Glades County. Upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), and Section 404 of the Clean Water Act (33 U.S.C. 1344) general authority is hereby given for the discharge of fill material on the Brighton Seminole Indian Reservation (BSIR) for the following minor activities: single family home sites, utility lines, recreational facilities, boating, agricultural use, commercial use, government facilities, water control activities, ditch maintenance, and road construction. This authorization is valid subject to the following Special and General Conditions and is issued consistent with the associated Coordination Agreement entitled “Coordination Agreement Between the U.S. Army Corps of Engineers Jacksonville District and the Seminole Tribe of Florida Programmatic General Permit Big Cypress and Brighton Seminole Indian Reservations.”
Upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), and Section 404 of the Clean Water Act (33 U.S.C. 1344) general authority is hereby given for the discharge of fill material on the Brighton Seminole Indian Reservation (BSIR) for the following minor activities: single family home sites, utility lines, recreational facilities, boating, agricultural use, commercial use, government facilities, water control activities, ditch maintenance, and road construction. This authorization is valid subject to the following Special and General Conditions and is issued consistent with the associated Coordination Agreement entitled “Coordination Agreement Between the U.S. Army Corps of Engineers Jacksonville District and the Seminole Tribe of Florida Programmatic General Permit Big Cypress and Brighton Seminole Indian Reservations.”
The project area subject to this PGP includes the 36,700-acre BSIR, which is part of the historic Western Okeechobee Kissimmee Basin wetland system and is located north of Big Cypress National Preserve is located northwest of Lake Okeechobee in Glades County, Florida as illustrated in Attachment I.
APPROXIMATE CENTRAL COORDINATES:
Latitude: 27.047374º
Longitude: -81.083404º
SPECIAL CONDITIONS:
1. Limits of Authorized Work: This permit is limited to filling waters of the United States for the following minor activities: single family home sites, utility lines, recreational facilities, boating, agricultural use, commercial use, government facilities, water control activities, ditch maintenance, and road construction. Acreage thresholds and conditions for use under this PGP are as follows:
Activity No.
Activity Type
Fill Limits (acres)
Activity Description and Conditions
1
Single-Family Residential
1.00
Discharges of dredged or fill material in non-tidal waters of the U.S. including non-tidal wetlands, for the construction or expansion of traditional single family home sites that include houses, access roads, driveways, chickees for various practices (sewing, cooking, religious practices , and other similar practices) , bathhouses , and septic systems with drain fields with applicable set-backs.
2
Utility Lines
1.00
The construction, maintenance or repair of utility lines, including intake/outfall structures, and the associated excavation , backfilling or bedding, utility line substations, foundations for overhead utility line towers, cell towers, poles, and anchors; Access roads for the construction and maintenance of utility lines, including overhead power lines and utility line substations.
3
Recreational Facilities
1.50
Discharges of dredged or fill material in non-tidal waters of the U.S. including non-tidal wetlands for both passive and non-passive recreation use to include, but not limited to, campgrounds, swimming pools, playing fields (baseball, soccer or football), basketball and tennis courts. Also authorized are small support facilities, such as maintenance and storage buildings, restrooms and associated parking areas that are directly related to the recreational activity. Hotels, motels, restaurants, and other similar facilities are not authorized under this activity.
4
Boating
0.25
Noncommercial boat launching facility (ramps), parking for vehicles/trailers, associated structures-bulkheads, rub-rails, tie-up piers, and walkways. The acreage limitation includes the filled area and excavated area plus special aquatic sites and surface waters that are adversely affected.
5
Agricultural
1.00
Land clearing, building pads, new ditches and/or dikes, side casting from ditch construction, associated with agricultural uses. Ditches will be constructed to control both surface and ground water. Any direct, cumulative or secondary impacts shall not exceed the 1.0-acre threshold.
6
Commercial Development
1.50
Small business development proposed by tribal members. Development proposed by chain restaurant and retail stores is not authorized under this PGP. However, when associated with an existing single-family homesite both the existing and proposed fill impacts will not exceed 1.5 acres. Authorized development includes buildings, parking areas, septic systems with drain fields and access roads.
7
Government Facilities
1.50
New or additions to existing facilities such as schools, government buildings, medical facilities for associated parking areas, public works infrastructure , and other similar facilities. Existing facilities are those that were existing and/or under construction when this PGP is issued.
8
Water Control
1.00
The construction of stormwater management facilities including excavation of stormwater ponds, the installation and maintenance of water control structures, outfall structures, and emergency spillways, including secondary impacts associated with the excavation of stormwater ponds. Also for the construction and maintenance of ditches, which includes re-shaping of existing ditches and modification of the cross-sectional configuration of currently serviceable ditches. No activity shall cause an increase of the designed drainage capacity or in the designed drainage area.
9
Ditch Maintenance
No Limit
Maintenance of existing functional ditches, limited to pre-existing ditch design and/or historic design. This applies to ditches located on existing farm fields or on existing agricultural lands.
10
Transportation/ Roads
1.50
Construction, expansion, modification, or improvement of existing linear transportation crossings (roadways) for safety purposes. Includes the widening of existing road shoulders or construction of new shoulders along existing roadways, using only pervious material. Existing roads are those that were existing or under construction when this PGP is issued.
N/A
All
N/A
All effort must be made to minimize impacts to aquatic resources. Discharges authorized under this PGP must be part of a single and complete project.
2. Permit Area: Specific use of this PGP is limited to the areas shown in Attachment 2 located within the BSIR.
3. Limits of Fill: This permit authorizes minor activities involving the placement of fill material in up to 50 acres of federally designated jurisdictional wetlands within the BSIR per year, not to exceed a total of 100 acres of jurisdictional wetlands over a five–year period, effective the date of this permit.
4. Compensatory Mitigation: Mitigation requirements will be satisfied by generating functional capacity credits in accordance with the Advanced Mitigation Program (AMP) proposed at the FBI Mitigation Area Tract (Attachment 3). The STOF shall maintain a ledger to include the type and amount of mitigation credit(s) used for each verification under this PGP which requires mitigation. This ledger shall include, but not be limited to, the following information:
a. Permittee Name
b. Permittee Address and Contact Information
c. Date of DA permit verification
d. Date of credit purchase/release
e. Type of credit(s) purchased
f. Amount of credit(s) purchased
g. Total Credits purchased
h. Total Credits released/available
A copy of the ledger shall be provided to the Corps on an annual basis, or upon request. Information recorded in the ledger shall be subject to amendment/revision at the discretion of the Corps.
5. Pre-construction Notification: Before any activities may be conducted pursuant to this authorization, the applicant must submit a pre-construction notification to the Seminole Tribe of Florida (Tribe) Environmental Resource Management Division (ERMD). The ERMD will forward a copy of all PCN’s to the Corps, with the Tribe’s determination of compliance with this authorization, as a part of the quarterly reporting requirements prescribed by the associated Coordination Agreement. All PCN submittals shall include the following information, at a minimum:
a. ENG FORM 4345 (signed by an authorized representative of the Tribe).
b. Maps will identify federally jurisdictional wetlands consistent with the 1987
Corps of Engineers Wetland Delineation Manual, as modified by the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region (Version 2.0 – ERDC/EL TR-10-20), November 2010. A minimum of two sets of data sheets per wetland shall be submitted. The total number of data sheets will vary with each site, depending on the number of wetlands.
c. Provide a clear description (including maps) of the proposed work and wetland impact areas; analysis of impacts to Federally listed wildlife species; Wetland Rapid Assessment Procedure analysis of direct and secondary wetland impacts; and an updated version of the BSIR Programmatic General Permit (SAJ-84) Ledger.
6. Erosion Control: Prior to the initiation of any work authorized by this permit, the Permittee shall install erosion control measures along the perimeter of all work areas to prevent the displacement of fill material. Immediately after completion of the final grading of the land surface, all slopes, land surfaces, and filled areas adjacent to wetlands shall be stabilized using sod, degradable mats, or a combination of similar stabilizing materials to prevent erosion. For dredging activities, all dredged or excavated materials will be deposited and retained in an area that is not a water of the United States unless specifically approved by the Corps under a separate authorization and proper siltation controls must be used. The erosion and siltation control measures shall remain in place and be maintained until all authorized work has been completed and the site has been stabilized.
7. Cultural Resources/Historic Properties: If cultural resources, as defined by the Seminole Tribe of Florida’s Cultural Resource Ordinance(Ordinance # C-02-14); which includes but is not limited to places and items of special cultural importance, historic properties, archaeological sites/materials, and burial resources) are encountered, then the Permittee shall immediately stop all work and ground-disturbing activities within a
100-meter diameter of the discovery and notify the THPO within the same business day (8 hours). After such notification, work authorized by this PGP may not resume without written authorization from the THPO.
8. Biological Opinion: This Corps permit does not authorize the Tribe to take an endangered species, in particular the Audubon’s crested caracara (Polyborusplancus audubonii), Florida bonneted bat (Eumops floridanus), Florida panther (Puma (Felis) concolor coryi), and the Eastern indigo snake (Drymarchon corais couperi). In order to legally take a listed species, you must have separate authorization under the Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or a BO under ESA Section 7, with “incidental take” provisions with which you must comply). The U.S. Fish and Wildlife Service’s (Service) Biological Opinion (BO), dated December 19, 2014, contains mandatory terms and conditions (Attachment 4) to implement the reasonable and prudent measures that are associated with “incidental take.” that is also specified in the BO. Your authorization under this Corps permit is conditional upon your compliance with all of the mandatory terms and conditions associated with incidental take of the attached BO, which terms and conditions are incorporated by reference in this permit. Failure to comply with the terms and conditions associated with incidental take of the BO, where a take of the listed species occurs, would constitute an unauthorized take, and it would also constitute non-compliance with your Corps permit. The Service is the appropriate authority to determine compliance with the terms and conditions of its BO, and with the ESA.
9. Manatee Key: Prior to issuance of authorization, the dichotomous key titled “The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, April 2013”, (see
http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered_species/Manatee/2013_FINAL_ManateeKey.pdf) will be used to determine potential
manatee impacts. Those determined to be a “may affect” to the manatee will not be authorized until consultation on the project has been re-initiated and concluded with the U.S. Fish and Wildlife Service in accordance with the Endangered Species Act. Additionally, depending on the location of the project, some projects determined to be “may affect, not likely to adversely affect” will not be authorized until consultation on the project has been re-initiated and concluded with a “no jeopardy” determination. Note: The manatee key may be subject to revision at any time. It is our intention that the most recent version of this technical tool will be utilized during the evaluation of the permit application.
10. Manatee Conditions: For projects in waters accessible to manatees, the permittee will utilize the “Standard Manatee Conditions for In-Water Work, 2011” (see http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered species/Manatee/2011_StandardConditionsForIn-waterWork.pdf) and/or requirements, as appropriate for the proposed activity. Note: The manatee conditions may be subject to revision at any time. It is our intention that the most recent version of these conditions will be utilized during the evaluation of the permit application.
11. Eastern Indigo Snake Protection Measures: The Tribe shall comply with Service “Standard Protection Measures for the Eastern Indigo Snake” (dated August 12, 2013) (Attachment 5) during project site preparation and construction. These Protection Measures can be found at:
http://www.saj.usace.army.mil/Missions/Regulatory/Source-Book/
The following shall also apply:
a. All gopher tortoise burrows, active or inactive, will be evacuated prior to site manipulation in the burrow vicinity. The excavation method selected should also minimize the potential for injury of an indigo snake.
b. Holes, cavities, and snake refuge other than gopher tortoise burrows will be inspected each morning before planned site manipulation of a particular area, and if occupied by an indigo snake, no work will commence until the snake has vacated the vicinity of proposed work.
12. Water Quality Certification: Prior to the initiation of any construction, projects qualifying for PGP SAJ-84 must be authorized by the Seminole Tribe of Florida Environmental Resource Management Department.
13. Fill Material: The Tribe shall use only clean fill material for this project. The fill material shall be free from items such as trash, debris, automotive parts, asphalt, construction materials, concrete block with exposed reinforcement bars, and soils contaminated with any toxic substance, in toxic amounts in accordance with Section
307 of the Clean Water Act. Unless previously authorized under separate DA permit, the source of fill used under this PGP shall not include waters of the U.S.
14. Self-Certification: Within 60 days of completion of the authorized work, and any mitigation required, the attached Self-Certification Statement of Compliance form (Attachment 6) must be completed and submitted to the Tribe. The form must reference PGP SAJ-84 and other information associated with the work. The Tribe will report to the Corps on a quarterly basis on certification of projects receiving authorization under this PGP.
15. Reporting Address: All reports, documentation and correspondence required by the conditions of this permit shall be submitted to the following address: Attention, Deputy Chief, Regulatory Division, Jacksonville District, U.S. Army Corps of Engineers, P.O. Box 4970, Jacksonville, Florida 32232-0019.
16. Modification of Federally Authorized Projects: Evaluation of applications for utility line crossings of levees, dikes, dams, or other water retaining structures will require case specific review by the Jacksonville Engineering Division in accordance with 33 U.S.C. 408 and approval from the Jacksonville District Commander prior to authorization under this PGP. Subaqueous utility and aerial transmission line crossings, proposed in all Central and Southern Florida canals, with the exception of C-43, C-44, and Taylor Creek, will require project specific approval for compliance with 33 USC 408 from the U.S. Army Corps of Engineers prior to receiving authorization. Once, the project specific approval under 33 USC 408 has been received, and all other conditions of the permit have been met, a permit verification letter may be issued.
17. Subaqueous Utility and Aerial Transmission Lines: The discharge of dredged or fill material is authorized by this general permit for the installation, construction, maintenance, replacement, and/or repair of:
a. Foundations for overhead transmission line towers, poles, and anchors in all
waters of the United States, excluding those areas listed in Special Condition 17 above, provided the foundations are the minimum size necessary and separate footings for each tower leg (rather than a larger single pad) are used where feasible.
b. Electrical substations in non-tidal waters of the United States, excluding areas
listed in Special Condition 3 above and all non-tidal wetlands adjacent to tidal waters, providing the discharge does not cause the loss of greater than one-half acre of non-tidal waters of the United States.
c. Access roads in non-tidal waters of the United States, and all non-tidal wetlands
adjacent to tidal waters, for the construction and maintenance of overhead transmission lines and electrical substations, provided the discharge does not result in the loss of greater than 1.5 acres per project. NOTE: Access roads shall be the minimum width necessary. Access roads constructed under this permit shall be made of pervious materials such as sand, gravel, limestone, etc. Access roads must be constructed so that the length of the road minimizes the adverse effects on waters of the U.S. and as near as possible to preconstruction contours and elevations (e.g., at grade corduroy roads or geotextile/gravel roads). Access roads constructed above preconstruction contours and elevations in waters of the United States must be properly bridged or culverted to maintain surface flows. Access roads used solely for construction of the overhead power line must be removed upon completion of the work and the area restored to preconstruction contours, elevations, and wetland conditions.
18. Horizontal Directional Drilling: Directional boring vaults, junction boxes, and/or pads will not be constructed within 50 feet of the top of the bank of waterways (rivers/streams). Horizontal directional drilling pilot, entrance, and exit holes must be the minimum diameter necessary; and, must be set back from the waterway (river/stream) bank by a minimum of 50 feet. Excavated materials and drilling mud must be stockpiled on non-wetland areas, where available. Appropriate fabric must be placed beneath all materials stockpiled in wetlands.
19. Subaqueous Utility Line Depth Requirement: Except as otherwise noted by these Special Conditions, all subaqueous utility and/or transmission lines authorized by this regional general permit must be installed a minimum of 6 feet below the bottom contour of any other water of the United States. The 6-foot criterion applies to the entire authorized width of the crossing, plus a minimum of 10 feet on each side of the crossing.
20. Sidecasting: Material resulting from trench excavation may be temporarily sidecast (up to three months) into waters of the United States, provided that the material is not placed in such a manner that it is dispersed by currents or other forces. The District Engineer may extend the period of temporary side casting not to exceed a total of 180 days, where appropriate. The top 6- 12 inches of the trench should normally be backfilled with topsoil from the trench. Furthermore, the trench cannot be constructed in such a manner as to drain waters of the United States (e.g., backfilling with extensive gravel layers, creating a French drain effect). For example, utility line trenches can be backfilled with clay blocks to ensure that the trench does not drain the waters of the United States through which the utility line is installed. Any exposed slopes and stream banks must be stabilized immediately upon completion of the utility line crossing of each waterbody.
21. Maintaining Pre-Construction Contours: Dredged or fill material placed as backfill or bedding for subaqueous utility and transmission lines must not change the preconstruction bottom contours. Excess material must be moved to an upland disposal area.
22. Warning Signs for Subaqueous Utility and Transmission Lines: The permittee will install signs at the shoreline to notify navigational interests of the location of subaqueous utility and transmission lines.
23. Severing Jurisdiction: No project will be authorized under this PGP if the proposed fill activity will result in upstream waters of the United States being removed from Federal jurisdiction.
24. Marked Utilities: No work shall be performed until after the permittee provides notification to the owner(s) or operator(s) of any marked utilities in the work area, unless the permittee is the same entity as the owner(s) or operator(s).
25. Permit Expiration: This permit shall be valid for a period of five years from the date of issuance, unless suspended or revoked by issuance of a public notice by the District Engineer. A review will be conducted to determine if continuance of the permit is in the public interest after the 5-year expiration date. If this permit expires or is revoked prior to completion of the authorized work, authorization of activities that have commenced or are under contract to commence in reliance on this permit will remain in effect provided the activity is completed within 12 months of the date this permit expired or was revoked.
GENERAL CONDITIONS FOR DEPARTMENT OF THE ARMY GENERAL PERMITS
1. The time limit for completing the work authorized ends on December 22, 2022.
2. You must maintain the activity authorized by this permit in good condition and in
conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while
accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature and mailing address of the new owner in the space provided below and forward a copy of the permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you
must comply with the conditions specified in the certification as special conditions to
this permit.
6. You must allow representatives from this office to inspect the authorized activity
at anytime deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.
Further Information:
1. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal projects.
2. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
3. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided.
4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to
have been false, incomplete, or inaccurate (see 3 above).
c. Significant new information surfaces which this office did not consider in
reaching the original public interest decision.
5. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170 accomplish the corrective measures by contract or otherwise and bill you for the cost.
6. When the structures or work authorized by this permit are still in existence at the time the property is transferred , the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below.
(TRANSFEREE-SIGNATURE) (DATE)
(NAME-PRINTED)
(ADDRESS)
GENERAL PERMIT (SAJ-84)
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
P.O. BOX 4970
JACKSONVILLE, FLORIDA 32232-0019
REPLY TO ATTENTION OF
Regulatory Division
December 22, 2017
DEPARTMENT OF THE ARMY PERMIT
PROGRAMMATIC GENERAL PERMIT (PGP) SAJ-84
SAJ-2015-01075 (PGP-TKW)
LIMITED MINOR ACTIVITIES WITHIN THE SEMINOLE TRIBE OF FLORIDA
BRIGHTON INDIAN RESERVATION
Upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers
and Harbors Act of 1899 (33 U.S.C. 403), and Section 404 of the Clean Water Act (33
U.S.C. 1344) general authority is hereby given for the discharge of fill material on the
Brighton Seminole Indian Reservation (BSIR) for the following minor activities: single
family home sites, utility lines, recreational facilities, boating, agricultural use, commercial
use, government facilities, water control activities, ditch maintenance, and road
construction. This authorization is valid subject to the following Special and General
Conditions and is issued consistent with the associated Coordination Agreement entitled
"Coordination Agreement Between the U.S. Army Corps of Engineers Jacksonville
District and the Seminole Tribe of Florida Programmatic General Permit Big Cypress and
Brighton Seminole Indian Reservations."
The project area subject to this PGP includes the 36,700-acre BSIR, which is part of the
historic Western Okeechobee Kissimmee Basin wetland system and is located north of
Big Cypress National Preserve is located northwest of Lake Okeechobee in Glades
County, Florida as illustrated in Attachment I.
APPROXIMATE CENTRAL COORDINATES:
Latitude:
27.047374º
Longitude: -81.083404º
SPECIAL CONDITIONS:
1. Limits of Authorized Work: This permit is limited to filling waters of the United
States for the following minor activities: single family home sites, utility lines,
recreational facilities, boating, agricultural use, commercial use, government
facilities, water control activities, ditch maintenance, and road construction. Acreage
thresholds and conditions for use under this PGP are as follows:
1
Activity
No.
Activity Type
Fill
Limits
(acres)
1.00
1
Single-Family
Residential
2
Utility Lines
1.00
3
Recreational
Facilities
1.50
4
Boating
0.25
5
Agricultural
1.00
6
Commercial
Development
1.50
7
Government
Facilities
1.50
Activity Description and Conditions
Discharges of dredged or fill material in non-tidal waters of the U.S.
including non-tidal wetlands, for the construction or expansion of
traditional single family home sites that include houses, access
roads, driveways, chickees for various practices (sewing, cooking,
religious practices , and other similar practices) , bathhouses , and
septic systems with drain fields with applicable set-backs.
The construction, maintenance or repair of utility lines, including
intake/outfall structures, and the associated excavation , backfilling
or bedding, utility line substations, foundations for overhead utility
line towers, cell towers, poles, and anchors; Access roads for the
construction and maintenance of utility lines, including overhead
power lines and utility line substations.
Discharges of dredged or fill material in non-tidal waters of the U.S.
including non-tidal wetlands for both passive and non-passive
recreation use to include, but not limited to, campgrounds,
swimming pools, playing fields (baseball, soccer or football),
basketball and tennis courts. Also authorized are small support
facilities, such as maintenance and storage buildings, restrooms
and associated parking areas that are directly related to the
recreational activity. Hotels, motels, restaurants, and other similar
facilities are not authorized under this activity.
Noncommercial boat launching facility (ramps), parking for
vehicles/trailers, associated structures-bulkheads, rub-rails, tie-up
piers, and walkways. The acreage limitation includes the filled
area and excavated area plus special aquatic sites and surface
waters that are adversely affected.
Land clearing, building pads, new ditches and/or dikes, side
casting from ditch construction, associated with agricultural uses.
Ditches will be constructed to control both surface and ground
water. Any direct, cumulative or secondary impacts shall not
exceed the 1.0-acre threshold.
Small business development proposed by tribal members.
Development proposed by chain restaurant and retail stores is not
authorized under this PGP. However, when associated with an
existing single-family homesite both the existing and proposed fill
impacts will not exceed 1.5 acres. Authorized development
includes buildings, parking areas, septic systems with drain fields
and access roads.
New or additions to existing facilities such as schools, government
buildings, medical facilities for associated parking areas, public
works infrastructure , and other similar facilities. Existing facilities
are those that were existing and/or under construction when this
PGP is issued.
2
8
Water Control
1.00
9
Ditch
Maintenance
No Limit
10
Transportation/
Roads
1.50
N/A
All
N/A
The construction of stormwater management facilities including
excavation of stormwater ponds, the installation and maintenance
of water control structures, outfall structures, and emergency
spillways, including secondary impacts associated with the
excavation of stormwater ponds. Also for the construction and
maintenance of ditches, which includes re-shaping of existing
ditches and modification of the cross-sectional configuration of
currently serviceable ditches. No activity shall cause an increase
of the designed drainage capacity or in the designed drainage
area.
Maintenance of existing functional ditches, limited to pre-existing
ditch design and/or historic design. This applies to ditches located
on existing farm fields or on existing agricultural lands.
Construction, expansion, modification, or improvement of existing
linear transportation crossings (roadways) for safety purposes.
Includes the widening of existing road shoulders or construction of
new shoulders along existing roadways, using only pervious
material. Existing roads are those that were existing or under
construction when this PGP is issued.
All effort must be made to minimize impacts to aquatic resources.
Discharges authorized under this PGP must be part of a single and
complete project.
2. Permit Area: Specific use of this PGP is limited to the areas shown in Attachment 2
located within the BSIR.
3. Limits of Fill: This permit authorizes minor activities involving the placement of fill
material in up to 50 acres of federally designated jurisdictional wetlands within the
BSIR per year, not to exceed a total of 100 acres of jurisdictional wetlands over a five
year period, effective the date of this permit.
4. Compensatory Mitigation: Mitigation requirements will be satisfied by generating
functional capacity credits in accordance with the Advanced Mitigation Program (AMP)
proposed at the FBI Mitigation Area Tract (Attachment 3). The STOF shall maintain a
ledger to include the type and amount of mitigation credit(s) used for each verification
under this PGP which requires mitigation. This ledger shall include, but not be limited to,
the following information:
a.
b.
c.
d.
e.
f.
g.
h.
Permittee Name
Permittee Address and Contact Information
Date of DA permit verification
Date of credit purchase/release
Type of credit(s) purchased
Amount of credit(s) purchased
Total Credits purchased
Total Credits released/available
3
A copy of the ledger shall be provided to the Corps on an annual basis, or upon
request. Information recorded in the ledger shall be subject to amendment/revision at
the discretion of the Corps.
5. Pre-construction Notification: Before any activities may be conducted pursuant to
this authorization, the applicant must submit a pre-construction notification to the
Seminole Tribe of Florida (Tribe) Environmental Resource Management Division
(ERMD). The ERMD will forward a copy of all PCN's to the Corps, with the Tribe's
determination of compliance with this authorization, as a part of the quarterly reporting
requirements prescribed by the associated Coordination Agreement. All PCN
submittals shall include the following information, at a minimum:
a. ENG FORM 4345 (signed by an authorized representative of the Tribe).
b. Maps will identify federally jurisdictional wetlands consistent with the 1987
Corps of Engineers Wetland Delineation Manual, as modified by the Regional
Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf
Coastal Plain Region (Version 2.0 ERDC/EL TR-10-20), November 2010. A
minimum of two sets of data sheets per wetland shall be submitted. The total number
of data sheets will vary with each site, depending on the number of wetlands.
c. Provide a clear description (including maps) of the proposed work and wetland
impact areas; analysis of impacts to Federally listed wildlife species; Wetland Rapid
Assessment Procedure analysis of direct and secondary wetland impacts; and an
updated version of the BSIR Programmatic General Permit (SAJ-84) Ledger.
6. Erosion Control: Prior to the initiation of any work authorized by this permit, the
Permittee shall install erosion control measures along the perimeter of all work areas to
prevent the displacement of fill material. Immediately after completion of the final
grading of the land surface, all slopes, land surfaces, and filled areas adjacent to
wetlands shall be stabilized using sod, degradable mats, or a combination of similar
stabilizing materials to prevent erosion. For dredging activities, all dredged or
excavated materials will be deposited and retained in an area that is not a water of the
United States unless specifically approved by the Corps under a separate authorization
and proper siltation controls must be used. The erosion and siltation control measures
shall remain in place and be maintained until all authorized work has been completed
and the site has been stabilized.
7. Cultural Resources/Historic Properties: If cultural resources, as defined by the
Seminole Tribe of Florida's Cultural Resource Ordinance(Ordinance # C-02-14); which
includes but is not limited to places and items of special cultural importance, historic
properties, archaeological sites/materials, and burial resources) are encountered, then
the Permittee shall immediately stop all work and ground-disturbing activities within a
100-meter diameter of the discovery and notify the THPO within the same business day
(8 hours). After such notification, work authorized by this PGP may not resume without
written authorization from the THPO.
4
8. Biological Opinion: This Corps permit does not authorize the Tribe to take an
endangered species, in particular the Audubon's crested caracara (Polyborusplancus
audubonii), Florida bonneted bat (Eumops floridanus), Florida panther (Puma (Felis)
concolor coryi), and the Eastern indigo snake (Drymarchon corais couperi). In order
to legally take a listed species, you must have separate authorization under the
Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or a BO under ESA
Section 7, with "incidental take" provisions with which you must comply). The U.S.
Fish and Wildlife Service's (Service) Biological Opinion (BO), dated December 19,
2014, contains mandatory terms and conditions (Attachment 4) to implement the
reasonable and prudent measures that are associated with "incidental take." that is
also specified in the BO. Your authorization under this Corps permit is conditional
upon your compliance with all of the mandatory terms and conditions associated with
incidental take of the attached BO, which terms and conditions are incorporated by
reference in this permit. Failure to comply with the terms and conditions associated
with incidental take of the BO, where a take of the listed species occurs, would
constitute an unauthorized take, and it would also constitute non-compliance with your
Corps permit. The Service is the appropriate authority to determine compliance with
the terms and conditions of its BO, and with the ESA.
9. Manatee Key: Prior to issuance of authorization, the dichotomous key titled "The
Corps of Engineers, Jacksonville District, and the State of Florida Effect
Determination Key for the Manatee in Florida, April 2013", (see
http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered_spec
ies/Manatee/2013_FINAL_ManateeKey.pdf) will be used to determine potential
manatee impacts. Those determined to be a "may affect" to the manatee will not be
authorized until consultation on the project has been re-initiated and concluded with the
U.S. Fish and Wildlife Service in accordance with the Endangered Species Act.
Additionally, depending on the location of the project, some projects determined to be
"may affect, not likely to adversely affect" will not be authorized until consultation on the
project has been re-initiated and concluded with a "no jeopardy" determination. Note:
The manatee key may be subject to revision at any time. It is our intention that the most
recent version of this technical tool will be utilized during the evaluation of the permit
application.
10. Manatee Conditions: For projects in waters accessible to manatees, the permittee
will utilize the "Standard Manatee Conditions for In-Water Work, 2011" (see
http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered_spec
ies/Manatee/2011_StandardConditionsForIn-waterWork.pdf) and/or requirements, as
appropriate for the proposed activity. Note: The manatee conditions may be subject to
revision at any time. It is our intention that the most recent version of these conditions
will be utilized during the evaluation of the permit application.
11. Eastern Indigo Snake Protection Measures: The Tribe shall comply with Service
"Standard Protection Measures for the Eastern Indigo Snake" (dated August 12, 2013)
(Attachment 5) during project site preparation and construction. These Protection
Measures can be found at:
http://www.saj.usace.army.mil/Missions/Regulatory/Source-Book/
5
The following shall also apply:
a. All gopher tortoise burrows, active or inactive, will be evacuated prior to site
manipulation in the burrow vicinity. The excavation method selected should also
minimize the potential for injury of an indigo snake.
b. Holes, cavities, and snake refuge other than gopher tortoise burrows will be
inspected each morning before planned site manipulation of a particular area, and
if occupied by an indigo snake, no work will commence until the snake has
vacated the vicinity of proposed work.
12. Water Quality Certification: Prior to the initiation of any construction, projects
qualifying for PGP SAJ-84 must be authorized by the Seminole Tribe of Florida
Environmental Resource Management Department.
13. Fill Material: The Tribe shall use only clean fill material for this project. The fill
material shall be free from items such as trash, debris, automotive parts, asphalt,
construction materials, concrete block with exposed reinforcement bars, and soils
contaminated with any toxic substance, in toxic amounts in accordance with Section
307 of the Clean Water Act. Unless previously authorized under separate DA permit, the
source of fill used under this PGP shall not include waters of the U.S.
14. Self-Certification: Within 60 days of completion of the authorized work, and any
mitigation required, the attached Self-Certification Statement of Compliance form
(Attachment 6) must be completed and submitted to the Tribe. The form must
reference PGP SAJ-84 and other information associated with the work. The Tribe will
report to the Corps on a quarterly basis on certification of projects receiving
authorization under this PGP.
15. Reporting Address: All reports, documentation and correspondence required by
the conditions of this permit shall be submitted to the following address: Attention,
Deputy Chief, Regulatory Division, Jacksonville District, U.S. Army Corps of Engineers,
P.O. Box 4970, Jacksonville, Florida 32232-0019.
16. Modification of Federally Authorized Projects: Evaluation of applications for
utility line crossings of levees, dikes, dams, or other water retaining structures will require
case specific review by the Jacksonville Engineering Division in accordance with 33
U.S.C. 408 and approval from the Jacksonville District Commander prior to authorization
under this PGP. Subaqueous utility and aerial transmission line crossings, proposed in
all Central and Southern Florida canals, with the exception of C-43, C-44, and Taylor
Creek, will require project specific approval for compliance with 33 USC 408 from the
U.S. Army Corps of Engineers prior to receiving authorization. Once, the project specific
approval under 33 USC 408 has been received, and all other conditions of the permit
have been met, a permit verification letter may be issued.
17. Subaqueous Utility and Aerial Transmission Lines: The discharge of dredged or
fill material is authorized by this general permit for the installation, construction,
maintenance, replacement, and/or repair of:
6
a. Foundations for overhead transmission line towers, poles, and anchors in all
waters of the United States, excluding those areas listed in Special Condition 17 above,
provided the foundations are the minimum size necessary and separate footings for each
tower leg (rather than a larger single pad) are used where feasible.
b. Electrical substations in non-tidal waters of the United States, excluding areas
listed in Special Condition 3 above and all non-tidal wetlands adjacent to tidal waters,
providing the discharge does not cause the loss of greater than one-half acre of non-tidal
waters of the United States.
c. Access roads in non-tidal waters of the United States, and all non-tidal wetlands
adjacent to tidal waters, for the construction and maintenance of overhead transmission
lines and electrical substations, provided the discharge does not result in the loss of
greater than 1.5 acres per project. NOTE: Access roads shall be the minimum width
necessary. Access roads constructed under this permit shall be made of pervious
materials such as sand, gravel, limestone, etc. Access roads must be constructed so that
the length of the road minimizes the adverse effects on waters of the U.S. and as near as
possible to preconstruction contours and elevations (e.g., at grade corduroy roads or
geotextile/gravel roads). Access roads constructed above preconstruction contours and
elevations in waters of the United States must be properly bridged or culverted to
maintain surface flows. Access roads used solely for construction of the overhead power
line must be removed upon completion of the work and the area restored to
preconstruction contours, elevations, and wetland conditions.
18. Horizontal Directional Drilling: Directional boring vaults, junction boxes, and/or
pads will not be constructed within 50 feet of the top of the bank of waterways
(rivers/streams). Horizontal directional drilling pilot, entrance, and exit holes must be the
minimum diameter necessary; and, must be set back from the waterway (river/stream)
bank by a minimum of 50 feet. Excavated materials and drilling mud must be stockpiled
on non-wetland areas, where available. Appropriate fabric must be placed beneath all
materials stockpiled in wetlands.
19. Subaqueous Utility Line Depth Requirement: Except as otherwise noted by these
Special Conditions, all subaqueous utility and/or transmission lines authorized by this
regional general permit must be installed a minimum of 6 feet below the bottom contour
of any other water of the United States. The 6-foot criterion applies to the entire
authorized width of the crossing, plus a minimum of 10 feet on each side of the crossing.
20. Sidecasting: Material resulting from trench excavation may be temporarily sidecast
(up to three months) into waters of the United States, provided that the material is not
placed in such a manner that it is dispersed by currents or other forces. The District
Engineer may extend the period of temporary side casting not to exceed a total of 180
days, where appropriate. The top 6- 12 inches of the trench should normally be backfilled
with topsoil from the trench. Furthermore, the trench cannot be constructed in such a
manner as to drain waters of the United States (e.g., backfilling with extensive gravel
layers, creating a French drain effect). For example, utility line trenches can be backfilled
with clay blocks to ensure that the trench does not drain the waters of the United States
through which the utility line is installed. Any exposed slopes and stream banks must be
7
stabilized immediately upon completion of the utility line crossing of each waterbody.
21. Maintaining Pre-Construction Contours: Dredged or fill material placed as backfill
or bedding for subaqueous utility and transmission lines must not change the
preconstruction bottom contours. Excess material must be moved to an upland disposal
area.
22. Warning Signs for Subaqueous Utility and Transmission Lines: The permittee
will install signs at the shoreline to notify navigational interests of the location of
subaqueous utility and transmission lines.
23. Severing Jurisdiction: No project will be authorized under this PGP if the proposed
fill activity will result in upstream waters of the United States being removed from Federal
jurisdiction.
24. Marked Utilities: No work shall be performed until after the permittee provides
notification to the owner(s) or operator(s) of any marked utilities in the work area, unless
the permittee is the same entity as the owner(s) or operator(s).
25. Permit Expiration: This permit shall be valid for a period of five years from the
date of issuance, unless suspended or revoked by issuance of a public notice by the
District Engineer. A review will be conducted to determine if continuance of the permit
is in the public interest after the 5-year expiration date. If this permit expires or is
revoked prior to completion of the authorized work, authorization of activities that have
commenced or are under contract to commence in reliance on this permit will remain in
effect provided the activity is completed within 12 months of the date this permit expired
or was revoked.
BY AUTHORITY OF THE SECRETARY OF THE ARMY
Digitally signed by
KINARD.DONALD.W KINARD.DONALD.WAYNE.1229879703
DN: c=US, o=U.S. Government, ou=DoD,
ou=USA,
AYNE.1229879703 ou=PKI,
cn=KINARD.DONALD.WAYNE.1229879703
Date: 2017.12.22 12:35:24 -05'00'
FOR Jason A. Kirk
Colonel, U.S. Army
District Engineer
8
GENERAL CONDITIONS FOR DEPARTMENT OF THE ARMY GENERAL PERMITS
1. The time limit for completing the work authorized ends on December 22, 2022.
2. You must maintain the activity authorized by this permit in good condition and in
conformance with the terms and conditions of this permit. You are not relieved of this
requirement if you abandon the permitted activity, although you may make a good
faith transfer to a third party in compliance with General Condition 4 below. Should
you wish to cease to maintain the authorized activity or should you desire to abandon
it without a good faith transfer, you must obtain a modification of this permit from this
office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while
accomplishing the activity authorized by this permit, you must immediately notify this
office of what you have found. We will initiate the Federal and State coordination
required to determine if the remains warrant a recovery effort or if the site is eligible for
listing in the National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature
and mailing address of the new owner in the space provided below and forward a
copy of the permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you
must comply with the conditions specified in the certification as special conditions to
this permit.
6. You must allow representatives from this office to inspect the authorized activity
at anytime deemed necessary to ensure that it is being or has been accomplished in
accordance with the terms and conditions of your permit.
Further Information:
1. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or local
authorizations required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed
Federal projects.
2. Limits of Federal Liability. In issuing this permit, the Federal Government does
not
9
assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted
or
unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future
activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or
structures caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or
revocation of this permit.
3. Reliance on Applicant's Data: The determination of this office that issuance of this
permit is not contrary to the public interest was made in reliance on the information
you provided.
4. Reevaluation of Permit Decision: This office may reevaluate its decision on this
permit at any time the circumstances warrant. Circumstances that could require a
reevaluation include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to
have been false, incomplete, or inaccurate (see 3 above).
c. Significant new information surfaces which this office did not consider in
reaching the original public interest decision.
5. Such a reevaluation may result in a determination that it is appropriate to use the
suspension, modification, and revocation procedures contained in 33 CFR 325.7 or
enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The
referenced enforcement procedures provide for the issuance of an administrative
order requiring you comply with the terms and conditions of your permit and for the
initiation of legal action where appropriate. You will be required to pay for any
corrective measures ordered by this office, and if you fail to comply with such
directive, this office may in certain situations (such as those specified in 33 CFR
209.170) accomplish the corrective measures by contract or otherwise and bill you
for the cost.
10
6. When the structures or work authorized by this permit are still in existence at the
time the property is transferred , the terms and conditions of this permit will continue
to be binding on the new owner(s) of the property. To validate the transfer of this
permit and the associated liabilities associated with compliance with its terms and
conditions, have the transferee sign and date below.
(TRANSFEREE-SIGNATURE)
(DATE)
(NAME-PRINTED)
(ADDRESS)
GENERAL PERMIT (SAJ-84)
2
Attachment 1. Permit Area Location Map
Seminole Tribe of Indians of Florida Brighton
Reservation, Glades County, Florida
N
Lat: 27 0 03' 36.84" N
Lon: 81 0 04' 13.05" W
Attachment 2. Permit Use Area
US Army Corps of Engineers
SAJ-2013-01462 (DWP)
5/13/2015
Attachment 2 of 3
Brighton Seminole Indian Reservation
Rese rvatron Boundary
Proposed Land Use Map for
Brighton ACOE General Permit
1/22/2014 M1shka Shaw, Environmental R~source Management Department, True Color Aerial 2010
The mfo rmatio n shown on this map is provided by the Seminole Tnbe of Florida GIS Department Map Information 1s believed to be
accurate but accuracy 1s not guaranteed Any d1screpanc1es should be reported to the Seminole Tnbe of Florida. GlS Department
ATTACHMENT 3
U.S. Army Corps of Engineers
Permit # SAJ-2004-03931 (PGP-JSC)
Date: 3/5/2015
Drawing
Attachment 3 of 10
U.S. Army Corps of Engineers
Permit # SAJ-2004-03931 (RGP SAJ-83)
Date: 2/07/2014
Drawing
Attachment 3 of 10
Attachment 3. Mitigation Area
Legend
' D
631 - Enhanced Wetland Shrub
c::J 641- Enhanced Marsh
D 643 - Enhanced Wet Prairie
211 - Improved Pasture
E2'.'.J 330 - Mixed Rangelunds
425 - Temperate Hardwood
D
......-====---·-·
427 - Oak w/ Saw Palmetto
Seminole Tribe of Florida Brighton Reservation
ATTACHMENT 3
Advanced Mitigation Area (FBI)
Baseline Conditions
Habitats to be Preserved & Enhanced
· Map does not reflect all exotic/nuisance sp
..
\.lap
crl.!at~d
bv
P.lt7.ilbd~
1.ctIB. Env1ronmcntal Rc"'tOurc..:
~vla n ag.em~nt l~pa1
US Army Corps of Engineers
SAJ-2013-01462 (DWP)
511 312015
Attachment 3 of 3
Wetland ID
Priority Wetland
lnfestation Areas
Priority Wetland
Infestation Areas
Priority Wetland
Infestation Areas
Habitat Type/ FLUCCS Code
Enhanced Wetland Shrub/ 631
Enhanced Wet Prairie/ 643
Low Priority
Wetland
Enhanced Freshwater Marsh/ 641
Infestation Areas
Low Priority
Wetland
Exotic Species
Schinus terebinthifolius
Schinus terebinthifolius,
Lygodium microphylum,
Enhanced Freshwater Marsh/ 641
Enhanced Wet Prairie/ 643
Infestation Areas
Activity: Pre & Post WRAP
Date: 6/10/14
Project: Brighton Advanced Mitigation Area
Exotic Species
Common Name
Brazilian pepper
Acreage
Exotic
Wetland
Removals
Infestation
0.61
0.75
5
0.7
0.83
0.45
0.77
129.54
41.45
0.42
0.7
60.32
0.61
0.73
0.57
0.7
Pre WRAP
(%)
10-15%
exotic cover
Habitat Type/ FLUCCS Code
Melaleuca quinquenervia,
world climbing fern,
Mel 10-25%
Melaleuca, Paragrass,
Pan 20%
Torpedo grass
Ure 50%
Exotic Species
Rangelands/ 330, Pine Flatwoods/
Infestation Areas
411, Brazilian Pepper/ 422,
Temperate Hardwood/ 425,
Cabbage Palm/ 428, Streams &
Waterways/ 510, Roads & ROW/
814
Imperato cylindrica,
Melaleuca quinquenervia,
Schinus terebinthifolius,
Urena lobata, Urochloa
mutica, Solanum torvum
Mel 10%
Melaleuca, Paragrass
Ure 50%
Brazilian pepper, Old-
Lygo <10%
Rangelands/ 330, Pine Flatwoods/
Upland
411, Temperate Hardwood/
Infestation Areas
425,Live Oak/ 427, Upland Scrub/
436, Roads & ROW/ 814
Schinus terebinthifolius,
Melaleuca quinquenervia
Final Totals
Functional Lift
Prescribed
Functional
Burns
Lift
Treatment&
Burns
5
0.4
1.102
0.8
129.54
3.89
45.37
16.89
0.76
60.32
3.61
22.78
66.59
7.99
0.78
66.59
3.33
11.32
34.78
4.523
0.75
34.78
1.74
6.27
296.23
71.55
Totals :
296.23
12.97
84.52
Exotic Removals
Prescribed
Burns
Prescribed
Burns
Sch <10%
world climbing fern ,
Mel <10%
Melaleuca, Paragrass,
Pan <10%
Torpedo grass
Uro <10%
Brazilian pepper, Old-
Lygo <10%
Sch <10%
world climbing fern,
Mel <10%
Melaleuca, Paragrass,
Pan <10%
Torpedo grass
Ura <10%
Totals:
Exotic Species
Common Name
Infestation
Percentages
(%)
Acreage Upland
Acre age Upland
Infestation
Prescribed
Burns
Cogongrass,
Melaleuca,
Brazilian
pepper, Caesar weed,
Paragrass,
Turkeyberry
Imp 75%
Mel5%
Sch 6-25%
Ure5%
300.36
300.36
284.28
284.28
584.64
584.64
Uro
20%
Improved Pasture/ 211, Mixed
Low Priority
Acreage
Wetland
Sch 6-25%
Brazilian pepper,
Improved Pasture/ 211, Mixed
Priority Upland
Post WRAP
Sch 10%
*Burn functional lift determined by deduction from the post exotic removal WRAP score
Upland ID
Functional lift
Brazilian pepper, Old- Lygo 26-75%
Urochloa mutica, Panicum
repens
Schinus terebinth1folius,
Melaleuca quinquenervia ,
Uroch/oa mutica
Schinus terebinthifolius,
Lygodium microphylum,
Melaleuca quinquenervia,
Urochloa mutica, Panicum
repens
Schinus terebinthifolius,
Lygodium microphylum,
Melaleuca quinquenervia ,
Urochloa mutica, Panicum
repens
Post WRAP
Infestation
Percentages
Evaluator: Elizabeth Letts
Brazilian pepper,
Sch 10-75%
Melaleuca
Mel 10-25%
Totals:
US Army Corps of Engineers
SAJ-2013-01462 (DWP)
5/13/2015
Attachment 3 of 3
Attachment 4
U.S. Fish and Wildlife Service Biological Opinion Terms and Conditions
Service Federal Activity Code: 2013-F-0197
Issued: December 19, 2014
1. Preservation and enhancement:
a. The preservation-sites will be managed in perpetuity for the control of invasive
exotic vegetation as defined by the Florida Exotic Pest Plant Council's Pest Plant List
Committee's 2001 List of Invasive Species (Category 1) (2005) and managed for the benefit
of the Florida panther in accordance to the management and monitoring plans provided as
part of this action.
2. Education:
a. Enforce the use of the Standard Wildlife Education Measures developed by the
ERMD, which include a mandatory wildlife workshop for all project personnel on tribal lands.
3. Monitoring:
a. The Tribe will annually locate all caracara nests on the Reservations according
to Appendix B of the Draft 2004 Audubon's Crested Caracara Species Conservation
Guidelines (Service 2004).
4. Reporting:
a. Report the acreage, PHU value, and provide a GIS file for each project that results in
loss of habitat. Consolidate this information biannually and report it to the Service no later than
the second weeks of June and January each calendar year.
b. Upon locating a dead, injured, or sick federally listed species, initial notification must
be made to the referenced project biologist and the nearest Service Law Enforcement Office
(U.S. Fish and Wildlife Service; 1339 20'h Street, Vero Beach, Florida; 772-562-3909).
Secondary notification should be made to the FWC, South Region; 8535 Northlake Boulevard,
West Palm Beach, Florida; 33412-3303; 561-625-5122; 1-888-404-3922.
c. Care shall be taken in handling sick or injured specimens to ensure effective treatment
and care, or, in the handling of dead specimens, to preserve biological material in the best
possible state for later analysis as to the cause of death. Dead specimens should be placed on ice
and frozen as soon as possible. In conjunction with the care of sick or injured specimens or
preservation of biological materials from a dead animal, the finder has the responsibility to carry
out instructions provided by Law Enforcement to ensure evidence intrinsic to the specimen is
not unnecessarily disturbed.
d. Report all listed species' sightings, injuries, or deaths resulting from the proposed action
to the referenced project biologist. This report shall contain the location (latitude and longitude),
dates, times, prevailing environmental conditions, and the circumstances surrounding all
sightings and the disposition of all animals found. A site map with observation locations shall
also be included in this report. If no snakes are encountered, a report shall be submitted
indicating that fact.
Attachment 5
STANDARD PROTECTION MEASURES FOR THE EASTERN INDIGO SNAKE
U.S. Fish and Wildlife Service
August 12, 2013
The eastern indigo snake protection/education plan (Plan) below has been developed by the U.S.
Fish and Wildlife Service (USFWS) in Florida for use by applicants and their construction
personnel. At least 30 days prior to any clearing/land alteration activities, the applicant shall
notify the appropriate USFWS Field Office via e-mail that the Plan will be implemented as
described below (North Florida Field Office: jaxregs@fws.gov; South Florida Field Office:
verobeach@fws.gov; Panama City Field Office: panamacity@fws.gov). As long as the signatory
of the e-mail certifies compliance with the below Plan (including use of the attached poster and
brochure), no further written confirmation or "approval" from the USFWS is needed and the
applicant may move forward with the project.
If the applicant decides to use an eastern indigo snake protection/education plan other than the
approved Plan below, written confirmation or "approval" from the USFWS that the plan is
adequate must be obtained. At least 30 days prior to any clearing/land alteration activities, the
applicant shall submit their unique plan for review and approval. The USFWS will respond via email, typically within 30 days of receiving the plan, either concurring that the plan is adequate or
requesting additional information. A concurrence e-mail from the appropriate USFWS Field
Office will fulfill approval requirements.
The Plan materials should consist of: 1) a combination of posters and pamphlets (see Poster
Information section below); and 2) verbal educational instructions to construction personnel by
supervisory or management personnel before any clearing/land alteration activities are initiated
(see Pre-Construction Activities and During Construction Activities sections below).
POSTER INFORMATION
Posters with the following information shall be placed at strategic locations on the construction
site and along any proposed access roads (a final poster for Plan compliance, to be printed on 11"
x 17" or larger paper and laminated, is attached):
DESCRIPTION: The eastern indigo snake is one of the largest non-venomous snakes in North
America, with individuals often reaching up to 8 feet in length. They derive their name from the
glossy, blue-black color of their scales above and uniformly slate blue below. Frequently, they
have orange to coral reddish coloration in the throat area, yet some specimens have been reported
to only have cream coloration on the throat. These snakes are not typically aggressive and will
attempt to crawl away when disturbed. Though indigo snakes rarely bite, they should NOT be
handled.
SIMILAR SNAKES: The black racer is the only other solid black snake resembling the eastern
indigo snake. However, black racers have a white or cream chin, thinner bodies, and WILL BITE
if handled.
LIFE HISTORY: The eastern indigo snake occurs in a wide variety of terrestrial habitat types
throughout Florida. Although they have a preference for uplands, they also utilize some wetlands
1
and agricultural areas. Eastern indigo snakes will often seek shelter inside gopher tortoise
burrows and other below- and above-ground refugia, such as other animal burrows, stumps,
roots, and debris piles. Females may lay from 4 - 12 white eggs as early as April through June,
with young hatching in late July through October.
PROTECTION UNDER FEDERAL AND STATE LAW: The eastern indigo snake is
classified as a Threatened species by both the USFWS and the Florida Fish and Wildlife
Conservation Commission. "Taking" of eastern indigo snakes is prohibited by the Endangered
Species Act without a permit. "Take" is defined by the USFWS as an attempt to kill, harm,
harass, pursue, hunt, shoot, wound, trap, capture, collect, or engage in any such conduct.
Penalties include a maximum fine of $25,000 for civil violations and up to $50,000 and/or
imprisonment for criminal offenses, if convicted.
Only individuals currently authorized through an issued Incidental Take Statement in association
with a USFWS Biological Opinion, or by a Section 10(a)(1)(A) permit issued by the USFWS, to
handle an eastern indigo snake are allowed to do so.
IF YOU SEE A LIVE EASTERN INDIGO SNAKE ON THE SITE:
Cease clearing activities and allow the live eastern indigo snake sufficient time to move
away from the site without interference;
Personnel must NOT attempt to touch or handle snake due to protected status.
Take photographs of the snake, if possible, for identification and documentation purposes.
Immediately notify supervisor or the applicant's designated agent, and the appropriate
USFWS office, with the location information and condition of the snake.
If the snake is located in a vicinity where continuation of the clearing or construction
activities will cause harm to the snake, the activities must halt until such time that a
representative of the USFWS returns the call (within one day) with further guidance as to
when activities may resume.
IF YOU SEE A DEAD EASTERN INDIGO SNAKE ON THE SITE:
Cease clearing activities and immediately notify supervisor or the applicant's designated
agent, and the appropriate USFWS office, with the location information and condition of
the snake.
Take photographs of the snake, if possible, for identification and documentation purposes.
Thoroughly soak the dead snake in water and then freeze the specimen. The appropriate
wildlife agency will retrieve the dead snake.
Telephone numbers of USFWS Florida Field Offices to be contacted if a live or dead
eastern indigo snake is encountered:
North Florida Field Office (904) 731-3336
Panama City Field Office (850) 769-0552
South Florida Field Office (772) 562-3909
2
PRE-CONSTRUCTION ACTIVITIES
1. The applicant or designated agent will post educational posters in the construction office and
throughout the construction site, including any access roads. The posters must be clearly visible
to all construction staff. A sample poster is attached.
2. Prior to the onset of construction activities, the applicant/designated agent will conduct a
meeting with all construction staff (annually for multi-year projects) to discuss identification of
the snake, its protected status, what to do if a snake is observed within the project area, and
applicable penalties that may be imposed if state and/or federal regulations are violated. An
educational brochure including color photographs of the snake will be given to each staff
member in attendance and additional copies will be provided to the construction superintendent
to make available in the onsite construction office (a final brochure for Plan compliance, to be
printed double-sided on 8.5" x 11" paper and then properly folded, is attached). Photos of
eastern indigo snakes may be accessed on USFWS and/or FWC websites.
3. Construction staff will be informed that in the event that an eastern indigo snake (live or dead)
is observed on the project site during construction activities, all such activities are to cease until
the established procedures are implemented according to the Plan, which includes notification of
the appropriate USFWS Field Office. The contact information for the USFWS is provided on the
referenced posters and brochures.
DURING CONSTRUCTION ACTIVITIES
1. During initial site clearing activities, an onsite observer may be utilized to determine whether
habitat conditions suggest a reasonable probability of an eastern indigo snake sighting (example:
discovery of snake sheds, tracks, lots of refugia and cavities present in the area of clearing
activities, and presence of gopher tortoises and burrows).
2. If an eastern indigo snake is discovered during gopher tortoise relocation activities (i.e. burrow
excavation), the USFWS shall be contacted within one business day to obtain further guidance
which may result in further project consultation.
3. Periodically during construction activities, the applicant's designated agent should visit the
project area to observe the condition of the posters and Plan materials, and replace them as
needed. Construction personnel should be reminded of the instructions (above) as to what is
expected if any eastern indigo snakes are seen.
POST CONSTRUCTION ACTIVITIES
Whether or not eastern indigo snakes are observed during construction activities, a monitoring
report should be submitted to the appropriate USFWS Field Office within 60 days of project
completion. The report can be sent electronically to the appropriate USFWS e-mail address listed
on page one of this Plan.
3
ATTACHMENT 6
CERTIFICATION STATEMENT OF COMPLIANCE
PGP SAJ-84
Permittee's Name & Address (please print or type):
____________________________________________________________________________
Telephone Number: _
Location of the Work:
Date Work Started: _
Date Work Completed:
PROPERTY IS INACCESSIBLE WITHOUT PRIOR NOTIFICATION: YES
NO
TO SCHEDULE AN INSPECTION PLEASE CONTACT
AT
Description of the Work (e.g. bank stabilization, residential or commercial filling, docks,
dredging, etc.):_
__________________________________________________________
Acreage or Square Feet of Impacts to Waters of the United States:
Describe Mitigation completed (if applicable):
Describe any Deviations from Permit (attach drawing(s) depicting the deviations):
********************
I certify that all work, and mitigation (if applicable) was done in accordance with the limitations
and conditions as described in the permit. Any deviations as described above are depicted on
the attached drawing(s).
Signature of Permittee
Date
THE CORPS OF ENGINEERS, JACKSONVILLE DISTRICT, AND THE STATE OF
FLORIDA EFFECT DETERMINATION KEY FOR THE MANATEE IN FLORIDA
April 2013
Purpose and background of the key
The purpose of this document is to provide guidance to improve the review of permit
applications by U.S. Army Corps of Engineers' (Corps) Project Managers in the Regulatory
Division regarding the potential effects of proposed projects on the endangered West Indian
manatee (Trichechus manatus) in Florida, and by the Florida Department of Environmental
Protection or its authorized designee or Water Management District, for evaluating projects
under the State Programmatic General Permit (SPGP) or any other Programmatic General
Permits that the Corps may issue for administration by the above agencies. Such guidance is
contained in the following dichotomous key. The key applies to permit applications for in-water
activities such as, but not limited to: (1) dredging [new or maintenance dredging of not more
than 50,000 cubic yards], placement of fill material for shoreline stabilization, and
construction/placement of other in-water structures as well as (2) construction of docks, marinas,
boat ramps and associated trailer parking spaces, boat slips, dry storage or any other watercraft
access structures or facilities.
At a certain step in the key, the user is referred to graphics depicting important manatee areas or
areas with inadequate protection. The maps can be downloaded from the Corps' web page at
http://www.saj.usace.army.mil/Missions/Regulatory/SourceBook.aspx. We intend to utilize the
most recent depiction of these areas, so should these areas be modified by statute, rule, ordinance
and/or other legal mandate or authorization, we will modify the graphical depictions accordingly.
These areas may be shaded or otherwise differentiated for identification on the maps.
Explanatory footnotes are provided in the key and must be closely followed whenever
encountered.
Scope of the key
This key should only be used in the review of permit applications for effect determinations on
manatees and should not be used for other listed species or for other aquatic resources such as
Essential Fish Habitat (EFH). Corps Project Managers should ensure that consideration of the
project's effects on any other listed species and/or on EFH is performed independently. This key
may be used to evaluate applications for all types of State of Florida (State Programmatic
General Permits, noticed general permits, standard general permits, submerged lands leases,
conceptual and individual permits) and Department of the Army (standard permits, letters of
permission, nationwide permits, and regional general permits) permits and authorizations. The
final effect determination will be based on the project location and description; the potential
effects to manatees, manatee habitat, and/or manatee critical habitat; and any measures (such as
project components, standard construction precautions, or special conditions included in the
authorization) to avoid or minimize effects to manatees or manatee critical habitat. Projects that
key to a "may affect" determination equate to "likely to adversely affect" situations, and those
projects should not be processed under the SPGP or any other programmatic general permit. For
__________________________________
Manatee Key
April 2013 version
Page 1 of 12
all "may affect" determinations, Corps Project Managers shall refer to the Manatee
Programmatic Biological Opinion, dated March 21, 2011, for guidance on eliminating or
minimizing potential adverse effects resulting from the proposed project. If unable to resolve the
adverse effects, the Corps may refer the applicant to the U.S. Fish and Wildlife Service (Service)
for further assistance in attempting to revise the proposed project to a "may affect, not likely to
adversely affect" level. The Service will coordinate with the Florida Fish and Wildlife
Conservation Commission (FWC) and the counties, as appropriate. Projects that provide new
access for watercraft and key to "may affect, not likely to adversely affect" may or may not need
to be reviewed individually by the Service.
__________________________________
Manatee Key
April 2013 version
Page 2 of 12
MANATEE KEY
Florida1
April 2013
The key is not designed to be used by the Corps' Regulatory Division for making their
effect determinations for dredging projects greater than 50,000 cubic yards, the Corps'
Planning Division in making their effect determinations for civil works projects or by the
Corps' Regulatory Division for making their effect determinations for projects of the same
relative scope as civil works projects. These types of activities must be evaluated by the
Corps independently of the key.
A.
Project is not located in waters accessible to manatees and does not directly or indirectly affect manatees
(see Glossary) ......................................................................................................................................No effect
Project is located in waters accessible to manatees or directly or indirectly affects manatees ...................... B
B.
Project consists of one or more of the following activities, all of which are May affect:
1.
blasting or other detonation activity for channel deepening and/or widening, geotechnical surveys or
exploration, bridge removal, movies, military shows, special events, etc.;
2.
installation of structures which could restrict or act as a barrier to manatees;
3.
new or changes to existing warm or fresh water discharges from industrial sites, power plants, or
natural springs or artesian wells (but only if the new or proposed change in discharge requires a
Corps permit to accomplish the work);
4.
installation of new culverts and/or maintenance or modification of existing culverts (where the
culverts are 8 inches to 8 feet in diameter, ungrated and in waters accessible, or potentially
accessible, to manatees)2;
5.
mechanical dredging from a floating platform, barge or structure3 that restricts manatee access to
less than half the width of the waterway;
6.
creation of new slips or change in use of existing slips, even those located in a county with a Stateapproved Manatee Protection Plan (MPP) in place and the number of slips is less than the MPP
threshold, to accommodate docking for repeat use vessels, (e.g., water taxis, tour boats, gambling
boats, etc; or slips or structures that are not civil works projects, but are frequently used to moor
large vessels (>100') for shipping and/or freight purposes; does not include slips used for docking at
boat sales or repair facilities or loading/unloading at dry stack storage facilities and boat ramps);
[Note: For projects within Bay, Dixie, Escambia, Franklin, Gilchrist, Gulf, Hernando, Jefferson,
Lafayette, Monroe (south of Craig Key), Nassau, Okaloosa, Okeechobee, Santa Rosa, Suwannee,
Taylor, Wakulla or Walton County, the reviewer should proceed to Couplet C.]
7.
any type of in-water activity in a Warm Water Aggregation Area (WWAA) or No Entry Area (see
Glossary and accompanying Maps4); [Note: For residential docking facilities in a Warm Water
Aggregation Area that is not a Federal manatee sanctuary or No Entry Area, the reviewer should
proceed to couplet C.]
8.
creation or expansion of canals, basins or other artificial shoreline and/or the connection of such
features to navigable waters of the U.S.; [Note: For projects proposing a single residential dock, the
reviewer should proceed to couplet C; otherwise, project is a May Affect.]
__________________________________
Manatee Key
April 2013 version
Page 3 of 12
9.
installation of temporary structures (docks, buoys, etc.) utilized for special events such as boat races,
boat shows, military shows, etc., but only when consultation with the U.S. Coast Guard and FWS
has not occurred; [Note: See programmatic consultation with the U.S. Coast Guard on manatees
dated May 10, 2010.].
Project is other than the activities listed above............................................................................................... C
C.
Project is located in an Important Manatee Area (IMA) (see Glossary and accompanying Maps4) .............. D
Project is not located in an Important Manatee Area (IMA) (see Glossary and accompanying Maps4) ........ G
D.
Project includes dredging of less than 50,000 cubic yards ............................................................................. E
Project does not include dredging .................................................................................................................. G
E.
Project is for dredging a residential dock facility or is a land-based dredging operation ............................... N
Project not as above.........................................................................................................................................F
F.
Project proponent does not elect to follow all dredging protocols described on the maps for the respective
IMA in which the project is proposed .............................................................................................. May affect
Project proponent elects to follow all dredging protocols described on the maps for the respective IMA in
which the project is proposed ......................................................................................................................... G
G.
Project provides new5 access for watercraft, e.g., docks or piers, marinas, boat ramps and associated trailer
parking spaces, new dredging, boat lifts, pilings, floats, floating docks, floating vessel platforms, boat slips,
dry storage, mooring buoys, or other watercraft access (residential boat lifts, pilings, floating docks, and
floating vessel platforms installed in existing slips are not considered new access) or improvements
allowing increased watercraft usage............................................................................................................... H
Project does not provide new5 access for watercraft, e.g., bulkheads, seawalls, riprap, maintenance
dredging, boardwalks and/or the maintenance (repair or rehabilitation) of currently serviceable watercraft
access structures provided all of the following are met: (1) the number of slips is not increased; (2) the
number of existing slips is not in question; and (3) the improvements do not allow increased watercraft
usage............................................................................................................................................................... N
H.
Project is located in the Braden River Area of Inadequate Protection (Manatee County) (see Glossary and
accompanying AIP Map4)
.......................................................................................................................................................... May affect
Project is not located in the Braden River Area of Inadequate Protection (Manatee County) (see Glossary
and accompanying AIP Map4)......................................................................................................................... I
I.
Project is for a multi-slip facility (see Glossary) ............................................................................................. J
Project is for a residential dock facility or is for dredging (see Glossary)...................................................... N
J.
Project is located in a county that currently has a State-approved MPP in place (BREVARD, BROWARD,
CITRUS, CLAY, COLLIER, DUVAL, INDIAN RIVER, LEE, MARTIN, MIAMI-DADE, PALM BEACH, ST. LUCIE,
SARASOTA, VOLUSIA) or shares contiguous waters with a county having a State-approved MPP in place
(LAKE, MARION, SEMINOLE)6 ........................................................................................................................... K
Project is located in a county not required to have a State-approved MPP .................................................... L
__________________________________
Manatee Key
April 2013 version
Page 4 of 12
K.
Project has been developed or modified to be consistent with the county's State-approved MPP and has
been verified by a FWC review (or FWS review if project is exempt from State permitting) or the number
of slips is below the MPP threshold ............................................................................................................... N
Project has not been reviewed by the FWC or FWS or has been reviewed by the FWC or FWS and
determined that the project is not consistent with the county's State-approved MPP ...................... May affect
L.
Project is located in one of the following counties: CHARLOTTE, DESOTO7, FLAGLER, GLADES, HENDRY,
7
7
HILLSBOROUGH, LEVY, MANATEE, MONROE , PASCO , PINELLAS ................................................................... M
Project is located in one of the following counties: BAY, DIXIE, ESCAMBIA, FRANKLIN, GILCHRIST, GULF,
HERNANDO, JEFFERSON, LAFAYETTE, MONROE (south of Craig Key), NASSAU, OKALOOSA, OKEECHOBEE,
PUTNAM, SANTA ROSA, ST. JOHNS, SUWANNEE, TAYLOR, WAKULLA, WALTON ................................................ N
M.
The number of slips does not exceed the residential dock density threshold (see Glossary) ......................... N
The number of slips exceeds the residential dock density threshold (see Glossary) ........................ May affect
N.
Project impacts to submerged aquatic vegetation8, emergent vegetation or mangrove will have beneficial,
insignificant, discountable9 or no effects on the manatee10 ............................................................................ O
Project impacts to submerged aquatic vegetation8, emergent vegetation or mangrove may adversely affect
the manatee10 .................................................................................................................................... May affect
O.
Project proponent elects to follow standard manatee conditions for in-water work11 and requirements, as
appropriate for the proposed activity, prescribed on the maps4 .......................................................................P
Project proponent does not elect to follow standard manatee conditions for in-water work11 and appropriate
requirements prescribed on the maps4 .............................................................................................. May affect
P.
If project is for a new or expanding5 multi-slip facility and is located in a county with a State-approved
MPP in place or in Bay, Dixie, Escambia, Franklin, Gilchrist, Gulf, Hernando, Jefferson, Lafayette,
Monroe (south of Craig Key), Nassau, Okaloosa, Okeechobee, Putnam, St. Johns, Santa Rosa, Suwannee,
Taylor, Wakulla or Walton County, the determination of "May affect, not likely to adversely affect" is
appropriate12 and no further consultation with the Service is necessary.
If project is for a new or expanding5 multi-slip facility and is located in Charlotte, Desoto, Flagler, Glades,
Hendry, Hillsborough, Levy, Manatee, Monroe (north of Craig Key), Pasco, or Pinellas County, further
consultation with the Service is necessary for "May affect, not likely to adversely affect" determinations.
If project is for repair or rehabilitation of a multi-slip facility and is located in an Important Manatee Area,
further consultation with the Service is necessary for "May affect, not likely to adversely affect"
determinations. If project is for repair or rehabilitation of a multi-slip facility and: (1) is not located in an
Important Manatee Area; (2) the number of slips is not increased; (3) the number of existing slips is not in
question; and (4) the improvements to the existing watercraft access structures do not allow increased
watercraft usage, the determination of "May affect, not likely to adversely affect" is appropriate12 and no
further consultation with the Service is necessary.
If project is a residential dock facility, shoreline stabilization, or dredging, the determination of "May
affect, not likely to adversely affect" is appropriate12 and no further consultation with the Service is
necessary. Note: For residential dock facilities located in a Warm Water Aggregation Area or in a No
Entry area, seasonal restrictions may apply. See footnote 4 below for maps showing restrictions.
If project is other than repair or rehabilitation of a multi-slip facility, a new5 multi-slip facility, residential
dock facility, shoreline stabilization, or dredging, and does not provide new5 access for watercraft or
__________________________________
Manatee Key
April 2013 version
Page 5 of 12
improve an existing access to allow increased watercraft usage, the determination of "May affect, not likely
to adversely affect" is appropriate12 and no further consultation with the Service is necessary.
1
On the St. Mary's River, this key is only applicable to those areas that are within the geographical limits of the State of Florida.
2
All culverts 8 inches to 8 feet in diameter must be grated to prevent manatee entrapment. To effectively prevent manatee
access, grates must be permanently fixed, spaced a maximum of 8 inches apart (may be less for culverts smaller than 16 inches in
diameter) and may be installed diagonally, horizontally or vertically. For new culverts, grates must be attached prior to
installation of the culverts. Culverts less than 8 inches or greater than 8 feet in diameter are exempt from this requirement. If
new culverts and/or the maintenance or modification of existing culverts are grated as described above, the determination of
"May affect, not likely to adversely affect" is appropriate11 and no further consultation with the Service is necessary.
3
If the project proponent agrees to follow the standard manatee conditions for in-water work as well as any special conditions
appropriate for the proposed activity, further consultation with the Service is necessary for "May affect, not likely to adversely
affect" determinations. These special conditions may include, but are not limited to, the use of dedicated observers (see Glossary
for definition of dedicated observers), dredging during specific months (warm weather months vs cold weather months), dredging
during daylight hours only, adjusting the number of dredging days, does not preclude or discourage manatee egress/ingress with
turbidity curtains or other barriers that span the width of the waterway, etc.
4
Areas of Inadequate Protection (AIPs), Important Manatee Areas (IMAs), Warm Water Aggregation Areas (WWAAs) and No
Entry Areas are identified on these maps and defined in the Glossary for the purposes of this key. These maps can be viewed on
the Corps' web page. If projects are located in a No Entry Area, special permits may be required from FWC in order to access
these areas (please refer to Chapter 68C-22 F.A.C. for boundaries; maps are also available at FWC's web page).
5
New access for watercraft is the addition or improvement of structures such as, but not limited to, docks or piers, marinas, boat
ramps and associated trailer parking spaces, boat lifts, pilings, floats, floating docks, floating vessel platforms, (maintenance
dredging, residential boat lifts, pilings, floating docks, and floating vessel platforms installed in existing slips are not considered
new access), boat slips, dry storage, mooring buoys, new dredging, etc., that facilitates the addition of watercraft to, and/or
increases watercraft usage in, waters accessible to manatees. The repair or rehabilitation of any type of currently serviceable
watercraft access structure is not considered new access provided all of the following are met: (1) the number of slips is not
increased; (2) the number of existing slips is not in question; and (3) the improvements to the existing watercraft access structures
do not result in increased watercraft usage.
6
Projects proposed within the St. Johns River portion of Lake, Marion, and Seminole counties and contiguous with Volusia
County shall be evaluated using the Volusia County MPP.
7
For projects proposed within the following areas: the Peace River in DeSoto County; all areas north of Craig Key in Monroe
County, and the Anclote and Pithlachascotee Rivers in Pasco County, proceed to Couplet M. For all other locations in DeSoto,
Monroe (south of Craig Key) and Pasco Counties, proceed to couplet N.
8
Where the presence of the referenced vegetation is confirmed within the area affected by docks and other piling-supported
minor structures and the reviewer has concluded that the impacts to SAV, marsh or mangroves would not adversely affect the
manatee or its critical habitat, proceed to couplet O.
Where the presence of the referenced vegetation is confirmed within the area affected by docks and other piling-supported minor
structures and the reviewer has concluded that the impacts to SAV, marsh or mangroves would adversely affect the manatee or its
critical habitat, the applicant can elect to avoid/minimize impacts to that vegetation. In that instance, where impacts are
unavoidable and the applicant elects to abide by or employ construction techniques that exceed the criteria in the following
documents, the reviewer should conclude that the impacts to SAV, marsh or mangroves would not adversely affect the manatee
or its critical habitat and proceed to couplet O.
-
"Construction Guidelines in Florida for Minor Piling-Supported Structures Constructed in or over Submerged Aquatic
Vegetation (SAV), Marsh or Mangrove Habitat," prepared jointly by the U.S. Army Corps of Engineers and the National
Marine Fisheries Service (August 2001) [refer to the Corps' web page], and
-
"Key for Construction Conditions for Docks or Other Minor Structures Constructed in or over Johnson's seagrass
(Halophila johnsonii)," prepared jointly by the National Marine Fisheries Service and U.S. Army Corps of Engineers
(October 2002), for those projects within the known range of Johnson's seagrass occurrence (Sebastian Inlet to central
Biscayne Bay in the lagoon systems on the east coast of Florida) [refer to the Corps' web page],
__________________________________
Manatee Key
April 2013 version
Page 6 of 12
Where the presence of the referenced vegetation is confirmed within the area affected by docks and other piling-supported minor
structures and the reviewer has concluded that the impacts to SAV, marsh or mangroves would adversely affect the manatee or its
critical habitat, and the applicant does not elect to follow the above Guidelines, the Corps will need to request formal consultation
on the manatee with the Service as May affect.
For activities other than docks and other piling-supported minor structures proposed in SAV, marsh, or mangroves (e.g., new
dredging, placement of riprap, bulkheads, etc.), if the reviewer determines the impacts to the SAV, marsh or mangroves will not
adversely affect the manatee or its critical habitat, proceed to couplet O, otherwise the Corps will need to request formal
consultation on the manatee with the Service as May affect.
9
See Glossary, under "is not likely to adversely affect."
10
Federal reviewers, when making your effects determination, consider effects to manatee designated critical habitat pursuant to
section 7(a)(2) of the Endangered Species Act. State reviewers, when making your effects determination, consider effects to
manatee habitat within the entire State of Florida, pursuant to Chapter 370.12(2)(b) Florida Statutes.
11
See the Corps' web page for manatee construction conditions. At this time, manatee construction precautions c and f are not
required in the following Florida counties: Bay, Escambia, Franklin, Gilchrist, Gulf, Jefferson, Lafayette, Okaloosa, Santa Rosa,
Suwannee, and Walton.
12
By letter dated April 25, 2013, the Corps received the Service's concurrence with "May affect, not likely to adversely affect"
determinations made pursuant to this key for the following activities: (1) selected non-watercraft access projects; (2) watercraftaccess projects that are residential dock facilities, excluding those located in the Braden River AIP; (3) launching facilities solely
for kayaks and canoes, and (4) new or expanding multi-slip facilities located in Bay, Dixie, Escambia, Franklin, Gilchrist, Gulf,
Hernando, Jefferson, Lafayette, Monroe (south of Craig Key), Nassau, Okaloosa, Okeechobee, Santa Rosa, Suwannee, Taylor,
Wakulla or Walton County.
Additionally, in the same letter dated April 25, 2013, the Corps received the Service's concurrence for "May affect, not likely to
adversely affect" determinations specifically made pursuant to Couplet G of the key for the repair or rehabilitation of currently
serviceable multi-slip watercraft access structures provided all of the following are met: (1) the project is not located in an IMA,
(2) the number of slips is not increased; (3) the number of existing slips is not in question; and (4) the improvements to the
existing watercraft access structures do not allow increased watercraft usage. Upon receipt of such a programmatic concurrence,
no further consultation with the Service for these projects is required.
__________________________________
Manatee Key
April 2013 version
Page 7 of 12
GLOSSARY
Areas of inadequate protection (AIP) Areas within counties as shown on the maps where the
Service has determined that measures intended to protect manatees from the reasonable certainty
of watercraft-related take are inadequate. Inadequate protection may be the result of the absence
of manatee or other watercraft speed zones, insufficiency of existing speed zones, deficient speed
zone signage, or the absence or insufficiency of speed zone enforcement.
Boat slip A space on land or in or over the water, other than on residential land, that is
intended and/or actively used to hold a stationary watercraft or its trailer, and for which intention
and/or use is confirmed by legal authorization or other documentary evidence. Examples of boat
slips include, but are not limited to, docks or piers, marinas, boat ramps and associated trailer
parking spaces, boat lifts, floats, floating docks, pilings, boat davits, dry storage, etc.
Critical habitat For listed species, this consists of: (1) the specific areas within the
geographical area occupied by the species, at the time it is listed in accordance with the
provisions of section 4 of the Endangered Species Act (ESA), on which are found those physical
or biological features (constituent elements) (a) essential to the conservation of the species and
(b) which may require special management considerations or protection; and (2) specific areas
outside the geographical area occupied by the species at the time it is listed in accordance with
the provisions of section 4 of the ESA, upon a determination by the Secretary that such areas are
essential for the conservation of the species. Designated critical habitats are described in 50 CFR
17 and 50 CFR 226.
Currently serviceable Currently, serviceable means usable as is or with some maintenance,
but not so degraded as to essentially require reconstruction.
Direct effects The direct or immediate effects of the project on the species or its habitat.
Dredging For the purposes of this key, the term dredging refers to all in-water work associated
with dredging operations, including mobilization and demobilization activities that occur in
water or require vessels.
Emergent vegetation Rooted emergent vascular macrophytes such as, but not limited to,
cordgrass (Spartina alterniflora and S. patens), needle rush (Juncus roemerianus), swamp
sawgrass (Cladium mariscoides), saltwort (Batis maritima), saltgrass (Distichlis spicata), and
glasswort (Salicornia virginica) found in coastal salt marsh-related habitats (tidal marsh, salt
marsh, brackish marsh, coastal marsh, coastal wetlands, tidal wetlands).
Formal consultation A process between the Services and a Federal agency or applicant that:
(1) determines whether a proposed Federal action is likely to jeopardize the continued existence
of listed species or destroy or adversely modify designated critical habitat; (2) begins with a
Federal agency's written request and submittal of a complete initiation package; and (3)
concludes with the issuance of a biological opinion and incidental take statement by either of the
Services. If a proposed Federal action may affect a listed species or designated critical habitat,
formal consultation is required (except when the Services concur, in writing, that a proposed
__________________________________
Manatee Key
April 2013 version
Page 8 of 12
action "is not likely to adversely affect" listed species or designated critical habitat). [50 CFR
402.02, 50 CFR 402.14]
Important manatee areas (IMA) Areas within certain counties where increased densities of
manatees occur due to the proximity of warm water discharges, freshwater discharges, natural
springs and other habitat features that are attractive to manatees. These areas are heavily utilized
for feeding, transiting, mating, calving, nursing or resting as indicated by aerial survey data,
mortality data and telemetry data. Some of these areas may be federally-designated sanctuaries
or state-designated "seasonal no entry" zones. Maps depicting important manatee areas and any
accompanying text may contain a reference to these areas and their special requirements.
Projects proposed within these areas must address their special requirements.
Indirect effects Those effects that are caused by or will result from the proposed action and
are later in time, but are still reasonably certain to occur. Examples of indirect effects include,
but are not limited to, changes in water flow, water temperature, water quality (e.g., salinity, pH,
turbidity, nutrients, chemistry), prop dredging of seagrasses, and manatee watercraft injury and
mortality. Indirect effects also include watercraft access developments in waters not currently
accessible to manatees, but watercraft access can, is, or may be planned to waters accessible to
manatees by the addition of a boat lift or the removal of a dike or plug.
Informal consultation A process that includes all discussions and correspondence between the
Services and a Federal agency or designated non-Federal representative, prior to formal
consultation, to determine whether a proposed Federal action may affect listed species or critical
habitat. This process allows the Federal agency to utilize the Services' expertise to evaluate the
agency's assessment of potential effects or to suggest possible modifications to the proposed
action which could avoid potentially adverse effects. If a proposed Federal action may affect a
listed species or designated critical habitat, formal consultation is required (except when the
Services concur, in writing, that a proposed action "is not likely to adversely affect" listed
species or designated critical habitat). [50 CFR 402.02, 50 CFR 402.13]
In-water activity Any type of activity used to construct/repair/replace any type of in-water
structure or fill; the act of dredging.
In-water structures watercraft access structures Docks or piers, marinas, boat ramps, boat
slips, boat lifts, floats, floating docks, pilings (depending on use), boat davits, etc.
In-water structures other than watercraft access structures Bulkheads, seawalls, riprap,
groins, boardwalks, pilings (depending on use), etc.
Is likely to adversely affect The appropriate finding in a biological assessment (or conclusion
during informal consultation) if any adverse effect to listed species may occur as a direct or
indirect result of the proposed action or its interrelated or interdependent actions and the effect is
not: discountable, insignificant, or beneficial (see definition of "is not likely to adversely
affect"). An "is likely to adversely affect" determination requires the initiation of formal
consultation under section 7 of the ESA.
__________________________________
Manatee Key
April 2013 version
Page 9 of 12
Is not likely to adversely affect The appropriate conclusion when effects on listed species are
expected to be discountable, insignificant, or completely beneficial. Discountable effects are
those extremely unlikely to occur. Insignificant effects relate to the size of the impact and
should never reach the scale where take occurs. Beneficial effects are contemporaneous positive
effects without any adverse effects to the species. Based on best judgment, a person would not
(1) be able to meaningfully measure, detect, or evaluate insignificant effects or (2) expect
discountable effects to occur.
Manatee Protection Plan (MPP) A manatee protection plan (MPP) is a comprehensive
planning document that addresses the long-term protection of the Florida manatee through law
enforcement, education, boat facility siting, and habitat protection initiatives. Although MPPs
are primarily developed by the counties, the plans are the product of extensive coordination and
cooperation between the local governments, the FWC, the Service, and other interested parties.
Manatee Protection Plan thresholds The smallest size of a multi-slip facility addressed under
the purview of a Manatee Protection Plan (MPP). For most MPPs, this threshold is five slips or
more. For Brevard, Clay, Citrus, and Volusia County MPPs, this threshold is three slips or more.
Mangroves Rooted emergent trees along a shoreline that, for the purposes of this key, include
red mangrove (Rhizophora mangle), black mangrove (Avicennia germinans) and white
mangrove (Laguncularia racemosa).
May affect The appropriate conclusion when a proposed action may pose any effects on listed
species or designated critical habitat. When the Federal agency proposing the action determines
that a "may affect" situation exists, then they must either request the Services to initiate formal
consultation or seek written concurrence from the Services that the action "is not likely to
adversely affect" listed species. For the purpose of this key, all "may affect" determinations
equate to "likely to adversely affect" and Corps Project Managers should request the Service to
initiate formal consultation on the manatee or designated critical habitat. No effect the
appropriate conclusion when the action agency determines its proposed action will not affect a
listed species or designated critical habitat.
Multi-slip facility Multi-slip facilities include commercial marinas, private multi-family
docks, boat ramps and associated trailer parking spaces, dry storage facilities and any other
similar structures or activities that provide access to the water for multiple (five slips or more,
except in Brevard, Clay, Citrus, and Volusia counties where it is three slips or more) watercraft.
In some instances, the Corps and the Service may elect to review multiple residential dock
facilities as a multi-slip facility.
New access for watercraft New dredging and the addition, expansion or improvement of
structures such as, but not limited to, docks or piers, marinas, boat ramps and associated trailer
parking spaces, boat lifts, pilings, floats, floating docks, floating vessel platforms, (residential
boat lifts, pilings, floats, and floating vessel platforms installed in existing slips are not
considered new access), boat slips, dry storage, mooring buoys, etc., that facilitates the addition
of watercraft to, and/or increases watercraft usage in, waters accessible to manatees.
__________________________________
Manatee Key
April 2013 version
Page 10 of 12
Observers During dredging and other in-water operations within manatee accessible waters,
the standard manatee construction conditions require all on-site project personnel to watch for
manatees to ensure that those standard manatee construction conditions are met. Within
important manatee areas (IMA) and under special circumstances, heightened observation is
needed. Dedicated Observers are those having some prior experience in manatee observation,
are dedicated only for this task, and must be someone other than the dredge and equipment
operators/mechanics. Approved Observers are dedicated observers who also must be approved
by the Service (if Federal permits are involved) and the FWC (if state permits are involved),
prior to work commencement. Approved observers typically have significant and often projectspecific observational experience. Documentation on prior experience must be submitted to
these agencies for approval and must be submitted a minimum of 30 days prior to work
commencement. When dedicated or approved observers are required, observers must be on site
during all in-water activities, and be equipped with polarized sunglasses to aid in manatee
observation. For prolonged in-water operations, multiple observers may be needed to perform
observation in shifts to reduce fatigue (recommended shift length is no longer than six hours).
Additional information concerning observer approval can be found at FWC's web page.
Residential boat lift A boat lift installed on a residential dock facility.
Residential dock density ratio threshold The residential dock density ratio threshold is used
in the evaluation of multi-slip projects in some counties without a State-approved Manatee
Protection Plan and is consistent with 1 boat slip per 100 linear feet of shoreline (1:100) owned
by the applicant.
Residential dock facility A residential dock facility means a private residential dock which is
used for private, recreational or leisure purposes for single-family or multi-family residences
designed to moor no more than four vessels (except in Brevard, Clay, Citrus, and Volusia
counties which allow only two vessels). This also includes normal appurtenances such as
residential boat lifts, boat shelters with open sides, stairways, walkways, mooring pilings,
dolphins, etc. In some instances, the Corps and the Service may elect to review multiple
residential dock facilities as a multi-slip facility.
Submerged aquatic vegetation (SAV) Rooted, submerged, aquatic plants such as, but not
limited to, shoal grass (Halodule wrightii), paddle grass (Halophila decipiens), star grass
(Halophila engelmanni), Johnson's seagrass (Halophila johnsonii), sago pondweed
(Potamogeton pectinatus), clasping-leaved pondweed (Potamogeton perfoliatus), widgeon grass
(Ruppia maritima), manatee grass (Syringodium filiforme), turtle grass (Thalassia testudinum),
tapegrass (Vallisneria americana), and horned pondweed (Zannichellia palustris).
Warm Water Aggregation Areas (WWAAs) and No Entry Areas Areas within certain
counties where increased densities of manatees occur due to the proximity of artificial or natural
warm water discharges or springs and are considered necessary for survival. Some of these areas
may be federally-designated manatee sanctuaries or state-designated seasonal "no entry"
manatee protection zones. Projects proposed within these areas may require consultation in
order to offset expected adverse impacts. In addition, special permits may be required from the
FWC in order to access these areas.
__________________________________
Manatee Key
April 2013 version
Page 11 of 12
Watercraft access structures Docks or piers, marinas, boat ramps and associated trailer
parking spaces, boat slips, boat lifts, floats, floating docks, pilings, boat davits, dry storage, etc.
Waters accessible to manatees Although most waters of the State of Florida are accessible to
the manatee, there are some areas such as landlocked lakes that are not. There are also some
weirs, salinity control structures and locks that may preclude manatees from accessing water
bodies. If there is any question about accessibility, contact the Service or the FWC.
__________________________________
Manatee Key
April 2013 version
Page 12 of 12