You can copy from here when filling out the rest of the page.
Orange County. Duke Energy Florida, Tarpon Springs, FL.
PROJECT PURPOSE:
Basic: Electric utility infrastructure maintenance
Overall: Replace steel and concrete utility structures, and install permanent, at-grade structure pads at utility poles located within wetlands in Orange County.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT:
Duke Energy Florida
Attn: Wayne Richardson
101 Cemetery Road
Tarpon Springs, FL 34689
WATERWAY AND LOCATION: The project would affect waters of the United States associated with Hydrologic Unit Code 0308010110 (Econolockhatchee River) and Hydrologic Unit Code 0309010101 (East Lake Tohopekaliga). The project site is located within the existing transmission line corridor in Sections 2, 3, 4, 6, 7, 17, 18, 19, 20, 29, 30, 31, 32, 33, Townships 23, 24, South, Range 31 East, Orange County, Florida.
Directions to the site are as follows: The project begins at existing structure RW-26 located 1500 feet northeast of the intersection of Faith Assembly of God Roadway and Curry Ford Road and follows the existing transmission line corridor 0.85 miles south, then east 0.46 miles then 1.95 miles south to existing structure RW-66-1. The project begins again at existing structure RW-89 located 0.42 miles south of the intersection of Highway 528 and Highway 417. From structure RW-89 the project follows the existing transmission line corridor southeast 2.48 miles, terminating at the FGT East Substation (13129 Wewahootee Road, Orlando, Florida 32832).
APPROXIMATE CENTRAL COORDINATES: Latitude 28.48724°
Longitude -81.24412°
PROJECT PURPOSE:
Basic: Electric utility infrastructure maintenance
Overall: Replace steel and concrete utility structures, and install permanent, at-grade structure pads at utility poles located within wetlands in Orange County.
EXISTING CONDITIONS: Four wetland habitat types were identified within the transmission line corridor. The wetlands and surface waters within the project corridor were classified using the State of Florida FLUCCS (SJRWMD 2011) description and the U.S. Fish and Wildlife Commission (FWS) Classification of Wetlands and Deepwater Habitats of the United Stated (Cowardin 1979). All the wetlands found within the project corridor are disturbed with varying degrees of hydrologic alteration, have been cleared of natural vegetation, or have been invaded with exotic/nuisance plant species. There are no wetlands or surface waters designated as Outstanding Florida Waters within the project corridor. In addition, no portion of the corridor is located within State of Florida designated Riparian Habitat Protection Areas. These four habitat types include a total of 14 individual wetlands and one surface water that were delineated within the project corridor.
FLUCCS 510 (Canal)
FWS: R2UBH (Riverine, Lower Perennial, Unconsolidated Bottom,Permanently Flooded)
One surface water, a landfill canal, parallels the east side of the project corridor between existing structures RW-43 and RW-58. This canal flows north to the Azalea Park Outfall canal which then flows into the Little Econlockhatchee River. Within the project corridor, the northern portion of the canal is deeply incised and free of wetland vegetation and the southern portion of the project corridor has wetland vegetation along the bank. Common species within this area include Virginia chain fern (Woodwardia virginica), cattails (Typha sp.), Carolina willow (Salix caroliniana), sapling red maple (Acer rubrum), wax myrtle (Myrica cerifera) and torpedograss (Panicum repens).
FLUCCS: 630 (Mixed Wetland Forest) FWS: PFO6/7C (Palustrine, Forested, Deciduous/Evergreen, Seasonally Flooded)
Wetlands J and K were designated as mixed wetland forest communities. This classification consists of forested wetlands in which neither hardwoods nor conifers achieve a 67-percent dominance of the crown canopy composition. These wetlands parallel the project corridor and primarily consist of cypress (Taxodium ascendens), red maple, Virginia chain fern, primrose-willow (Ludwigia peruviana), and blackberry (Rubus spp.).
FLUCCS: 641 (Freshwater Marshes)
FWS: PEM1C (Palustrine, Emergent, Persistent, Seasonally Flooded)
Wetlands 1, 2, 3, 4, 6, E, F, G, and I were designated as freshwater marshes. This classification consists of areas dominated by herbaceous wetland plant species with surface water present for extended periods during the growing season. Within the project corridor, vegetation within this classification includes maidencane (Panicum hemitomon), rush (Juncus spp.), broomsedge (Andropogon virginicus), water pennywort (Hydrocotyle umbellata), smartweed (Polygonum punctatum), dog-fennel (Eupatorium capillifolium), beakrush (Rhynchospora spp.), and coinwort (Centella asiatica).
FLUCCS 643 (Wet Prairies)
FWS: PEM1C (Palustrine, Emergent Marsh, Persistent, Seasonally Flooded)
PEM1Cd (Palustrine, Emergent, Persistent, Seasonally Flooded, Partially drained/ditched)
Wetlands 5, H, and L were designated as wet prairies. This classification consists of areas dominated by grassy vegetation with shorter herbs and less water than a marsh. Within the project corridor, vegetation within these areas includes maidencane, yellow-eyed-grass (Xyris sp.), beakrush (Rhynchospora spp.), whitetop sedge (Dichromena colorata), water pennywort, coinwort, false-willow (Baccharis angustifolia), and broomsedge.
PROPOSED WORK: The applicant requests authorization to fill 4.92 acres of wetlands for the installation of transmission structures, geoweb at-grade access improvements (16- feet wide, pervious, unpaved and at-grade) and geo-web at-grade structure pads.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
“Overall, the applicant has designed the project to have a minimal adverse effect on wetland resources. The proposed project was designed to replace 28 existing transmission structures in wetlands with 28 new steel or concrete structures. Structures within wetlands will be accessed on permanent access improvements. A temporary bridge will be constructed over the Little Econlockhatchee to avoid impacts to that surface water. Once the project is complete the bridge will be removed. There are no surface water impacts associated with the bridge.
Over the long term, the access improvements within wetlands will provide for minimization of impacts to the wetland by providing a designated point of crossing. The point of entry of the structures within wetlands will be from the access improvements. The access improvements have been designed and located to have the least impact to wetlands. Deep pools of the wetlands were avoided, flow characteristics were maintained, and seasonal high water elevations were not altered. Access improvements and pole pads will be built at-grade and will be modified with geo-web and gravel design. No compaction will occur. Installation of temporary construction matting will be utilized to prevent impacts to wetlands during construction in those areas where access improvements are not proposed. Once construction is complete, the temporary matting will be removed. To prevent wetland impacts in adjacent wetlands, sedimentation and erosion controls will be installed and maintained during construction. ”
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
“A Wetland Rapid Assessment Procedure (WRAP) analysis was also conducted for the proposed wetland impacts. The total WRAP loss score is -0.65 for the 4.92 acres of total permanent impact. To compensate for the wetland loss, Duke Energy is proposing to purchase mitigation bank credits in the FDEP and USACE approved TM-Econ Mitigation Bank (SJRWMD 4-095-84310-7 and SAJ-2001-07089) located in the Econlockhatchee River Nested Basin. This bank is state approved using UMAM and federally approved using WRAP. Duke Energy will purchase 1.01 State Freshwater UMAM wetlands mitigation credits to compensate for the functional loss of 1.01 units. Duke Energy will purchase 0.65 USACE Palustrine WRAP credits for the loss of 0.65. A preliminary Mitigation Bank Reservation Letter is provided in the submittal. A final Reservation Letter will be submitted upon agency approval of the UMAM/WRAP analysis and proposed mitigation credit purchase.”
CULTURAL RESOURCES:
The Corps is not aware of any known historic properties within the permit area, which is defined by the project boundaries. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES:
The Corps has determined the proposed project may affect, not likely to adversely affect the Eastern Indigo Snake (Drymarchon corais couperi). Based upon review of the Corps and Service’s Eastern Indigo Snake Programmatic Effect Determination Key (dated August 13, 2013), the proposed project resulted in the following sequential determination: A (The project is not located in open water or salt marsh.) >B (The permit will be conditioned for use of the Service’s standard Protection Measures for the Eastern Indigo snake during site preparation and protection construction.) >C (There are gopher tortoise burrows, holes, cavities, or other refugia where a snake could be buried or trapped and injured during project activities) >D (The project will impact less than 25 acres of xeric habitat) >E (permit will be conditioned such that gopher tortoise burrows, holes, cavities, and snake refugia will be inspected before site manipulation of a particular area, and if occupied by an indigo snake, no work will commence until the snake has vacated the vicinity of proposed work) = NLAA. No further consultation was required.
The Corps has determined the proposed project will have no effect on wood stork (Mycteria americana). The Corps completed an evaluation of the project based upon the US Fish and Wildlife Service (FWS) North Florida Ecological Services Field Offices Programmatic Concurrence for use with the Wood Stork (September 2008). Use of the Key for Wood Stork resulted in the following sequential determination: A (The project is more than 2,500 feet from a colony site.) > B (Project does not impact SFH) = no effect. No further consultation was required.
Based on existing habitat types the Corps has determined the proposed project will have no effect on Florida scrub jay (Aphelocoma coerulescens). The proposed work occurs within the consultation area for the scrub jay. Following the Standard Local Operating Procedures for Endangered Species (SLOPES) guideline, no suitable habitat will be impacted by the proposed work therefore, the Corps determined the proposed project would have no effect on the Florida Scrub Jay. No further consultation was required.
Based on existing habitat types and survey information, the Corps determination for the proposed project is “no affect” to the Crested Caracara. The proposed work occurs within the consultation area for the caracara. Following the Standard Local Operating Procedures for Endangered Species (SLOPES) guideline, no suitable habitat will be impacted by the proposed work therefore, the Corps determined the proposed project would have no effect on the Crested Caracara. No further consultation was required.
The Corps has determined the proposed project will have no effect on sand skinks (Neoseps reynoldsi) and blue-tailed mole skinks (Eumeces egregious lividus). The proposed work occurs within the consultation area for skinks and, per the FWS guidelines, an oriented strand board coverboard survey was conducted. No sand skinks, blue-tailed mole skinks, or evidence of their presence was found as a result of the survey. Additionally, on March 30, 2017 the applicant received technical Assistance from the FWS supporting the proposed work will not impact skinks. Therefore, the Corps determined the proposed project would have no effect on sand skinks and blue-tailed mole skinks. No further consultation was required.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 4.92 acres of freshwater wetlands which ultimately discharges to the Econolockhatchee River and East Lake Tohopekaliga. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the downstream waters. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926, within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Brandon Conroy, in writing at the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926; by electronic mail at brandon.j.conroy@usace.army.mil; by facsimile transmission at (321) 504-3803; or, by telephone at (504) 321-3771 x11.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
COCOA REGULATORY OFFICE
400 HIGH POINT DRIVE, SUITE 600
COCOA, FLORIDA 32926
REPLY TO
ATTENTION OF
Regulatory Division
North Permits Branch
Cocoa Permits Section
December 21, 2017
PUBLIC NOTICE
Permit Application No. SAJ-2017-02778 (SP-BJC)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT:
Duke Energy Florida
Attn: Wayne Richardson
101 Cemetery Road
Tarpon Springs, FL 34689
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with Hydrologic Unit Code 0308010110 (Econolockhatchee River) and
Hydrologic Unit Code 0309010101 (East Lake Tohopekaliga). The project site is
located within the existing transmission line corridor in Sections 2, 3, 4, 6, 7, 17, 18, 19,
20, 29, 30, 31, 32, 33, Townships 23, 24, South, Range 31 East, Orange County,
Florida.
Directions to the site are as follows: The project begins at existing structure RW-26
located 1500 feet northeast of the intersection of Faith Assembly of Goad Roadway and
Curry Ford Road and follows the existing transmission line corridor 0.85 miles south,
then east 0.46 miles then 1.95 miles south to existing structure RW-66-1. The project
begins again at existing structure RW-89 located 0.42 miles south of the intersection of
Highway 528 and Highway 417. From structure RW-89 the project follows the existing
transmission line corridor southeast 2.48 miles, terminating at the FGT East Substation
(13129 Wewahootee Road, Orland, Florida 32832).
APPROXIMATE CENTRAL COORDINATES: Latitude 28.48724°
Longitude -81.24412°
PROJECT PURPOSE:
Basic: Electric utility infrastructure maintenance
Overall: Replace steel and concrete utility structures, and install permanent, at-grade
structure pads at utility poles located within wetlands in Orange County.
EXISTING CONDITIONS: Four wetland habitat types were identified within the
transmission line corridor. The wetlands and surface waters within the project corridor
were classified using the State of Florida FLUCCS (SJRWMD 2011) description and the
U.S. Fish and Wildlife Commission (FWS) Classification of Wetlands and Deepwater
Habitats of the United Stated (Cowardin 1979). All the wetlands found within the project
corridor are disturbed with varying degrees of hydrologic alteration, have been cleared
of natural vegetation, or have been invaded with exotic/nuisance plant species. There
are no wetlands or surface waters designated as Outstanding Florida Waters within the
project corridor. In addition, no portion of the corridor is located within State of Florida
designated Riparian Habitat Protection Areas. These four habitat types include a total of
14 individual wetlands and one surface water that were delineated within the project
corridor.
FLUCCS 510 (Canal)
FWS: R2UBH (Riverine, Lower Perennial, Unconsolidated Bottom,
Permanently Flooded)
One surface water, a landfill canal, parallels the east side of the project corridor
between existing structures RW-43 and RW-58. This canal flows north to the Azalea
Park Outfall canal which then flows into the Little Econlockhatchee River. Within the
project corridor, the northern portion of the canal is deeply incised and free of wetland
vegetation and the southern portion of the project corridor has wetland vegetation along
the bank. Common species within this area include Virginia chain fern (Woodwardia
virginica), cattails (Typha sp.), Carolina willow (Salix caroliniana), sapling red maple
(Acer rubrum), wax myrtle (Myrica cerifera) and torpedograss (Panicum repens).
FLUCCS: 630 (Mixed Wetland Forest) FWS: PFO6/7C (Palustrine, Forested,
Deciduous/Evergreen, Seasonally Flooded)
Wetlands J and K were designated as mixed wetland forest communities. This
classification consists of forested wetlands in which neither hardwoods nor conifers
achieve a 67-percent dominance of the crown canopy composition. These wetlands
parallel the project corridor and primarily consist of cypress (Taxodium ascendens), red
maple, Virginia chain fern, primrose-willow (Ludwigia peruviana), and blackberry (Rubus
spp.).
FLUCCS: 641 (Freshwater Marshes)
FWS: PEM1C (Palustrine, Emergent, Persistent, Seasonally Flooded)
Wetlands 1, 2, 3, 4, 6, E, F, G, and I were designated as freshwater marshes. This
classification consists of areas dominated by herbaceous wetland plant species with
surface water present for extended periods during the growing season. Within the
project corridor, vegetation within this classification includes maidencane (Panicum
hemitomon), rush (Juncus spp.), broomsedge (Andropogon virginicus), water pennywort
(Hydrocotyle umbellata), smartweed (Polygonum punctatum), dog-fennel (Eupatorium
capillifolium), beakrush (Rhynchospora spp.), and coinwort (Centella asiatica).
FLUCCS 643 (Wet Prairies)
FWS: PEM1C (Palustrine, Emergent Marsh, Persistent, Seasonally Flooded)
2
PEM1Cd (Palustrine, Emergent, Persistent, Seasonally Flooded, Partially
drained/ditched)
Wetlands 5, H, and L were designated as wet prairies. This classification consists of
areas dominated by grassy vegetation with shorter herbs and less water than a marsh.
Within the project corridor, vegetation within these areas includes maidencane, yellow
eyed-grass (Xyris sp.), beakrush (Rhynchospora spp.), whitetop sedge (Dichromena
colorata), water pennywort, coinwort, false-willow (Baccharis angustifolia), and
broomsedge.
PROPOSED WORK: The applicant requests authorization to fill 4.92 acres of wetlands
for the installation of transmission structures, geoweb at-grade access improvements
(16- feet wide, pervious, unpaved and at-grade) and geo-web at-grade structure pads.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
"Overall, the applicant has designed the project to have a minimal adverse effect on
wetland resources. The proposed project was designed to replace 28 existing
transmission structures in wetlands with 28 new steel or concrete structures. Structures
within wetlands will be accessed on permanent access improvements. A temporary
bridge will be constructed over the Little Econlockhatchee to avoid impacts to that
surface water. Once the project is complete the bridge will be removed. There are no
surface water impacts associated with the bridge.
Over the long term, the access improvements within wetlands will provide for
minimization of impacts to the wetland by providing a designated point of crossing. The
point of entry of the structures within wetlands will be from the access improvements.
The access improvements have been designed and located to have the least impact to
wetlands. Deep pools of the wetlands were avoided, flow characteristics were
maintained, and seasonal high water elevations were not altered. Access improvements
and pole pads will be built at-grade and will be modified with geo-web and gravel
design. No compaction will occur. Installation of temporary construction matting will be
utilized to prevent impacts to wetlands during construction in those areas where access
improvements are not proposed. Once construction is complete, the temporary matting
will be removed. To prevent wetland impacts in adjacent wetlands, sedimentation and
erosion controls will be installed and maintained during construction. "
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
"A Wetland Rapid Assessment Procedure (WRAP) analysis was also conducted for the
proposed wetland impacts. The total WRAP loss score is -0.65 for the 4.92 acres of
total permanent impact. To compensate for the wetland loss, Duke Energy is proposing
to purchase mitigation bank credits in the FDEP and USACE approved TM-Econ
3
Mitigation Bank (SJRWMD 4-095-84310-7 and SAJ-2001-07089) located in the
Econlockhatchee River Nested Basin. This bank is state approved using UMAM and
federally approved using WRAP. Duke Energy will purchase 1.01 State Freshwater
UMAM wetlands mitigation credits to compensate for the functional loss of 1.01 units.
Duke Energy will purchase 0.65 USACE Palustrine WRAP credits for the loss of 0.65. A
preliminary Mitigation Bank Reservation Letter is provided in the submittal. A final
Reservation Letter will be submitted upon agency approval of the UMAM/WRAP
analysis and proposed mitigation credit purchase."
CULTURAL RESOURCES:
The Corps is not aware of any known historic properties within the permit area, which is
defined by the project boundaries. By copy of this public notice, the Corps is providing
information for review. Our final determination relative to historic resource impacts is
subject to review by and coordination with the State Historic Preservation Officer and
those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES:
The Corps has determined the proposed project may affect, not likely to adversely affect
the Eastern Indigo Snake (Drymarchon corais couperi). Based upon review of the
Corps and Service's Eastern Indigo Snake Programmatic Effect Determination Key
(dated August 13, 2013), the proposed project resulted in the following sequential
determination: A (The project is not located in open water or salt marsh.) >B (The permit
will be conditioned for use of the Service's standard Protection Measures for the
Eastern Indigo snake during site preparation and protection construction.) >C (There
are gopher tortoise burrows, holes, cavities, or other refugia where a snake could be
buried or trapped and injured during project activities) >D (The project will impact less
than 25 acres of xeric habitat) >E (permit will be conditioned such that gopher tortoise
burrows, holes, cavities, and snake refugia will be inspected before site manipulation of
a particular area, and if occupied by an indigo snake, no work will commence until the
snake has vacated the vicinity of proposed work) = NLAA. No further consultation was
required.
The Corps has determined the proposed project will have no effect on wood stork
(Mycteria americana). The Corps completed an evaluation of the project based upon the
US Fish and Wildlife Service (FWS) North Florida Ecological Services Field Offices
Programmatic Concurrence for use with the Wood Stork (September 2008). Use of the
Key for Wood Stork resulted in the following sequential determination: A (The project is
more than 2,500 feet from a colony site.) > B (Project does not impact SFH) = no effect.
No further consultation was required.
Based on existing habitat types the Corps has determined the proposed project will
have no effect on Florida scrub jay (Aphelocoma coerulescens). The proposed work
occurs within the consultation area for the scrub jay. Following the Standard Local
Operating Procedures for Endangered Species (SLOPES) guideline, no suitable habitat
4
will be impacted by the proposed work therefore, the Corps determined the proposed
project would have no effect on the Florida Scrub Jay. No further consultation was
required.
Based on existing habitat types and survey information, the Corps determination for the
proposed project is "no affect" to the Crested Caracara. The proposed work occurs
within the consultation area for the caracara. Following the Standard Local Operating
Procedures for Endangered Species (SLOPES) guideline, no suitable habitat will be
impacted by the proposed work therefore, the Corps determined the proposed project
would have no effect on the Crested Caracara. No further consultation was required.
The Corps has determined the proposed project will have no effect on sand skinks
(Neoseps reynoldsi) and blue-tailed mole skinks (Eumeces egregious lividus). The
proposed work occurs within the consultation area for skinks and, per the FWS
guidelines, an oriented strand board coverboard survey was conducted. No sand
skinks, blue-tailed mole skinks, or evidence of their presence was found as a result of
the survey. Additionally, on March 30, 2017 the applicant received technical Assistance
from the FWS supporting the proposed work will not impact skinks. Therefore, the
Corps determined the proposed project would have no effect on sand skinks and bluetailed mole skinks. No further consultation was required.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposal would impact approximately
4.92 acres of freshwater wetlands which ultimately discharges to the Econolockhatchee
River and East Lake Tohopekaliga. Our initial determination is that the proposed action
would not have a substantial adverse impact on EFH or federally managed fisheries in
the downstream waters. Our final determination relative to project impacts and the
need for mitigation measures is subject to review by and coordination with the National
Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Cocoa Permits
Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926, within 21 days from the
date of this notice.
5
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Brandon Conroy, in writing at the Cocoa Permits Section, 400 High Point Drive, Suite
600, Cocoa, Florida 32926; by electronic mail at brandon.j.conroy@usace.army.mil; by
facsimile transmission at (321) 504-3803; or, by telephone at (504) 321-3771 x11.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
6
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
7
'"
Corp
J
I
.
I
\
\
Begin Project
11m:1e Counly
ler Treli1rnen1
Fa:: 1hty
\
l~Rcl
I/)
iS
...~
I
"'
"
""'
0
.:rt
I
o<' 'IN
4\\'I)
<:-0
'Y
,<:-
B It\'\
mrm"C
Oraf\JQ Couitv
Coni..r
Lard fill
it
~
Wi'1e
JIPt
S11 mp
/ '''
1-
~
(>
00
~t
~
'
-j:I°"
®
@>
End Project:
FGT East Substation
~
~
(
2
I
i:
<
~
·
'
w-.ahootee Rd
I~~~::::::::::::::::::.............:~;,;;...:.;..........."":'~:"::':~::':"';::':""'................................~:::::!·soo!E:::::::s~ooo~
C*cbh'Mt:StarlMCOW.Of'l'lelihOM~ltytot dalO
(1. Stantec
aiwi.d li\ -.Ctonlc: tcoimot. IMN>C~t~ts
lJ l ~,..,kwY~IMOCCU10C1ond
~solll'ledolo. fM.~I~
stoni..c.llsol'lc«l., emploof-.COl'lflllkln.bO'ld
OQe""'- hoMOl'l}'Ofld otldc:i~ot fng ~Otl)' ~
tom tie cotll·nl otptOIWiton ol hdoto.
Rio Pinar - FGT East
Transmission Line Rebuild Proi·ect
O range C o u n ty Flo rida
FIGURE 1 - PROJECT LOCA TION M AP
June 2017
N
s1on1. c eoruuffino ' ·"'rn1nc.
300Prirnera 81vd. Sl.ite300
"''· ""'"' fl327'6
.':!~~~
@ ""'"""'
....
ProjectC«l1Clor oi..e 6'1ef9Y, 2016
mage1y ESR1. 2013
Page 1
lCJke Underhill Rd
J
I
.
Ro Pinl:'r
~ Countl)
Club
m
~
I
RC
World
I
Begin Project
!:.)
::
~
)\
( 'r nge County
vV tm Treatmen t
Fae fo}
\
\
Eaat.vocxl
Goll Club
I
LLC
\
c
Alafoya Tr/ 8
Cu·ry Ferd R
Po~·e
St
.
86 ft
Lutf
Orange
Co univ
Landfill
- 528- TOL~ E
&
1SR ·52 8
10~\;
- ® -s eachl ine·Ex py------sR-52
:'l'l
End Project:
FGT East Substation
lnnovctlon
P.looe ORI
W~-c ~ffe B11:je
Tranil·tors
CJ,, Sta ntec
C*clah'Mt: StanMCOUlll'MS llO,.~ltytotdalO
aippled ~ .-ClrOl'lic: bffl'IOI. JM N>Clpi.n.t occ.pts
ll l ~~lStoni..c. llsof'lc.M, eMPIO'f-,COl'lli1111a!\ha'ld
OQefltt, hoM Ol'l)'Gfld otlebl'nsot fnQ ~ Otl)' _ ,
tom r1e cotll·nt otp«Witon ol h
doto.
Rio Pinar - FGT East
Transmission Line Rebuild Project
Orange Cou n ty Florida
FIG URE 2 · QUAD MAP
June 2017
2500
S.tonlec Comultif19 $.eMc:e~ h:.
300Prirnera 81vd. Sl.ite 300
lokeMory R.327'6
tel 407. 710.3364
'"'""'.sas.01sa
@
N
sooo
!!!!!!!!!!iiii--!!!!!!!!!!!!!!!~
Rele..,....
....
°'*
Project c.ornaor
Etlef9Y, 2016
lmagef'y ESRl. 2013
Page 1
(I DUKE
~~ ENERGY.
RIO PINAR TO FGT EAST RW
69KV TRANSMISSION LINE
EASEMENT STABILIZATION CONSTRUCTION DRAWINGS
THOR/ORACLE: 2098T1 I 30000386
(WETLAND IMPACTS ONLY)
BEGIN SECTION 1
STR: RIO·PINAR SUB
PROJECT START
LAT. 28.541013°
LONG. -81.253502"
STA=(O+OO)
1. FLOOD Zt*E INfORM1'1ION BASEO OH1HE ORAHCif COUNiV.
FLORIDA FLOOD !~SURA.Ha MTE MAPS
MAP NUMeUt tl<>!tSC0455f
MAP'NIJM6[ft12095C04Sl5FMAP NUMBER U09SC0270f
MAPHUMSEll l2095C0290J
2. APPi 1CA84i FU>OO l0H £ OEUh'£ATK)N.$ FllnHt: AflOVE Ri.:fUl{NCI-))
FLOOD INSURANCE RAlf MAPS ARE AS fOLI OWS:,
ZONE A
ARCA SUBJ£CT TO 100.YCNl fLOOO Pt.Uf
20NE AE
/.AfA WITHIN lllE lOl>YEAA FLOOD "AIN
1.0NE le
ARtA CKJT51Di: TI-tl 1,00.VEAR f'l.000 P\.AIN
D\IG.
R\r/~200
R\14201
R\10202
R\14203
R\14200
R\14205
END SECTION 1
R\14206
R\14207
R\r/4208
R\14209
R\14210
R\14W
R\14212
RIJ4213
R1,<421·
R\14215
BEGIN SECTION 2
STR: RW-131
PROJECT END
END SECTION 2
LAT. 28.427733"
DESCRIPTION
COVER, KEY MAP & INDEX
GENERAL NOT ES
EASEMENT STABILIZATION PLAN VIE\/
EASEl'\ENT S Tl\BILIZAT!O ~ PLl\ll VIE\/
EASEMENT S TABILIZATION PLAN VIE\/
EASEMENT STABILIZATION PLAN VIE\/
E4SE.,EMT STABILIZATION PLAN VIE\/
EASEMENT S TABILIZATION PLAN VIE\/
I
EASEMENT S TABILIZATIDN -P LAN V IE\I
E
E
E
E
STABILIZATION PLAN
VIE\J
""rn'""
~ "=
ST/>JULIZP,TION PLAN VIE\/
S TABILIZATION PLAN
STABILIZATION PLAN
S Tl'JllLIZllTION PLAI"
EASEMENT STABILIZATION TYPICAL
VIE\J
\/IE\J
VIE\/
SECTIONS
...... ,
.....
flP", Ji ,
LONG. -81.194298° ---11---l~~~~~~~
STA=(542+90)
f.ASDIEl(f $ AIJU2-'T IDI
IUD
P1)fd
TO r<'iT U l f
(,fl(V J111!t411($s:JO' U llE
R\14200
CONSTRUCTION NOTES
I.
STOCK PILES OF DREDGED OR EXCAVATED MATERIAL SHAL BE PLACED IN
THE UPlAND AREAS OUTSIDE THE FLOODPLAIN WITH SEDIMENT CONTROLS
OOWN SLOPE OF THE AREA.
2.
AL.L EXCAVATED MATERIAL FROM WETLANDS ANO LOW WATER CROSSINGS
SHAL.L BE REMOVED FROM THE JOBSITE ANO DISPOSED OF AT AN
APPROVED LANDFILL. All UPLAND EXCAVATED MATERIAL MAY BE SPREAD
IN UPLANDS AND SHALL BE COtrrAINED OUTSIDE OF FLOODPLAINS AND
WETI..AND AREAS. UPLAND SPOIL MATERIAL SHALl BE STABILIZED AND
ALLOWED TO REVEGHATE NATURALlY.
3.
CONTRACTOR SHALL SEED, STRAW AND TACK UPLAND GRADES WITI-llN 3
DAYS OF DISTURBANCE.
4.
NO WORK SHAL.l COMMENCE PRIOR, TO A SCHEDULED PRE-CONS~UCTION
MEETING WITH DUKE ENERGY. AFTER PRE-CONSTRUCTION MEETING, NO
WORK SHALL COMMENCE PRIOR TO INSl ALLA TION OF THE BMP'S PER THE
SW PPP.
..
,,,, ,,._
. ..
·~ ·
I,.,.
RIJ42 01
~POUTO
Htrf:StA.l.1.11)
~POUTO
HMMO\l!D
W!:'ft.A!olOMCAS
DUKE ~EAGY F\.ORl:>A
EASEMENT
ACCUSl'tOUT!
PAOPOHOGAn.
A.NOft)ft, tNce:
Al.OR.A.OE EASEMENT
STA81LIZA.nott wnv.HOS
WROVOt£'fT
,U.QR.A.De aA.slME.NT
STA811.RADOH UPv.NOS
--
AT.ORA.De POU: PAD
W!T\.AHOS IMPllOVl!MENT
A.ToQRAOE "°'-E PAD
UPLAHOS ..PROWMENT
AT.ORA<>! POU PAD
PA.ltTIAL UPt.NIOS &
WiT\.ANOS IMPROVEMENT
-
~
,..............
-
14.4 -
LOWWATlllCROSSIHG
(CA.all OONCMT!)
Pft()ft()Sl!DTOIP.
8R.DGE
WA.TVt Of'nt AT
SU.SOfW. lCH WA.TiR
ftlltOPOIEDOAAOE
vasnHGGftA.D!
Ct"COHTOUltSl
SIASOHAL. lCH
WATfAl.l!fE
'EMA.1-.Vu.R
P:L.000 Pl.MN l.IHI
...
""'
,,.,
N'
i"
9...
...31:
a:
..........
......=
!!!.
,..
...
...
0
N
......
!!!.
...z
11111
N
en
::::J
:z:
=
!$
::E
=
u
=
::E
I
I
I
I
...z
:::;
i =
u
.
E
I
!
I
=
::E
i
i
!
LlGCND
I
~POUTO
IH!trf:StAl.1.11)
~POUTO
el!RIMO\l!D
di
~
~
. ..
W!:T1..A!ilOMCAS
nno BOOC
"""
DUKE ~EAGY R.ORl:>A
EASEMENT
Al.ORA.OE EASEMENT
S'l'A81LIZATtOtt wnlAHOS
WltOVOt£'fT
,U.QRAOe: eASiME.NT
STA811.RAnoH UPv.NOS
--
AT.OR.A.OE POU: PAD
Wnt.AHOSI MPA.OVl!MENT
AToQRAOE POU PM'
ACCUSl'lOUT!
PAOPOHOGAn.
ANOft)ft, tNte:
-
~
_,.............
UPLANDS ..Pfl<>WMENT
AT..CRAO!!i POL! PAO
PAltT\AL UPt.NIOS &
WiT\.ANOS IMPROVEMENT
-
74.4 -
LOWWATlllCA.OSSING
(CA.all OONCMT!)
PftOPOS!D T'[MP.
8R.DCE
WATVt Of'Ttl AT
SU.SOMAI. tcH WATiR
ftlltOftOIEOOAAOE
flCISnNGGftAD!
Ct "COWTOUltSl
SIASOHAl. lCH
WATfJtLl!fE
"""""'° "
...,,,._.ci
l'llLM!!J(ACl.J'NlS.
"ll#lft"-"ST.tell1l"1ION
QltQl')lt\l{,.!IJ ><:U
''"'~·m
HU. MU,CKlfij
......
.
>1.>0
.............. .,,.
S_,,,Ctvf((S
$TRVC'IU!itU
RW·26
146-60
a
STAt>U l.\'ID
Rm PllM 10 r GT UST
f.ASOO(T
HIV T11Hi'SMl$SIO' U ll(
' EMA.1-.VIE.AR
P:L.000 Pl.AIM l.INI
R\.14203
J
GP LANOHOLOERS-ORl.ANOO I U C
PARCEi. 10 07-23'11""""°"""
'
·'
c;;
~
;
a:
...:z:t;
en
......
!!!.
...z
cwt
::J
I
:z:
u
i
iii'
>
0
Ill
......c
!!!.
...""z
::r
:z:
i
l lG[N()
~POUTO
IHtdtAlLIO
~POUTO
81!MM0\11!0
Wf!l'l.A!ilOARCAS
DUKE ~ ERGY R.ORl:>A
EASEMENT
ACCUSlll...,.,.,....."'
AT.ORA.DE EASEMENT
STA81LIZA.nott wnt.AHOS
AT.OR.A.Oe eASiME.HT
STA811.RADOH UIP~NOS
...,._,.
AT.OR.A.OE POU: PAD
Wnt.AHOSIMPROVl!MENT
AToGRADE "°'-E PM
UPLAHOS ,.PROYEMENT
AT.ORAO~ PIX! PAD
PAOPOUDGA~
PAltllAL UPl.AHOS &
ANO!'Oft,tNte:
WliT\.AHOSI MPROVEMENT
~
LOW WAT!R CROSSING
(CA.all OOHCM:T!)
ftttOPOS!DTOIP.
8R.DGE
WATVt OflPT'tt AT
SU.$0MM. HDH WATiR
fttltOftOIEOOAAOE
........-----
!Xl$TIHGGftADI!
-
SIASOHAl. lCH
14A-
Ct "COWTOUltSl
WATfAl.l!tE
,l!MA.10l).V£AR
nooo Pt.MN UNI
WflV>il.01'()
..,,.. .,.....
M
""""""'' "''
l'fltNl'f,..,. ,,,..
nu.-r"'iM>
c;llr(,,ot)'\Vl;ll,lktl
..,
kll#:!tJlrC-0!-li
S¥VCto""l~
.,,,,,
""M""""
nrucn.ui:t.:
,,_y
f.AU)O(I STAtlU l.\11Dt
Rm PllM TO r GT U ST
"""'
HKV T11#1SMl$s:IO' U llE
'~ '
R\./4204
;g
ii
0
......
......
!!!.
...
!:
N
""ac=-
Ill
...:z:
"'......
!!!.
..."'z
t;
co
...:z:
u
!C
::r
::E
:z:
u
!C
::E
iU
>
0
Ill
......c
!!!.
...z
co
:::r
:z:
.l u
I
I
l
i
'
I
I
i
.
l
LfGCND
~POt.ETO
IH!mtM.1.11)
~POUTO
81!MMO\l!O
W!:'ft.A!olO MCA.a
DUKE ~EAGY R.ORl:>A
EASEMENT
ACCUSl'lOUT!
PAOPOHOGAn.
ANO!'OftPCNce:
Al.ORA.OE EASEMENT
stA81LIZA.Ttofrf wnv.HOS
WltOYOt£'fT
,U.QR.A.De: e.A.slME.NT
STA81LRATtOH UPv.NOS
--
AT.ORAOe POU: PAD
Wnt.AHOS IMPROVl!MENT
AToQRAOE POU PM'
~
_,...........--
UPLAHOS ..PROWMENT
AT.ORAO!!i POL! PAO
PAltT\AL UPt.ANOS &
WiT\.ANOS IMPROVEMENT
-
74.4 -
ATTI!~IS OlllE<:n:OTO N(Ul;fntAl niUEPWIS
-YltA.VtllCNAl.Jl"ID W!Ultv ·l'llOtlUCllON.'"'5
LOWWATIACROSSIHG
(CA.all OONCMT!)
PftOPOS! D TOIP.
8R.DCE
WATVt Of,TtlAT
SU.$0KAI. HGH WA.TiR
ftftOftOIED OR.ADE
l!XISTING GftAD!
K6Tllf CO!UClfllfO '11'1
0
ntlMUO("CJ·lllOVlt.
S7~'1Ai1Qt.I
QllQt)O:t,lt,.{!Jk:t)
""'"""
fw.JAoU~fli
\"'tUCtuQ:U
Ct "COHTOUltSl
SIASOMAL. lCH
WATfJtLl!fE
Fl!MA.1-.VIE.AR
P:L.000 PLAIN l.INI
R\o/4205
iii'
ii
0
......
......
!!!.
...z
..,
Cl
N
·tu
Ill
a:
...:z:
......
!!!.
.......z
co
Cl)
::::.
:z:
u
!C
::r
::E
:z:
u
!C
:E
;::Cl
..,
N
iU
>
0
·......
a:
Ill
......
!!!.
...z
::r
:z:
u
!C
c
!!!.
...z
OI
co
:::r
:z:
u
!C
::E
:E
LfG[NC>
~POUTO
IH!mtALLIO
~POUTO
HROIO\l!O
. ..
W!:Tl.A!llOAltCAS
nno
BOOC
"""
>-->------+------<
~ f--+------f-----1
di
~ ~=====l==:::::::::1
DUKE ~EAGY R.ORl:>A
EASEMENT
ACCUSl'lOUT!
PAOPOHOGAn.
ANO!'OftPCNce:
Al.ORA.DE EASEMENT
STA81LIZATtOfrf wnlAHOS
-WltOVOt£'fT
AT.OR.A.De: e.A.slME.NT
ST"81LRATtoH UPLANDS
AT.ORA.OE POU: PAO
Wnt.AHOSIMPllOVl!MENT
AToQRAOE POU PM'
UPLAHOS . .PROWMENT
AT.ORAO!!i POL! PAD
PAltT\AL UPt.ANOS &
WiT\.ANOS IMPROVEMENT
~
,,.........---
74.4 -
*l'-11 -.:~:;IC
AC.~(l>.:.;tl:.OC.:~
L&NWATlllCROSSING
(CA.all OONCMT!)
PltOPOS!D TOIP.
8R.DGE
WATVt Of'Ttl AT
SU.SOMAI.. tcH WATiR
ftlltOPOIEDOAAOE
vasnNG GftAD!
Ct"COWTOUltSl
SIASOHAl. lCH
WATatLl!fE
'EMA.1-.Vu.R
P:L.000 PLM NU NI
·JI Nl111:,>i..'.; "K.IS
"
,;,~·'"" "°'''"
b"muu.- Ott
.~1·
.
SW»
'")!Id/,. .It! \
IJ\1lf~0
"""
~llt\t.
~~
)
Jltl:.O
"' ~'i ,A4.r.;i.
~l"'-r.-lS!l ~
R\o/4206
":-''
{
UE HOLOINGS-4 UC
LID
.. ·
~9-23-31 ·1775-02--0 11
~1
~L..- ~
lfG[ND
~POUTO
el!t«S'TA.1.llO
~POUTO
81!MMO\l!O
. ..
nno
"""""""...,.,.
di
WEl'l.AJilOMCAS
BOOC
DUKE ~EAGY R.ORl:>A
EASEMENT
~
ACCUSl'lOUT!
~
PAOPOHOGAn.
ANO!'OftPCNce:
Al.ORA.DE EASEMENT
stA81l.IZATtofrf wnlAHOS
WltOVOt£'fT
AT.OR.A.De: eASiMiMT
STA811.RAnoH UPv.NOS
--
AT.OR.A.OE POU: PAD
Wn\AHOS IMPROVl!MENT
AToORADE "°'-E PM
UPLAHOS ,.PROYEMENT
AT.OR.AO~ PIX! PAD
PAlt11Al UPt.AHDS &
Wil\.AHOS IMPROVEMENT
~
........----
14A-
W\h.·l·CHO
lOWWATIACROSSING
(CA.all OONCMT!)
PftOPOS!D T'[MP.
8R.DGE
WATVtOf,TtlAT
11.ASOMM. tcH WATiR
ntOftOIED OR.ADE
l!Xl$TINGGftAD!
"eotn'OUltS)
SIASOHAL. lCH
WATfALl!fE
c1
' £MA10l).V£AR
P:LOOD Pl.MN UNI
AQ:O'J.ft-'C'
nu.N':u-1 ,.q~AOS
fllLJUtNM;J«OIJIL
ltAIU!Al!OM
I "'''""' .rcu.u;TI.iRH
Nl....U:O
lll NU>.;Km)·
ltltUCTlJlt£$
flllNt(rfril,IQ·
.11111JC:l01tl'l
J
001
0
lfGCMC>
~POUTO
81!td'TA&..Lf0
f'RAH.!MSSIOH POLE TO
IU!RDIO\l!D
di
~
~
. ..
Wf!1'1..A.HDMCAS
...,.,.
nno BOOC
DUKE Bl ERGY Fl.ORf)A
EASEMENT
ACCHS llOUT!
MOPOUDGA~
ANO!'OR, tMta
Al.ORA.DE EASEMENT
........"""""''"
.,.......,.
stA81LIZAltON wnt.AHOS
o\T.ORA.Oe: EASlMEHT
STA81LRATlOH UIPV.NOS
AT.ORAOe POLE PAD
Wnt.AHOS IMPROVEMEMt
AT-GRADE "°'-f PAD
UPLANDS ..~MENT
AT..CRAOl!!Jl'Oc.! PAD
PAlt11AL UPlAHOI &
WliT\.AHDSIMIPROVEMEHT
~
............---
14A-
LOWWATIRCROSSING
(CMLl!COHCl'tt:T!)
~se:orn-P.
8Rl>GE
WAl'VtOflPntAT
SIASONM. lGH WATiR
PttOftOIEDOAAOE
l!Xl$TIHGGftA.DI!
C1 "COWTOUltS)
SIASOHAL. lCH
WATfltLl!fE
, E:MA.11»-VIE.AR
' L00D Pl.MM UNI.
,,.
'""""'' '
..,,,,._.,,
"ILM!f.J(ACl-l'MS.
0
r>U.-.itt"(-"'Cj.Jl'O<.llC
-Sllllll11"1'1t'W.
Ql!Vf)<\l(.!1,1"!1:,)
'"'"""'
tlU.MU.Cs.Qtlj
Slfl\ICf\.llUS
"''""""''"
$Tll\IC'IUl(U
0
0
0
0
''11,,~SIO~l\\'
,,,,
-....:..."":-"'..:R\o/4208
i'
0
.......
......
!!!.
......
ID
....
0
N
Coll
z
:z
z:z
:::;
ID
!:i
a...
:ii:
c.:t
:&
LlGCND
~POUTO
IH!mtAl.1.11)
~POUTO
el!RIMO\l!O
W!:'ft.A!ilOAltCAS
DUKE ~EAGY R.ORl:>A
EASEMENT
Al.OR.A.OE EASEMENT
STA81LIZATtOtt Wnl.AHOS
--
WROYOt£'fT
,U.QRAOe: eASlME.NT
STA81LRAnoH UIP~OS
AT.OR.A.OE POU: PAD
Wnt.AHOS IMPllOVl!MENT
AToQRAOE POU PM'
ACCUSl'lOUT!
PAOPOHOGAn.
ANO!'OftPCNce:
-
ftlltOftOIEOOAAOE
_,...........--
Ct"COWTOUltSl
~
UPLANDS . .Pfl<>WMENT
AT..CRAO!!i POL! PAO
PAltT\AL UPt.NIOS &
WiT\.ANOS IMPROVEMENT
-
74.4 -
W£TiNiO·OI
LOWWATIACROSSING
(CABLI OONCMT!)
l"ttOPOS!DTOIP.
8R.DCE
A.CD..Wto!Jtl:J
.....
RU .t.ReA(AQ·PAO$ 033
"U.4!'.All'CJ-COUlt
!>(-1.AOON
QU(.lf~ll(V<.!l.lt'U
WATVt Of'Ttl AT
SU.SOMAI.. tcH WATiR
vasnNo GftAD!
SU.SOHM. tCH
WATfALl!fE
'l!MA.1-.V!.AR
P:L.000 Pl..M N l.INI
IH.CJ'JiillO
fU,i.1(£~~..,,....
S!flUCtlJ-K$
·-·~·
Sl$1UC1ll ltf-S
·'"'"
i'
0
......
......
..,!!!.
...
:z
ID
-
""
w
...
:;
:z:
!i:E
:E
~
:z:
u
~
LlGCND
~POl.ETO
IH!trf:StAl.1.11)
~POUTO
HRIMO\l!O
W!:'ft.A!ilOMCAS
Al.OR.A.OE EASEMENT
STA81LIZATtofrf wnlAHOS
--
WROYOt£'fT
,U.QRAOe eASlME.NT
STA81LRAnoH UIPv.NOS
AT.ORAOe POU: PAO
DUKE ~EAGY F\.ORl:>A
EASEMENT
ACCUSl'tOUT!
PAOPOHOGAn.
ANOft)ft,tNce:
W!T\.AHOS hlllPllOVEMENT
AToQRAOE POU PAD
~
PftOPOS! D T'[MP.
8R.DCE
WA.T Vt OflP'lttAT
SU.$0KM. lCH WATiR
,..............
ftlltOftOIEOORAOE
-
SIASOHAL. lCH
WATfALl!fE
UPLAHOS . .PROWMENT
AT..CRAO! POlf PAD
PAltTIAL UPt.ANOS &
Wil\.ANOS IMPROVEMENT
WtflAhlOIO
LOWWATIACROSSIHG
(CA.all OOHCMT!)
14.4 -
vasnNo GftAD!
Ct "COHTOUltSl
AO:~ACI
fill Mf,l(A.Cl-l'Nli
"~ #Oft("(.CJ-«c>Jf(
$fl&i-,1l"1~
.
.,,....
0'4
"""""' ·
Ql1QH».i<;!U"1U
f tUM!"Aj)Vt,.
S*°C-!Ulti:S
...
..,.,...,.,...,. 00000
S!INClU~U
STAt>U l.\'ID
RIJ PlliWt 10 r GT UST
fASf)O(T
HIV TIIHl!SMl$s:IO' U ll(
Fl!MA.1-.VIE.AR
P:L.000 Pl.NM l.INI
RIJ4 2 10
i'
0
......
......
!!!.
......
:z
ID
CD
in
...
E
...
=
:::;
=
u
=
=
::&
::&
~
...N'
N
0
"'
...cc=-
1111
Cl:
...!!!....
......
E
...
...!!!.
......,.....
z
CD
=
::r
::&
::&
=
u
u
to-
=
Cl:
LfGCNC>
~POUTO
IH!mtM.1.11)
~POUTO
el!RIMO\l!O
we:n..uio MCAS
DUKE ~EAGY F1.0Rl:>A
EASEMENT
..."""""'"
Al.ORA.OE EASEMENT
STA81LIZATION wn\.AHOS
AT.OR.AOe aA.SlMENT
STA&ll.RATK>H UIP~OS
.....ovooaAToQRAOE POU PM'
ACCUSl'lOUT!
-
ftftOftOIEOCAAOE
_,...........--
Ct "COHfOUltS)
~
UPLAHOS . .Pft<>WMENT
AT..CRAO! POlf PAD
PROPOHOGAn.
PAltT\AL UPt.NIOS &
ANOi'ORP:tN<:e:
WiT\.ANOS IMPROVEMENT
-
1·.4-
Wffl.A'L<:HtWATlllCROSSIHG
(CA8LI OONCMT!)
PttOPOS!O T'[MP.
8R.DCE
A<7~N~ · IAC
Rlt ~f:'(ACJ.f'JC
~IU l'«~Jo«0\11
ST.le!UZAJIOI
UITUt~l!>JCIUKU
WATVt Of'Ttl AT
SU.$0KM. CH WATiR
lt.sT.ltt.H
flU.JWt':AiW'
vasnHo GftAD!
SU.SOHM. tCH
WATfALl!fE
'l!MA 1·VIEAR
P:L.000 Pl..M Nl.INI
.
...."'.. .,..,...,
3
'
AW-102
415S+-99
'
""" .....
"""
...,....,"'-' ,..,.
RW·109
S'INCTV~E
S'll\IC lURf
..._. ..
,,,.'i&l.W=;.;....--1.!!""~µ!g!...I
_
_ _ ,_
Clf.ASOO(T STAt>U l.\TIDt
lllJPl:N.wt10rGTUST
HIV Til#fSMl$S!O' U llE
RW-42 11
i'
0
......
......
!!!.
...
:z
ID
....
CD
...
a!
...
=
~
::;
=
~
u
:::E
:::E
I
I
I
LfGCND
~POt.ETO
IH!mfAl.1.11)
~POUT'O
el!RIMO\l!O
W!:T1..A!ilOMCAS
..."""""'"
Al.OR.A.OE EASEMENT
STA81LIZATION wnlAHOS
AT.ORAOe EA.SlMENT
STA&ILRAnc>H UPI.ANOS
-ovooaAT.ORAOe POU: PAD
DUKE 91 EAGY F1.0Rl:>A
EASEMENT
Wl!T\.AHOS IMPllOV!MENT
AToQRAOE POU PM'
ACCUSl'lOUT!
UPLAHOS . .Pft<>WMENT
AT..CRAO!! POlf PAD
PAOPOHOGAn.
ANOi'Oft,tNce:
PNtllAL UPt.NIOS &
WiT\.ANOS IMPROVEMENT
-
fllltOPOIEOCAAOE
-
l!XISTIHG GftAD!
Ct "CONTOURS)
SU.SOHM. tCH
~
........---14.4-
LOWWATIJ\CROSSING
(CA8LI OONCMT!)
PftOf»OS!OTCMP.
8 1tDCE
WA.T Vt Of'Ttt AT
SU.$0KM. CH WA.TiR
WATERLl!fE
r-t MA. 1-.VEAR:
n.ooo Pl.MN l.INI
i'
0
......
......
!!!.
...
:z
ID
0
en
w
N
...
=
~
::;
=
~
u
=
::&
::&
LlGCNC>
~POt.ETO
IH!mfAl.1.11)
~POUTO
el!RIMO\l!O
W!:'ft.A!ilOAltCAS
DUKE ~EAGY F1.0Rl:>A
EASEMENT
Al.OR.ADE EASEMENT
STA81LIZATtOtf Wnl.AHOS
--
WROYOt£'fT
,U .ORAOe aA.SlME.NT
STA811.RAnoH UIPv.NOS
AT.OR.A.OE POU: PAD
Wl!T\.AHOS IMPllOV! MENT
AToQRAOE POU PM'
ACCUS l'lOUT!
PAOPOHOGA~
ANOi'OR P:tNce:
-
ftftOftOI EOOAAOE
_,...........--
Ct "COWTOUltSl
-
SIASOHAL. lCH
~
UPLAHOS ..PROWMENT
AT..CRAO!! POlf PAD
PAltT\AL UPt.ANOS &
WiT\.ANOS IMPROVEMENT
14.4 -
wrn.~10
LOWWATIACROSSING
(CABLI OONCMT!)
PftOPOS!O T'[MP.
8R.DCE
WATVt OflP'nt AT
SU.SONM. CH WATiR
vasnHo GftAD!
WATfALl!fE
Fl!MA10l).V£AR
P:L.000 PlM NUN!
AC:llfAGf'.llll/Rf.r.(,4().#A()S.
tl''.L/oJol'l'-1.-C~OUtl
srAl!WAllON
01Y O,.SlRVCIU'U
IN$1..U.(0
FUMfAl,On··
11110CfUltt$
,..u, ..-,1u~.rr.c:>·
SlllVCIUUS
...,,.'
OJ$
'
,,..,
·RY4213
i'
0
......
......
!!!.
...
:z
ID
...
N
N
...z
N
:::i
:::i
=
!C
=
=
u
:::&
:::&
N
z
0
i::
u
...en
...
i!E
...
....
0
...z
0
=
=
:::&
lfGCND
~POUTO
IH!trf:StAl.1.11)
~POUTO
el!RIMO\l!O
W!:'ft.A!ilOMCAS
DUKE ~EAGY R.ORl:>A
EASEMENT
....-....'"
Al.OR.A.OE EASEMENT
stA81LIZATtofrf wnlAHOS
--
AT.OR.AOe: e.A.SlME.NT
STA81LRATtOH UPv.NOS
AT.ORAOe POU: PAO
Wnt.AHOSIMPROVl!MENT
AToQRAOE POU PM'
ACCUSl'lOUT!
PAOPOHOGAn.
ANO!'OftPCNce:
~
_,...........--
UPLAHOS . .Pfl<>WMENT
AT..CRAO!!i POL! PAD
PAltT\AL UPt.NIOS &
WiT\.ANOS IMPROVEMENT
-
74.4 -
L<:HtWATlllCROSSIHG
(CABU! OONCMT!)
PftOPOS!D TOIP.
8R.DCE
WATVt Of''nt AT
SU.SOMAI.. lCH WATiR
ftlltOftOIEOOAAOE
vasnNo GftAD!
Ct"COHTOUltSl
f.AU)O(I STAtlU l.\'ID
SIASOHAl. lCH
WATfALl!fE
HKV T11#1$Ml$SIO' U llE
Rm l"lliWt TOrGTUST
Fl!MA.1-.VIE.AR
P:L.000 Pl..AfN UNI
R'.14214
~.
OEMOCKN'OIOR SMOOTH TOP 8' TO 10" 1.AYfR Ofi EXISTING
MATERIAL SEFORE IMSTH.LfOO THE PERMANENTEASCMENT
S fAOkl!ATION.M.J.EXCAVArtDllM~St~llE
w e11ancl
DeSWl·Ol
PP-01
E
E
Wetlands AHlrid· Road
Wedanw Pt rman.,,t Pole Pad
10.0SU
HOO
QJL_
0.08
1,GOO
2,796
008
3600
0.08
HIGH STRDfGnt WO...EN G£0'ftxllLE FMAIC. OR
APPAOV60 EOOIVAl.EHT. INSTALL OEOT£XTJLEf'MAC
0.58
0.08
0.05
O.OS
0.35
PROVIOl'OO: ...Nlt.IUM LAP Aa .P9t tMNUf"ACT"UR£R
IHSTAUATIOff "'1STRUCTIONS f',T TW( I.A? JOtlff.
PP~
E
We tland! Pem'!enent Pote Ped
W1·02
PP-03
W103
F
Vie ti ands At·Grade R~·d
Wetlands PcrmanentPole Pad
G
Wotl .,.l'!ds-ftt.Gf'ad~ J(o~d
25.215
pp. 04
G
PP-05
PP-06
G
G
H
WtHl.,,d· Permanent Pole Pad
Wetlands-Part.rat Permanent Pole P1d
J600
2013
2.336
15,304
W1·04
I
.Area(f1')
AEUO'JEO FROM THE J08SPE ANO C15POSEO OF AT Art
Label
F
W!llandt, fJartral Perm1ment Pole Potd
We!lands At-Grode Road
Area(a<)
0.06
PP·08
H
Wec1tlnas Partlal Permancm Pole P-ad
Sll7
o.oz.
PP-09
PJ>.-10
H
H
Wetl·nds Permanent Pole pad
W·~·nds Pa:-tlal Pennanent Pole Pad
1320
1.078
003
0.02
Wl·OS
I
Wetland~ At· Grad~ Road
8,92.S
0.20
PP·ll
Wl·06
PP·l2
I
Wedanda Permane:1l Pale P.ad
s
1,3211
64,688
G
We Hands. P~rmanent Pde Pnd
ll.03
149
0.03
PMJ
s
Wetlands PcrmonentPol· Pod
Wetlands Pcrma11ent Pote Pad
PP·l4
PPlS
PP-16
PM7
PP.tB
PP·l9
PP-20
PP 21
PP-22
·
s
·
·
6
&
Wetl·nds At·G·nde Road___
1,320
l.32()
1,32(1
003
0.03
Wc.d-..nds Ponnanon t Pote- P~d
Wedands Perman~ntPoll' Pad
We danda Permanent Pole Pad
1,320
0.0)
1,320
1320
0,03
0.03
Wo!l;iindc- PPrtn.artU'nt- Poia Pad
1.37.0
003
l 320
1,32()
l 32ll
1.320
0.03
003
0.03
7.330
0.17
o.oo
AP~l.ANOf'.U.
2.
SMOOTHSIJ1:9GMOE. JOLEVEl.EU:VAtlOH ACROSS WI01l1
Of 1ff WIDE EASEMENT STAlllJZATIClN.
3.. INST!lt.tGRMIAAASU68.'.Sf (COORSC!SAND) l'TOll"
lltClPlACEE4$Cf~EKT STA81LIZ4TPH 8ECl.fl\IER, ~ R~
S. INSTAtl6"'PERFOftATB>GEOWE8A..,, f lLL'\\tTll Cflb..IStO
CONCRETE l ~Ff..l,..,. lle7 SIZE,
fl,
\IERIFY TOP Of'QEOWE&l$ Vll'frl'l' a'~
PRe.cON$'Ml.ICTION CONTOURS.
1.
8.
JiMSli TOP
r WITH atustiEO &TONIE SURFAct.
w.RK$t.>ES~ l &'~EAS£MENTS'iAel.IZ.\1~
WtlHP\IC
WETLAND IMPROVEMENT ATGRADE EASEMENT STABILIZATION
l>IAAKCRS-.AS NEOCCSS#iRV.
W1·07
pp.23
s
wettand1 Permane.itl'ole Pad
Wetl·nd1 PermMent Pole Pad
Wetlondl Pcnn·n~t POie Pad
Welland> Permanent Pole Pad
wetland> AL·G·.d· R··d
5
Wet land~ Pattial Perm.anent Pufe P;1d
95
Wl·08
4
Wetlands At·Gr.de Road
6,796
0.16
WeUond:.. P,ylfol Pcmnonent Po fC' Pot.f
t,080
o.o:z
We!Jand1Pennanent Pole Pad
Wctl<1nds At-Grade R6'1d
1,32()
648
10,138
13211
O.D3
0.01
3. HSTAU. GEOTOOILf ll"IJ!HC PA0\110..G t.t~MUM I.AP A$ Pfl\t.W4UFAC'NRER INS TAt.1.ATION tMSTJU.IC1K>rtS AT T\11! lAP ..cllMr.
0.23
··
0.03
5. (L£VAllOO Of: TOP~OOHCRrTl1 CEU.S $HALL MATCH El GfWE_ Wl.,,.,2" SOAS
Welland! Perman.mt Pole P.ad
W~tbnds Partlal Permanent Pole Pnd
l 320
0.03
851
0.02
SE IMfERNATIONM.
EROst:lNCOMTROI.
Wetlaf\ds Partial Permanent Pole eild
Wetlands Partial Perm>nent Pole Pad
844
1149
0.02
0.02
S'rSTEMSf:Oft
2
l
Wetlands At· Gtade Road
15,261
0.35
SS
0.00
0.01
PP-2S
PP-26
6
6
6
·
4
Wl·09
WI 10
PP·28
PP-29
l
Wo t l~ " dc- At· Grwdo Roold
3
l
We uand1 Perman·nt Pole Pad
pp.30
1
PP·31
PP-32
Will
PP·3S
PP·J6
?
PP.37
4
1
l
1
WetJ·f\d! Partl·I Po.rrn·nont Pale Pad
Wt!tland1 Part(lill Permanen1 Pole Pad
Watland> Pattlal Pe·m·nenJ Pol· Pad
TOTAL AREA
0.03
633
431
0.01
214,009
4.91
·t'
acre
384
Wm.ANO IMPACT SUMMARY (AREAS):
Area of At ·Grade Road
Area of Permanef't Pads
Are ii or P1irtlal Perm·nent Pole Pad
Area or New Struct"tJre~
TOTAL W f Tl,;.\NO IMPACT AREA
167 185
35,520
U,3().1
0.82
0.26
327
o.oi
214,336
4,92
THSSE:COOM FOR STAND AL~
~
1:!Q!f:1l.
I.
EXCA\/Aft INSTAiJ.Afk)N Ji/11.tiA TOA.DEPTH~ TO'llE n fC!(NE$$C#Tl11E CAel.tCONCAETL
2.
PU.Ct EASEMENT STM!l.UATIOH 8EOLIHER (GEOFAORI:). WIAAFI R~ HbH S'tRENGl H WOVEN GEOlEXlll..l f'N!Rt.:, Oft
APPROVEDEQUll/~NT.
hSTAlLCA!tl.E OONCAf'Y£ TYPE CC...SON TOP~ GEOfASf:CtCPfR MAHUr:AC1'\.JRER"S INSTAl.1.ATIONIN$1'RUCTIONS,
ro NOl l~I)( WAlEM FU>W.
CABLE CONOHETE.
Sf'ECIFJ:A1lONS
UPLAND IMPROVEMENT
AT- GRADE EASEMENT STABILIZATION
SHErr DESCRIP1ION
RIO PINAR - FGT EAST
TRANSMISSION LINE REBUILD
/(£'{ SHfFT
doi£1W NOTES
PUN NID EIEMOOH
CRClSS SEm1QN
/>8IJTllEN1' 1.AYOl/r
TFMPORARY BRIDGE
AllUTll£NT se:c:TIONS
ORANGE' COUNTY, Fl.
PREPARED BY:
BRIDGING sownoNS, LLC
PERMIT PU.NS
NOT FOR CONSTRUCTION
SIRUCTIJR£S SHOP DR1411'1HGS RI BE SIBM11TED 10:
ROWNX> CMS4. PE No. 7Jt91
t1RiDQINO 50U.ITTONS.
J.1.C
B 112 CffAMPIONS liDREST
r.wl'l4, FLDRIQA .:IJ~
""y
ro/dlldoflbrfdg/ng-aolutictrll.'COITI
/'Um PR£1W'IED /Jt';
llRIDGlfi(; sownoNs., UC,
8112 CffAMPIONS FOREST MY
7ll.W'll, F1.Dl'/JDl4 JJU:S
8t.J-767~
PH.
CER111'1CX1l: OF ~TION No.
HOTF::
~
THE~
OWlfJED
DUE
CJF THESE PVJtS M'IT H
THIS /TEN J"5 BEEN a..ECTRONfCILJ.Y SIGNED NHJ SOLED BY
l10UtNDO ~ 1£ ON _
USING 1' OIGITAL Sl(;N1'TIJR£
~ W 1HIS orx;rJMfJIT NfC NOr ~
SIGNlD /IND SE'N.LD IND TH£ SKNA1Vfl£ llUSr BC VERlf'/ED ON
l'RIN1W
.wr t:.J.£c:rlKJMc CQO'IE3:
~
SOLUTIONS c==.=:.:--
-
DUKE ENERCY Fl.ORIDA
RIO PINAA - FGT EAST
'TRANSMISSION UNE REBUILD
1 ·
B
GENERAL NQTF:S
6Qi£lW. SPEClf/CltTIONS:
srrc ~1'0N SHN.L BC f'fRFfJRMfJ) flt A~E" Wf1H
Gl.()'TECH#leAL REF!ORT Br PSI QA1f11 08/JO/r8.
Fl..ORJDll. DEPNmENT OF TRANSPOf(TATTON (FDOT) "!>l'IND4RO SPfXIRCA110/j$ FOR RCWJ AND BRIDGE
CON$11ill.)COON",
(2017) MID
SIJPPf.EllEN1S TH£RETr).
R.DRDA DEFWmAENr OF TIW/SPORrATION, 2me ~11"'1$ QCiClf18W
IN mE
SE.mEMENT.·
O£:jf(W 'SpmROIJJ(llS.·
ESTBQ.1F1J FrJUN()A.Tl()N St!1"llEJelT MU. BE'
Ii".
MSHrO 'l.RFt> 8RIDGE DESIGN !ffelft:A'OONS~ 7TH EDFT10N. iNCWDING AU. iN1ERltiS THE1l£TO.
fUJf«J/t OEPNmllBir OF T1Wll'IPCJRTATION ~ -
PESJ1iN
'; QUW 2016.
LCW§;
J. 111llCr< LIN(;:
:t. WIND LOAIJING:
Hl.-9J
.J$
- 0,4
PSF
- 1500,,,,,.
oc;1f;N llETtfJDg
ElfYi\UONS;
WAD RE'SIST'NICE FAcmR DESJGN (U(F?))
ltl.J. ElEVATIONS llUERRED TO J.641IOl'IW. G8XJ£DC
1- CCNCllE1E: AND CCNSTtrUEXr W..1ERfA/..S ~LL t.IEET THE ~ OF S£C1TON 3#1 AND c4()() or TH£
Fl.ORl£M ~ OF TTWe'ORTATKJN '5'TAN!Wi0 SP£CIFICl.TTOl6 FOR ROM MD BRDC£ CONSTRIJC11()N,'
(2P1T) NIO 5VPPi.E1ll£NTS THERaO.
FINAL Ii/IX D£S/Cl
r:AST-IN-Pt.N:E
1t'
MIDGIVC
!lOl..UT1rJNs,
J.LC FfJR ~ MtOlf
PBUAll!jQtZW
Riff:RENC£
STEA
~
t:l41IAll OF 11129 (NOO JQag),
1lfU5S:
PllOJE1:r SP£aFJC TF.r:HNICN.. SP£CW... PROrfSION
f()R
PREFABRICATf!J Sim. TRI/SS' RE.QUIREllENIS;
ro POURtNG
CONCfi£TC.
CONCRm S1B£$S§;'
CONCRETE /NfORMAnON TABLE
N
flEIN£QRgHtj
5500 PS/
3848 KSI
srm:
I. AU. RfJNFORCNJ Sim. SHALL B£ AS7ll, M16 filWJE IJO.
:t. AIL IJlllENSIONS PEF!rNNtm ro LOCATION OF' REINFORaNG smt ARE 1tl C£NTE1lLME OF 8ltRS EXIXPT WHERE
THE'. CLF.AR DlllENS/ON IS SHOWN 1D FACE OF' CONCRETE.
CONCRm COIJEll;
J-INCHES, IJNl.ESS NOTE$ OTliE1MSE.
'-4NCJl£S roR ~ S~cn' ~ J,CllN'ST CAfm!
~~"""to~~ :t~~~ ~~ IODfTIONIL
CONS1RUCnCN
CQN511il&1KJN M:!l§:
1. 8'CKRU. FUl.J.. ABi/1M£Nr H£JQ(T' PRfOR TO PUCENENT OF SUPERSTRIJCTURE.
:: $E1 ~ SOLUTIONS
BRIDGING!!'!!'='"""'
i:=.=:.r-·
-.-i:n
GENERAL liOTES
'
-·~---
~~
.
1
. .1
;
\fil~
\_~ lL
'
\ ~
I~h.
\
.
- - - - - --
----
rnf &__r <-~-=·_ r1·~e·
-
~I
-----~-
//.r f' P 1 '
\J ___ "'-:::-A 1______
----------------------- ------------
I ~),
:i:~
RIGHT'
.i
- - - - - - - - - - - - - - -·-1--.
(
7DJPCllAR'f
BRIDC£_1
I
..
-------------------------'---·- ----------
BEGIN 8RK1C£
FFBW ABUrlrlENT t
,90
90
f"REFN11/JCA1E:t> 7FJ,/1"0RIRY V£H/CUUR
S7l!Et TRUSS 8llJtX;C l1Y t,tABf.Y (OR £QtW.)
TOO' SPNt If 15'-11" lltl40llMY WAl)ffl
---------------------- wmi_srm..:_HECI<~~---·----[
75
BC
7$
70
EL£VAnON
~-··-1--0-
~
SOLUTIONS :=.:'"',.::'-
-
DUKE ENERC\' Fl.ORI.DA
PIAN AND ELEVATION
RIO PINAR - FGT EAST
'TRANSMISSION UNE REBU1LD
3 · 8
6-11" O/A 1RtJSS MD'lll
rs·-s· ctEAR RtWlllMl'
I
f COtmTNC11CN
Tall'OlllRr 8RIOC£
_!:_STEEl.
oo·
PREFNJRICATfJJ TDlf'OIW('f l£HICl.JUR
TRUSS BllrDQE 8Y 6WlfY (OR ~
SPAN-' 15'-8' RQIDlll\Y wrtmf
Wfffl S7ffl. r;:ttD;KBf
a..
(){r;;I(
I
U.P1 IJ£CIN SfflDCC
(EL IJ1. 10 END 8RIDGE)
'
I
I
;
0
I
~
.
~~-
0
~LU-~
I
·'"I
(EL 7~.13 Ell() BRf(Y;E)
_J
L
~1~
£1.. 1.J.92 BEGIN 8RIDG£
(£1... 12. ID EMJ i1RIUJE)
CROSS SECTION
SC/11..e - 1·-1·-11·
--
-
-· -·
re.:.=
- ..
-- "'
BRJDGlNG !!!=!'="""'
.... SOLUTIONS c==.=:.:--
Q.91\1
DUKE ENERCY Fl.ORIDA
RIO PINAA - FGT EAST
'TRAHSMISSKlN UNE REBUILD
=
1l'llA
-
.
CROSS SECTION
I
4 ·
B
~~·
~,
~
- - 1---.---r-
I
I
I
-- 1
l
{i I
I
I
I
l ~
;
I
l
~
I
I
I
I
I
I
},.
I
_.___.__L _
BeGIN fll(q)Q£
~
I
I
I
I
I
I
I
I
l
I
I
I
I
I
I
: -- -:---....~~~ -+
I
l
l
I
I
l
I
I
I
I
1-
--1
:ti
fll
J_
l ~
l
.I
~
I
:
L _ _ J_
~
~
_.___._
I
END BRilJGE
~~~~------------------------------~'00~~~0·--------------------------------~1~2
-· ......"
w.,
-
-
SOLUTIONS
:==-..=-- -
i\BUTMENT lAYOIJT
f;llO PINAi< - FGT EA5)'"
'TRANSMISSION UNE REBUILD
I
a-. a
EL
EL 78.7'
(ll.. 7.f;(IJ)
76.r.J
(El.. 7-1-PJ)
EL 75.87
.
(£1. 1;,.1U}
~I
.i")
a
72. ,7
(EL 70.:U)
·'...
EL 7.l.47
(U. 71.IU}
EL 73.tJ7
(fl. Tr.JU)
L.
_
_
J
EL 72.17
(U.
SECTION A-A
70.J~)
~_.__ _ .__ _ _ _ _ _ __ .
SECTION B-B
-··-··-
~ · r--r
-.e (J'IP;
,.,,.~
SECTION C-C
··-1·-a-
~
-~
-11o·-··-o·
~11111"
-~
a 11.75
(EL 14.SJ)
t.
~
j
EL n.rr..,
(EL 70.:H)
·'..,
~
."'
~
i
:s1·-s·
__ J
4~·~
I
SECVON D-D
!11::11£: ...... ,.-o·
BRJDGlNG !!'!=!='"""
.... SOLUTIONS :=!l'"',.::'-
DUKE ENERC\' Fl.ORIDA
RIO PINAR - F'GT EAST
"!RAHSMISSION UNE REBUILD
a .. a