Home

Chicago District

Run scraper

The Illinois Urban Manual Standard

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The Illinois Urban Manual Standard, “Dewatering”, is being updated by the Illinois Urban Manual Technical Review Committee.

PUBLIC NOTICE

Illinois Urban Manual (IUM) Standard Update

U.S. ArmyCorps of Engineers Chicago District

IUM Standard NUMBERs: Dewatering Standard IUM #813 Comment Period Begins: January 8, 2018 Comment Period Expires: February 8, 2018

DESCRIPTION OF STANDARD

The Illinois Urban Manual Standard, “Dewatering”, is being updated by the Illinois Urban Manual (IUM) Technical Review Committee (TRC). The TRC is comprised of representatives of various regulatory agencies, consultants, developers, and other stakeholders. The IUM is the primary technical manual for Erosion and Sediment Control in the State of Illinois and is in the process of being updated as a result of advances in product development and associated operation and maintenance practices.

The Corps of Engineers and the IUM TRC is requesting comments from erosion and sediment control professionals, developers, engineers, contractors, and other interested parties on the enclosed attached standard. The comments will be reviewed by the TRC prior to the finalization of the IUM update. The approved standard will be incorporated into the IUM immediately upon approval by the IUM Steering Committee and Illinois Environmental Protection Agency.

Interested parties wishing to comment on the updated standard must do so in writing no later than February 8, 2018. It is presumed that all parties receiving this notice will wish to respond to this public notice; therefore, a lack of response will be interpreted as meaning that there is no objection to the "standard" as described herein.

All comments regarding the proposed standard must be submitted to the following person:

Rick McAndless Illinois Urban Manuel Technical Review Committee Coordinator North Cook County Soil and Water Conservation District 6640 Cosman Road Elk Grove Village, IL 600007 Phone: (224) 875-7580 r.mcandless@northcookswcd.org

It should be noted that ALL comments received on this standard (via hard copy, or electronic) will only be accepted with the full name and address of the individual commenting.

This public notice is not a paid advertisement and is for public information only. Issuance of this notice does not imply Corps of Engineers endorsement of the standard as described.

If you have any questions regarding this public notice, please contact Kathy Chernich by telephone at (312) 846-5531, or email at kathy.g.chernich@usace.army.mil.

//ORIGINAL SIGNED//

Kathleen G. Chernich Chief, East Section Regulatory Branch

NOTICE TO POSTMASTERS:

It is requested that this notice be conspicuously and continuously posted until February 8, 2018.

PUBLIC NOTICE Illinois Urban Manual (IUM) Standard Update U.S. ARMY CORPS OF ENGINEERS CHICAGO DISTRICT

IUM STANDARD NUMBERS:

Dewatering Standard IUM #813

COMMENT PERIOD BEGINS: COMMENT PERIOD EXPIRES:

January 8, 2018 February 8, 2018

DESCRIPTION OF STANDARD The Illinois Urban Manual Standard, "Dewatering", is being updated by the Illinois Urban Manual (IUM) Technical Review Committee (TRC). The TRC is comprised of representatives of various regulatory agencies, consultants, developers, and other stakeholders. The IUM is the primary technical manual for Erosion and Sediment Control in the State of Illinois and is in the process of being updated as a result of advances in product development and associated operation and maintenance practices. The Corps of Engineers and the IUM TRC is requesting comments from erosion and sediment control professionals, developers, engineers, contractors, and other interested parties on the enclosed attached standard. The comments will be reviewed by the TRC prior to the finalization of the IUM update. The approved standard will be incorporated into the IUM immediately upon approval by the IUM Steering Committee and Illinois Environmental Protection Agency. Interested parties wishing to comment on the updated standard must do so in writing no later than February 8, 2018. It is presumed that all parties receiving this notice will wish to respond to this public notice; therefore, a lack of response will be interpreted as meaning that there is no objection to the "standard" as described herein. All comments regarding the proposed standard must be submitted to the following person: Rick McAndless Illinois Urban Manuel Technical Review Committee Coordinator North Cook County Soil and Water Conservation District 6640 Cosman Road Elk Grove Village, IL 600007 Phone: (224) 875-7580

-2r.mcandless@northcookswcd.org It should be noted that ALL comments received on this standard (via hard copy, or electronic) will only be accepted with the full name and address of the individual commenting. This public notice is not a paid advertisement and is for public information only. Issuance of this notice does not imply Corps of Engineers endorsement of the standard as described. If you have any questions regarding this public notice, please contact Kathy Chernich by telephone at (312) 846-5531, or email at kathy.g.chernich@usace.army.mil. //ORIGINAL SIGNED// Kathleen G. Chernich Chief, East Section Regulatory Branch

NOTICE TO POSTMASTERS: It is requested that this notice be conspicuously and continuously posted until February 8, 2018.

ILLINOIS URBAN MANUAL PRACTICE STANDARD

DEWATERING (no.) CODE 813

(Source: Illinois Urban Manual Technical Committee)

DEFINITION

water, ground water, or other bodies of water.

The controlled removal of water from construction sites.

1. Where pumping operations occur.

PURPOSE

2. Where the water table is intercepted.

The purposes of this practice are as follows:

3. Where work is performed in-stream. 4. Where collected runoff is removed from construction sites.

1. To facilitate construction in areas with surface water or a high water table.

CRITERIA

2. To prevent sediment transport.

Dewatering shall consist of the removal of surface water and/or ground water by diverting and/or removing water from construction sites to perform the required construction in accordance with the plans and specifications.

3. To provide worksite safety. 4. To prevent pollution of groundwater or surface water from suspended soil particles carried in construction site dewatering operations.

Upland vegetated areas shall not be used as a standalone sediment control practice during dewatering operations.

5. To preserve downgradient natural resources and property. CONDITIONS WHERE PRACTICE APPLIES Construction sites, including any onsite and offsite excavated areas, where the presence of water creates unsafe conditions, potential damage, or restricts construction operations. Construction sites where water is present in any form, including intermittent runoff, streams, standing

Diverting Surface Water ­ Cofferdams, channels, sumps, flumes, and temporary diversions shall be built and maintained, according to contract plans, specifications, and respective IUM practice standards. Installation of cofferdams and sumps shall follow the requirements as outlined in practice standards COFFERDAM 803 and SUMP PIT 950.

813 - 1

Excess surface runoff shall be diverted from the construction area as outlined in the practice standards TEMPORARY DIVERSION 955, TEMPORARY SWALE 980, DIVERSION 815, and DIVERSION DIKE 820. A permanent stream or other concentrated flow shall be diverted away from the construction area as outlined in practice standard TEMPORARY STREAM DIVERSION 976. Removing Water ­ Drains, sumps, pumps, casings, well points and all other practices required to dewater the site shall be furnished, installed and maintained according to contract plans, specifications, and respective IUM practice standards. Well points and deep wells shall be placed at intervals along the construction area as necessary to depress the groundwater table during construction. Monitoring wells shall be installed where measurement of the pumping effectiveness is required. Well point and deep well dewatering shall be terminated as soon as practical. In poorly drained soil areas, or where well dewatering is not practical, pumping directly from construction trenches will be permitted, provided appropriate sediment control practices are incorporated with the pumping activity. Erosion and Sediment Control ­ All dewatering activities shall be performed in a manner that does not negatively impact the water quality of the water table, cause erosion, or transport sediment to wetlands, water bodies, water conveyance features, etc. on or off site. Sediment removal shall be provided using the following practices, or combination of practices, depending on the soil type, dewatering method, location, and amount of dewatering.

Where sumps are used, they shall meet the requirements of SUMP PIT 950. In addition, where space is available, a TEMPORARY SEDIMENT TRAP 960 shall be used to detain water and remove sediment from pumping and diversion operations. Where there is limited space a PORTABLE SEDIMENT TANK 895 shall be used to retain sediment during dewatering operations. POLYACRYLAMIDE (PAM) FOR TURBIDITY REDUCTION AND SEDIMENT CONTROL 894 may also be used, as appropriate. Where there is low, intermittent pumping activity, pumps with sediment filter bags shall be used. Sediment filter bags shall be attached to pump discharges and surrounded with a secondary containment practice. Secondary containment shall be used when discharge water from a sediment filter bag drains to any body of water, wetland, or water conveyance feature (ditch, swale, etc.) Secondary containment shall be placed between the sediment filter bag and the receiving area and/or aquatic resource. Sediment filter bags shall be placed on a stabilized surface area. Sediment filter bags shall not be placed, whole or partially, within aquatic areas (wetlands, streams, etc.), or water conveyance features ( ditches, swales, etc.). Sediment filter bags shall be raised above the supporting ground on a surface, or material, that allows water to flow out of the bottom of the bag at the respective design discharge rate for the sediment filter bag selected. Materials, structures, etc. that are used to ensure that water flows out of the bottom of a sediment filter bag must also be placed atop a stabilized surface area ( E.g. stone). The material for the sediment filter bag shall meet the requirements of material

813 - 2

5. Ability to supervise pump operation.

specification 592 GEOTEXTILE, Table 2, Class I with a minimum tensile strength of 200 lbs, or Table 1, Class 4 The sediment filter bag shall be sized per manufacturer recommendations and based on the size of the pump however, the minimum bag size shall be10 foot x 15 foot with a useable surface drainage area of 300 square feet ( 10 x 15 x 2 sides, top & bottom) The largest size pump to be used with a sediment filter bag shall be 4-inch diameter. Multiple hoses/pipes shall not be attached to a single filtration bag inlet sleeve.

Evaluate function, need, velocity control, outlet stability, and site aesthetics. The location and capacity of temporary diversion and protective works should be based on the characteristics of the site, accessibility, and the potential damage during development. Winter conditions and freezing temperatures can impact the effectiveness and functionality of sediment filter bags and anionic polymers for sediment removal during dewatering. If dewatering activities are likely to occur over winter, dewatering practices for sediment control should be included in the development of the Stormwater Pollution Prevention Plan that can be effective in freezing temperatures.

All outlets, and drainage pathways for dewatering discharges shall be stable and protected from erosion. Removal of Dewatering Facilities - The temporary dewatering areas shall be removed after they have served their purpose. The dewatering areas shall be graded and stabilized with appropriate erosion control practices and not create any obstruction of normal water flow, or any other interference with the operation of, or access to the permanent works. Federal, state, county and local water quality requirements shall be followed when choosing a dewatering method and may include a requirement for sampling and evaluating discharges for clarity. CONSIDERATIONS Base the location, method of dewatering, and configuration on site conditions. The following items should be considered when selecting the proper dewatering method: 1. Amount of water to remove. 2. Maintenance and operation required as a result of the construction operations. 3. Length of time to complete the work. 4. The space available in the work area.

An analysis of the effects of dewatering a site should also be considered. For example, permanent dewatering of a site may cause subsidence of surface areas and settlement of foundations, Also, temporary dewatering may create dry areas during construction but the effect of allowing water tables to rise after construction may result in excess pressure on subsurface structures, potentially causing damage and/or excessive sump pump cycling. PLANS AND SPECIFICATIONS Plans and specifications for installing and building dewatering facilities shall be in keeping with this standard and shall describe the requirements for applying the practice to achieve its intended purpose. At a minimum include:

813 - 3

1. Approximate location and proposed type of dewatering method shown on plans. 2. Drawings, specifications, etc. for all items of work as needed for dewatering. 3. Include the dewatering plan as part of the stormwater pollution prevention plan (SWPPP) and/or the erosion and sediment control plan, detailing the location of dewatering activities, presence of aquatic areas, equipment, fuel storage, and discharge point. 4. Any total maximum daily load (TMDL) requirements for the receiving waters or turbidity standards shall be stated on the plan set. 5. A brief narrative outlining a construction sequence for the dewatering operation. 6. Drawing details for proper installation of the various dewatering facilities as needed. All plans shall include installation, inspection, and maintenance schedules with the responsible party identified. Methods of dewatering shall be constructed to meet the requirements of construction specification REMOVAL OF WATER 11. OPERATION AND MAINTENANCE The frequency of inspections shall depend on the dewatering method, amount of discharge, potential damage, and quality of the receiving bodies of water. The frequency of inspections, responsible party and specific tasks shall be identified.

2. Accumulated sediment shall be removed from the flow area and temporary diversions shall be repaired, as required. 3. Outlet areas shall be checked and repairs shall be made in a timely manner, as needed. 4. Pump outlets shall be inspected for erosion, and sumps shall be inspected for accumulated sediment. 5. Sediment filter bags shall be removed and replaced when half full of sediment, or when the design flow rate of the filter bag is no longer being maintained. 6. If the receiving area is showing any signs of cloudy water, erosion, or sediment accumulation, discharges shall be stopped immediately once safety and property damage concerns have been addressed. 7. Accumulated sediment from dewatering operations shall be disposed of in accordance with all applicable laws and regulations. REFERENCES Maine Department of Environmental Protection, Bureau of Land and Water Quality. Maine Erosion and Sediment Control BMPs. G-3 Construction Dewatering. Augusta, ME. March 2003. IDOT Erosion and Sediment Control Field Guide for Construction Inspection, July 1, 2010 November 2017 urbst813.doc

1. Inspections shall be conducted to ensure proper operation and compliance with all permits and water quality standards.

813 - 4

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas