Regal Talc Mine expansion consists of modifying and or relocating approximately 1330 linear feet of Hoffman Creek impacting 0.72 acre of wetland.

The impacted Hoffman Spring Creek channel reach of approximately 730 linear feet is located on the downstream half of the drainage immediately above its confluence with Hoffman Creek. The 730 linear feet of impacted Hoffman Spring Creek channel includes about 530 linear feet that will be removed by the expanded mine pit (including adjacent safety bench, berm, and access road), and about 200 linear feet that will be affected by construction of the uppermost part of the realigned channel, including a catchment basin and cutoff wall. The engineered realigned channel will extend from the new catchment basin constructed in the existing channel, and then to Hoffman Creek through uplands, with an elevation change of approximately 47 feet. At the confluence, the realigned channel will merge with the natural Hoffman Creek channel, and will include a groundwater cutoff wall constructed beneath and perpendicular to Hoffman Creek immediately upstream of the confluence. All of these areas are characterized by intermittent stream flow.

The impacted Hoffman Creek channel of approximately 600 linear feet will be located both upstream and downstream of its confluence with Hoffman Spring Creek. The modification will consist of channel consolidation with natural sealing minerals (bentonite) mixed to a depth of approximately 6 inches, and native soft armoring utilizing existing channel debris/stone and local riparian cuttings.

Regal Talc Mine expansion consists of modifying and or relocating approximately 1330 linear feet of Hoffman Creek impacting 0.72 acre of wetland.

The impacted Hoffman Spring Creek channel reach of approximately 730 linear feet is located on the downstream half of the drainage immediately above its confluence with Hoffman Creek. The 730 linear feet of impacted Hoffman Spring Creek channel includes about 530 linear feet that will be removed by the expanded mine pit (including adjacent safety bench, berm, and access road), and about 200 linear feet that will be affected by construction of the uppermost part of the realigned channel, including a catchment basin and cutoff wall. The engineered realigned channel will extend from the new catchment basin constructed in the existing channel, and then to Hoffman Creek through uplands, with an elevation change of approximately 47 feet. At the confluence, the realigned channel will merge with the natural Hoffman Creek channel, and will include a groundwater cutoff wall constructed beneath and perpendicular to Hoffman Creek immediately upstream of the confluence. All of these areas are characterized by intermittent stream flow.

The impacted Hoffman Creek channel of approximately 600 linear feet will be located both upstream and downstream of its confluence with Hoffman Spring Creek. The modification will consist of channel consolidation with natural sealing minerals (bentonite) mixed to a depth of approximately 6 inches, and native soft armoring utilizing existing channel debris/stone and local riparian cuttings.

PUBLIC NOTICE

Omaha District

Application No: NWO-2015-00766-MTH Applicant: Barretts Minerals, Inc. Waterway: Hoffman Creek Issue Date: 26 December 2017 Expiration Date: 23 January 2018 30 DAY NOTICE Helena Regulatory Office 10 West 15 Street, Suite 2200 Helena, Montana 59626

JOINT PUBLIC NOTICE FOR PERMIT APPLICATION SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS AND MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application for Regal Talc Mine expansion, which would result in permanent and temporary impacts to approximately 0.72 acre of scrub shrub wetland and approximately 1330 linear feet of Hoffman Creek, waters of the United States. This notice is to inform interested parties of the proposed activity and to solicit comments. This notice may also be viewed at the Corps web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana/PublicNotices.aspx AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States. APPLICANT: Barretts Minerals 8626 Highway 91 Dillon, Montana 59725 LOCATION: The approximately 50-acre project site is located on and near Hoffman Creek, within Section 3, Township 8 S, Range 7 W, Latitude 45.173396°, Longitude -112.431098°, Madison County, Montana. There is approximately 1330 linear feet of the Hoffman Creek, and 0.72 acre of scrub shrub wetlands within the project area. PROJECT DESCRIPTION: Regal Talc Mine expansion consists of modifying and or relocating approximately 1330 linear feet of Hoffman Creek impacting 0.72 acre of wetland. The impacted Hoffman Spring Creek channel reach of approximately 730 linear feet is located on the downstream half of the drainage immediately above its confluence with Hoffman Creek. The 730 linear feet of impacted Hoffman Spring Creek channel includes about 530 linear feet that will be removed by the expanded mine pit (including adjacent safety bench, berm, and access road), and about 200 linear feet that will be affected by construction of the uppermost part of the realigned channel, including a catchment basin and cutoff wall. The engineered

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 2

Action ID: NWO-2015-00766-MTH

realigned channel will extend from the new catchment basin constructed in the existing channel, and then to Hoffman Creek through uplands, with an elevation change of approximately 47 feet. At the confluence, the realigned channel will merge with the natural Hoffman Creek channel, and will include a groundwater cutoff wall constructed beneath and perpendicular to Hoffman Creek immediately upstream of the confluence. All of these areas are characterized by intermittent stream flow. The impacted Hoffman Creek channel of approximately 600 linear feet will be located both upstream and downstream of its confluence with Hoffman Spring Creek. The modification will consist of channel consolidation with natural sealing minerals (bentonite) mixed to a depth of approximately 6 inches, and native soft armoring utilizing existing channel debris/stone and local riparian cuttings. The consolidated segment of Hoffman Creek channel will not require relocation, nor will wetlands be impacted. Procedurally, channel modification will seal the channel to prevent surface water from infiltrating into the shallow alluvial aquifer. The 600-ft long section of channel in Hoffman Creek, which has an average width of 2 feet, will be hand worked to set aside rock and woody debris, then bentonite will be worked into the channel substrate to a depth of 6 inches (bentonite application rate of 1 lb/ft2). The 600 linear feet of impacted Hoffman Creek channel includes some other relatively minor proposed disturbance where the realigned Hoffman Spring Creek channel would join Hoffman Creek, consisting of additional channel modification and a groundwater cutoff wall constructed immediately upstream of the confluence. The linear impacts to Hoffman Creek due to merging with the realigned Hoffman Spring Creek channel in Figure 1. In addition to the proposed impacts to the streams, there will be 0.72 acre of adjacent scrub shrub wetland impact. The applicant's preferred alternative would result in permanent impacts to 1330 linear feet to Hoffman Creek and 0.72 acre of adjacent wetland impact. The applicant's stated project purpose is to expand its Regal Mine Pit (a talc mine) toward Hoffman Creek. The attached drawings provide additional project details. ADDITIONAL INFORMATION: Alternatives. The applicant has provided information concerning the following project alternatives: Alternative 1: No action. Hoffman Creek would continue to be dewatered within the reach along the Regal Mine Pit. Existing surface water rights would continue to be impacted. Mine operations would continue to be affected by additional flows to the pit. Alternative 2: Piping Hoffman Creek flow past Regal Mine Pit ­ Storm water modeling predicts the 10-year, 24-hour peak flow in this reach of Hoffman Creek to exceed 167 cubic feet per second (cfs) for the total watershed. The pipeline required to transport this volume of water would be about 4 feet in diameter. Installing a temporary pipeline of this size is not practicable or cost effective. Alternative 3: Larger mine pit ­ Previous mine pit expansion plans had the pit extending farther to the east into the main Hoffman Creek Channel. Subsequent geotechnical studies indicated that the ultimate mine pit footprint could be reduced and not directly impact Hoffman Creek.

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 3

Action ID: NWO-2015-00766-MTH

Mitigation: Barretts Minerals Inc. is proposing to purchase the necessary stream and wetland credits for the impacts at a Corps approved bank, The Upper Missouri River Mitigation Bank. OTHER GOVERNMENTAL AUTHORIZATIONS: The Montana Department of Environmental Quality, 1520 East 6th Avenue, Post Office Box 200901, Helena, Montana 59620-0901 will review the proposed project with the intent to certify in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. The Montana Department of Environmental Quality hereby incorporates this public notice as its own public notice and procedures by reference thereto. HISTORIC PROPERTIES: The Corps is lead federal agency for determining compliance with Section 106 of the National Historic Preservation Act for this project and has completed a cultural resource review of the project site in conjunction with their obligations under Section 106 and the National Environmental Policy Act. The Corps has not determined effects to properties eligible for listing on the National Register of Historic Properties; The Montana State Historic Preservation Office will be solicited for comments. ENDANGERED SPECIES: Due to that the area is disturbed and there is a high amount of construction activity within the area the proposed activity will not affect the canada lynx, a Federally-listed endangered or threatened species or their critical habitat. The above determinations are based on information provided by the applicant and our preliminary review. EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the described activity will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The activity's impact on the public interest will include application of the Section 404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230). COMMENTS: The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 4

Action ID: NWO-2015-00766-MTH

public interest of the proposed activity. All public notice comments will be considered public information and will be subject to review by the applicant. The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Any person may request, in writing and within the comment period specified in this notice, that a public hearing be held for the purpose of gathering additional information. Requests for public hearings must be identified as such and shall state specifically the reasons for holding a public hearing and what additional information would be obtained. The request must be submitted to the U.S. Army Corps of Engineers, at Helena Regulatory Office 10 West 15 Street, Suite 2200 Helena, Montana 59626. If it is decided that additional information is required and that a public hearing should be held, interested parties will be notified of the date, time and location. Any interested party (particularly officials of any town, city, county, state, or Federal agency; Indian tribe; or local association whose interests may be affected by the work) is invited to submit to this office written facts, arguments, or objections on or before the expiration date listed on the front of this notice. Any agency or individual having an objection to the work should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. All replies to the public notice should be addressed to Timothy McNew at Helena Regulatory Office 10 West 15 Street, Suite 2200 Helena, Montana 59626, by email at Timothy.M.McNew@usace.army.mil, or telephone at (406) 441-1375. Please refer to identification number NWO-2015-00766-MTH in any correspondence concerning this project. Comments postmarked after the expiration date of this public notice, or received by fax or e-mail after the expiration date, will not be considered. Comments left on our voicemail system will not be considered.

Attachments: 1 drawings

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 5

Action ID: NWO-2015-00766-MTH

Fig 1. Map detailing proposed plans and impacts to Hoffman Creek and adjacent wetlands.

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas