You can copy from here when filling out the rest of the page.
The City of Corona’s Department of Water and Power (DWP) is requesting implementation of its Proposition 1–funded Reclaimed Water Distribution System Project, which includes the overall installation, operation and maintenance of approximately 73,400 lineal feet of 8-inch to 20-inch diameter recycled water pipelines, and two 2.1 million-gallon recycled water storage tanks. It is anticipated that the Project would be implemented in five phases. Phase 1, the only portion requiring Federal/Corps approval, would include approximately 2,000 lineal feet of 20-inch diameter recycled water pipeline to be installed on Federal land, and 5,000 feet total between the Western Riverside County Regional Wastewater Authority’s facilities at 14634 River Road in the City of Eastvale to its intersection with Bluff Street in the City of Norco
The City of Corona’s Department of Water and Power (DWP) is requesting implementation of its Proposition 1–funded Reclaimed Water Distribution System Project, which includes the installation, operation and maintenance of approximately 73,400 lineal feet of 8-inch to 20-inch diameter recycled water pipelines and two 2.1 million-gallon recycled water storage tanks.Phase 1 is the only portion requiring Federal/Corps approval (easement) andincludesapproximately 2,000 lineal feet of 20-inch diameter recycled water pipeline to be installed on Federal land outgranted by Riverside County Open Space District and locatedbetween the Western Riverside County Regional Wastewater Authority’s facilities near River RoadDrive,City of Eastvale. The waterline would continue on City streets to an existing facility at Bluff Street,City of Norco, and the water then sent to Corona for use in parkland irrigation.
A draft Environmental Assessment is attached to this notice and the public is invited to providecomments or ask for more information, by sending to carvel.h.bass@usace.army.milor by calling 213-452-3392 during the time period December 21, 2017-January 22, 2018.
U.S.ARMY CORPS OF ENGINEERS
LOS ANGELES DISTRICT
Draft FINDING OF NO SIGNIFICANT IMPACT
Approval for Easement to Construct, Operate, and Maintain a Recycled Water Line
Prado Flood Risk Management Basin
Riverside County CA
I have reviewed the attached Environmental Assessment (EA) which was prepared to
describe and analyze effects should the U.S. Army Corps of Engineers (Corps) approve the
proposal by the City of Corona, a Recreation lessee, for a 25-year easement, across recreationoutgranted land which the Corps controls. The easement would allow the City to construct,
operate, and maintain a segment of a buried, 20-inch recycled water line within the Prado Dam
Flood Control Basin, from Western Riverside County Regional Wastewater Authority
(WRCRWA)'s Treatment Plant to Baron Road, City of Eastvale. After leaving Federal land, the
line would enter City streets and extend to a location in Norco where Corona would receive the
water for use in its recreational parkland, much of which is also Federal land under the Corps
recreation outgrant to Corona.
The Corps will issue a 25-year easement to City of Corona to build, operate, and maintain
the proposed waterline segment, which crosses Federal land at the Crossroads Riverview Park
which is operated (presently not in operation) by a concessionaire with Riverside County Open
Space District under a recreation outgrant from the Corps.
Corona's purpose in contacting the Corps was to obtain permission to construct the initial
segment of the proposed waterline, which originates and ends on non-Federal property but would
cross Corps-controlled areas. Corona, as a member-partner within the WRCRWA, sought a
feasible route from the Treatment Plant to facilities, in Norco, where Corona could receive water
for its irrigation purposes. The water will benefit Corps-owned parkland which is managed under
Corona's Recreation license with the Corps.
The purpose of the draft EA, submitted for public review during December 21, 2017 January 22, 2018, was to determine whether Proponent's request for approval of the proposed
line would result in significant environmental impacts which might require development of an
Environmental Impact Statement. A No-Action Alternative as part of baseline conditions
analysis was evaluated in the EA, and several additional alternatives, examined in previous
CEQA documentation were also described herein, but discarded from further analysis, in
comparison with the Preferred Alternative.
Resources identified as potentially affected by the Proposed Action are described in the
EA. The State Historical Office and Tribes, and the U.S. Fish and Wildlife Office were
consulted. Although no significant adverse impacts were identified, environmental commitments
listed in the EA are expected to continue to avoid and minimize adverse impacts associated with
any proposed operations. The proposal does not contribute significantly to cumulative or other
impacts.
I have determined that implementation of the Proposed Action (Preferred Alternative) as
requested by the Proponent is in compliance with Section 106 of the National Historic
Preservation Act, the Endangered Species Act, Migratory Bird Treaty Act and other Federal laws
and Executive Orders described in this EA, and that there are no significant adverse impacts on
any federal resources resulting from approval and implementation of the Preferred Action/Onsite
Alternative requested by the Proponent.
After consideration of the significant factors and all pertinent environmental legislation,
and in addition to comments received and other coordination with concerned agencies, as
discussed in the EA, I have determined that implementation of the Preferred Onsite Alternative
requested by the Proponent, together with the environmental commitments and mitigation
requirements, will not significantly affect the quality of the human environment nor would there
be significant adverse environmental effects. Therefore, an Environmental Impact Statement will
not be required and the Preferred Onsite Alternative is approved for implementation pursuant to
33 CFR 230.11.
Prepared by:
________________________
Carvel Bass
Ecologist, Civil Works Branch
Asset Management Division
________________________
Date
Approval Recommended by:
________________________
Cheryl L. Connett
Chief, Asset Management Division
Real Estate Contracting Officer
________________________
Date
Approval by:
________________________
Kirk E. Gibbs
Colonel, U.S. Army
Commander and District Engineer
_________________________
Date
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
DRAFT
ENVIRONMENTAL ASSESSMENT
EASEMENT FOR THE WRCRWA RECYCLED WATER LINE
WRCRWTP TO BLUFF STREET, NORCO, CA
PRADO DAM BASIN, CORONA
RIVERSIDE COUNTY, CALIFORNIA
U.S. Army Corps of Engineers
Los Angeles District
December, 2017
1
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
1 Introduction
The City of Corona's Department of Water and Power (DWP) is requesting implementation of its Proposition 1funded
Reclaimed Water Distribution System Project, which includes the overall installation, operation and maintenance of
approximately 73,400 lineal feet of 8-inch to 20-inch diameter recycled water pipelines, and two 2.1 million-gallon
recycled water storage tanks. It is anticipated that the Project would be implemented in five phases. Phase 1, the only
portion requiring Federal/Corps approval, would include approximately 2,000 lineal feet of 20-inch diameter recycled
water pipeline to be installed on Federal land, and 5,000 feet total between the Western Riverside County Regional
Wastewater Authority (WRCRWA facilities, a regional water treatment plant, to cross River Road (Figure 1-1). As
shown on Figure 1-1, the Proposed Project area includes mixed uses (e.g., residential, commercial and open space).
It is accessible via River Road from State Route 91. The Federal portion of this proposal is shown, below, from its exit
at the treatment plant's mid-eastern area then extending on Federal land, until leaving Federal land and the scope of
this document, traveling eastward to reach Baron Drive and then River Road, and terminating at Bluff Street in Norco
(see Bluff Street in Figures 2.2.2-1 and 2.3.2-1).
Figure 1-1 Recycled Water Line Preferred Alignment (purple) on Federal land, showing southeast exit from treatment plant
As seen above, the proposed alignment would exit the WRCRWA Wastewater Treatment Plant site and would cross
Federal lands administered by the U.S. Army Corps of Engineers (Corps) between the Treatment Plant site and Baron
Drive, a distance of approximately 2,000 lineal feet. The pipeline would then follow public street rights-of-way (Baron
Drive and River Road) to the intersection of River Road and Bluff Street. At the Santa Ana River crossing, the pipeline
would be installed within an existing, dedicated space within the River Road Bridge structure.
2
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
The crossing of federal land west of River Road Bridge requires that DWP acquire an easement from the Corps. The
granting of the easement would be considered a Federal action. Additional phases of the proposed construction activity
involves no Federal land and will not be considered here.
The National Environmental Policy Act (NEPA) requires that Federal agencies consider potential environmental
consequences of implementation of proposed actions. (The same requirement is triggered when a Proposed Project
requires a Federal permit and/or is aided by Federal funding.) NEPA's intent is to ensure that project proponents protect
environmental quality through informed Federal decisions. The Council of Environmental Quality (CEQ) was
established under NEPA for the purpose of implementing and overseeing Federal policies as they relate to this process.
In 1978, the CEQ issued Regulations for Implementing the Procedural Provisions of the National Environmental Policy
Act (40 CFR §1500-1508, 1978). These regulations indicate that an Environmental Assessment (EA) be prepared to:
Briefly provide sufficient analysis and evidence for determining whether to prepare an environmental impact
statement (EIS) or a Finding of No Significant Impact (FONSI);
Aid in an agency's compliance with NEPA when an EIS is necessary; and
Facilitate preparation of an EIS when one is necessary.
Further, to comply with other relevant environmental requirements (e.g., Endangered Species Act (ESA), National
Historic Preservation Act (NHPA), Clean Air Act (CAA), Clean Water Act (CWA), etc.,) in addition to NEPA, and to
assess potential environmental impacts, the impact assessment and decision-making processes for the proposed
action involves thorough examination of all environmental issues pertinent to the Proposed Project. Specific to U.S.
Army programs, compliance with NEPA is effectively ensured by implementing policies and procedures outlined in
Army Regulations (AR) 200-1, Environmental Protection and Enhancement Regulations, 200-2-2, Procedures for
Implementing NEPA, and in 33 Code of Federal Regulations, Part 230, et seq.
The Corps is the Lead Agency for this draft EA (dEA) because the Proposed Project area involves facilities and land
controlled by the Corps. The dEA evaluates the potential environmental impacts that could result from implementation
of the Proposed Project, which is described in Section 1.2. Reasonable alternatives to the Proposed Project have been
considered during the planning process (see Chapter 2) and potential environmental consequences of these
alternatives have been included in the evaluation (see Section 2.2).
Section 1.1 Project Authority, Purpose, and Scope
Authority
The United States Corps of Engineers (USACE) pursuant to 10 U.S.C. 2667 (Lease) and/or 10 U.S.C. 2668
(Easement for Right-of-Way) is authorized to permit non-Federal entities the right to use Federal lands if the
proposed use is determined to be compatible with the Federal project, laws, regulations and serve the interests of the
public and/or the Federal government.
Purpose and Need
3
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
The City of Corona holds a Recreation outgrant with the USACE, in its western areas on Federal land associated
with Prado Dam which is operated for flood risk management by the Corps. These outgranted areas, which are
owned by the Federal government, include a number of City parks as well as the Corona Municipal Airport, all of
which use recycled water in their landscape irrigation. In other words, both Federal (Corps-owned) and non-Federal
(Corona-owned) lands will benefit from access to additional recycled water for the local parklands. To conserve
potable water, and to provide recycled water necessary to facilitate City park irrigation needs, the construction of
additional recycled water facilities is necessary. Corona is requesting a new easement for this waterline to cross
Federal open space on land currently leased for Recreation (Crossroads Riverview Park) by Riverside County, to
connect at Corona's existing recycled waterline connection in Norco, Riverside County, CA. The proposed waterline
path would closely parallel Norco's existing buried waterline which also runs from the treatment plant to Baron Drive.
The background for the City's need in requesting a Corps easement, is that consistent with WRCRWA's Resolution
No. 97-38, each member agency (such as the City of Corona) shall have the right to take delivery of and use
recycled water from WRCRWA's facilities, an amount of recycled water treated and produced by WRCRWA's
facilities as determined by WRCRWA annually, not to exceed the amount of reclaimable wastewater delivered by the
member agency to WRCRWA's facilities for treatment less any amount consumed during the course of the
operations of WRCRWA's facilities.
The Corps' land management purpose is to review such proposals as the current one, for the easement to install,
operate and maintain such a pipeline as described, for consistent and appropriate Corps land use. The Federal need
is to determine whether the request is in the interest of the public and the Corps (/Federal government), and to
process the request to occupy/use Federal lands in a way that prioritizes compatibility with the existing Federal Flood
Risk Management Project (Santa Ana River Mainstem Project, including Prado Basin and Dam). The purpose of this
draft Environmental Assessment (dEA) is to evaluate any potential impacts associated with the United States Army
Corps of Engineers (USACE/Corps) granting the requested recycled waterline easement, to City of Corona, and in
subsequent construction, use, and maintenance of the recycled waterline as proposed.
City of Corona's stated purpose in this matter is to:
Decrease the amount of recycled water that cannot be beneficially used within the service area of the
WRCRWA, of which the City of Corona is a member agency.
Increase the amount of recycled water that can be beneficially used thereby decreasing the amount of potable
water that is currently being used for non-potable uses.
Decrease the amount of imports from the State Water Project and Colorado River Aqueduct.
Improve the reliability of landscape irrigation water supplies at Corona's landholdings, both Federal and nonFederal holdings.
The City of Corona's stated need for the Proposed Project is that the pipeline is the critical link to the supply of reclaimed
water for its reclaimed water distribution system. While other potential routes do exist between the Treatment Plant
4
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
water source and Corona's existing connector location in Norco, each of those alternatives has major and
disadvantageous constraints when compared with the proposed route introduced in this draft EA. Examples of these
constraints include the need for significantly longer pipeline construction footprints on additional private or public lands
as well as restricting construction to significantly more constrained spaces within the Treatment Plant's water source
location itself.
Scope of Analysis
This Environmental Assessment (EA) analyzes likely effects of the proposal by comparing a No Action Alternative,
with the proposed action, which would provide for an easement on USACE-owned properties that would ultimately be
used for development of the recycled waterline. This analysis is offered to the interested public to solicit input on the
project and would be made available for review and public input for 30 days.
Comments regarding this proposal should be addressed to the USACE at the address provided on the accompanying
public notice information. Following the 30-day review period, the USACE's Asset Management Division will
determine if an Environmental Impact Statement (EIS) will be required or if a Finding of No Significant Impact
(FONSI) can be issued.
1.2 Proposed Project Description Federal Action
As proposed (Preferred Alternative), the Federal Action consists of the Corps granting a 25-year easement to the
project proponent (City of Corona DWP), because the City's preferred route would cross Federal land controlled by
the Corps. The waterline would originate from within the Western Riverside Wastewater Treatment Plant and then
cross adjacent Federal land currently leased for Recreation (Crossroads Riverview Park) by Riverside County, then
follow and continue on non-Federal, public street rights-of-way to an existing connection location in Norco, CA near
City of Corona's northwest boundary. This proposed easement of approximately 2,000 lineal feet would allow the City
of Corona to construct, operate and maintain an essential link in its reclaimed water distribution system. (Note that
the Riverview Park and the proposed project footprint area is generally closed to the public, except for rare, special
events held elsewhere in the Park).
2 Alternatives
This section presents alternatives which were considered, including the Preferred Action Alternative and a No-Action
Alternative which are carried forward for analysis, as well as alternatives which will not be carried forward. To best
meet the City's Purpose and Need, a portion of the pipeline would cross Federal land controlled by the Corps and this
Preferred Alternative would consist of the Corps granting an easement to the proponent, City of Corona DWP. The
maintenance of Federal lands now managed in recreational parkland and sports fields by Corona, would benefit from
this new source of recycled wastewater for its annual irrigation needs.
2.1 No Action Alternative
5
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
CEQ regulations implementing NEPA require that a No Action Alternative be analyzed to provide a baseline for
comparison with action alternatives. The No Action Alternative identifies and describes the potential environmental
impacts of the status quo (i.e., if the Corps did not grant the easement for the construction, operation and maintenance
of the proposed 20-inch diameter reclaimed water pipeline across Federal land). However, because CEQ regulations
stipulate that the No Action Alternative be analyzed, to assess environmental consequences that may occur if the
Proposed Project is not implemented, this alternative is also carried forward for analysis in this dEA.
Under the No Action Alternative, the proposed 20-inch diameter pipeline would not be constructed, operated and
maintained via an easement to cross Federal lands. In this case, there would be no construction or maintenance
footprint on the approximately up to 2,000 lineal feet of Federal land, as proposed. Corona would be faced with different
constraints in its ability to construct a pipeline to utilize this valuable source of reclaimed water. Corona has already
submitted this proposal to a CEQA analysis and because of the constraints, indicated below, both the City and
Treatment Plant would be limited in developing a significantly feasible alternate to the Preferred Alternative. Under the
No Action Alternative, with no use of Federal land, the City would be less able to supply its customers with reclaimed
water and may have to meet future demands using additional, more expensive potable water, which is mostly imported
from the State Water Project and the Colorado River Aqueduct.
2.2 Description of Action Alternatives
The following three (3) action alternatives were initially evaluated for the Proposed Project.
2.2.1 Preferred Alternative (or Alternative 1)
The Preferred Alternative (shown previously on Figure 1-1) consists of approximately 2,000 lineal feet of Federal land
to be used for a total 5,000 lineal feet (LF) of 20 inch-diameter recycled water pipeline to be installed from the Western
Riverside County Regional Wastewater Treatment Plant to the City's existing reclaimed water distribution system at
the intersection of River Road and Bluff Street; see Bluff Street in Figure 2.2.2-1. With the exception of the bridge
crossing, the pipeline would be installed through open-cut techniques. At the bridge crossing location, the pipeline
would be placed within an existing dedicated space located within the bridge structure.
The City is requesting a 20-foot wide, approximately 2,000-foot long, permanent easement from the Corps for the
construction, operation and maintenance of the reclaimed water line in this corridor. It is also requesting an additional
20-foot wide temporary construction easement, largely on the existing, unused asphalt road (see Figure 1-1) for
installation of the reclaimed water line. The actual trench would be approximately 5 feet wide by 7 to 8 feet deep. A
plan and profile drawing of the pipeline across federal lands is provided on Figure 2.2.1-1. Within this portion of the
(inactive) Crossroads Park, a portion of the temporary construction easement would partially overlie an existing, littleused asphalt roadway which also parallels a second, similar, existing buried waterline which City of Norco constructed
and maintains. The legal descriptions, for the two lines (existing and proposed) are distinct; and Corona and Norco
have consulted on developing the proposed line in this area.
6
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Figure 2.2.1-1 Plan/Profile of Preferred Alternative Crossing Federal Land (Riverview Park), Riverside Co.
2.2.2 Alternative 2
The City of Corona's Department of Water and Power fully analyzed a similar but different alignment for the pipeline
between the Western Riverside County Regional Wastewater Treatment Plant and Baron Road. That alignment is
shown below on Figure 2.2.2-1. This alternative was fully analyzed in the July 2016 CEQA document (Initial Study
and Mitigated Negative Declaration for the Proposition 1 Reclaimed Water Distribution System) as the Phase 1
Project (WRCRWA Reclaimed Water Pipeline) and would avoid Federal land by taking a different route
(northeastern) to exit the Wastewater Treatment Plant, if this would be practical and permissible within the Plant
itself.
However, in contrast with the Preferred Alternative's exit area, Plant managers determined there was no other route,
without crossing many other, conflicting internal utility lines within the Plant, whereby a new pipeline could exit the
plant at this location as easily as Alternative 1. Because of internal constraints, it is less feasible to actually construct
a new line to exit the Plant's northeastern (or other) location. As shown in Figure 1-1, exiting from the Plant as
proposed, from the southeast, is a superior route when Plant operations are considered.
7
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Figure 2.2.2-1 Alternative 2, showing northeast exit from treatment plant but requiring more complex internal plant piping
Thus, Alternative 2 was dropped from further consideration due to impracticality of its construction within the
Treatment Plant itself, for it would severely impact existing facilities.
2.2.3 Alternative 3
The City also examined the possibility of exiting the Treatment Plant at the southeast corner of the property and
paralleling the westerly property line to River Road and then (as in Alternatives 1 and 2) following Baron Drive and
River Road to its intersection with Bluff Street (Figure 2.2.3-1). Although this alternative to exit the Plant is technically
feasible, it would add approximately 3,700 lineal feet of pipeline to the alignment and require the acquisition of an
easement from private property owners. Therefore, although this alternative alignment would eliminate the need to
utilize Federal lands, it was dropped from further consideration due to the extra time and uncertainty involved to
acquire the necessary easements as well as higher additional costs associated with additional lengths of pipeline
construction.
8
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Figure 2.2.3-1 Alternative 3: blue line avoids Federal land by going W then N to Baron Dr. (purple shows approximate preferred alignment)
2.3 Preferred Alternative
The Preferred Alternative is preferred because it would impose the fewest new environmental impacts and is
considerably shorter than Alternative 3, the only other technically feasible alternative.
Also, as shown on Figure 1-1, the Federal land route includes existing encroachments (i.e., roads, private 2-inch diameter
water line, and the City of Norco's 12-inch diameter recycled water line). This existing utility corridor has already been
disturbed. The alignment was also reviewed by the State Office of Historical Preservation which agreed that mitigation
measures may be incorporated to ensure that the project will not adversely affect historic properties.
.
9
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
2.3.1 Description
The Preferred Alternative consists of the Corps granting an easement to the City of Corona to construct, operate and
maintain a 20-inch diameter reclaimed water pipeline across Federal land, City of Eastvale, Riverside County. As
discussed previously, the requested easement includes a 20-foot wide permanent easement and an additional 20-foot
wide temporary construction easement for laydown or other non-ground-disturbing activities.
As previously shown on Figure 1-1, the WRCRWA Recycled Water Pipeline would extend across Federal land for
approximately 2,000 feet, extending a total of approximately 5,000 lineal feet from the Western Riverside County
Regional Wastewater Treatment Plant, located in the City of Eastvale, to the intersection of River Road and Bluff Street,
located in the City of Norco. The subject proposed water pipeline would generally parallel a roadway and the City of
Norco's existing 20-inch diameter pipeline easement, across the Riverview parkland, from the Treatment Plant to Baron
Street. It would then follow Baron Street in an easterly direction to its intersection with River Road. It would then follow
River Road in a southerly direction to its intersection with Bluff Street.
The pipeline would be a 20-inch diameter ductile iron, Class 350 pipe, fully restrained, dual-wire bonded, cement mortar
lined, encased in 2 layers of 8-mil, color purple, polyethylene encasement. It would be installed by the open-trench
method with the exception of the river crossing where it would be installed in a dedicated space in the bridge structure.
2.3.2 Construction
The anticipated overall flow and sequence of construction activity is described below and includes determining the
locations for tying new pipe into existing pipe via potholing, open-trench linear excavation for installation of the new
pipeline, hydrostatic testing and tie-in to existing lines, backfill of the trench, and site restoration. (Equipment anticipated
to be used for construction activities is described below.)
Construction contractors would ensure that the proposed material laydown yard (Figure 2.3.2-1), which is not on
Federal land, and all workspaces are clear and ready for construction, by removing brush, trees, large rocks, and other
obstructions from the work areas. No sensitive or protected species would be removed under the Preferred Alternative.
Topsoil and organic surface material along the alignment would be stripped and stored in the laydown area until the
project is complete and the site is ready for restoration.
10
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
+
Figure 2.3.2-1 Proposed Laydown Area
The trench width would be approximately five feet to accommodate the 20-inch-diameter pipe. To maximize safe
conditions and minimize confusion among interagency staff, all project field activities would be communicated to and
reviewed by the Corps Asset Management staff, including its Operations Branch, prior to initiation. In addition, the City
of Corona would provide a Corps-approved construction safety plan, including site safety and communications
management aspects, prior to Corps issuance of the real estate easement and any other approvals.
Pipe would be delivered to the proposed laydown yard and would be inspected to ensure it meets industry and federal
government safety standards. The sections (i.e., joints) of pipe would be strung out along the easement according to
the designed material specification (e.g., diameter, wall thickness, grade, and coating). Bending individual joints of pipe
would be done where required. The pipe would be positioned along the designed centerline of the trench, aligning it to
facilitate welding pipe joints together above the trench. After welding, the weld quality would be inspected for
inconsistencies using various inspection techniques (e.g., radiographic or ultrasonic testing), and repair or replacement
would be performed if joints fail to meet acceptance requirements of industry specifications. A corrosion-resistant epoxy
coating would be applied to the weld areas and to any area where the factory-applied coating has become damaged.
Side-boom tractors would then lower the welded joints of pipe into the trench.
The new pipeline would be covered with imported and original topsoil to return the site as near to the original condition
as possible. The trench would be backfilled with zero slack slurry to provide a minimum of 12 inches of coverage over
the top of the pipe. Native soil would then be used to complete backfilling of the trench and would be graded to the
site's original contours. All excess soil would be removed from the site.
After installation, the new pipeline would be hydrostatically tested to ensure its structural integrity and validate its
Maximum Allowable Operating Pressure. This process involves filling the new pipeline segment with water and
11
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
pressurizing the pipe to an applicable pressure for a certain length of time. After a successful test, the new pipeline
segment would be tied in and connected to the existing pipeline.
Construction equipment involved in project implementation would include the following:
Equipment
Air Compressors
Concrete Saws
Cranes
Excavators
Off Highway Trucks
Pavement Breakers
Pavers
Plate Compactors
Sweeper/Scrubbers
Tractors/Loaders/Backhoes
Water Trucks
Number
1
1
1
1
1
1
1
1
1
1
1
Horsepowera
78
81
226
163
400
126
131
8
64
98
189
Load Factorb
0.48
0.73
0.29
0.38
0.38
0.42
0.36
0.43
0.46
0.37
0.38
Hours per Day
4.0
1.0
1.0
6.0
4.0
1.0
1.0
1.0
1.0
6.0
2.0
Notes:
1 2011
2
OFFROAD default values.
Percentage of the engine's maximum horsepower rating that the equipment actually operates.
There would also be two heavy-duty trucks delivering equipment and supplies to the site as well as two pickup trucks
utilized by inspectors. In addition, 10 vehicles would be utilized by construction workers commuting to and from the
site. Operation of the trucks would be limited to the construction easement or public street rights-of-way.
The Preferred Alternative would be constructed over a period of approximately 150 construction days of which
approximately 60 days would include work on Federal lands. It is anticipated that construction would commence as
soon as the Corps issues the easement to the City of Corona. Approximately 10 workers would be on-site at any one
time.
2.3.3 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline en route to its distribution points. Following the construction phase, and entering the
operations and maintenance phases, activity would generally cease and no personnel or routine daily activities would
be associated with the site except as otherwise described in the easement language for this Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. Maintenance personnel
would confine their activities to the permanent easement for the recycled water pipeline.
12
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
2.4 Alternatives Considered but Eliminated from Further Consideration
As described and for reasons provided, above, Alternatives 2 and 3 were eliminated from further consideration, and
the environmental analysis in this EA focuses on the Preferred Alternative and the comparative No Action Alternative.
The following sections consider the No Action and the Preferred Action Alternatives, both carried forward for analysis.
3 Environmental Impacts and Analysis
This section presents the environmental analyses for the Preferred Alternative versus the No Action Alternative.
3.1 Land Use
3.1.1 Baseline Conditions
The WRCRWA Recycled Water Line is located within the Santa Ana River Basin in the Cities of Eastvale and Norco
in Riverside County. The pipeline would be mostly located within public street rights-of-way; however, a portion of it
would cross federal lands controlled by the Corps as part of the Santa Ana River Mainstem Project.
3.1.1.1 Santa Ana River Mainstem Project
The Santa Ana River Mainstem Project stretches a distance of approximately 75 miles along the Santa Ana River from
its headwaters in San Bernardino County to its mouth at the Pacific Ocean in Orange County. Two main elements of
the Santa Ana River Mainstem Project are Seven Oaks Dam in San Bernardino County and Prado Dam in Riverside
County. The purpose of the project is to provide flood protection to property and residents along the Santa Ana River.
The Preferred Alternative would consist of an underground 20-inch diameter recycled water pipeline which would have
no effect on flood control and would therefore be consistent with the Santa Ana River Mainstem Project.
3.1.2 Significance Thresholds
For the purposes of this analysis, implementation of the Preferred Alternative would result in a significant effect on land
use if it would:
result in the physical division of an established community;
conflict with any established, applicable land use plan, policy or regulation of an agency with jurisdiction over
the Proposed Project area; or
require changes in land use as a result of implementing the alternatives that are considered to be incompatible
with the existing land uses at and adjacent to the proposed facilities.
3.1.3 Alternative Analysis
13
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
3.1.3.1 No Action Alternative
Should the Corps not issue the requested easement, the City would not construct the WRCRWA Reclaimed Water
Pipeline upon any federal lands. Therefore, the No Action Alternative would not involve any construction activities
reviewable under NEPA. The City of Corona may or may not utilize its reclaimed water allotment from the Western
Riverside County Regional Wastewater Reclamation Facility and there would be no changes to the existing federal
land uses. Specifically, the No Action Alternative would not conflict with any applicable federal land use plan, policy or
regulation; or result in changes that would be incompatible with existing land uses at and adjacent to the proposed
facilities.
3.1.3.2 Preferred Alternative
3.1.3.2.1 Construction
Construction of the Preferred Alternative would not physically divide an established community because the pipeline
would be underground and would be located within the Corps' easement or within public street rights-of-way.
Although the pipeline would be constructed mostly within public street rights-of-way, a portion of it would cross federal
lands under the control of the Corps. Therefore, it will be necessary for the City of Corona to acquire an easement from
the Corps to place the pipeline in this location. Project-related activities are compatible with the existing land use (public
street rights-of-way).
Construction activities associated with the Preferred Alternative would be short-term and temporary (i.e., lasting
approximately 150 construction days) and not interfere with any activities on adjoining federal lands controlled by the
Corps.
The Preferred Alternative would not conflict with any federal or local applicable land use plan, policy, or regulation or
result in changes in land use that would be incompatible with the existing land uses at and adjacent to the proposed
facilities. Based on the above, the Preferred Alternative would not result in significant effects on land use.
3.1.3.2.2 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline en route to its distribution points. Following the construction phase, no personnel or
daily activities would be routinely associated with the Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such, land use impacts
associated with operations and maintenance would be negligible and would not approach any of the significance
thresholds previously identified.
14
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
3.1.4 Environmental Commitments
Based on the analysis of potential impacts to land use conditions at and in the vicinity of the Proposed Project, no
significant impacts are anticipated; therefore, no mitigation measures or other environmental commitments are
proposed.
3.2 Geology and Soils
3.2.1 Baseline Conditions
In general, the Project area is underlain by three distinct geologic units; 1) bedrock composed of sediments of Ladd,
Silverado, Santiago, Vaqueros-Sespe and Puente Formations; 2) remnants of a widespread terrace of ancient river
deposits; and 3) recent alluvium on the floor of the canyons tributary to the Prado Flood Control Basin dating from the
Quaternary, Tertiary and Cretaceous periods.
The bedrock consists of 3 to 60 million-year old sedimentary rock formations of interbedded conglomerates,
sandstones, siltstones and claystones. Southeast of WRF #1 exists a lower bedrock plateau known as the Gavilan
Hills. This unit has been uplifted, tilted and folded by movement of the Whittier-Elsinore fault zone, and most beds are
steeply inclined at angles greater than 45°.
Quaternary Age (less than 2 million years old) terrace deposits overlie and form a cap on the bedrock. Borings indicate
that these deposits are more than 40 feet thick. The terrace deposits consist of well-to-poorly consolidated silt, sand
and gravel with some boulders.
The alluvial deposits, which were deposited during the last 10 million years, are strewn across the floors of the canyons
tributary to Prado Flood Control Basin. The alluvial deposits consist mostly of unconsolidated sand with some clay, silt,
gravel, cobbles and boulders removed from the mountains as the result of stream erosion and weathering. The
maximum known thickness of alluvium is in excess of 35 feet. In general, the alluvium in the upper valley is coarse
nearby its source in the upper mountains and becomes less coarse and permeable the farther it is deposited
downstream. However, lenses of sand and gravel are present near Prado Dam, at the mouth of the upper valley.
3.2.1.1 Earthquake Faults/Seismicity
Several major geologic fault systems are contained in the Southern California region. These faults include the San
Andreas, San Jacinto, Sierra Madre, Newport-Inglewood, Whittier- Elsinore and Chino fault systems. The San Gabriel,
San Bernardino and San Jacinto Mountains were formed during the late Tertiary and Quaternary periods by both
vertical and horizontal movements along the Sierra Madre, San Andreas and San Jacinto faults. Less severe faulting
and folding formed the Chino Hills and the Santa Ana Mountains in the Corona vicinity.
The largest of the faults affecting the region is the San Andreas Fault, which extends northwest to southeast from the
Mojave Desert through Cajon Pass along the southern border of the San Bernardino Mountains through San Gorgonio
Pass. Land west of the fault is tending to drift northward relative to land east of it at a rate of approximately one-half to
two inches per year.
15
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
The San Jacinto fault branches from the San Andreas zone in the San Gabriel Mountains and extends southsoutheastward into the Imperial Valley. During this century the San Jacinto fault has been the source of seven
earthquakes ranging in magnitude from 6.0 to 7.1 on the Richter scale.
The Sierra Madre fault system is one of the few east-west lying faults in Southern California. The fault runs along the
southern base of the San Gabriel Mountains. The Newport-Inglewood fault extends northwest to southeast along the
coastline. The fault stretches from West Los Angeles on the north to the ocean offshore from Newport Beach. The
1933 Long Beach earthquake which measured 6.3 on the Richter Scale occurred on this fault.
The Whittier-Elsinore fault system passes through the Santa Ana Canyon about two miles downstream from the Prado
Dam. Although considered relatively active, no earthquake greater than 6.0 on the Richter scale has occurred on this
fault since 1900. The Elsinore fault system also includes numerous other faults in the Chino Basin that have exhibited
seismic activity.
The Chino fault, which is a part of the Whittier-Elsinore fault system, parallels Chino Creek along the eastern flank of
the Chino Hills and crosses Prado Basin just northeast of Prado Dam. Although no major seismic activity has occurred
on the fault recently, the Chino fault zone exhibits signs of being seismically active. Because of this, the fault poses the
threat of a potentially catastrophic earthquake. Future earthquakes could cause ground rupture along the Chino fault
itself.
3.2.1.1.2 Soils
Based on the NRCS USDA Web Soil Survey, the pipeline alignment is underlain by the following soil units: Dello loamy
fine sand, Dello loamy sand, Grangeville fine sandy loam, Grangeville loamy fine sand, Grangeville sandy loam,
Ramona very fine sandy loam, and Terrace escarpments.
3.2.2 Significance Thresholds
A significant geology and soils impact would occur if the Proposed Project:
Significantly increases local soils' exposure to wind and water erosion or loss of topsoil either or- of off-site.
Significantly alters the physical or chemical quality of sediments or soils.
Triggers or accelerates geological processes such as erosion or sedimentation brought about by disturbance
of landforms.
3.2.3 Alternative Analysis
3.2.3.1 No Action Alternative
If the No Action Alternative were selected, the City of Corona would not use federal land to construct the recycled water
pipeline. Therefore, no impacts to geology and soils would occur under the No Action Alternative and conditions would
remain as described in Section 3.2.1.
16
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
3.2.3.2 Preferred Alternative
3.2.3.2.1 Construction
During construction, there would be no permanent or long-term impact on the existing topography or landforms because
the topography of the area is generally flat and activities associated with project implementation would be short term
and temporary. Conditions would return to those similar to the baseline conditions upon completion of construction.
Where excavation occurs along the pipeline alignment, soil would be re-compacted to minimize future erosion.
Sedimentation rates would continue, unchanged, in the project area. Furthermore, the site would be subject to the
same seismic activity, earthquake fault zones, and areas of liquefaction as under baseline conditions. Therefore,
construction activities associated with the Proposed Project would not have significant impacts to local or regional
geology and soils, or with regard to any associated risk factors.
3.2.3.2.2 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline en route to its distribution points. Following the construction phase, no personnel or
daily activities would be routinely associated with the Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such geology and soils
impacts associated with operations and maintenance would be negligible and would not approach any of the
significance thresholds previously identified.
3.2.4 Environmental Commitments
Based on the analysis of potential impacts to geology and soils conditions at and in the vicinity of the Proposed Project,
no significant impacts are anticipated; therefore, no mitigation measures or other environmental commitments are
proposed.
3.3 Hydrology and Water Quality
3.3.1 Baseline Conditions
3.3.1.1 Flood Plain Management
The Project Area is within FEMA Floodway Areas Zone AE and X. Zone AE is defined as the channel of a stream plus
any adjacent floodplain areas that must be kept free of encroachment so that the 1% annual chance flood can be
carried without substantial increases in flood heights. Zone X is defined as areas of 0.2% annual chance flood with
average depths of less than 1 foot or with drainage areas less than 1 square mile and areas protected by levees from
1% annual chance flood.
17
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
3.3.1.2 Hydrology
The Prado Basin is the dominant water feature in the Project Area. It was formed by Prado Dam which is a flood control
and water conservation project constructed and operated by the Corps. The original construction was completed in
April 1941. It is located at the upper end of the Lower Santa Ana River Canyon, which is a natural constriction controlling
2,255 square miles of the 2,450 square-mile Santa Ana River Watershed.
Prado Dam has an existing storage capacity of 362,000 acre-feet (af). It provides flood control between the invert
elevation of 460 feet to the spillway elevation of 566 feet. Recent construction included an inlet structure to allow a
maximum release of 30,000 cfs. The surface area of the reservoir was also increased to 10,256 acres.
The Santa Ana River is the main drainage entering the Prado Basin. Other drainages tributary to the Prado Basin
include Cucamonga Creek, Chino Creek and Temescal Creek.
The U.S. Geological Survey measures flows in the Santa Ana River in the greater Project Area. The upstream station
is at Riverside Narrows and the downstream station is at Prado. These flows for the 1970-71 through 2014-15 water
years as reported by the Santa Ana River Watermaster are summarized on Figure 3-1. During the 44-year period of
record, the average flows at Riverside Narrows have been 96,807 acre-feet per year and at Prado Dam have been
211, 277 acre-feet per year.
18
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
700,000
600,000
Flow, acre-feet per year
500,000
400,000
300,000
200,000
100,000
0
Water Year
Riverside Narrows
Prado
Figure 3-1 Average Monthly Flows in the Santa Ana River at Riverside Narrows and at Prado Dam
3.3.1.3 Surface Water Quality
The Water Quality Control Plan for the Santa Ana River (Basin Plan) includes numerous narrative water quality
objectives that apply to all inland surface waters. In addition, the following numerical objectives apply to the base flow1
in Reach 3 of the Santa Ana River. These are as follows:
Constituent
Total
Dissolved
Solids
Hardness
Sodium
Chloride
Total
Inorganic
Nitrogen
Sulfate
Chemical
Oxygen
Demand
Boron
Objective
(mg/l)
700
350
110
140
10a
150
30
0.75
a Total
1
nitrogen, filtered sample.
Base flow is defined in the Basin Plan as the combination of wastewater, rising water, and non-point sources.
19
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
3.3.1.4 Prado Basin Management Zone
The flood plain behind Prado Dam has unique hydraulic characteristics. Chino Creek, Cucamonga Creek (which flows
into Mill Creek) and Temescal Creek join the Santa Ana River behind the dam. Flood control operations at the dam,
coupled with an extremely shallow groundwater table and an unusually thin aquifer, significantly affect these surface
flows, as well as subsurface flows in the area. Depending on how the dam is operated, surface waters may or may not
percolate behind the dam. There is little or no groundwater storage in the flood plain behind the dam. Any groundwater
in storage is forced to the surface because the foot of Prado Dam extends to bedrock and subsurface flows cannot
pass through the barrier created by the dam and the surrounding hills. Given these characteristics, this area is
designated as a surface water management zone, rather than a groundwater management zone. The Prado Basin
Management Zone is generally defined by the 566-foot elevation above mean sea level. It extends from Prado Dam
up Chino Creek, Reach 1A and 1B to the concrete-lined portion near the road crossing at Old Central Avenue, up the
channel of Mill Creek (Prado Area) to where Mill Creek becomes named as Cucamonga Creek and the concrete-lined
portion near the crossing at Hellman Road, up what was formerly identified as Temescal Creek, Reach 1A (from the
confluence with the Santa Ana River upstream of Lincoln Avenue) (this area is indistinguishable because of shifting
topography and is now considered a part of the Prado Basin Management Zone), and up the Santa Ana River, Reach
3 to the 566-foot elevation (just west of Hammer Avenue). The Prado Basin Management Zone encompasses the
Prado Flood Control Basin, which is a created wetlands as defined in the Basin Plan. Orange County Water District's
wetlands ponds are also located within the Prado Basin Management Zone. (CRWQCB, SAR 1995).
3.3.2 Significance Thresholds
A significant impact to hydrology or water quality would occur if implementation of the Proposed Project:
Substantially alters the existing drainage pattern of the site or area, including the alteration of the course of a
stream or river, in a manner that would result in a substantial increase in erosion or siltation on- or offsite.
Substantially alters the existing drainage pattern of the site or area, including the alteration of the course of a
stream or river, in a manner that would result in a substantial reduction in the quality or quantity of surface
water.
Substantially alters the existing drainage pattern of the site or area, including the alteration of the course of a
stream or river, or substantially increases the rate or amount of surface runoff in a manner that would result
in flooding on- or offsite, or provide substantial additional sources of polluted runoff.
Increases substantial erosion or sedimentation relative to existing conditions.
Encounters groundwater during excavation activities and causes changes to groundwater levels and/or
groundwater quality.
3.3.3
Alternatives Analysis
3.3.3.1 No Action Alternative
If the No Action Alternative were selected, the City of Corona would not construct, operate or maintain the proposed
20
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
recycled water pipeline on federal land, as proposed. No impacts to hydrology or water quality would occur under the
No Action Alternative and conditions would remain as described in Section 3.3.1.
3.3.3.2 Preferred Alternative
3.3.3.2.1 Construction
Construction of the Preferred Alternative would not alter the existing drainage pattern of the Project area and would
have no impact on State or local flood plain protection standards because any ground disturbance would be temporary
and the land surface would be restored as close as possible to its existing contours. The proposed pipeline would cross
the Santa Ana River within the River Road Bridge structure and no work would be performed in the channel or on the
bank of the channel.
Implementation of the Preferred Alternative would not negatively affect the natural or beneficial values of the
floodplain. It would also not induce floodplain development or increase risks to public safety, because the
proposed pipeline would be located underground or within the River Road Bridge structure. Implementation of
the Preferred Alternative would not introduce hazards within the floodplain because proposed project elements
do not include flood-vulnerable structures.
If groundwater were to be encountered during excavation for the pipeline, appropriate permits would be obtained and
appropriate measures [e.g., dewatering, etc.] would be implemented. In any event, if groundwater is encountered during
excavation activities, the Preferred Alternative would not cause changes to groundwater levels and/or groundwater
quality because of the short-term nature of potential temporary dewatering that would be implemented to facilitate
installation of the pipeline span foundation. Groundwater quality is not anticipated to be impacted because the
installation of the pipeline would be installed in such a manner to prevent negative impacts to the groundwater.
No facilities would be installed within jurisdictional waters; therefore, the Proposed Project would be exempt from the
notification requirements associated with Nationwide Permit No. 12 (NWP `1), which addresses permitting
requirements with regard to utilities.
Overall, construction of the Preferred Alternative would not result in significant impacts to hydrology or water quality.
3.3.3.2.2 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline en route to its distribution points. Following the construction phase, no personnel or
daily activities would be routinely associated with the Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such hydrology and water
quality impacts associated with operations and maintenance would be negligible and would not approach any of the
significance thresholds previously identified.
21
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
3.3.4 Environmental Commitments
In order to further reduce any potential impacts, environmental commitments for Proposed Project implementation
would include using industry-standard erosion control materials and techniques as appropriate to this site.
However, the Preferred Alternative would not alter existing drainage patterns so no additional methods are required.
3.4
Air Quality
3.4.1 Baseline Conditions
Ambient air quality is affected by both the rate and location of pollutant emissions and by meteorological conditions
that influence the local and regional dispersal of pollutants. Atmospheric conditions such as wind speed and direction
and air temperature gradients combined with local topography provide the link between air pollutant emissions and air
quality.
The proposed Project is within the South Coast Air Basin (SCAB), which incorporates approximately 12,000 square
miles, consisting of four counties (i.e., San Bernardino, Riverside, Los Angeles, and Orange) including some portions
of what used to be the Southeast Desert Air Basin that includes the Beaumont-Banning area. Nearly half of California's
population, which generates about one-third of the State's total criteria pollutant emissions, lives within the SCAB.
Planning for the attainment and maintenance of both federal and State air quality standards in the Project area is the
responsibility of the South Coast Air Quality Management District (SCAQMD).
3.4.1.1 Air Pollutants
Pollutants regulated by the State and federal Clean Air Acts fall within three categories:
criteria air pollutants
toxic air contaminants, and
global warming and ozone depleting gases.
Pollutants in each of these categories are monitored and regulated differently. Criteria air pollutants are measured by
sampling concentrations in the air; toxic air contaminants are measured at the source and in the general atmosphere,
and global warming and ozone-depleting gases are not monitored but are subject to federal and regional policies that
call for their reduction and eventual phaseout (www.aqmd.gov, 10/18/06). California's landmark global warming
legislation, AB 32, requires that the State's greenhouse gas emissions be reduced to 1990 levels by 2020. Emission
trading is being considered for achieving the requirements of AB 32 (www.aqmd.gov, 4/21/07).
3.4.1.1.1 Criteria Air Pollutants
Criteria air pollutants are defined as those pollutants for which the federal and state governments have established air
quality standards for outdoor or ambient concentrations to protect public health. Those standards have been set at
levels to protect the human health with an adequate margin of safety. The following paragraphs describe the source
22
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
and health effects of the criteria pollutants as described in SCAQMD's Appendix I, Health Effects, to its Draft Final
2016 Air Quality Management Plan (SCAQMD, December 2016). In addition, Table 3-1 below lists the primary
emission sources of the criteria pollutants and some of the harmful effects of the pollutants.
Table 3-1
Air Pollutant
Ozone
(O3)
Ambient Air Quality Standards and Key Health and Welfare Effects
Federal Standard
State Standard
(NAAQA)
(CAAQS)
Key Health & Welfare Effects#
Concentration, Averaging Time,
Concentration,
Year of NAAQS Review
Averaging Time
(a) Pulmonary function decrements and localized lung
0.070 ppm, 8-Hour (2015)
injury in humans and animals; (b) Risk to public health
0.075 ppm, 8-Hour (2008)
0.070 ppm, 8-Hour
implied by alterations in pulmonary morphology and
0.09 ppm, 1-Hour
host defense in animals; (c) Increased mortality risk; (d)
0.08 ppm, 8-Hour (1997)
Increased respiratory related hospital admissions and
0.12 ppm, 1-Hour (1979)
emergency room visits; (e) Vegetation damage;
Fine Particulate Matter
(PM2.5)
35 µg/m3, 24-Hour (2006)
12.0 µg/m3, Annual (2012)
15.0 µg/m3, Annual (1997)
12 µg/m3, Annual
Respirable Particulate Matter
(PM10))
150 µg/m3, 24-Hour (1997)
50 µg/m3, 24-Hour
20 µg/m3, Annual
Carbon Monoxide
(CO)
35 ppm, 1-Hour (1971)
9 ppm, 8-Hour (1971)
20 ppm, 1-Hour
9.0 ppm, 8-Hour
Nitrogen Dioxide
(NO2)
100 ppb, 1-Hour (2010)
0.053 ppm, Annual (1971)
0.18 ppm, 1-Hour
0.030 ppm, Annual
75 ppb, 1-Hour (2010)
0.25 ppm, 1-Hour
0.04 ppm, 24-Hour
0.15 µg/m3,
rolling 3-month average (2008)
1.5 µg/m3,
30-day average
Sulfates (PM10)
(SO4)
N/A
25 µg/m3, 24-Hour
Hydrogen Sulfide
(H2S)
N/A
0.03 ppm, 1-hour
Sulfur Dioxide
(SO2)
Lead
(Pb)
(a) Exacerbation of symptoms in sensitive patients with
respiratory or cardiovascular disease; (b) Decline in
pulmonary function or growth in children; (c) Increased
risk of premature death; (d) Increased risk of lung
cancer; (e) increased asthma-related hospital
admissions; (f) increased school absences and lost
work days; (g) possible link to reproductive effects; (h)
visibility reduction
(a) Aggravation of angina pectoris and other aspects
of coronary heart disease; (b) Decreased exercise
tolerance in persons with peripheral vascular disease
and lung disease; (c) Possible impairment of central
nervous system functions; (d) Possible increased risk
to fetuses.
(a) Potential to aggravate chronic respiratory disease
and respiratory symptoms in children with asthma; (b)
Increased airway responsiveness in asthmatics; (c)
Contribution to atmospheric discoloration.
Respiratory symptoms (bronchoconstriction, possible
wheezing or shortness of breath) during exercise or
physical activity in persons with asthma.
(a) Learning disabilities; (b) Impairment of blood
formation and nerve conduction; (c) cardiovascular
effects, including coronary heart disease and
hypertension.
(a) Decrease in lung function; (b) Aggravation of
asthmatic symptoms; (c) Vegetation damage; (d)
Degradation of visibility; (e) Property damage.
Exposure to lower ambient concentrations above the
standard may result in objectionable odor and may be
accompanied by symptoms such as headaches,
nausea, dizziness, nasal irritation, cough, and shortness
of breath.
Notes:
ppm = parts per million by volume;
Ppb = parts per billion by volume (0.01 ppm = 10 ppb)
Standards in bold are the current, most stringent standards; there may be continuing obligations for former standards
State standards are "nottoexceed" values based on State designation value calculations
Federal standards follow the 3-year design value form of the NAAQS
Source: SCAQMD, December 2016.
3.4.1.1.1.1 Ozone (O3)
Ozone (O3) is one of a number of substances called photochemical oxidants that are formed when reactive organic
compounds and nitrogen oxides, both byproducts of the internal combustion engine, react in the presence of ultraviolet
23
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
sunlight. Outdoor ozone exposures have been associated with a range of negative human health effects. The strongest
evidence for negative health impacts are on the respiratory system, and are measured by decreased lung function and
increased cell injury. In addition, the 2013 ISA also concluded that there was a likely causal relationship between shortterm ozone exposures and cardiovascular effects (such as changes in heart function, and increased systemic
inflammation and oxidative stress) as well as respiratory mortality. Although the specific mechanisms of action for
ozone effects on various health endpoints have not been fully identified there is evidence of the important roles of
oxidation of key enzymes and proteins, inflammatory responses, changes in immune response, and modification and
activation of neural reflex pathways (U.S. EPA 2013 in SCAQMD, December 2016).
3.4.1.1.1.2 Particulate Matter
Air borne particulates are a complex group of pollutants that vary in physical, chemical, and biological dimensions.
Physically, particles can vary by size, surface area and roughness, shape, and mass. Chemically, they vary by chemical
composition. Biologically, they can vary by toxicity. In addition, particles vary by source, and can come from
anthropogenic (man-made, such as from combustion of fuels, or fractional abrasion) or "natural" (plants for example,
pollen, and spores) origins.
There are also differences in the composition and sources of particles in the different size ranges that may have
implications for health effects. The particles in the coarse fraction (PM 2-5 10) are mostly produced by mechanical
processes. These include automobile tire wear, industrial processes such as cutting and grinding, and resuspension
of particles from the ground or road surfaces by wind and human activities, such as agricultural, mining, and
construction operations, which may be particularly in rural areas.
In contrast, particles smaller than 2.5 microns are mostly derived from combustion sources, such as automobiles,
trucks, and other vehicles exhaust, as well as from stationary combustion sources. The particles are either directly
emitted or are formed in the atmosphere from gases that are emitted. Components from material in the earth's crust,
such as dust, are also present, with the amount varying in different locations.
A considerable body of scientific evidence from epidemiologic, controlled human exposure, and toxicological studies
support the causal determinations for particulate matter and several categories of health endpoints, with the strongest
evidence supporting a causal relationship for PM2.5 exposures with cardiovascular effects and mortality. Specific
cardiovascular effects include cardiovascular deaths, hospital admissions for ischemic heart disease and congestive
heart failure, changes in heart rate variability, and markers of oxidative stress, and makers or atherosclerosis.
The scientific evidence also supported a likely causal relationship for PM2.5 exposure with respiratory effects such as
hospital admissions for COPD or respiratory functions, asthma development, asthma or allergy exacerbation, lung
cancer, impacts on lung function, lung inflammation, oxidative stress, and airway health effects in humans. Young
children, older adults, and people with pre-existing respiratory or cardiovascular health conditions arfe among those
who may be more susceptible to the adverse effects of PM.
3.4.1.1.1.3 Carbon Monoxide
Carbon monoxide (CO) is a gaseous air pollutant that has a high affinity to bond with oxygen-carrying proteins
(hemoglobin and myoglobin). The resulting reduction in oxygen supply in the bloodstream is responsible for the toxic
24
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
effects on CO, which are typically manifested in the oxygen-sensitive organ systems. The effects have been studied in
controlled laboratory environments involving exposure of humans and animals to CO, as well as in population-based
studies of ambient CO exposure effects. People with deficient blood supply to the heart (ischemic heart disease) are
known to be susceptible to the effects of CO. Protection of this group is the basis of the existing National Ambient Air
Quality Standards for CO at 35 ppm for one hour and 9 ppm averaged over 8 hours. The health effects of ambient CO
have been recently reviewed by the U.S. EPA, with the strongest evidence supporting a likely causal link between
short-term CO exposures and cardiovascular outcomes, although studies have linked both short-term and long-term
CO exposures to several other health outcomes (U.S. EPA 2010 in SCAQMD, December 2016).
3.4.1.1.1.4 Nitrogen Dioxide
Nitrogen dioxide (NO2) is a gaseous air pollutant that serves as an indicator of gaseous oxides of nitrogen, such as
nitric oxide (NO) and other related compounds (NOx). These gases can undergo photochemical reactions to form
ground-level ozone, and are important contributors to ozone pollution levels in the SCAB. Evidence of the health effects
of NO2 is derived from human and animal studies, which link NO2 with respiratory effects such as decreased lung
function and increases in airway responsiveness and pulmonary inflammation (U.S. EPA 2016 in SCAQMD, December
2016). The U.S. EPA in 2010 retained the existing standard of 100 ppb (0.1 ppm) averaged over one hour. The standard
was designed to protect against increases in airway reactivity in individuals with asthma based on controlled exposure
studies, as well as respiratory symptoms observed in epidemiological studies. The revised standard also requires
additional monitoring for NO2 near roadways.
3.4.1.1.1.5 Sulfur Dioxide
Sulfur dioxide (SO2) is a gaseous air pollutant that has been linked to a variety of respiratory effects, such as decreased
lung function and increased airway resistance. Controlled laboratory studies involving human volunteers have clearly
identified asthmatics as a very sensitive group to the effects of ambient SO 2 exposures. Healthy subjects have failed
to demonstrate any short-term respiratory functional changes at exposure levels up to 1.0 ppm over 1-3 hours. In
exercising asthmatics, brief exposure (5-10 minutes) to SO2 levels between 0.2 to 0.6 ppm can result in increases in
airway resistance and decreases in breathing capacity. The response to SO2 inhalation is observable within two
minutes of exposure, increase further with continuing exposure up to five minutes, then remains relatively steady as
exposure continues. SO2 exposure is generally not associated with any delayed reactions or repetitive asthmatic
attacks (U.S. EPA 2008 in SCAQMD, December 2016). In 2010, the U.S. EPA SO2 air quality standard was set at 75
ppb (0.075 ppm) averaged over one hour to protect against acute asthma attacks in sensitive individuals.
In epidemiological studies of children and adults, associations of short-term variations in SO2 levels with increases in
respiratory symptoms, emergency department visits, and hospital admissions for respiratory-related causes have been
reported. There is uncertainty as to whether SO2 is associated with the effects or whether other co-occurring pollutants
may explain the observed effects, although some studies indicated that the SO2 effects remained even after accounting
for the effects of other pollutants, including PM2.5. Coupled with the human clinical studies, these data suggest that SO2
can trigger asthmatic episodes in individuals with pre-existing asthma (U.S. EPA 2008 in SCAQMD, December 2016).
3.4.1.1.1.6 Lead
25
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Lead (Pb) is a toxic air contaminant that is recognized to exert an array of deleterious effects on multiple organ systems.
There are a number of potential public health effects at low level exposures, and there is no recognized lower threshold
for health effects (U.S. EPA 2013a in SCAQMD, December 2016). The health implications are generally indexed by
blood levels which are related to lead exposures both from inhalation as well as from ingestion. Effects include impacts
on population IQ as well as heart disease and kidney disease. The initial air quality standard for lead was established
by the U.S. EPA in 1978 at a level of 1.5 µg/m3 averaged over a calendar quarter. U.S. EPA revised the NAAQS for
lead in 2008 to a level of 0.15 1.5 µg/m3 averaged over a rolling three-month period to protect against lead toxicity.
The U.S. EPA has recently reviewed the health effects of ambient lead exposures in conjunction with an Integrated
Science Assessment and a review of the NAAQS for lead (U.S. EPA 2013a, U.S. EPA 2013C in SCAMD, December
2016). Lead can accumulate and be stored in the bone, and this lead in bone can be released into the blood when the
bone is metabolized, which happens naturally and continuously. Blood lead is the most common measure of lead
exposure and it represents recent exposure and may be an indicator of total body burden of lead (U.S. EPA 2013a in
SCAQMD, December 2016).
3.4.1.1.2 Toxic Air Pollutants
Toxic air pollutants (TAPs) are those pollutants that are known or suspected of causing cancer or other serious health
effects. Some TAPs are immediately dangerous to human health even in small quantities; some TAPs cause health
problems if the exposure extends over a longer period of time. The degree to which a TAP affects a person's health
depends on many factors, including the quantity of the pollutant the person is exposed to, the duration and frequency
of exposures, the toxicity of the chemical, and the person's state of health and susceptibility.
Scientists estimate that millions of tons of TAPs are released into the air each year. Some air toxics are released from
natural sources such as volcanic eruptions and forest fires. However, most originate from manmade sources, including
both mobile sources (e.g., cars, trucks and buses) and stationary sources (e.g., factories, refineries, power plants and
small businesses). In addition, many routine activities around the home, such as using gas-powered lawn mowers and
tools, or using volatile paints and solvents release TAPs into the atmosphere.
The list of TAPs in the Clean Air Act is a long one (275 names) and includes some familiar names such as benzene.
Examples of other TAPs include percholoroethylene, methylene chlorine, toluene, dioxin, and metals such as mercury,
chromium and lead compounds.
3.4.1.2 Ambient Air Quality
The California Air Resources Board (ARB) provides ambient air quality data for most air basins in the State. A summary
of the data available for the greater project area is provided in Tables 3-2, 3-3, 3-4 and 3-5.
26
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Table 3-2
Ozone Trends Summary
National Standards
Days > Standard
8-hr Observations
1-hr Observations
1-hr
8-hr
0.070 Std.
0.075 Std.
EENED1
0.12 0.070 0.075
1-Yr
3-Yr
Max.
D.V.²
Max.
D.V.²
Max.
D.V.²
Year
Coverage
Riverside-Rubidoux
2016
1
69
47
0.142
1.1
1.1
0.122
0.104
0.094
0.104
0.094
96
2015
1
55
39
0.132
1.0
0.7
0.122
0.105
0.093
0.105
0.093
97
2014
1
66
41
0.141
1.1
0.7
0.122
0.014
0.063
0.014
0.063
96
2013
0
36
26
0.123
0.0
1.8
0.126
0.103
0.098
0.103
0.098
93
2012
1
70
47
0.126
1.1
2.1
0.126
0.102
0.098
0.102
0.098
93
2011
4
90
67
0.128
4.2
1.8
0.127
0.115
0.095
0.115
0.095
93
2010
1
74
47
0.128
1.1
3.1
0.126
0.098
0.097
0.098
0.097
90
2009
0
54
36
0.116
0.0
3.4
0.135
0.106
0.099
0.106
0.099
88
2008
8
55
64
0.146
8.2
6.1
0.135
0.116
0.107
0.116
0.107
99
2007
2
66
46
0.131
2.0
4.4
0.140
0.111
0.105
0.111
0.105
99
Ambient Standard
0.12
0.070
Notes: All concentrations expressed in parts per million.
The national 1-hour ozone standard was revoked in June 2005. Statistics related to the revoked standard are shown in italics or italics.
National exceedances shown in orange.
An exceedance is not necessarily a violation.
Daily maximum 8-hour averages associated with the National 0.070 ppm standard exclude those 8-hour averages that have first hours between
midnight and 6:00 am, Pacific Standard Time.
Daily maximum 8-hour averages associated with the National 0.070 ppm standard include only those 8-hour averages from days that have
sufficient data for the day to be considered valid.
Daily maximum 8-hour averages associated with the National 0.075 ppm standard may come from days that don't have sufficient data for the day
to be considered valid, provided the daily maximum 8-hour average itself includes sufficient data to be considered valid.
¹ EENED = Estimated Expected Number of Exceedance Days
² D.V. = National Design Value
* There was insufficient (or no) data available to determine the value.
Source: arb.ca.gov, 06/19/2017
Table 3-3
Ozone Trends Summary
State Standards
Days > Standard
1-Hour Observations
1-Hour
8-Hour
Max.
EPDC¹
D.V.²
Year
Riverside-Rubidoux
2016
33
71
0.142
0.1277
0.13
2015
31
59
0.132
0.1258
0.13
2014
29
69
0.141
0.1242
0.12
2013
13
38
0.123
0.1330
0.13
2012
27
70
0.126
0.1329
0.13
2011
52
62
0.128
0.1297
0.13
2010
31
84
0.128
0.1320
0.13
2009
25
57
0.116
0.1322
0.13
2008
54
89
0.146
0.1412
0.14
2007
31
69
0.131
0.1377
0.14
Ambient Standard
0.09
Notes: All concentrations expressed in parts per million.
State exceedances shown in green.
An exceedance is not necessarily a violation.
¹ EPDC = Expected Peak Day Concentration
² D.V. = State Designation Value
*There was insufficient (or no) data available to determine the value.
Max.
0.105
0.106
0.105
0.104
0.102
0.115
0.099
0.101
0.116
0.111
0.070
8-Hour Averages
EPDC¹
D.V.²
Year
Coverage
0.1069
0.1058
0.1047
0.1161
0.1142
0.1128
0.1138
0.1187
0.1245
0.1233
0.106
0.106
0.105
0.115
0.111
0.111
0.113
0.116
0.117
0.117
96
95
95
92
92
91
88
86
99
98
Source: arb.ca.gov, 06/19/2017
27
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Year
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
Notes:
Table 3-4
PM10 Trends Summary
Annual Average
3-yr Average
Nat'l
State
Nat'l
State
Riverside-Rubidoux
38.1
*
35
45
32.2
40.0
34
45
36.3
44.8
35
45
33.2
34.6
34
35
34.5
33.4
34
34
33.5
32.5
35
42
33.1
33.8
41
42
40.0
41.9
-42
46.5
44.8
54
57
59.5
57.0
55
57
-20
Est. Days > Std.
Nat'l
State
0.0
0.0
0.0
0.0
0.0
*
0.0
0.0
0.0
3.1
Ambient Standard
*
92.2
124.7
30.2
51.7
30.3
42.7
120.1
140.4
201.9
High 24-hr Average
Nat'l
State
84.0
69.0
100.0
135.0
67.0
82.7
75.0
86.8
115.0
559.0
150
170.5
107.4
122.7
199.2
82.6
79.0
72.0
78.0
108.0
540.0
50
Year Coverage
96
100
100
100
100
0
100
0
100
100
All concentrations expressed in micrograms per cubic meter (µg/m3).
The national annual average PM10 standard was revoked in December 2006 and is no longer in effect. Statistics
related to the revoked standard are shown in italics or italics.
State exceedances shown in green. National exceedances shown in orange.
An exceedance is not necessarily a violation.
Statistics may include data that are related to an exceptional event.
State and national statistics may differ for the following reasons:
State statistics are based on California approved samplers, whereas national statistics are based on samplers using federal reference or
equivalent methods.
State statistics for 2002 and later are based on local conditions.
National statistics are based on standard conditions.
State criteria for ensuring that data are sufficiently complete for calculating valid annual averages are more stringent than the national criteria.
*There was insufficient (or no) data available to determine the value.
Source: Air Resources Board 2017 (arb.ca.gov 6/19/2017)
Table 3-5
PM2.5 Trends Summary
Year
Est. Days
>Nat'l
'06 Std.
2016
5.1
2015
10.3
2014
5.3
2013
6.2
2012
7.1
2011
4.2
2010
4.2
2009
13.5
2008
15.0
2007
*
Ambient Standard
Notes:
Annual Average
Nat'l
State
12.6
11.9
12.5
12.5
13.5
13.6
13.2
15.2
16.4
19.0
12.8
15.3
16.8
17.1
17.6
13.5
17.9
17.1
*
19.8
12
Nat'l
Ann. Std.
D.V.1
*
*
*
13.2
13.4
14.0
14.9
16.9
18.1
19.6
State
Ann.
D.V.2
Nat;l '06 Std.
98th
Percentile
Riverside-Rubidoux
17
32.0
17
38.1
18
39.3
18
34.6
18
33.7
18
31.0
18
32.0
20
39.6
20
41.0
21
54.3
Nat'l '06
24-Hr.
Std
D.V.1
36
37
36
33
32
34
38
45
50
56
High 24-Hour
Nat'l
State
51.5
54.7
48.9
60.3
38.1
50.8
46.5
54.4
57.6
75.6
35
60.8
61.1
50.6
170.8
182.2
70.0
59.2
54.4
57.6
75.6
--
Year
Coverage
97
93
83
96
96
97
97
95
92
81
All concentrations expressed in micrograms per cubic meter (µg/m3).
State exceedances shown in green. National exceedances shown in orange.
1 D.V. = State designation value.
28
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
D.V. = National design value.
*There was insufficient (or no) data available to determine the value.
Source: Air Resources Board 2017 (arb.ca.gov 6/19/2017)
2
The ARB has designated the SCAB as non-attainment for the State ozone, PM10 and PM2.5 standards. In addition, the
U.S. Environmental Protection Agency has designated the South Coast Air Basin as non-attainment for the federal
ozone, PM10 and PM2.5 standards.
3.4.1.3 Greenhouse Gases and Climate Change
Greenhouse gases (GHGs) are any of various gases that absorb infrared radiation, trap heat in the atmosphere and
contribute to the greenhouse effect. These various gases are produced from natural processes and human activities.
The accumulation of GHGs in the atmosphere influences the long-term range of average atmospheric temperatures to
cause global climate change. In 2013, the most recent year for which data are provided, annual statewide GHG
emissions in California were 459.28 million metric tons of CO2-equivalent (CARB, 2015).
On 18 December 2014, the CEQ released updated draft guidance on how and when federal agencies should account
for the effects of GHG emissions and climate change impacts under NEPA. The guidance uses projected GHG
emissions as a proxy for assessing an action's potential climate change impacts. The guidance also directs agencies
to consider the direct, indirect, and cumulative effects of the GHG emissions from an action, and take into account the
effects of connected actions. The CEQ recommended that emissions equal to or greater than 25,000 metric tons
annually should be included in NEPA assessments (CEQ, 2014). A Final Guidance in consideration of Greenhouse
Gases and Climate Change was provided by CEQ, in August, 2016.
3.4.2 Significance Thresholds
Impacts would be considered significant if the proposed project:
Exceeds General Conformity Rule de minimis thresholds.
Exceeds any SCAQMD daily Regional Significance Thresholds.
Conflicted with or delayed achievement of air quality standards, as set forth in the State Implementation Plan
(SIP).
3.4.3 Alternative Analysis
3.4.3.1 No Action Alternative
If the No Action Alternative were selected, the City of Corona would not construct the recycled water pipeline on federal
land. No impacts to air quality would occur from federal land activities, under the No Action Alternative, and conditions
would remain as described in Section 3.4.1. If alternative routes, as described earlier, were developed then air quality
impacts could well be higher, based on larger lineal project footprints.
29
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Preferred Alternative
3.4.3.1
3.4.3.1.1
Construction
The South Coast Air Quality Management District has suggested threshold criteria for determining significance with
respect to construction and operational air quality impacts. Those threshold criteria are shown in Table 3.4.3.1.1-1.
Table 3.4.3.1.1-1
Threshold Criteria for Determining Significance
Threshold Criteria, pounds per day
Pollutant
Construction
Operation
Carbon Monoxide (CO)
550
550
Sulfur Dioxide (SO2)
150
150
Nitrogen Oxides (NOX)
100
55
Particulates (PM10)
150
150
Particulates (PM2.5)
55
55
Volatile Organic Compounds (VOC)
75
55
Lead (Pb)
3
3
Toxic Air Contaminants (TACs), Odor and GHG Thresholds
TACs
Maximum Incremental Cancer Risk 10 in 1 million
(including carcinogens and non-carcinogens)
Cancer Burden > 0.5 excess cancer cases (in areas 1 in 1 million
Chronic and Acute Hazard Index 1.0 (project increment)
Odor
Project creates an odor nuisance pursuant to SCAQMD Rule 402
GHG
10,000 MT/yr CO2eq for industrial facilities
Source: SCAQMD CEQA Handbook, 1993, revised March 2011
These threshold criteria are used in this dEA in determining significance of air quality impacts.
During Phase 1 of its Proposition 1 Reclaimed Water Distribution Facilities Project, DWP plans to construct the
WRCRWA Reclaimed Water Pipeline. That 20-inch diameter pipeline would extend approximately 5,000 lineal feet
from WRCRWA's facilities at 14634 River Road to the intersection of River Road and Bluff Street. Due to the fact that
the actual date of construction is not known at this time, a "worst-case" scenario2 is analyzed for the air quality impacts
associated with future construction.
The following assumptions were utilized in estimating the air emissions from construction equipment for the WRCRWA
Reclaimed Water Pipeline Project:
Trenching would progress at an average rate of 100 lineal feet per day.
Approximately 0.05 acres per day would be disturbed during pipeline installation.
There would be approximately 2 heavy-heavy duty diesel trucks moving supplies to the site and removing
asphalt and other waste materials from the site. It is anticipated that each truck would travel approximately
100 miles per day.
2
Although construction may not start until after January 1, 2017, that start date was used in this air quality analysis to provide a "worst case" scenario. Due to the
phasing out of older equipment, increased regulatory requirements, and new technology, the emissions factors decrease somewhat on an annual basis.
30
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
There would be approximately 2 pickup trucks traveling to and from the site by inspectors. Mileage for each
pickup would be approximately 100 miles per day.
Approximately 10 construction workers would be involved in excavation and other pipeline installation
activities at the site on the peak day of activities. Mileage for worker commuters would be approximately 50
per day.
In addition to the truck traffic and worker commute traffic discussed above, the following construction
equipment would be on the job site:
Equipment
Air Compressors
Concrete Saws
Cranes
Excavators
Off Highway Trucks
Pavement Breakers
Pavers
Plate Compactors
Sweeper/Scrubbers
Tractors/Loaders/Backhoes
Water Trucks
Number
1
1
1
1
1
1
1
1
1
1
1
Horsepowera
78
81
226
163
400
126
131
8
64
98
189
Load Factorb
0.48
0.73
0.29
0.38
0.38
0.42
0.36
0.43
0.46
0.37
0.38
Hours per Day
4.0
1.0
1.0
6.0
4.0
1.0
1.0
1.0
1.0
6.0
2.0
Notes:
1 2011
2
OFFROAD default values.
Percentage of the engine's maximum horsepower rating that the equipment actually operates.
K.S. Dunbar & Associates, Inc., developed an Excel Spreadsheet model, based on the California Air Resources Board's
2011 OFFROAD emission factors, that calculates estimated emissions from construction activities. That model was
used to estimate construction related emissions from off-road heavy construction equipment. Based on construction
occurring in 2017, the model generated estimated construction emissions as shown in Table 3.4.3.1.1-2 (detailed model
results are contained in Appendix A)3.
Table 3.4.3.1.1-2
Estimated Maximum Day Emissions from Off-Road Heavy Construction Equipment
(pounds per day)a
ROG
CO
NOx
SOx
PM10
PM2.5
Construction Year 2017
1.54
15.90
17.42
0.02
0.16
0.14
Threshold Limitsb
75
550
100
150
150
55
Localized Significance Thresholdsc
N/A
887
148
N/A
12
4
CO2
2,318
N/A
N/A
CH4
0.66
N/A
N/A
a Use
of particulate traps reduces PM10 and PM2.5 by 85% and oxidation catalysts reduces NOx by 15%.
Construction-related threshold limits developed by SCAQMD to determine significance.
c Localized threshold limits developed by SCAQMD to determine significance at construction sites of up to 1 acre and the nearest receptor within 50
meters of the construction site.
b
As can be seen by the data in Table 3.4.3.1.1-2, emissions from heavy construction equipment during pipeline
construction would not exceed SCAQMD's construction-related threshold limits or localized threshold limits.
Should the construction period be delayed, the emissions from heavy construction equipment would be less due to technology improvements and phasing out of
older equipment. Therefore, the emissions shown are considered the worst-case scenario.
3
31
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
There would also be two heavy-duty trucks traveling to and from the job site as well as two pickup trucks utilized by
inspectors at the job site. Based on the assumption that each heavy-duty truck and pickup travels 100 miles per day,
exhaust emissions would be as shown in Table 3.4.3.1.1-3.
Equipment
ROG
0.08
0.01
0.09
On-Road Trucks
Pickups
Totals
Table 3.4.3.1.1-3
Estimated Maximum Day Emissions from On-Road Vehicles
Pollutant (pounds per day)
CO
NOx
SOx
PM10
0.29
2.62
0.01
0.03
0.12
0.03
0.00
0.02
0.41
2.65
0.01
0.05
PM2.5
0.02
0.01
0.03
CO2
713
217
930
CH4
0.01
0.01
0.02
Vehicles owned by construction workers would be an additional source of air pollutants. An estimate of emissions
based on 10 worker vehicles per day of which 100 percent are pickup trucks (gross vehicle weight of 8,500 pounds or
less) with an average round trip of 50 miles is presented in Table 3.4.3.1.1-4.
ROG
0.02
CO
0.29
Table 3.4.3.1.1-4
Construction Worker Commute Vehicle Emissions
Pollutant (pounds per day)
NOx
SOx
PM10
PM2.5
0.07
0.01
0.04
0.02
CO2
543
CH4
0.03
Installation of the pipeline would create fugitive dust emissions. It is estimated that fugitive dust emissions from
construction activities on disturbed soil approximate 5 pounds per acre per day (PM10) with no mitigation. However, the
application of water as required would reduce the emissions by 61 percent. As stated above, it is anticipated that
approximately 0.05 acres would be disturbed each day. Therefore, the resulting PM10 emissions would be estimated
at 0.1 pounds per day. SCAQMD also estimates that the PM2.5 emissions in fugitive dust are equal to 21 percent of the
PM10 emissions in fugitive dust (SCAQMD, October 2006). Therefore, the PM2.5 emissions would equal 0.02 pounds
per day.
The total estimated daily emissions from the construction of WRCRWA Reclaimed Water Pipeline Project are shown
in Table 3.4.3.1.1-5.
Source
Construction Equipment
On-Road Vehicles
Worker Commutes
Fugitive Dust
Total
Threshold Limitsb
Localized Thresholdsc
Table 3.4.3.1.1-5
Total Estimated Construction Emissionsa
Pollutant (pounds per day)
ROG
CO
NOx
SOx
PM10
1.54
0.09
0.02
0.00
1.65
75
N/A
15.90
0.41
0.29
0.00
16.6
550
887
17.42
2.65
0.07
0.00
20.14
100
148
0.02
0.01
0.01
0.00
0.04
150
N/A
0.16
0.05
0.04
0.10
0.35
150
12
PM2.5
0.14
0.03
0.02
0.02
0.21
55
4
CO2
2,318
930
543
0.00
3,791
N/A
N/A
CH4
0.66
0.02
0.03
0.00
0.71
N/A
N/A
Use of particulate traps reduces PM10 and PM2.5 by 85% and oxidation catalysts reduces NOx by 15%.
Construction-related threshold limits developed by SCAQMD to determine significance.
c Localized significant thresholds developed by SCAQMD to determine localized significance, based on a work area of up to 1 acre and a 50-meter
distance to the nearest receptor.
a
b
32
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
As shown in Table 3.4.3.1.1-5, the total estimated emissions from construction of the WRCRWA Reclaimed Water
Pipeline would not exceed the construction-related threshold limits for significance or the localized thresholds.
3.4.3.2.2 Greenhouse Gases and Climate Change
Under the Proposed Action, construction activities associated with the pipeline would result in short-term GHG
emissions from heavy equipment and construction worker vehicles. However, the total amount of GHG emissions
associated with the Proposed Project (310 metric tons per year) would not approach the 25,000-metric ton threshold
provided by CEQ. Consequently, the Proposed Action would result in less than significant impacts related to GHG
and climate change.
3.4.3.2.3 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or
daily activities would be routinely associated with the Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such air quality and
greenhouse gas impacts associated with operations and maintenance would be negligible and would not approach any
of the significance thresholds previously identified.
3.4.4 Environmental Commitments
Although there were no significant impacts to air quality identified, the City of Corona committed to including the
following best management practices as part of its Mitigation Monitoring and Reporting Program adopted for this
Project:
DWP will:
Appoint a construction relations officer to act as a community liaison concerning on-site construction activities
including resolution of issues related to PM10 generation.
Add the following best management practices in its contract documents for this project:
The contractor shall:
Utilize electricity from power poles instead of from temporary diesel or gasoline power generators,
when feasible.
Require the use of 2010 and newer diesel haul trucks (e.g., material delivery trucks and soil
import/export) and if the lead agency determines that 2010 model year or newer diesel trucks
cannot be obtained the contractor shall use trucks that meet EPA 2007 model year NOx emissions
requirements.
33
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Require that all on-site construction equipment meet EPA Tier 3 or higher emissions standards
according to the following:
All off-road diesel-powered construction equipment greater than 50 hp shall meet the Tier 4
emission standards, where available. In addition, all construction equipment shall be outfitted
with BACT devices certified by CARB. Any emissions control device used by the contractor
shall achieve emissions reductions that are no less than what could be achieved by a Level 3
diesel emissions control strategy for a similarly sized engine as defined by CARB regulations.
A copy of each unit's certified tier specification, BACT documentation, and CARB or SCAQMD
operating permit shall be provided at the time of mobilization of each applicable unit of
equipment.
Maintain construction equipment engines by keeping them properly tuned and maintained
according to manufacturer's specifications.
Use alternative fuels or clean and low-sulfur fuel for equipment.
Idle trucks in accordance with the Airborne Toxic Control Measure (ACTM) to Limit Diesel Fueled
Commercial Motor Vehicle Idling and other applicable laws.
Spread soil binders on site, where appropriate, unpaved roads and staging areas.
Water site and equipment as necessary to control dust.
Sweep all streets at least once per day using SCAQMD Rule 1186 certified street sweepers or
roadway washing trucks if visible soil materials are carried to adjacent streets.
Conduct operations in accordance with SCAQMD Rule 403 requirements.
If necessary, wash off trucks leaving the site.
Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at least two feet of
freeboard in accordance with the requirements of California Vehicle Code (CVC) Section 23114.
3.5 Noise
3.5.1 Baseline Conditions
The ambient noise level of a region is the total noise generated within the specific environment and is usually composed
of sounds emanating from natural and manmade sources. Noise levels monitored in a region tend to have wide spatial
and temporal variation due to the great diversity of contributing sources. This is especially true for the greater Project
area with its blend of open space, agricultural, commercial and industrial land uses.
Characterization of the Project area noise levels is difficult due to the lack of actual field measurements. The federal
land in question is an existing sloped uninhabited open space near the River Road corridor, which due to traffic would
34
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
be louder than the field. Very little noise measurement data are available for the Project area in general. However,
typical noise levels for areas like the Project area are in the range of 45 to 55 dB(A).
Generally, the noise levels in the Project area are affected by natural and manmade sources. However, the sound
levels are more strongly influenced by human rather than natural sound sources. Within the Project area, the major
sources of noise include adjacent vehicular traffic and aircraft flyovers
3.5.2
Significance Thresholds
Noise effects would be considered significant if they result in any of the following:
Expose sensitive receptors to noise levels above thresholds established by the Cities of Eastvale and Norco,
the US Department of Housing and Urban Development (HUD), and/or the US EPA.
Result in a substantial temporary or periodic increase in ambient noise levels in the proposed project area
above levels existing without the Proposed Project.
Result in a substantial permanent increase in ambient noise levels in the proposed project area above levels
existing without the Proposed Project.
Alternative Analysis
3.5.2.1 No Action Alternative
If the No Action Alternative were selected, the City of Corona would not construct the recycled water pipeline on
federal land as proposed. No impacts to noise would occur under the No Action Alternative and conditions would
remain as described in Section 3.5.1.
3.5.2.2 Preferred Alternative
3.5.3.1.1 Construction
The analysis of noise impacts resulting from any project must consider both the construction and operational phases.
However, due to the nature of this Project, very little additional noise would be associated with the operational phase.
Therefore, the following noise analysis concentrates on the construction of the recycled water pipeline.
Operation of equipment used during construction would temporarily increase noise levels, during work hours in daylight,
to well in excess of ambient noise levels. The construction noise would vary with the particular construction stage in
progress due to the different pieces of construction equipment being used.
Table 3.5.3.1.1-1 lists equipment expected to be used during construction and identifies the number of pieces of
equipment typically used, their utilization factor, and their reference sound level at a distance of 50 feet.
35
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Table 3.5.3.1.1-1
Construction Equipment List and Reference Sound Levels
Equipment
Number
Required
Horsepower
Rating
Utilization
Factor
1
1
1
1
2
1
1
1
1
1
1
2
2
78
81
226
163
400
131
126
8
64
98
189
N/A
225
0.48
0.73
0.29
0.38
0.38
0.36
0.42
0.43
0.46
0.37
0.38
1.00
1.00
Air Compressor
Concrete Saw
Crane
Excavator
Off-Highway Trucks
Pavement Breaker
Paver
Plate Compactor
Sweeper
Tractor/Loader/Backhoe
Water Truck
Pickups
On-Road Trucks
Nominal Noise
Level, Leq
at 50 feet
dB(A)
78
78
81
81
84
86
77
83
82
78
82
72
82
As shown above, noise associated with construction could be locally significant during the construction period.
However, the exact degree of impact on the surrounding community would depend on the type of equipment being
used at any one time, the distance from the equipment, and the hours of operation as well as (in the case of local
wildlife activities) the specific time of year. It is anticipated that noise levels associated with construction would range
from 72 to 84 dB(A) within 50 feet of the equipment being used. These noise levels would be further attenuated by the
distance to the nearest receptor.
3.5.3.2.3 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or
daily activities would be routinely associated with the Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such noise impacts
associated with operations and maintenance would be negligible and would not approach any of the significance
thresholds previously identified.
3.5.4 Environmental Commitments
In its July 2016 Mitigation Monitoring and Reporting Program adopted for this Project, the City of Corona committed to
the following:
DWP will add the following best management practices in its standard construction specifications:
36
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
All equipment used during construction shall be muffled and maintained in good operating condition. All internal
combustion engines shall be fitted with well-maintained mufflers in accordance with manufacturers'
recommendations.
IN addition, allowances to project scheduling in light of local wildlife (see below) may also be adopted as needed to
reduce impacts to a less than signirficant level.
3.6 Biological Resources, Including Listed Species
3.6.1 Baseline Conditions
Prior to conducting the following habitat assessment, staff biologist Travis J. McGill conducted a literature review and
records search for sensitive biological resources potentially occurring on or within the vicinity of the project site.
Previously recorded occurrences of special-status plant and wildlife species and their proximity to the Project site were
determined through a query of the California Department of Fish and Wildlife's (CDFWs) CNDDB Rarefind 5, the
California Native Plant Society's (CNPS) Electronic Inventory of Rare and Endangered Vascular Plants of California,
Calflora Database, compendia of special-status species published by CDFW, and the United States Fish and Wildlife
Service (USFWS) species listings and the Western Riverside County MSHCP and associated technical documents.
Standard field guides and texts on sensitive and non-sensitive biological resources were reviewed for habitat
requirements, as well as the following resources:
Annual Prado Basin least Bell's vireo survey data (2017), Orange County Water District biologists;
Google Earth Pro historic and aerial imagery;
United States Department of Agriculture (USDA) Natural Resource Conservation Service (NRCS) Web Soil
Survey;
USFWS Critical Habitat designations for Threatened and Endangered Species; and
Western Riverside County MSHCP and RCIP Conservation Summary Report.
The literature review provided a baseline from which to inventory the biological resources potentially occurring on the
Project site. Additional recorded occurrences of these species found on or near the Project site were derived from
database queries. The CNDDB ArcGIS database was used, in conjunction with ArcGIS software, to locate the nearest
occurrence and determine the distance from the Project site.
3.6.1.1 Habitat Assessment/Field Investigation
Following the literature review, the staff biologist inventoried and evaluated the extent and conditions of the plant
communities found within the pipeline alignment and proposed laydown area and, in addition, identified any
jurisdictional features, riparian/riverine habitat, as well as natural corridors and linkages that may support the movement
of wildlife through the area. Special attention was given to any sensitive habitats and/or undeveloped areas, which
37
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
have higher potentials to support sensitive flora and fauna species. Areas providing suitable habitat for burrowing owl
were closely surveyed for signs of presence during the habitat assessment.
Areas providing suitable habitat for burrowing owl were closely surveyed for suitable burrows during the habitat
assessment, consisting of natural and non-natural substrates in areas with low, open vegetation. Methods to detect
the presence of burrowing owl included direct observation, aural detection, and signs of presence including pellets,
white wash, feathers, or prey remains. The location of remnant and occupied burrows/nests were documented, if found.
All plant and wildlife species observed, as well as dominant plant species within each plant community, were recorded.
Wildlife detections were made through observation of scat, trails, tracks, burrows, nests, and/or visual and aural
observation. In addition, site characteristics such as soil condition, topography, hydrology, anthropogenic disturbances,
indicator species, condition of on-site plant communities, and presence of potential jurisdictional drainage and/or
wetland features as well as riparian/riverine areas were noted.
3.6.1.1.1 Existing Site Conditions
The pipeline alignment ranges in elevation from 550 feet above mean sea level to 580 feet above mean sea level and
generally slopes from north to south. Based on the NRCS USDA Web Soil Survey, the pipeline alignment is underlain
by the following soil units Dello loamy fine sand, Dello loamy sand, Grangeville fine sandy loam, Grangeville loamy fine
sand, Grangeville sandy loam, Ramona very fine sandy loam, Terrace escarpments, and water.
The area south of the Santa Ana River is primarily composed of residential developments, while the area north of the
Santa Ana River is composed of a mix of residential developments, wastewater facilities, agricultural and livestock land
uses, and undeveloped vacant lots. The section of the Santa Ana River that the River Road Bridge crosses over
supports a southern cottonwood willow riparian forest plant community.
3.6.1.1.1.1 Vegetation
The proposed pipeline alignment would run within a previously disturbed area with scattered individual ruderal plants,
and in an existing paved road and a dedicated space in the River Road Bridge. No plant communities would be affected
from installation of the proposed pipeline. Because the pipeline will be installed in a dedicated space in the River Road
Bridge, no impacts to the riparian habitats associated with the Santa Ana River will occur.
The proposed laydown area is located within a vacant parcel on the southeast corner of the intersection of River Road
and Bluff Street. The vacant parcel supports a disturbed land cover type that has been subject to routine weed
abatement activities, stockpiling activities, and agricultural land uses.
3.6.1.1.1.2 Wildlife
Because the vacant federal land has been used for various outdoor recreation group activities, the specific pipeline
alignment provides limited habitat for wildlife species except those adapted to a high degree of human presence and
development. Because the proposed pipeline will be installed within the existing paved road and a dedicated space in
the River Road Bridge, wildlife species are not expected to be directly impacted from installation of pipeline. However,
riparian vegetation several hundreds of feet south of the proposed line will contain nesting birds during the biological
season.
38
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
The majority of the wildlife observed during the habitat assessment consisted of avian species including red-tailed
hawk (Buteo jamaicensis), killdeer (Charadrius vociferus), American crow (Corvus brachyrhynchos), house finch
(Haemorhous mexicanus), northern mockingbird (Mimus polyglottos), house sparrow (Passer domesticus), California
towhee (Pipilo crissalis), black phoebe (Sayornis nigricans), Anna's hummingbird (Calypte anna), and lesser goldfinch
(Spinus psaltria).
3.6.1.1.1.3 Nesting Birds
The River Road Bridge and plant communities adjacent to the pipeline alignment provides suitable nesting, foraging,
and cover habitat for year-round and seasonal avian residents, and migrating songbirds that could occur in the area.
No nesting birds or breeding behaviors were observed during the field survey.
3.6.1.1.1.4 Migratory Corridors and Linkages
Habitat linkages provide connections between larger habitat areas that are separated by development. Wildlife
corridors are similar to linkages, but provide specific opportunities for animals to disperse or migrate between areas. A
corridor can be defined as a linear landscape feature of sufficient width to allow animal movement between two
comparatively undisturbed habitat fragments. Adequate cover is essential for a corridor to function as a wildlife
movement area. It is possible for a habitat corridor to be adequate for one species yet still inadequate for others.
Wildlife corridors are features that allow for the dispersal, seasonal migration, breeding, and foraging of a variety of
wildlife species. Additionally, open space can provide a buffer against both human disturbance and natural fluctuations
in resources.
Although the proposed pipeline alignment crosses over the Santa Ana River, which is a regional wildlife movement
corridor, the pipeline will be installed within the existing paved road and a dedicated space in the River Road Bridge
and will not impact any native plant communities or the Santa Ana River. As a result, installation of the pipeline is not
expected to disrupt or have any adverse effects on any migratory corridors or linkages associated with the Santa Ana
River.
3.6.1.1.1.5 Jurisdictional Areas
There are three key agencies that regulate activities within inland streams, wetlands, and riparian areas in California.
The Corps Regulatory Branch regulates discharge of dredge or fill materials into "waters of the United States" pursuant
to Section 404 of the CWA and Section 10 of the Rivers and Harbors Act. Of the State agencies, the CDFW regulates
alterations to streambed and bank under Fish and Game Code Sections 1600 et seq., and the Regional Board regulates
discharges into surface waters pursuant to Section 401 of the CWA and the California Porter-Cologne Water Quality
Control Act.
The Santa Ana River is a relatively permanent water that drains into the Pacific Ocean (a Traditional Navigable Water)
that would be considered jurisdictional "waters of the United States" or "waters of the State" and fall under the regulatory
authority of the United States Army Corps of Engineers (Corps), Regional Water Quality Control Board (Regional
Board), and the California Department of Fish and Wildlife (CDFW). Impacts to the Santa Ana River would require a
Clean Water Act (CWA) Section 404 permit from the Corps, CWA Section 401 Water Quality Certification from the
39
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Regional Board, and/or a Section 1602 Streambed Alteration Agreement (SAA) from CDFW. No other drainage
features were observed within alignment of the proposed recycled water pipeline.
The proposed pipeline will be installed outside of the jurisdictional limits of the Santa Ana River. As a result, no
regulatory agency approvals are anticipated. In addition, no jurisdictional features were observed within the proposed
laydown area.
.3.6.1.1.1.6 Sensitive Biological Resources
The CNDDB, CNPS, and the USFWS IPaC were queried for reported locations of special-status plant and wildlife
species as well as sensitive natural plant communities occurring within the Corona North USGS 7.5-minute quadrangle
and within the vicinity of the proposed pipeline alignment. Specifically, the CNDDB was queried within a 2-mile buffer
of the proposed pipeline alignment due to the site's isolation from undisturbed native habitat and existing development
on and surrounding the Project site. This assessment evaluated the conditions of the habitat(s) within the boundaries
of the Project site to determine if the existing plant communities have the potential to provide suitable habitat(s) for
special-status plant and wildlife species.
The CNDDB and CNPS were queried for reported locations of listed and sensitive plant and wildlife species as well as
sensitive natural plant communities in the Corona North and Corona South USGS 7.5-minute quadrangles. A search
of published records of these species was conducted within these quadrangles using the CNDDB Rarefind 5 online
software. The CNPS Inventory of Rare and Endangered Vascular Plants of California and MSHCP supplied information
regarding the distribution and habitats of vascular plants in the vicinity of the Project site. The habitat assessment was
used to assess the ability of the plant communities found on-site to provide suitable habitat for relevant special-status
plant and wildlife species.
The literature search identified eleven (11) special-status plant species thirty (30) special-status wildlife species, and
seven (7) sensitive habitats as having potential to occur within the Corona North and Corona South quadrangles.
Special-status and wildlife species were evaluated for their potential to occur within the Project boundaries based on
habitat requirements, availability and quality of suitable habitat, and known distributions. Species determined to have
the potential to occur within the general vicinity are presented in Attachment C, Potentially Occurring Special-Status
Biological Resources, and discussed below.
3.6.1.1.1.6.1 Special-Status Plants
According to the CNDDB and CNPS, eleven (11) special-status plant species have been recorded in the Corona North
and Corona South quadrangles (refer to Attachment C). No special-status plant species were observed on-site during
the habitat assessment. Based on habitat requirements for specific species and the availability and quality of on-site
habitats, it was determined that the no special-status plant species are expected to occur within the pipeline alignment
because it will be installed within the existing paved road and dedicated space within the River Road Bridge. Due to
the heavily disturbed nature of the proposed laydown area, no special-status plant species are expected to occur on
that site.
40
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
3.6.1.1.1.6.2 Special-Status Wildlife
According to the CNDDB, thirty (30) special-status wildlife species have been reported in the Corona North and Corona
South quadrangles (refer to Attachment C). No sensitive wildlife species were observed on-site during the habitat
assessment. Based on habitat requirements for specific species and the availability and quality of on-site habitats, it
was determined that the proposed pipeline alignment and laydown area do not provide suitable habitat for any of the
special-status wildlife species known to occur in the area. Several hundred feet to the south, the least Bell's vireo (vireo
bellii pusillus) is known to populate the nearby suitable habitat and so measures to avoid adverse effects, provided
below, would be taken in consultation with the U.S. Fish and Wildlife Service. This proposed work on Federal land
would be implemented during Sept. 15-March 15 of the calendar year which allows the Corps and Service to concur
on a May Affect, Not Likely to Adversely Affect the vireo or other sensitive species.
3.6.1.1.1.6.3 Special-Status Plant Communities
The CNDDB lists seven (7) special-status plant communities as being identified within the Corona North and Corona
South quadrangles: Southern California Arroyo Chub/Santa Ana Sucker Stream, Southern Coast Live Oak Riparian
Forest, Southern Cottonwood Willow Riparian Forest, Southern Interior Cypress Forest, Southern Riparian Forest,
Southern Sycamore Alder Riparian Woodland, and Southern Willow Scrub. No special-status plant communities occur
within the pipeline alignment. However, a Southern Cottonwood Willow Riparian Forest plant community is found
adjacent to the Project site within the Santa Ana River. No impacts to the Santa Ana River or its habitats will occur.
3.6.1.1.1.6.3 Critical Habitat
Under the federal Endangered Species Act, "Critical Habitat" is designated at the time of listing of a species or within
one year of listing. Critical Habitat refers to habitat or a specific geographic area that contains the elements and features
that are essential for the survival and recovery of the species. Maintenance of these physical and biological features
requires special management considerations or protection, regardless of whether individuals or the species are present
or not. In the event that a project may result in take or adverse modification to a species' designated Critical Habitat, a
project proponent may be required to engage in suitable mitigation. However, consultation for impacts to Critical Habitat
is only required when a project has a federal nexus (i.e. occurs on federal land, is issued federal permits [e.g. Corps
Section 404 permit, or Corps Section 408 permit], or receives any other federal oversight or funding). If a project does
not have a federal nexus, Critical Habitat consultations are not required.
The proposed alignment crosses over the Santa Ana River, which has been designated as Critical Habitat for
southwestern willow flycatcher (Empidonax trailli extimus), Santa Ana sucker (Catostomus santaanae), and least Bell's
vireo (vireo bellii pusillus). However, the pipeline will be installed in open spaces, within the existing paved road, and
in dedicated space in the River Road Bridge and will not impact any native wildlife or plant communities or the Santa
Ana River. Therefore, no impacts to federally designated Critical Habitat will occur from implementation of the proposed
project. Absent other factors or issues, this is No-Effect to listed species and no Adverse Modification to Critical Habitat.
3.6.1.1.2 Western Riverside County MSHCP
The Proposed Project is located within the Cities of Riverside and Norco Area Plan and Eastvale Area Plan of the
MSHCP, but is not located within any Criteria Cells or MSHCP Conservation Areas. However, the proposed alignment
41
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
is located immediately adjacent to Existing Core A and MSHCP designated Public/Quasi-Public Lands associated with
the Santa Ana River.
3.6.1.1.2.1 Section 6.1.2 Riparian/Riverine Areas and Vernal Pools
3.6.1.1.1.1.1 Riparian/Riverine Areas
As identified in Section 6.1.2 of the MSHCP, Protection of Species Associated with Riparian/Riverine Areas and Vernal
Pools, riparian/riverine areas are defined as areas dominated by trees, shrubs, persistent emergent plants, or emergent
mosses and lichens which occur close to or are dependent upon nearby freshwater, or areas with freshwater flowing
during all or a portion of the year. Conservation of these areas is intended to protect habitat that is essential to a number
of listed or special-status water-dependent fish, amphibian, avian, and plant species. If all impacts to riparian/riverine
habitat cannot be avoided, a Determination of Biologically Equivalent or Superior Preservation (DBESP) must be
developed to address the replacement of lost functions of habitats in regards to the listed species. This assessment is
independent from considerations given to "waters of the U.S." and "waters of the State" under the CWA and the
California Fish and Game Code. The Santa Ana River and associated riparian vegetation also qualify as
riparian/riverine habitat under the Section 6.1.2 of the MSHCP. The extent of the riparian/riverine habitat within the
Santa Ana River is synonymous with the jurisdiction of CDFW. As a result, any alteration or loss of riparian/riverine
habitat would require the preparation of a (DBESP) under the MSHCP. This analysis is separate from any regulatory
approvals/permitting by the Corps, Regional Board, and CDFW.
However, the proposed alignment will be installed entirely outside of the Santa Ana River and associated plant
communities. As a result, a DBESP will not be required for installation of the proposed pipeline.
3.6.1.1.1.1.2 Vernal Pools and Fairy Shrimp Habitat
One of the factors for determining the suitability of the habitat for fairy shrimp would be demonstrable evidence of
seasonal ponding in an area of topographic depression that is not subject to flowing waters. These astatic pools are
typically characterized as vernal pools. More specifically, vernal pools are seasonal wetlands that occur in depression
areas without a continual source of water. They have wetland indicators of all 3 parameters (soils, vegetation, and
hydrology) during the wetter portion of the growing season but normally lack wetland indicators of hydrology and/or
vegetation during the drier portion of the growing season. Obligate hydrophytes and facultative wetlands plant species
are normally dominant during the wetter portion of the growing season. The determination that an area exhibits vernal
pool characteristics and the definition of the watershed supporting vernal pool hydrology is made on a case-by-case
basis. Such determinations that should be considered include the length of time the areas exhibit upland and wetland
characteristics and the manner in which the area fits into the overall ecological system as a wetland. The seasonal
hydrology of vernal pools provides for a unique environment, which supports plants and invertebrates specifically
adapted to a regime of winter inundation, followed by an extended period when the pool soils are dry.
Vernal pools are seasonally inundated, ponded areas that only form in regions where specialized soil and climatic
conditions exist. During fall and winter rains typical of Mediterranean climates, water collects in shallow depressions
where downward percolation of water is prevented by the presence of a hard pan or clay pan layer (duripan) below the
soil surface. Later in the spring when rains decrease and the weather warms, the water evaporates and the pools
generally disappear by May. The shallow depressions remain relatively dry until late fall and early winter with the advent
42
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
of greater precipitation and cooler temperatures. Vernal pools provide unusual "flood and drought" habitat conditions
to which certain plant and wildlife species have specifically adapted as well as invertebrate species such as fairy shrimp.
The MSHCP lists two general classes of soils known to be associated with listed and special-status plant species; clay
soils and Traver-Domino Willow association soils. The specific clay soils known to be associated with listed and specialstatus species within the MSHCP plan area include Bosanko, Auld, Altamont, and Porterville series soils, whereas
Traver-Domino Willows association includes saline-alkali soils largely located along floodplain areas of the San Jacinto
River and Salt Creek. Without the appropriate soils to create the impermeable restrictive layer, none of the specialstatus plant or wildlife species associated with vernal pools can occur on the project site.
None of these soils have been documented within the proposed pipeline alignment. Because the pipeline will be
installed within the existing paved road and dedicated space in the River Road Bridge no undisturbed soils will be
impacted. Therefore, no impacts to vernal pools or fairy shrimp habitat will occur from implementation of the Proposed
Project.
3.6.1.1.2.2 Section 6.1.3 Narrow Endemic Plant Species
Based on the RCIP query and review of the MSHCP, it was determined that the project site is located immediately
adjacent to the designated survey area for Narrow Endemic Plant Species San Diego ambrosia, Brand's phacelia, and
San Miguel savory as depicted in Figure 6-1 within Section 6.1.3 of the MSHCP. The Proposed Project will be installed
within existing paved streets and a dedicated space in the River Road Bridge that does not provide suitable habitat for
Narrow Endemic Plant Species.
3.6.1.1.2.3 Section 6.1.4 Urban/Wildlands Interface Guidelines
The Project site is not located within any Criteria Cells, corridors, or linkages; however, the proposed alignment is
located immediately adjacent to Existing Core A and MSHCP designated Public/Quasi-Public Lands associated with
the Santa Ana River. Phase 1 will be installed within existing paved road and a dedicated space in the River Road
Bridge; therefore, indirect project-related impacts to drainage, toxics, lighting, noise, invasive plant species, barriers,
and grading/land development will not occur.
3.6.1.1.2.4 Section 6.3.2 Additional Survey Needs and Procedures
The RCIP Conservation Summary Report Generator was queried to determine if the MSHCP lists any survey
requirements for the Project. The summary report identified that the Project site is located immediately adjacent to the
designated survey area for burrowing owl. Phase 1 will be installed within existing paved road and a dedicated space
in the River Road Bridge that does not provide suitable habitat for burrowing owl.
3.6.2 Significance Thresholds
Based on the existing conditions discussed above, effects of the Proposed Project would be significant if they:
Adversely impact any federal or state special-status wildlife species, plants, or habitat.
Adversely impact any riparian habitat or other sensitive natural communities.
43
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Adversely impact federally protected wetlands or Waters of the United States or waters of the state through
direct removal, filling, and/or hydrological interruption.
Additional information will be incorporated into this section, if necessary, following interagency coordination with the
USFWS and the California Department of Fish and Wildlife (CDFW). As outlined in 33 CFR Part 325, coordination will
take place (e.g., per the Fish and Wildlife Coordination Act) to ensure relevant agencies are provided an opportunity to
make known concerns regarding sensitive species and/or their habitat.
3.6.3 Alternative Analysis
3.6.2.1 No Action Alternative
If the No Action Alternative were selected, the City of Corona would not construct the recycled water pipeline on federal
lands. No direct impacts to biological resources on federal land would occur under the No Action Alternative and
conditions would remain as described in Section 3.6.1. However, note that the vireo and flycatcher are also Statelisted species and it is possible that, given alternate routes, these same species could be affected.
3.6.2.2 Preferred Alternative
3.6.2.2.1 Construction
3.6.3.2.1.1 Special-Status Plants
As previously stated (Section 3.6.1.1.1.6.1), no special-status plant species were observed on-site during the habitat
assessment. Based on habitat requirements for specific species and the availability and quality of on-site habitats, it
was determined that the no special-status plant species are expected to occur within the pipeline alignment or at the
laydown area.
3.6.3.2.1.2 Special-Status Wildlife
As previously stated (Section 3.6.1.1.1.6.2), according to the CNDDB, twenty-eight (28) special-status wildlife species
have been reported in the Corona North and Corona South quadrangles (refer to Attachment C). Based on habitat
requirements for specific species and the availability and quality of on-site habitats, it was determined that no specialstatus wildlife species are expected to occur within the pipeline alignment or laydown area. However, in adjacent
habitat areas, it is likely that during the avian nesting season, listed or other species do exist and their protection
accounted for, as described below.
3.6.3.2.1.3 Nesting Birds
As previously stated in Section 3.6.1.1.1.3, the River Road Bridge and plant communities adjacent to the pipeline
alignment provides suitable nesting, foraging, and cover habitat for year-round and seasonal avian residents, and
migrating songbirds that could occur in the area. No nesting birds or breeding behaviors were observed during the field
survey. However, if construction is scheduled during the avian nesting season (typically approximately February 1st
through August 31st) a nesting bird survey will be required to ensure compliance with the Migratory Bird Treaty Act
(MBTA). If active nests are identified, a protective buffer (i.e., typically up to a 500-foot "no work zone" depending upon
44
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
the species in question) around the nest may be delineated and work in other areas may continue. However, depending
on the location of the nest, construction activities may need to be demobilized and cause a delay in progress until after
the birds have fledged (e.g., typically six weeks). Coordination with appropriate agencies may be required to determine
the best avoidance, minimization and compliance measures for the particular species. It is recommended that the
proposed work areas and laydown yards within non-native grassland be mowed in the winter to discourage nesting
prior to and during construction. Conservatively, encountering a nesting bird could result in extending the construction
timeline from a best-case scenario of approximately 10 weeks to as many as 12 weeks. Compliance with the MBTA
would ensure that impacts to nesting birds would be avoided and significant effects would not result.
3.6.3.2.1.4 Jurisdictional Waters
As previously stated in Section 3.6.1.1.1.5, the Santa Ana River is a relatively permanent water that drains into the
Pacific Ocean (a Traditional Navigable Water) that would be considered jurisdictional "waters of the United States" or
"waters of the State" and fall under the regulatory authority of the United States Army Corps of Engineers (Corps),
Regional Water Quality Control Board (Regional Board), and the California Department of Fish and Wildlife (CDFW).
Impacts to the Santa Ana River would require a Clean Water Act (CWA) Section 404 permit from the Corps, CWA
Section 401 Water Quality Certification from the Regional Board, and/or a Section 1602 Streambed Alteration
Agreement (SAA) from CDFW. No other drainage features were observed within alignment of the proposed recycled
water pipeline.
The proposed alignment will be installed within the existing paved road and a dedicated space in the River Road Bridge
outside of the jurisdictional limits of the Santa Ana River. As a result, no regulatory agency approvals are anticipated.
Construction of the Preferred Alternative would not result in significant impacts to biological resources.
3.6.3.2.2 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or
daily activities would be routinely associated with the Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such biological resources
impacts associated with operations and maintenance would be negligible and would not approach any of the
significance thresholds previously identified.
3.6.4 Environmental Commitments
A query of the Riverside County Integrated Project (RCIP) Conservation Summary Report Generator found that the
proposed project sites are located within the designated survey area for burrowing owl (Athene cunicularia). Based on
habitat requirements, the availability and quality of those habitats on-site, it was determined that the burrowing owl is
presumed absent due to lack of suitable habitat and existing development/disturbance.
45
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
However, in order to comply with the conservation goals of the MSCHP and to ensure burrowing owl and nesting birds
remain absent from the Project sites, DWP committed to the following in its July 2016 Mitigation Monitoring and
Reporting Program for the Proposed Project:
A burrowing owl clearance survey shall be conducted prior to any ground disturbing activities in accordance
with the CDFW 2012 Staff Report on Burrowing Owl Mitigation. Two pre-construction clearance surveys shall
be conducted 14-30 days and 24 hours prior to ground disturbing activities to document the continued absence
of burrowing owl from the Project site.
Regarding the vireo/flycatcher and their critical habitat setting, it is recommended that construction work on the
federal land be conducted outside these species' annual nesting season, that is, outside of approximately
March 1-September 1, in order to achieve a No Effect to these species. Otherwise, pre-construction surveys
should also be planned if the work might possibly extend into the nesting season. The Corps will consult with
the U.S. Fish and Wildlife Service for further planning purposes if needed. While several related periods of time
are recognized as nesting season for several types of birds, the March 1-Sept. 1 is recognized and used locally
for local planning regarding riparian avian communities.
If ground-disturbing activities or removal of any trees, shrubs, or any other potential nesting habitat are
scheduled within the avian nesting season (nesting season generally extends from February 1 - August 31;
see above regarding different dates), a pre-construction clearance survey for nesting birds should be
conducted within 10 days prior to any ground disturbing activities. The biologist conducting the clearance
survey should document a negative survey with a brief letter report indicating that no impacts to active bird
nests will occur. If an active avian nest is discovered during the 10-day preconstruction clearance survey,
construction activities should stay outside of a 300-foot buffer around the active nest. For raptor species, this
buffer is expanded to 500 feet. It is recommended that a biological monitor be present to delineate the
boundaries of the buffer area and to monitor the active nest to ensure that nesting behavior is not adversely
affected by the construction activity. Once the young have fledged, normal construction activities can occur.
3.7
Paleontological Resources
3.7.1 Baseline Conditions
The County of Riverside's database indicates that the Project area has a low potential for containing significant
paleontological resources. (www.mapmycounty 12/28/2016).
3.7.2 Significance Thresholds
In its standard guidelines for assessment and mitigation of significant impacts to paleontological resources, the Society
of Vertebrate Paleontology (1995) notes that a geologic unit is considered to possess high paleontological sensitivity if
it has produced vertebrate or significant invertebrate fossils, or significant suites of plant fossils, and is considered to
have a potential for containing significant non-renewable paleontological resources. A geologic unit is considered to
possess an unknown paleontological sensitivity if little information is available for the unit. All other geologic units are
considered to be of low paleontological sensitivity.
46
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Using the above criteria, the significance of potentially significant impacts of proposed project- related excavations on
the paleontological resources was assessed. Any unmitigated impact on a fossil site, or on a fossil-bearing rock unit of
high or moderate sensitivity, would be considered significant.
3.7.3 Alternative Analysis
3.7.3.1 No Action Alternative
If the No Action Alternative were selected, the City of Corona would not construct the recycled water pipeline on Federal
land. No impacts to paleontological resources would occur under the No Action Alternative and conditions would remain
as described in Section 3.7.1.
3.7.3.2 Preferred Alternative
3.7.3.2.1 Construction
In general, pipeline excavations would have the potential to affect paleontological resources because at a certain depth,
they may impact sediment that has not been previously disturbed. However, excavations associated with the Proposed
Project are expected to be no deeper than eight feet below ground surface, a depth at which significant paleontological
resources are unlikely to be found. Clearing, use of proposed laydown areas, pavement removal, and other activities
required for this project would occur at the surface, or within nominal depths, and do not have the potential to affect
paleontological resources. In addition, excavations within the limits of previous pipeline trenching would affect only
previously disturbed fill, and previously excavated sediment is not considered paleontologically sensitive. Even if fossils
were encountered during original excavations and subsequently returned to the ground mixed with fill, they have little
scientific value because they no longer occur in stratigraphic context. Overall, impacts are expected to be less than
significant.
3.7.3.2.2 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or
daily activities would be routinely associated with the Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such impacts to
paleontological resources associated with operations and maintenance would be negligible and would not approach
any of the significance thresholds previously identified.
3.7.4 Environmental Commitments
In its July 2016 Mitigation Monitoring and Reporting Program adopted for this Project, the City of Corona committed to
the following:
47
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
3.8
Should construction/development activities uncover paleontological resources, work will be moved to other
parts of the Project site and a qualified paleontologist shall determine the significance of these resources.
If the find is determined to be significant, avoidance or other appropriate measures shall be implemented.
Appropriate measures would include that a qualified paleontologist be permitted to recover and evaluate
the find(s) in accordance with current standards and guidelines.
Cultural Resources
3.8.1 Baseline Conditions
A cultural resources assessment to support the Corps's responsibility pursuant to Section 106 of the National Historic
Preservation Act (NHPA) (36 Code of Federal Regulations [CFR] 800) was conducted for the proposed work at the
City of Corona's River Road Recycled Water Pipeline site. The purpose of the assessment was to review known records
and conduct a pedestrian survey to determine the presence of historic properties (any prehistoric or historic district,
site, building, structure, or object included in, or eligible for inclusion on the National Register) within the area of potential
effects (APE) and determine if the proposed undertaking will result in any adverse effects to known resources
3.8.1.1 Area of Potential Effects (APE)
The APE of an undertaking is defined in 36 CFR 800.16(d) as the "geographic area or areas within which an undertaking
may directly or indirectly cause alterations in the character or use of historic properties if any such property exists."
Additionally, CEQA-Plus guidelines state that the APE is "three-dimensional (depth, length, width) and includes all
areas directly affected by the proposed construction" (State Water Resources Control Board 2004). The APE includes
the area of direct impact (ADI), consisting of all areas where work related to the project will occur.
The width of surface trenching is expected to be approximately 5 feet; however, the permanent easement is 20 feet.
The temporary construction easement will be an additional 20 feet wide. The depth of the pipeline is expected to
vary between 6 and 8 feet based on sloping needs and the diameter of the pipe. The State Historic Preservation
Officer (SHPO) accepted this determination of the APE in a letter dated August 7, 2017.
3.8.1.2 Literature Search Methods
Rincon archaeologist Breana Campbell conducted a search of cultural resource records housed at the California
Historical Resources Information System (CHRIS), Eastern Information Center (EIC) located at the University of
California, Riverside in January and February 2016. The search was conducted to identify all previous cultural
resources work and previously recorded cultural resources within a 0.5-mile radius of the project site. The CHRIS
search included a review of the NRHP, the CRHR, the California Points of Historical Interest list, the California Historical
Landmarks list, the Archaeological Determinations of Eligibility list, and the California State Historic Resources
Inventory list. The records search also included a review of all available historic USGS 7.5- and 15-minute quadrangle
maps.
3.8.1.3 Literature Search Results
48
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
The EIC records search identified 14 previously conducted studies within a 0.5-mile radius of the APE (Table 3-12). Of
these reports, six (6) discuss the project APE; none of these studies identified cultural resources within the project
APE.
Table 3-12
Previous Studies Within 0.5 Mile of the APE
EIC Report No.
Author
Year
Study
Relationship to APE
RI-00061
Langenwalter, P.E., and J. Brock
1985
Phase II Archaeological Studies Prado Basin and The Lower Santa
Ana River
Within
RI-00063
Kirkish, A., and L. McCoy
1972
RI-00736
Swenson, J.D.
1979
Addendum To: An Archaeological Assessment of the
Norco Hills Proposed Subdivision Near Norco, California
Outside
RI-01125
Drover, C.E.
1981
Environmental Impact Evaluation: Archaeological
Assessment of Tentative Parcel Map 17414 Near Norco,
California
Outside
RI-01697
Drover, C.E.
1982
Environmental Impact Evaluation: Archaeological
Assessment of the Proposed Norco Wastewater
Management Facilities
Within
RI-01954
Rosenthal, E.J., and
S.J. Schwarz
1981
A Cultural Resource Survey of the Proposed Santa Ana River
Hiking/Biking Trail in the Prado Flood Control Basin
Within
RI-02429
Stickel, E.G., and T. D'altroy
1980
Santa Ana River and Santiago Creek: A Cultural Resources Survey
Outside
RI-02593
Drover, C.E.
1989
An Archaeological Assessment of the Archibald Sewage Treatment
Plant Norco, Riverside County, California
Outside
RI-03629
Seymour, G., and D. Doak
1992
An Archaeological Survey for the Western Riverside
Regional Wastewater Treatment System in Corona and
Norco, Riverside County.
Outside
RI-04331
Lerch, M.K.
1999
Historic Property Survey Report: Corydon Avenue
Equestrian Staging Area, City of Norco, Riverside
County, California.
Within
RI-05775
Tang, B., M. Hogan, and M.
Dahdul
2002
Historical/Archaeological Resources Survey Report, Tentative
Tract Map No. 30825, Near the City of Norco, Riverside
County, CA
Outside
RI-05958
Tang, B., M. Hogan,
C. Tibbet, and D, Ballester
2003
Historical/ Archaeological Resources Survey Report Assessor's
Parcel Number 130-030-012 and -013, Near the City of Norco,
Riverside County, CA
Outside
RI-05964
Tang, B., M. Hogan,
J. Smallwood, and D. Ballester
2003
Historical/Archaeological Resources Survey Report, Tentative
Tract Map No. 31406, Near the City of Norco, Riverside
County, CA
Within
A Preliminary Site Report on the Salvage Excavations
at the Bovine Site
Outside
49
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
EIC Report No.
RI-07500
Author
Year
Bonner, W.H., and M. Aislin-Kay
2007
Study
Relationship to APE
Letter Report: Cultural Resource Records Search Results and
Site Visit for Royal Street Communications, LLC Facility
Candidate LA2364A (SBC/ATT Woodcrest), 16991 Van Buren
Boulevard, Riverside, Riverside County, California.
Within
Eastern Information Center, January and February 2016
The EIC records search identified two (2) cultural resources within a 0.5-mile radius of the APE (Table 3-13). Both of
these resources are prehistoric artifact scatters. None of these resources are located within or adjacent to the APE for
the current project; however, 33-001436 is immediately adjacent to the proposed laydown area. Therefore, DWP will
construct a fence across the proposed laydown area property to ensure that the site is not further disturbed.
Table 3-13
Previously Recorded Cultural Resources Within 0.5-mile of theAPE
Primary
Number
Description
NRHP/CRHR Eligibility Status
Recorded/Updated By
and Year
Relationship to APE
33-000652
Prehistoric Artifact Scatter
Insufficient information
Kirkish 1972
Outside
33-001436
Prehistoric Artifact Scatter
Insufficient information
Hammond 1977
Outside
Eastern Information Center, January and February 2016.
3.8.1.4 Pedestrian Survey Methods
Rincon archaeologist Breana Campbell conducted a cultural resources survey of the APE on July 12, 2017. Ms.
Campbell conducted a pedestrian survey of the proposed pipeline across U.S. Army Corps land and the proposed
laydown area.
During the survey efforts, Ms. Campbell examined all areas of exposed ground surface for prehistoric artifacts (e.g.,
chipped stone tools and production debris, stone milling tools, ceramics), historic debris (e.g., metal, glass, ceramics),
or soil discoloration that might indicate the presence of a cultural midden. Ms. Campbell recorded characteristics of the
project APE and survey conditions using a field notebook and a digital camera. Copies of the field notes and digital
photographs are on file with Rincon's Carlsbad office.
3.8.1.5 Pedestrian Survey Results
The survey identified no previously unrecorded cultural resources within the project site. Vegetation where present
within the project site included non-native grasses. The EIC records search identified no previously recorded cultural
resources within the project site and no new discoveries were made as a result of the pedestrian survey.
3.8.1.6 Native American Consultation
A search of the Sacred Lands file by the Native American Heritage Commission (NAHC) on May 4, 2017 indicated that
Native American cultural resources were not identified within the APE.
50
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
The Corps invited the 34 tribal contacts provided by the NAHC by letter on July 10, 2017. (The Bureau of
Reclamation and the City of Corona had previously conducted tribal consultation on the larger distribution, but the
proposed issuance of an easement is a separate undertaking.) Unresponsive tribes were contacted again on
November 29, 2017.
The San Manuel Band of Mission Indians replied that the proposed project is located outside of Serrano ancestral
territory, so they would not be a consulting party. The Pala Band of Mission Indians also determined the project to
be outside the territory that the tribe considers its Traditional Use area and deferred to closer tribes. The Viehas
Band of Kumeyaay Indians determined that the project area has little cultural significance to Viejas and
recommended contacting closer tribes. The Rincon Band of Luiseño Indians deferred to the Pechanga or Soboba
Bands. The Morongo Band of Mission Indians requested additional information but did not provide any subsequent
comments.
The Soboba Band of Luiseño Indians requested a face to face consultation meeting on August 15, 2017. A meeting
was held on September 20, 2017. Their concerns included the desire for construction to be periodically monitored by
a qualified professional archaeologist and that any recovered cultural material be curated according to federal law
and policy. Specific mitigation measures were developed to address their concerns.
3.8.1.7 Determination of Effect
The current project includes issuing a permit for the installation of a 20-inch diameter across federal lands.
Several previous studies have investigated portions of the APE and adjacent areas (RI-00061, RI-01697, RI-01954,
RI-04331, RI-05964, RI-07500), and new pedestrian survey of the APE was completed. No cultural resources were
identified within the APE. Two previously recorded cultural resources have been identified within 0.5-mile of the APE.
These resources are located outside of the APE and would not be impacted by the current project.
Based on the level of disturbance of the APE from previous infrastructure development (e.g., roads, pipelines) and
results of previous inventory, it is unlikely that any previously unidentified cultural resources will be affected or impacted
by the current project. Therefore, Rincon recommends a finding of no impact to historical resources under CEQA and
no historic properties affected under the NHPA.
3.8.2 Significance Thresholds
3.8.3
The criteria for significant, adverse effects to cultural resources are if the project would include disturbance,
alteration or otherwise diminishing the integrity of a cultural or archeological resource or historic property's
location, design, setting, materials, workmanship, feeling or association, or the introduction of culturally
incompatible elements to a property listed on or considered eligible for listing on the National Register of
Historic Places. Additionally, adverse impacts to important Native American sites or traditional resources could
also constitute a significant adverse effect.
3.8.4
Alternative Analysis
3.8.4.1 No Action Alternative
51
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
If the No Action Alternative were selected, the City of Corona would not construct the recycled water pipeline. No
impacts to cultural resources would occur under the No Action Alternative and conditions would remain as described
in Section 3.8.1.
3.8.3.1 Preferred Alternative
3.8.3.1.1
Construction
As summarized above and based on the literature search and pedestrian survey conducted to evaluate potentially
important resources, no properties have been identified within the APE. In accordance with 36 CFR 800.13(b), if any
cultural resources are identified during construction, the Corps Operations Branch and archaeologist will be notified
and the Corps archaeologist will be consulted in order to determine appropriate effects and treatment. The Corps has
determined that no historic properties would be affect granting an easement for the proposed project, contingent upon
the mitigation measures developed in coordination with interested tribes. The State Historic Preservation Officer
agreed with this finding in a letter dated December 1, 2017.Iimpacts to cultural resources are expected to be less than
significant.
3.8.3.1.2 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or
daily activities would be routinely associated with the Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. Any excavation required for
repairs would occur within the permanent easement and, most likely, within the area disturbed by the initial construction.
Operation and maintenance activities are presumed to be inherent with the construction of pipelines. As such impacts
to historical and archaeological resources associated with operations and maintenance would be negligible and would
not approach any of the significance thresholds previously identified.
3.8.4
Environmental Commitments
In its July 2016 Mitigation Monitoring and Reporting Program adopted for this Project, the City of Corona committed to
numerous measures to ensure the protection of cultural resources. In addition, mitigation measures, listed in Section
4.7, below, would be incorporated to ensure that the project will not adversely affect historic properties.
3.9
Hazardous Materials and Wastes
3.9.1 Baseline Conditions
Several standard environmental record services are available to determine the potential for recognized environmental
conditions in an area. Those databases are briefly described in the following paragraphs.
52
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
3.9.1.1 National Priorities List (NPL)
The National Priorities List (NPL) is a federal database of uncontrolled hazardous waste sites that warrant further
investigation to determine if long-term "remedial action" is necessary. There are no NPL sites located in the Project
area.
3.9.1.2 Envirostor
Envirostor is a database maintained and primarily used by the California Department of Toxic Substances Control to
determine the location of all hazardous waste sites. There are no hazardous waste sites located in the Project area
listed in the Envirostor database.
1.9.1.3 Geotracker
Geotracker is the State Water Resources Control Board's data management system for managing sites that impact
groundwater, especially those that require groundwater cleanup (Underground Storage Tanks, Department of Defense
Site Cleanup Program) as well as permitted facilities such as operating USTs and land disposal sites. There are no
permitted underground storage tanks within the Project area.
1.9.1.4 Comprehensive Environmental Response, Compensation and Liability Act
(CERCLA)
The Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as
Superfund, was enacted by Congress on December 11, 1980. In implementing this law, the Environmental Protection
Agency (EPA) compiles a list of known hazardous waste sites that are under consideration for the Superfund list. This
list is known as the CERCLIS database. There are no CERCLIS sites located in the Project area.
3.9.1.5 Resource Conservation and Recovery Act (RCRA)
The primary goals of the Resource Conservation and Recovery Act (RCRA) are to protect human health and the
environment from the potential hazards of waste disposal, to conserve energy and natural resources, to reduce the
amount of waste generated, and to ensure that wastes are managed in an environmentally sound manner. In
implementing this law, EPA compiles a list of known hazardous waste generators. There are no known hazardous
waste generators within the Project area.
3.9.1.6 Hazardous Materials Response Plans and Inventory
The Governor's Office of Emergency Services (OES) administers the Hazardous Materials Response Plans and
Inventory program (Article 1, Chapter 6.95, Health and Safety Code). As part of this program, OES maintains a
database of all hazardous materials spills in the State (RIMS). According to that database, there have not been any
hazardous materials spills within the Project area.
3.9.1.7 Leaking Underground Storage Tank Information System (LUSTIS)
53
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
The State Water Resources Control Board (State Water Board) administers the Leaking Underground Storage Tank
Information System (LUSTIS). The LUSTIS database includes all reported leaks from underground storage tanks. The
LUSTIS database is now reported in the Georacker results.
3.9.1.8 Site Mitigation Program Property Database (formerly CalSites)
The California Environmental Protection Agency's Department of Toxic Substances Control (DTSC) administers the
CalSites program. Information in the CalSites database is preliminary in nature; therefore, most sites listed in the
database need additional work to determine if contamination exists. There are no sites in the CalSites database within
the Project area.
3.9.1.9 Hazardous Waste and Substances Sites List (Cortese)
California's Government Code §65962.5 requires the California Department of Toxic Substances Control to develop,
at least annually, an updated list of Hazardous Waste and Substances Sites. This list, known as the Cortese List, is a
planning document used by the State, local agencies and developers to comply with the California Environmental
Quality Act requirements in providing information about the location of hazardous materials release sites. DTSC is
responsible for a portion of the information contained in the Cortese List. Other State and local agencies are required
to provide additional hazardous materials release information for the Cortese List. The Cortese List is to be submitted
to the Secretary of the California Environmental Protection Agency. There are no sites on the Cortese List within the
Project area.
3.9.1.10 Solid Waste Information System (SWIS)
The Solid Waste Information System (SWIS) is a database provided by the California Integrated Waste Management
Board which consists of both open as well as closed and inactive solid waste disposal facilities and transfer stations.
There are no sites in the SWIS database within the Project area.
3.9.2 Significance Thresholds
A significant impact would occur if implementation of the Proposed Project:
Caused soil contamination, including flammable or toxic gases, at levels exceeding Federal, state, and local
hazardous waste limits established by 40 CFR Part 261.
Exposed the general public to hazardous situations through the transport, use, storage, or disposal of
hazardous materials.
Created a significant hazard to the public or environment through reasonably foreseeable upset and accident
conditions involving the release of hazardous materials into the environment.
3.9.3 Alternative Analysis
3.9.3.1 No Action Alternative
54
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
If the No Action Alternative were selected, the City of Corona would not construct its recycled water pipeline on Federal
land. No impacts to hazardous materials and wastes would occur under the No Action Alternative and conditions would
remain as described in Chapter 3.9.1.
3.9.3.2 Preferred Alternative
3.9.3.2.1 Construction
No sites have been identified through review of regulatory records involving releases or spills of hazardous waste that
would have the potential to affect the Proposed Project area. No activities are proposed that would increase the
potential release of hazardous or toxic substances. Virtually all hazardous materials required to facilitate
implementation of the Proposed Project (e.g., fuel for vehicles and equipment) would be provided / distributed off-site,
and any minor amount of such materials necessary onsite would be handled in accordance with appropriate plans and
in compliance with all applicable regulatory requirements. These potential minor amounts of material include, for
example: vehicle fuel, hydraulic fluid, and compressed gases for welding. Overall, impacts would be less than
significant.
3.9.3.2.2 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or
daily activities would be routinely associated with the Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such, impacts related to
hazardous materials and wastes associated with operations and maintenance activities would be negligible and
would not approach any of the significance thresholds previously identified.
3.9.4 Environmental Commitments
In its July 2016 Mitigation Monitoring and Reporting Program adopted for this Project, the City of Corona committed to
the following:
To reduce potentially hazardous conditions and minimize the impacts from the handling of potentially hazardous
materials, DWP shall include the following in its construction contract documents:
The contractor(s) shall prepare a Health and Safety Plan in compliance with the requirements of Chapter 6.95,
Division 20 of the Health and Safety Code (§§ 25500--25532). The plan shall include measures to be taken
in the event of an accidental spill.
The contractor(s) shall enforce strict on-site handling rules to keep construction and maintenance materials
out of receiving waters and storm drains. In addition, the contractor(s) shall store all reserve fuel supplies only
55
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
within the confines of designated construction staging areas, refuel equipment only within the designated
construction staging areas, and regularly inspect all construction equipment for leaks.
The construction staging area shall be designed to contain contaminants such as oil, grease, and fuel products
so that they do not drain towards receiving waters or storm drain inlets.
3.10 Aesthetics
3.10.1 Baseline Conditions
The proposed project location and setting provide the context for determining the type and severity of changes to the
existing visual environment that could result from the Proposed Project. The project setting is defined as the area of
land that is visible from, adjacent to, and outside the project area, and is determined by topography, vegetation, and
viewing distance. While the photos below show adjacent roads, please see Figure 2-3-1 to see the approximately 2,000
feet of Federal land that would be affected. Typical roadway scenes along the proposed pipeline alignment are shown
on Figures 3-2, 3-3 and 3-4.
Figure 3-2 River Road Bridge Looking Northerly
56
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Figure 3-3 River Road Looking Northerly from Bridge
Figure 3-4 River Road Looking Northerly at Baron Drive Intersection
3.10.2 Significance Thresholds
Aesthetics, or visual resources, are the natural and cultural features of the landscape that can be seen and that
contribute to the public's enjoyment of the environment. Visual resource or aesthetic impacts are generally defined in
terms of a project's physical characteristics and potential visibility, light, and glare and the extent to which the pipeline's
presence would change the perceived visual character and quality of the environment in which it would be located.
3.10.3 Alternatives Analysis
3.10.3.1 No Action Alternative
57
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
If the No Action Alternative were selected, the City of Corona would not construct its recycled water pipeline on Federal
land. (Please see Figure 2-3-1 for an aerial view of the Federal land, outgranted for outdoor recreation, that would or
would not be affected by the proposal.) No impacts to aesthetics would occur under the No Action Alternative and
conditions would remain as described in Section 3.10.1.
3.10.3.2 Preferred Alternative
3.10.3.2.1 Construction
The visual quality and character of the existing Proposed Project area would not be altered by constructing the
Preferred Alternative. The Preferred Alternative would be underground except for the portion installed within a
dedicated space in the River Road Bridge. No new, permanent sources of light or glare would be installed and night
work is not anticipated.
During construction of the Preferred Alternative, temporary visual impacts could result from the presence of heavy
equipment and construction materials stored onsite. Views of the proposed project during construction would be
short in duration and visible by travelers along River Road and Barron Drive.
Construction of the Preferred Alternative would not result in significant effects on visual resources or viewer response,
or to aesthetics generally.
3.10.3.2.2 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or
daily activities would be routinely associated with the Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such, impacts related to
aesthetics associated with operations and maintenance activities would be negligible and would not approach
any of the significance thresholds previously identified.
3.10.4 Environmental Commitments
Based on the analysis of potential impacts to visual resources at and in the vicinity of the Proposed Project, no
significant impacts are anticipated; therefore, no mitigation measures or other environmental commitments are
proposed.
3.11 Recreational Resources
3.11.1 Baseline Conditions
58
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
The Proposed Project, if not conducted on Federal land, would be constructed upon private property, on public street
rights-of-way, or within a dedicated space in the River Road Bridge. However, there are recreational resources within
the immediate Project area as proposed.
3.11.2 Significance Thresholds
Recreation-related impacts would be considered a significant effect if the selected alternative results in:
Permanent removal of substantial recreational areas and critical recreational facilities.
Increased usage that will result in substantial physical deterioration of the recreational area or facility.
3.11.3 Alternative Analysis
3.11.3.1 No Action Alternative
If the No Action Alternative were selected, the City of Corona would not construct its recycled water pipeline on Federal
land. No impacts to Federal recreation areas would occur under the No Action Alternative and conditions would remain
as described in Section 3.11.1.
3.11.3.2 Preferred Alternative
3.11.3.2.1 Construction
The Preferred Alternative includes the granting of a new easement by the Corps to the City of Corona for the
construction, operation and maintenance of its recycled water pipeline. The Federal land that would be affected
lies between the WR treatment plant and Baron Drive and is open space, in an area outgranted by a
concessionaire operating for recreation in Riverside County. Note also that this proposed pipeline would lie near
an existing underground utility line in the area.
The Proposed Project would predominately be underground in the new easement and is compatible with existing
land use designations, including an existing line. The line would be in an undeveloped area just north of the
existing hard-surfaced roadway on this outgranted parcel.
Therefore, there would be no impacts to recreation during construction and the Preferred Alternative will result in
no significant effects to recreation.
3.11.3.2.2 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline enroute to its distribution points. Following the construction phase, no personnel or
daily activities would be routinely associated with the Preferred Alternative.
Maintenance activities would be similar to those currently associated with other pipelines in the Project Area. These
activities are typically non-invasive (e.g., they do not require soil excavation or other surface disturbances). These
59
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
activities would include, for example, regular and routine inspections, calibration, and surface maintenance to ensure
regular access, in-pipe testing, hydrostatic testing, leak detection and associated repairs. As such, impacts related to
recreational resources associated with operations and maintenance activities would be negligible and would not
approach any of the significance thresholds previously identified.
3.11.4 Environmental Commitments
Based on the analysis of potential impacts to recreational resources at and in the vicinity of the Proposed Project, no
significant impacts are anticipated; no mitigation measures or other environmental commitments are proposed.
3.12 Public Health and Safety
3.12.1 Baseline Conditions
Public Health and Safety Hazards associated with flooding, illegal activities, wildfires, and mosquitos are
described below.
3.12.1.1 Flooding
As shown on Figure 3-5 (FIRM 06065C0686G) which represents the general action alternative, the proposed pipeline
will generally cross a flood plain. Once constructed, the pipeline would be underground and not interfere with flood
flows.
The Corps has a formal notification process whereby the Reservoir Regulation Section contacts any known entities
that will be affected by forecasted flood inflow to the Prado Dam Basin (for example, this construction project will be
flagged through Asset Management Division to the Reservoir Regulations Section). This notification procedure is based
on forecasted runoff and the maximum estimated height of surface water. These notifications are continually updated
based on the current hydrologic and Basin conditions. During potential flood conditions in the Prado Dam Basin, local
entities have authorities in place to redirect traffic and erect roadway barriers and signage.
60
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Figure 3-5 WRCRWA Recycled Water Pipeline Shown on FIRM 06065C0686G
3.12.1.2 Illegal Activities Hazards
The Cities of Corona, Eastvale and Norco coordinate closely with law enforcement and the Corps as well as fire,
medical and emergency response agencies in the area. Illegal activities in the area create a safety issue associated
with trespassing, ongoing lewd and lascivious conduct, and drug dealing. Areas adjacent to the Proposed Project area
are patrolled by Cities of Eastvale and Norco as well as Corps staff. These agencies have expressed concerns
regarding their own safety and especially the safety of the public who enter the area for bird watching, walking, or
jogging. Additionally, numerous homeless encampments in the area have been observed.
3.12.1.3 Wildfires
Areas within the Prado Dam Basin are susceptible to local uncontrolled burning because of un-maintained vegetation
or areas of dry vegetation. These small brush fires can make the area more susceptible to increased erosion by rain
storms and wind.
3.12.1.4 Mosquito Hazard
61
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
California has several species of mosquitoes that are known to transmit agents that can cause mosquito-borne
diseases including western equine encephalomyelitis, St. Louis encephalitis, malaria, and West Nile Virus. The lack of
many of the natural predators in an urban environment can allow mosquitoes to reach nuisance levels. When this
occurs, the potential for an increase in the spread of mosquito-borne diseases can occur without monitoring and
abatement measures. Breeding areas for mosquitoes include stagnant or standing water. Detention basins and
wetlands can act as breeding sites if not managed properly. Biological and chemical insecticides administered by the
Riverside County Vector Control are typically used to control mosquitos.
3.12.2 Significance Thresholds
A significant impact will occur if the alternative:
Increases exposure of people or structures to flooding hazards.
Creates conditions that will present potential dangers to the public or attract the public to a potentially
hazardous area (e.g., attractive nuisances).
Creates mosquito breeding conditions in an amount that will require increased levels of mosquito abatement
programs to maintain mosquito populations at pre-project levels.
3.12.3 Alternative Analysis
3.12.3.1 No Action Alternative
If the No Action Alternative were selected, the City of Corona would not construct its recycled water pipeline on Federal
land. Adverse conditions with regard to public health and safety concerns would continue if the No Action Alternative
were selected and conditions would remain as described in Section 3.12.1.
3.12.3.2 Preferred Alternative
3.12.3.2.1 Construction
Because construction activities would be short-term and not occur during heavy rainfall, the presence of workers in the
floodplain would not increase their risk of exposure to flood hazards. Construction activities would also not attract the
public into a hazardous area or result in the establishment of stagnant water that would be conducive to promulgation
of mosquito populations.
3.11.3.2.2 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature as the recycled
water passes through the pipeline enroute to its distribution points. No personnel or daily activities would be routinely
62
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
associated with the Proposed Project area and therefore no increase in safety risks related to floodplains or other public
health metrics would result.
Maintenance activities would be similar to those currently occurring at the project area and at similar sites throughout
the Los Angeles Basin. These activities are typically non-invasive (e.g., they do not require soil excavation or other
surface disturbance). As such, impacts to public health and safety associated with operations and maintenance
activities would be negligible and would not approach any of the significance thresholds previously identified.
3.12.4 Environmental Commitments
Coordination and established communication with the Corps Reservoir Regulation Section personnel responsible
for public notification of flood inflow to the Prado Dam Basin will prevent impacts to construction personnel and
equipment working within the flood plain.
The City of Corona will prepare a Project Safety Plan for Corps review and approval prior to entry onto the site
for construction.
3.13 Socioeconomics and Environmental Justice
3.13.1 Baseline Conditions
Each federal agency is required by Executive Order 12898, Federal Actions to Address Environmental Justice in
Minority Populations and Low-Income Populations, to "make achieving environmental justice part of its mission by
identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects
of its programs, policies, and activities on minority populations and-low income populations..."
The CEQ defines a minority population as any group of minorities, individually or cumulatively, that exceeds 50 percent
of the existing population within the market area or where a minority group comprises a meaningfully greater
percentage of the local population than in the general population. Additionally, the CEQ identifies low income as
"individuals living below the poverty level" using 2010 Census data.
Ensuring environmental justice means protecting existing local and market-area minority and low income populations
from disproportionate adverse human health or environmental effects related to Federal government action.
No residential land uses occur within or directly adjacent to the proposed project area, which is located within Census
Tract 9800.24. Communities (including Sherman Oaks and Encino) surrounding the Sepulveda Dam Basin are largely
White with the communities of Van Nuys and Lake Balboa having a large Hispanic population. (Data in Table 3-14
below are presented for 2010, the last year for which information is available across all representative geographies.
White
Black
Table 3-14
Regional and National Socioeconomic Characteristics
Eastvale
Norco
Corona
Riverside County
46.63%
74.24%
71.22%
65.31%
9.61%
5.62%
5.02%
6.24%
California
62.13%
5.94%
63
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Hispanic
%Asian
N%ative American
One Race, Other
Two or More Races
Total Population
Poverty Level
38.98%
27.15%
0.99%
11.20%
4.41%
55,298
5.08%
29.89%
4.21%
1.29%
9.60%
5.03%
27,143
6.23%
42.19%
10.99%
1.42%
7.19%
4.17%
157,395
11.26%
46.54%
6.11%
1.29%
16.76%
4.29%
2,266,899
16.62%
38.18%
13.48%
1.14%
12.85%
4.46%
38,066,920
16.06%
Source: www.usa.com 12/31/2016
3.13.2 Significance Thresholds
The impact on socioeconomics and environmental justice will be considered significant if the following were to occur:
Impacts to a sector of the economy, productivity, competition, prices or jobs.
Impacts on the welfare of low income or minority populations.
The impact of project-induced population changes on the availability of public services
A substantial long-term decrease in local employment due to direct loss of jobs or an adverse effect on
the local economy that results in an indirect long-term loss of jobs.
Disproportionately high and adverse impacts on minorities, low-income residents, or children.
A substantial population growth in an area induced by the alternative.
3.13.3 Alternative Analysis
3.13.3.1 No Action Alternative
If the No Action Alternative were selected, the City of Corona would not construct its recycled water pipeline on Federal
land. No impacts to socioeconomics and environmental justice would occur under the No Action Alternative and
conditions would remain as described in Section 3.13.1.
3.13.3.2 Preferred Alternative
3.13.3.2.1 Construction
Construction of the Preferred Alternative is expected to take approximately 150 days total, to complete. A maximum of
10 construction workers onsite would be needed for the Proposed Project. There would be no substantial shift in
population, or a need for additional housing or employment for the short construction duration.
The new pipeline would be unmanned, except during maintenance activities which occur only two to three times per
year.
Six residential uses exist adjacent to the proposed project site (i.e., along Barron Drive). Impacts outside the site, which
include commuting trips and vehicle trips, would be minimal. The local residents, including low-income and minority
64
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
populations, would be effected by construction of the Preferred Alternative, but such impacts are not disproportionately
high and adverse. Therefore, the impact on socioeconomics and environmental justice would not be considered
significant.
3.13.3.2.2 Operations and Maintenance
Operational activities associated with the recycled water pipeline would be largely passive in nature, as recycled water
passes through the pipeline enroute to distribution points. No personnel or daily activities would be routinely associated
with the Proposed Project.
Maintenance activities would be similar to those currently occurring at the project site and at similar sites throughout
the Santa Ana River Basin. These activities are typically non-invasive (e.g., they do not require soil excavation or other
surface disturbance). As such, impacts to socioeconomics and environmental justice associated with operations and
maintenance activities would be negligible and would not approach any of the significance thresholds previously
identified.
3.13.4 Environmental Commitments
Based on the analysis of potential impacts to socioeconomic characteristics or environmental justice concerns at
or in the vicinity of the Proposed Project, no significant impacts are anticipated; no mitigation measures or other
commitments are proposed.
3.14 Traffic and Transportation
3.14.1 Baseline Conditions
Regional access to the Project site is via Interstate 15 and State Highway 91. The latest traffic counts by Caltrans for
these two highways in the Project area is provided in Table 3-15.
Location
Peak Hour
Table 3-15
Selected Traffic Counts by Caltrans
(2014)
Southbound
Peak Month
AADT1
Peak Hour
Interstate 15
Ontario Avenue
Magnolia Avenue
Junction 91
Hidden Valley
12,600
11,600
12,800
11,300
175,000
169,000
187,000
165,000
Green River Drive
Junction 71 North
Serfas Club Drive
Main Street
Junction 15
183,000
16,700
16,500
16,000
15,000
272,000
258,000
269,000
259,000
245,000
169,000
164,000
182,000
156,000
Northbound
Peak Month
AADT1
11,800
12,800
11,300
11,200
167,000
187,000
165,000
165,000
164,000
182,000
156,000
156,000
16,700
16,500
16,700
15,000
15,200
258,000
269,000
270,000
245,000
230,000
253,000
256,000
257,000
247,000
219,000
Highway 91
267,000
253,000
256,000
247,000
233,000
1 AADT
= Average Annual Daily Traffic
Source: Caltrans 2015, www.dot.ca.gov (3/29/2016)
65
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
The latest traffic information on River Road was taken by the City of Corona. It indicated an ADT of 15,200 at Corydon
Drive.
3.14.1 Significance Thresholds
The evaluation criteria used for this impact analysis are based on current regulations, typical threshold standards,
knowledge of the area, and consideration of the context and intensity of the environmental effects, as required
pursuant to NEPA. Traffic impacts typically are considered to be significant if the alternative would:
Cause an increase in traffic that is substantial in relation to the existing traffic load and capacity of the street
system.
Exceed, either individually or cumulatively, a Level of Service (LOS) standard established by the regulatory
agency.
Result in inadequate parking capacity.
3.14.2 Alternative Analysis
Based on the jurisdictional guidance described above, a one percent traffic threshold volume was used to assess
potential impacts. The one percent threshold was used as the most conservative (worst case) criterion from the
affected jurisdictions. Since LOS was not calculated directly, this conservative analysis captures potential impacts
regardless of the roadway operations.
3.14.3.1 No Action Alternative
The No Action Alternative would not involve construction or operation activity, and no vehicle trips or parking
demand would be generated on Federal land. Specifically, the No Action Alternative would not cause an increase
in traffic that is substantial in relation to the existing traffic load and capacity of the street system; exceed an LOS
standard established by the regulatory agency; or result in inadequate parking capacity. The No Action Alternative
would not result in effects on traffic.
3.14.3.2 Preferred Alternative
3.14.3.2.1 Construction
Implementation of the Preferred Alternative is expected to take approximately 150 days to complete. The City of
Corona anticipates that construction activities would typically occur from Monday to Friday during normal daytime
work hours (for example, between 7:00 a.m. and 6:00 p.m.), although periodic Saturday work may be needed.
Note that work on the Federal portion, which is not usually open to the public, would have little impact on public
transportation because there is little activity on the Riverside County outgranted area during most of the year.
A maximum of 10 construction workers would be needed. As a conservative estimate, it is assumed that the
construction workers would drive to the site alone (either in personal vehicles or company vehicles/trucks),
66
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
resulting in up to 20 average daily trips (one incoming and one outgoing trip), 20 AM peak-hour trips and 20 PM
peak-hour trips. Parking for the construction workforce would be provided entirely on-site.
The average number of truck trips per day related to delivery of equipment and hauling materials is estimated to
6 truck trips/day over the estimated 150-day period period. Truck trips are projected to travel to and from the
construction site during off-peak hours (between 9 AM and 3 PM).
The increased traffic volume would be minimal considering current traffic in the site vicinity. Based on the existing
peak hour volumes, the increase in traffic is estimated to be less than 1 percent on River Road, State Highway
91 and Interstate 15.
During the installation of the project facilities, it might be necessary to temporarily close lanes on the affected streets
(i.e., Barron Drive and River Road). In such instances, the contractor would be required to comply with the provisions
of Part 6, Temporary Traffic Control, of the California Manual on Uniform Traffic Control Devices and the California
Supplement to minimize any traffic and pedestrian hazards that exist during Project construction.
Specifically, the construction of the Preferred Alternative would not cause an increase in traffic that is substantial
in relation to the existing traffic load and capacity of the street system; exceed an LOS standard established by
the regulatory agency; or result in inadequate parking capacity. Construction and operation of the Preferred
Alternative would not result in significant effects on traffic.
3.14.3.2.2 Operations and Maintenance
Operational activities associated with the new pipeline would be largely passive in nature, as recycled water passes
through the pipeline enroute to distribution points. No personnel or daily activities would be routinely associated with
the Proposed Project area.
Maintenance activities would be similar to those currently occurring at the project area and at similar sites throughout
the Santa Ana River Basin. These activities are typically non-invasive (e.g., they do not require soil excavation or
other surface disturbance). As such, traffic and transportation system impacts associated with operations and
maintenance activities would be negligible and would not approach any of the significance thresholds previously
identified.
3.14.4 Environmental Commitments
A construction Traffic Management Plan for the Federal land portion would be prepared and submitted to Corps for
review and approval prior to the start of any construction work. This plan would include such elements as the
designation of haul routes for construction-related trucks, the location of access to the construction site, temporary
traffic control devices or flagmen (if needed), travel time restrictions for construction-related traffic to avoid peak
travel periods on selected roadways, and designated staging and parking areas for workers and equipment.
Information on traffic will also be included in the Safety Plan, as appropriate.
67
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
3.15 Cumulative Impacts
Cumulative effects are impacts on the environment that result from the incremental impacts of a proposed action
when added to other past, present, and reasonably foreseeable future actions (State CEQA Guidelines
§15355[b], 40 CFR 1508.7). Such impacts can result from individually minor but collectively significant actions
taking place over time.
The construction, operation and maintenance of the WRCRWA recycled water pipeline will not have any direct, indirect,
or permanent significant effects as discussed in the environmental analysis sections of this dEA. Construction,
operation and maintenance of the pipeline will not contribute to a cumulative effect on any resources because the
defined significance thresholds were not reached for any resource area. As indicated in earlier sections concerning
likely project impacts, in general no significant, adverse effects would result from the Proposed Project, even in
combination with past, present, and future projects and conditions; final notes will be provided, below.
In addition, considering the Preferred Alternative along with numerous other City of Corona pipeline projects, the
cumulative effect is beneficial as it will allow the City of Corona to meet its Project objectives which are:
Decrease the amount of recycled water that cannot be beneficially used within the service area of the Western
Riverside County Regional Wastewater Authority (WRCRWA) of which the City of Corona is a member
agency.
Increase the amount of recycled water that can be beneficially used thereby decreasing the amount of potable
water that is currently being used for non-potable uses.
Decrease the amount of imports from the State Water Project and Colorado River Aqueduct.
Improve the reliability of landscape irrigation water supplies.
A brief description of past, present, and future actions is presented, below.
3.15.1 Past Actions
During 1998 WRCRWA commenced operation of its Western Riverside County Regional Wastewater Treatment Plant
(WRCRWTP) located at 14634 River Road, Eastvale, California. That facility is capable of producing recycled water
for reuse or for discharge to Reach 3 of the Santa Ana River, upstream of Prado Dam. Its ultimate design capacity is
16 mgd.
Consistent with and subject to WRCWA's Resolution No. 97-38, and any successor thereto, each member agency (the
City of Corona is a member agency) shall have the right to take delivery of and use recycled water from WRCRWA's
facilities, an amount of recycled water treated and produced by WRCRWA's facilities as determined by WRCRWA
annually, not to exceed the amount of reclaimable wastewater delivered by the member agency to WRCRWA's facilities
for treatment less any amount consumed during the course of the operations of WRCRWA's facilities. Prior to
exercising its right to take its basic allocation or any portion thereof, each member agency shall enter into a written
agreement with WRCRWA. As stated in Resolution No. 97-38, that agreement shall provide, at a minimum:
68
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
a) The Authority's determination of the Basic Allocation as set forth above; and
b) That the point of delivery shall be the Treatment Facility, and the Member Agency shall be solely responsible
for all costs and expenses associated with taking delivery and metering of reclaimed wastewater from the
point of delivery; and
c) That the Member Agency shall be responsible for obtaining, at is sole cost and expense, all permits and
approvals applicable to the use of reclaimed wastewater; and
d) That the Member Agency shall indemnify and hold the Authority harmless from legal liability and economic
losses that may result from the Member Agency's use of the reclaimed wastewater; and
e) That the Member Agency shall have an option to obtain Surplus Reclaimed Wastewater (Section 2 below);
and
f)
That the Member Agency shall be responsible for assuring that the reclaimed wastewater is delivered and
utilized in full compliance with the NPDES Permit Order No. 97-2 and any Amendment or successor thereto,
Title 22 of the California Code of Regulations, the "Guidelines for Use of Reclaimed Water" by the California
Department of Health Services, and all other applicable laws regulations and ordinances; and
g) Such other terms and conditions as may be reasonably required or necessary to effectuate this policy,
including a clause providing for binding arbitration.
2. Allocation of Surplus Reclaimed Wastewater
Subject to the availability of reclaimed wastewater and the commitments and obligations of the Authority, including
in plant uses, (so as not to interfere with treatment plant operations), and subject further to each Member Agency's
right to its Basic Allocation under Section 1 above, each Member Agency of the Authority may be permitted by the
Authority to temporarily take delivery of reclaimed wastewater in excess of the net amount of reclaimable
wastewater delivered to the Treatment Facility, on an interruptible basis. Prior to taking surplus reclaimed
wastewater, each Member Agency shall enter into a written agreement of the type described in Section 1, above.
All allocations of surplus reclaimed wastewater must be first approved by the Authority.
Other past actions in this area include the construction (early 2000's) of Norco's recycled waterline in the similar area
at the Riverview Park; the gradual closure of Crossroads Park due to the concessionaire's family changes; and the
development, north of River Road, of the new community of Eastvale, on land which had previously been used as
dairy farmland.
69
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
3.15.2 Present Actions
The City of Corona is presently implementing its Proposition 1 Reclaimed Water Distribution System, Phase 1 Project
(the Preferred Project). This project is critical to the success of the Proposition 1 Reclaimed Water Distribution System
Project as it is the critical link to transport reclaimed water from the WRCRWTP to the City's reclaimed water distribution
system. In the region, development and maintenance of existing facilities and infrastructure is virtually a constant reality,
with ongoing improvements to transportation and other infrastructure facilities.
3.15.3 Future Actions
Completion of the Preferred Alternative will allow the City of Corona to implement the remaining four phases of its
Proposition 1 Reclaimed Water Distribution System Project. The impacts of implementing the Proposition 1
Reclaimed Water Distribution System were analyzed in the July 2016 Initial Study and Mitigated Negative Declaration,
Proposition 1 Reclaimed Water Distribution System, City of Corona Department of Water and Power, prepared by
K.S. Dunbar & Associates, Inc. That analysis indicated that there were no impacts which could not be mitigated to a
less than significant level associated with implementation of the Project.
Additional notes may also mention that there has been a baseline of construction in adjacent areas, especially the
new City of Eastvale located just north and northeast of the treatment plant, although this has taken place off Federal
land and while the Federal parcel in question has gone unchanged for several decades.
The WRCRWA's treatment plant itself continues to provide potable and recycled water to its member agencies. And,
the U.S. Army Corps of Engineers, as well as Orange County Water District and OC Flood Control District, all
maintain present and future footprints in the general River Road area of Riverside County. Each of these regional
agencies is involved with particular aspects of sediment, water, flood risk management, habitat conservation, open
space/recreation, and other regional issues.
4 Environmental Commitments
This section describes the environmental commitments that will be implemented by the City of Corona as part of
the Proposed Project. Although no significant impacts were identified during preparation of this EA, the
environmental commitments summarized below will decrease the severity of any short-term or temporary projectrelated impacts on resources. Importantly, due to the limited and localized nature of disturbance, the activities
associated with construction, operation, and maintenance of the new pipeline are not expected to result in any
long-term significant effects.
4.1
Land Use
Construction activities will be limited to the times allowed in the municipal codes of the Cities of Eastvale
and Norco in order to avoid potential impacts to adjacent land use activities.
70
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
4.2
Hydrology and Water Quality
Environmental commitments for Proposed Project implementation would include using industry-standard
erosion control materials and techniques. The City of Corona will also coordinate with appropriate entities
(e.g., USACE, RWQCB) with regard to permitting requirements under the Clean Water Act and Rivers and
Harbors Act, as necessary.
4.3
Air Quality
DWP will:
Appoint a construction relations officer to act as a community liaison concerning on-site construction
activities including resolution of issues related to PM10 generation.
Add the following best management practices in its contract documents for this project:
The contractor shall:
Utilize electricity from power poles instead of from temporary diesel or gasoline power generators,
when feasible.
Require the use of 2010 and newer diesel haul trucks (e.g., material delivery trucks and soil
import/export) and if the lead agency determines that 2010 model year or newer diesel trucks
cannot be obtained the contractor shall use trucks that meet EPA 2007 model year NOx emissions
requirements.
Require that all on-site construction equipment meet EPA Tier 3 or higher emissions standards
according to the following:
All off-road diesel-powered construction equipment greater than 50 hp shall meet the Tier 4
emission standards, where available. In addition, all construction equipment shall be outfitted
with BACT devices certified by CARB. Any emissions control device used by the contractor
shall achieve emissions reductions that are no less than what could be achieved by a Level 3
diesel emissions control strategy for a similarly sized engine as defined by CARB regulations.
A copy of each unit's certified tier specification, BACT documentation, and CARB or SCAQMD
operating permit shall be provided at the time of mobilization of each applicable unit of
equipment.
Maintain construction equipment engines by keeping them properly tuned and maintained
according to manufacturer's specifications.
Use alternative fuels or clean and low-sulfur fuel for equipment.
71
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Idle trucks in accordance with the Airborne Toxic Control Measure (ACTM) to Limit Diesel Fueled
Commercial Motor Vehicle Idling and other applicable laws.
Spread soil binders on site, where appropriate, unpaved roads and staging areas.
Water site and equipment as necessary to control dust.
Sweep all streets at least once per day using SCAQMD Rule 1186 certified street sweepers or
roadway washing trucks if visible soil materials are carried to adjacent streets.
Conduct operations in accordance with SCAQMD Rule 403 requirements.
If necessary, wash off trucks leaving the site.
Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at least two feet of
freeboard in accordance with the requirements of California Vehicle Code (CVC) Section 23114.
4.4 Noise
DWP will add the following best management practices in its standard construction specifications:
All equipment used during construction shall be muffled and maintained in good operating condition. All
internal combustion engines shall be fitted with well-maintained mufflers in accordance with manufacturers'
recommendations.
4.5 Biological Resources
A burrowing owl clearance survey shall be conducted prior to any ground disturbing activities in accordance
with the CDFW 2012 Staff Report on Burrowing Owl Mitigation. Two pre-construction clearance surveys shall
be conducted 14-30 days and 24 hours prior to ground disturbing activities to document the continued absence
of burrowing owl from the Project site.
If ground-disturbing activities or removal of any trees, shrubs, or any other potential nesting habitat are
scheduled within the avian nesting season (nesting season generally extends from February 1 - August 31),
a pre-construction clearance survey for nesting birds should be conducted within 10 days prior to any ground
disturbing activities. The biologist conducting the clearance survey should document a negative survey with
a brief letter report indicating that no impacts to active bird nests will occur. If an active avian nest is discovered
during the 10-day preconstruction clearance survey, construction activities should stay outside of a 300-foot
buffer around the active nest. For raptor species, this buffer is expanded to 500 feet. It is recommended that
a biological monitor be present to delineate the boundaries of the buffer area and to monitor the active nest
to ensure that nesting behavior is not adversely affected by the construction activity. Once the young have
fledged, normal construction activities can occur.
In addition, no construction work on Federal land will occur between the March 1-September 1 riparian bird
breeding season due to potential presence of the Federally-listed-as-endangered least Bell's vireo. Work
outside the avian nesting season will result in a No Effect to Federally-listed species. Work proposed for
72
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
outside this timing window will be conditioned, via informal consultation and concurrence with the USFWS, to
result in May Affect But Not Likely to Adversely Affect, Federally-listed avian species.
4.6
4.7
Paleontological Resources
Should construction/development activities uncover paleontological resources, work will be moved to other
parts of the Project site and a qualified paleontologist shall determine the significance of these resources. If
the find is determined to be significant, avoidance or other appropriate measures shall be implemented.
Appropriate measures would include that a qualified paleontologist be permitted to recover and evaluate the
find(s) in accordance with current standards and guidelines.
Cultural Resources
In its July 2016 Mitigation Monitoring and Reporting Program adopted for this Project, the City of Corona committed to
numerous measures to ensure the protection of cultural resources. In addition, the following mitigation measure would
be incorporated to ensure that the project will not adversely affect historic properties:
MM CUL-1
MM CUL-2
MM CUL-3
MM CUL-4
MM CUL-5
The grantee shall allow any interested tribe to monitor any and all construction activities
and will proactively coordinate with tribal members to schedule access.
Ground disturbing activities shall be periodically monitored by a qualified archaeologist
meeting the Secretary of the Interior's Standards, as per Appendix A to 36 CFR 61.
In the event that previously unknown cultural resources are discovered during the project,
all ground disturbing activities shall immediately cease within 200 feet of the discovery
until the Corps has met the requirement of 36 CFR 800.13 regarding post-review
discoveries. The Corps will evaluate the eligibility of such resources for listing on the
National Register of Historic Places and propose actions to resolve any anticipated adverse
effects. Work shall not resume in the area surrounding the potential historic property until
the Corps re-authorizes project construction.
Any artifact(s) or other item(s) collected from federal lands as a result of any inadvertent
discoveries will be curated in compliance with the Archaeological Resources Protection
Act (Public Law 96-95; 16 U.S.C. 470aa-mm), 36 CFR 79, 36 CFR 800.13, and EP 11302-540, Chapter 6.
In the event of accidental discovery of human remains, all construction activities shall be
halted immediately, and the Corps archaeologist and the Riverside County Coroner must
be notified. The coroner will determine whether the remains are of forensic interest. If
human remains, funerary objects, sacred objects, or items of cultural patrimony are
encountered during the proposed project, the treatment and disposition of such remains will
73
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
be carried out in compliance with the Native American Graves Protection and Repatriation
Act (Public Law 101-601; 25 U.S.C. 3001 et seq.) and EP 1130-2-540, Chapter 6.
4.8
Hazardous Materials and Wastes
To reduce potentially hazardous conditions and minimize the impacts from the handling of potentially hazardous
materials, DWP shall include the following in its construction contract documents:
The contractor(s) shall prepare a Health and Safety Plan in compliance with the requirements of Chapter 6.95,
Division 20 of the Health and Safety Code (§§ 25500--25532). The plan shall include measures to be taken
in the event of an accidental spill.
The contractor(s) shall enforce strict on-site handling rules to keep construction and maintenance materials
out of receiving waters and storm drains. In addition, the contractor(s) shall store all reserve fuel supplies only
within the confines of designated construction staging areas, refuel equipment only within the designated
construction staging areas, and regularly inspect all construction equipment for leaks.
The construction staging area shall be designed to contain contaminants such as oil, grease, and fuel products
so that they do not drain towards receiving waters or storm drain inlets.
4.9
Public Health and Safety
Coordination and established communication with the Corps Reservoir Regulation Section personnel
responsible for public notification of flood inflow to the Prado Dam Basin will prevent impacts to
construction personnel and equipment working within the flood plain.
The City of Corona will prepare a Project Safety Plan for Corps review and approval prior to entry onto
the site for construction.
4.10 Traffic and Transportation
A construction Traffic Management Plan would be prepared and submitted to Corps for review and
approval prior to the start of any construction work. This plan would include such elements as the
designation of haul routes for construction-related trucks, the location of access to the construction site,
temporary traffic control devices or flagmen (if needed), travel time restrictions for construction-related
traffic to avoid peak travel periods on selected roadways, and designated staging and parking areas for
workers and equipment.
74
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Information on traffic will also be included in the Safety Plan, as appropriate.
Public Involvement, Coordination and Consultation
5.1 Project Delivery Team
The Corps Project Delivery Team for review of this proposal comprises a variety of specialists from a range of scientific
and professional backgrounds, including project managers, biologists, planners, and engineers. Other specialists are
engaged for resource-specific discussions and analyses and Corps staff coordinates with other regulatory agencies
and stakeholders, as appropriate, including representatives of Federal, state, and local/regional agencies.
5.2
Agency Coordination
Although a "No Effect to Listed Species" determination is anticipated, this Draft EA has been discussed and will
be noticed to the US Fish and Wildlife Service. It is also anticipated that the environmental impact analysis
process will involve engagement with the California State Historic Preservation Office (SHPO) and with Tribes,
as has already occurred during the CEQA process. Other agencies (e.g., SCAQMD, CRWQCB, SAR) may be
coordinated with before the EA is finalized, and any interaction and notable, substantive discourse will be
summarized herein.
5.3
Public Involvement
Public involvement is the process by which interested parties, affected individuals, non- governmental organizations,
and governmental entities are consulted and included in the decision-making process addressing a planning or
development effort. NEPA requires public notification of the availability of a Draft EA, and encourages the invitation of
public and agency involvement in the process. This draft Environmental Assessment, with draft Finding of No
Significant Impact, will be provided to the public for comment, for a period of 30 days.
6 Applicable Environmental Laws and Regulations
6.1 National Environmental Policy Act
NEPA requires that Federal agencies consider potential environmental consequences of proposed actions. The
law's intent is to protect, restore, or enhance the environment through well-informed Federal decisions. The CEQ
was established under NEPA for the purpose of implementing and overseeing Federal policies as they relate to this
process. In 1978, the CEQ issued Regulations for Implementing the Procedural Provisions of the National
Environmental Policy Act (40 CFR § 1500-1508 [CEQ 1978]). These regulations specify that an EA be prepared to:
Briefly provide sufficient analysis and evidence for determining whether to prepare an Environmental Impact
Statement (EIS)or a Finding of No Significant Impact (FONSI);
75
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
Aid in in an agency's compliance with NEPA when no EIS is necessary; and
Facilitate preparation of an EIS when one is necessary.
Further, to comply with other relevant environmental requirements (e.g., the Endangered Species Act [ESA] and
National Historic Preservation Act [NHPA]) in addition to NEPA, and to assess potential environmental impacts, the
EIAP and decision-making process for the proposed action involves a thorough examination of all environmental issues
pertinent to the Proposed Project. Specific to U.S. Army programs, compliance with NEPA is effectively ensured by
incorporating policies and procedures outlined in Army Regulation (AR) 200-1, Environmental Protection and
Enhancement, additional USACE guidance is outlined in 33 CFR 220, Design Criteria for Dam and Lake Projects and
33 CFR 230, Procedures for Implementing NEPA.
6.2 Biological Resources
The Endangered Species Act (ESA) (16 U.S. Code [USC] §§ 15311544, as amended) established measures for the
protection of plant and animal species that are federally listed as threatened and endangered, and for the conservation
of habitats that are critical to the continued existence of those species. Federal agencies must evaluate the effects of
their proposed actions through a set of defined procedures, which can include the preparation of a Biological
Assessment and can require formal consultation with the U.S. Fish and Wildlife Service (USFWS) under Section 7 of
the ESA. This EA will include a summary of coordination with appropriate regulatory entities. As mentioned earlier, the
Corps in consultation with the U.S. Fish and Wildlife Service (December 5, 2017), determined this project to result in
No Effect as presently conditioned, and May Affect, but Not Adversely Affect, listed species or their Critical Habitat if
work would occur within the nesting season. Therefore, absent further information, no formal Section 7 consultation
would be required. Stipulations outlined in other regulations promulgated to ensure the protection of sensitive species
and their habitat (e.g., Migratory Bird Treaty Act [MBTA], Bald and Golden Eagle Protection Act [BGEPA], etc.) are
also taken into consideration when evaluating potential impacts associated with implementation of a Proposed Action.
6.3 Clean Air Act and Conformity Requirements
The Clean Air Act (CAA) (42 USC §§ 74017671, as amended) provided the authority for the U.S. Environmental
Protection Agency (USEPA) to establish nationwide air quality standards to protect public health and welfare.
Federal standards, known as the National Ambient Air Quality Standards (NAAQS), were developed for six criteria
pollutants: ozone (O3), nitrogen dioxide (NO2), carbon monoxide (CO), sulfur dioxide (SO2), particulate matter
(PM10 and PM2.5), and lead (Pb). The CAA also requires that each state prepare a State Implementation Plan (SIP)
for maintaining and improving air quality and eliminating violations of the NAAQS. Under the CAA A mendments
of 1990, Federal agencies are required to determine whether their undertakings are in conformance with the
applicable SIP and demonstrate that their actions will not cause or contribute to a new violation of the NAAQS;
increase the frequency or severity of any existing violation; or delay timely attainment of any standard, emission
reduction, or milestone contained in the SIP. The USEPA has set forth regulations in 40 CFR 51, Subpart W,
which require the proponent of a proposed action to perform an analysis to determine if its implementation would
comply with the SIP. This EA includes a presentation and an analysis of project elements (e.g., construction
equipment and worker vehicle trips) that could affect local and regional air quality conditions.
76
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
6.4 Water Resources Regulatory Requirements
The Clean Water Act (CWA) of 1977 (33 USC §§ 1251 et seq.) regulates pollutant discharges that could affect aquatic
life forms or human health and safety. Section 404 of the CWA, and EO 11990, Protection of Wetlands, regulate
development activities in or near streams or wetlands. Section 404 also requires a permit from the USACE for dredging
and filling in wetlands. EO 11988, Floodplain Management, as amended by EO 13960, requires Federal agencies to
take action to reduce the risk of flood damage; minimize the impacts of floods on human safety, health, and welfare;
and to restore and preserve the natural and beneficial values served by floodplains. Federal agencies are directed to
consider the proximity of their actions to or within floodplains.
Per USACE, this project is exempt from Sections 401 and 404 of the CWA and Section 10 of the Rivers and Harbors
Act. Still, this EA includes a presentation and an analysis, and their mitigation, of project elements (e.g., sedimentladen runoff) that could affect local and regional water resources.
6.5 Cultural Resources Regulatory Requirements
The National Historic Preservation Act (NHPA) of 1966 (16 USC § 470) established the National Register of
Historic Places (NRHP) and the Advisory Council on Historic Preservation (ACHP) which outlined procedures for
the management of cultural resources on Federal property. Cultural resources can include archaeological
remains, architectural structures, and traditional cultural properties such as ancestral settlements, historic trails,
and places where significant historic events occurred. The NHPA requires Federal agencies to consider potential
impacts to cultural resources that are listed, nominated to, or eligible for listing on the NRHP; designated a
National Historic Landmark; or valued by modern Native Americans for maintaining their traditional culture.
Section 106 of NHPA requires Federal agencies to consult with the appropriate SHPO and Tribe(s) if their
undertaking might affect such resources. Protection of Historic and Cultural Properties (36 CFR 800) provides an
explicit set of procedures for Federal agencies to meet their obligations under the NHPA, which includes
inventorying of resources and consultation with SHPO. This EA includes a presentation and an analysis of project
elements (e.g., trenching) that could affect cultural resources, as well as a description of coordination efforts
undertaken with appropriate partiers.
The American Indian Religious Freedom Act (AIRFA) (42 USC § 1996) established Federal policy to protect and
preserve the rights of Native Americans to believe, express, and exercise their traditional religions, including
providing access to sacred sites. The Native American Graves Protection and Repatriation Act (NAGPRA) (25
USC §§ 30013013) requires consultation with Native American Tribes prior to excavation or removal of human
remains and certain objects of cultural importance.
6.6 Sustainability and Greening
EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, strives to improve
efficiency and environmental performance of Federal agencies by setting goals in the areas of energy efficiency,
greenhouse gas emission mitigation, water conservation, waste management and recycling, green procurement,
77
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
pollution prevention, and livable communities, among others. The EO specifies that every Federal organization
and agency must make the reduction of greenhouse gas emissions a priority and establishes specific goal-setting,
inventorying, and reporting requirements for Federal agencies. This includes an order for each agency to develop,
implement, and update a Strategic Sustainability Performance Plan, which should work toward continual improvement
of sustainable practices associated with Federal actions.
Sustainable green building and development practices can be recognized through sustainable site development, water
savings, energy efficiency, materials selection and indoor environmental quality. The U.S. Green Building Council's
(USGBC's) Leadership in Energy and Environmental Design (LEED) Green Building Rating SystemTM is a thirdparty certification program and the nationally-accepted benchmark for the design, construction, and operation of
high-performance green buildings (USGBC 2010). LEED rating systems are based on a set number of
prerequisites and credits in six major categories: 1) sustainable sites; 2) water efficiency; 3) energy and
atmosphere; 4) materials and resources; 5) indoor environmental quality; and 6) innovation and design process
(USGBC 2009). In the most recent LEED rating system (version 2.2), buildings can qualify for four levels of
certification, in order from highest to lowest: platinum, gold, silver, and certified. Benefits of constructing LEED certified facilities include lower operating costs and increased asset value, reduced waste sent to landfills,
conservation of energy and water, healthier and safer facilities for occupants, reduction of harmful greenhouse
gas emissions that incrementally contribute to global climate change, and the demonstration of an owner's
commitment to environmental stewardship and social responsibility.
6.7 Other Executive Orders
Additional regulatory legislation that potentially applies to the implementation of this Proposed Project in cludes
guidelines promulgated by EO 12898, Federal Actions to Address Environmental Justice in Minority Populations
and Low-Income Populations, to ensure that citizens in either of these categories are not disproportionately
affected. Additionally, potential health and safety impacts that could disproportionately affect children are
considered under the guidelines established by EO 13045, Protection of Children from Environmental Health
Risks and Safety Risks. EO 13186, Responsibilities of Federal Agencies to Protect Migratory Birds, acts as
additional protection for migratory birds.
6.8 Intergovernmental Review of Federal Programs
EO 12372, Intergovernmental Review of Federal Programs, structures the Federal government's system of
consultation with state and local governments on its decisions involving grants, other forms of financial assistance, and
direct development. EO 12372 states in consultation with local governments, design their own review processes and
select those federally supported development activities that they wish to review. As detailed in 40 CFR § 1501.4(b),
CEQ regulations require intergovernmental notifications prior to making any detailed statement of environmental
impacts. Through the consultation under EO 12372, the proponent notifies relevant Federal, state, and local agencies
and allows them sufficient time to make known their environmental concerns specific to a proposed action. Comments
and concerns submitted by these agencies are subsequently incorporated into the analysis of potential environmental
impacts conducted as part of the EA.
78
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
7 Summary
Based on research and analyses conducted in support of this dEA, and contingent on comments received during the
public review period, it is recommended that the Corps determine that a Finding of No Significant Impact (FONSI) is
the appropriate decision document for this action and that an Environmental Impact Statement is not necessary.
A FONSI, if appropriate, would be a necessary precursor to the Corps for granting an easement to the City of Corona
for its recycled water pipeline per the Preferred Alternative. This recommendation is based on the fact that this
alternative best satisfies the purpose of and need for the proposed action while also resulting in the least amount of
significant environmental impacts.
79
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
8 References
Air Resources Board. 2016. www.arb.ca.gov, 12/22/2016.
Air Resources Board. 2000. Risk Guidance for the Permitting of New Stationary Diesel-Fueled Engines.
California Department of Transportation. 2010. List of Scenic Highways in California. www.dot.ca.gov, 3/25/2014.
California Department of Transportation. 2015. Traffic Counts. www.dot.ca.gov, 5/19/2015.
California Department of Toxic Substances Control. 2015. www.dtsc.ca.gov. 8/16/2015.
California Department of Water Resources. 2010. Guidelines, Proposition 84 & Proposition 1E, Integrated Regional
Water Management. August.
California Geological Survey. 2015. Alquist-Priolo. www.consvr.ca.gov. 8/16/2015.
California Geological Survey, 2015. Probabilistic Ground Motion Map. www.consvr.ca.gov. 8/16/2015.
California Geological Survey. 2015. Seismic Hazards Map. www.conservation.ca.gov. 8/16/2015.
City of Corona. 2014. General Plan Map Book. 8/14/2014.
City of Corona. Corona Municipal Code, Chapter 9.24, Loud and Unnecessary Noises. 5/18/2014
County of Riverside. 2015. www3.tlma.co.riverside.ca.us. 8/17/2015.
Environmental Protection Agency. 2015 www.epa.gov. 8/16/2015.
K.S. Dunbar & Associates, Inc. 2016. Initial Study and Mitigated Negative Declaration, Proposition 1 Reclaimed
Water Distribution System, City of Corona Department of Water and Power. July.
K.S. Dunbar & Associates, Inc. 2016. Mitigation Monitoring and Reporting Program, Proposition 1 Reclaimed Water
Distribution System, City of Corona Department of Water and Power. July.
K.S. Dunbar & Associates, Inc. 2016. Air Quality and Greenhouse Gases Analyses, Proposition 1 Reclaimed Water
Distribution System, Phase 1, City of Corona Department of Water and Power. April.
K.S. Dunbar & Associates, Inc. 2017. Habitat Assessment and MSHCP Consistency Analysis, Proposition 1
Reclaimed Water Distribution System, Phase 1, City of Corona Department of Water and Power. July.
Rincon Consultants, Inc. 2017. Cultural Resources Assessment Report for the Proposition 1- Reclaimed Water Distribution
System Project, City of Corona Department of Water and Power, Riverside County, California. July.
Riverside County Board of Supervisors, Riverside General Plan, adopted October 7, 2003.
SCAQMD. 2006. Final Methodology to Calculate Particulate Matter (PM) 2.5 and PM 2.5 Significance Thresholds.
October.
SCAQMD. 2012. Air Quality Management Plan.
80
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
SCAQMD. 1999. CEQA Air Quality Handbook. Revised March 2011. www.aqmd.gov. 5/24/2014
SCAQMD. 2008. Localized Significance Thresholds. July. www.aqmd.gov. 5/24/2014
SCAQMD. 2008. Draft Guidance Document Interim CEQA Greenhouse Gas (GHG) Significance Threshold. October.
State of California. Title 24, California Code of Regulations, Part 6, Section 132, Building Standards.
State Water Resources Control Board. 2015. www.waterboards.ca.gov. 8/16/2015.
Thomas Brothers. 2008. The Thomas Guide San Bernardino and Riverside Counties.
Uniform Building Code. 1994.
U.S. Department of Agriculture, Soil Conservation Service. 2015. General Soil Map Western Riverside Area, California.
www.usda.gov. 8/16/2015.
www.usa.com, 12/31/2016.
81
Easement for the WRCRWA Recycled Water Pipeline
WRCRWTP to Bluff Street
Draft Environmental Assessment
9 List of Preparers
9.1 U.S. Army Corps of Engineers
Travis Bone, Archaeologist, Planning Division
Carvel Bass, Ecologist, Asset Management Division
Joseph Manahan, District Counsel, Office of Counsel
9.2 U.S. Fish and Wildlife Service
Kai Palenscar, Biologist, Palm Springs Office
9.2 Contributors
City of Corona Department of Water and Power
K.S. Dunbar & Associates, Inc.
Rincon Consultants, Inc.
82