You can copy from here when filling out the rest of the page.
Collier County, Craig Granchi, Naples, Florida
PROJECT PURPOSE:
Basic: Housing
Overall: To construct a single family residence with driveway and associated infrastructure in Naples, Collier County, Florida.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Mr. Craig Granchi
530 12th Ave N.E
Naples, FL 32824
WATERWAY AND LOCATION: The project would affect waters of the United States associated with freshwater forested wetlands located in the Big Cypress Swamp watershed. The project is located in Section 1, Township 50 South, Range 27 East, at 3426 22nd Ave. S.E., Naples, Collier County, Florida.
Directions to the site are as follows: From Fort Myers take Interstate 75 South to Immokalee Rd exit. Turn left at end of ramp and proceed east on Immokalee for approximately 9 miles, turn right on Randall Blvd, turn right on Everglades Blvd, then left onto 22nd Ave S.W. Property will be located approximately 0.4 miles on the right side of the road.
APPROXIMATE CENTRAL COORDINATES: Latitude 26.189678°
Longitude -81.537678°
PROJECT PURPOSE:
Basic: Housing
Overall: To construct a single family residence with driveway and associated infrastructure in Naples, Collier County, Florida.
EXISTING CONDITIONS: The 2.73 acre lot wetland system consists of palustrine mixed hardwood wetlands and scrub/shrub wetland freshwater systems. The onsite vegetation consists of Sabal Palmetto (Sabal palmetto), Wax Myrtle (Myrica cerifera), Laurel Oak (Quercus laurifolia), and Brazilian pepper (Schinus terebinthifolius). The existing area surrounding the project area consists of undeveloped properties to the north, south, and west with one developed single-family lot to the east.
PROPOSED WORK: The applicant seeks authorization to discharge 1,771 cubic yards (CY) fill into approximately 0.3 acres of freshwater mixed hardwood wetland to build a single family residence.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has proposed to utilize the existing driveway to minimize impacts.
COMPENSATORY MITIGATION – The applicant has proposed the purchase of 0.1 credits from Panther Island Extension Mitigation Bank.
CULTURAL RESOURCES: Any effects within the upland portions of the project footprint would be minimal due to the small footprint of the project. The likelihood of affecting a historic property is very low. Because of these factors, the Corps has determined that the proposed project has "No potential to cause effect" to historic properties.
ENDANGERED SPECIES: The US Fish, and Wildlife Service reviewed the information provided on October 5, 2017 for the Florida bonneted bat (FBB), red-cockaded woodpecker (RCW) and the Florida scrub jay and found that the proposed action is not likely to adversely affect any federally listed species or designated critical habitat protected by the Endangered Species Act of 1973 (Act), as amended (16 U.S.C. 1531 et. seq.). A record of this consultation, dated November 21, 2017, is on file at the South Florida Ecological Service Office.
This fulfills the requirements of section 7 of the Act and further action is not required. If modifications are made to the project, if additional information involving potential effects to listed species becomes available, or if a new species is listed, reinitiation of consultation may be necessary.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Fort Myers Permits Section, 1520 Royal Palm Square Blvd, Fort Myers, FL 33919 within 15 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Erin Campbell, in writing at the Fort Myers Permits Section, 1520 Royal Palm Square Blvd, Fort Myers, FL 33919; by electronic mail at erin.m.campbell@usace.army.mil; or, by telephone at (239)334-1975.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
1520 ROYAL PALM SQUARE BLVD, SUITE 310
FORT MYERS, FLORIDA 33919
December 22, 2017
REPLY TO
ATTENTION OF
Regulatory Division
West Branch
Fort Myers Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-2017-00126(SP-EMC)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Mr. Craig Granchi
530 12th Ave N.E
Naples, FL 32824
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with freshwater forested wetlands located in the Big Cypress Swamp
watershed. The project is located in Section 1, Township 50 South, Range 27 East, at
3426 22nd Ave. S.E., Naples, Collier County, Florida.
Directions to the site are as follows: From Fort Myers take Interstate 75 South to
Immokalee Rd exit. Turn left at end of ramp and proceed east on Immokalee for
approximately 9 miles, turn right on Randall Blvd, turn right on Everglades Blvd, then left
onto 22nd Ave S.W. Property will be located approximately 0.4 miles on the right side of
the road.
APPROXIMATE CENTRAL COORDINATES: Latitude 26.189678°
Longitude -81.537678°
PROJECT PURPOSE:
Basic: Housing
Overall: To construct a single family residence with driveway and associated
infrastructure in Naples, Collier County, Florida.
EXISTING CONDITIONS: The 2.73 acre lot wetland system consists of palustrine
mixed hardwood wetlands and scrub/shrub wetland freshwater systems. The onsite
vegetation consists of Sabal Palmetto (Sabal palmetto), Wax Myrtle (Myrica cerifera),
Laurel Oak (Quercus laurifolia), and Brazilian pepper (Schinus terebinthifolius). The
existing area surrounding the project area consists of undeveloped properties to the
north, south, and west with one developed single-family lot to the east.
PROPOSED WORK: The applicant seeks authorization to discharge 1,771 cubic yards
(CY) fill into approximately 0.3 acres of freshwater mixed hardwood wetland to build a
single family residence.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has proposed to
utilize the existing driveway to minimize impacts.
COMPENSATORY MITIGATION The applicant has proposed the purchase of 0.1
credits from Panther Island Extension Mitigation Bank.
CULTURAL RESOURCES: Any effects within the upland portions of the project footprint
would be minimal due to the small footprint of the project. The likelihood of affecting a
historic property is very low. Because of these factors, the Corps has determined that
the proposed project has "No potential to cause effect" to historic properties.
ENDANGERED SPECIES: The US Fish, and Wildlife Service reviewed the information
provided on October 5, 2017 for the Florida bonneted bat (FBB), red-cockaded
woodpecker (RCW) and the Florida scrub jay and found that the proposed action is not
likely to adversely affect any federally listed species or designated critical habitat
protected by the Endangered Species Act of 1973 (Act), as amended (16 U.S.C. 1531
et. seq.). A record of this consultation, dated November 21, 2017, is on file at the South
Florida Ecological Service Office.
This fulfills the requirements of section 7 of the Act and further action is not required. If
modifications are made to the project, if additional information involving potential effects
to listed species becomes available, or if a new species is listed, reinitiation of
consultation may be necessary.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Fort Myers
Permits Section, 1520 Royal Palm Square Blvd, Fort Myers, FL 33919 within 15 days
from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
2
QUESTIONS concerning this application should be directed to the project manager,
Erin Campbell, in writing at the Fort Myers Permits Section, 1520 Royal Palm Square
Blvd, Fort Myers, FL 33919; by electronic mail at erin.m.campbell@usace.army.mil; or,
by telephone at (239)334-1975.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
3
comment period of the notice and must state the specific reasons for requesting the
public hearing.
4
SKETCH OF BOUNDARY SURVEY
SURVEY #17364
Certlffed To:
Property Address:
Craig Grandi/
XXXX 22nd Avenue S.E.
Naples, FL 34117
Legs/ Description As Furnished:
Th6 Wnt 180 feet of Tract 14, GOLDEN GA TE ESTA TES UNIT NO. 86, BCCOfding to the plat thereofBS
recorded In Plst Book 5, Page (s) 25, of the Pub/le Records of Col/16r County, Florfds.
BENCHMARK
SITE PLAN: 12/15/2016
LAND SERVICES, INC.
1807 J. & C. BoulBvarrJ
Nsp/es,Florlds 34109
L.B. # 75()2
AlJO£D CROWN OF ROAD: 12/1.1/2016
PROPOSCD CUL IDfl: 10/28/2016
DATE OF Sllli'l£Y
Tfll. 239-591..0778
Fsx. 239-591- 1195
www.b6ndlmsrldBnds6rv/c6.com
Flood Zone Information:
DRAWN BY
10/20/2016
COMPt£110N DA TE:
Community Number: 120067 Panel: 0435 Suffix: H
K.S.
Effective Date: 05/16/2012
Flood Zone: AH BFE: 12.5' NA V.D. 1988
CHECKED BY
10/21/2016
£.S.
TRACT13
i
i
TRACT 4
.·
1
22ND. AVENUE S.E.
TRACT20
(IMPROVED) ROAD 60' WIDE (P.)
-·-·Tffm:"P.ic____
I~----~·-·----~Bi~
t:
jN.&O. NO/O.
DEWm NOT TO SCALE
1
,
l
I~;
i
~~
..,M....
.
FNO. P. - .
NAIL
___J~~L....:!-
->
1I
-
·-·-·-·-£-·- ·-·-·-
-
BEARINGS SHOWN HEREON ARE
BASED UPON AN ASSUMED BEARING OF
""'"°"'YARD
1r~ ~ --:
i
~
""'
·- __ ·-·-·
l;;JV IJ.
SEE
~ · r~!Jrr-------
----s., -;,<.F.-::t'-'
~l
...
....
-/
i-
0
S 89°40'5() E FOR THE CENTERLINE OF
22ND. A j NUE S.E.
I
\.
-
II
I
I "'- ........ -·
~~
(.)
L-1= S 89°40'5()" E 180' D.
S 89°41'29" E 179.97'
-....__
L-2= S 89°38'54" E 179.96' M.
73.'9'
DETAIL #2: NOT TO SCALE
~
.---~~~~~~~~
~
I
)7.33'
I
11.57'
185.18'
IPROPOSED
I WELL
I
I
.~ ~ I
~ I- I
~
~ (.) I ~
~ ~ I ).":
~ ~ I~
L __
-
I~
I
I
I
I
I
I
_J
15'REAR YARD
100
I hereby certify that A Surwy of the hereon dtJscribed property was
mad6 under my direction snd fTl88ts the Minimum Technical Standards
ssperChspterSJ..17.051 & .052
C., pursusnttosection472.027.
Florida
Mss.
/ }
c:.
I
/c,r!ot6
State of Florida
&R.
C.
~1V
llEARINORB'ERENCE
CALCU.A711D
OUll.Erv. IWER
1.P.
AE.
/..A
T.U.E.
IRONPPE
ACCEIS EA8EJENT
UWDSUM!l'M1tlUSINES!l
1ECH'«ll.OGYUTl.ITY EA8EMEM"
I.Cu.£ LEE COUNTY l/Tl.JTY EASEMENT
M.
KE.
H~
FIELD AEMl.flEI)
L«E~EASEJENr
0. HAL· DISK
O.H.L.
~I.ME
PlAT
l'.C.
POINT OF CVRVllTVRE
l'.C.C. POINT OFca#'OUHD CVRVllTIJRE
l'.c.P. _,CONTROLl'OINT
P.
MRKER-KALONHAL
. /.
P.L.S
P. T.
l'.o.&
1'.0.C.
l'.R.C.
l'./UI.
l'. u.£
RM
ClU.E.
LE.
l'OINTOFINTERSECTION
PROF£SIONAL !ANO STAM.
1ElloF'GVIARY 8ENCH-
T.0.11.
TB.E1'HOHE FACIUTIES
TCP OFIJllNK
m.
U.E.
l/Tl.JTYEA8BllENT
WM
Wll1E1UE1Elr
- - FENCE
c::::> ElOSTlHG B.EVllTIOH
Cl ""°"°9ED a.EVA TIOH
R.
-
c.H.R.
V.G.
-- Qlfl1Elr
CONC
VllUEY
c.a
llD.
CK
GO
~TCH8MIH
BTOllN DIWN
CONCRETEMOMMENT
a.£1NOUT
YN
E.P. EDGE OF PAVEMENT
t>Wll1Elr VllLVE
C'"(h
POMI! POLE
e
MU
~
·
·
iii
EX1STWO RRE HYDRANT
J.R.
CONCRETEllOHIJMENT
~TCH-
llENCH-
11.M. ·
¢
I.AMI' l'Ol!IT
f
CENTERL.WE
Pl.NT
~
Pl.llN71fR
HAL
CONC. CONCRETE
,.,II HC1r
N'PUCABl.E