You can copy from here when filling out the rest of the page.
The Nebraska Department of Transportation (NDOT) is proposing to expand approximately 9.6 miles of United States Highway 30 (US-30) from a two-lane highway to a four-lane expressway. The current proposed project, Rogers to North Bend, is the second phase of the entire Schuyler to Fremont US-30 project, which is proposed to be constructed in three phases. The project would begin along the existing US-30 alignment approximately 0.8 mile east of the Colfax/Dodge County line. The project would diverge from the existing US-30 alignment between Dodge County Roads 3 and 4 and would curve to the northeast to provide a wider northern bypass around North Bend. It would then curve southeast between Dodge County Roads 9 and 10. From this point, the alignment would be located approximately 200 feet south of Dodge County Road S and would end near County Road 11.
The Nebraska Department of Transportation (NDOT) is proposing to expand approximately 9.6 miles of United States Highway 30 (US-30) from a two-lane highway to a four-lane expressway. The current proposed project, Rogers to North Bend, is the second phase of the entire Schuyler to Fremont US-30 project, which is proposed to be constructed in three phases. The project would begin along the existing US-30 alignment approximately 0.8 mile east of the Colfax/Dodge County line. The project would diverge from the existing US-30 alignment between Dodge County Roads 3 and 4 and would curve to the northeast to provide a wider northern bypass around North Bend. It would then curve southeast between Dodge County Roads 9 and 10. From this point, the alignment would be located approximately 200 feet south of Dodge County Road S and would end near County Road 11.