Broward County. Florida’s Turnpike Enterprise, Ocoee, Florida.
PROJECT PURPOSE:
Basic: The basic project purpose is linear transportation.
Overall: The overall project purpose is to facilitate the projected increased transportation capacity and traffic demands and provide a safe, improved, and reliable evacuation route within the corridor of southeast Broward and northeast and central Miami-Dade Counties.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Florida’s Turnpike Enterprise
Mr. Martin Horwitz
Turkey Lake HQ, MP 263, Bldg. #5315
P.O. Box 613069
Ocoee, Florida 34761
WATERWAY AND LOCATION: The project would affect waters of the United States associated with Broward Drainage Canal No. 2 which ultimately flows to Biscayne Bay, a Traditional Navigable Waterway. The project is located along State Road 821, also known as the Homestead Extension of Florida’s Turnpike (HEFT), from Mile Post 43, which is west of 57th Avenue (Red Road), to Mile Post 47, which is east of 27th Avenue (University Drive), extending approximately 3.95 miles. The project site is located in Sections 27, 28, 29, and 30; Township 51 South, Range 41 East, Broward County, Florida.
Directions to the site are as follows: Take Florida’s Turnpike (HEFT) to Exit 47. The project limits are from west of 57th Avenue to east of 27th Avenue.
APPROXIMATE CENTRAL COORDINATES: Latitude: 25.971667 °
Longitude -80.268889 °
PROJECT PURPOSE:
Basic: The basic project purpose is linear transportation.
Overall: The overall project purpose is to facilitate the projected increased transportation capacity and traffic demands and provide a safe, improved, and reliable evacuation route within the corridor of southeast Broward and northeast and central Miami-Dade Counties.
EXISTING CONDITIONS: The existing site conditions, as provided by the applicant, are as follows: The proposed project area encompasses approximately 262.22 acres, consisting of existing roadway, identified as the HEFT which is currently a 4-lane divided roadway through this segment, stormwater management features, borrow pit, surface waters, and bridge crossings over the South Broward Canal No. 2. The existing area surrounding the project site consists primarily of residential, industrial, and County lands. The following surface waters were identified by the applicant as being present within the proposed project limits:
OSW1 is a shallow upland-cut drainage feature located on the north side of the HEFT, west of SR 823. The total area of OSW1 is 1.85 acres. This is a seasonally inundated drainage feature.
OSW2 is a deep upland-cut stormwater treatment pond. Due to steep slopes, none of OSW2 is considered suitable wood stork foraging habitat.
OSW4 is a deep upland-cut drainage feature with 1:2 steep side-slopes located on the north side of the HEFT, west of NW 47th Avenue. The total area of OSW4 is 2.14 acres. Due to steep slopes, approximately 20% of OSW4 is considered suitable wood stork foraging habitat.
OSW5 is the South Broward Drainage Canal No. 2.
OSW6 is a shallow upland-cut drainage feature located on the north side of the HEFT, east of NW 47th Avenue. The total area of OSW6 is 0.98 acre.
OSW7 is an upland cut borrow pit within the northwest quadrant of the SR 817 interchange. The total area of OSW7 is 3.31 acres. Due to steep side slopes, approximately 10% of OSW7 is considered suitable wood stork foraging habitat.
OSW9 is a shallow upland-cut drainage feature located on the north side of the HEFT, east of NW 27th Avenue. The total area of OSW9 is 0.16 acre.
PROPOSED WORK: The project proposes roadway improvements along a segment of the HEFT, from Mile Post 43 (west of 57th Avenue) to Mile Post 47 (east of 27th Avenue), extending approximately 3.95 miles. The proposal includes widening the existing four-lane divided highway to eight lanes from west of NW 57th Avenue to the NW 27th Avenue ramps, and to six lanes from NW 27th Avenue to the Miramar toll gantries. The project also proposes intersection improvements throughout the corridor to increase operation and capacity at each of the ramp intersections with NW 57th Avenue and NW 27th Avenue. The project would result in impacts to 5.87 acres of impacts to the identified upland-cut surface water features, through the following activities: reconfiguration of OSW1 (shallow upland-cut drainage feature), resulting in 1.85 acres impacts and expansion of this feature to 6.05 acres; modification of OSW2 (deep upland-cut stormwater treatment pond), resulting 0.01 acre of impacts; piping of OSW4 (deep upland-cut drainage feature), resulting in 2.14 acres of impacts; placement of pilings into OSW5 (South Broward Drainage Canal No. 2), resulting in 0.01 acre of impacts; piping of OSW6 (shallow upland-cut drainage feature), resulting in 0.98 acre of impacts; modification to OSW7 (upland-cut borrow pit), resulting in 0.89 acre of impacts; and regrading of OSW9 (shallow upland-cut drainage feature, resulting in 0.16 acre of impacts. The project also involves the creation of eight dry detention stormwater treatment areas, constructed with similar depth and hydroperiod as the drainage features proposed to be impacted, encompassing 20.94 acres in total. The project also includes the construction of one wet stormwater facility, encompassing 1.71 acres.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The project has been designed to avoid and minimize impacts to aquatic resources. The project does not propose the discharge of fill material into wetlands. The features which would be impacted consist of shallow and deep upland-cut stormwater management drainage features, a deep upland cut stormwater treatment pond, the South Broward Drainage Canal No. 2, and an upland-cut borrow pit. The only impact to the South Broward Canal No. 2 would be due to the placement of piles for the proposed bridge widening. Piping of two surface water drainage features is proposed and would reduce the amount of sedimentation which enters into the receiving waters. Additionally, the project design includes establishment of more than 20 acres of surface water drainage features which would efficiently and effectively control all drainage generated onsite as a result of the proposed roadway improvement project.
COMPENSATORY MITIGATION – The applicant has provided the following explanation why compensatory mitigation should not be required: The project does not propose the discharge of fill material into wetlands; therefore, the project would not result in wetland losses. Also, onsite surface waters/drainage features would be created, to include features which would be expected to provide suitable habitat for species.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES
The Corps has determined the proposal may affect the Florida bonneted bat (Eumops floridanus). The Corps will request initiation of formal consultation with the Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act by separate letter. Additionally, the Corps has made the determination that the project may affect, but is not likely to adversely affect the wood stork (Mycteria americana) and Eastern Indigo snake (Drymarchon corais couperi). The Corps will request U.S. Fish and Wildlife Service concurrence with this determination pursuant to Section 7 of the Endangered Species. Finally, the Corps has determined that the project would have no effect on the Everglade snail kite (Rostrhamus sociabilis).
Florida Bonneted Bat: The project occurs entirely within the U.S. Fish and Wildlife Service Consultation Area for the Florida bonneted bat. However, the project is not within any of the designated Focal Areas for this species. The majority of the project area consists of mowed right of way. Overpasses within the project corridor were evaluated by the FTE via vehicular and pedestrian meandering, and no roosting bats were documented. Although the findings of the FTE’s site evaluation indicate that the project would have no impact on any habitat that could be utilized by the Florida bonneted bat, the use of the U.S. Fish and Wildlife Service Florida Bonneted Bat guidelines resulted in the following sequential determination: 2.e = may affect the Florida bonneted bat. This is due to the project site being greater than 5 acres and including potential roost sites (i.e., bridges). Therefore, the Corps has made the initial determination that the project may affect the Florida bonneted bat.
Wood Stork: This species nests colonially in a variety of inundated forested wetlands, including cypress strands and domes, mixed hardwood swamps, sloughs, and mangroves. Foraging habitat includes shallow water in freshwater marshes, swamps, lagoons, ponds, tidal creeks, flooded pastures and ditches, where fluctuating water levels concentrate food sources. The Corps ran a Resources at Risk (RAR) Report on November 2, 2017, and the report findings included that the proposed project is located within the Core Foraging Areas (CFA) of the nesting colony identified as 2B Melaleuca. According to the information provided by the FTE, foraging habitat for the wood stork can be found adjacent to the project corridor, and suitable foraging habitat (SFH) is present within the project area within roadside swales. Four of the stormwater treatment features where impacts would occur consist primarily of steep-sloped open water (OSW2, OSW4, OSW5 and OSW7). Of these features, OSW2, and OSW5 do not provide SFH. Approximately 3.34 acres of the stormwater treatment features (OSW1, OSW4, OSW6 and OSW7) which would be impacted by this project provide SFH for the wood stork. Additionally, as identified previously, the project includes the construction of eight dry detention stormwater treatment areas. The proposed dry detention stormwater areas are 20.94 acres in total and would be constructed with similar depth and hydroperiod as the impacted drainage features and stormwater ponds, thereby offsetting impacts to wood stork suitable foraging habitat. Also stated previously, the project includes the construction of one wet stormwater facility encompassing 1.71 acres, which would also provide foraging habitat for the wood stork. Given the above factors, it is expected that the project would result in the replacement, and increase, of features which would provide similar foraging biomass for the wood stork as would be impacted. Based on the above information, the Corps reviewed the Wood Stork Key for South Florida dated May 18, 2010, and the proposed project resulted in the following sequential determination: A > B > C > E = not likely to adversely affect the wood stork.
b. Eastern Indigo Snake: This species is found in a variety of habitats, including swamps, wet prairies, xeric pinelands and scrub areas. It may utilize gopher tortoise (Gopherus polyphemus) burrows for shelter during the winter and to escape the heat during the summer. This species feeds on snakes, frogs, salamanders, toads, small mammals, birds and young turtles. Stormwater will be treated within existing Turnpike right of way. Adjacent to the existing roadway, vehicular and pedestrian meandering field reviews performed by the applicant have documented that the project area is primarily mowed Bahia, with no significant areas of refugia or indigo snake habitat (e.g., sandhill, scrub, pine flatwoods, pine rocklands, scrubby flatwoods, high pine, dry prairie, coastal prairie, mangrove swamps, tropical hardwood hammocks, hydric hammocks, edges of freshwater marshes, agricultural fields [including sugar cane fields and active, inactive, or abandoned citrus groves], or coastal dunes). The project has no known holes, cavities, active or inactive gopher tortoise burrows, or underground refugia where a snake could be buried, trapped, and/or injured during project activities. However, the FTE would adhere to the U.S. Fish and Wildlife Service approved Standard Protection Measures for the Eastern Indigo Snake to ensure protection of this species. Based on the above information, the Corps also utilized The Eastern Indigo Snake Programmatic Effect Determination Key, August 2013, Revised August 2017. Use of the Eastern Indigo snake key resulted in the following sequential determination: A > B > C > D = not likely to adversely affect the Eastern Indigo snake.
c. Everglade Snail Kite: The project limits are within the U.S. Fish and Wildlife Service Consultation Area of the Everglade snail kite. Everglade snail kites inhabit large, open, freshwater marshes and lakes, and usually nest over the water in low trees or shrubs, including cabbage palm (Sabal palmetto), coastal plain willow (Salix caroliniana), and buttonbush (Cephalanthus occidentalis). Shallow wetlands with emergent vegetation such as spikerush, duck potato and pickerelweed provide good Everglade snail kite foraging habitat, provided the density of vegetation does not prevent the snail kites from spotting apple snails from above. The project area does not contain suitable habitat for the Everglade snail kite. Therefore, the Corps has determined that the proposed project would have no effect on the Everglade snail kite.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the onsite waters or receiving waters of Biscayne Bay. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the North Permits Branch, Panama City Permits Section, 1002 West 23rd Street, Suite 350, Panama City, Florida 32405 within 15 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms. Lisa Lovvorn, in writing at the North Permits Branch, Panama City Permits Section, 1002 West 23rd Street, Suite 350, Panama City, Florida 32405, by electronic mail at Lisa.S.Lovvorn@usace.army.mil@usace.army.mil, by fax at (850) 872-0231 or by telephone at (850) 763-0717, Ext. 27.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
PALM CITY PERMITS SECTION
1002 WEST 23RD STREET, SUITE 350
PANAMA CITY, FLORIDA 32405
REPLY TO
ATTENTION OF
Regulatory Division
North Permits Branch
Panama City Permits Section
January 10, 2018
PUBLIC NOTICE
Permit Application No. SAJ-2017-02743 (SP-TLO)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Florida's Turnpike Enterprise
Mr. Martin Horwitz
Turkey Lake HQ, MP 263, Bldg. #5315
P.O. Box 613069
Ocoee, Florida 34761
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with Broward Drainage Canal No. 2 which ultimately flows to Biscayne Bay,
a Traditional Navigable Waterway. The project is located along State Road 821, also
known as the Homestead Extension of Florida's Turnpike (HEFT), from Mile Post 43,
which is west of 57th Avenue (Red Road), to Mile Post 47, which is east of 27th Avenue
(University Drive), extending approximately 3.95 miles. The project site is located in
Sections 27, 28, 29, and 30; Township 51 South, Range 41 East, Broward County,
Florida.
Directions to the site are as follows: Take Florida's Turnpike (HEFT) to Exit 47. The
project limits are from west of 57th Avenue to east of 27th Avenue.
APPROXIMATE CENTRAL COORDINATES: Latitude: 25.971667 °
Longitude -80.268889 °
PROJECT PURPOSE:
Basic: The basic project purpose is linear transportation.
Overall: The overall project purpose is to facilitate the projected increased
transportation capacity and traffic demands and provide a safe, improved, and reliable
evacuation route within the corridor of southeast Broward and northeast and central
Miami-Dade Counties.
EXISTING CONDITIONS: The existing site conditions, as provided by the applicant,
are as follows: The proposed project area encompasses approximately 262.22 acres,
consisting of existing roadway, identified as the HEFT which is currently a 4-lane
divided roadway through this segment, stormwater management features, borrow pit,
surface waters, and bridge crossings over the South Broward Canal No. 2. The existing
area surrounding the project site consists primarily of residential, industrial, and County
lands. The following surface waters were identified by the applicant as being present
within the proposed project limits:
OSW1 is a shallow upland-cut drainage feature located on the north side of the HEFT,
west of SR 823. The total area of OSW1 is 1.85 acres. This is a seasonally inundated
drainage feature.
OSW2 is a deep upland-cut stormwater treatment pond. Due to steep slopes, none of
OSW2 is considered suitable wood stork foraging habitat.
OSW4 is a deep upland-cut drainage feature with 1:2 steep side-slopes located on the
north side of the HEFT, west of NW 47th Avenue. The total area of OSW4 is 2.14 acres.
Due to steep slopes, approximately 20% of OSW4 is considered suitable wood stork
foraging habitat.
OSW5 is the South Broward Drainage Canal No. 2.
OSW6 is a shallow upland-cut drainage feature located on the north side of the HEFT,
east of NW 47th Avenue. The total area of OSW6 is 0.98 acre.
OSW7 is an upland cut borrow pit within the northwest quadrant of the SR 817
interchange. The total area of OSW7 is 3.31 acres. Due to steep side slopes,
approximately 10% of OSW7 is considered suitable wood stork foraging habitat.
OSW9 is a shallow upland-cut drainage feature located on the north side of the HEFT,
east of NW 27th Avenue. The total area of OSW9 is 0.16 acre.
PROPOSED WORK: The project proposes roadway improvements along a segment of
the HEFT, from Mile Post 43 (west of 57th Avenue) to Mile Post 47 (east of 27th
Avenue), extending approximately 3.95 miles. The proposal includes widening the
existing four-lane divided highway to eight lanes from west of NW 57th Avenue to the
NW 27th Avenue ramps, and to six lanes from NW 27th Avenue to the Miramar toll
gantries. The project also proposes intersection improvements throughout the corridor
to increase operation and capacity at each of the ramp intersections with NW 57th
Avenue and NW 27th Avenue. The project would result in impacts to 5.87 acres of
impacts to the identified upland-cut surface water features, through the following
activities: reconfiguration of OSW1 (shallow upland-cut drainage feature), resulting in
1.85 acres impacts and expansion of this feature to 6.05 acres; modification of OSW2
(deep upland-cut stormwater treatment pond), resulting 0.01 acre of impacts; piping of
OSW4 (deep upland-cut drainage feature), resulting in 2.14 acres of impacts; placement
of pilings into OSW5 (South Broward Drainage Canal No. 2), resulting in 0.01 acre of
impacts; piping of OSW6 (shallow upland-cut drainage feature), resulting in 0.98 acre of
2
impacts; modification to OSW7 (upland-cut borrow pit), resulting in 0.89 acre of impacts;
and regrading of OSW9 (shallow upland-cut drainage feature, resulting in 0.16 acre of
impacts. The project also involves the creation of eight dry detention stormwater
treatment areas, constructed with similar depth and hydroperiod as the drainage
features proposed to be impacted, encompassing 20.94 acres in total. The project also
includes the construction of one wet stormwater facility, encompassing 1.71 acres.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment: The project has been designed to avoid and minimize impacts to
aquatic resources. The project does not propose the discharge of fill material into
wetlands. The features which would be impacted consist of shallow and deep uplandcut stormwater management drainage features, a deep upland cut stormwater treatment
pond, the South Broward Drainage Canal No. 2, and an upland-cut borrow pit. The only
impact to the South Broward Canal No. 2 would be due to the placement of piles for the
proposed bridge widening. Piping of two surface water drainage features is proposed
and would reduce the amount of sedimentation which enters into the receiving waters.
Additionally, the project design includes establishment of more than 20 acres of surface
water drainage features which would efficiently and effectively control all drainage
generated onsite as a result of the proposed roadway improvement project.
COMPENSATORY MITIGATION The applicant has provided the following explanation
why compensatory mitigation should not be required: The project does not propose the
discharge of fill material into wetlands; therefore, the project would not result in wetland
losses. Also, onsite surface waters/drainage features would be created, to include
features which would be expected to provide suitable habitat for species.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties
within the permit area. By copy of this public notice, the Corps is providing information
for review. Our final determination relative to historic resource impacts is subject to
review by and coordination with the State Historic Preservation Officer and those
federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES
The Corps has determined the proposal may affect the Florida bonneted bat (Eumops
floridanus). The Corps will request initiation of formal consultation with the Fish and
Wildlife Service pursuant to Section 7 of the Endangered Species Act by separate letter.
Additionally, the Corps has made the determination that the project may affect, but is
not likely to adversely affect the wood stork (Mycteria americana) and Eastern Indigo
snake (Drymarchon corais couperi). The Corps will request U.S. Fish and Wildlife
Service concurrence with this determination pursuant to Section 7 of the Endangered
Species. Finally, the Corps has determined that the project would have no effect on the
Everglade snail kite (Rostrhamus sociabilis).
3
Florida Bonneted Bat: The project occurs entirely within the U.S. Fish and Wildlife
Service Consultation Area for the Florida bonneted bat. However, the project is not
within any of the designated Focal Areas for this species. The majority of the project
area consists of mowed right of way. Overpasses within the project corridor were
evaluated by the FTE via vehicular and pedestrian meandering, and no roosting bats
were documented. Although the findings of the FTE's site evaluation indicate that the
project would have no impact on any habitat that could be utilized by the Florida
bonneted bat, the use of the U.S. Fish and Wildlife Service Florida Bonneted Bat
guidelines resulted in the following sequential determination: 2.e = may affect the
Florida bonneted bat. This is due to the project site being greater than 5 acres and
including potential roost sites (i.e., bridges). Therefore, the Corps has made the initial
determination that the project may affect the Florida bonneted bat.
Wood Stork: This species nests colonially in a variety of inundated forested wetlands,
including cypress strands and domes, mixed hardwood swamps, sloughs, and
mangroves. Foraging habitat includes shallow water in freshwater marshes, swamps,
lagoons, ponds, tidal creeks, flooded pastures and ditches, where fluctuating water
levels concentrate food sources. The Corps ran a Resources at Risk (RAR) Report on
November 2, 2017, and the report findings included that the proposed project is located
within the Core Foraging Areas (CFA) of the nesting colony identified as 2B Melaleuca.
According to the information provided by the FTE, foraging habitat for the wood stork
can be found adjacent to the project corridor, and suitable foraging habitat (SFH) is
present within the project area within roadside swales. Four of the stormwater
treatment features where impacts would occur consist primarily of steep-sloped open
water (OSW2, OSW4, OSW5 and OSW7). Of these features, OSW2, and OSW5 do
not provide SFH. Approximately 3.34 acres of the stormwater treatment features
(OSW1, OSW4, OSW6 and OSW7) which would be impacted by this project provide
SFH for the wood stork. Additionally, as identified previously, the project includes the
construction of eight dry detention stormwater treatment areas. The proposed dry
detention stormwater areas are 20.94 acres in total and would be constructed with
similar depth and hydroperiod as the impacted drainage features and stormwater
ponds, thereby offsetting impacts to wood stork suitable foraging habitat. Also stated
previously, the project includes the construction of one wet stormwater facility
encompassing 1.71 acres, which would also provide foraging habitat for the wood stork.
Given the above factors, it is expected that the project would result in the replacement,
and increase, of features which would provide similar foraging biomass for the wood
stork as would be impacted. Based on the above information, the Corps reviewed the
Wood Stork Key for South Florida dated May 18, 2010, and the proposed project
resulted in the following sequential determination: A > B > C > E = not likely to
adversely affect the wood stork.
b. Eastern Indigo Snake: This species is found in a variety of habitats, including
swamps, wet prairies, xeric pinelands and scrub areas. It may utilize gopher tortoise
(Gopherus polyphemus) burrows for shelter during the winter and to escape the heat
during the summer. This species feeds on snakes, frogs, salamanders, toads, small
mammals, birds and young turtles. Stormwater will be treated within existing Turnpike
4
right of way. Adjacent to the existing roadway, vehicular and pedestrian meandering
field reviews performed by the applicant have documented that the project area is
primarily mowed Bahia, with no significant areas of refugia or indigo snake habitat (e.g.,
sandhill, scrub, pine flatwoods, pine rocklands, scrubby flatwoods, high pine, dry prairie,
coastal prairie, mangrove swamps, tropical hardwood hammocks, hydric hammocks,
edges of freshwater marshes, agricultural fields [including sugar cane fields and active,
inactive, or abandoned citrus groves], or coastal dunes). The project has no known
holes, cavities, active or inactive gopher tortoise burrows, or underground refugia where
a snake could be buried, trapped, and/or injured during project activities. However, the
FTE would adhere to the U.S. Fish and Wildlife Service approved Standard Protection
Measures for the Eastern Indigo Snake to ensure protection of this species. Based on
the above information, the Corps also utilized The Eastern Indigo Snake Programmatic
Effect Determination Key, August 2013, Revised August 2017. Use of the Eastern
Indigo snake key resulted in the following sequential determination: A > B > C > D = not
likely to adversely affect the Eastern Indigo snake.
c. Everglade Snail Kite: The project limits are within the U.S. Fish and Wildlife
Service Consultation Area of the Everglade snail kite. Everglade snail kites inhabit
large, open, freshwater marshes and lakes, and usually nest over the water in low trees
or shrubs, including cabbage palm (Sabal palmetto), coastal plain willow (Salix
caroliniana), and buttonbush (Cephalanthus occidentalis). Shallow wetlands with
emergent vegetation such as spikerush, duck potato and pickerelweed provide good
Everglade snail kite foraging habitat, provided the density of vegetation does not
prevent the snail kites from spotting apple snails from above. The project area does not
contain suitable habitat for the Everglade snail kite. Therefore, the Corps has
determined that the proposed project would have no effect on the Everglade snail kite.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or Federally managed
fisheries in the onsite waters or receiving waters of Biscayne Bay. Our final
determination relative to project impacts and the need for mitigation measures is subject
to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the North Permits
5
Branch, Panama City Permits Section, 1002 West 23rd Street, Suite 350, Panama City,
Florida 32405 within 15 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms.
Lisa Lovvorn, in writing at the North Permits Branch, Panama City Permits Section,
1002 West 23rd Street, Suite 350, Panama City, Florida 32405, by electronic mail at
Lisa.S.Lovvorn@usace.army.mil@usace.army.mil, by fax at (850) 872-0231 or by
telephone at (850) 763-0717, Ext. 27.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
6
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
7
o' 1.2~0
E:°
Peir
5,000
2,Joo
I
~~§iiiiiiiiiii~~~~~ Feet
~ ~
I
s
p.,rnbro e Rd
Pembroka.: Rd
Veoet1<1nSt
,., Shennal'I Cir
0
..
'I:
0
c.
~
Project
Location
(
O Mirarnilt 131vd
SW 251h St
End Project d 1
J11nl
QI
c.
1ili
e
;;:
"'
I
~
"'
>
5
~
~
t/)
I
If
Btvt
Gr.,
ri1BI
Alh
lvd
oBlv
Biltmo
Co1:il Blvd
0
F.mba5~Y Bl"!d
Fairw
Blvd
..r.,_ r
z
NW 213Lh SI
~
...2t
NW211Ul SI
CG
0
o Lake
~
g~ u cern e
l>l'N 20 (/) St
~
Begin Project
iii
c:
·
Snapper Creek (C-9) Canal
U1
l
Kiit·
10 St
Dr
,
NW201s1St
FLORIDA'S
TURNPIKE
FIGURE 1
PROJECT LOCATION MAP
EXIST. R/W LINE
EXIST.
-----------~
-
~
-
.
~
,
- - - - · - - - - · FoC(B)- · · · · -"- · · - - BF C(B ~ - - - - - - - BFOC( 'f- · · · · :'· · - BFOC(BJ ·
· - · - - 8FOE(B)- - · · - · - - - - - - BFOE(B} · · · - · · - ·
· BFOE(B)- - - - -~~ - - · - · BFOE(BJ ·
OSWI
SWALE 1A
TOTAL MEA--
- ______ - -= J.85 AC.
- ------
--SB SR 821 (HEFT)
*
=--
I
=-~-=---=---=---=---=--~ - -
@ SURVEY SR 821
...:....:-=-- - - - - - - --=- - - - - - -
-=---=-- - -=--- - ~ - - -=- -"'=---=--=--=- - - - - -=--
NB SR 821 (HEFT)
--" - - - · - - / - - - - - - - - - - - - - - - ·sW-AJ:f! -tB- - - - - - - - - -
OSWl PERMANENT IMPACT= 1.85 AC.
OSWl TOTAL AREA= 7.85 AC.
f
SURVEY SR
8211
LEGEND
1VV1 PERMANENT SURFACE
~
~
$WALE 1A
-- - - --- - - -------
WATER IMPACTS
SWN.E I B
g
---- ------
- -Feet
---
0 20
100
"
......
aloe
OSW1
PERMANENT IMPACTS
SECTION
srA. 5970+oo.oo
PURPOSE: SR 821 (HEFT) WIDENING
AT:
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 01 - SURFACE WATER OSWI
Grossz
7/31/2011
3:29:18 Pit
X:\P\42g3zs1320 I \roadway\Pt.rMlt\D&F_o uign
FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
APPLICATION BY:
S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
EXIST. R/W LINE
· · · · · : · - · · · - BFOC(8) · - - - · - - · - - - FO (8) - · ---- · · - - - - - BFOClt · BF
· · · · · · - - - - - BFOE(8) · · · - - - · · · · - BFOE(B)- · - . - . - - - · - -BF01((8)
SWALE 1A
BEGIN PROJECT
PERMANENT lMPACT
=
OSWI
1.85 AC.
_
STA.. 5769+75.00
~ME....!:-43.047- -
-
-
-
-
,
--
-
OSW1
_ _ _ _ _ _ _ _ TQLAL AREA
=JM~
------
OSWl PERMANENT IMPACT= 1.85 AC.
OSWl TOTAi.. AREA= 7.85 AC.
EX'lST. LA R/W LINE
@ SU/WEY SR
--
...,. .t~-
---LEGEND
1VV1 PERMANENT
8~11
~
SURFACE
WATER IMPACTS
0
SWAlE IA
-----
0 20
~
~
~
...
'
:!
~
100
OSWJ
Feet
PERMANENT IMPACTS
SECTION
STA. 5772+oo.oo
PURPOSE: SR 821 (HEFT) WIDENING
AT:
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 02 - SURFACE WATER OSWI
Grossz
7/31/2011
3:29:20 Pit
X:V\42g3zs1320 I \roadway\Pt.rMlt'\D&F_02.tign
FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
APPLICATION BY: S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
EXIST. LA R!W LINE
-;XIST. R/W LINE
J
___ ___
_.
- _ osw1
PERMANENT J)J~A'CT = 1.8-:S-A&-- ~
------ ----
- - -=1.Bs AC.- - ·
OSWl PERMANENT IMPACT= 1.85 AC.
OSWl TOTAL AREA= 7.85 AC.
i
I
l
-----
0 20
---
OSWI
TOTAL AREA
SUIWEY SR
'
8211
LEGEND
PERMANENT SURFACE
WATER IMPACTS
0
~
....
/~~
..;
4. 1
~
cAs
100
Feet
s
.......... _________ _
05W1
SECTION
srA. s1so+oo.oo
PERMANENT IMPACTS
PURPOSE: SR 821 (HEFT) WIDENING
AT:
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 03 - SURFACE WATER OSWI
Grossz
7/3 1/2011
3:29:21 Pit
X:'\P\42g3'181320 I \roadway\Pt.rMlt'\D&F_03.tign
FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
APPLICATION BY: S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
OSW1 TOTAL
AREA = 1.85 AC.
--== ~79~ ------------- ~
OSW1 PERMANENT IMPACT"'" 1.85 AC.
OSW1 TOTAL AREA = 1.85 AC.
LEGEND
t!
SURVEY SR
821~
~
~
~
~
~24.PIPE
-----
0 20
1VV1 PERMANENT SURFACE
~ WATER IMPACTS
100
NOC
SECTION
Feet
PERMANENT IMPACTS
STA. s1ss+oo.oo
PURPOSE: SR 821 (HEFT) WIDENING
AT:
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 04 - SURFACE WATER OSW1
Grossz
7/31/2011
3:29:22 Pit
X:\P\42g3'181320 I \roadway\Pt.rMlt'\D&F_04.tign
FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
APPLICATION BY: S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
@RAMP A-2
-.::::W;;=ci.- OSW2 PERMANENT
IMPACT = 0.01 AC.
OSW2 PERMANENT IMPACT = O.oJ AC.
OSW2 TOTAL AREA = 3.92 AC.
LEGEND
PERMANENT SURFACE
WATER IMPACTS
- - Feet
-- -
0 20
-- ·v"~--'---- -
- - ~- - - - -
100
----------------OSW2
PERMANENT IMPACTS
SECTION
STA. 210+12.80
PURPOSE:
DATUM:
AT: FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
SR 821 (HEFT) WIDENING
COUNTY OF: BROWARD & "1/AIM-DADE
N.A.V.D 1988
FIGURE 05 - SURFACE WATER OSW2
Gr ossZ
113112011
3:29:241'14
APPLICATION BY: S.F.W.M.D./ U.S.AC.E
X:\P\42932813201\r D«iwoy\l'ermit\D&F _OS.dgn
STATE: FLORIDA
EXIST. LA R/W LINE
_________
----
-_-----
SURVEY SR 821
--
-~
- ------------ - - - -
--- --~ - -.
- ---..---· ·
OSW4 PERMANENT IMPACT ""2.14 AC.
OSW4 TOTAL AREA = 2.14 AC.
@SURVEY SR
I
-----
0 20
~
1/oc
OSW4
fMPACTS
SECTION
Feet
STA. ss1s+oo.oo
PURPOSE: SR 821 (HEFT) WIDENING
AT:
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 06 - SURFACE WATER OSW4
Grossz
WATER IMPACTS
~
PERMANENT
100
LEGEND
1VV1 PERMANENT SURFACE
I
I
''
821~
7/31/2011
3:29:26 Pit
X:\P\42g3zs1320 I \roadway\Pt.rMlt'\D&F_06.tign
FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
APPLICATION BY: S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
OSW4 PERMANENT
-
-
--.i-_.;__
-
-
- -
-----------------------------SB SR 821 HEFT
_..--------
---
....
- - - - - - - - - - _ - 5WALE-tf)- - - - - - - - _ - · - - - - - - - - __
----~~---
0
OSW4 PERMANENT IMPACT= 2.14 AC.
OSW4 TOTAL AREA= 2.14 AC.
f
LEGEND
~
1VV1 PERMANENT SURFACE
~
'
~!lo
~
~
SWAlt° 10
' ,.....
,-_-,,,-~-
OSW4
PERMANENT IMPACTS
-----
100
SECTION
Feet
STA 5828+o0.00
PURPOSE: SR 821 (HEFT) WIDENING
AT:
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 07 - SURFACE WATER OSW4
Grossz
WATER IMPACTS
I
I
0 20
SURVEY SR 821
EXIg .,M R!w_}:_INE _
7/31/2011
3:29:27 Pit
X:\P\42g3zs1320 I \roadway\Pt.rMlt'\D&F_01.tign
FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
APPLICATION BY: S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
OSW4 TOTAL
AREA= 2.14 AC.
- BF'OC(B) · · · · ·
-----
----------==-_
.
-------- ---......-
-
=-
NB SR 821 (HEFT)
----
· ·
· · ··
~
----- ...
----------····-8211
----
-ib.
----4------- - ~~~w - --~-
OSW4 PERMANENT IMPACT= 2.14 AC.
OSW4 TOTAL AREA= 2.14 AC.
@SURVEY SR
I
-----
LEGEND
1'V"V'1 PERMANENT SURFACE
~
WATER IMPACTS
5
'
0 20
--
100
PERMANENT IMPACTS
Feet
SECTION
STA. 5B37+oo.oo
PURPOSE: SR 821 (HEFT) WIDENING
AT:
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 08 - SURFACE WATER OSW4
Grossz
7/31/2011
3:29:28 Pit
X:\P\42g3zs1320 I \roadway\Pt.rMlt'\D&F_os.tign
FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
APPLICATION BY: S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
11
!"'I
ci
:c:
.....
...... ~
...
lI
~
11
'
~·
w 11~
0
0
Cl)
I'
1~~~~~~~~~~~-11
1-_-~1
-1
SB SR 821 (HEFT)
I
///
///
///
//.~
///
.......--~....._~_..~......~~~~--~----~~~~--~1::1.__
-: ·---= -
Q)
I
~
-
I
I
.
I
'1
I
'
,,
i
I
i.
I
DSW4 PERMANENT IMPACT = 2.14 AC.
OSW4 TOTAi. AREA= 2.14 AC.
'
I
!
Ii-.
ill
..,..
I·
~
7
=
/,
'.i
/,
''
'
'
....
~:~~
I
-
. I I~~
--:5(.
i=·.
I
I
--I-
:~
~'1 r--..
'I
I
I
~
.. ""' .
0
,c
--..o\
....
·~
~
1J
'1
~ -.......
O",
......
'
~
J.
SWALE JD
..
'<:I'
I
I
....
I Ii
NB SR 821 (HEFT)
I
1~~~~~~~~~
'
; o
II \
I
:(
--J
4i!:
'0
I~\
-"
3:
.
.-
'i-.
I
'<:I'
~
to
I !\ .,,...
l
I'
"
:
1
SR 847-' t
\I
I
I UJ-:-
'fi-:
IXl
i
'
II :::.
11 :~~
.
~
I
.
I
~
·~
I
I
LEGEND
~
PERMANENT SURFACE
WATER IMPACTS
\
\
\
\
\
\
\
\
\
- -- - -
0 20
Feet
OSW4
SECTION
PERMANENT IMPACTS
srA. 5845+oo.oo
PURPOSE: SR 821 (HEFT) WIDENING
AT: FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 09 - SURFACE WATER OSW4
Grossz
7/3112011
3:.29:30 Pit
==iii'~
X:\P\42g3l81320 I \roadway\Pt.rMlt'\D&F_09.tign
APPLICATION BY: S.F.W.M.D./ U.S.A.C.E
STATE: FLORIDA
EXIST. LA
I
-- - - - - - - -
RJW LINE
}
--
SR 847 (NW 47TH AVE.)
DSW5 PERMANENT IMPACT = 36 SF (0.00 AC.}
OSW5 TOTAi. AREA= 0.51 AC.
LEGEND
BRIDGE ELEVAT!ON VIEW
I
1VV1 PERMANENT SURFACE
~
----
WATER IMPACTS
L,Ut" S OF COJtC.
l'.ZIP'f PNl£W'/ff
(EXISTil'G
!Nt6THMfi.
- -- - -
0 20
100
tr PRESTAESSED
o:>HC. PJu.$ (IYPJ
Feet
OSW5
PERMANENT IMPACTS
PURPOSE: SR 821 (HEFT) WIDENING
AT: FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 10 - SURFACE WATER OSW5
Grossz
7/31/2011
3:29:31 Pit
X:\P\4]g3181310 I \roadway\PNMlt'\D&F_ 1O.tign
APPLICATION BY: S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
OSW6 PERMANENT
IMPACT = 0.98 AC.
0
SB SR 821 (HEFT)
NB SR 821 (HEFT)
l
~ · · · *
t XIST. LA R/W LINE
· · ·
·
v
EXIST. LA R/W LINE
0
OSW6 PERMANENT IMPACT = 0,98 AC.
OSW6 TOT AL AREA = 0.98 AC.
LEGEND
II
PERMANENT SURFACE
IMPACTS
· ~ WATER
~24'1'1PE
I
I
I
I
I
/
/
\
\
~f
\
SURVEY SR 821 \ ,
/
/
-----
0 20.
100
OSW6
PERMANENT IMPACTS
Feet
SECTION
STA. 5855+o0.00
PURPOSE: SR 821 (HEFT) WIDENING
AT: FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 11 - SURFACE WATER OSW6
Grossz
7/31/2011
3:29:35 Pit
X:\P\42g3'181320I\roadway\Pt.rMlt\D&F_11.tign
APPLICATION BY: S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
OSW6 PERMANENT
IMPACT"" 0.98 AC.
EXIST. LA RJW llNE
OSW6 TOTAL
AREA= 0.98 AC.
NB SR 821 (HEFT)
0
---0
-
......
. - ~ ~ _*_EXl6!.:_ 10_RJw_ J,J.NE..::
---------
0
----------------------0
· ····
OSW6 PERMANENT If=
LEGEND
1VV1 PERMANENT SURFACE
~
-----
0 20
WATER IMPACTS
100
SECTION
STA. 5862+o0.00
Feet
PURPOSE: SR 821 (HEFT) WIDENING
AT:
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 12 - SURFACE WATER OSW6
Grossz
7/31/2011
3:29:36 Pit
X:\P\42g3zs1320I\roadway\Pt.rMlt\D&F_12.tign
FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
APPLICATION BY: S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
OSW6 TOTAL
OSW6 PERMANENT
IMPACT = 0.98 AC.
f
0
NB SR 821 (HEFT)
SURVEY SR 821
--------·
0
s-21m_
- - - - - - - - - - 5-WALE-2/iJ- - - - - - -- - - ·
·
"'
o
o
EXIST
·a · LA R/W LfAJt:
·r:r
o
-----------~---
* * "' *
o
o
"'
OSW6 PERMANENT IMPACT = 0.98 AC.
OSW5 TOTAL AREA = 0.98 AC.
I
I
-- _,
,..
I
/
-----
0 20
100
}If'
LEGEND
@ SURVEY SR 821
SVIN.£ 2A
I
I
1~
I I
- , ~I
1VV1 PERMANENT SURFACE
1
~
5WN.£ 18
',
I
,,;~
II
'
._ .....
)---
PIPE
STA. 5873+o0.00
Feet
PURPOSE: SR 821 (HEFT) WIDENING
AT:
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM-DADE
FIGURE 13 - SURFACE WATER OSW6
Grossz
WATER IMPACTS
1/31/2011
3:29:31 Pit
X:\P\42g3zs1320 I \roadway\PNMlt'\D&F_ 13.tign
FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
APPLICATION BY:
S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
~- og °ri
1.
0
J .
I
1_ \
~c._ ~
= = = IMPACT = 0.98
·
.
.
·
-
,,
PERMANENT~ I t''\
OSW6
~.
I .
- - .. - - - . - · '.t'\".t>.
-
I
I.
.
.....-1-#
... \
..
ii
I
/
I
- -
J
... ...- - - ...- ~.:!!,..;
... - ... SWALE
... ·' 2A..
.,
... ... ... ... ...
...
OSW6 TOTAL I
AREA = 0.98 AC.
S-231
...
... ..
....
,.,
'
.,,
...
...
.·.
. ...
\
...
.,
.
1.
I
EXIST. LA R!W LINE\
CS-2J1')
I.
,
.. \
'
...,,,
I
1
J
~
.-.-....::::.·-
.-~-
,, r,
I
~=
I/
///
///
/, v '\
. -;=;r
_r f
~
0
..
0
I
I
'/
I
"'
..
. ..
I
///
....... ff/
rc
D
I
-
7"/Y'::l
-,IY'/-
LA R/W LINE
0
ti
/
.,,7\
~
I
I
I
I
OSW6 PERMANENT TMPACT = 0.98 AC.
OSW6 TOTAL AREA.- 0.98 AC.
---
. -· -··- - -
0
"
\
I
SURVEY SR 821
/;'I'
--·~
\
5 - 23? - - - - - - - - - -
()
///
..,..,,_
7//
-ZB- - - - - - - - - -~ - . - . - .---SWA-tE
·
-
/ / ,r I
NB SR 821 (HEFT)
-
//L
.
""'
JI
///
//7
I
.
..
"'
I
I
I
1VV1 PERMANENT SURFACE
~ WATER IMPACTS
..
BFOC
U'PIP£_)
-----
100
PERMANENT IMPACTS
SECTION
STA 5880+o0.00
Feet
PURPOSE: SR 821 (HEFT) WIDENING
AT:
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 14 - SURFACE WATER OSW6
Grossz
7/31/2011
3:29:39 Pit
I
LEGEND
.............~-
0 20
.
0
SB SR 821 (HEFT)
1///
I
.,.
t
///
J
.. \ 1
X:\P\4293'181320 I \roadway\PNMlt'\D&F_ l 4.tign
FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
APPLICATION BY: S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
EXIST. LA R/W LfNE
OSW9 PERMANENT
IMPACT
0.16 AC.
=
SWALE 3~
@RAMP C-1
OSW9 PERMANENT IMPACT = 0.16 AC.
OSW9 TOT AL AREA = 0.16 AC.
LEGEND
fV'Vl PERMANENT SURFACE
~
WATER IMPACTS
- - - --
0 20
BFOE
BFOC
100
Feet
BFOC
OSW9
PERMANENT IMPACTS
SECTION
STA. 51o+a0.00
PURPOSE: SR 821 (HEFT) WIDENING
AT:
DATUM: N.A.V.D 1988
COUNTY OF: BROWARD & MIAIM- DADE
FIGURE 15 - SURFACE WATER OSW9
Grossz
7/31/2011
3:29:40 Pit
X:\P\42g3zs1320 I \roadway\PNMlt'\D&F_15.tign
FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
APPLICATION BY: S.F.W.M .D./ U.S.A.C.E
STATE: FLORIDA
°'
<::>
!t:'
"'
~ -'C
~
CD- 12
OSW7 PERMANENT
IMPACT = 0.44 AC.
OSWl TOTAL
AREA = 3.31 AC.
@ SURVEY SR 817
EXIST. RJW LINE
l
OSW7 PERMANENT
If.f PACT = 0.45 AC.
--~-~-
OSW7 PERMANENT IMPACT = 0 .89 AC.
OSWl TOTAL AREA = 3.31 AC.
LEGEND
PERMANENT SURFACE
WATER IMPACTS
I
'
- - Feet
-- -
0 20
I
100
PERMANENT IMPACTS
SECTION
STA. 610+95.20
PURPOSE: SR 821 (HEFT) WIDENING
AT: FROM SOUTH OF 57TH AVE. TO NORTH OF 27TH AVE.
DATUM:
COUNTY OF: BROWARD & "1/AIM-DADE
N.A.V.D 1988
FIGURE 16 - SURFACE WATER OSWl
Gr ossZ
113112011
3:19:42 PM
APPLICATION BY: S.F.W.M.D./ U.5.AC.E
X:\P\429J2813201\rD«iwoy\Permit\D&F _16.dgn
STATE: FLORIDA