Home

St. Louis District

Run scraper

P-3074

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

WATCO Companies, LLC., seeks authorization, under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act, to relocate a barge, upgrade an access walkway and liquids lines leading to their existing Cahokia Marine terminal liquids dock along the left descending bank of the Mississippi River, river mile 178.2 in Sauget, St. Clair County, Illinois. Written comments must be submitted by replying by electronic mail or written mail to the addresses shown in the signature block, below. The Public Notice comment period opens on January 10, 2018, and closes on January 31, 2018.

WATCO Companies, LLC., seeks authorization, under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act, to relocate a barge, upgrade an access walkway and liquids lines leading to their existing Cahokia Marine terminal liquids dock along the left descending bank of the Mississippi River, river mile 178.2 in Sauget, St. Clair County, Illinois. Written comments must be submitted by replying by electronic mail or written mail to the addresses shown in the signature block, below. The Public Notice comment period opens on January 10, 2018, and closes on January 31, 2018.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas