Home

St. Paul District

Run scraper

City of Sheboygan

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

LETTER OF PERMISSION: The City of Sheboygan has applied for a Department of the Army permit for commercial development on a 160 acre site.

PROJECT DESCRIPTION AND PURPOSE: The City of Sheboygan has applied for a Department of the Army permit for commercial development on a 160 acre site. Currently the site is primarily agricultural fields with residential development and Interstate 43 located to the west, a two-lane paved roadway to the east, additional agricultural fields to the north, and a forested parcel of land to the south.

Information for File #2017-04192-JLK

Applicant: City of Sheboygan Corps Contact: Jessica Kempke, U. S.Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; Jessica.l.kempke@usace.army.mil (651) 290-5856. Primary County: Sheboygan County Location: Section 9, Township 14N, Range 23E Information Complete On: 12-27-2017 Posting Expires On: 01-29-2018 Authorization Type: LOP-06-WI This application is being reviewed in accordance with current practices for documenting Corps jurisdiction under Section(s) 9 & 10 of the Rivers and Harbor Act of 1899 and Section 404 of the Clean Water Act. We have made a preliminary determination that the aquatic resources that would be impacted by the proposed project are subject to Corps of Engineers jurisdiction under Section(s) 9 & 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. If an approved jurisdictional determination is completed as part of the review process for this application, a copy will be posted on the ·St. Paul District web page at the following link: http://www.mvp.usace.army.mil/Missions/Regulatorv.aspx. PROJECT DESCRIPTION AND PURPOSE: The City of Sheboygan has applied for a Department of the Army permit for commercial development on a 160 acre site. Currently the site is primarily agricultural fields with residential development and Interstate 43 located to the west, a two-lane paved roadway to the east, additional agricultural fields to the north, and a forested parcel of land to the south. NAME. AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO IMPACT: Approximately 0.60 acres of wetlands adjacent to unnamed tributaries of the Black River would be permanently filled as a result of the new construction and related development. Approximately 0.57 acres of fresh wet meadow and 0.03 acres of hardwood/coniferous swamp would be impacted. The majority of impacted wetlands are lower quality farmed wetlands.

1

ALTERNATIVES CONSIDERED: Alternative A: Under the no-build alternative, no permit would be issued and the project would not be completed. Alternative B-1 : Alternative project location east of the preferred project site that includes two unnamed tributaries to the Black River with potentially higher amounts of wetlands. Use of this site would result in greater environmental impacts and limited expansion due to surrounding residential properties. Additionally, the applicant has indicated this project site is not sufficient size to meet the overall project purpose. Alternative B-2: Alternative project location north of the preferred project site that includes an unnamed tributary to the Black River and potentially higher amounts of wetlands. Additionally, railroad tracks bisect the site further complicating development potential. Use of this project site would result in logistical issues and limited space for expansion . Additionally, the applicant has indicated this project site is not sufficient size to meet the overall project purpose. Alternative B:-3: Alternative project location west of the preferred project site that is privately owned and includes Weeden Creek with potentially higher amounts of wetlands. Additionally, the site includes residential and institutional properties which do not support overall intent of the site. Use of this site would result in logistical issues and higher environmental impacts. Additionally, the applicant has indicated the project site is not sufficient size to meet the overall project purpose. Alternative C: This alternative included grading and road development over the entire site resulting in the largest amount of wetland impacts totaling 2.1 acres. MITIGATION : As compensation for the proposed unavoidable loss of 0.57 acres of fresh (wet) meadow and 0.03 acres of hardwood/coniferous swamp, the applicant proposes to purchase 0.87 wetland credits from the Wisconsin Wetland Conservation Trust (In-Lieu Fee). DRAWINGS: See attached.

2

Sheboygan Business Park Expansion w/ WWI & wetland indicator soils

Legend Wetland Class Points Dammed pond Excavated pond Filled excavated pond Filled/drained wetland Wetland too small to delineate

Filled Points Wetland Class Areas Wetland Upland

Filled Areas NRCS Wetspots Wetland Indicators Municipality State Boundaries County Boundaries Major Roads Interstate Highway State Highway US Highway

County and Local Roads County HWY

Local Road

Railroads Tribal Lands Rivers and Streams Intermittent Streams Lakes and Open water Index to EN_lmage_Basemap_Leaf_ Off

Notes 0.5

NAD_1983_HARN_Wisconsin_TM

0

0.25

1: 15,840

0.5 Miles

DISCLAIMER: The information shown on these maps has been obtained from various sources, and are of varying age, reliability and resolution. These maps are not intended to be used for navigation, nor are these maps an authoritative·source of information about legal land ownership or public access. No warranty, expressed or implied, is made regarding accuracy, applicability for a particular use, completeness, or legality of the information depicted on this map. For more information, see the DNR Legal Notices web page: http:/ldnr.wi.gov/legall

2017-04192-JLK (Figure 1 of 3)

..t......l-LJ"",...,.....,

I

2017-04192-JLK (Figure 2 of 3)

SHEBOYGAN BUSINESS CENTER EXPANSION ADJACENT PROPERTY OWNERS CITY OF SHEBOYGAN SHEBOYGAN COUNTY, WISCONSIN

illOfECT BOUNDAllY

n £Tl.ANOS OELINEAT£0 IJY TRC ON AUOVSTa:IIIID

·

Areas of Fill within Waters of the U.S.

N

·~· s

80Ulle£a llAUMA:JIOIJRCE r.

2017-04192-JLK (Figure 3 of 3)

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas