominant during the wetter portion of the growing season. The determination that an area exhibits vernal pool characteristics and the definition of the watershed supporting vernal pool hydrology is made on a case-by-case basis. Such determinations that should be considered include the length of time the areas exhibit upland and wetland characteristics and the manner in which the area fits into the overall ecological system as a wetland. The seasonal hydrology of vernal pools provides for a unique environment, which supports plants and invertebrates specifically adapted to a regime of winter inundation, followed by an extended period when the pool soils are dry. Vernal pools are seasonally inundated, ponded areas that only form in regions where specialized soil and climatic conditions exist. During fall and winter rains typical of Mediterranean climates, water collects in shallow depressions where downward percolation of water is prevented by the presence of a hard pan or clay pan layer (duripan) below the soil surface. Later in the spring when rains decrease and the weather warms, the water evaporates and the pools generally disappear by May. The shallow depressions remain relatively dry until late fall and early winter with the advent 42

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment of greater precipitation and cooler temperatures. Vernal pools provide unusual "flood and drought" habitat conditions to which certain plant and wildlife species have specifically adapted as well as invertebrate species such as fairy shrimp. The MSHCP lists two general classes of soils known to be associated with listed and special-status plant species; clay soils and Traver-Domino Willow association soils. The specific clay soils known to be associated with listed and specialstatus species within the MSHCP plan area include Bosanko, Auld, Altamont, and Porterville series soils, whereas Traver-Domino Willows association includes saline-alkali soils largely located along floodplain areas of the San Jacinto River and Salt Creek. Without the appropriate soils to create the impermeable restrictive layer, none of the specialstatus plant or wildlife species associated with vernal pools can occur on the project site. None of these soils have been documented within the proposed pipeline alignment. Because the pipeline will be installed within the existing paved road and dedicated space in the River Road Bridge no undisturbed soils will be impacted. Therefore, no impacts to vernal pools or fairy shrimp habitat will occur from implementation of the Proposed Project. 3.6.1.1.2.2 Section 6.1.3 Narrow Endemic Plant Species

Based on the RCIP query and review of the MSHCP, it was determined that the project site is located immediately adjacent to the designated survey area for Narrow Endemic Plant Species San Diego ambrosia, Brand's phacelia, and San Miguel savory as depicted in Figure 6-1 within Section 6.1.3 of the MSHCP. The Proposed Project will be installed within existing paved streets and a dedicated space in the River Road Bridge that does not provide suitable habitat for Narrow Endemic Plant Species. 3.6.1.1.2.3 Section 6.1.4 Urban/Wildlands Interface Guidelines

The Project site is not located within any Criteria Cells, corridors, or linkages; however, the proposed alignment is located immediately adjacent to Existing Core A and MSHCP designated Public/Quasi-Public Lands associated with the Santa Ana River. Phase 1 will be installed within existing paved road and a dedicated space in the River Road Bridge; therefore, indirect project-related impacts to drainage, toxics, lighting, noise, invasive plant species, barriers, and grading/land development will not occur. 3.6.1.1.2.4 Section 6.3.2 Additional Survey Needs and Procedures

The RCIP Conservation Summary Report Generator was queried to determine if the MSHCP lists any survey requirements for the Project. The summary report identified that the Project site is located immediately adjacent to the designated survey area for burrowing owl. Phase 1 will be installed within existing paved road and a dedicated space in the River Road Bridge that does not provide suitable habitat for burrowing owl.

3.6.2 Significance Thresholds Based on the existing conditions discussed above, effects of the Proposed Project would be significant if they:

Adversely impact any federal or state special-status wildlife species, plants, or habitat.

Adversely impact any riparian habitat or other sensitive natural communities. 43

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

Adversely impact federally protected wetlands or Waters of the United States or waters of the state through direct removal, filling, and/or hydrological interruption.

Additional information will be incorporated into this section, if necessary, following interagency coordination with the USFWS and the California Department of Fish and Wildlife (CDFW). As outlined in 33 CFR Part 325, coordination will take place (e.g., per the Fish and Wildlife Coordination Act) to ensure relevant agencies are provided an opportunity to make known concerns regarding sensitive species and/or their habitat.

3.6.3 Alternative Analysis 3.6.2.1 No Action Alternative If the No Action Alternative were selected, the City of Corona would not construct the recycled water pipeline on federal lands. No direct impacts to biological resources on federal land would occur under the No Action Alternative and conditions would remain as described in Section 3.6.1. However, note that the vireo and flycatcher are also Statelisted species and it is possible that, given alternate routes, these same species could be affected. 3.6.2.2 Preferred Alternative 3.6.2.2.1 Construction 3.6.3.2.1.1 Special-Status Plants

As previously stated (Section 3.6.1.1.1.6.1), no special-status plant species were observed on-site during the habitat assessment. Based on habitat requirements for specific species and the availability and quality of on-site habitats, it was determined that the no special-status plant species are expected to occur within the pipeline alignment or at the laydown area. 3.6.3.2.1.2 Special-Status Wildlife

As previously stated (Section 3.6.1.1.1.6.2), according to the CNDDB, twenty-eight (28) special-status wildlife species have been reported in the Corona North and Corona South quadrangles (refer to Attachment C). Based on habitat requirements for specific species and the availability and quality of on-site habitats, it was determined that no specialstatus wildlife species are expected to occur within the pipeline alignment or laydown area. However, in adjacent habitat areas, it is likely that during the avian nesting season, listed or other species do exist and their protection accounted for, as described below. 3.6.3.2.1.3 Nesting Birds

As previously stated in Section 3.6.1.1.1.3, the River Road Bridge and plant communities adjacent to the pipeline alignment provides suitable nesting, foraging, and cover habitat for year-round and seasonal avian residents, and migrating songbirds that could occur in the area. No nesting birds or breeding behaviors were observed during the field survey. However, if construction is scheduled during the avian nesting season (typically approximately February 1st through August 31st) a nesting bird survey will be required to ensure compliance with the Migratory Bird Treaty Act (MBTA). If active nests are identified, a protective buffer (i.e., typically up to a 500-foot "no work zone" depending upon 44

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment the species in question) around the nest may be delineated and work in other areas may continue. However, depending on the location of the nest, construction activities may need to be demobilized and cause a delay in progress until after the birds have fledged (e.g., typically six weeks). Coordination with appropriate agencies may be required to determine the best avoidance, minimization and compliance measures for the particular species. It is recommended that the proposed work areas and laydown yards within non-native grassland be mowed in the winter to discourage nesting prior to and during construction. Conservatively, encountering a nesting bird could result in extending the construction timeline from a best-case scenario of approximately 10 weeks to as many as 12 weeks. Compliance with the MBTA would ensure that impacts to nesting birds would be avoided and significant effects would not result. 3.6.3.2.1.4 Jurisdictional Waters

As previously stated in Section 3.6.1.1.1.5, the Santa Ana River is a relatively permanent water that drains into the Pacific Ocean (a Traditional Navigable Water) that would be considered jurisdictional "waters of the United States" or "waters of the State" and fall under the regulatory authority of the United States Army Corps of Engineers (Corps), Regional Water Quality Control Board (Regional Board), and the California Department of Fish and Wildlife (CDFW). Impacts to the Santa Ana River would require a Clean Water Act (CWA) Section 404 permit from the Corps, CWA Section 401 Water Quality Certification from the Regional Board, and/or a Section 1602 Streambed Alteration Agreement (SAA) from CDFW. No other drainage features were observed within alignment of the proposed recycled water pipeline. The proposed alignment will be installed within the existing paved road and a dedicated space in the River Road Bridge outside of the jurisdictional limits of the Santa Ana River. As a result, no regulatory agency approvals are anticipated. Construction of the Preferred Alternative would not result in significant impacts to biological resources. 3.6.3.2.2 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or daily activities would be routinely associated with the Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such biological resources impacts associated with operations and maintenance would be negligible and would not approach any of the significance thresholds previously identified.

3.6.4 Environmental Commitments A query of the Riverside County Integrated Project (RCIP) Conservation Summary Report Generator found that the proposed project sites are located within the designated survey area for burrowing owl (Athene cunicularia). Based on habitat requirements, the availability and quality of those habitats on-site, it was determined that the burrowing owl is presumed absent due to lack of suitable habitat and existing development/disturbance. 45

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment However, in order to comply with the conservation goals of the MSCHP and to ensure burrowing owl and nesting birds remain absent from the Project sites, DWP committed to the following in its July 2016 Mitigation Monitoring and Reporting Program for the Proposed Project:

A burrowing owl clearance survey shall be conducted prior to any ground disturbing activities in accordance with the CDFW 2012 Staff Report on Burrowing Owl Mitigation. Two pre-construction clearance surveys shall be conducted 14-30 days and 24 hours prior to ground disturbing activities to document the continued absence of burrowing owl from the Project site.

Regarding the vireo/flycatcher and their critical habitat setting, it is recommended that construction work on the federal land be conducted outside these species' annual nesting season, that is, outside of approximately March 1-September 1, in order to achieve a No Effect to these species. Otherwise, pre-construction surveys should also be planned if the work might possibly extend into the nesting season. The Corps will consult with the U.S. Fish and Wildlife Service for further planning purposes if needed. While several related periods of time are recognized as nesting season for several types of birds, the March 1-Sept. 1 is recognized and used locally for local planning regarding riparian avian communities.

If ground-disturbing activities or removal of any trees, shrubs, or any other potential nesting habitat are scheduled within the avian nesting season (nesting season generally extends from February 1 - August 31; see above regarding different dates), a pre-construction clearance survey for nesting birds should be conducted within 10 days prior to any ground disturbing activities. The biologist conducting the clearance survey should document a negative survey with a brief letter report indicating that no impacts to active bird nests will occur. If an active avian nest is discovered during the 10-day preconstruction clearance survey, construction activities should stay outside of a 300-foot buffer around the active nest. For raptor species, this buffer is expanded to 500 feet. It is recommended that a biological monitor be present to delineate the boundaries of the buffer area and to monitor the active nest to ensure that nesting behavior is not adversely affected by the construction activity. Once the young have fledged, normal construction activities can occur.

3.7

Paleontological Resources

3.7.1 Baseline Conditions The County of Riverside's database indicates that the Project area has a low potential for containing significant paleontological resources. (www.mapmycounty 12/28/2016).

3.7.2 Significance Thresholds In its standard guidelines for assessment and mitigation of significant impacts to paleontological resources, the Society of Vertebrate Paleontology (1995) notes that a geologic unit is considered to possess high paleontological sensitivity if it has produced vertebrate or significant invertebrate fossils, or significant suites of plant fossils, and is considered to have a potential for containing significant non-renewable paleontological resources. A geologic unit is considered to possess an unknown paleontological sensitivity if little information is available for the unit. All other geologic units are considered to be of low paleontological sensitivity.

46

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment Using the above criteria, the significance of potentially significant impacts of proposed project- related excavations on the paleontological resources was assessed. Any unmitigated impact on a fossil site, or on a fossil-bearing rock unit of high or moderate sensitivity, would be considered significant.

3.7.3 Alternative Analysis 3.7.3.1 No Action Alternative If the No Action Alternative were selected, the City of Corona would not construct the recycled water pipeline on Federal land. No impacts to paleontological resources would occur under the No Action Alternative and conditions would remain as described in Section 3.7.1. 3.7.3.2 Preferred Alternative 3.7.3.2.1 Construction

In general, pipeline excavations would have the potential to affect paleontological resources because at a certain depth, they may impact sediment that has not been previously disturbed. However, excavations associated with the Proposed Project are expected to be no deeper than eight feet below ground surface, a depth at which significant paleontological resources are unlikely to be found. Clearing, use of proposed laydown areas, pavement removal, and other activities required for this project would occur at the surface, or within nominal depths, and do not have the potential to affect paleontological resources. In addition, excavations within the limits of previous pipeline trenching would affect only previously disturbed fill, and previously excavated sediment is not considered paleontologically sensitive. Even if fossils were encountered during original excavations and subsequently returned to the ground mixed with fill, they have little scientific value because they no longer occur in stratigraphic context. Overall, impacts are expected to be less than significant. 3.7.3.2.2 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or daily activities would be routinely associated with the Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such impacts to paleontological resources associated with operations and maintenance would be negligible and would not approach any of the significance thresholds previously identified.

3.7.4 Environmental Commitments In its July 2016 Mitigation Monitoring and Reporting Program adopted for this Project, the City of Corona committed to the following:

47

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

3.8

Should construction/development activities uncover paleontological resources, work will be moved to other parts of the Project site and a qualified paleontologist shall determine the significance of these resources. If the find is determined to be significant, avoidance or other appropriate measures shall be implemented. Appropriate measures would include that a qualified paleontologist be permitted to recover and evaluate the find(s) in accordance with current standards and guidelines.

Cultural Resources

3.8.1 Baseline Conditions ­ A cultural resources assessment to support the Corps's responsibility pursuant to Section 106 of the National Historic Preservation Act (NHPA) (36 Code of Federal Regulations [CFR] 800) was conducted for the proposed work at the City of Corona's River Road Recycled Water Pipeline site. The purpose of the assessment was to review known records and conduct a pedestrian survey to determine the presence of historic properties (any prehistoric or historic district, site, building, structure, or object included in, or eligible for inclusion on the National Register) within the area of potential effects (APE) and determine if the proposed undertaking will result in any adverse effects to known resources 3.8.1.1 Area of Potential Effects (APE) The APE of an undertaking is defined in 36 CFR 800.16(d) as the "geographic area or areas within which an undertaking may directly or indirectly cause alterations in the character or use of historic properties if any such property exists." Additionally, CEQA-Plus guidelines state that the APE is "three-dimensional (depth, length, width) and includes all areas directly affected by the proposed construction" (State Water Resources Control Board 2004). The APE includes the area of direct impact (ADI), consisting of all areas where work related to the project will occur. The width of surface trenching is expected to be approximately 5 feet; however, the permanent easement is 20 feet. The temporary construction easement will be an additional 20 feet wide. The depth of the pipeline is expected to vary between 6 and 8 feet based on sloping needs and the diameter of the pipe. The State Historic Preservation Officer (SHPO) accepted this determination of the APE in a letter dated August 7, 2017. 3.8.1.2 Literature Search Methods Rincon archaeologist Breana Campbell conducted a search of cultural resource records housed at the California Historical Resources Information System (CHRIS), Eastern Information Center (EIC) located at the University of California, Riverside in January and February 2016. The search was conducted to identify all previous cultural resources work and previously recorded cultural resources within a 0.5-mile radius of the project site. The CHRIS search included a review of the NRHP, the CRHR, the California Points of Historical Interest list, the California Historical Landmarks list, the Archaeological Determinations of Eligibility list, and the California State Historic Resources Inventory list. The records search also included a review of all available historic USGS 7.5- and 15-minute quadrangle maps. 3.8.1.3 Literature Search Results

48

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment The EIC records search identified 14 previously conducted studies within a 0.5-mile radius of the APE (Table 3-12). Of these reports, six (6) discuss the project APE; none of these studies identified cultural resources within the project APE. Table 3-12 Previous Studies Within 0.5 Mile of the APE EIC Report No.

Author

Year

Study

Relationship to APE

RI-00061

Langenwalter, P.E., and J. Brock

1985

Phase II Archaeological Studies Prado Basin and The Lower Santa Ana River

Within

RI-00063

Kirkish, A., and L. McCoy

1972

RI-00736

Swenson, J.D.

1979

Addendum To: An Archaeological Assessment of the Norco Hills Proposed Subdivision Near Norco, California

Outside

RI-01125

Drover, C.E.

1981

Environmental Impact Evaluation: Archaeological Assessment of Tentative Parcel Map 17414 Near Norco, California

Outside

RI-01697

Drover, C.E.

1982

Environmental Impact Evaluation: Archaeological Assessment of the Proposed Norco Wastewater Management Facilities

Within

RI-01954

Rosenthal, E.J., and S.J. Schwarz

1981

A Cultural Resource Survey of the Proposed Santa Ana River Hiking/Biking Trail in the Prado Flood Control Basin

Within

RI-02429

Stickel, E.G., and T. D'altroy

1980

Santa Ana River and Santiago Creek: A Cultural Resources Survey

Outside

RI-02593

Drover, C.E.

1989

An Archaeological Assessment of the Archibald Sewage Treatment Plant Norco, Riverside County, California

Outside

RI-03629

Seymour, G., and D. Doak

1992

An Archaeological Survey for the Western Riverside Regional Wastewater Treatment System in Corona and Norco, Riverside County.

Outside

RI-04331

Lerch, M.K.

1999

Historic Property Survey Report: Corydon Avenue Equestrian Staging Area, City of Norco, Riverside County, California.

Within

RI-05775

Tang, B., M. Hogan, and M. Dahdul

2002

Historical/Archaeological Resources Survey Report, Tentative Tract Map No. 30825, Near the City of Norco, Riverside County, CA

Outside

RI-05958

Tang, B., M. Hogan, C. Tibbet, and D, Ballester

2003

Historical/ Archaeological Resources Survey Report Assessor's Parcel Number 130-030-012 and -013, Near the City of Norco, Riverside County, CA

Outside

RI-05964

Tang, B., M. Hogan, J. Smallwood, and D. Ballester

2003

Historical/Archaeological Resources Survey Report, Tentative Tract Map No. 31406, Near the City of Norco, Riverside County, CA

Within

A Preliminary Site Report on the Salvage Excavations at the Bovine Site

Outside

49

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

EIC Report No.

RI-07500

Author

Year

Bonner, W.H., and M. Aislin-Kay

2007

Study

Relationship to APE

Letter Report: Cultural Resource Records Search Results and Site Visit for Royal Street Communications, LLC Facility Candidate LA2364A (SBC/ATT Woodcrest), 16991 Van Buren Boulevard, Riverside, Riverside County, California.

Within

Eastern Information Center, January and February 2016

The EIC records search identified two (2) cultural resources within a 0.5-mile radius of the APE (Table 3-13). Both of these resources are prehistoric artifact scatters. None of these resources are located within or adjacent to the APE for the current project; however, 33-001436 is immediately adjacent to the proposed laydown area. Therefore, DWP will construct a fence across the proposed laydown area property to ensure that the site is not further disturbed. Table 3-13 Previously Recorded Cultural Resources Within 0.5-mile of theAPE Primary Number

Description

NRHP/CRHR Eligibility Status

Recorded/Updated By and Year

Relationship to APE

33-000652

Prehistoric Artifact Scatter

Insufficient information

Kirkish 1972

Outside

33-001436

Prehistoric Artifact Scatter

Insufficient information

Hammond 1977

Outside

Eastern Information Center, January and February 2016.

3.8.1.4 Pedestrian Survey Methods Rincon archaeologist Breana Campbell conducted a cultural resources survey of the APE on July 12, 2017. Ms. Campbell conducted a pedestrian survey of the proposed pipeline across U.S. Army Corps land and the proposed laydown area. During the survey efforts, Ms. Campbell examined all areas of exposed ground surface for prehistoric artifacts (e.g., chipped stone tools and production debris, stone milling tools, ceramics), historic debris (e.g., metal, glass, ceramics), or soil discoloration that might indicate the presence of a cultural midden. Ms. Campbell recorded characteristics of the project APE and survey conditions using a field notebook and a digital camera. Copies of the field notes and digital photographs are on file with Rincon's Carlsbad office. 3.8.1.5 Pedestrian Survey Results The survey identified no previously unrecorded cultural resources within the project site. Vegetation where present within the project site included non-native grasses. The EIC records search identified no previously recorded cultural resources within the project site and no new discoveries were made as a result of the pedestrian survey. 3.8.1.6 Native American Consultation A search of the Sacred Lands file by the Native American Heritage Commission (NAHC) on May 4, 2017 indicated that Native American cultural resources were not identified within the APE. 50

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

The Corps invited the 34 tribal contacts provided by the NAHC by letter on July 10, 2017. (The Bureau of Reclamation and the City of Corona had previously conducted tribal consultation on the larger distribution, but the proposed issuance of an easement is a separate undertaking.) Unresponsive tribes were contacted again on November 29, 2017. The San Manuel Band of Mission Indians replied that the proposed project is located outside of Serrano ancestral territory, so they would not be a consulting party. The Pala Band of Mission Indians also determined the project to be outside the territory that the tribe considers its Traditional Use area and deferred to closer tribes. The Viehas Band of Kumeyaay Indians determined that the project area has little cultural significance to Viejas and recommended contacting closer tribes. The Rincon Band of Luiseño Indians deferred to the Pechanga or Soboba Bands. The Morongo Band of Mission Indians requested additional information but did not provide any subsequent comments. The Soboba Band of Luiseño Indians requested a face to face consultation meeting on August 15, 2017. A meeting was held on September 20, 2017. Their concerns included the desire for construction to be periodically monitored by a qualified professional archaeologist and that any recovered cultural material be curated according to federal law and policy. Specific mitigation measures were developed to address their concerns. 3.8.1.7 Determination of Effect The current project includes issuing a permit for the installation of a 20-inch diameter across federal lands. Several previous studies have investigated portions of the APE and adjacent areas (RI-00061, RI-01697, RI-01954, RI-04331, RI-05964, RI-07500), and new pedestrian survey of the APE was completed. No cultural resources were identified within the APE. Two previously recorded cultural resources have been identified within 0.5-mile of the APE. These resources are located outside of the APE and would not be impacted by the current project. Based on the level of disturbance of the APE from previous infrastructure development (e.g., roads, pipelines) and results of previous inventory, it is unlikely that any previously unidentified cultural resources will be affected or impacted by the current project. Therefore, Rincon recommends a finding of no impact to historical resources under CEQA and no historic properties affected under the NHPA. 3.8.2 Significance Thresholds 3.8.3

The criteria for significant, adverse effects to cultural resources are if the project would include disturbance, alteration or otherwise diminishing the integrity of a cultural or archeological resource or historic property's location, design, setting, materials, workmanship, feeling or association, or the introduction of culturally incompatible elements to a property listed on or considered eligible for listing on the National Register of Historic Places. Additionally, adverse impacts to important Native American sites or traditional resources could also constitute a significant adverse effect.

3.8.4

Alternative Analysis

3.8.4.1 No Action Alternative

51

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment If the No Action Alternative were selected, the City of Corona would not construct the recycled water pipeline. No impacts to cultural resources would occur under the No Action Alternative and conditions would remain as described in Section 3.8.1. 3.8.3.1 Preferred Alternative 3.8.3.1.1

Construction

As summarized above and based on the literature search and pedestrian survey conducted to evaluate potentially important resources, no properties have been identified within the APE. In accordance with 36 CFR 800.13(b), if any cultural resources are identified during construction, the Corps Operations Branch and archaeologist will be notified and the Corps archaeologist will be consulted in order to determine appropriate effects and treatment. The Corps has determined that no historic properties would be affect granting an easement for the proposed project, contingent upon the mitigation measures developed in coordination with interested tribes. The State Historic Preservation Officer agreed with this finding in a letter dated December 1, 2017.Iimpacts to cultural resources are expected to be less than significant. 3.8.3.1.2 Operations and Maintenance Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or daily activities would be routinely associated with the Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. Any excavation required for repairs would occur within the permanent easement and, most likely, within the area disturbed by the initial construction. Operation and maintenance activities are presumed to be inherent with the construction of pipelines. As such impacts to historical and archaeological resources associated with operations and maintenance would be negligible and would not approach any of the significance thresholds previously identified.

3.8.4

Environmental Commitments

In its July 2016 Mitigation Monitoring and Reporting Program adopted for this Project, the City of Corona committed to numerous measures to ensure the protection of cultural resources. In addition, mitigation measures, listed in Section 4.7, below, would be incorporated to ensure that the project will not adversely affect historic properties.

3.9

Hazardous Materials and Wastes

3.9.1 Baseline Conditions Several standard environmental record services are available to determine the potential for recognized environmental conditions in an area. Those databases are briefly described in the following paragraphs. 52

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

3.9.1.1 National Priorities List (NPL) The National Priorities List (NPL) is a federal database of uncontrolled hazardous waste sites that warrant further investigation to determine if long-term "remedial action" is necessary. There are no NPL sites located in the Project area. 3.9.1.2 Envirostor Envirostor is a database maintained and primarily used by the California Department of Toxic Substances Control to determine the location of all hazardous waste sites. There are no hazardous waste sites located in the Project area listed in the Envirostor database. 1.9.1.3 Geotracker Geotracker is the State Water Resources Control Board's data management system for managing sites that impact groundwater, especially those that require groundwater cleanup (Underground Storage Tanks, Department of Defense Site Cleanup Program) as well as permitted facilities such as operating USTs and land disposal sites. There are no permitted underground storage tanks within the Project area. 1.9.1.4 Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) The Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as Superfund, was enacted by Congress on December 11, 1980. In implementing this law, the Environmental Protection Agency (EPA) compiles a list of known hazardous waste sites that are under consideration for the Superfund list. This list is known as the CERCLIS database. There are no CERCLIS sites located in the Project area. 3.9.1.5 Resource Conservation and Recovery Act (RCRA) The primary goals of the Resource Conservation and Recovery Act (RCRA) are to protect human health and the environment from the potential hazards of waste disposal, to conserve energy and natural resources, to reduce the amount of waste generated, and to ensure that wastes are managed in an environmentally sound manner. In implementing this law, EPA compiles a list of known hazardous waste generators. There are no known hazardous waste generators within the Project area. 3.9.1.6 Hazardous Materials Response Plans and Inventory The Governor's Office of Emergency Services (OES) administers the Hazardous Materials Response Plans and Inventory program (Article 1, Chapter 6.95, Health and Safety Code). As part of this program, OES maintains a database of all hazardous materials spills in the State (RIMS). According to that database, there have not been any hazardous materials spills within the Project area. 3.9.1.7 Leaking Underground Storage Tank Information System (LUSTIS) 53

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment The State Water Resources Control Board (State Water Board) administers the Leaking Underground Storage Tank Information System (LUSTIS). The LUSTIS database includes all reported leaks from underground storage tanks. The LUSTIS database is now reported in the Georacker results. 3.9.1.8 Site Mitigation Program Property Database (formerly CalSites) The California Environmental Protection Agency's Department of Toxic Substances Control (DTSC) administers the CalSites program. Information in the CalSites database is preliminary in nature; therefore, most sites listed in the database need additional work to determine if contamination exists. There are no sites in the CalSites database within the Project area. 3.9.1.9 Hazardous Waste and Substances Sites List (Cortese) California's Government Code §65962.5 requires the California Department of Toxic Substances Control to develop, at least annually, an updated list of Hazardous Waste and Substances Sites. This list, known as the Cortese List, is a planning document used by the State, local agencies and developers to comply with the California Environmental Quality Act requirements in providing information about the location of hazardous materials release sites. DTSC is responsible for a portion of the information contained in the Cortese List. Other State and local agencies are required to provide additional hazardous materials release information for the Cortese List. The Cortese List is to be submitted to the Secretary of the California Environmental Protection Agency. There are no sites on the Cortese List within the Project area. 3.9.1.10 Solid Waste Information System (SWIS) The Solid Waste Information System (SWIS) is a database provided by the California Integrated Waste Management Board which consists of both open as well as closed and inactive solid waste disposal facilities and transfer stations. There are no sites in the SWIS database within the Project area. 3.9.2 Significance Thresholds A significant impact would occur if implementation of the Proposed Project:

Caused soil contamination, including flammable or toxic gases, at levels exceeding Federal, state, and local hazardous waste limits established by 40 CFR Part 261.

Exposed the general public to hazardous situations through the transport, use, storage, or disposal of hazardous materials.

Created a significant hazard to the public or environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment.

3.9.3 Alternative Analysis 3.9.3.1 No Action Alternative

54

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment If the No Action Alternative were selected, the City of Corona would not construct its recycled water pipeline on Federal land. No impacts to hazardous materials and wastes would occur under the No Action Alternative and conditions would remain as described in Chapter 3.9.1. 3.9.3.2 Preferred Alternative 3.9.3.2.1 Construction

No sites have been identified through review of regulatory records involving releases or spills of hazardous waste that would have the potential to affect the Proposed Project area. No activities are proposed that would increase the potential release of hazardous or toxic substances. Virtually all hazardous materials required to facilitate implementation of the Proposed Project (e.g., fuel for vehicles and equipment) would be provided / distributed off-site, and any minor amount of such materials necessary onsite would be handled in accordance with appropriate plans and in compliance with all applicable regulatory requirements. These potential minor amounts of material include, for example: vehicle fuel, hydraulic fluid, and compressed gases for welding. Overall, impacts would be less than significant. 3.9.3.2.2 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or daily activities would be routinely associated with the Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such, impacts related to hazardous materials and wastes associated with operations and maintenance activities would be negligible and would not approach any of the significance thresholds previously identified.

3.9.4 Environmental Commitments In its July 2016 Mitigation Monitoring and Reporting Program adopted for this Project, the City of Corona committed to the following: To reduce potentially hazardous conditions and minimize the impacts from the handling of potentially hazardous materials, DWP shall include the following in its construction contract documents:

The contractor(s) shall prepare a Health and Safety Plan in compliance with the requirements of Chapter 6.95, Division 20 of the Health and Safety Code (§§ 25500--25532). The plan shall include measures to be taken in the event of an accidental spill.

The contractor(s) shall enforce strict on-site handling rules to keep construction and maintenance materials out of receiving waters and storm drains. In addition, the contractor(s) shall store all reserve fuel supplies only 55

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment within the confines of designated construction staging areas, refuel equipment only within the designated construction staging areas, and regularly inspect all construction equipment for leaks.

The construction staging area shall be designed to contain contaminants such as oil, grease, and fuel products so that they do not drain towards receiving waters or storm drain inlets.

3.10 Aesthetics 3.10.1 Baseline Conditions The proposed project location and setting provide the context for determining the type and severity of changes to the existing visual environment that could result from the Proposed Project. The project setting is defined as the area of land that is visible from, adjacent to, and outside the project area, and is determined by topography, vegetation, and viewing distance. While the photos below show adjacent roads, please see Figure 2-3-1 to see the approximately 2,000 feet of Federal land that would be affected. Typical roadway scenes along the proposed pipeline alignment are shown on Figures 3-2, 3-3 and 3-4.

Figure 3-2 River Road Bridge Looking Northerly

56

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

Figure 3-3 River Road Looking Northerly from Bridge

Figure 3-4 River Road Looking Northerly at Baron Drive Intersection

3.10.2 Significance Thresholds Aesthetics, or visual resources, are the natural and cultural features of the landscape that can be seen and that contribute to the public's enjoyment of the environment. Visual resource or aesthetic impacts are generally defined in terms of a project's physical characteristics and potential visibility, light, and glare and the extent to which the pipeline's presence would change the perceived visual character and quality of the environment in which it would be located.

3.10.3 Alternatives Analysis 3.10.3.1 No Action Alternative

57

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment If the No Action Alternative were selected, the City of Corona would not construct its recycled water pipeline on Federal land. (Please see Figure 2-3-1 for an aerial view of the Federal land, outgranted for outdoor recreation, that would or would not be affected by the proposal.) No impacts to aesthetics would occur under the No Action Alternative and conditions would remain as described in Section 3.10.1. 3.10.3.2 Preferred Alternative 3.10.3.2.1 Construction

The visual quality and character of the existing Proposed Project area would not be altered by constructing the Preferred Alternative. The Preferred Alternative would be underground except for the portion installed within a dedicated space in the River Road Bridge. No new, permanent sources of light or glare would be installed and night work is not anticipated. During construction of the Preferred Alternative, temporary visual impacts could result from the presence of heavy equipment and construction materials stored onsite. Views of the proposed project during construction would be short in duration and visible by travelers along River Road and Barron Drive. Construction of the Preferred Alternative would not result in significant effects on visual resources or viewer response, or to aesthetics generally. 3.10.3.2.2 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or daily activities would be routinely associated with the Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such, impacts related to aesthetics associated with operations and maintenance activities would be negligible and would not approach any of the significance thresholds previously identified.

3.10.4 Environmental Commitments Based on the analysis of potential impacts to visual resources at and in the vicinity of the Proposed Project, no significant impacts are anticipated; therefore, no mitigation measures or other environmental commitments are proposed.

3.11 Recreational Resources 3.11.1 Baseline Conditions

58

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment The Proposed Project, if not conducted on Federal land, would be constructed upon private property, on public street rights-of-way, or within a dedicated space in the River Road Bridge. However, there are recreational resources within the immediate Project area as proposed.

3.11.2 Significance Thresholds Recreation-related impacts would be considered a significant effect if the selected alternative results in:

Permanent removal of substantial recreational areas and critical recreational facilities.

Increased usage that will result in substantial physical deterioration of the recreational area or facility.

3.11.3 Alternative Analysis 3.11.3.1 No Action Alternative If the No Action Alternative were selected, the City of Corona would not construct its recycled water pipeline on Federal land. No impacts to Federal recreation areas would occur under the No Action Alternative and conditions would remain as described in Section 3.11.1. 3.11.3.2 Preferred Alternative 3.11.3.2.1 Construction

The Preferred Alternative includes the granting of a new easement by the Corps to the City of Corona for the construction, operation and maintenance of its recycled water pipeline. The Federal land that would be affected lies between the WR treatment plant and Baron Drive and is open space, in an area outgranted by a concessionaire operating for recreation in Riverside County. Note also that this proposed pipeline would lie near an existing underground utility line in the area. The Proposed Project would predominately be underground in the new easement and is compatible with existing land use designations, including an existing line. The line would be in an undeveloped area just north of the existing hard-surfaced roadway on this outgranted parcel. Therefore, there would be no impacts to recreation during construction and the Preferred Alternative will result in no significant effects to recreation. 3.11.3.2.2 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or daily activities would be routinely associated with the Preferred Alternative. Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These 59

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such, impacts related to recreational resources associated with operations and maintenance activities would be negligible and would not approach any of the significance thresholds previously identified.

3.11.4 Environmental Commitments Based on the analysis of potential impacts to recreational resources at and in the vicinity of the Proposed Project, no significant impacts are anticipated; no mitigation measures or other environmental commitments are proposed.

3.12 Public Health and Safety

3.12.1 Baseline Conditions Public Health and Safety Hazards associated with flooding, illegal activities, wildfires, and mosquitos are described below. 3.12.1.1 Flooding As shown on Figure 3-5 (FIRM 06065C0686G) which represents the general action alternative, the proposed pipeline will generally cross a flood plain. Once constructed, the pipeline would be underground and not interfere with flood flows. The Corps has a formal notification process whereby the Reservoir Regulation Section contacts any known entities that will be affected by forecasted flood inflow to the Prado Dam Basin (for example, this construction project will be flagged through Asset Management Division to the Reservoir Regulations Section). This notification procedure is based on forecasted runoff and the maximum estimated height of surface water. These notifications are continually updated based on the current hydrologic and Basin conditions. During potential flood conditions in the Prado Dam Basin, local entities have authorities in place to redirect traffic and erect roadway barriers and signage.

60

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

Figure 3-5 WRCRWA Recycled Water Pipeline Shown on FIRM 06065C0686G

3.12.1.2 Illegal Activities Hazards The Cities of Corona, Eastvale and Norco coordinate closely with law enforcement and the Corps as well as fire, medical and emergency response agencies in the area. Illegal activities in the area create a safety issue associated with trespassing, ongoing lewd and lascivious conduct, and drug dealing. Areas adjacent to the Proposed Project area are patrolled by Cities of Eastvale and Norco as well as Corps staff. These agencies have expressed concerns regarding their own safety and especially the safety of the public who enter the area for bird watching, walking, or jogging. Additionally, numerous homeless encampments in the area have been observed. 3.12.1.3 Wildfires Areas within the Prado Dam Basin are susceptible to local uncontrolled burning because of un-maintained vegetation or areas of dry vegetation. These small brush fires can make the area more susceptible to increased erosion by rain storms and wind. 3.12.1.4 Mosquito Hazard 61

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment California has several species of mosquitoes that are known to transmit agents that can cause mosquito-borne diseases including western equine encephalomyelitis, St. Louis encephalitis, malaria, and West Nile Virus. The lack of many of the natural predators in an urban environment can allow mosquitoes to reach nuisance levels. When this occurs, the potential for an increase in the spread of mosquito-borne diseases can occur without monitoring and abatement measures. Breeding areas for mosquitoes include stagnant or standing water. Detention basins and wetlands can act as breeding sites if not managed properly. Biological and chemical insecticides administered by the Riverside County Vector Control are typically used to control mosquitos.

3.12.2 Significance Thresholds A significant impact will occur if the alternative:

Increases exposure of people or structures to flooding hazards.

Creates conditions that will present potential dangers to the public or attract the public to a potentially hazardous area (e.g., attractive nuisances).

Creates mosquito breeding conditions in an amount that will require increased levels of mosquito abatement programs to maintain mosquito populations at pre-project levels.

3.12.3 Alternative Analysis 3.12.3.1 No Action Alternative If the No Action Alternative were selected, the City of Corona would not construct its recycled water pipeline on Federal land. Adverse conditions with regard to public health and safety concerns would continue if the No Action Alternative were selected and conditions would remain as described in Section 3.12.1.

3.12.3.2 Preferred Alternative 3.12.3.2.1 Construction

Because construction activities would be short-term and not occur during heavy rainfall, the presence of workers in the floodplain would not increase their risk of exposure to flood hazards. Construction activities would also not attract the public into a hazardous area or result in the establishment of stagnant water that would be conducive to promulgation of mosquito populations. 3.11.3.2.2 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled water passes through the pipeline enroute to its distribution points. No personnel or daily activities would be routinely

62

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment associated with the Proposed Project area and therefore no increase in safety risks related to floodplains or other public health metrics would result. Maintenance activities would be similar to those currently occurring at the project area and at similar sites throughout the Los Angeles Basin. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbance). As such, impacts to public health and safety associated with operations and maintenance activities would be negligible and would not approach any of the significance thresholds previously identified.

3.12.4 Environmental Commitments Coordination and established communication with the Corps Reservoir Regulation Section personnel responsible for public notification of flood inflow to the Prado Dam Basin will prevent impacts to construction personnel and equipment working within the flood plain. The City of Corona will prepare a Project Safety Plan for Corps review and approval prior to entry onto the site for construction.

3.13 Socioeconomics and Environmental Justice 3.13.1 Baseline Conditions Each federal agency is required by Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, to "make achieving environmental justice part of its mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects of its programs, policies, and activities on minority populations and-low income populations..." The CEQ defines a minority population as any group of minorities, individually or cumulatively, that exceeds 50 percent of the existing population within the market area or where a minority group comprises a meaningfully greater percentage of the local population than in the general population. Additionally, the CEQ identifies low income as "individuals living below the poverty level" using 2010 Census data. Ensuring environmental justice means protecting existing local and market-area minority and low income populations from disproportionate adverse human health or environmental effects related to Federal government action. No residential land uses occur within or directly adjacent to the proposed project area, which is located within Census Tract 9800.24. Communities (including Sherman Oaks and Encino) surrounding the Sepulveda Dam Basin are largely White with the communities of Van Nuys and Lake Balboa having a large Hispanic population. (Data in Table 3-14 below are presented for 2010, the last year for which information is available across all representative geographies.

White Black

Table 3-14 Regional and National Socioeconomic Characteristics Eastvale Norco Corona Riverside County 46.63% 74.24% 71.22% 65.31% 9.61% 5.62% 5.02% 6.24%

California 62.13% 5.94%

63

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment Hispanic %Asian N%ative American One Race, Other Two or More Races Total Population Poverty Level

38.98% 27.15% 0.99% 11.20% 4.41% 55,298 5.08%

29.89% 4.21% 1.29% 9.60% 5.03% 27,143 6.23%

42.19% 10.99% 1.42% 7.19% 4.17% 157,395 11.26%

46.54% 6.11% 1.29% 16.76% 4.29% 2,266,899 16.62%

38.18% 13.48% 1.14% 12.85% 4.46% 38,066,920 16.06%

Source: www.usa.com 12/31/2016

3.13.2 Significance Thresholds The impact on socioeconomics and environmental justice will be considered significant if the following were to occur:

Impacts to a sector of the economy, productivity, competition, prices or jobs.

Impacts on the welfare of low income or minority populations.

The impact of project-induced population changes on the availability of public services

A substantial long-term decrease in local employment due to direct loss of jobs or an adverse effect on the local economy that results in an indirect long-term loss of jobs.

Disproportionately high and adverse impacts on minorities, low-income residents, or children.

A substantial population growth in an area induced by the alternative.

3.13.3 Alternative Analysis 3.13.3.1 No Action Alternative If the No Action Alternative were selected, the City of Corona would not construct its recycled water pipeline on Federal land. No impacts to socioeconomics and environmental justice would occur under the No Action Alternative and conditions would remain as described in Section 3.13.1. 3.13.3.2 Preferred Alternative 3.13.3.2.1 Construction

Construction of the Preferred Alternative is expected to take approximately 150 days total, to complete. A maximum of 10 construction workers onsite would be needed for the Proposed Project. There would be no substantial shift in population, or a need for additional housing or employment for the short construction duration. The new pipeline would be unmanned, except during maintenance activities which occur only two to three times per year. Six residential uses exist adjacent to the proposed project site (i.e., along Barron Drive). Impacts outside the site, which include commuting trips and vehicle trips, would be minimal. The local residents, including low-income and minority 64

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment populations, would be effected by construction of the Preferred Alternative, but such impacts are not disproportionately high and adverse. Therefore, the impact on socioeconomics and environmental justice would not be considered significant. 3.13.3.2.2 Operations and Maintenance

Operational activities associated with the recycled water pipeline would be largely passive in nature, as recycled water passes through the pipeline enroute to distribution points. No personnel or daily activities would be routinely associated with the Proposed Project. Maintenance activities would be similar to those currently occurring at the project site and at similar sites throughout the Santa Ana River Basin. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbance). As such, impacts to socioeconomics and environmental justice associated with operations and maintenance activities would be negligible and would not approach any of the significance thresholds previously identified.

3.13.4 Environmental Commitments Based on the analysis of potential impacts to socioeconomic characteristics or environmental justice concerns at or in the vicinity of the Proposed Project, no significant impacts are anticipated; no mitigation measures or other commitments are proposed.

3.14 Traffic and Transportation 3.14.1 Baseline Conditions Regional access to the Project site is via Interstate 15 and State Highway 91. The latest traffic counts by Caltrans for these two highways in the Project area is provided in Table 3-15.

Location

Peak Hour

Table 3-15 Selected Traffic Counts by Caltrans (2014) Southbound Peak Month AADT1 Peak Hour Interstate 15

Ontario Avenue Magnolia Avenue Junction 91 Hidden Valley

12,600 11,600 12,800 11,300

175,000 169,000 187,000 165,000

Green River Drive Junction 71 North Serfas Club Drive Main Street Junction 15

183,000 16,700 16,500 16,000 15,000

272,000 258,000 269,000 259,000 245,000

169,000 164,000 182,000 156,000

Northbound Peak Month

AADT1

11,800 12,800 11,300 11,200

167,000 187,000 165,000 165,000

164,000 182,000 156,000 156,000

16,700 16,500 16,700 15,000 15,200

258,000 269,000 270,000 245,000 230,000

253,000 256,000 257,000 247,000 219,000

Highway 91 267,000 253,000 256,000 247,000 233,000

1 AADT

= Average Annual Daily Traffic Source: Caltrans 2015, www.dot.ca.gov (3/29/2016)

65

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment The latest traffic information on River Road was taken by the City of Corona. It indicated an ADT of 15,200 at Corydon Drive.

3.14.1 Significance Thresholds The evaluation criteria used for this impact analysis are based on current regulations, typical threshold standards, knowledge of the area, and consideration of the context and intensity of the environmental effects, as required pursuant to NEPA. Traffic impacts typically are considered to be significant if the alternative would:

Cause an increase in traffic that is substantial in relation to the existing traffic load and capacity of the street system.

Exceed, either individually or cumulatively, a Level of Service (LOS) standard established by the regulatory agency.

Result in inadequate parking capacity.

3.14.2 Alternative Analysis Based on the jurisdictional guidance described above, a one percent traffic threshold volume was used to assess potential impacts. The one percent threshold was used as the most conservative (worst case) criterion from the affected jurisdictions. Since LOS was not calculated directly, this conservative analysis captures potential impacts regardless of the roadway operations. 3.14.3.1 No Action Alternative The No Action Alternative would not involve construction or operation activity, and no vehicle trips or parking demand would be generated on Federal land. Specifically, the No Action Alternative would not cause an increase in traffic that is substantial in relation to the existing traffic load and capacity of the street system; exceed an LOS standard established by the regulatory agency; or result in inadequate parking capacity. The No Action Alternative would not result in effects on traffic. 3.14.3.2 Preferred Alternative 3.14.3.2.1 Construction

Implementation of the Preferred Alternative is expected to take approximately 150 days to complete. The City of Corona anticipates that construction activities would typically occur from Monday to Friday during normal daytime work hours (for example, between 7:00 a.m. and 6:00 p.m.), although periodic Saturday work may be needed. Note that work on the Federal portion, which is not usually open to the public, would have little impact on public transportation because there is little activity on the Riverside County outgranted area during most of the year. A maximum of 10 construction workers would be needed. As a conservative estimate, it is assumed that the construction workers would drive to the site alone (either in personal vehicles or company vehicles/trucks), 66

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment resulting in up to 20 average daily trips (one incoming and one outgoing trip), 20 AM peak-hour trips and 20 PM peak-hour trips. Parking for the construction workforce would be provided entirely on-site. The average number of truck trips per day related to delivery of equipment and hauling materials is estimated to 6 truck trips/day over the estimated 150-day period period. Truck trips are projected to travel to and from the construction site during off-peak hours (between 9 AM and 3 PM). The increased traffic volume would be minimal considering current traffic in the site vicinity. Based on the existing peak hour volumes, the increase in traffic is estimated to be less than 1 percent on River Road, State Highway 91 and Interstate 15. During the installation of the project facilities, it might be necessary to temporarily close lanes on the affected streets (i.e., Barron Drive and River Road). In such instances, the contractor would be required to comply with the provisions of Part 6, Temporary Traffic Control, of the California Manual on Uniform Traffic Control Devices and the California Supplement to minimize any traffic and pedestrian hazards that exist during Project construction. Specifically, the construction of the Preferred Alternative would not cause an increase in traffic that is substantial in relation to the existing traffic load and capacity of the street system; exceed an LOS standard established by the regulatory agency; or result in inadequate parking capacity. Construction and operation of the Preferred Alternative would not result in significant effects on traffic. 3.14.3.2.2 Operations and Maintenance

Operational activities associated with the new pipeline would be largely passive in nature, as recycled water passes through the pipeline enroute to distribution points. No personnel or daily activities would be routinely associated with the Proposed Project area. Maintenance activities would be similar to those currently occurring at the project area and at similar sites throughout the Santa Ana River Basin. These activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbance). As such, traffic and transportation system impacts associated with operations and maintenance activities would be negligible and would not approach any of the significance thresholds previously identified.

3.14.4 Environmental Commitments A construction Traffic Management Plan for the Federal land portion would be prepared and submitted to Corps for review and approval prior to the start of any construction work. This plan would include such elements as the designation of haul routes for construction-related trucks, the location of access to the construction site, temporary traffic control devices or flagmen (if needed), travel time restrictions for construction-related traffic to avoid peak travel periods on selected roadways, and designated staging and parking areas for workers and equipment. Information on traffic will also be included in the Safety Plan, as appropriate.

67

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

3.15 Cumulative Impacts Cumulative effects are impacts on the environment that result from the incremental impacts of a proposed action when added to other past, present, and reasonably foreseeable future actions (State CEQA Guidelines §15355[b], 40 CFR 1508.7). Such impacts can result from individually minor but collectively significant actions taking place over time. The construction, operation and maintenance of the WRCRWA recycled water pipeline will not have any direct, indirect, or permanent significant effects as discussed in the environmental analysis sections of this dEA. Construction, operation and maintenance of the pipeline will not contribute to a cumulative effect on any resources because the defined significance thresholds were not reached for any resource area. As indicated in earlier sections concerning likely project impacts, in general no significant, adverse effects would result from the Proposed Project, even in combination with past, present, and future projects and conditions; final notes will be provided, below. In addition, considering the Preferred Alternative along with numerous other City of Corona pipeline projects, the cumulative effect is beneficial as it will allow the City of Corona to meet its Project objectives which are:

Decrease the amount of recycled water that cannot be beneficially used within the service area of the Western Riverside County Regional Wastewater Authority (WRCRWA) of which the City of Corona is a member agency.

Increase the amount of recycled water that can be beneficially used thereby decreasing the amount of potable water that is currently being used for non-potable uses.

Decrease the amount of imports from the State Water Project and Colorado River Aqueduct.

Improve the reliability of landscape irrigation water supplies.

A brief description of past, present, and future actions is presented, below. 3.15.1 Past Actions

During 1998 WRCRWA commenced operation of its Western Riverside County Regional Wastewater Treatment Plant (WRCRWTP) located at 14634 River Road, Eastvale, California. That facility is capable of producing recycled water for reuse or for discharge to Reach 3 of the Santa Ana River, upstream of Prado Dam. Its ultimate design capacity is 16 mgd. Consistent with and subject to WRCWA's Resolution No. 97-38, and any successor thereto, each member agency (the City of Corona is a member agency) shall have the right to take delivery of and use recycled water from WRCRWA's facilities, an amount of recycled water treated and produced by WRCRWA's facilities as determined by WRCRWA annually, not to exceed the amount of reclaimable wastewater delivered by the member agency to WRCRWA's facilities for treatment less any amount consumed during the course of the operations of WRCRWA's facilities. Prior to exercising its right to take its basic allocation or any portion thereof, each member agency shall enter into a written agreement with WRCRWA. As stated in Resolution No. 97-38, that agreement shall provide, at a minimum: 68

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment a) The Authority's determination of the Basic Allocation as set forth above; and b) That the point of delivery shall be the Treatment Facility, and the Member Agency shall be solely responsible for all costs and expenses associated with taking delivery and metering of reclaimed wastewater from the point of delivery; and c) That the Member Agency shall be responsible for obtaining, at is sole cost and expense, all permits and approvals applicable to the use of reclaimed wastewater; and d) That the Member Agency shall indemnify and hold the Authority harmless from legal liability and economic losses that may result from the Member Agency's use of the reclaimed wastewater; and e) That the Member Agency shall have an option to obtain Surplus Reclaimed Wastewater (Section 2 below); and f)

That the Member Agency shall be responsible for assuring that the reclaimed wastewater is delivered and utilized in full compliance with the NPDES Permit Order No. 97-2 and any Amendment or successor thereto, Title 22 of the California Code of Regulations, the "Guidelines for Use of Reclaimed Water" by the California Department of Health Services, and all other applicable laws regulations and ordinances; and

g) Such other terms and conditions as may be reasonably required or necessary to effectuate this policy, including a clause providing for binding arbitration. 2. Allocation of Surplus Reclaimed Wastewater Subject to the availability of reclaimed wastewater and the commitments and obligations of the Authority, including in plant uses, (so as not to interfere with treatment plant operations), and subject further to each Member Agency's right to its Basic Allocation under Section 1 above, each Member Agency of the Authority may be permitted by the Authority to temporarily take delivery of reclaimed wastewater in excess of the net amount of reclaimable wastewater delivered to the Treatment Facility, on an interruptible basis. Prior to taking surplus reclaimed wastewater, each Member Agency shall enter into a written agreement of the type described in Section 1, above. All allocations of surplus reclaimed wastewater must be first approved by the Authority.

Other past actions in this area include the construction (early 2000's) of Norco's recycled waterline in the similar area at the Riverview Park; the gradual closure of Crossroads Park due to the concessionaire's family changes; and the development, north of River Road, of the new community of Eastvale, on land which had previously been used as dairy farmland.

69

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment 3.15.2 Present Actions

The City of Corona is presently implementing its Proposition 1 ­ Reclaimed Water Distribution System, Phase 1 Project (the Preferred Project). This project is critical to the success of the Proposition 1 ­ Reclaimed Water Distribution System Project as it is the critical link to transport reclaimed water from the WRCRWTP to the City's reclaimed water distribution system. In the region, development and maintenance of existing facilities and infrastructure is virtually a constant reality, with ongoing improvements to transportation and other infrastructure facilities. 3.15.3 Future Actions

Completion of the Preferred Alternative will allow the City of Corona to implement the remaining four phases of its Proposition 1 ­ Reclaimed Water Distribution System Project. The impacts of implementing the Proposition 1 ­ Reclaimed Water Distribution System were analyzed in the July 2016 Initial Study and Mitigated Negative Declaration, Proposition 1 ­ Reclaimed Water Distribution System, City of Corona Department of Water and Power, prepared by K.S. Dunbar & Associates, Inc. That analysis indicated that there were no impacts which could not be mitigated to a less than significant level associated with implementation of the Project. Additional notes may also mention that there has been a baseline of construction in adjacent areas, especially the new City of Eastvale located just north and northeast of the treatment plant, although this has taken place off Federal land and while the Federal parcel in question has gone unchanged for several decades. The WRCRWA's treatment plant itself continues to provide potable and recycled water to its member agencies. And, the U.S. Army Corps of Engineers, as well as Orange County Water District and OC Flood Control District, all maintain present and future footprints in the general River Road area of Riverside County. Each of these regional agencies is involved with particular aspects of sediment, water, flood risk management, habitat conservation, open space/recreation, and other regional issues.

4 Environmental Commitments This section describes the environmental commitments that will be implemented by the City of Corona as part of the Proposed Project. Although no significant impacts were identified during preparation of this EA, the environmental commitments summarized below will decrease the severity of any short-term or temporary projectrelated impacts on resources. Importantly, due to the limited and localized nature of disturbance, the activities associated with construction, operation, and maintenance of the new pipeline are not expected to result in any long-term significant effects.

4.1

Land Use Construction activities will be limited to the times allowed in the municipal codes of the Cities of Eastvale and Norco in order to avoid potential impacts to adjacent land use activities.

70

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

4.2

Hydrology and Water Quality Environmental commitments for Proposed Project implementation would include using industry-standard erosion control materials and techniques. The City of Corona will also coordinate with appropriate entities (e.g., USACE, RWQCB) with regard to permitting requirements under the Clean Water Act and Rivers and Harbors Act, as necessary.

4.3

Air Quality DWP will:

Appoint a construction relations officer to act as a community liaison concerning on-site construction activities including resolution of issues related to PM10 generation.

Add the following best management practices in its contract documents for this project: The contractor shall:

Utilize electricity from power poles instead of from temporary diesel or gasoline power generators, when feasible.

Require the use of 2010 and newer diesel haul trucks (e.g., material delivery trucks and soil import/export) and if the lead agency determines that 2010 model year or newer diesel trucks cannot be obtained the contractor shall use trucks that meet EPA 2007 model year NOx emissions requirements.

Require that all on-site construction equipment meet EPA Tier 3 or higher emissions standards according to the following: All off-road diesel-powered construction equipment greater than 50 hp shall meet the Tier 4 emission standards, where available. In addition, all construction equipment shall be outfitted with BACT devices certified by CARB. Any emissions control device used by the contractor shall achieve emissions reductions that are no less than what could be achieved by a Level 3 diesel emissions control strategy for a similarly sized engine as defined by CARB regulations. A copy of each unit's certified tier specification, BACT documentation, and CARB or SCAQMD operating permit shall be provided at the time of mobilization of each applicable unit of equipment.

Maintain construction equipment engines by keeping them properly tuned and maintained according to manufacturer's specifications.

Use alternative fuels or clean and low-sulfur fuel for equipment.

71

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

Idle trucks in accordance with the Airborne Toxic Control Measure (ACTM) to Limit Diesel Fueled Commercial Motor Vehicle Idling and other applicable laws.

Spread soil binders on site, where appropriate, unpaved roads and staging areas.

Water site and equipment as necessary to control dust.

Sweep all streets at least once per day using SCAQMD Rule 1186 certified street sweepers or roadway washing trucks if visible soil materials are carried to adjacent streets.

Conduct operations in accordance with SCAQMD Rule 403 requirements.

If necessary, wash off trucks leaving the site.

Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at least two feet of freeboard in accordance with the requirements of California Vehicle Code (CVC) Section 23114.

4.4 Noise

DWP will add the following best management practices in its standard construction specifications:

All equipment used during construction shall be muffled and maintained in good operating condition. All internal combustion engines shall be fitted with well-maintained mufflers in accordance with manufacturers' recommendations.

4.5 Biological Resources

A burrowing owl clearance survey shall be conducted prior to any ground disturbing activities in accordance with the CDFW 2012 Staff Report on Burrowing Owl Mitigation. Two pre-construction clearance surveys shall be conducted 14-30 days and 24 hours prior to ground disturbing activities to document the continued absence of burrowing owl from the Project site.

If ground-disturbing activities or removal of any trees, shrubs, or any other potential nesting habitat are scheduled within the avian nesting season (nesting season generally extends from February 1 - August 31), a pre-construction clearance survey for nesting birds should be conducted within 10 days prior to any ground disturbing activities. The biologist conducting the clearance survey should document a negative survey with a brief letter report indicating that no impacts to active bird nests will occur. If an active avian nest is discovered during the 10-day preconstruction clearance survey, construction activities should stay outside of a 300-foot buffer around the active nest. For raptor species, this buffer is expanded to 500 feet. It is recommended that a biological monitor be present to delineate the boundaries of the buffer area and to monitor the active nest to ensure that nesting behavior is not adversely affected by the construction activity. Once the young have fledged, normal construction activities can occur.

In addition, no construction work on Federal land will occur between the March 1-September 1 riparian bird breeding season due to potential presence of the Federally-listed-as-endangered least Bell's vireo. Work outside the avian nesting season will result in a No Effect to Federally-listed species. Work proposed for 72

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment outside this timing window will be conditioned, via informal consultation and concurrence with the USFWS, to result in May Affect But Not Likely to Adversely Affect, Federally-listed avian species.

4.6

4.7

Paleontological Resources Should construction/development activities uncover paleontological resources, work will be moved to other parts of the Project site and a qualified paleontologist shall determine the significance of these resources. If the find is determined to be significant, avoidance or other appropriate measures shall be implemented. Appropriate measures would include that a qualified paleontologist be permitted to recover and evaluate the find(s) in accordance with current standards and guidelines.

Cultural Resources

In its July 2016 Mitigation Monitoring and Reporting Program adopted for this Project, the City of Corona committed to numerous measures to ensure the protection of cultural resources. In addition, the following mitigation measure would be incorporated to ensure that the project will not adversely affect historic properties: MM CUL-1 MM CUL-2 MM CUL-3

MM CUL-4

MM CUL-5

The grantee shall allow any interested tribe to monitor any and all construction activities and will proactively coordinate with tribal members to schedule access. Ground disturbing activities shall be periodically monitored by a qualified archaeologist meeting the Secretary of the Interior's Standards, as per Appendix A to 36 CFR 61. In the event that previously unknown cultural resources are discovered during the project, all ground disturbing activities shall immediately cease within 200 feet of the discovery until the Corps has met the requirement of 36 CFR 800.13 regarding post-review discoveries. The Corps will evaluate the eligibility of such resources for listing on the National Register of Historic Places and propose actions to resolve any anticipated adverse effects. Work shall not resume in the area surrounding the potential historic property until the Corps re-authorizes project construction. Any artifact(s) or other item(s) collected from federal lands as a result of any inadvertent discoveries will be curated in compliance with the Archaeological Resources Protection Act (Public Law 96-95; 16 U.S.C. 470aa-mm), 36 CFR 79, 36 CFR 800.13, and EP 11302-540, Chapter 6. In the event of accidental discovery of human remains, all construction activities shall be halted immediately, and the Corps archaeologist and the Riverside County Coroner must be notified. The coroner will determine whether the remains are of forensic interest. If human remains, funerary objects, sacred objects, or items of cultural patrimony are encountered during the proposed project, the treatment and disposition of such remains will

73

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment be carried out in compliance with the Native American Graves Protection and Repatriation Act (Public Law 101-601; 25 U.S.C. 3001 et seq.) and EP 1130-2-540, Chapter 6.

4.8

Hazardous Materials and Wastes

To reduce potentially hazardous conditions and minimize the impacts from the handling of potentially hazardous materials, DWP shall include the following in its construction contract documents:

The contractor(s) shall prepare a Health and Safety Plan in compliance with the requirements of Chapter 6.95, Division 20 of the Health and Safety Code (§§ 25500--25532). The plan shall include measures to be taken in the event of an accidental spill.

The contractor(s) shall enforce strict on-site handling rules to keep construction and maintenance materials out of receiving waters and storm drains. In addition, the contractor(s) shall store all reserve fuel supplies only within the confines of designated construction staging areas, refuel equipment only within the designated construction staging areas, and regularly inspect all construction equipment for leaks.

The construction staging area shall be designed to contain contaminants such as oil, grease, and fuel products so that they do not drain towards receiving waters or storm drain inlets.

4.9

Public Health and Safety

Coordination and established communication with the Corps Reservoir Regulation Section personnel responsible for public notification of flood inflow to the Prado Dam Basin will prevent impacts to construction personnel and equipment working within the flood plain.

The City of Corona will prepare a Project Safety Plan for Corps review and approval prior to entry onto the site for construction.

4.10 Traffic and Transportation

A construction Traffic Management Plan would be prepared and submitted to Corps for review and approval prior to the start of any construction work. This plan would include such elements as the designation of haul routes for construction-related trucks, the location of access to the construction site, temporary traffic control devices or flagmen (if needed), travel time restrictions for construction-related traffic to avoid peak travel periods on selected roadways, and designated staging and parking areas for workers and equipment.

74

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

Information on traffic will also be included in the Safety Plan, as appropriate.

Public Involvement, Coordination and Consultation 5.1 Project Delivery Team The Corps Project Delivery Team for review of this proposal comprises a variety of specialists from a range of scientific and professional backgrounds, including project managers, biologists, planners, and engineers. Other specialists are engaged for resource-specific discussions and analyses and Corps staff coordinates with other regulatory agencies and stakeholders, as appropriate, including representatives of Federal, state, and local/regional agencies.

5.2

Agency Coordination

Although a "No Effect to Listed Species" determination is anticipated, this Draft EA has been discussed and will be noticed to the US Fish and Wildlife Service. It is also anticipated that the environmental impact analysis process will involve engagement with the California State Historic Preservation Office (SHPO) and with Tribes, as has already occurred during the CEQA process. Other agencies (e.g., SCAQMD, CRWQCB, SAR) may be coordinated with before the EA is finalized, and any interaction and notable, substantive discourse will be summarized herein.

5.3

Public Involvement

Public involvement is the process by which interested parties, affected individuals, non- governmental organizations, and governmental entities are consulted and included in the decision-making process addressing a planning or development effort. NEPA requires public notification of the availability of a Draft EA, and encourages the invitation of public and agency involvement in the process. This draft Environmental Assessment, with draft Finding of No Significant Impact, will be provided to the public for comment, for a period of 30 days.

6 Applicable Environmental Laws and Regulations 6.1 National Environmental Policy Act NEPA requires that Federal agencies consider potential environmental consequences of proposed actions. The law's intent is to protect, restore, or enhance the environment through well-informed Federal decisions. The CEQ was established under NEPA for the purpose of implementing and overseeing Federal policies as they relate to this process. In 1978, the CEQ issued Regulations for Implementing the Procedural Provisions of the National Environmental Policy Act (40 CFR § 1500-1508 [CEQ 1978]). These regulations specify that an EA be prepared to:

Briefly provide sufficient analysis and evidence for determining whether to prepare an Environmental Impact Statement (EIS)or a Finding of No Significant Impact (FONSI);

75

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

Aid in in an agency's compliance with NEPA when no EIS is necessary; and

Facilitate preparation of an EIS when one is necessary.

Further, to comply with other relevant environmental requirements (e.g., the Endangered Species Act [ESA] and National Historic Preservation Act [NHPA]) in addition to NEPA, and to assess potential environmental impacts, the EIAP and decision-making process for the proposed action involves a thorough examination of all environmental issues pertinent to the Proposed Project. Specific to U.S. Army programs, compliance with NEPA is effectively ensured by incorporating policies and procedures outlined in Army Regulation (AR) 200-1, Environmental Protection and Enhancement, additional USACE guidance is outlined in 33 CFR 220, Design Criteria for Dam and Lake Projects and 33 CFR 230, Procedures for Implementing NEPA.

6.2 Biological Resources The Endangered Species Act (ESA) (16 U.S. Code [USC] §§ 1531­1544, as amended) established measures for the protection of plant and animal species that are federally listed as threatened and endangered, and for the conservation of habitats that are critical to the continued existence of those species. Federal agencies must evaluate the effects of their proposed actions through a set of defined procedures, which can include the preparation of a Biological Assessment and can require formal consultation with the U.S. Fish and Wildlife Service (USFWS) under Section 7 of the ESA. This EA will include a summary of coordination with appropriate regulatory entities. As mentioned earlier, the Corps in consultation with the U.S. Fish and Wildlife Service (December 5, 2017), determined this project to result in No Effect as presently conditioned, and May Affect, but Not Adversely Affect, listed species or their Critical Habitat if work would occur within the nesting season. Therefore, absent further information, no formal Section 7 consultation would be required. Stipulations outlined in other regulations promulgated to ensure the protection of sensitive species and their habitat (e.g., Migratory Bird Treaty Act [MBTA], Bald and Golden Eagle Protection Act [BGEPA], etc.) are also taken into consideration when evaluating potential impacts associated with implementation of a Proposed Action.

6.3 Clean Air Act and Conformity Requirements The Clean Air Act (CAA) (42 USC §§ 7401­7671, as amended) provided the authority for the U.S. Environmental Protection Agency (USEPA) to establish nationwide air quality standards to protect public health and welfare. Federal standards, known as the National Ambient Air Quality Standards (NAAQS), were developed for six criteria pollutants: ozone (O3), nitrogen dioxide (NO2), carbon monoxide (CO), sulfur dioxide (SO2), particulate matter (PM10 and PM2.5), and lead (Pb). The CAA also requires that each state prepare a State Implementation Plan (SIP) for maintaining and improving air quality and eliminating violations of the NAAQS. Under the CAA A mendments of 1990, Federal agencies are required to determine whether their undertakings are in conformance with the applicable SIP and demonstrate that their actions will not cause or contribute to a new violation of the NAAQS; increase the frequency or severity of any existing violation; or delay timely attainment of any standard, emission reduction, or milestone contained in the SIP. The USEPA has set forth regulations in 40 CFR 51, Subpart W, which require the proponent of a proposed action to perform an analysis to determine if its implementation would comply with the SIP. This EA includes a presentation and an analysis of project elements (e.g., construction equipment and worker vehicle trips) that could affect local and regional air quality conditions. 76

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

6.4 Water Resources Regulatory Requirements The Clean Water Act (CWA) of 1977 (33 USC §§ 1251 et seq.) regulates pollutant discharges that could affect aquatic life forms or human health and safety. Section 404 of the CWA, and EO 11990, Protection of Wetlands, regulate development activities in or near streams or wetlands. Section 404 also requires a permit from the USACE for dredging and filling in wetlands. EO 11988, Floodplain Management, as amended by EO 13960, requires Federal agencies to take action to reduce the risk of flood damage; minimize the impacts of floods on human safety, health, and welfare; and to restore and preserve the natural and beneficial values served by floodplains. Federal agencies are directed to consider the proximity of their actions to or within floodplains. Per USACE, this project is exempt from Sections 401 and 404 of the CWA and Section 10 of the Rivers and Harbors Act. Still, this EA includes a presentation and an analysis, and their mitigation, of project elements (e.g., sedimentladen runoff) that could affect local and regional water resources.

6.5 Cultural Resources Regulatory Requirements The National Historic Preservation Act (NHPA) of 1966 (16 USC § 470) established the National Register of Historic Places (NRHP) and the Advisory Council on Historic Preservation (ACHP) which outlined procedures for the management of cultural resources on Federal property. Cultural resources can include archaeological remains, architectural structures, and traditional cultural properties such as ancestral settlements, historic trails, and places where significant historic events occurred. The NHPA requires Federal agencies to consider potential impacts to cultural resources that are listed, nominated to, or eligible for listing on the NRHP; designated a National Historic Landmark; or valued by modern Native Americans for maintaining their traditional culture. Section 106 of NHPA requires Federal agencies to consult with the appropriate SHPO and Tribe(s) if their undertaking might affect such resources. Protection of Historic and Cultural Properties (36 CFR 800) provides an explicit set of procedures for Federal agencies to meet their obligations under the NHPA, which includes inventorying of resources and consultation with SHPO. This EA includes a presentation and an analysis of project elements (e.g., trenching) that could affect cultural resources, as well as a description of coordination efforts undertaken with appropriate partiers. The American Indian Religious Freedom Act (AIRFA) (42 USC § 1996) established Federal policy to protect and preserve the rights of Native Americans to believe, express, and exercise their traditional religions, including providing access to sacred sites. The Native American Graves Protection and Repatriation Act (NAGPRA) (25 USC §§ 3001­3013) requires consultation with Native American Tribes prior to excavation or removal of human remains and certain objects of cultural importance.

6.6 Sustainability and Greening EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, strives to improve efficiency and environmental performance of Federal agencies by setting goals in the areas of energy efficiency, greenhouse gas emission mitigation, water conservation, waste management and recycling, green procurement, 77

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment pollution prevention, and livable communities, among others. The EO specifies that every Federal organization and agency must make the reduction of greenhouse gas emissions a priority and establishes specific goal-setting, inventorying, and reporting requirements for Federal agencies. This includes an order for each agency to develop, implement, and update a Strategic Sustainability Performance Plan, which should work toward continual improvement of sustainable practices associated with Federal actions. Sustainable green building and development practices can be recognized through sustainable site development, water savings, energy efficiency, materials selection and indoor environmental quality. The U.S. Green Building Council's (USGBC's) Leadership in Energy and Environmental Design (LEED) Green Building Rating SystemTM is a thirdparty certification program and the nationally-accepted benchmark for the design, construction, and operation of high-performance green buildings (USGBC 2010). LEED rating systems are based on a set number of prerequisites and credits in six major categories: 1) sustainable sites; 2) water efficiency; 3) energy and atmosphere; 4) materials and resources; 5) indoor environmental quality; and 6) innovation and design process (USGBC 2009). In the most recent LEED rating system (version 2.2), buildings can qualify for four levels of certification, in order from highest to lowest: platinum, gold, silver, and certified. Benefits of constructing LEED certified facilities include lower operating costs and increased asset value, reduced waste sent to landfills, conservation of energy and water, healthier and safer facilities for occupants, reduction of harmful greenhouse gas emissions that incrementally contribute to global climate change, and the demonstration of an owner's commitment to environmental stewardship and social responsibility.

6.7 Other Executive Orders Additional regulatory legislation that potentially applies to the implementation of this Proposed Project in cludes guidelines promulgated by EO 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, to ensure that citizens in either of these categories are not disproportionately affected. Additionally, potential health and safety impacts that could disproportionately affect children are considered under the guidelines established by EO 13045, Protection of Children from Environmental Health Risks and Safety Risks. EO 13186, Responsibilities of Federal Agencies to Protect Migratory Birds, acts as additional protection for migratory birds.

6.8 Intergovernmental Review of Federal Programs EO 12372, Intergovernmental Review of Federal Programs, structures the Federal government's system of consultation with state and local governments on its decisions involving grants, other forms of financial assistance, and direct development. EO 12372 states in consultation with local governments, design their own review processes and select those federally supported development activities that they wish to review. As detailed in 40 CFR § 1501.4(b), CEQ regulations require intergovernmental notifications prior to making any detailed statement of environmental impacts. Through the consultation under EO 12372, the proponent notifies relevant Federal, state, and local agencies and allows them sufficient time to make known their environmental concerns specific to a proposed action. Comments and concerns submitted by these agencies are subsequently incorporated into the analysis of potential environmental impacts conducted as part of the EA.

78

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

7 Summary Based on research and analyses conducted in support of this dEA, and contingent on comments received during the public review period, it is recommended that the Corps determine that a Finding of No Significant Impact (FONSI) is the appropriate decision document for this action and that an Environmental Impact Statement is not necessary. A FONSI, if appropriate, would be a necessary precursor to the Corps for granting an easement to the City of Corona for its recycled water pipeline per the Preferred Alternative. This recommendation is based on the fact that this alternative best satisfies the purpose of and need for the proposed action while also resulting in the least amount of significant environmental impacts.

79

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

8 References Air Resources Board. 2016. www.arb.ca.gov, 12/22/2016. Air Resources Board. 2000. Risk Guidance for the Permitting of New Stationary Diesel-Fueled Engines. California Department of Transportation. 2010. List of Scenic Highways in California. www.dot.ca.gov, 3/25/2014. California Department of Transportation. 2015. Traffic Counts. www.dot.ca.gov, 5/19/2015. California Department of Toxic Substances Control. 2015. www.dtsc.ca.gov. 8/16/2015. California Department of Water Resources. 2010. Guidelines, Proposition 84 & Proposition 1E, Integrated Regional Water Management. August. California Geological Survey. 2015. Alquist-Priolo. www.consvr.ca.gov. 8/16/2015. California Geological Survey, 2015. Probabilistic Ground Motion Map. www.consvr.ca.gov. 8/16/2015. California Geological Survey. 2015. Seismic Hazards Map. www.conservation.ca.gov. 8/16/2015. City of Corona. 2014. General Plan Map Book. 8/14/2014. City of Corona. Corona Municipal Code, Chapter 9.24, Loud and Unnecessary Noises. 5/18/2014 County of Riverside. 2015. www3.tlma.co.riverside.ca.us. 8/17/2015. Environmental Protection Agency. 2015 www.epa.gov. 8/16/2015. K.S. Dunbar & Associates, Inc. 2016. Initial Study and Mitigated Negative Declaration, Proposition 1 ­ Reclaimed Water Distribution System, City of Corona Department of Water and Power. July. K.S. Dunbar & Associates, Inc. 2016. Mitigation Monitoring and Reporting Program, Proposition 1 ­ Reclaimed Water Distribution System, City of Corona Department of Water and Power. July. K.S. Dunbar & Associates, Inc. 2016. Air Quality and Greenhouse Gases Analyses, Proposition 1 ­ Reclaimed Water Distribution System, Phase 1, City of Corona Department of Water and Power. April. K.S. Dunbar & Associates, Inc. 2017. Habitat Assessment and MSHCP Consistency Analysis, Proposition 1 ­ Reclaimed Water Distribution System, Phase 1, City of Corona Department of Water and Power. July. Rincon Consultants, Inc. 2017. Cultural Resources Assessment Report for the Proposition 1- Reclaimed Water Distribution System Project, City of Corona Department of Water and Power, Riverside County, California. July.

Riverside County Board of Supervisors, Riverside General Plan, adopted October 7, 2003. SCAQMD. 2006. Final Methodology to Calculate Particulate Matter (PM) 2.5 and PM 2.5 Significance Thresholds. October. SCAQMD. 2012. Air Quality Management Plan.

80

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment SCAQMD. 1999. CEQA Air Quality Handbook. Revised March 2011. www.aqmd.gov. 5/24/2014 SCAQMD. 2008. Localized Significance Thresholds. July. www.aqmd.gov. 5/24/2014 SCAQMD. 2008. Draft Guidance Document ­ Interim CEQA Greenhouse Gas (GHG) Significance Threshold. October. State of California. Title 24, California Code of Regulations, Part 6, Section 132, Building Standards. State Water Resources Control Board. 2015. www.waterboards.ca.gov. 8/16/2015. Thomas Brothers. 2008. The Thomas Guide San Bernardino and Riverside Counties. Uniform Building Code. 1994. U.S. Department of Agriculture, Soil Conservation Service. 2015. General Soil Map Western Riverside Area, California. www.usda.gov. 8/16/2015. www.usa.com, 12/31/2016.

81

Easement for the WRCRWA Recycled Water Pipeline WRCRWTP to Bluff Street Draft Environmental Assessment

9 List of Preparers 9.1 U.S. Army Corps of Engineers Travis Bone, Archaeologist, Planning Division Carvel Bass, Ecologist, Asset Management Division Joseph Manahan, District Counsel, Office of Counsel

9.2 U.S. Fish and Wildlife Service Kai Palenscar, Biologist, Palm Springs Office

9.2 Contributors City of Corona Department of Water and Power K.S. Dunbar & Associates, Inc. Rincon Consultants, Inc.

82

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas