NOTICE OF AVAILABILITY For RECORD OF DECISION (ROD) and FINAL GENERAL CONFORMITY DETERMINATION (GCD)

The project is located on Terminal Island at Berths 226-236 in the Port of Los Angeles, Los Angeles Harbor, in the City and County of Los Angeles, California (33° 44’ 35” latitude, -118° 16’ 25” longitude).

SPECIAL PUBLIC NOTICE _________________________________________________________________________________________

U.S. ARMY CORPS OF ENGINEERS

BUILDING STRONG®

LOS ANGELES DISTRICT

NOTICE OF AVAILABILITY For RECORD OF DECISION (ROD) and FINAL GENERAL CONFORMITY DETERMINATION (GCD)

Public Notice/Application No.: SPL-2013-00756-TS Project: Berths 226-236 [Everport] Container Terminal Improvements Project Project Manager: Theresa Stevens, Ph.D.; 805-585-2146; theresa.stevens@usace.army.mil Applicant David M. Walsh, P.E. Chief Harbor Engineer Los Angeles Harbor Department 425 S. Palos Verdes Street, P.O. Box 151 San Pedro, CA 90733-0151

Contact Tara Tisopulos c/o Environmental Management Division Los Angeles Harbor Department 425 S. Palos Verdes Street, P.O. Box 151 San Pedro, CA 90733-0151

Location The project is located on Terminal Island at Berths 226-236 in the Port of Los Angeles, Los Angeles Harbor, in the City and County of Los Angeles, California (33° 44' 35" latitude, -118° 16' 25" longitude). Specifically, the Everport Container Terminal (also known as Evergreen) is located on the west side of Terminal Island along the Main Channel and near the Main Channel Turning Basin. The LA-2 offshore disposal site is located in San Pedro Bay at 33° 37' 06" latitude / -118° 17' 24" longitude. Activity The Los Angeles Harbor Department (LAHD) has been requested authorization to conduct work (dredging), install structures (overwater cranes, wharf improvements) in and over navigable waters of the U.S., and transport suitable dredged material to LA-2 for the purpose of ocean disposal in association with terminal improvement activities at Berths 226-236. For more information see below.

Interested parties are hereby notified that a ROD and Final GCD, in association with a Department of the Army permit application for the activity described here has been completed. The permit for this action will be issued or denied under section 10 of the Rivers and Harbors Act (RHA, 33 U.S.C. 403), section 103 of the Marine Protection, Research and Sanctuaries Act (MPRSA, 33 U.S.C. 1413) and the Corps implementing regulations (33 CFR parts 320-332).

Questions regarding the ROD and Final GCD should be mailed or sent electronically to: U.S. Army Corps of Engineers Los Angeles District, Regulatory Division Ventura Field Office Attn: SPL-2013-00756-TS 2151 Alessandro Drive, Suite 110 Ventura, CA 93001 Electronic mail: theresa.stevens@usace.army.mil This Public Notice is available at the following internet address: http://www.spl.usace.army.mil/Media/PublicNotices/RegulatoryPublicNotices.aspx. Digital copies of the ROD and Final GCD are available electronically at the Port of Los Angeles web site (http://www.portoflosangeles.org) and the Corps Regulatory Division web site (http://www.spl.usace.army.mil/Missions/Regulatory/). The US Army Corps of Engineers, Los Angeles District Regulatory Division (Corps), in coordination with the LAHD (state/local lead agency), completed a ROD for an EIS/Environmental Impact Report (EIR) and GCD for the Berths 226-236 [Everport] Container Terminal Improvements Project (project). The Corps and the LAHD prepared a joint EIS/EIR to optimize efficiency and avoid duplication. The EIS/EIR and GCD addressed federal, state, and local requirements and environmental issues concerning the project activities and permit approvals. The LAHD requires Department of the Army (DA) authorization pursuant to section 10 of the RHA and section 103 of the MPRSA to implement regulated activities in waters of the U.S. As such, the following Project activities require a permit from the Corps. Direct, indirect, and cumulative impacts associated with regulated activities are evaluated in the EIS/EIR and GCD as required by NEPA and the Corps' NEPA implementing regulations (33 CFR 325 Appendix B). As a result public input and the LAHD Board of Harbor Commissioners approval of Alternative 5 1 for construction, the following activities have been provisionally authorized: Berths 226-229 Dredge approximately 30,000 cy of sediment to increase design depth from -45 feet mean lower low water (MLLW) to -53 feet MLLW plus two feet of overdredge depth tolerance for a total depth of -55 feet MLLW to accommodate the largest ships in the fleet; install king piles and approximately 1,400 linear feet of sheet piles to stabilize the wharf. Berths 230-232 Dredge approximately 8,000 cy of sediment to increase design depth from -45 feet MLLW to -47 feet MLLW, plus two feet of overdredge depth tolerance for a total depth of -49 feet MLLW; install approximately 1,400 linear feet of sheet piles to stabilize the wharf.

1

Alternative 5 includes all the project elements of the originally proposed project as well as the TICTF on-dock rail expansion.

2

Dredged Material Disposal Dispose of approximately 38,000 cy of dredged material at the LA-2 ocean disposal site. The EIS/EIR included detailed information on sediment testing (Appendix F1) and the dredged material disposal analysis required by the section 103 implementing regulations (Appendix F2). The Corps has received EPA approval for this disposal action. Cranes Up to five of the existing cranes would be raised at the site in order to accommodate larger vessels. Installation of five new 100-foot gauge A-frame over-water gantry (wharf) cranes manufactured by Shanghai Zhenhua Heavy Industry Co., Ltd. (ZPMC), or equivalent would also occur. These additional cranes would be installed upon existing crane rails at Berths 226-229 to accommodate larger ships at the proposed deeper berths. The new cranes would require infrastructure improvements (such as cable and electrical upgrades) to support the three additional cranes. These infrastructure improvements would take place in the 100-foot backland area and were evaluated in the EIS/EIR because the 100foot backland area is included in the Corps scope of analysis and are within the Corps federal control and responsibility. Vessel Servicing Infrastructure Construction of five alternative maritime power (AMP) vaults (throughout wharf area adjacent to Berths 226 to 232) and associated electrical infrastructure. The AMP systems provide ship to shore electrical power while the vessels are at berth. Without AMP infrastructure, ships rely on diesel generators or diesel engines. Similar AMP vaults have been installed in the past at the terminal without a DA permit because their construction does not involve a discharge of dredged or fill material nor work in navigable waters of the United States. These infrastructure improvements would take place within the 100-foot backland area and were evaluated in the EIS/EIR because the 100-foot backland area is included in the Corps scope of analysis. Alternative 5 would be constructed over approximately 24 months, beginning in 2018. During construction, the terminal would remain in operation with a single berth in use. The EIS/EIR included a Draft GCD because construction emissions associated with the Corps' federal action (i.e., issuance of a permit to conduct work and install structures in navigable waters of the United States and transport dredged material for the purpose of ocean disposal) would exceed de minimis thresholds of NOx as described at 40 CFR 93.153(b)(1) in construction year 2018. The following activities do not require DA authorization but were evaluated in the EIS/EIR: Backland Development Development of approximately 1.5 acres of vacant land as new backlands. In addition, development of approximately 22 acres as new backlands, and potentially, a modified inbound and outbound gate complex. Backland development would require closure of streets and demolition of existing structures. These backland areas are not in jurisdictional waters of the United States, are outside the Corps scope of analysis, are not subject to the Corps federal control and responsibility, and could be developed without a DA permit. Further, closures and changes to traffic routes is considered an operational activity and would be implemented without a DA permit. Closure of portions of Terminal Way, Barracuda Street, Tuna Street, and Ways Street and rerouting of Terminal Way traffic to Cannery Street would occur. In addition the following would occur: ·

Improvements to Cannery Street, including: street realignment, pavement improvements, street widening, striping, traffic lighting and signals, drainage, and sidewalk improvements;

3

·

Installation of utility infrastructure to support 23.5 acres (1.5 + 22 acres) of new backlands (such as lighting, paving, and drainage improvements);

·

Amendment of the lease to add approximately 48.5 acres of terminal backlands comprised of approximately 25 acres of existing developed terminal backlands currently under space assignment, and the 23.5 acres (1.5 plus 22) of new backland area, for a total terminal acreage of approximately 229 acres; and

·

Extension of the facility lease by 10 years for continued operations from the current end date of 2028 to 2038.

·

Terminal Island Container Transfer Facility (TICTF) rail expansion would result in one additional loading track.

Operations Terminal operations are not regulated by the Corps. However, operations may be modified as a result of the Corps federal action. Under the Alternative 5, and at optimal throughput capacity, the terminal could handle approximately 2,379,525 twenty-foot-equivalent-units (TEU) and 208 ship calls per year by 2038. Everport may operate the terminal at lower TEU volumes than those described; however, an estimate of throughput based on optimal terminal capacity ensures a conservative analysis in that all reasonably foreseeable project operations, direct, indirect and cumulative impacts are disclosed and evaluated as required by NEPA and the Corps' implementing regulations. If you have any questions about the ROD or Final GCD, please contact Theresa Stevens, Ph.D. of my staff at 805-585-2146 or via e-mail at theresa.stevens@usace.army.mil. This special public notice is issued by the Chief, Regulatory Division. Regulatory Program Goals: · To provide strong protection of the nation's aquatic environment, including wetlands. · To ensure the Corps provides the regulated public with fair and reasonable decisions. · To enhance the efficiency of the Corps' administration of its regulatory program.

__________________________________________________________ U.S. ARMY CORPS OF ENGINEERS, LOS ANGELES DISTRICT VENTURA FIELD OFFICE 2151 ALESSANDRO DRIVE, SUITE 110 VENTURA, CA 93001 WWW.SPL.USACE.ARMY.MIL

4

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas