Home

Jacksonville District

Run scraper

Duke Energy Florida

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Orange County. Duke Energy Florida, Tarpon Springs, FL. PROJECT PURPOSE: Basic: Electric utility infrastructure maintenance Overall: Replace steel and concrete utility structures, and install permanent, at-grade structure pads at utility poles located within wetlands in Orange County.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below: APPLICANT: Duke Energy Florida Attn: Wayne Richardson 101 Cemetery Road Tarpon Springs, FL 34689

WATERWAY AND LOCATION: The project would affect waters of the United States associated with Hydrologic Unit Code 0308010110 (Econolockhatchee River) and Hydrologic Unit Code 0309010101 (East Lake Tohopekaliga). The project site is located within the existing transmission line corridor in Sections 2, 3, 4, 6, 7, 17, 18, 19, 20, 29, 30, 31, 32, 33, Townships 23, 24, South, Range 31 East, Orange County, Florida.

Directions to the site are as follows: The project begins at existing structure RW-26 located 1500 feet northeast of the intersection of Faith Assembly of God Roadway and Curry Ford Road and follows the existing transmission line corridor 0.85 miles south, then east 0.46 miles then 1.95 miles south to existing structure RW-66-1. The project begins again at existing structure RW-89 located 0.42 miles south of the intersection of Highway 528 and Highway 417. From structure RW-89 the project follows the existing transmission line corridor southeast 2.48 miles, terminating at the FGT East Substation (13129 Wewahootee Road, Orlando, Florida 32832).

APPROXIMATE CENTRAL COORDINATES: Latitude 28.48724° Longitude -81.24412°

PROJECT PURPOSE: Basic: Electric utility infrastructure maintenance Overall: Replace steel and concrete utility structures, and install permanent, at-grade structure pads at utility poles located within wetlands in Orange County.

EXISTING CONDITIONS: Four wetland habitat types were identified within the transmission line corridor. The wetlands and surface waters within the project corridor were classified using the State of Florida FLUCCS (SJRWMD 2011) description and the U.S. Fish and Wildlife Commission (FWS) Classification of Wetlands and Deepwater Habitats of the United Stated (Cowardin 1979). All the wetlands found within the project corridor are disturbed with varying degrees of hydrologic alteration, have been cleared of natural vegetation, or have been invaded with exotic/nuisance plant species. There are no wetlands or surface waters designated as Outstanding Florida Waters within the project corridor. In addition, no portion of the corridor is located within State of Florida designated Riparian Habitat Protection Areas. These four habitat types include a total of 14 individual wetlands and one surface water that were delineated within the project corridor.

FLUCCS 510 (Canal) FWS: R2UBH (Riverine, Lower Perennial, Unconsolidated Bottom,Permanently Flooded) One surface water, a landfill canal, parallels the east side of the project corridor between existing structures RW-43 and RW-58. This canal flows north to the Azalea Park Outfall canal which then flows into the Little Econlockhatchee River. Within the project corridor, the northern portion of the canal is deeply incised and free of wetland vegetation and the southern portion of the project corridor has wetland vegetation along the bank. Common species within this area include Virginia chain fern (Woodwardia virginica), cattails (Typha sp.), Carolina willow (Salix caroliniana), sapling red maple (Acer rubrum), wax myrtle (Myrica cerifera) and torpedograss (Panicum repens).

FLUCCS: 630 (Mixed Wetland Forest) FWS: PFO6/7C (Palustrine, Forested, Deciduous/Evergreen, Seasonally Flooded) Wetlands J and K were designated as mixed wetland forest communities. This classification consists of forested wetlands in which neither hardwoods nor conifers achieve a 67-percent dominance of the crown canopy composition. These wetlands parallel the project corridor and primarily consist of cypress (Taxodium ascendens), red maple, Virginia chain fern, primrose-willow (Ludwigia peruviana), and blackberry (Rubus spp.).

FLUCCS: 641 (Freshwater Marshes) FWS: PEM1C (Palustrine, Emergent, Persistent, Seasonally Flooded) Wetlands 1, 2, 3, 4, 6, E, F, G, and I were designated as freshwater marshes. This classification consists of areas dominated by herbaceous wetland plant species with surface water present for extended periods during the growing season. Within the project corridor, vegetation within this classification includes maidencane (Panicum hemitomon), rush (Juncus spp.), broomsedge (Andropogon virginicus), water pennywort (Hydrocotyle umbellata), smartweed (Polygonum punctatum), dog-fennel (Eupatorium capillifolium), beakrush (Rhynchospora spp.), and coinwort (Centella asiatica).

FLUCCS 643 (Wet Prairies) FWS: PEM1C (Palustrine, Emergent Marsh, Persistent, Seasonally Flooded) PEM1Cd (Palustrine, Emergent, Persistent, Seasonally Flooded, Partially drained/ditched) Wetlands 5, H, and L were designated as wet prairies. This classification consists of areas dominated by grassy vegetation with shorter herbs and less water than a marsh. Within the project corridor, vegetation within these areas includes maidencane, yellow-eyed-grass (Xyris sp.), beakrush (Rhynchospora spp.), whitetop sedge (Dichromena colorata), water pennywort, coinwort, false-willow (Baccharis angustifolia), and broomsedge.

PROPOSED WORK: The applicant requests authorization to fill 4.92 acres of wetlands for the installation of transmission structures, geoweb at-grade access improvements (16- feet wide, pervious, unpaved and at-grade) and geo-web at-grade structure pads. AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: “Overall, the applicant has designed the project to have a minimal adverse effect on wetland resources. The proposed project was designed to replace 28 existing transmission structures in wetlands with 28 new steel or concrete structures. Structures within wetlands will be accessed on permanent access improvements. A temporary bridge will be constructed over the Little Econlockhatchee to avoid impacts to that surface water. Once the project is complete the bridge will be removed. There are no surface water impacts associated with the bridge. Over the long term, the access improvements within wetlands will provide for minimization of impacts to the wetland by providing a designated point of crossing. The point of entry of the structures within wetlands will be from the access improvements. The access improvements have been designed and located to have the least impact to wetlands. Deep pools of the wetlands were avoided, flow characteristics were maintained, and seasonal high water elevations were not altered. Access improvements and pole pads will be built at-grade and will be modified with geo-web and gravel design. No compaction will occur. Installation of temporary construction matting will be utilized to prevent impacts to wetlands during construction in those areas where access improvements are not proposed. Once construction is complete, the temporary matting will be removed. To prevent wetland impacts in adjacent wetlands, sedimentation and erosion controls will be installed and maintained during construction. ”

COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: “A Wetland Rapid Assessment Procedure (WRAP) analysis was also conducted for the proposed wetland impacts. The total WRAP loss score is -0.65 for the 4.92 acres of total permanent impact. To compensate for the wetland loss, Duke Energy is proposing to purchase mitigation bank credits in the FDEP and USACE approved TM-Econ Mitigation Bank (SJRWMD 4-095-84310-7 and SAJ-2001-07089) located in the Econlockhatchee River Nested Basin. This bank is state approved using UMAM and federally approved using WRAP. Duke Energy will purchase 1.01 State Freshwater UMAM wetlands mitigation credits to compensate for the functional loss of 1.01 units. Duke Energy will purchase 0.65 USACE Palustrine WRAP credits for the loss of 0.65. A preliminary Mitigation Bank Reservation Letter is provided in the submittal. A final Reservation Letter will be submitted upon agency approval of the UMAM/WRAP analysis and proposed mitigation credit purchase.”

CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area, which is defined by the project boundaries. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area. ENDANGERED SPECIES: The Corps has determined the proposed project may affect, not likely to adversely affect the Eastern Indigo Snake (Drymarchon corais couperi). Based upon review of the Corps and Service’s Eastern Indigo Snake Programmatic Effect Determination Key (dated August 13, 2013), the proposed project resulted in the following sequential determination: A (The project is not located in open water or salt marsh.) >B (The permit will be conditioned for use of the Service’s standard Protection Measures for the Eastern Indigo snake during site preparation and protection construction.) >C (There are gopher tortoise burrows, holes, cavities, or other refugia where a snake could be buried or trapped and injured during project activities) >D (The project will impact less than 25 acres of xeric habitat) >E (permit will be conditioned such that gopher tortoise burrows, holes, cavities, and snake refugia will be inspected before site manipulation of a particular area, and if occupied by an indigo snake, no work will commence until the snake has vacated the vicinity of proposed work) = NLAA. No further consultation was required. The Corps has determined the proposed project will have no effect on wood stork (Mycteria americana). The Corps completed an evaluation of the project based upon the US Fish and Wildlife Service (FWS) North Florida Ecological Services Field Offices Programmatic Concurrence for use with the Wood Stork (September 2008). Use of the Key for Wood Stork resulted in the following sequential determination: A (The project is more than 2,500 feet from a colony site.) > B (Project does not impact SFH) = no effect. No further consultation was required. Based on existing habitat types the Corps has determined the proposed project will have no effect on Florida scrub jay (Aphelocoma coerulescens). The proposed work occurs within the consultation area for the scrub jay. Following the Standard Local Operating Procedures for Endangered Species (SLOPES) guideline, no suitable habitat will be impacted by the proposed work therefore, the Corps determined the proposed project would have no effect on the Florida Scrub Jay. No further consultation was required. Based on existing habitat types and survey information, the Corps determination for the proposed project is “no affect” to the Crested Caracara. The proposed work occurs within the consultation area for the caracara. Following the Standard Local Operating Procedures for Endangered Species (SLOPES) guideline, no suitable habitat will be impacted by the proposed work therefore, the Corps determined the proposed project would have no effect on the Crested Caracara. No further consultation was required. The Corps has determined the proposed project will have no effect on sand skinks (Neoseps reynoldsi) and blue-tailed mole skinks (Eumeces egregious lividus). The proposed work occurs within the consultation area for skinks and, per the FWS guidelines, an oriented strand board coverboard survey was conducted. No sand skinks, blue-tailed mole skinks, or evidence of their presence was found as a result of the survey. Additionally, on March 30, 2017 the applicant received technical Assistance from the FWS supporting the proposed work will not impact skinks. Therefore, the Corps determined the proposed project would have no effect on sand skinks and blue-tailed mole skinks. No further consultation was required.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 4.92 acres of freshwater wetlands which ultimately discharges to the Econolockhatchee River and East Lake Tohopekaliga. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the downstream waters. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926, within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Brandon Conroy, in writing at the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926; by electronic mail at brandon.j.conroy@usace.army.mil; by facsimile transmission at (321) 504-3803; or, by telephone at (504) 321-3771 x11.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS COCOA REGULATORY OFFICE 400 HIGH POINT DRIVE, SUITE 600 COCOA, FLORIDA 32926 REPLY TO ATTENTION OF

Regulatory Division North Permits Branch Cocoa Permits Section

December 21, 2017

PUBLIC NOTICE Permit Application No. SAJ-2017-02778 (SP-BJC) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below: APPLICANT: Duke Energy Florida Attn: Wayne Richardson 101 Cemetery Road Tarpon Springs, FL 34689 WATERWAY AND LOCATION: The project would affect waters of the United States associated with Hydrologic Unit Code 0308010110 (Econolockhatchee River) and Hydrologic Unit Code 0309010101 (East Lake Tohopekaliga). The project site is located within the existing transmission line corridor in Sections 2, 3, 4, 6, 7, 17, 18, 19, 20, 29, 30, 31, 32, 33, Townships 23, 24, South, Range 31 East, Orange County, Florida. Directions to the site are as follows: The project begins at existing structure RW-26 located 1500 feet northeast of the intersection of Faith Assembly of Goad Roadway and Curry Ford Road and follows the existing transmission line corridor 0.85 miles south, then east 0.46 miles then 1.95 miles south to existing structure RW-66-1. The project begins again at existing structure RW-89 located 0.42 miles south of the intersection of Highway 528 and Highway 417. From structure RW-89 the project follows the existing transmission line corridor southeast 2.48 miles, terminating at the FGT East Substation (13129 Wewahootee Road, Orland, Florida 32832). APPROXIMATE CENTRAL COORDINATES: Latitude 28.48724° Longitude -81.24412° PROJECT PURPOSE: Basic: Electric utility infrastructure maintenance Overall: Replace steel and concrete utility structures, and install permanent, at-grade structure pads at utility poles located within wetlands in Orange County.

EXISTING CONDITIONS: Four wetland habitat types were identified within the transmission line corridor. The wetlands and surface waters within the project corridor were classified using the State of Florida FLUCCS (SJRWMD 2011) description and the U.S. Fish and Wildlife Commission (FWS) Classification of Wetlands and Deepwater Habitats of the United Stated (Cowardin 1979). All the wetlands found within the project corridor are disturbed with varying degrees of hydrologic alteration, have been cleared of natural vegetation, or have been invaded with exotic/nuisance plant species. There are no wetlands or surface waters designated as Outstanding Florida Waters within the project corridor. In addition, no portion of the corridor is located within State of Florida designated Riparian Habitat Protection Areas. These four habitat types include a total of 14 individual wetlands and one surface water that were delineated within the project corridor. FLUCCS 510 (Canal) FWS: R2UBH (Riverine, Lower Perennial, Unconsolidated Bottom, Permanently Flooded) One surface water, a landfill canal, parallels the east side of the project corridor between existing structures RW-43 and RW-58. This canal flows north to the Azalea Park Outfall canal which then flows into the Little Econlockhatchee River. Within the project corridor, the northern portion of the canal is deeply incised and free of wetland vegetation and the southern portion of the project corridor has wetland vegetation along the bank. Common species within this area include Virginia chain fern (Woodwardia virginica), cattails (Typha sp.), Carolina willow (Salix caroliniana), sapling red maple (Acer rubrum), wax myrtle (Myrica cerifera) and torpedograss (Panicum repens). FLUCCS: 630 (Mixed Wetland Forest) FWS: PFO6/7C (Palustrine, Forested, Deciduous/Evergreen, Seasonally Flooded) Wetlands J and K were designated as mixed wetland forest communities. This classification consists of forested wetlands in which neither hardwoods nor conifers achieve a 67-percent dominance of the crown canopy composition. These wetlands parallel the project corridor and primarily consist of cypress (Taxodium ascendens), red maple, Virginia chain fern, primrose-willow (Ludwigia peruviana), and blackberry (Rubus spp.). FLUCCS: 641 (Freshwater Marshes) FWS: PEM1C (Palustrine, Emergent, Persistent, Seasonally Flooded) Wetlands 1, 2, 3, 4, 6, E, F, G, and I were designated as freshwater marshes. This classification consists of areas dominated by herbaceous wetland plant species with surface water present for extended periods during the growing season. Within the project corridor, vegetation within this classification includes maidencane (Panicum hemitomon), rush (Juncus spp.), broomsedge (Andropogon virginicus), water pennywort (Hydrocotyle umbellata), smartweed (Polygonum punctatum), dog-fennel (Eupatorium capillifolium), beakrush (Rhynchospora spp.), and coinwort (Centella asiatica). FLUCCS 643 (Wet Prairies) FWS: PEM1C (Palustrine, Emergent Marsh, Persistent, Seasonally Flooded) 2

PEM1Cd (Palustrine, Emergent, Persistent, Seasonally Flooded, Partially drained/ditched) Wetlands 5, H, and L were designated as wet prairies. This classification consists of areas dominated by grassy vegetation with shorter herbs and less water than a marsh. Within the project corridor, vegetation within these areas includes maidencane, yellow eyed-grass (Xyris sp.), beakrush (Rhynchospora spp.), whitetop sedge (Dichromena colorata), water pennywort, coinwort, false-willow (Baccharis angustifolia), and broomsedge. PROPOSED WORK: The applicant requests authorization to fill 4.92 acres of wetlands for the installation of transmission structures, geoweb at-grade access improvements (16- feet wide, pervious, unpaved and at-grade) and geo-web at-grade structure pads. AVOIDANCE AND MINIMIZATION INFORMATION ­ The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: "Overall, the applicant has designed the project to have a minimal adverse effect on wetland resources. The proposed project was designed to replace 28 existing transmission structures in wetlands with 28 new steel or concrete structures. Structures within wetlands will be accessed on permanent access improvements. A temporary bridge will be constructed over the Little Econlockhatchee to avoid impacts to that surface water. Once the project is complete the bridge will be removed. There are no surface water impacts associated with the bridge. Over the long term, the access improvements within wetlands will provide for minimization of impacts to the wetland by providing a designated point of crossing. The point of entry of the structures within wetlands will be from the access improvements. The access improvements have been designed and located to have the least impact to wetlands. Deep pools of the wetlands were avoided, flow characteristics were maintained, and seasonal high water elevations were not altered. Access improvements and pole pads will be built at-grade and will be modified with geo-web and gravel design. No compaction will occur. Installation of temporary construction matting will be utilized to prevent impacts to wetlands during construction in those areas where access improvements are not proposed. Once construction is complete, the temporary matting will be removed. To prevent wetland impacts in adjacent wetlands, sedimentation and erosion controls will be installed and maintained during construction. " COMPENSATORY MITIGATION ­ The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: "A Wetland Rapid Assessment Procedure (WRAP) analysis was also conducted for the proposed wetland impacts. The total WRAP loss score is -0.65 for the 4.92 acres of total permanent impact. To compensate for the wetland loss, Duke Energy is proposing to purchase mitigation bank credits in the FDEP and USACE approved TM-Econ 3

Mitigation Bank (SJRWMD 4-095-84310-7 and SAJ-2001-07089) located in the Econlockhatchee River Nested Basin. This bank is state approved using UMAM and federally approved using WRAP. Duke Energy will purchase 1.01 State Freshwater UMAM wetlands mitigation credits to compensate for the functional loss of 1.01 units. Duke Energy will purchase 0.65 USACE Palustrine WRAP credits for the loss of 0.65. A preliminary Mitigation Bank Reservation Letter is provided in the submittal. A final Reservation Letter will be submitted upon agency approval of the UMAM/WRAP analysis and proposed mitigation credit purchase." CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area, which is defined by the project boundaries. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area. ENDANGERED SPECIES: The Corps has determined the proposed project may affect, not likely to adversely affect the Eastern Indigo Snake (Drymarchon corais couperi). Based upon review of the Corps and Service's Eastern Indigo Snake Programmatic Effect Determination Key (dated August 13, 2013), the proposed project resulted in the following sequential determination: A (The project is not located in open water or salt marsh.) >B (The permit will be conditioned for use of the Service's standard Protection Measures for the Eastern Indigo snake during site preparation and protection construction.) >C (There are gopher tortoise burrows, holes, cavities, or other refugia where a snake could be buried or trapped and injured during project activities) >D (The project will impact less than 25 acres of xeric habitat) >E (permit will be conditioned such that gopher tortoise burrows, holes, cavities, and snake refugia will be inspected before site manipulation of a particular area, and if occupied by an indigo snake, no work will commence until the snake has vacated the vicinity of proposed work) = NLAA. No further consultation was required. The Corps has determined the proposed project will have no effect on wood stork (Mycteria americana). The Corps completed an evaluation of the project based upon the US Fish and Wildlife Service (FWS) North Florida Ecological Services Field Offices Programmatic Concurrence for use with the Wood Stork (September 2008). Use of the Key for Wood Stork resulted in the following sequential determination: A (The project is more than 2,500 feet from a colony site.) > B (Project does not impact SFH) = no effect. No further consultation was required. Based on existing habitat types the Corps has determined the proposed project will have no effect on Florida scrub jay (Aphelocoma coerulescens). The proposed work occurs within the consultation area for the scrub jay. Following the Standard Local Operating Procedures for Endangered Species (SLOPES) guideline, no suitable habitat 4

will be impacted by the proposed work therefore, the Corps determined the proposed project would have no effect on the Florida Scrub Jay. No further consultation was required. Based on existing habitat types and survey information, the Corps determination for the proposed project is "no affect" to the Crested Caracara. The proposed work occurs within the consultation area for the caracara. Following the Standard Local Operating Procedures for Endangered Species (SLOPES) guideline, no suitable habitat will be impacted by the proposed work therefore, the Corps determined the proposed project would have no effect on the Crested Caracara. No further consultation was required. The Corps has determined the proposed project will have no effect on sand skinks (Neoseps reynoldsi) and blue-tailed mole skinks (Eumeces egregious lividus). The proposed work occurs within the consultation area for skinks and, per the FWS guidelines, an oriented strand board coverboard survey was conducted. No sand skinks, blue-tailed mole skinks, or evidence of their presence was found as a result of the survey. Additionally, on March 30, 2017 the applicant received technical Assistance from the FWS supporting the proposed work will not impact skinks. Therefore, the Corps determined the proposed project would have no effect on sand skinks and bluetailed mole skinks. No further consultation was required. ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 4.92 acres of freshwater wetlands which ultimately discharges to the Econolockhatchee River and East Lake Tohopekaliga. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the downstream waters. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926, within 21 days from the date of this notice.

5

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Brandon Conroy, in writing at the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926; by electronic mail at brandon.j.conroy@usace.army.mil; by facsimile transmission at (321) 504-3803; or, by telephone at (504) 321-3771 x11. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto 6

Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

7

'" Corp

J

I .

I \

\

Begin Project

11m:1e Counly ler Treli1rnen1

Fa:: 1hty

\

l~Rcl I/)

iS

...~

I

"' " ""' 0 .:rt

I

o<' 'IN 4\\'I) <:-0

'Y

,<:-

B It\'\

mrm"C

Oraf\JQ Couitv

Coni..r

Lard fill

it

~

Wi'1e JIPt S11 mp

/ '''

1-

~ (>

00

~t

~

'

-j:I°"

®

@>

End Project: FGT East Substation

~ ~

( 2

I i: < ~

·

'

w-.ahootee Rd

I~~~::::::::::::::::::.............:~;,;;...:.;..........."":'~:"::':~::':"';::':""'................................~:::::!·soo!E:::::::s~ooo~ C*cbh'Mt:StarlMCOW.Of'l'lelihOM~ltytot dalO

(1. Stantec

aiwi.d li\ -.Ctonlc: tcoimot. IMN>C~t~ts lJ l ~,..,kwY~IMOCCU10C1ond ~solll'ledolo. fM.~I~

stoni..c.llsol'lc«l., emploof-.COl'lflllkln.bO'ld

OQe""'- hoMOl'l}'Ofld otldc:i~ot fng ~Otl)' ~ tom tie cotll·nl otptOIWiton ol hdoto.

Rio Pinar - FGT East Transmission Line Rebuild Proi·ect O range C o u n ty Flo rida FIGURE 1 - PROJECT LOCA TION M AP June 2017

N

s1on1. c eoruuffino ' ·"'rn1nc. 300Prirnera 81vd. Sl.ite300 "''· ""'"' fl327'6 .':!~~~

@ ""'"""'

....

ProjectC«l1Clor oi..e 6'1ef9Y, 2016

mage1y ESR1. 2013

Page 1

lCJke Underhill Rd

J

I .

Ro Pinl:'r ~ Countl) Club

m ~

I

RC World

I

Begin Project

!:.)

::

~

)\

( 'r nge County vV tm Treatmen t Fae fo}

\

\

Eaat.vocxl Goll Club

I

LLC

\

c

Alafoya Tr/ 8

Cu·ry Ferd R

Po~·e

St

.

86 ft

Lutf

Orange Co univ Landfill

- 528- TOL~ E

&

1SR ·52 8

10~\;

- ® -s eachl ine·Ex py------sR-52

:'l'l

End Project: FGT East Substation

lnnovctlon

P.looe ORI

W~-c ~ffe B11:je

Tranil·tors

CJ,, Sta ntec

C*clah'Mt: StanMCOUlll'MS llO,.~ltytotdalO aippled ~ .-ClrOl'lic: bffl'IOI. JM N>Clpi.n.t occ.pts ll l ~~l

Stoni..c. llsof'lc.M, eMPIO'f-,COl'lli1111a!\ha'ld OQefltt, hoM Ol'l)'Gfld otlebl'nsot fnQ ~ Otl)' _ ,

tom r1e cotll·nt otp«Witon ol h

doto.

Rio Pinar - FGT East Transmission Line Rebuild Project Orange Cou n ty Florida FIG URE 2 · QUAD MAP June 2017

2500 S.tonlec Comultif19 $.eMc:e~ h:. 300Prirnera 81vd. Sl.ite 300 lokeMory R.327'6 tel 407. 710.3364

'"'""'.sas.01sa

@ N

sooo

!!!!!!!!!!iiii--!!!!!!!!!!!!!!!~

Rele..,....

....

°'*

Project c.ornaor Etlef9Y, 2016 lmagef'y ESRl. 2013

Page 1

(I DUKE

~~ ENERGY. RIO PINAR TO FGT EAST RW 69KV TRANSMISSION LINE EASEMENT STABILIZATION CONSTRUCTION DRAWINGS THOR/ORACLE: 2098T1 I 30000386 (WETLAND IMPACTS ONLY)

BEGIN SECTION 1

STR: RIO·PINAR SUB PROJECT START LAT. 28.541013° LONG. -81.253502" STA=(O+OO)

1. FLOOD Zt*E INfORM1'1ION BASEO OH1HE ORAHCif COUNiV. FLORIDA FLOOD !~SURA.Ha MTE MAPS MAP NUMeUt tl<>!tSC0455f MAP'NIJM6[ft12095C04Sl5FMAP NUMBER U09SC0270f

MAPHUMSEll l2095C0290J

2. APPi 1CA84i FU>OO l0H £ OEUh'£ATK)N.$ FllnHt: AflOVE Ri.:fUl{NCI-)) FLOOD INSURANCE RAlf MAPS ARE AS fOLI OWS:, ZONE A ARCA SUBJ£CT TO 100.YCNl fLOOO Pt.Uf

20NE AE

/.AfA WITHIN lllE lOl>YEAA FLOOD "AIN

1.0NE le

ARtA CKJT51Di: TI-tl 1,00.VEAR f'l.000 P\.AIN

D\IG. R\r/~200

R\14201 R\10202 R\14203 R\14200 R\14205

END SECTION 1

R\14206 R\14207 R\r/4208

R\14209 R\14210 R\14W R\14212 RIJ4213 R1,<421· R\14215

BEGIN SECTION 2

STR: RW-131 PROJECT END END SECTION 2 LAT. 28.427733"

DESCRIPTION COVER, KEY MAP & INDEX GENERAL NOT ES EASEMENT STABILIZATION PLAN VIE\/ EASEl'\ENT S Tl\BILIZAT!O ~ PLl\ll VIE\/ EASEMENT S TABILIZATION PLAN VIE\/ EASEMENT STABILIZATION PLAN VIE\/ E4SE.,EMT STABILIZATION PLAN VIE\/ EASEMENT S TABILIZATION PLAN VIE\/

I

EASEMENT S TABILIZATIDN -P LAN V IE\I

E E E E

STABILIZATION PLAN VIE\J ""rn'"" ~ "= ST/>JULIZP,TION PLAN VIE\/

S TABILIZATION PLAN STABILIZATION PLAN S Tl'JllLIZllTION PLAI" EASEMENT STABILIZATION TYPICAL

VIE\J \/IE\J VIE\/ SECTIONS

...... , ..... flP", Ji ,

LONG. -81.194298° ---11---l~~~~~~~ STA=(542+90)

f.ASDIEl(f $ AIJU2-'T IDI

IUD

P1)fd

TO r<'iT U l f

(,fl(V J111!t411($s:JO' U llE

R\14200

CONSTRUCTION NOTES I.

STOCK PILES OF DREDGED OR EXCAVATED MATERIAL SHAL BE PLACED IN THE UPlAND AREAS OUTSIDE THE FLOODPLAIN WITH SEDIMENT CONTROLS OOWN SLOPE OF THE AREA.

2.

AL.L EXCAVATED MATERIAL FROM WETLANDS ANO LOW WATER CROSSINGS SHAL.L BE REMOVED FROM THE JOBSITE ANO DISPOSED OF AT AN APPROVED LANDFILL. All UPLAND EXCAVATED MATERIAL MAY BE SPREAD IN UPLANDS AND SHALL BE COtrrAINED OUTSIDE OF FLOODPLAINS AND WETI..AND AREAS. UPLAND SPOIL MATERIAL SHALl BE STABILIZED AND ALLOWED TO REVEGHATE NATURALlY.

3.

CONTRACTOR SHALL SEED, STRAW AND TACK UPLAND GRADES WITI-llN 3 DAYS OF DISTURBANCE.

4.

NO WORK SHAL.l COMMENCE PRIOR, TO A SCHEDULED PRE-CONS~UCTION MEETING WITH DUKE ENERGY. AFTER PRE-CONSTRUCTION MEETING, NO WORK SHALL COMMENCE PRIOR TO INSl ALLA TION OF THE BMP'S PER THE SW PPP.

..

,,,, ,,._

. ..

·~ ·

I,.,.

RIJ42 01

~POUTO

Htrf:StA.l.1.11) ~POUTO

HMMO\l!D W!:'ft.A!olOMCAS DUKE ~EAGY F\.ORl:>A EASEMENT

ACCUSl'tOUT! PAOPOHOGAn. A.NOft)ft, tNce:

Al.OR.A.OE EASEMENT STA81LIZA.nott wnv.HOS WROVOt£'fT ,U.QR.A.De aA.slME.NT STA811.RADOH UPv.NOS

--

AT.ORA.De POU: PAD W!T\.AHOS IMPllOVl!MENT

A.ToQRAOE "°'-E PAD UPLAHOS ..PROWMENT AT.ORA<>! POU PAD PA.ltTIAL UPt.NIOS & WiT\.ANOS IMPROVEMENT

-

~ ,.............. -

14.4 -

LOWWATlllCROSSIHG (CA.all OONCMT!) Pft()ft()Sl!DTOIP. 8R.DGE WA.TVt Of'nt AT SU.SOfW. lCH WA.TiR ftlltOPOIEDOAAOE vasnHGGftA.D!

Ct"COHTOUltSl SIASOHAL. lCH WATfAl.l!fE 'EMA.1-.Vu.R P:L.000 Pl.MN l.IHI

... ""'

,,.,

N'

i" 9...

...31: a: .......... ......= !!!. ,.. ... ... 0 N

...... !!!. ...z 11111

N

en

::::J :z:

=

!$

::E

=

u

=

::E

I I I

I

...z

:::; i = u

. E

I

! I

=

::E

i

i !

LlGCND

I

~POUTO

IH!trf:StAl.1.11) ~POUTO

el!RIMO\l!D

di

~

~

. ..

W!:T1..A!ilOMCAS

nno BOOC

"""

DUKE ~EAGY R.ORl:>A EASEMENT

Al.ORA.OE EASEMENT

S'l'A81LIZATtOtt wnlAHOS WltOVOt£'fT ,U.QRAOe: eASiME.NT STA811.RAnoH UPv.NOS

--

AT.OR.A.OE POU: PAD Wnt.AHOSI MPA.OVl!MENT AToQRAOE POU PM'

ACCUSl'lOUT!

PAOPOHOGAn. ANOft)ft, tNte:

-

~ _,.............

UPLANDS ..Pfl<>WMENT

AT..CRAO!!i POL! PAO PAltT\AL UPt.NIOS &

WiT\.ANOS IMPROVEMENT

-

74.4 -

LOWWATlllCA.OSSING (CA.all OONCMT!)

PftOPOS!D T'[MP. 8R.DCE WATVt Of'Ttl AT SU.SOMAI. tcH WATiR

ftlltOftOIEOOAAOE flCISnNGGftAD!

Ct "COWTOUltSl SIASOHAl. lCH WATfJtLl!fE

"""""'° " ...,,,._.ci l'llLM!!J(ACl.J'NlS. "ll#lft"-"

ST.tell1l"1ION QltQl')lt\l{,.!IJ ><:U

''"'~·m HU. MU,CKlfij

......

.

>1.>0

.............. .,,. S_,,,Ctvf((S $TRVC'IU!itU

RW·26 146-60

a

STAt>U l.\'ID Rm PllM 10 r GT UST

f.ASOO(T

HIV T11Hi'SMl$SIO' U ll(

' EMA.1-.VIE.AR

P:L.000 Pl.AIM l.INI

R\.14203

J

GP LANOHOLOERS-ORl.ANOO I U C PARCEi. 10 07-23'11""""°"""

'

·'

c;; ~

; a:

...:z:t; en ...... !!!. ...z cwt

::J

I

:z: u

i

iii'

> 0

Ill

......c !!!. ...""z ::r :z:

i

l lG[N() ~POUTO

IHtdtAlLIO ~POUTO

81!MM0\11!0

Wf!l'l.A!ilOARCAS DUKE ~ ERGY R.ORl:>A EASEMENT

ACCUSlll

...,.,.,....."'

AT.ORA.DE EASEMENT

STA81LIZA.nott wnt.AHOS AT.OR.A.Oe eASiME.HT STA811.RADOH UIP~NOS

...,._,.

AT.OR.A.OE POU: PAD Wnt.AHOSIMPROVl!MENT

AToGRADE "°'-E PM UPLAHOS ,.PROYEMENT AT.ORAO~ PIX! PAD

PAOPOUDGA~

PAltllAL UPl.AHOS &

ANO!'Oft,tNte:

WliT\.AHOSI MPROVEMENT

~

LOW WAT!R CROSSING (CA.all OOHCM:T!)

ftttOPOS!DTOIP. 8R.DGE WATVt OflPT'tt AT SU.$0MM. HDH WATiR

fttltOftOIEOOAAOE

........-----

!Xl$TIHGGftADI!

-

SIASOHAl. lCH

14A-

Ct "COWTOUltSl WATfAl.l!tE ,l!MA.10l).V£AR nooo Pt.MN UNI

WflV>il.01'()

..,,.. .,..... M

""""""'' "''

l'fltNl'f,

..,. ,,,..

nu.-r"'i

M>

c;llr(,,ot)'\Vl;ll,lktl

..,

kll#:!tJlrC-0!-li

S¥VCto""l~

.,,,,, ""M"""" nrucn.ui:t.:

,,_y

f.AU)O(I STAtlU l.\11Dt

Rm PllM TO r GT U ST

"""'

HKV T11#1SMl$s:IO' U llE

'~ '

R\./4204

;g

ii 0

...... ...... !!!. ... !:

N

""ac=-

Ill

...:z: "'...... !!!. ..."'z t;

co

...:z: u

!C

::r

::E

:z: u

!C ::E

iU > 0

Ill

......c !!!. ...z co

:::r

:z:

.l u I

I l i ' I I

i

. l

LfGCND ~POt.ETO

IH!mtM.1.11) ~POUTO

81!MMO\l!O

W!:'ft.A!olO MCA.a DUKE ~EAGY R.ORl:>A

EASEMENT ACCUSl'lOUT! PAOPOHOGAn. ANO!'OftPCNce:

Al.ORA.OE EASEMENT stA81LIZA.Ttofrf wnv.HOS WltOYOt£'fT ,U.QR.A.De: e.A.slME.NT STA81LRATtOH UPv.NOS

--

AT.ORAOe POU: PAD Wnt.AHOS IMPROVl!MENT AToQRAOE POU PM'

~

_,...........--

UPLAHOS ..PROWMENT

AT.ORAO!!i POL! PAO PAltT\AL UPt.ANOS & WiT\.ANOS IMPROVEMENT

-

74.4 -

ATTI!~IS OlllE<:n:OTO N(Ul;fntAl niUEPWIS

-YltA.VtllCNAl.Jl"ID W!Ultv ·l'llOtlUCllON.'"'5

LOWWATIACROSSIHG (CA.all OONCMT!) PftOPOS! D TOIP. 8R.DCE WATVt Of,TtlAT SU.$0KAI. HGH WA.TiR

ftftOftOIED OR.ADE l!XISTING GftAD!

K6Tllf CO!UClfllfO '11'1

0

ntlMUO("CJ·lllOVlt. S7~'1Ai1Qt.I

QllQt)O:t,lt,.{!Jk:t)

""'"""

fw.JAoU~fli

\"'tUCtuQ:U

Ct "COHTOUltSl SIASOMAL. lCH

WATfJtLl!fE Fl!MA.1-.VIE.AR

P:L.000 PLAIN l.INI

R\o/4205

iii'

ii 0

...... ...... !!!. ...z

..,

Cl

N

·tu

Ill

a:

...:z: ...... !!!. .......z

co

Cl)

::::.

:z: u

!C

::r

::E

:z: u

!C :E

;::Cl

.., N

iU > 0

·...... a:

Ill

...... !!!. ...z

::r

:z: u

!C

c

!!!.

...z OI

co

:::r

:z: u

!C

::E

:E

LfG[NC> ~POUTO

IH!mtALLIO ~POUTO

HROIO\l!O

. ..

W!:Tl.A!llOAltCAS

nno

BOOC

"""

>-->------+------< ~ f--+------f-----1

di

~ ~=====l==:::::::::1

DUKE ~EAGY R.ORl:>A

EASEMENT

ACCUSl'lOUT! PAOPOHOGAn. ANO!'OftPCNce:

Al.ORA.DE EASEMENT STA81LIZATtOfrf wnlAHOS

-WltOVOt£'fT

AT.OR.A.De: e.A.slME.NT ST"81LRATtoH UPLANDS AT.ORA.OE POU: PAO Wnt.AHOSIMPllOVl!MENT AToQRAOE POU PM'

UPLAHOS . .PROWMENT

AT.ORAO!!i POL! PAD PAltT\AL UPt.ANOS & WiT\.ANOS IMPROVEMENT

~

,,.........---

74.4 -

*l'-11 -.:~:;IC AC.~(l>.:.;tl:.OC.:~

L&NWATlllCROSSING (CA.all OONCMT!)

PltOPOS!D TOIP. 8R.DGE WATVt Of'Ttl AT SU.SOMAI.. tcH WATiR

ftlltOPOIEDOAAOE vasnNG GftAD!

Ct"COWTOUltSl SIASOHAl. lCH WATatLl!fE 'EMA.1-.Vu.R P:L.000 PLM NU NI

·JI Nl111:,>i..'.; "K.IS

"

,;,~·'"" "°'''" b"muu.- Ott

.~1·

.

SW»

'")!Id/,. .It! \ IJ\1lf~0

"""

~llt\t.

~~

)

Jltl:.O

"' ~'i ,A4.r.;i. ~l"'-r.-lS!l ~

R\o/4206

":-''

{ UE HOLOINGS-4 UC LID

.. ·

~9-23-31 ·1775-02--0 11

~1

~L..- ~

lfG[ND ~POUTO

el!t«S'TA.1.llO ~POUTO

81!MMO\l!O

. ..

nno """""""...,.,. di

WEl'l.AJilOMCAS BOOC

DUKE ~EAGY R.ORl:>A

EASEMENT

~

ACCUSl'lOUT!

~

PAOPOHOGAn. ANO!'OftPCNce:

Al.ORA.DE EASEMENT stA81l.IZATtofrf wnlAHOS WltOVOt£'fT AT.OR.A.De: eASiMiMT STA811.RAnoH UPv.NOS

--

AT.OR.A.OE POU: PAD Wn\AHOS IMPROVl!MENT AToORADE "°'-E PM

UPLAHOS ,.PROYEMENT AT.OR.AO~ PIX! PAD PAlt11Al UPt.AHDS & Wil\.AHOS IMPROVEMENT

~

........----

14A-

W\h.·l·CHO

lOWWATIACROSSING (CA.all OONCMT!) PftOPOS!D T'[MP. 8R.DGE WATVtOf,TtlAT 11.ASOMM. tcH WATiR ntOftOIED OR.ADE l!Xl$TINGGftAD! "eotn'OUltS) SIASOHAL. lCH WATfALl!fE

c1

' £MA10l).V£AR

P:LOOD Pl.MN UNI

AQ:O'J.ft-'C' nu.N':u-1 ,.q~AOS

fllLJUtNM;J«OIJIL ltAIU!Al!OM I "'''""' .rcu.u;TI.iRH Nl....U:O lll NU>.;Km)·

ltltUCTlJlt£$ flllNt(rfril,IQ· .11111JC:l01tl'l

J

001 0

lfGCMC> ~POUTO

81!td'TA&..Lf0 f'RAH.!MSSIOH POLE TO IU!RDIO\l!D

di

~

~

. ..

Wf!1'1..A.HDMCAS

...,.,.

nno BOOC

DUKE Bl ERGY Fl.ORf)A EASEMENT ACCHS llOUT! MOPOUDGA~

ANO!'OR, tMta

Al.ORA.DE EASEMENT

........"""""''" .,.......,.

stA81LIZAltON wnt.AHOS o\T.ORA.Oe: EASlMEHT STA81LRATlOH UIPV.NOS

AT.ORAOe POLE PAD Wnt.AHOS IMPROVEMEMt AT-GRADE "°'-f PAD UPLANDS ..~MENT AT..CRAOl!!Jl'Oc.! PAD PAlt11AL UPlAHOI & WliT\.AHDSIMIPROVEMEHT

~

............---

14A-

LOWWATIRCROSSING (CMLl!COHCl'tt:T!) ~se:orn-P.

8Rl>GE

WAl'VtOflPntAT SIASONM. lGH WATiR PttOftOIEDOAAOE l!Xl$TIHGGftA.DI! C1 "COWTOUltS) SIASOHAL. lCH WATfltLl!fE , E:MA.11»-VIE.AR

' L00D Pl.MM UNI.

,,.

'""""'' ' ..,,,,._.,, "ILM!f.J(ACl-l'MS.

0

r>U.-.itt"(-"'Cj.Jl'O<.llC

-Sllllll11"1'1t'W. Ql!Vf)<\l(.!1,1"!1:,)

'"'"""'

tlU.MU.Cs.Qtlj

Slfl\ICf\.llUS

"''""""''"

$Tll\IC'IUl(U

0

0 0

0

''11,,~SIO~l\\'

,,,,

-....:..."":-"'..:R\o/4208

i' 0

....... ...... !!!. ...... ID

.... 0

N

Coll

z

:z

z:z

:::;

ID

!:i

a...

:ii:

c.:t

:&

LlGCND ~POUTO

IH!mtAl.1.11) ~POUTO

el!RIMO\l!O

W!:'ft.A!ilOAltCAS DUKE ~EAGY R.ORl:>A EASEMENT

Al.OR.A.OE EASEMENT STA81LIZATtOtt Wnl.AHOS

--

WROYOt£'fT ,U.QRAOe: eASlME.NT STA81LRAnoH UIP~OS

AT.OR.A.OE POU: PAD Wnt.AHOS IMPllOVl!MENT AToQRAOE POU PM'

ACCUSl'lOUT! PAOPOHOGAn. ANO!'OftPCNce:

-

ftlltOftOIEOOAAOE

_,...........--

Ct"COWTOUltSl

~

UPLANDS . .Pfl<>WMENT

AT..CRAO!!i POL! PAO PAltT\AL UPt.NIOS &

WiT\.ANOS IMPROVEMENT

-

74.4 -

W£TiNiO·OI LOWWATIACROSSING (CABLI OONCMT!) l"ttOPOS!DTOIP. 8R.DCE

A.CD..Wto!Jtl:J

.....

RU .t.ReA(AQ·PAO$ 033 "U.4!'.All'CJ-COUlt

!>(-1.AOON QU(.lf~ll(V<.!l.lt'U

WATVt Of'Ttl AT SU.SOMAI.. tcH WATiR

vasnNo GftAD!

SU.SOHM. tCH WATfALl!fE 'l!MA.1-.V!.AR P:L.000 Pl..M N l.INI

IH.CJ'JiillO fU,i.1(£~~..,,....

S!flUCtlJ-K$

·-·~· Sl$1UC1ll ltf-S

·'"'"

i' 0

...... ...... ..,!!!. ... :z ID

-

"" w

...

:; :z:

!i:E

:E

~

:z:

u

~

LlGCND ~POl.ETO

IH!trf:StAl.1.11) ~POUTO

HRIMO\l!O W!:'ft.A!ilOMCAS

Al.OR.A.OE EASEMENT STA81LIZATtofrf wnlAHOS

--

WROYOt£'fT ,U.QRAOe eASlME.NT STA81LRAnoH UIPv.NOS AT.ORAOe POU: PAO

DUKE ~EAGY F\.ORl:>A EASEMENT

ACCUSl'tOUT! PAOPOHOGAn. ANOft)ft,tNce:

W!T\.AHOS hlllPllOVEMENT

AToQRAOE POU PAD

~

PftOPOS! D T'[MP. 8R.DCE WA.T Vt OflP'lttAT SU.$0KM. lCH WATiR

,..............

ftlltOftOIEOORAOE

-

SIASOHAL. lCH WATfALl!fE

UPLAHOS . .PROWMENT

AT..CRAO! POlf PAD PAltTIAL UPt.ANOS & Wil\.ANOS IMPROVEMENT

WtflAhlOIO

LOWWATIACROSSIHG (CA.all OOHCMT!)

14.4 -

vasnNo GftAD!

Ct "COHTOUltSl

AO:~ACI

fill Mf,l(A.Cl-l'Nli "~ #Oft("(.CJ-«c>Jf( $fl&i-,1l"1~

.

.,,.... 0'4

"""""' ·

Ql1QH».i<;!U"1U f tUM!"Aj)Vt,.

S*°C-!Ulti:S

...

..,.,...,.,...,. 00000 S!INClU~U

STAt>U l.\'ID RIJ PlliWt 10 r GT UST

fASf)O(T

HIV TIIHl!SMl$s:IO' U ll(

Fl!MA.1-.VIE.AR

P:L.000 Pl.NM l.INI

RIJ4 2 10

i' 0

...... ...... !!!. ...... :z ID

CD

in

... E

... =

:::;

=

u

=

= ::&

::&

~

...N' N

0

"' ...cc=-

1111 Cl:

...!!!.... ...... E ...

...!!!. ......,..... z

CD

=

::r

::&

::&

=

u

u to-

=

Cl:

LfGCNC> ~POUTO

IH!mtM.1.11) ~POUTO

el!RIMO\l!O

we:n..uio MCAS DUKE ~EAGY F1.0Rl:>A EASEMENT

..."""""'"

Al.ORA.OE EASEMENT

STA81LIZATION wn\.AHOS AT.OR.AOe aA.SlMENT

STA&ll.RATK>H UIP~OS

.....ovooa

AToQRAOE POU PM'

ACCUSl'lOUT!

-

ftftOftOIEOCAAOE

_,...........--

Ct "COHfOUltS)

~

UPLAHOS . .Pft<>WMENT

AT..CRAO! POlf PAD

PROPOHOGAn.

PAltT\AL UPt.NIOS &

ANOi'ORP:tN<:e:

WiT\.ANOS IMPROVEMENT

-

1·.4-

Wffl.A'

L<:HtWATlllCROSSIHG (CA8LI OONCMT!)

PttOPOS!O T'[MP. 8R.DCE

A<7~N~ · IAC

Rlt ~f:'(ACJ.f'JC ~IU l'«~Jo«0\11

ST.le!UZAJIOI UITUt~l!>JCIUKU

WATVt Of'Ttl AT SU.$0KM. CH WATiR

lt.sT.ltt.H flU.JWt':AiW'

vasnHo GftAD! SU.SOHM. tCH WATfALl!fE 'l!MA 1·VIEAR P:L.000 Pl..M Nl.INI

. ...."'.. .,..,..., 3

'

AW-102

415S+-99

'

""" ..... """ ...,....,"'-' ,..,.

RW·109

S'INCTV~E

S'll\IC lURf

..._. ..

,,,.'i&l.W=;.;....--1.!!""~µ!g!...I _ _ _ ,_ Cl

f.ASOO(T STAt>U l.\TIDt lllJPl:N.wt10rGTUST HIV Til#fSMl$S!O' U llE

RW-42 11

i' 0

...... ...... !!!. ... :z ID

....

CD

... a!

... = ~

::;

= ~

u

:::E

:::E

I I I

LfGCND ~POt.ETO

IH!mfAl.1.11) ~POUT'O

el!RIMO\l!O

W!:T1..A!ilOMCAS

..."""""'"

Al.OR.A.OE EASEMENT STA81LIZATION wnlAHOS AT.ORAOe EA.SlMENT STA&ILRAnc>H UPI.ANOS

-ovooa

AT.ORAOe POU: PAD DUKE 91 EAGY F1.0Rl:>A EASEMENT

Wl!T\.AHOS IMPllOV!MENT AToQRAOE POU PM'

ACCUSl'lOUT!

UPLAHOS . .Pft<>WMENT

AT..CRAO!! POlf PAD PAOPOHOGAn. ANOi'Oft,tNce:

PNtllAL UPt.NIOS &

WiT\.ANOS IMPROVEMENT

-

fllltOPOIEOCAAOE

-

l!XISTIHG GftAD! Ct "CONTOURS) SU.SOHM. tCH

~

........---14.4-

LOWWATIJ\CROSSING

(CA8LI OONCMT!)

PftOf»OS!OTCMP. 8 1tDCE

WA.T Vt Of'Ttt AT SU.$0KM. CH WA.TiR

WATERLl!fE r-t MA. 1-.VEAR: n.ooo Pl.MN l.INI

i' 0

...... ...... !!!. ... :z ID

0

en w

N

... =

~

::;

= ~

u

=

::&

::&

LlGCNC> ~POt.ETO

IH!mfAl.1.11) ~POUTO

el!RIMO\l!O

W!:'ft.A!ilOAltCAS DUKE ~EAGY F1.0Rl:>A EASEMENT

Al.OR.ADE EASEMENT

STA81LIZATtOtf Wnl.AHOS

--

WROYOt£'fT ,U .ORAOe aA.SlME.NT STA811.RAnoH UIPv.NOS

AT.OR.A.OE POU: PAD Wl!T\.AHOS IMPllOV! MENT AToQRAOE POU PM'

ACCUS l'lOUT! PAOPOHOGA~

ANOi'OR P:tNce:

-

ftftOftOI EOOAAOE

_,...........--

Ct "COWTOUltSl

-

SIASOHAL. lCH

~

UPLAHOS ..PROWMENT

AT..CRAO!! POlf PAD PAltT\AL UPt.ANOS & WiT\.ANOS IMPROVEMENT

14.4 -

wrn.~10

LOWWATIACROSSING (CABLI OONCMT!)

PftOPOS!O T'[MP. 8R.DCE WATVt OflP'nt AT SU.SONM. CH WATiR

vasnHo GftAD!

WATfALl!fE Fl!MA10l).V£AR P:L.000 PlM NUN!

AC:llfAGf'.llll/Rf.r.(,4().#A()S. tl''.L/oJol'l'-1.-C~OUtl

srAl!WAllON

01Y O,.SlRVCIU'U IN$1..U.(0

FUMfAl,On··

11110CfUltt$

,..u, ..-,1u~.rr.c:>· SlllVCIUUS

...,,.' OJ$

'

,,..,

·RY4213

i' 0

...... ...... !!!. ... :z ID

...

N N

...z N

:::i

:::i

=

!C

=

=

u

:::&

:::&

N

z 0 i:: u

...en

... i!E ...

.... 0

...z 0

=

=

:::&

lfGCND ~POUTO

IH!trf:StAl.1.11) ~POUTO

el!RIMO\l!O

W!:'ft.A!ilOMCAS DUKE ~EAGY R.ORl:>A EASEMENT

....-....'"

Al.OR.A.OE EASEMENT

stA81LIZATtofrf wnlAHOS

--

AT.OR.AOe: e.A.SlME.NT STA81LRATtOH UPv.NOS AT.ORAOe POU: PAO Wnt.AHOSIMPROVl!MENT

AToQRAOE POU PM'

ACCUSl'lOUT! PAOPOHOGAn. ANO!'OftPCNce:

~

_,...........--

UPLAHOS . .Pfl<>WMENT

AT..CRAO!!i POL! PAD PAltT\AL UPt.NIOS &

WiT\.ANOS IMPROVEMENT

-

74.4 -

L<:HtWATlllCROSSIHG (CABU! OONCMT!) PftOPOS!D TOIP. 8R.DCE WATVt Of''nt AT SU.SOMAI.. lCH WATiR

ftlltOftOIEOOAAOE vasnNo GftAD!

Ct"COHTOUltSl

f.AU)O(I STAtlU l.\'ID

SIASOHAl. lCH WATfALl!fE

HKV T11#1$Ml$SIO' U llE

Rm l"lliWt TOrGTUST

Fl!MA.1-.VIE.AR

P:L.000 Pl..AfN UNI

R'.14214

~.

OEMOCKN'OIOR SMOOTH TOP 8' TO 10" 1.AYfR Ofi EXISTING MATERIAL SEFORE IMSTH.LfOO THE PERMANENTEASCMENT S fAOkl!ATION.M.J.EXCAVArtDllM~St~llE

w e11ancl

DeS

Wl·Ol PP-01

E E

Wetlands AHlrid· Road Wedanw Pt rman.,,t Pole Pad

10.0SU HOO

QJL_ 0.08

1,GOO 2,796

008

3600

0.08

HIGH STRDfGnt WO...EN G£0'ftxllLE FMAIC. OR APPAOV60 EOOIVAl.EHT. INSTALL OEOT£XTJLEf'MAC

0.58 0.08 0.05 O.OS 0.35

PROVIOl'OO: ...Nlt.IUM LAP Aa .P9t tMNUf"ACT"UR£R IHSTAUATIOff "'1STRUCTIONS f',T TW( I.A? JOtlff.

PP~

E

We tland! Pem'!enent Pote Ped

W1·02 PP-03 W103

F

Vie ti ands At·Grade R~·d Wetlands PcrmanentPole Pad

G

Wotl .,.l'!ds-ftt.Gf'ad~ J(o~d

25.215

pp. 04

G

PP-05 PP-06

G G H

WtHl.,,d· Permanent Pole Pad Wetlands-Part.rat Permanent Pole P1d

J600 2013 2.336 15,304

W1·04

I

.Area(f1')

AEUO'JEO FROM THE J08SPE ANO C15POSEO OF AT Art

Label

F

W!llandt, fJartral Perm1ment Pole Potd

We!lands At-Grode Road

Area(a<)

0.06

PP·08

H

Wec1tlnas Partlal Permancm Pole P-ad

Sll7

o.oz.

PP-09 PJ>.-10

H H

Wetl·nds Permanent Pole pad W·~·nds Pa:-tlal Pennanent Pole Pad

1320 1.078

003 0.02

Wl·OS

I

Wetland~ At· Grad~ Road

8,92.S

0.20

PP·ll Wl·06 PP·l2

I

Wedanda Permane:1l Pale P.ad

s

1,3211 64,688

G

We Hands. P~rmanent Pde Pnd

ll.03 149 0.03

PMJ

s

Wetlands PcrmonentPol· Pod Wetlands Pcrma11ent Pote Pad

PP·l4 PPlS PP-16 PM7 PP.tB

PP·l9 PP-20 PP 21 PP-22

· s · ·

6

&

Wetl·nds At·G·nde Road___

1,320 l.32()

1,32(1

003 0.03

Wc.d-..nds Ponnanon t Pote- P~d Wedands Perman~ntPoll' Pad We danda Permanent Pole Pad

1,320

0.0)

1,320 1320

0,03 0.03

Wo!l;iindc- PPrtn.artU'nt- Poia Pad

1.37.0

003

l 320 1,32() l 32ll 1.320

0.03 003 0.03

7.330

0.17

o.oo

AP~l.ANOf'.U.

2.

SMOOTHSIJ1:9GMOE. JOLEVEl.EU:VAtlOH ACROSS WI01l1 Of 1ff WIDE EASEMENT STAlllJZATIClN.

3.. INST!lt.tGRMIAAASU68.'.Sf (COORSC!SAND) l'TOll" lltCl

PlACEE4$Cf~EKT STA81LIZ4TPH 8ECl.fl\IER, ~ R~

S. INSTAtl6"'PERFOftATB>GEOWE8A..,, f lLL'\\tTll Cflb..IStO CONCRETE l ~Ff..l,..,. lle7 SIZE, fl,

\IERIFY TOP Of'QEOWE&l$ Vll'frl'l' a'~

PRe.cON$'Ml.ICTION CONTOURS. 1. 8.

JiMSli TOP

r WITH atustiEO &TONIE SURFAct.

w.RK$t.>ES~ l &'~EAS£MENTS'iAel.IZ.\1~

WtlHP\IC

WETLAND IMPROVEMENT ATGRADE EASEMENT STABILIZATION

l>IAAKCRS-.AS NEOCCSS#iRV.

W1·07 pp.23

s

wettand1 Permane.itl'ole Pad Wetl·nd1 PermMent Pole Pad Wetlondl Pcnn·n~t POie Pad Welland> Permanent Pole Pad wetland> AL·G·.d· R··d

5

Wet land~ Pattial Perm.anent Pufe P;1d

95

Wl·08

4

Wetlands At·Gr.de Road

6,796

0.16

WeUond:.. P,ylfol Pcmnonent Po fC' Pot.f

t,080

o.o:z

We!Jand1Pennanent Pole Pad Wctl<1nds At-Grade R6'1d

1,32() 648 10,138 13211

O.D3 0.01

3. HSTAU. GEOTOOILf ll"IJ!HC PA0\110..G t.t~MUM I.AP A$ Pfl\t.W4UFAC'NRER INS TAt.1.ATION tMSTJU.IC1K>rtS AT T\11! lAP ..cllMr.

0.23

··

0.03

5. (L£VAllOO Of: TOP~OOHCRrTl1 CEU.S $HALL MATCH El GfWE_ Wl.,,.,2" SOAS

Welland! Perman.mt Pole P.ad W~tbnds Partlal Permanent Pole Pnd

l 320

0.03

851

0.02

SE IMfERNATIONM. EROst:lNCOMTROI.

Wetlaf\ds Partial Permanent Pole eild Wetlands Partial Perm>nent Pole Pad

844 1149

0.02 0.02

S'rSTEMSf:Oft

2 l

Wetlands At· Gtade Road

15,261

0.35

SS

0.00 0.01

PP-2S

PP-26

6 6

6

· 4

Wl·09 WI 10 PP·28 PP-29

l

Wo t l~ " dc- At· Grwdo Roold

3 l

We uand1 Perman·nt Pole Pad

pp.30

1

PP·31 PP-32 Will PP·3S PP·J6

?

PP.37

4

1

l 1

WetJ·f\d! Partl·I Po.rrn·nont Pale Pad Wt!tland1 Part(lill Permanen1 Pole Pad Watland> Pattlal Pe·m·nenJ Pol· Pad TOTAL AREA

0.03

633 431

0.01

214,009

4.91

·t'

acre 384

Wm.ANO IMPACT SUMMARY (AREAS): Area of At ·Grade Road Area of Permanef't Pads Are ii or P1irtlal Perm·nent Pole Pad Area or New Struct"tJre~ TOTAL W f Tl,;.\NO IMPACT AREA

167 185 35,520 U,3().1

0.82 0.26

327

o.oi

214,336

4,92

THSSE:COOM FOR STAND AL~ ~

1:!Q!f:1l. I.

EXCA\/Aft INSTAiJ.Afk)N Ji/11.tiA TOA.DEPTH~ TO'llE n fC!(NE$$C#Tl11E CAel.tCONCAETL

2.

PU.Ct EASEMENT STM!l.UATIOH 8EOLIHER (GEOFAORI:). WIAAFI R~ HbH S'tRENGl H WOVEN GEOlEXlll..l f'N!Rt.:, Oft APPROVEDEQUll/~NT.

hSTAlLCA!tl.E OONCAf'Y£ TYPE CC...SON TOP~ GEOfASf:CtCPfR MAHUr:AC1'\.JRER"S INSTAl.1.ATIONIN$1'RUCTIONS,

ro NOl l~I)( WAlEM FU>W. CABLE CONOHETE.

Sf'ECIFJ:A1lONS

UPLAND IMPROVEMENT AT- GRADE EASEMENT STABILIZATION

SHErr DESCRIP1ION

RIO PINAR - FGT EAST TRANSMISSION LINE REBUILD

/(£'{ SHfFT

doi£1W NOTES

PUN NID EIEMOOH

CRClSS SEm1QN

/>8IJTllEN1' 1.AYOl/r

TFMPORARY BRIDGE

AllUTll£NT se:c:TIONS

ORANGE' COUNTY, Fl. PREPARED BY: BRIDGING sownoNS, LLC

PERMIT PU.NS NOT FOR CONSTRUCTION SIRUCTIJR£S SHOP DR1411'1HGS RI BE SIBM11TED 10:

ROWNX> CMS4. PE No. 7Jt91

t1RiDQINO 50U.ITTONS.

J.1.C

B 112 CffAMPIONS liDREST r.wl'l4, FLDRIQA .:IJ~

""y

ro/dlldoflbrfdg/ng-aolutictrll.'COITI

/'Um PR£1W'IED /Jt';

llRIDGlfi(; sownoNs., UC,

8112 CffAMPIONS FOREST MY 7ll.W'll, F1.Dl'/JDl4 JJU:S 8t.J-767~

PH.

CER111'1CX1l: OF ~TION No. HOTF::

~

THE~

OWlfJED

DUE

CJF THESE PVJtS M'IT H

THIS /TEN J"5 BEEN a..ECTRONfCILJ.Y SIGNED NHJ SOLED BY l10UtNDO ~ 1£ ON _ USING 1' OIGITAL Sl(;N1'TIJR£ ~ W 1HIS orx;rJMfJIT NfC NOr ~ SIGNlD /IND SE'N.LD IND TH£ SKNA1Vfl£ llUSr BC VERlf'/ED ON

l'RIN1W

.wr t:.J.£c:rlKJMc CQO'IE3:

~

SOLUTIONS c==.=:.:--

-

DUKE ENERCY Fl.ORIDA RIO PINAA - FGT EAST

'TRANSMISSION UNE REBUILD

1 ·

B

GENERAL NQTF:S 6Qi£lW. SPEClf/CltTIONS:

srrc ~1'0N SHN.L BC f'fRFfJRMfJ) flt A~E" Wf1H Gl.()'TECH#leAL REF!ORT Br PSI QA1f11 08/JO/r8.

Fl..ORJDll. DEPNmENT OF TRANSPOf(TATTON (FDOT) "!>l'IND4RO SPfXIRCA110/j$ FOR RCWJ AND BRIDGE

CON$11ill.)COON",

(2017) MID

SIJPPf.EllEN1S TH£RETr).

R.DRDA DEFWmAENr OF TIW/SPORrATION, 2

me ~11"'1$ QCiClf18W

IN mE

SE.mEMENT.·

O£:jf(W 'SpmROIJJ(llS.·

ESTBQ.1F1J FrJUN()A.Tl()N St!1"llEJelT MU. BE'

Ii".

MSHrO 'l.RFt> 8RIDGE DESIGN !ffelft:A'OONS~ 7TH EDFT10N. iNCWDING AU. iN1ERltiS THE1l£TO. fUJf«J/t OEPNmllBir OF T1Wll'IPCJRTATION ~ -

PESJ1iN

'; QUW 2016.

LCW§;

J. 111llCr< LIN(;: :t. WIND LOAIJING:

Hl.-9J .J$

- 0,4

PSF

- 1500,,,,,.

oc;1f;N llETtfJDg ElfYi\UONS;

WAD RE'SIST'NICE FAcmR DESJGN (U(F?))

ltl.J. ElEVATIONS llUERRED TO J.641IOl'IW. G8XJ£DC 1- CCNCllE1E: AND CCNSTtrUEXr W..1ERfA/..S ~LL t.IEET THE ~ OF S£C1TON 3#1 AND c4()() or TH£ Fl.ORl£M ~ OF TTWe'ORTATKJN '5'TAN!Wi0 SP£CIFICl.TTOl6 FOR ROM MD BRDC£ CONSTRIJC11()N,' (2P1T) NIO 5VPPi.E1ll£NTS THERaO.

FINAL Ii/IX D£S/Cl

r:AST-IN-Pt.N:E

1t'

MIDGIVC

!lOl..UT1rJNs,

J.LC FfJR ~ MtOlf

PBUAll!jQtZW Riff:RENC£

STEA

~

t:l41IAll OF 11129 (NOO JQag),

1lfU5S:

PllOJE1:r SP£aFJC TF.r:HNICN.. SP£CW... PROrfSION

f()R

PREFABRICATf!J Sim. TRI/SS' RE.QUIREllENIS;

ro POURtNG

CONCfi£TC.

CONCRm S1B£$S§;'

CONCRETE /NfORMAnON TABLE N

flEIN£QRgHtj

5500 PS/

3848 KSI

srm:

I. AU. RfJNFORCNJ Sim. SHALL B£ AS7ll, M16 filWJE IJO. :t. AIL IJlllENSIONS PEF!rNNtm ro LOCATION OF' REINFORaNG smt ARE 1tl C£NTE1lLME OF 8ltRS EXIXPT WHERE THE'. CLF.AR DlllENS/ON IS SHOWN 1D FACE OF' CONCRETE.

CONCRm COIJEll; J-INCHES, IJNl.ESS NOTE$ OTliE1MSE.

'-4NCJl£S roR ~ S~cn' ~ J,CllN'ST CAfm!

~~"""to~~ :t~~~ ~~ IODfTIONIL

CONS1RUCnCN

CQN511il&1KJN M:!l§:

1. 8'CKRU. FUl.J.. ABi/1M£Nr H£JQ(T' PRfOR TO PUCENENT OF SUPERSTRIJCTURE.

:: $E1 ~ SOLUTIONS BRIDGING!!'!!'='"""' i:=.=:.r-·

-.-i:n

GENERAL liOTES

'

-·~---

~~ .

1 . .1

; \fil~ \_~ lL '

\ ~ I~h. \

.

- - - - - --

----

rnf &__r <-~-=·_ r1·~e· -

~I

-----~-

//.r f' P 1 '

\J ___ "'-:::-A 1______

----------------------- ------------

I ~),

:i:~

RIGHT'

.i

- - - - - - - - - - - - - - -·-1--. (

7DJPCllAR'f

BRIDC£_1

I

..

-------------------------'---·- ----------

BEGIN 8RK1C£ FFBW ABUrlrlENT t ,90

90

f"REFN11/JCA1E:t> 7FJ,/1"0RIRY V£H/CUUR S7l!Et TRUSS 8llJtX;C l1Y t,tABf.Y (OR £QtW.) TOO' SPNt If 15'-11" lltl40llMY WAl)ffl

---------------------- wmi_srm..:_HECI<~~---·----[

75

BC

7$

70

EL£VAnON ~-··-1--0-

~

SOLUTIONS :=.:'"',.::'-

-

DUKE ENERC\' Fl.ORI.DA

PIAN AND ELEVATION

RIO PINAR - FGT EAST

'TRANSMISSION UNE REBU1LD

3 · 8

6-11" O/A 1RtJSS MD'lll

rs·-s· ctEAR RtWlllMl' I

f COtmTNC11CN Tall'OlllRr 8RIOC£

_!:_STEEl. oo·

PREFNJRICATfJJ TDlf'OIW('f l£HICl.JUR TRUSS BllrDQE 8Y 6WlfY (OR ~ SPAN-' 15'-8' RQIDlll\Y wrtmf

Wfffl S7ffl. r;:ttD;KBf

a..

(){r;;I(

I

U.P1 IJ£CIN SfflDCC

(EL IJ1. 10 END 8RIDGE)

'

I

I

; 0

I

~

.

~~-

0

~LU-~

I

·'"I

(EL 7~.13 Ell() BRf(Y;E)

_J

L

~1~

£1.. 1.J.92 BEGIN 8RIDG£ (£1... 12. ID EMJ i1RIUJE)

CROSS SECTION SC/11..e - 1·-1·-11·

--

-

-· -·

re.:.=

- ..

-- "'

BRJDGlNG !!!=!'="""'

.... SOLUTIONS c==.=:.:--

Q.91\1

DUKE ENERCY Fl.ORIDA RIO PINAA - FGT EAST

'TRAHSMISSKlN UNE REBUILD

=

1l'llA

-

.

CROSS SECTION I

4 ·

B

~~·

~,

~

- - 1---.---r-

I

I I

-- 1

l

{i I I

I I l ~ ;

I l

~ I

I I

I I I

},.

I

_.___.__L _ BeGIN fll(q)Q£

~

I

I I I I I

I

I l I

I

I

I I I

: -- -:---....~~~ -+ I

l

l

I I l I

I

I

I

1-

--1

:ti

fll

J_

l ~ l

.I

~

I

:

L _ _ J_

~

~

_.___._

I

END BRilJGE

~~~~------------------------------~'00~~~0·--------------------------------~1~2

-· ......"

w.,

-

-

SOLUTIONS

:==-..=-- -

i\BUTMENT lAYOIJT f;llO PINAi< - FGT EA5)'"

'TRANSMISSION UNE REBUILD

I

a-. a

EL

EL 78.7' (ll.. 7.f;(IJ)

76.r.J

(El.. 7-1-PJ)

EL 75.87

.

(£1. 1;,.1U}

~I

.i")

a

72. ,7

(EL 70.:U)

·'...

EL 7.l.47 (U. 71.IU}

EL 73.tJ7

(fl. Tr.JU)

L.

_

_

J

EL 72.17

(U.

SECTION A-A

70.J~)

~_.__ _ .__ _ _ _ _ _ __ .

SECTION B-B

-··-··-

~ · r--r

-.e (J'IP;

,.,,.~

SECTION C-C

··-1·-a-

~

-~

-11o·-··-o·

~11111"

-~

a 11.75 (EL 14.SJ) t.

~ j

EL n.rr.., (EL 70.:H)

·'..,

~

."' ~

i

:s1·-s·

__ J 4~·~

I

SECVON D-D !11::11£: ...... ,.-o·

BRJDGlNG !!'!=!='"""

.... SOLUTIONS :=!l'"',.::'-

DUKE ENERC\' Fl.ORIDA

RIO PINAR - F'GT EAST "!RAHSMISSION UNE REBUILD

a .. a

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas