Nassau County. Jacksonville Electric Authority. Jacksonville, Florida.
PROJECT PURPOSE:
Basic: To install a new water supply well and water supply pipeline.
Overall: To install a new water supply well and water supply pipeline to improve the JEA Nassau Regional Water Treatment Plant (WTP) production capacity and system reliability, in Fernandina Beach, Nassau County Florida a design pumping capacity of 2,000 gallons per minute (gpm).
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Jacksonville Electric Authority
Attention: Hai X. Vu, P.E.
21 West Church Street T-4
Jacksonville, FL 32202
WATERWAY AND LOCATION: The project would affect waters of the United States associated with Lanceford Creek which discharges into the Nassau River. The project site is located at The JEA Nassau Regional Water Treatment Plant (WTP), located at 96362 Piedmont Drive in Fernandina Beach, Florida.
Directions to the site are as follows: Travel north on Interstate 95. Take exit 373 onto FL-200, Fl-A1A toward Fernandina Beach. Turn right onto State Road toward Yulee, Amelia Island for 6.2 miles. Turn right onto Amelia Concourse. The destination is on the right after 0.4 miles.
APPROXIMATE CENTRAL COORDINATES:
Latitude 30.620793°
Longitude - 81.548287°
PROJECT PURPOSE:
Basic: To install a new water supply well and water supply pipeline.
Overall: To install a new water supply well and water supply pipeline to improve the JEA Nassau Regional Water Treatment Plant (WTP) production capacity and system reliability, in Fernandina Beach, Nassau County Florida a design pumping capacity of 2,000 gallons per minute (gpm).
EXISTING CONDITIONS: The wetland system consists of a freshwater system. The onsite vegetation consists of mixed forested swamp, with dominant vegetation includes flattened pipewort (Eriocaulon compressum), broomsedge (Andropogon virginicus), yellow-eyed grass (Xyris sp.), sedges (Rhynchospora spp.), myrtle dahoon (Ilex cassine), gallberry (Ilex glabra), slash pine (Pinus elliottii), and foxtail clubmoss
(Lycopodiella alopecuroides). The existing area surrounding the project area consists of development associated with the urbanized City of Yulee.
PROPOSED WORK: The applicant seeks authorization to permanently impact 0.68 acres of freshwater wetlands and temporarily impact 0.01 acre of freshwater wetlands.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
The wellhead and well site have been located at the Nassau Regional WRF in an area of the property previously impacted by grading activities. The FDEP required setbacks for municipal water supply wells in proximity to wastewater systems and adjacent property lines determined the final placement of the wellsite resulting in 0.68 acres of permanent impact to PEM/PSS wetlands. The pipeline will be collocated within existing utility right-of-ways to the extent possible. The pipeline will be buried, ground surface regraded to original elevations, stockpiled wetland soils replaced, and the corridor allowed to revegetate naturally. Excavations in wetlands are estimated to be completed and regraded within 60 days of construction implementation. Vegetation would be expected to return to existing conditions within 5 years of the project completion. Erosion, sedimentation, and turbidity controls will be utilized at wetland crossings to further minimize water quality impacts to wetlands. Silt fences will be utilized to
reduce erosion and sedimentation to wetlands. The location of silt fences are shown on the project plans. All test well drilling will be kept out of the wetland areas. Discharges from well testing will be clear turbidity free and will be discharged to the west of the well site. Temporary impacts from the construction of the pipeline to wetlands will total 0.01 acres.
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
Permanent wetland impacts incurred by the project are proposed to be compensated through purchase of wetland mitigation credits from an approved mitigation bank located in the Lower St. Mary’s and Nassau Basin. Longleaf Mitigation Bank, which services this basin, currently has “general wetland community type” credits available. The bank utilized a Wetland Rapid Assessment Protocol (WRAP) to score functional credits but Unified Mitigation Assessment Method (UMAM) scores can be also be transferred. It is anticipated that 0.36 credits will be required to mitigate the 0.68 acres of permanent impacts to wetlands from the project. UMAM datasheets for permanent impacts to Wetland B and the resulting offsetting credits are provided in Attachment 2.
Restoration of wetlands temporarily impacted (by the pipeline installation) will begin immediately upon completion of the installation. Prior to any trenching for pipeline installation, the top 6 inches of top soil (mucky soils and a wetland plant seed source) will be scraped and stockpiled separately for replacement as the top soil layer after the pipe is installed. The altered ground contours within the wetlands will be regraded and restored to pre-construction elevations so as to maintain natural drainage pattern. The stockpiled mucky top soil will be spread on top, to promote re vegetation of the impacted area. Because of the restorative actions described above, the existing condition of the wetland (previously graded and cleared), and the minimal temporary impacts proposed (0.01 acres) from the pipeline, no additional mitigation activities are proposed.
CULTURAL RESOURCES: The Corps has determined the permit area has been extensively modified by previous work and there is little likelihood a historic property may be affected.
ENDANGERED SPECIES: The Corps has determined the proposed project may affect, but is not likely to adversely affect the wood stork (Mycteria Americana) or its designated critical habitat. The Corps will request U.S. Fish and Wildlife/National Marine Fisheries Service concurrence with this determination pursuant to Section 7 of the Endangered Species Act.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Jacksonville Permits Section, Post Office Box 4970 Jacksonville, Florida 32232 Permits Section, within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Danielle D’Amato, in writing at the Jacksonville Permits Section, Post Office Box 4970 Jacksonville, Florida 32232, by telephone at (904) 232-2166, or by electronic mail at Danielle.S.D’Amato@usace.army.mil.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
POST OFFICE BOX 4970
JACKSONVILLE, FLORIDA 32232
January 3, 2018
REPLY TO
ATTENTION OF
Regulatory Division
North Permits Branch
Jacksonville Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-2004-01459 (SP-DSD)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Jacksonville Electric Authority
Attention: Hai X. Vu, P.E.
21 West Church Street T-4
Jacksonville, FL 32202
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with Lanceford Creek which discharges into the Nassau River. The project
site is located at The JEA Nassau Regional Water Treatment Plant (WTP), located at
96362 Piedmont Drive in Fernandina Beach, Florida.
Directions to the site are as follows: Travel north on Interstate 95. Take exit 373 onto
FL-200, Fl-A1A toward Fernandina Beach. Turn right onto State Road toward Yulee,
Amelia Island for 6.2 miles. Turn right onto Amelia Concourse. The destination is on the
right after 0.4 miles.
APPROXIMATE CENTRAL COORDINATES: Latitude 30.620793°
Longitude - 81.548287°
PROJECT PURPOSE:
Basic: To install a new water supply well and water supply pipeline.
Overall: To install a new water supply well and water supply pipeline to improve the JEA
Nassau Regional Water Treatment Plant (WTP) production capacity and system
reliability, in Fernandina Beach, Nassau County Florida a design pumping capacity of
2,000 gallons per minute (gpm).
EXISTING CONDITIONS: The wetland system consists of a freshwater system. The
onsite vegetation consists of mixed forested swamp, with dominant vegetation includes
flattened pipewort (Eriocaulon compressum), broomsedge (Andropogon virginicus),
yellow-eyed grass (Xyris sp.), sedges (Rhynchospora spp.), myrtle dahoon (Ilex
cassine), gallberry (Ilex glabra), slash pine (Pinus elliottii), and foxtail clubmoss
(Lycopodiella alopecuroides). The existing area surrounding the project area consists
of development associated with the urbanized City of Yulee.
PROPOSED WORK: The applicant seeks authorization to permanently impact 0.68
acres of freshwater wetlands and temporarily impact 0.01 acre of freshwater wetlands.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
The wellhead and well site have been located at the Nassau Regional WRF in an area
of the property previously impacted by grading activities. The FDEP required setbacks
for municipal water supply wells in proximity to wastewater systems and adjacent
property lines determined the final placement of the wellsite resulting in 0.68 acres of
permanent impact to PEM/PSS wetlands. The pipeline will be collocated within existing
utility right-of-ways to the extent possible. The pipeline will be buried, ground surface
regraded to original elevations, stockpiled wetland soils replaced, and the corridor
allowed to revegetate naturally. Excavations in wetlands are estimated to be completed
and regraded within 60 days of construction implementation. Vegetation would be
expected to return to existing conditions within 5 years of the project completion.
Erosion, sedimentation, and turbidity controls will be utilized at wetland crossings to
further minimize water quality impacts to wetlands. Silt fences will be utilized to
reduce erosion and sedimentation to wetlands. The location of silt fences are shown on
the project plans. All test well drilling will be kept out of the wetland areas. Discharges
from well testing will be clear turbidity free and will be discharged to the west of the well
site. Temporary impacts from the construction of the pipeline to wetlands will total 0.01
acres.
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
Permanent wetland impacts incurred by the project are proposed to be compensated
through purchase of wetland mitigation credits from an approved mitigation bank
located in the Lower St. Mary's and Nassau Basin. Longleaf Mitigation Bank, which
services this basin, currently has "general wetland community type" credits available.
The bank utilized a Wetland Rapid Assessment Protocol (WRAP) to score functional
credits but Unified Mitigation Assessment Method (UMAM) scores can be also be
transferred. It is anticipated that 0.36 credits will be required to mitigate the 0.68 acres
of permanent impacts to wetlands from the project. UMAM datasheets for permanent
impacts to Wetland B and the resulting offsetting credits are provided in Attachment 2.
Restoration of wetlands temporarily impacted (by the pipeline installation) will begin
immediately upon completion of the installation. Prior to any trenching for pipeline
installation, the top 6 inches of top soil (mucky soils and a wetland plant seed source)
will be scraped and stockpiled separately for replacement as the top soil layer after the
pipe is installed. The altered ground contours within the wetlands will be regraded and
2
restored to pre-construction elevations so as to maintain natural drainage pattern. The
stockpiled mucky top soil will be spread on top, to promote re vegetation of the
impacted area. Because of the restorative actions described above, the existing
condition of the wetland (previously graded and cleared), and the minimal temporary
impacts proposed (0.01 acres) from the pipeline, no additional mitigation activities are
proposed.
CULTURAL RESOURCES: The Corps has determined the permit area has been
extensively modified by previous work and there is little likelihood a historic property
may be affected.
ENDANGERED SPECIES: The Corps has determined the proposed project may affect,
but is not likely to adversely affect the wood stork (Mycteria Americana) or its
designated critical habitat. The Corps will request U.S. Fish and Wildlife/National
Marine Fisheries Service concurrence with this determination pursuant to Section 7 of
the Endangered Species Act.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Jacksonville
Permits Section, Post Office Box 4970 Jacksonville, Florida 32232 Permits Section,
within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Danielle D'Amato, in writing at the Jacksonville Permits Section, Post Office Box 4970
Jacksonville, Florida 32232, by telephone at (904) 232-2166, or by electronic mail at
Danielle.S.D'Amato@usace.army.mil.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
3
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
4
St Marys
Pu~l1<
H\11
Kohl ·
::0
c.
02N27E037
Jacks'onvillt
f
f!i
=>
9
02N28E02~
Nassau Regional WWRF
02N27E001
l
Nassau Regional WTP
Well No.1
Proposed Well No.3
~
..
~~
!2..
iii'
o()
6'
~
02N27E012
g
02N27E038
0
0
~
n
0
c:
.....
02N28E026
!/I
CD
Gol C lub:ol
NOrth i.tlrnplD
LEG END
-$-
Figure 1. Project Location
c::I Township, Range, Section
Proposed Well 3 Site
0
Proposed Raw Water Pipeline
...
....
1.000
2,000
JEA Nassau Regional Water Treatment Plant
Well No. 3 Project
..JE,l\_
;::;;:;:=::;;::;;;;::;;;--~~~~~~~~~~~~~~~~~~~~~~~~~~~c11Zttt
Last Upaateci: OMFT20171219
NassauWTP_Pt'OjeaLocaixt.TRSJ'Or·taLnew
5o~ o.~: FOOT APLUS 2016, flOf~il Geogta~ Lbraiy, Google Eatft, JEA, fSR\OU\lal COu~,
Ft>roa owis..:ri firt eigencyMaMgemen~ Ftlrida Resowces & ErMronmenial Anil~cener FbridaWaltf Millna.Je~~s
LEGEND
$-
Proposed Well 3 Site
1iiiJ Grading
· · Existing JEA Water Main
Proposed Raw Water Pipeline 1111 Wetland Continues Boundary
Proposed Well Site
~ USACE Wetland
last Updated: DRAFTZ0111220
ftlssauWTP_Plopr»edWelll__USACEWelands12202017
Seu.wee Dan: FOOT APLUS 2<>16, Fiorita Ceoq-aphclhaiy.CoogleEam,.JEA. ESRl.DwalCou~.
Fbri:ia Divisicm EmetgencyManagemeat. Florida Resowus & EnWoomenalMatpistefW!f Ftma Wall! ManageirentCish::t>
i
c:::J
RIBs 225ft Boundary
RIBs 200ft Boundary
Nassau Well 3 Wetland Impacts
Figu re 2. Project Components
and Proposed Impacts
JEA Nassau Regional Water Treatment Plant
...JE,l\..
Well ~o. 3 :oject
....
200
ch~
l(mq
6
S t Marys
LEGEND
$
-
Proposed Well 3 Site
11!!!11 Grading
· ·
Existing JEA Water Main
Proposed Raw Water Pipeline · 11 · Wetland Continues Boundary
Proposed Well Site
~ USACE Wetland
RIBs 225ft Boundary
RIBs 200ft Boundary
c:::J Nassau Well 3 Wetland Impacts
Figure 3. Project Components
and Proposed Impacts
JEA Nassau Regional Water Treatment Plant
Well ~a. 3
~afe~f,.
200
...lEJI\..
~~~~~~~~~~~~~~~~~~~~~~~
-~---.cl12m:
Last Up::lated: DRAFTZ0171220
NllssauWTP_PloposedWelll_WetalB_Pcml
Sowce Dan: FOOT APLUS 2016, Flori:la G1M9"aplj(lhaiy.Coogle£am,JEA. ESRlDwalCou~.
Fbriia Divisicm £lnetgencyManagemea1. Fb'ida Resoi.ces & EnWoomenalMatpistefW!f fbrida Wal! Managelrl!lllllsh::t>
2
6
5
I
I
Ii
l1
I
I
-I
-I
-I
I
l
a
l
-II
~
I!
_o_s_H-EE_T_K_EY_N_o_r_E-ts"""T""'T'""T""T"ir-TX
v
,,.
11.
HANDHOLE HH-1 FURNISHED BY JEA,
INSTALLED BY CONTRACTOR. ROUTE
2 ...'C {DETAIL 40&) TO SECONDARY
3.
I
I
I
X
II
X
I
I
CONmACTORTOCOORDINA'TUIC>
INS'TALLAEQUIREOC:OMPONENTSOF
SERVICE TRANSFORMER IKSTAUATION
INACCOADANCEWITlUlARULEBAND
REOUl.ATIONS FOR ELECTRIC SERI/ICE,
a: ~8
CONTRACTORTOFIJRNIBHANO
INSTAl.LJEA UTIUTYMETER FRME,
CAN AND CT CONDUITS PER .-:A R\A.ES
ANOREGl.l.ATIONSFORELEC'Tlt~
I
SERVICE, !MY 2013.
I 7.
AAAOWINDICA'TESAIMINGDIRECTION
I
I
I
~~Ill
>
j!!
C§
ci ~c
z0
i
~
11
,,, y
4 ~ !~ ~
jl!I
~ ~
I
,.~
o jj!o
!~
~~
~Ii
O
l-+-+-+-+-+-+-1
a:: Q
J lil ii
!_
5
1
~i
l!I~
H
~I!
oi
U!li , , ~ I ~ ;;
d--
~ ... ~ ~
~
hp ~ ~ ~ 8 ~i
l~i~
~ ~ i ~ ~1-·li
:S~~
I
I
!!!I
I t-----~
I
x
~
"i~
d~
l!i
------ifl
~
Il
~1
I
~
t:z
"
I
""
I')( 1
...
ll
~ ~ !II::~
!
OFPOtETOPLU'ollNAIRE.
I
J,...--SILTFENCE
ii'
ts
CONllW)T()R TO COt-ITACT JEA
EL.EC'T1'11C DM$ION PRIOR TO STARTING
AHYWOlllI
II~
iU
~., ¥
EQUAL REFS\ TO TABLE 4A OF DETAIL
I,
1
X
I
j
40& FOR SIZWG N'ORMATION.
1 5.
EXISTINGFENCE 7-t-rt-+--T-t---+- . . . . ¢
1
f ~fl
AS MANUFACTURED BY
OLDCAS1lEICHRISTVORAPPROVED
x
USACE WE'TlJ\ND LINE
I~
ii< I
~ Ii
INSTALLED BY CONTRACTOR.
HANDHOLE SHALL BE PAECAST
CONCAEll!, H-20 RATED, OPEN-BOTTOM
I
X I
I
xI
I
~
CUTOUT OF PADMOUt-IT
TIWISFOAMER.
HANDHOLE HH-2 FURNISHED AND
4.
1
I
~
MAY2013
II
x
~=:;.~AC
I
I
i
SECONDAAY,300KVAONAN.
I 2.
II
X
I
I
l
i
I
...
-I
-I
I'
X
l'
...
I
I 6.
-I
cl
lI
X1
I
I
I
I
I
I
-I
I
-I
I
1
\!
~
I
1 ,
X
t
C')
~
1:
~ ~
i
.. ~ ~~~
!
x
~
Q..
t!:!
'1.
ll
~~en
o
o~o::
CJ>u
-w1W:>w
0::
_.
~ ~~
WETLAND I PACT
29646BF.
0.88ACS.
en 2: z
~
u ~
:J
1------'M-NO_
T_EO_--tg
··········10
20
Scels In Feel
PLAN
1"=10'
ilO
\
11\FERVIOUS NfEA TABLE
CONCRETE WB.L PAO:
CRUSHliD CONCRi:T'E:
638 SF
3,li56 SF
z
(!)
·
DATE
PROJ
DWG
PLOT DATE: 2017\12121
VERIFY SCALE
=~~
,. en
NOVEMBER2017
697178
W
0
lJ.C.1 ';fl.
StEET
lof.f
PLOT TIME: 12:00:1& PM
g
JEA PROJECT NUMBER lOOOOOOl
JACKSONVlLLe, FLORIDA
RAW WATER MAIN
PLAN AND PROFILE
JEA NASSAU REGIONAi. WJP
WEU. NO. 3 & RAW W"lER MMN
CM.JYllllD Pl'ING
.....
.....
NASSAU REGIONAL WTP WELL 3
Dllo11n Mk:h·I Dyba PE FL #81388
E8COOOll72
JACKllONlllJ..E, flOROI\ 322119
MC0019112 LC28000118
94288"YM~ROADSUllE300
0
DSGN
NO.
11
I
I
'I
I II
DDYKES
DAlE
l
'
I
I
I
DR
\
l
I
I
~
,_/
!~ ~
I ~
\
\
\
\
\.,_
REVISION
NPATTERSON
..... I
I
I
I
.. 0"<4'
I
I
I
I
I
I
RMOARISON
,
- -~,,
\ ~
\
\
I
I
I
\
~i
\
\
~ \I
I
I
I ~
~ l 0
/
....:i,,r........._
crt(ll--...,
~,,
11 1
'
I
I
' """
1,.....,.,\1.~1
I
I
I
I
I
/
I
\
I
I
(
·--
I
I
__
..
~
~0
__
.....
.... .....
....
c
............,,."""'
....
OCH2U ltLUl01f. All.~~D.
D DY1BY N"'ID
' ...... '~-00'\C
--
,1~.!"'i!'
...........
I~
~ I {..v,.
I I I
I
I
I
I
I
ZI
CD
..... ~
....
..
..
~
~
~~
~
i
~
'!
I.I
c
0
r.i
!
~
...
I
I
NO.
DSGN
JEA PROJECT NUMBER lOOOOOOl
......CKSONVlLLe, FLORIDA
WEU. NO. 3 & RAW W"lER MMN
JEA NASSAU REGIONAi. WJP
Dllo11n Mk:h·I Dyba PE FL #81388
E8COOOll72
JACKllONlllJ..E, flOROI\ 322119
MC0019112 LC28000118
9428BAYM~ROADSUllE300
0
DAlE
I
1
I
I
I
I
I
I
I
I
I
I
I
1
I
I
I
I
I
I
I
I
I
REVISION
I
5"
I
..~
8
8
!!!
0
N
Q
OCH2U ltLUl01f. All.~~D.
D D'l1BY N"'ID
>
°'
-
..
-
-
-
2
5
3
6
N
C)
0
30
&········
&ale In feet
....
\
I
..\,;,'~
'\.\
'~\\·
?
'1_
12" Q.DI (PC 360) RAW WATER MAIN
BY OPEN CIJT
~.,,.,,.
11124_, llO'f
/l- -
, \
l --
-
--
\
....
--
--
......
--
--
--
- -'
~a<"?'~
~01-:;~~0l
~
"~
~
\t.,
~
\
'1~i~
,~~~-
-
-
I
l\
\
A
B
i
\
80
"1
~
11
0
J£.t4
/\
/ ,..\1
-
c
en
~
z
w
~
D
::>
.___ _.____....Jog
NJ NO'Tl:D
....__..;.;
VER:;.;;;.
IFY
..:....;:;
SCAL
::.=:E
:...___J
z
:-.:~.=.:
(!)
0
DATE
PROJ
DWG
Stt:ET
Fl.ENAME: 0501· Y.()00_997t78.diJ't
PLOT DATE: 11121/2017
1'
NOVEMBER 2017
Ci)
W
1197178 Q
05-Y~3 ';/!,
X of XX
PLOT TIME: 8:H:19PM
~
2
5
6
I
..... ·····-
0
i
60
I
~
~
.........-r-..,........,--.-~..........- ~
.......+-+--+---+-+-+"'-!~
A
R S E
11
0
_,_
,.,
"'SPH/ll.T
..(28.7~'
- ---- -
B
- --
- - ..
---
...
- -----
-- ~ ---
''
--
~Wei.~350) RA'l'( WATER MAIN
\
.
"""
01-lN-27-0000-0003-024()
I
c
en
~
zw
~
D
::>
NJ NOl1:D
VERIFY SCALE
BARISON!INCHON
ORIO!M.. DRAWWG.
0
DATE
PROJ
DWG
Fl.ENAME: 0501·Y.()()4_997t78.diJ1
PLOT DATE: 11121/2017
1'
NOVEMBER 2017
8
~
Ci)
\J'
W
1197178 C
OH~ ';/!.
Stt:ET
XofXX
PLOT TIME: 8:H:24 PM
~
4
2
35
I
I
--
V-
1
!ICX> AND STi\KI ITYPl
L·-wmANo1u M"'
I
USACE WETLAND LIMIT ~
I
~
l
A
r
I
r
PROPOSED GRADE
v
I
/'
~
I
~'
'
Y __~v~*~YY\.
t
~
I
~'--4:1 SIDESLOPE
' h~ i..f x-~:\.
V V
V v 'l
~.i(-A.:..Y..,.;A.-A-/K7'\;:~
~~~v~~~ ¥- x-t)<- x- x- x-x- x- xF-4SL
- J__ _ ----~)
~ ~ xJ}( x A~2S. x x ·1.x.: x x )C ~
25
_ ...L-- - -
-~
20
15
I
I
SODANO STAKE(TYP}
SI ED AND MULCH
I
30
I
I
I
I
I
I
:
......_
,.,
i'- ~ /
,/
7" :.- '
/
'\
'
~
\
\... EXISTING GRADE
~ -
~
~
I
a:
I
z
I
I
I
100
200
300
353
~
ANGLE BOTH ENDS OF RLTER FABRIC
FENCE TO ASSURE SOIL 1$ TRAPPED
z
~
8
l~OCKED 2"x4·
POSTSANOATIAC
./"\SACE WEiTl.ND LIMIT
/
35
1
1
,_-.S-OON·1 I
1- - - - + - - - -·--+---·- - + - - - - + - - - - --11
25
1----_,_
~A.~~~7'~/K"~
n.
_,,..,.'_""':;A..:___:,/\.-h""'A
-x- x.:ix-x.
'- I.Ax >..
x x
~
)t
~
-; '!:-':::it-~~~-Y~~~'L-"'-L-".k."'
,. .
.
x;
-
I
-E-Y~
1
I :
/,.
~~-- --
-
'J
.~-"-<
FILlER. FA8RJC MATERIAL.
-
=st----1------1
~_ .---+-/--+-----+---I
__- - - -
I
I
100
!:iQ!§;
Il'- - - + - - - - + - - - - + - - - - + - - - - + - - - - + - -1
1. BURY BOTIOM OF FILTER FABRIC 11" VERTICAU.Y BELOW FINISHED GRADE.
300
4. COMPACT AU. AA£NJ OF FILTER FABRIC TRENCH.
\V
30
f
v
EJOSr.Rllf~-
- ·-- -
D
25
---
----
--
E
I
-~-~f--
20
3'-11
-
- -
NTS
Ii
..,I
j!:I'!
~i
~
..,
g>:
~
I"
I
~(J
..... ~
~ ~Cll
"' -0
oZ
(!)-
wl-
o:@
:::> Cll
en·-
MNOTED
\IERIFY SCALE
I
BAR 19QNE INCH Oii
"
15
~
_._
~~
'1. (J
-1-~ILTJ:'ENC"
l" RAW WA'l'ER·MAIN~~
ii:
...J ...J
!-5
SILT FENCE
FDEP/SJRWMD WETlAND LMT
~ 5'
II
..,~
(")
3. STTTCHEO LOOPS TO BE INSTAUED DOWNHILL SIDE OF SLOPE.
f2\
35
i~~
I=>95iS:
~!~
~
w
2. WOOD OR STEEL FENCE POSTS.
389
r
~~I~
ELEYATION
11- - - + - - - - + - - - + - - - - + - - - - + - - - + - -I
200
!
I!
J;H I ~ ...~ i i~
i
II' MAXIMUM SPACING
EXISTING~G~
' ~·=
nE,,__-+--I
I
I
I
15 ~--~--~---~--~---~--~'~--~-~l-~---~I~-~---~--~---~--~--~-~
u!~
is
---+----1-----+--
I
il
I
8
~h"'§
1~--+----1-----1----+----+----+--1
1----+----+---1-----+----+--~,-1-----+-- 1
0
8
~-
L
-
I'
~1
! ..
36' 'MOE ROLLS
-
~'
h
!II
-/--" - + - - - + -
~'-A--vv~,.6!~
. .L ~
' /i
A
z
~2
Q
BACKFILL IN TRENCH
/
~
~ '<-fl' r-~-~~
1-----+----+----+----+----1----~:-+----+-I
I
I
I
t,.', ZfyW,
1- ---+----+----+----+----1---+'+----+-I
20
I
I _~ T~~
1---+---·-tkR
,.~~~x-~'>t{y-'9-v-v.-<;V....___ -~
c
-+-~E<---,X-X-~~ ~ ~~j,"< /<;./",J
11
I
0
~
-COMPACT
--_-._-._.J.Hl-t-----=--=:==:,_,.,_S~EDMD'
.,. MUl:Cr-!.:_---+----+----t-----+-----i--\Y=I
~I
~ ll15
TOP OF EXISTING BERM\
:~·I:=/7
tz PR~II
£
~
USE STITCHED LOOPS
OVER 2'>14· POSTS
\
30 1- - - - + - - -·--+---·- - 1 - - - - - + - - - - + - - -_.,
- + - - - -1
H
...
I ~~~1
2~ g
-~..
~ i11
jl
I
I
0
6
5
,.
ORIGIM..CIUWfWtG.
0
12 INCH RAW WATER MAIN TYPICAL SECTION
DATE
PR.OJ
NTS
PLOT DATE: 2017\12121
f!!z
w
~
:::>
(.)
NOVEMBER 2017
0
697178 (J
U.(;.4 (J
DWG
StEET
PLOT TIME: 12:00:&4 PM
·or· m