Supplemental Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869; Mosaic – Ona Phosphate Mine
TO WHOM IT MAY CONCERN: The Regulatory Division, Jacksonville District, U.S. Army Corps of Engineers (Corps) is circulating this notice to provide the public with a supplemental environmental assessment, draft Clean Water Act (CWA) Section 404(b)(1) Guidelines analysis, and draft public interest review for DA permit application SAJ-2011-01869; Mosaic – Ona Phosphate Mine.
BACKGROUND AND PURPOSE: The Corps issued the original public notice for DA Permit Application SAJ-2011-01869 on June 1, 2012. On May 3, 2013, the U.S. Army Corps of Engineers (Corps), U.S. Environmental Protection Agency (EPA), and Florida Department of Environmental Protection (FDEP) published a notice of availability for the Final Areawide Environmental Impact Statement on Phosphate Mining in the Central Florida Phosphate District (Final EIS). The scope of action for the Final EIS includes Department of the Army (DA) Permit Application SAJ-2011-01869. See Final EIS page 1-21 to 1-31. On July 12, 2013, the Corps, EPA, and FDEP published an Addendum to the Final EIS. The Final EIS and the Addendum are available at: http://www.saj.usace.army.mil/Missions/Regulatory/Items-of-Interest/
The Final EIS states, "A draft of the Section 404(b)(1) and public interest review analyses for each project will be made available for public review and comment." See e.g., Final EIS page 5-2. Therefore, the Corps is exercising its discretion pursuant to the CWA (33 U.S.C. § 1344(a)), the National Environmental Policy Act (NEPA) (40 C.F.R. § 1506.6), and its public interest review (33 C.F.R. § 320.4), to provide additional opportunity for public review and comment on the draft CWA Section 404(b)(1) Guidelines analysis and public interest review for DA Permit Application SAJ-2011-01869. Furthermore, pursuant to 40 C.F.R. §§ 1501.3(b) and 1502.9(c)(2), the Corps is also exercising its discretion to prepare an environmental assessment (EA) on DA Permit Application SAJ-2011-01869 in order to assist with the permit decision and further the purposes of NEPA. This draft analysis does not include any of the final determinations required by the CWA Section 404(b)(1) Guidelines or the public interest review as the Corps cannot make such determinations until the conclusion of the permit application review process. Comments made in response to this notice will be considered in making those final determinations. The conclusions of the CWA Section 404(b)(1) analysis and public interest review will be published in the record of decision and statement of findings (RODSOF) for DA Permit Application SAJ-2011-01869. The Corps plans to adopt the Final EIS and this EA in the RODSOF.
Attached to this Public Notice are a copy of the EA/draft 404(b)(1) Guidelines analysis/draft public interest review document and its attachments.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer by e-mail to pn.comment.ona@usace.army.mil, or by mail to 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610, within 30 days from the date of this notice.
QUESTIONS concerning this application should be directed to the project manager, John Fellows, in writing at the West Branch Mining Team, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at john.p.fellows@usace.army.mil; by facsimile transmission at (813)769-7061; or, by telephone at (813)769-7070.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
10117 PRINCESS PALM AVENUE, SUITE 120
TAMPA, FLORIDA 33610
January 12, 2018
REPLY TO
ATTENTION OF
Regulatory Division
PUBLIC NOTICE
Permit Application Number: SAJ-2011-01869 (IP-JPF)
Supplemental Environmental Assessment, Draft Clean Water Act Section
404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of
the Army (DA) Permit Application SAJ-2011-01869; Mosaic Ona Phosphate Mine
TO WHOM IT MAY CONCERN: The Regulatory Division, Jacksonville District, U.S.
Army Corps of Engineers (Corps) is circulating this notice to provide the public with a
supplemental environmental assessment, draft Clean Water Act (CWA) Section
404(b)(1) Guidelines analysis, and draft public interest review for DA permit application
SAJ-2011-01869; Mosaic Ona Phosphate Mine.
BACKGROUND AND PURPOSE: The Corps issued the original public notice for DA
Permit Application SAJ-2011-01869 on June 1, 2012. On May 3, 2013, the U.S. Army
Corps of Engineers (Corps), U.S. Environmental Protection Agency (EPA), and Florida
Department of Environmental Protection (FDEP) published a notice of availability for the
Final Areawide Environmental Impact Statement on Phosphate Mining in the Central
Florida Phosphate District (Final EIS). The scope of action for the Final EIS includes
Department of the Army (DA) Permit Application SAJ-2011-01869. See Final EIS page
1-21 to 1-31. On July 12, 2013, the Corps, EPA, and FDEP published an Addendum to
the Final EIS. The Final EIS and the Addendum are available at:
http://www.saj.usace.army.mil/Missions/Regulatory/Items-of-Interest/
The Final EIS states, "A draft of the Section 404(b)(1) and public interest review
analyses for each project will be made available for public review and comment." See
e.g., Final EIS page 5-2. Therefore, the Corps is exercising its discretion pursuant to
the CWA (33 U.S.C. § 1344(a)), the National Environmental Policy Act (NEPA) (40
C.F.R. § 1506.6), and its public interest review (33 C.F.R. § 320.4), to provide additional
opportunity for public review and comment on the draft CWA Section 404(b)(1)
Guidelines analysis and public interest review for DA Permit Application SAJ-201101869. Furthermore, pursuant to 40 C.F.R. §§ 1501.3(b) and 1502.9(c)(2), the Corps is
also exercising its discretion to prepare an environmental assessment (EA) on DA
Permit Application SAJ-2011-01869 in order to assist with the permit decision and
further the purposes of NEPA. This draft analysis does not include any of the final
determinations required by the CWA Section 404(b)(1) Guidelines or the public interest
review as the Corps cannot make such determinations until the conclusion of the permit
application review process. Comments made in response to this notice will be
considered in making those final determinations. The conclusions of the CWA Section
404(b)(1) analysis and public interest review will be published in the record of decision
and statement of findings (RODSOF) for DA Permit Application SAJ-2011-01869. The
Corps plans to adopt the Final EIS and this EA in the RODSOF.
Attached to this Public Notice are a copy of the EA/draft 404(b)(1) Guidelines
analysis/draft public interest review document and its attachments.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer by e-mail to
pn.comment.ona@usace.army.mil, or by mail to 10117 Princess Palm Avenue, Suite
120, Tampa, Florida 33610, within 30 days from the date of this notice.
QUESTIONS concerning this application should be directed to the project manager,
John Fellows, in writing at the West Branch Mining Team, 10117 Princess Palm
Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at
john.p.fellows@usace.army.mil; by facsimile transmission at (813)769-7061; or, by
telephone at (813)769-7070.
2
CESAJ-RD-W
SAJ-2011-01869 (IP-JPF)
Supplemental Environmental Assessment, Draft Clean Water Act Section 404(b)(1)
Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA)
Permit Application SAJ-2011-01869
1) Background:
On May 3, 2013, the U.S. Army Corps of Engineers (Corps), U.S. Environmental
Protection Agency (EPA), and Florida Department of Environmental Protection (FDEP)
published a notice of availability for the Final Areawide Environmental Impact Statement
on Phosphate Mining in the Central Florida Phosphate District (Final EIS). The scope of
proposed action analyzed in the Final EIS includes Department of the Army (DA) Permit
Application SAJ-2011-01869. See Final EIS page 1-21 to 1-31. On July 12, 2013, the
Corps, EPA, and FDEP published an Addendum to the Final EIS. The Final EIS and the
Addendum are available at: http://www.saj.usace.army.mil/Missions/Regulatory/Items-ofInterest/
The Final EIS states, "A draft of the Section 404(b)(1) and public interest review
analyses for each project will be made available for public review and comment." See
e.g., Final EIS page 5-2. Therefore, the Corps is exercising its discretion pursuant to
the Clean Water Act (CWA) (33 U.S.C. § 1344(a)), the National Environmental Policy
Act (NEPA) (40 C.F.R. § 1506.6), and its public interest review (33 C.F.R. § 320.4), to
provide additional opportunity for public review and comment on the draft CWA Section
404(b)(1) Guidelines analysis and public interest review for DA Permit Application SAJ2011-01869. Furthermore, pursuant to 40 C.F.R. §§ 1501.3(b) and 1502.9(c)(2), the
Corps is also exercising its discretion to prepare an environmental assessment (EA) on
DA Permit Application SAJ-2011-01869 in order to assist with the permit decision and
further the purposes of NEPA. Because there have been no substantial changes to the
proposed action that are relevant to environmental concerns and no significant new
circumstances or information since the project was analyzed in the Final EIS,
supplemental NEPA was not required under 40 C.F.R. § 1502.9(c)(1). However, this EA
discloses changes to the proposed action that have occurred since the Final EIS (in
Section 2.d), and considers any potential impacts associated with such changes (in
Section 5.
This draft analysis does not include any of the final determinations required by the CWA
Section 404(b)(1) Guidelines or the public interest review as the Corps cannot make such
determinations until the conclusion of the permit application review process. Comments
made in response to this notice will be considered in making those final determinations.
The conclusions of the CWA Section 404(b)(1) analysis and public interest review will be
published in the record of decision and statement of findings (RODSOF) for DA Permit
Application SAJ-2011-01869. The Corps plans to adopt the Final EIS, Addendum, and
this EA in the RODSOF.
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
2) Application:
a) Applicant:
Mosaic Fertilizer, LLC
13830 Circa Crossing Drive
Lithia, FL 33547
b) Location: The Ona Mine property consists of approximately 22,483 acres
located in Sections 4, 8 through 12, 19, 22 through 31, and 36, Township
34 South, Range 23 East; Sections 14 through 23, and 26 through 33,
Township 34 South, Range 24 East; and Sections 4 and 5, Township 35
South, Range 24 East, in Hardee County, Florida. The majority of the
project area is within the Peace River watershed (HUC 03100101), with
approximately 300 acres within the Myakka River watershed (HUC
03100102). There are eight stream basins onsite: the Myakka River, the
West Fork of Horse Creek, Oak Creek, Troublesome Creek, Brady Creek,
Brushy Creek, Hickory Creek, and Horse Creek. The latter seven are all
tributaries to the Peace River.
c) Proposed Work: The applicant requests a 30-year construction window to
mine phosphate ore from approximately 16,842 acres1 of property in
Hardee County, Florida. The applicant proposes mining operations to
extract the phosphate ore reserves on the proposed Ona Mine for
approximately 24 years, and approximately six additional years to complete
the reclamation and mitigation construction. The applicant proposes to
process the mined ore at both the South Pasture Extension beneficiation
plant and the Four Corners beneficiation plant.
The applicant proposes to expand the capacity at the South Pasture plant
to handle the additional ore from Ona. Ona is within the ten-mile practicable
pumping distance described in Section 3.1.5 of the Final EIS, and Mosaic
can construct the necessary pipelines and other infrastructure across areas
previously permitted for phosphate mining (South Pasture and South
Pasture Extension Mines), as shown on Attachment A Figure 11.
The applicant proposes to disturb a total of 18,776 acres, including the 16,842 acres of
mining.
1
2
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
To transport material to and from the Four Corners plant, Mosaic proposes
to utilize an existing "operations corridor" (As shown on Attachment A
Figure 1) that crosses areas previously permitted for mining, and construct
a new `pre-washer' facility between Ona and Four Corners.
This plan extends the operational life of the South Pasture plant by 21 years,
and of the Four Corners plant by 14 years. Upon completion of mining
operations, the applicant proposes to reclaim all land disturbed by mining
operations and establish some areas as wetlands mitigation as described
below in Section 9.c of this EA.
The applicant proposes a total of approximately 3426.1 acres of impact to
Corps-jurisdictional wetlands, including 1357.87 acres of forested wetland
impacts and 2068.27 acres of herbaceous wetland impacts. By watershed,
38.54 acres of the total wetland impacts (10.27 acres forested, 28.27 acres
herbaceous) are within the Myakka River watershed, and the remainder are
within the Peace River watershed. All of the stream impacts are within the
Peace River watershed. The applicant also proposes approximately
100,766.8 linear feet of impact to Corps-jurisdictional streams.
The jurisdictional impacts include up to 14 acres of temporary impacts to
WOUS for necessary consolidated dragline and infrastructure corridor
crossings of an un-named tributary to Brushy Creek, Horse Creek, and
West Fork Horse Creek. Construction of these crossings would result in a
total up to 12 acres of temporary impacts to forested wetlands, up to 2 acres
of temporary impacts to herbaceous wetlands, and 1,794 linear feet of
temporary impacts to streams.
Section 9.c of this EA describes the applicant's plan for compensatory
mitigation of these impacts to waters to the United States.
d) Project Changes Since the June 1, 2012, Public Notice and the Final EIS:
i. The applicant avoided an additional 2250 acres of area overall; 3707
acres currently versus 1457 acres.
ii. The applicant reduced the impacts to Corps-jurisdictional wetlands from
4615 acres to 3426.1 acres, which includes a reduction in forested wetland
3
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
impacts from 1823.8 acres to 1357.87 acres and a reduction in herbaceous
wetland impacts from 2796.6 acres to 2068.27 acres.
iii. The applicant reduced the impacts to Corps-jurisdictional streams from
136,731 linear feet to 100,766.8.
iv. The applicant reduced the number of crossings of West Fork Horse
Creek from two to one.
v. The applicant eliminated the on-site beneficiation plant, and now
proposes to transport mined ore from the western portion of Ona to the Four
Corners beneficiation plant, via an existing "operations corridor" and a
proposed `pre-washer' facility, and transport ore from the eastern portion of
Ona to an expanded-capacity South Pasture beneficiation plant.
vi. The applicant added approximately 160 acres of proposed mining in an
area adjacent to the West Fork of Horse Creek, as shown on the attached
Attachment A Figure 2 (identified as the Parks-Beckley Parcel), which
allowed for the reconfiguration of the clay settling areas in that area and
additional avoidance of impacts to aquatic resources.
vii. The applicant has updated the compensatory mitigation plan to address
the Corps' technical review of its proposed UMAM functional analysis,
provisions for long-term management of the mitigation areas, and financial
assurances for mitigation implementation and long-term management.
viii. The applicant has provided updated analyses of direct, indirect and
cumulative impacts associated with the Ona Mine, which the Corps has
independently evaluated as it has conducted its review of the proposed
work in accordance with NEPA, the 404(b)(1) Guidelines, and the public
interest review factors, as described in Sections 5, 6, and 7 of this EA.
3) Authority: Section 404 of the Clean Water Act of 1972 (33 U.S.C. § 1344)
a) Jurisdictional Determination Information: The Corps issued an approved
jurisdictional determination for the project, as then proposed, on July 23,
2013. The Corps issued an approved jurisdictional determination for the
160-acre addition on August 3, 2017.
4
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
4) Draft Clean Water Act Section 404(b)(1) Alternatives Analysis
a) Basic and Overall Project Purpose and Need:
Basic: To extract phosphate ore.
Overall: To extract phosphate ore from the mineral reserves located in the
Central Florida Phosphate District (CFPD) and to construct the associated
infrastructure required to extract and process the phosphate ore at
separation/beneficiation facilities recognizing that the ore extracted must
be within a practicable distance to a new or existing beneficiation plant.
Public Need: Section 1.2.1 of the Final EIS describes the public's general
need.
Applicant's Need: Section 1.2.2 of the Final EIS describes the applicant's
general need. In addition, in the most recent (November 14, 2016) update
to the Ona permit application the applicant provided the following
statements about the specific need for the proposed project at an overall
operational level and at a project specific level. That submittal is included
by reference, including any sections described in the quoted language
below (in italics):
Overall Need: Mosaic currently operates the Four Corners, South Fort
Meade, South Pasture, and Wingate Creek Mines in the CFPD to meet its
phosphate rock needs (Final EIS page 2-6). The Final EIS estimated that
Mosaic produces an average of 17.1 million short tons of phosphate rock
per year (MTPY) at its CFPD mines as follows: Four Corners 6.1 MTPY;
Hookers Prairie (closed in 2014) 1.9 MTPY; South Fort Meade 4.3
MTPY; South Pasture 3.5 MTPY; and Wingate Creek 1.3 MTPY (Final
EIS Table 1-3). The Final EIS acknowledged that these estimated
production rates were calculated based on mining at 85 percent of capacity
and that actual production rates may fluctuate from year to year. (If
production rates were calculated based on mining at 100% capacity, the
total production rate would be 19.6 MTPY.)
Mosaic needs to maintain its overall annual production levels in order to
keep its place in the global phosphate product market and thereby remain
a competitive and reliable supplier of phosphate products. The Hookers
5
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
Prairie Mine completed extraction of its permitted reserves in 2014. All four
of Mosaic's remaining CFPD mines are projected to complete extraction of
permitted ore reserves between the end of 2020 and 2025 (Final EIS pages
1-15 to 1-16). In order to maintain an uninterrupted annual average
production rate of approximately 17.1 MTPY of phosphate rock and thereby
ensure a continuous supply of phosphate rock beyond 2020, Mosaic has
developed a comprehensive ore reserves development plan, which consists
of: (1) extending mining operations onto the South Pasture Extension
beginning in 2017 approximately 3.5 MTPY 2; (2) developing the western
portion of the Ona Mine reserves beginning in 2017 approximately 5.9
MTPY and the eastern portion of the Ona Mine reserves beginning in 2020
approximately 3.8 MTPY; (3) extending the mining operations onto the
Wingate East reserves beginning in 2017 approximately 1.3 MTPY 3; and
(4) developing the DeSoto Mine reserves after 2020 initially at
approximately 2.6 MTPY. The plan includes continued use of the Four
Corners plant, expansion of the capacity of the South Pasture plant, recent
upgrades to increase capacity of the Wingate plant, and construction of a
new plant at DeSoto. The final, future stage of the CFPD development plan
will be to develop the Pioneer and Pine Level/Keys reserves, beginning in
approximately 2040.
The mine development sequence is based upon those factors that
determine which mines can produce phosphate rock when and where
needed, and involve consideration of logistics, production needs, and
projected phosphate rock demand. Implementation of the ore reserves
development plan will provide Mosaic with the phosphate rock needed to
supply its existing concentrates/fertilizer plants beyond 2020 at current
production levels.
Project Specific Need: The Ona Mine has been planned to replace the
Four Corners and South Fort Meade mines as those mines complete
extraction of reserves, thereby maintaining an uninterrupted phosphate
rock supply to meet projected demand. In 2014, Mosaic purchased the
phosphate business assets of CF, including the South Pasture and South
The Corps' November 10, 2016, Record of Decision-Statement of Findings for SPE
considered an annual need of 3.37 MTPY.
3 The Corps' June 22, 2017 Supplemental Environmental Assessment for Wingate East
considered an annual need of 1.7 MTPY.
2
6
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
Pasture Extension ore reserves, as well as the South Pasture
beneficiation plant, all of which adjoin the Ona Mine. The proposed Ona
Mine's location adjacent to the existing Four Corners and South Pasture
mines allows Mosaic to maximize efficiencies by using the existing
beneficiation plants at those mines for the Ona Mine project.
Rather than construct a new beneficiation plant at the Ona Mine site as
previously proposed, Mosaic proposes to process ore reserves from the
western portion of the Ona Mine (West Ona) at the Four Corners plant,
and to process reserves from the eastern portion of the Ona Mine (East
Ona) at the South Pasture plant. Mosaic proposes to begin mining
activities on the Ona site in 2017 and continue for approximately 24
years 4. Mosaic would begin mining West Ona in 2017 to replace
decreasing Four Corners reserves, and would begin mining East Ona in
2020 to replace decreasing South Fort Meade reserves. Mosaic proposes
to expand the capacity of the South Pasture beneficiation plant, which will
process reserves from both East Ona as well as Mosaic's now operational
South Pasture and South Pasture Extension Mines (simultaneously, at
times). Timely development of the Ona Mine is necessary for Mosaic to
continue supplying its customers in the United States and over 40
countries with phosphate fertilizer and feed supplements beyond 2017.
CSA requirements are ore reserve-specific. At the Ona Mine, the extent of
recoverable phosphate rock reserves would be limited by CSA siting
constraints described in subsection 1.5.5.3 below. Each ton of phosphate
rock produced from the Ona Mine would generate 1.51 dry tons of claysized minerals. Given that each acre of land mined at Ona would yield
approximately 9,925 tons of phosphate rock product, recovery and
separation of the phosphate rock from one acre would require about 33
acre-feet of CSA capacity.
The applicant has also stated that the total expected production from the
Ona Mine, based on their currently proposed mine plan (the Applicant's
Preferred Alternative described in Section 4.e.i of this EA), is 178 million
tons of phosphate.
To help replace production from the Four Corners and South Fort Meade mines, the
Applicant states that it needs to produce a minimum average of 6 MTPY from the Ona
Mine for approximately 24 years.
4
7
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
As stated in 33 CFR Part 325, Appendix B, when defining the purpose and
need for a project "while generally focusing on the applicant's statement,
the USACE will in all cases, exercise independent judgment in defining the
purpose and need for the project from both from the applicant's and the
public's perspective." Therefore, the Corps independently reviewed and
verified the information in the applicant's statements of need.
Section 1.2.1 of the Final EIS includes the information about yearly overall
production rates and the plan of mine succession. The Corps determined
that this information is valid, and will use it in its alternatives analysis.
To independently review and verify the applicant's statement about the
project-specific production needed for the Ona project (6 mtpy for 24
years), the Corps evaluated data from the publicly available 10-K Reports,
as developed pursuant to Section 13 or 15(d) of the Securities Exchange
Act of 1934, for the Four Corners and South Fort Meade Mines.
The reports provide production data for Four Corners of 7.37 million tons
in 2011, 8.14 million tons in 2012, 7.04 million tons in 2013, 5.94 million
tons in 2014, 6.27 million tons in 2015, and 5.83 million tons in 2016,
which averages out to 6.76 mtpy over that six-year period.
For South Fort Meade, the reports show production data for South Fort
Meade of 6.05 million tons in 2013, 4.51 million tons in 2014, 4.73 million
tons in 2015, and 4.62 million tons in 2016 5, for a four-year average of
4.98 mtpy.
The combined average annual production for the Four Corners and South
Fort Meade Mines is approximately 11.74 mtpy. The applicant has stated
that they will rely on multiple mines to replace this production level,
including a proposed minimum average of 6 mtpy from the Ona Mine.
Based on the verified production data and the applicant's statement of
need, the Corps will consider a need for 6 mtpy for 24 years, or a total of
The South Fort Meade Mine operated only part of year in 2011 and 2012 due to
litigation, therefore the Corps did not consider these years' production values to be
representative and did not include them in the analysis.
5
8
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
144 million tons of phosphate recovered, in its alternatives analysis for this
project.
b) Water Dependency Determination: Because the project's basic purpose,
extracting phosphate ore, does not require siting within a water of the U.S.,
the proposed discharge is not water dependent.
c) Functional Alternatives: Section 2.2.6 of the Final EIS describes how the
Corps considered functional alternatives to the proposed activity, such as
using dredges instead of draglines, replacing phosphate-based fertilizers
with other types of fertilizers, and importing phosphate rock from outside of
the Central Florida Phosphate District. As described in that section, the
Corps did not consider any of these alternatives to be reasonable under
NEPA, and therefore did not carry them forward for further consideration.
Based on the analysis of these functional alternatives in Section 2.2.6 of the
Final EIS, the Corps has also determined that none of them are practicable
alternatives pursuant to 40 CFR 230.10(b)(2).
d) Offsite/Avoidance Alternatives Screening Process and Criteria: Section
2.2.4.1 and Appendix B of the Final EIS describe the screening process for
offsite, or avoidance, alternatives used for the Final EIS. The Corps'
project-specific evaluation of offsite alternatives under Clean Water Act
Section 404(b)(1) began with the list of parcels identified in the Final EIS:
Pioneer Tract, Desoto, Pine Level/Keys Tract, Site A-2, Site W-2, and
Wingate East 6.
40 CFR 230.10(b)(2) states "An alternative is practicable if it is available
and capable of being done after taking into consideration cost, existing
technology, and logistics in light of overall project purposes."
Section 3.1.5 of the Final EIS discusses a ten-mile practicable pumping
distance for transporting material to and from a phosphate beneficiation
The Corps issued a permit for the South Pasture Extension Mine project on November
15, 2016, therefore this alternative from the Final EIS is not part of the alternatives
analysis. Although there is an active DA permit application review in progress for the
Wingate East Mine (SAJ-2009-03221), the Corps has not yet made a final permit
decision on that application, and therefore the Corps considers it to be an available
alternative.
6
9
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
plant. However, in situations where the applicant can construct an
intermediate, `pre-washer' facility between the mine and the plant has a
nearby source of power, such as an electrical substation, sufficient to run
the facility, and is able to construct the necessary infrastructure such as
pipeline corridors, that pumping distance can be increased by an additional
ten miles. Therefore, in addition to consideration of a site is more or less
than ten miles from a beneficiation plant, in the first step of the projectspecific screening process the Corps also considered whether the applicant
could construct a `pre-washer' and the necessary infrastructure and
therefore exceed that distance.
The Desoto and Pine Level/Keys Tract sites are approximately 20 miles
away from the South Pasture beneficiation plant, and 13 miles away from
the Wingate Creek plant. Site W-2 is within ten miles of the Wingate Creek
plant.
The applicant does not own or control all of the land necessary to
construct the access corridors between these sites and the two
beneficiation plants. The applicant would need to acquire many miles of
access corridors, and construct pipelines and dragline crossings within
the corridors. County Property Appraiser7 ownership records indicate
that the applicant would need to complete numerous real estate
transactions to secure access corridor routes, regardless of the
corridors' locations.
In addition to securing access corridors, the applicant would need to
develop mining studies for any of the three parcels, get State and County
approvals, complete site designs, and complete construction of CSAs, all
before commencement of mining. For the W-2 site, the applicant would also
need to acquire the property and complete prospecting.
Finally, as shown on Attachment A Figure 11, for Desoto or Pine
Level/Keys, even if the applicant could acquire the land, develop a mine
plan, and get the necessary approvals in a timely manner, there is no source
of electric power, such as a substation, to power a pre-washer in between
those sites and the beneficiation plants to the north.
From the Hardee County Property Appraiser public website at https://hardeepa.com/,
and the Desoto County Property Appraiser public website at http://desotopa.com/
7
10
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
Alternatively, the applicant could construct a new beneficiation plant on any
of these three parcels, however such construction would similarly delay the
commencement of mining, as well as cost approximately $1 billion dollars,
according to the applicant.
Based on this information, the Corps did not consider Desoto, Pine
Level/Keys Tract, or Site W-2 to be practicable, and eliminated them from
further consideration as potential alternatives to Ona. The three remaining
sites, Pioneer Tract, Wingate East, and Site A-2, are within ten miles of a
beneficiation plant, with no property ownership or other logistical barriers in
between, or are further away from a plant and the Corps has assumed that
the applicant could construct the necessary infrastructure.
As stated in 40 CFR 230.1(a), "No discharge will be permitted if there is a
practicable alternative which would have less adverse impact on the aquatic
ecosystem provided the alternative does not have other significant adverse
environmental consequences." Therefore, for the next step in the projectspecific alternatives analysis the Corps independently reviewed and verified
both the practicability of and the environmental impacts for each alternative.
The Corps evaluated five alternatives for this step - the Applicant's
Preferred Site Alternative (Ona), the No Action Alternative, and the three
offsite alternatives (Wingate East, Pioneer Tract, and Site A-2).
The specific practicability criteria applied by the Corps included the
following:
i) The logistics associated with construction of the pipelines needed to
carry material between an alternative and the beneficiation plant, including
the total combined length of the pipelines and the availability of access
corridors;
ii) the number of stream crossings needed for pipelines (stream
crossings);
iii) the ability of an alternative to support other necessary mine
infrastructure such as clay settling areas (considering factors such as
available area);
iv) compliance with state (FDEP) or local permitting requirements,
v) the ability of an alternative to produce a total of 144 million tons, and
meet the project-specific need as described in Section 4.a of this
11
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
document, and;
vi) the ability of an alternative to fulfill the mining development sequence
described in the overall need statement in Section 4.a of this document.
The pipeline information for criterion i) is based on the distance between
each offsite alternative and the beneficiation plant, and on the number of
draglines needed to maintain a maximum of 6 mtpy production. The
Wingate East alternative assumes only one dragline, due to the size of the
alternative. Each dragline requires one matrix pipeline to the beneficiation
plant and one sand tailings line back to the current reclamation site.
Also, for Ona and Wingate East, the applicant used specific information
about the mine plan to provide this data. Because there are no mine plans
for Pioneer Tract or Site A-2, the applicant provided estimates for the
pipeline information. The stream crossing information also relied on the
mine plans for Ona and Wingate East, and on estimated plans for Pioneer
Tract and Site A-2.
The access corridor part of criterion i) relied on publicly available information
about property ownership or control.
The stream crossing information for criterion ii) relied on the mine plans for
Ona and Wingate East, and on an estimated plan for Site A-2 and Pioneer.
For criterion iii), the CSA data used the acreage of an alternative and an
estimated volume of phosphate and associated clay that an alternative
would produce. The production data considers each site's total mineable
reserves, to eliminate any discrepancies in the comparison of the
alternatives with mine plans (and their associated onsite avoidance and
minimization of wetland impacts), and the two alternatives without a mine
plan.
Criterion iv) considers either finalized state or local permitting actions, or
available information about state or local permitting requirements.
For criterion v), the estimated production values for Ona and Wingate East
relied on those alternative's mine plans. For Site A-2 and Pioneer, the
12
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
estimated production values assumed 16% preservation 8. For all
alternatives, the Corps used prospecting data provided by the Applicant.
For criterion vi), the Corps considered the Applicant's overall mining
sequence as described in section 4.a of this document.
In addition to the practicability criteria, the Corps evaluated the
environmental impacts of project alternatives. For the environmental
criteria, the Corps considered onsite wetland acreage based on National
Wetland Inventory data (NWI wetlands) and Southwest Florida Water
Management District data (SWFWMD wetlands), including a comparison of
the area of wetland coverage for each parcel as a percentage of the overall
acreage based on the SWFWMD wetland data. The Corps chose these
criteria to ensure a consistent approach and because the data is publicly
available. The Corps also considered the amount/distance of pipelines
needed, and the number of stream crossings as environmental factors.
Figure 2-8 in Chapter 2 of the Final EIS shows the locations of all of the
alternatives considered in the Final EIS, including the offsite alternatives
evaluated in Section 4(d) of this EA. Appendix C of the Final EIS has aerial
photographs of the alternatives.
e) Offsite/Avoidance Alternatives:
i. Applicant's Preferred Alternative: This is the 22,483-acre Ona parcel
described in Section 2 of this EA. The entire 22,483 acres is either within
ten miles of a beneficiation plant, or the applicant could construct a prewasher and the necessary infrastructure to reach a plant; the applicant's
current proposal is to use both the South Pasture and Four Corners plants.
The proposed mine plan mines or disturbs 18,776 acres within the 22,483acre site. This alternative requires approximately 62.5 miles of pipelines (4
miles from the South Pasture plant, 12.5 miles from the Four Corners plant
to the project boundary, and 46 miles within the project boundary), three
new stream crossings, and 68 miles of ditch and berm system. The
applicant states that this alternative has sufficient space for the necessary
clay settling areas. Mining the Ona parcel would produce 178 million tons
Based on the current proposal for the Ona Mine, as described in Section 2.d.i of this
EA.
8
13
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
of phosphate, based on the applicant's prospecting data. FDEP has issued
a permit for Ona.
The Ona parcel contains 5581 acres of NWI wetlands and 6140 acres of
SWFWMD wetlands. The SWFWMD wetlands constitute 27.3% of the total
area of the site.
This alternative is practicable, and meets the overall project purpose and
the applicant's need on both the overall and the project-specific levels.
ii. No Action Alternative: Section 4.1.9 of the Final EIS describes the two No
Action Alternatives No Mining and Upland Only Mining. This section of
the EA will address the No Action No Mining alternative. Section 4.e.i
below describes the Corps' evaluation of the No Action Upland Only
Mining alternative as a minimization alternative.
Under the No Action No Mining alternative, the applicant would not mine
Ona at all. There would be no construction of any mine infrastructure,
including pipelines, crossings, clay settling areas and ditch and berm
system, within the Ona parcel. This alternative does not produce any
phosphate rock at all.
The Ona parcel contains 5581 acres of NWI wetlands and 6140 acres of
SWFWMD wetlands. The SWFWMD wetlands constitute 27.3% of the total
area of the site. If there is no new mining, there are no mining-related
impacts to these wetlands.
This alternative does not satisfy the overall project purpose, and therefore
it is not a practicable alternative. The No Action Alternative also does not
meet the overall need nor the project-specific need. The No Action
Alternative No Mining alternative is the least environmentally damaging
alternative of all the avoidance alternatives, including the Applicant's
Preferred Alternative.
iii. Wingate East: The entire 3,635 acres of Wingate East is within ten miles
of a beneficiation plant (the Wingate Creek plant). Based on the current plan
to mine 2658 acres of the site, this alternative requires approximately 11
miles of pipelines (2 miles from the plant to the project boundary, 9 miles
within the project boundary), no new stream crossings, and 6.3 miles of
14
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
ditch and berm system. Available information indicates that the Applicant
owns or controls all of the property needed to construct the necessary
access corridors. The Applicant states that this alternative has sufficient
space for the necessary CSA. Mining the Wingate East parcel utilizing the
Applicant's Preferred Alternative would produce 28 million tons of
phosphate. This is based on 2,658 acres of mining and an estimated yield
of 10,500 tons of phosphate rock per acre. This alternative has received
approval from both FDEP and from Manatee County.
The Wingate East parcel contains 893 acres of NWI wetlands and 758 acres
of SWFWMD wetlands. The SWFWMD wetlands constitute 20.8% of the
total area of the site.
The Wingate East alternative meets the overall project purpose and
requires less infrastructure such as pipelines, crossings, and ditch and berm
system. However, based on the estimated production, it does not meet the
project-specific need. In addition, as explained in Section 4(a) of this EA,
the applicant's overall mine plan has the phosphate production from the
Wingate East Mine replacing the production from the Wingate Mine after
that mine's reserves run out, and therefore this alternative does not meet
the applicant's overall need. This is not a practicable alternative.
Considering the potential wetland impact acreage, the reduced linear
footage of pipelines, and the number of stream crossings (zero for Wingate
East versus three for Ona), the Wingate East alternative is less
environmentally damaging than the Applicant's Preferred Alternative.
iv. Pioneer Tract: Approximately 11,750 acres of Pioneer Tract's 25,231
acres is within ten miles of the proposed pre-washer or the South Pasture
beneficiation plant, and the Corps has assumed that the applicant could
construct the necessary infrastructure to reach either facility. There is no
current application to mine this parcel, and no mine plan. Therefore, as
stated in Section 4(c) of this EA, the analysis of this alternative relies on an
estimated mine plan with an assumed 16% preservation. This alternative
requires approximately 67 miles of pipelines (21.75 miles from the Four
Corners beneficiation plant, 7.9 miles from the South Pasture beneficiation
plant, and 37.7 miles within the project boundary), eight additional stream
crossings, and 38 miles of ditch and berm system. Based on the size of the
mined area, the Corps assumes that this alternative has sufficient space for
15
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
the necessary clay settling areas. Mining this alternative as described would
produce 79 million tons of phosphate, based on an estimated yield of 8000
tons per acre. It is unknown if either FDEP or Hardee County would approve
mining on this site. The Corps will conservatively assume that the Applicant
could obtain the necessary state and local approvals. This alternative would
not disrupt the Applicant's planned overall mining sequence, although the
applicant has indicated it intends to mine this site in the future.
The Pioneer Tract contains 9,356 acres of NWI wetlands and 9,293 acres
of SWFWMD wetlands. The SWFWMD wetlands constitute 36.8% of the
total area of the site.
The Pioneer Tract alternative meets the overall project purpose, and
because it does not disrupt the applicant's mining development sequence,
it meets the overall need. However, it requires additional infrastructure
compared to the Applicant's Preferred Alternative, and does not meet the
project-specific need, based on the estimated production. This is not a
practicable alternative.
Based on the greater coverage of the site by wetlands (36.8% for Pioneer
vs. 27.3% for Ona), the greater distance of pipelines needed, and the
additional five stream crossings, the Pioneer alternative is more
environmentally damaging than the Applicant's Preferred Alternative.
v. Site A-2: All 8,189 acres of Site A-2 is within ten miles of the South Fort
Meade beneficiation plant, and the Corps has assumed that the applicant
could construct the necessary infrastructure to reach that facility. There is
no current application to mine this parcel, and no mine plan. Therefore, as
stated in Section 4(c) of this EA, the analysis of this alternative relies on an
estimated mine plan with an assumed 16% preservation. This alternative
requires approximately 36 miles of pipelines, three new stream crossings,
and 36 miles of ditch and berm system. Based on the size of the mined
area, the Corps assumes that this alternative has sufficient space for the
necessary clay settling areas. It is unknown if either FDEP or Hardee
County would approve mining on this site. The Corps will conservatively
assume that the Applicant could obtain the necessary state and local
approvals. This alternative would not disrupt the Applicant's planned overall
mining sequence.
16
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
As described in Section 2.2.4.1 and Appendix B of the Final EIS, the Corps
considered prospecting data in screening the offsite alternatives, and
determined that there are sufficient phosphate resources to include this
parcel as an alternative. However there is insufficient prospecting data to
provide an estimated yield of phosphate rock per acre. Therefore, the Corps
applied the figure for the adjacent South Fort Meade Mine, 7325 tons of
rock per acre, to this alternative to produce an estimated total production of
50.39 million tons of phosphate.
Site A-2 contains 1,232 acres of NWI wetlands and 1,362 acres of
SWFWMD wetlands. SWFWMD wetlands comprise 16.6 percent of the
site.
This alternative meets the overall project purpose and the overall need, and
requires less infrastructure than Ona. However, it does not meet the
project-specific need, based on the estimated production. This is not a
practicable alternative.
Considering the potential wetland impact acreage and the reduced
infrastructure, Site A-2 is less environmentally damaging than the
Applicant's Preferred Alternative.
f) Onsite/Minimization Alternatives: The Corps evaluated six minimization
alternatives for Ona:
i. Applicant's Preferred Alternative (November 2016 Mine Plan)
ii. No-Action Uplands Only Mining
iii. Limited Action - Upland Mining with Crossings of WOUS
iv. Maximum Framework Avoidance Plan
v. Framework Crossings Plan
vi. June 2011 Plan (First PN Plan)
Each of these onsite alternatives represents a different mine plan for the
project, as shown in Figures 3 through 8 in Attachment A to this EA.
As with the consideration of offsite/avoidance alternatives described in
Section 4(c) of this EA, the Corps considered both practicability and
environmental criteria in its evaluation of the onsite/minimization
alternatives.
17
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
The practicability evaluation criteria for these alternatives included the
following:
1) The estimated total length of pipelines needed to carry material to the
beneficiation plants and the estimated total length of the ditch and berm
system around areas not to be mined;
2) the number of crossings needed for pipelines and draglines;
3) the ability of an alternative to support other necessary mine
infrastructure such as clay settling areas (considering factors such as
available area);
4) compliance with state (FDEP) or local (Hardee County) permitting
requirements, and;
5) the ability of an alternative to meet the overall project purpose, and to
produce a total of 144 MMT and meet the independently reviewed and
verified project-specific need as described in Section 4.a of this document.
The environmental criteria included each alternative's expected level of
impact to WOUS (based on the approved jurisdictional determinations)
and agreement with the mitigation framework described in Section 5.4 of
the Final EIS. As stated in Section 5.4.1 of the Final EIS, the mitigation
framework applies after consideration of the applicable presumptions for
proposed discharges of fill into special aquatic sites under the Section
404(b)(1) Guidelines, and does not modify any law or regulation or the
jurisdictional authority of USACE or any other agency. Section 5.4.2 of the
Final EIS describes the background and purpose of the mitigation
framework, including the input from the public, non-governmental
organizations, and local, state, and federal agencies considered in the
origin of the framework, and the interagency approach between the Corps,
USEPA, USFWS, and NOAA-NMFS used to develop the framework.
As further described in Section 5.4.3 of the Final EIS, there are four steps
in the mitigation framework. Step 1 is the identification of priority-based
avoidance areas (see Final EIS Section 5.4.3.1). Such resources include
perennial and intermittent streams, forested wetlands, and high quality
herbaceous wetlands (defined as having an overall UMAM score of 0.7 or
higher).
Section 5.4.3.1 of the Final EIS also describes how the Corps can apply
18
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
other factors in Step 1 of the mitigation framework, such as giving greater
priority to areas where multiple criteria apply, higher-quality forested
wetlands and streams, and other environmental criteria such as wetland's
or stream's location, surrounding land use, prior disturbance, connectivity,
hydrology, plant species composition, and usage by wildlife or listed
species.
The final part of Step 1 describes how the Corps can consider other
criteria to support its evaluations, such as Critical Lands and Waters
Identification Project (CLIP) priority, the Integrated Habitat Network, and
100-year floodplains.
Step 2 of the mitigation framework, as described in Section 5.4.3.2 of the
Final EIS, is to determine the extent of onsite avoidance that is practicable
under the Section 404(b)(1) Guidelines. Sections 4.e.i-vi below provide the
Corps' evaluation of the six alternatives for mine plans for Ona.
Step 3 of the mitigation framework, as described in Section 5.4.3.3 of the
Final EIS, evaluates opportunities to minimize impacts through best
management practices and mine plan design. Section 4.f of this EA
describes how the Corps considered Step 3 in its evaluation. Sections 5
("Evaluation of the CWA Section 404(b)(1) Guidelines") and 6 ("Public
Interest Review") of this EA also describe many of these minimization
measures.
Section 9.c of this EA, "Compensatory Mitigation for Unavoidable Impacts
to Aquatic Resources" addresses Step 4 of the mitigation framework
(reference Final EIS Section 5.4.3.4).
The Corps' evaluations of the six onsite/minimization alternatives for the
Ona Mine are as follows:
i. Applicant's Preferred Alternative (November 2016 Mine Plan): This is the
mine plan described in the most recent (November 2016) revised
application. Section 9.b.ii of this EA describes the sequence of project
revisions leading up to this alternative. Attachment A - Figure 3 shows this
alternative.
19
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
This alternative requires approximately 62.5 miles of pipelines (4 miles
from the South Pasture plant, 12.5 miles from the Four Corners plant to
the project boundary, and 46 miles within the project boundary), three new
stream crossings, and 68 miles of ditch and berm system. The applicant
states that this alternative has sufficient space for the necessary clay
settling areas. FDEP has issued a permit for Ona. Mining the Ona parcel
as proposed for this alternative would produce 178 million tons of
phosphate, based on the applicant's prospecting data.
This mine plan would impact 3,426 acres of WOUS overall (avoiding
approximately 30%), 1,188 acres of mitigation framework priority wetlands
(avoiding approximately 46%), and 12,938 linear feet of streams prioritized
by the mitigation framework (avoiding approximately 84%). Three of the
four key landscape systems would be avoided, with avoidance focused on
those areas adjacent to or near the avoided streams.
The Applicant's Preferred Alternative meets the overall project purpose.
The Applicant's Preferred Alternative also meets the overall and projectspecific need. This is a practicable alternative.
The Applicant's Preferred Alternative agrees with Steps 1 and 2 of the
mitigation framework.
ii. No Action Uplands Only Mining: This alternative involves impacts to
only non-Corps-jurisdictional areas on the Ona site, including uplands and
aquatic resources not considered to be WOUS, with no onsite impacts to
any WOUS, including from dragline and infrastructure crossings.
Attachment A - Figure 4 shows this alternative. For this alternative, the
applicant would construct an onsite beneficiation plant, to eliminate the
potential for offsite impacts to WOUS.
For this alternative, the applicant would construct approximately 1.7 miles
of pipelines to transport ore matrix to the beneficiation plants and
stormwater to the CSAs, and to return process water and tailing sand back
to the mine areas. The total length of perimeter ditch and berm systems
around avoided jurisdictional areas would be approximately 8.8 miles. The
applicant would not need to construct any wetland or stream crossings
with this plan, and an alternative CSA, such as an offsite CSA, could
20
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
handle this plan's clay output. Under this plan, the applicant could recover
7.9 million tons, from 824 acres of mined area.
The applicant states that both Hardee County and FDEP would not
approve this mine plan, due to reduced economic benefits (for Hardee
County) and reduced onsite mitigation and reclamation and offsite
mitigation (for FDEP). However, the applicant did not provide a specific
economic target from Hardee County for the project, and the proposed
mitigation and reclamation are only at the proposed levels due to the
proposed level of impact associated with the Applicant's Preferred
Alternative. Therefore, the Corps will assume that Hardee County and
FDEP would both approve this plan.
This mine plan avoids 100% of the onsite WOUS overall, and 100% of the
wetlands and 100% of the streams prioritized by the mitigation framework.
The No Action Uplands Only alternative meets the overall project
purpose and there is less infrastructure required, however it does not meet
the overall or project-specific need. This is not a practicable alternative.
Because there are no impacts to resources prioritized by the mitigation
framework, this alternative agrees with Steps 1 and 2 of the mitigation
framework. This is the least environmentally damaging alternative
compared to the other onsite alternatives, including the Applicant's
Preferred Alternative.
iii. Upland Mining with Crossings of WOUS: In this plan, the Applicant
would only mine upland/non-Corps-jurisdictional areas onsite at Ona,
however the Applicant would impact onsite wetlands, streams or other
surface waters for dragline or dredge and infrastructure crossings.
Attachment A - Figure 5 shows this alternative.
For this alternative, the applicant would construct approximately 25.6
miles of pipelines to transport ore matrix to the existing beneficiation
plants at Four Corners and South Pasture and stormwater to the CSAs,
and to return process water and tailing sand back to the mine areas. The
total length of perimeter ditch and berm systems around avoided
jurisdictional areas would be approximately 67.2 miles. This alternative
requires 13 wetland or stream crossings, and would not have sufficient
21
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
area for a CSA and other mine infrastructure. Under this plan, the
applicant could recover 47.2 million tons from 4,880 acres of mined area.
The applicant states that both Hardee County and FDEP would not
approve this mine plan, due to reduced economic benefits (for Hardee
County) and reduced onsite mitigation and reclamation and offsite
mitigation (for FDEP). However, the applicant did not provide a specific
economic target from Hardee County for the project, and the proposed
mitigation and reclamation are only at the proposed levels due to the
proposed level of impact associated with the Applicant's Preferred
Alternative. Therefore, the Corps will assume that Hardee County and
FDEP would both approve this plan.
This mine plan impacts 6.3 acres of WOUS overall (avoiding
approximately 99.9%), 6.3 acres of mitigation framework priority wetlands
(avoiding approximately 99.7%) and 1,794 linear feet streams prioritized
by the mitigation framework (97.8% avoidance).
The Upland Mining with Crossings alternative meets the overall project
purpose, however it does not meet the project-specific need. This is not a
practicable alternative.
Because there are impacts to only 0.3% of the wetlands prioritized by the
mitigation framework and 2.2% of the streams, this alternative agrees with
Steps 1 and 2 of the mitigation framework. With less impact to WOUS
overall and to framework wetlands and streams, and agreement with the
mitigation framework, this alternative is less environmentally damaging
than the Applicant's Preferred Alternative.
iv. Maximum Framework Avoidance For this alternative, the applicant
would avoid all wetlands and streams identified as "priority" under the
mitigation framework described in the Final EIS. This limits the mineable
area to land located west of Horse Creek and north of West Fork Horse
Creek 9, as shown in Attachment A - Figure 6. All ore extracted would be
The applicant states that they could not determine if there would be adequate CSA
capacity at South Pasture or South Pasture Extension to allow mining east of Horse
Creek until near the end of mining at South Pasture in 2035. Therefore this analysis
considers mining as described, "west of Horse Creek and north of West Fork Horse
9
22
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
processed at the Four Corners beneficiation plant. Clay settling areas
would be located offsite on mined areas at the adjacent Fort Green Mine.
For this alternative, the applicant would construct approximately 12.5
miles of pipelines to transport ore matrix to the beneficiation plant and
stormwater to the CSAs, and to return process water and tailing sand back
to the mine areas. The total length of perimeter ditch and berm systems
around avoided jurisdictional areas would be approximately 4.7 miles. This
alternative requires 19 wetland or stream crossings, and would use offsite
CSAs. Under this plan, the applicant could recover approximately 12
million tons from 1,472 acres of mined area.
The applicant states that both Hardee County and FDEP would not
approve this mine plan, due to reduced economic benefits (for Hardee
County) and reduced onsite mitigation and reclamation and offsite
mitigation (for FDEP). However, the applicant did not provide a specific
economic target from Hardee County for the project, and the proposed
mitigation and reclamation are only at the proposed levels due to the
proposed level of impact associated with the Applicant's Preferred
Alternative. Therefore, the Corps will assume that Hardee County and
FDEP would both approve this plan.
This mine plan would impact 25.2 acres of the onsite WOUS (avoiding
approximately 99.5%), and no priority WOUS (100% avoidance of priority
wetlands and streams).
This alternative meets the overall project purpose, however it does not
meet the project-specific need. This is not a practicable alternative.
Because there are no impacts to resources prioritized by the mitigation
framework, this alternative agrees with Steps 1 and 2 of the mitigation
framework. This alternative is less environmentally damaging than the
Applicant's Preferred Alternative.
v. Framework Crossings Plan: A variation on the Maximum Avoidance
plan, this alternative avoids impacts to wetlands and streams identified as
"priority" under the mitigation framework described in the Final EIS, except
Creek".
23
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
for dragline and infrastructure crossings. Attachment A - Figure 7 shows
this mine plan.
For this alternative, the applicant would construct approximately 20.1
miles of pipelines to transport ore matrix to the beneficiation plant and
stormwater to the CSAs, and to return process water and tailing sand back
to the mine areas. The total length of perimeter ditch and berm systems
around avoided jurisdictional areas would be approximately 23.4 miles.
This alternative requires 19 wetland or stream crossings. The applicant
could construct onsite CSAs, however there would only be enough
capacity to handle 5,750 acres of mining. Under this plan, the applicant
could recover approximately 61 million tons from 5750 acres of mined
area.
The applicant states that both Hardee County and FDEP would not
approve this mine plan, due to reduced economic benefits (for Hardee
County) and reduced onsite mitigation and reclamation and offsite
mitigation (for FDEP). However, the applicant did not provide a specific
economic target from Hardee County for the project, and the proposed
mitigation and reclamation are only at the proposed levels due to the
proposed level of impact associated with the Applicant's Preferred
Alternative. Therefore, the Corps will assume that Hardee County and
FDEP would both approve this plan.
This mine plan impacts 261 acres of WOUS overall (avoiding
approximately 94.7%), 6.3 acres of mitigation framework priority wetlands
(avoiding approximately 99.7%) and 1,794 linear feet streams prioritized
by the mitigation framework (97.8% avoidance).
This alternative meets the overall project purpose, however it does not
meet the project-specific need. This is not a practicable alternative.
Because there are impacts to only 0.3% of the wetlands prioritized by the
mitigation framework and 2.2% of the streams, this alternative agrees with
Steps 1 and 2 of the mitigation framework. With less impact to WOUS
overall and to framework wetlands and streams, and agreement with the
mitigation framework, this alternative is less environmentally damaging
than the Applicant's Preferred Alternative.
24
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
vi. June 2011 Plan (First PN Plan): The basis for this alternative is the
mine plan as described in June 2011, and as shown in the June 1, 2012,
public notice, with the mining of the site of the eliminated onsite
beneficiation plant and the additional 160 acres described in Section 2.d,
as shown in Attachment A - Figure 8.
For this alternative, the applicant would construct approximately 41 miles
of pipelines to transport ore matrix to the beneficiation plants and
stormwater to the CSAs, and to return process water and tailing sand back
to the mine areas. The total length of perimeter ditch and berm systems
around avoided jurisdictional areas would be approximately 66.8 miles.
This alternative requires five wetland or stream crossings, and would have
sufficient area for a CSA and other mine infrastructure. Under this plan,
the applicant could recover 185 million tons from 18,929 acres of mined
area.
The applicant states that both Hardee County and FDEP would not
approve this mine plan. For Hardee County, this is due to reduced
economic benefits. However, the applicant did not provide a specific
economic target from Hardee County for the project. Therefore, the Corps
will assume that Hardee County and FDEP would approve this plan.
FDEP considered this mine plan, and as part of its review requested that
the applicant eliminate and reduce impacts, ultimately permitting a
minimized mining footprint. Based on this information, the Corps agrees
that FDEP would not approve this mine plan.
This mine plan impacts 4,173 acres of the onsite WOUS overall (avoiding
approximately 10.9%), 1,265 acres of mitigation framework priority
wetlands (avoiding approximately 31.4%) and 56,669 linear feet of
streams prioritized by the mitigation framework (31.4% avoidance).
This alternative meets the overall project purpose, the overall need and
the project-specific need. This is a practicable alternative.
This alternative impacts more WOUS overall, framework wetlands, and
framework streams than the Applicant's Preferred Alternative. With
greater impact to framework wetlands and streams and onsite WOUS
overall, and a lack of agreement with the mitigation framework (due to the
greater impact to framework wetlands and streams), this alternative is
more environmentally damaging than the Applicant's Preferred Alternative.
25
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
g) Additional Minimization Measures As stated in Section 5.4.3.3 of the Final
EIS, "Impact minimization considerations may address both physical and
temporal impacts as well as direct, indirect, and cumulative impacts.
Potential minimization measures include, but are not limited to, reducing the
widths of infrastructure corridors; using existing CSAs and constructing
contiguous CSAs so that they have a common wall; minimizing CSA
footprints through design and operation methods; using existing stream
crossings created for agricultural operations; sequentially reusing disturbed
areas; using upland buffers; using recharge ditch systems; and maintaining
habitat interconnectivity and existing wildlife corridors."
The measures described below are part of the mine plan for the
Applicant's Preferred Alternative for Ona, as described in Sections 4.d.i
and 4.e.i of this EA. As stated in Section 5.4.2 of the Final EIS, the Corps
will detail the specific avoidance and minimization measures and
approaches determined to be appropriate in the final Record of
Decision/Statement of Findings for each project.
i. Infrastructure corridors: The Applicant's Preferred Alternative proposes
three crossings for infrastructure, one each for Horse Creek, West Fork
Horse Creek, and stream number 105 (a tributary to Brushy Creek). The
crossings utilize uplands and existing agricultural crossings to the greatest
extent possible.
The maximum width of each crossing is 220 feet, plus side slopes, which
minimizes impacts to the extent technically feasible without compromising
mine safety. The 220-foot maximum width includes a 115-foot dragline
walkpath, 45 feet of pipelines, 20 feet for a powerline, and 40 feet for
roads and power line safety setbacks. The applicant further minimized
impacts at the Horse Creek and West Fork Horse Creek crossings with
the use of a trestle design, which eliminates the need to clear all
vegetation and impact those waterways.
ii. CSAs: Implementation of the Applicant's Preferred Alternative allows
the applicant to minimize CSA impacts through several means including
utilization of existing CSA capacity within adjacent mines and stage filling;
proper design of the overall mine backfill plan to advantageously site
CSAs in areas with greater overall mining depths, thereby maximizing unit
26
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
storage capacity in terms of disposal capacity per acre of land; strategic
location of CSAs contiguous to each other so that common walls may be
utilized and thereby reduce the overall footprint; and proper consideration
of site hydrology effects in developing the mine backfill plan such that
changes in runoff or recharge are not disproportionally assigned to any
one subwatershed associated with the project.
iii. Buffers: The applicant proposes to preserve non-uniform upland buffers
around preserved wetlands, with a minimum width of 125 feet. All avoided
intermittent streams have a buffer of greater than 100 feet from the stream
banks, and the avoided key landscape systems, as shown on the attached
Attachment A - Figure 3, range in width from 200 feet to over 600 feet
wide.
A mine's ditch and berm system also buffers the adjacent area from the
mining activity, providing approximately 125 to 290 feet of separation
between the excavation and the boundary of the preserved buffer.
In addition to a physical buffer, the applicant proposes to have a "temporal
buffer" for avoided streams. Temporal buffers are manipulations of
mine/reclamation sequencing that will prevent concurrent disturbance
along both sides of avoided streams.
iv. Recharge ditches: The ditch and berm systems protect the adjacent
WOUS and the surficial aquifer by maintaining water table elevations at
sufficient levels to hydrate nearby wetlands or streams while the adjacent
mine cuts are temporarily dewatered. The recharge ditch delivers water to
the nearby wetland via the surficial aquifer. This delivery mechanism
mimics an important natural pathway and provides high quality water. The
ditch and berm system also constitutes an effective and recognized BMP
to protect downstream waters from water quality impacts and is a
requirement of FDEP's ERP permit for the project.
v. Maintaining connectivity: The applicant has identified several key
landscape features consisting of higher quality wetlands, streams, and
upland corridors in large continuous blocks for preservation and
enhancement. Preserving these areas will maintain connectivity both
onsite and offsite. Where possible, the applicant considered the location of
preserved areas on adjacent parcels to further meet these goals.
27
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
5) Final EIS Analysis Updates
a) Direct and Indirect Effects: In Chapter 4 of the Final EIS, the Corps
considered the direct and indirect effects of the four proposed actions,
including the Ona Mine, and their alternatives. The Corps identified the
following potential direct and indirect effects as being significant and,
therefore, included detailed analysis on them in the Final EIS: surface water
resources (hydrology), groundwater resources (hydrology), water quality
(surface water and groundwater), ecological resources (aquatic biological
communities, wetlands, wildlife habitat, and listed species), economic
resources, environmental justice, radiation, cultural resources and historic
properties, and surficial geology and soils.
The Corps has determined that for the Ona project, the project changes
described in Section 2.d of this EA, including reductions in mined area,
impacts to aquatic resources, and mining duration, should lead to reduced
degrees of effect on listed species, environmental justice, radiation, cultural
and historic resources, and surficial geology and soils. No updates to the
analyses described in Chapter 4 of the Final EIS for these resources are
necessary.
To address how the described project changes may affect the project's
potential direct and indirect effects on surface water resources,
groundwater resources, water quality, aquatic biological communities,
wetlands, wildlife habitat, and economic resources, the Corps has reviewed
updated analyses of those issues, as described below, including updates to
tables and information presented in the Final EIS.
i. Surface Water Resources: Section 4.2.3 of the Final EIS 10 described the
predicted effects of the proposed Ona project on surface water flows within
the Upper Myakka River, Horse Creek, and the Peace River. The Final EIS
stated that the project will have an insubstantial effect on the Upper Myakka,
minor to no effect on the Peace River, and a potentially moderate effect on
Horse Creek. The Final EIS also stated that measures such as monitoring
and the use of recharge ditches to maintain flow in Horse Creek would
reduce that moderate level of effect.
10
As corrected in the Addendum to the Final EIS
28
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
The Corps independently reviewed and verified an updated analysis of
Ona's effects on surface water hydrology in Horse Creek and the Peace
River to address the changes in the project since the Final EIS, including
the reduction in mined area and mining duration, both of which are critical
components to the hydrology analyses 11. Attachment B to this EA includes
updates to Tables 4-19 through 4-26, and Figures 45, 50-57 and 90-97.
Because there are no project changes within the Upper Myakka River
subwatershed portion of the project, there is no update for that analysis.
Within the Horse Creek subwatershed, the reduced capture area and
duration led to overall smaller reductions in flows with faster recovery times
under all conditions. Within the Peace River watershed, the updated results
were substantially similar to the results for the Final EIS.
Based on the updated analysis, the Corps has determined again that the
Ona Mine would have an insubstantial effect on the Upper Myakka, minor
to no effect on the Peace River, and a potentially moderate effect on Horse
Creek, and that measures such as monitoring and the use of recharge
ditches to maintain flow in Horse Creek would reduce that moderate level
of effect 12. The Corps does not consider these effects significant.
ii. Groundwater Resources: Section 4.3.3 of the Final EIS discusses the
Ona Mine's direct and indirect effects on groundwater resources, and states
that with mitigation, Ona would have minor impacts to the surficial,
intermediate, and Floridan aquifers, none of which would be significant.
This analysis considered groundwater withdrawals at Ona to support both
the mining activities and the then-proposed beneficiation plant. The
applicant has stated that the elimination of the onsite plant, and the
separation of Ona into a western part (associated with the Four Corners
plant) and eastern part (associated with the South Pasture plant), has
Appendix G of the Final EIS details the surface water hydrology impact analysis
methodology.
12 The FDEP Environmental Resource Permit (ERP) for Ona includes permit conditions
requiring Mosaic to maintain and monitor flows in Horse Creek and other potentially
affected waterbodies. If the Corps issues a DA permit for Ona, those ERP conditions
will become part of the Corps permit as well.
11
29
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
reduced the proposed onsite groundwater withdrawal rate by almost ten
million gallons per day. Based on this reduction in groundwater pumping,
the Corps has determined that the Ona project should have a reduced direct
and indirect effect on groundwater, which is still not significant.
iii. Water Quality: Section 4.4.4 of the Final EIS discusses the Ona Mine's
direct and indirect effects on water quality. As stated there, the Corps
determined that the Ona Mine would have a minor to moderate degree of
effect on surface water and groundwater quality, which is not considered
significant.
The following three sections describe available new information and
changes in regulatory requirements considered by the Corps in its updated
review of the Ona Mine, as committed to in Section 4.4.4 of the Final EIS.
Based on the updated analysis, the Corps has determined again that the
Ona Mine would have a minor to moderate degree of effect on surface water
and groundwater quality, which is not considered significant.
(1) Horse Creek Stewardship Program: Section 4.4.2.2 of the Final
EIS provided the results of monitoring within the study area, which
the Corps used to evaluate the alternatives' effects on surface water
quality. The information presented in the Final EIS included
monitoring results from the Horse Creek Stewardship Program from
2003-2008. The Corps recognizes the public's interest in Horse
Creek, as shown in the comments received during the Final EIS
review process and at other times. Therefore, using data from the
2014 Horse Creek Stewardship Program Annual Report, the Corps
updated Figure 4-16, showing the locations of the biological
monitoring stations; Figure 4-17, with Stream Condition Index (SCI
scores) shown through November 2014; and Figure 4-18, with fish
community assessment results shown through November 2014; as
shown in Attachment B to this EA.
The updated results13 show that stations HCSW-1 (the most
upstream station) and HCSW-4 (the most downstream) continue to
As described in the 2014 Annual Report for the Horse Creek Stewardship Program,
the updated results omit some of the earlier sampling points, including some shown in
the Final EIS, due to changes in FDEP's scoring methodology.
13
30
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
have scores in the `healthy' range (between 40 and 67, as described
in Section 3.3.4.2 of the Final EIS), and station HCSW-2 continues
to frequently score as `impaired', due to natural conditions. The
Corps notes that although the Final EIS describes HCSW-3 as
having variable scores (impaired to healthy), the updated results
show that station as scoring consistently `healthy' or even
`exceptional'.
(2) Numeric nutrient criteria: Section 4.4.2.2 of the Final EIS also
discusses numeric nutrient criteria. At that time, there were no criteria
in place for flowing waters.
Numeric nutrient criteria for streams14 and lakes went into effect on
October 27, 2014. The applicant states that they will work with FDEP
to ensure that new and renewed permitted discharges comply with
these criteria in accordance with FDEP rules, including the numeric
nutrient criteria.
Additional information about numeric nutrient criteria, including the
FDEP Numeric Nutrient Criteria Implementation Document, is
available
from
FDEP's
website
at
http://www.dep.state.fl.us/water/wqssp/nutrients/.
(3) Groundwater quality: Section 4.4.2.3 of the Final EIS discusses
groundwater quality, and provides the results of groundwater
sampling below a CSA on the South Pasture Mine from 2005 through
2010. The Corps updated Figure 4-20 to include results through the
first quarter of 2017, as shown in Attachment B to this EA.
The Corps has determined that as was stated in the Final EIS, the
groundwater quality at the compliance wells continued to rarely
exceed the primary and secondary drinking water standards.
iv. Ecological Resources - Aquatic Biological Communities: Section 4.5.1.3
of the Final EIS described the then-proposed 136,731 linear feet of direct
stream impacts, and predicted a minimization of impacts and the
As stated in the FDEP Numeric Nutrient Criteria Implementation Document and in
Rule 62-302.200(36), F.A.C., these criteria do not apply to non-perennial streams.
14
31
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
development of a compensatory mitigation plan that included offsets to
remaining unavoidable impacts. Section 2.c of this EA describes the current
project, which includes 100,766.8 linear feet of direct stream impacts, a
reduction of 35,964.2 linear feet. Section 9.c of this EA describes the
proposed compensatory mitigation, including the stream mitigation.
The Final EIS analysis of the Ona Mine's impacts also considered the
potential effects of changes in surface water hydrology and surface water
quality on aquatic biological communities. Sections 5.a.i and 5.a.iii of this
EA describe the Corps' updated analyses of those two issues.
Section 4.5.1.3 of the Final EIS also states that the Corps would coordinate
its determination that the Ona Mine would not have an adverse effect on
essential fish habitat (EFH) in the estuarine reaches of the Peace or Myakka
Rivers or in Charlotte Harbor with the National Marine Fisheries Service
(NMFS). On December 16, 2015, the NMFS Habitat Conservation Division
(NMFS-HCD) stated that they anticipated any adverse effects associated
with the proposed project that might occur on marine and anadromous
fishery resources would be minimal and, therefore, they did not object to
issuance of a permit.
The Final EIS states that with mitigative measures to offset unavoidable
direct impacts to streams, and to minimize impacts to surface water
hydrology and quality, the Ona Mine would have at most a moderate effect
on aquatic biological communities, which would not be significant. Based
on the project changes, completed EFH coordination, and updated
analyses described above, the Corps makes that same determination now.
v. Ecological Resources Wetlands: Section 4.5.2.3 of the Final EIS
described the then-proposed 4,615 acres of wetland impacts, including
1,824 acres of forested wetland impact and 2,770 acres of non-forested
wetland impact. However, the applicant has worked with the Corps, USEPA
and FDEP to avoid and minimize impacts, as required by federal and state
law. Section 2.c of this EA describes the current project, which includes
3,426.1 acres of impact to Corps-jurisdictional wetlands, including 1,357.87
acres of forested wetland impacts and 2,068.27 acres of herbaceous
wetland impacts. Attachment B to this EA has an updated Table 4-71
summarizing the avoidance and impact acreage for Ona. Section 9.c of this
EA describes the proposed compensatory mitigation, including the wetland
32
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
mitigation.
In addition, Section 4.5.2.3 of the Final EIS stated that the applicant would
apply the mitigation framework described in Chapter 5 of the Final EIS to
the Ona project. Section 4.e of this EA describes how the Corps considered
the mitigation framework in its evaluation, including determining the extent
of onsite avoidance that is practicable under the Section 404(b)(1)
Guidelines as described in Sections 4.e.i-vi, evaluating opportunities to
minimize impacts through best management practices and mine plan
design as described in Section 4.f, and evaluating compensatory mitigation
as described in Section 9.c.
Based on the project changes and the updated analysis, the Corps has
determined again that with mitigation, the Ona Mine would have no impact
to a minor impact on wetlands, which is not considered significant.
vi. Ecological Resources Wildlife Habitat: Section 4.5.3.3 of the Final EIS
included Table 4-83 summarizing the upland wildlife habitat avoidance,
impact and reclamation for the Ona Mine. That section also stated that the
Corps would consider requiring upland buffers along avoided wetlands and
streams, including higher quality aquatic resources, as described in the
mitigation framework. Section 5.7 of the Final EIS describes the FDEP
requirements for reclamation of lands mined for phosphate, including
upland habitats.
As shown in the updated Table 4-83 included in Attachment B of this EA,
the applicant has reduced their overall mining area, including to upland and
wetland wildlife habitats. In addition, as shown in Attachment A - Figure 3,
as part of the Applicant's Preferred Alternative the applicant proposes to
avoid large contiguous areas of wetlands and uplands as "key landscape
systems", with upland buffers. Section 4.f of this EA describes how, in
addition to those buffers, ditch and berm systems will separate the
preservation areas from the active mining, and how the applicant will not
mine on both sides of a preservation area at the same time, as a "temporal
buffer".
Based on the project changes and the updated analysis, the Corps has
determined again that with mitigative measures, the Ona Mine would have
no impact to a minor impact on wildlife habitat, which is not considered
33
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
significant.
vii. Economic Resources: Section 4.6.3 of the Final EIS described the direct
and indirect economic effects of the Ona Mine on Hardee County. As shown
in Table 4-98 in that section, with the Ona Mine, as compared to the NoAction Alternative described in Section 4.6.1 of the Final EIS, there would
be increases in average annual employment, present value labor income,
present value added, and present value output 15. The Corps determined
that this would be a major beneficial effect, which compared to the NoAction Alternative would be significant. However, the Corps also determined
that relative to current conditions, including the continuation of existing
phosphate mining in Hardee County, Ona would simply offset job losses
predicted under the No Action Alternative, and therefore from that
perspective, the effects were not significant.
Because some of the project updates described in Section 2.d of this EA
that could affect the economic effects, including the elimination of the onsite
beneficiation plant and the reduction in the area and duration of mining, the
Corps independently reviewed and verified an updated economic analysis.
This analysis included updates to Table 4-98, as shown in Attachment B of
this EA.
As described in the updated table, with the project changes, the Ona Mine
will have 382 less jobs in the average annual employment parameter and
generate $894,500,00 less in present value labor income, $1,835,500,000
less in present value added, and 3,092,500,000 less in present value
output, compared to the results shown in the Final EIS.
The Corps has determined that even with those reductions however, the
Ona Mine will still have a major beneficial economic effect on Hardee
County, which when compared to the No Action Alternative is significant,
and when compared to existing conditions is not significant.
b) Cumulative Effects: In Section 4.12 of the Final EIS, the Corps considered
the cumulative effects of the four proposed actions, two reasonably
foreseeable future actions, and other past, present and reasonably
Appendix H of the Final EIS explains the methodology used by the Corps to evaluate
economic effects, including definitions of the economic parameters considered.
15
34
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
foreseeable actions, including phosphate mining and non-phosphate mining
actions. The resource categories determined to have significant potential
cumulative impacts were surface water resources, groundwater resources,
surface water quality, ecological resources (wetlands and upland habitat),
and economic resources.
In addition to the changes to the Ona project described in Section 2.d of this
EA, other changes within the study area have occurred since the Final EIS,
such as the addition of infill parcels (both currently under review by the
Corps and reasonably foreseeable) to existing phosphate mines, and
updates on the status of phosphate mine reclamation.
Therefore, to address how these changes to Ona and within the study area
may affect the project's cumulative effects on surface water resources,
groundwater resources, ecological resources (wetlands and upland
habitat), and economic resources, the Corps has updated its analyses of
those issues, as described below, including updates to tables and
information presented in the Final EIS.
The Corps determined that the changes to the Ona project, as well as other
changes such as the implementation of numeric nutrient critieria as
described in Section 5.a.iii.2 of this EA, lead to a reduction in the magnitude
and significance of potential surface water quality cumulative impacts as
described in Section 4.12.4 of the Final EIS. No update to this analysis is
necessary.
i. Updates to Past Actions: Attachment B to this EA includes a new table Table 2-3(a) - showing information about currently proposed and
reasonably foreseeable phosphate mine infill parcels, including overall
acreage, mined/disturbed acreage, and overall potential acreage and linear
footage of impacts to waters of the United States (for wetland and streams
respectively); figures showing the locations of those infill parcels ("Table 23(a) figures 1 and 2"); and an updated Table 4-24 showing the status of
phosphate mine reclamation. Additionally, the applicant notes that 80 acres
of mined and reclaimed land became a county park and fire station, and
that TECO purchased 479 acres of mined and reclaimed land for a solar
power facility.
ii. Surface Water Resources: Section 4.12.2 of the Final EIS described the
35
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
predicted cumulative impacts on subwatershed and watershed water
deliveries to downstream reaches of the affected rivers and to the Charlotte
Harbor estuary. The proposed Ona Mine was specifically part of the
analyses for Horse Creek, the Peace River, and Charlotte Harbor 16. The
cumulative impact analysis included consideration of the use of the Peace
River as a public water supply. The Final EIS stated that there will be an
insubstantial effect on the Upper Myakka, minor to no effect on the Peace
River, and a potentially moderate effect on Horse Creek. The Final EIS also
stated that measures such as monitoring and the use of recharge ditches
to maintain flow in Horse Creek would reduce that moderate level of effect.
The Corps considered an updated cumulative impact analysis using the
same spreadsheet model used for the Final EIS. Attachment B to this EA
includes updates to Tables 4-113 through 120. Similar to the results of the
analysis of potential direct and indirect effects for Ona, within the Horse
Creek subwatershed, the updated analysis predicts overall smaller
reductions in flows with faster recovery times under all conditions. Within
the Peace River watershed, the updated results were substantially similar
to the results for the Final EIS. Based on these Peace River watershed
results, the Corps did not update the quantitative analysis of the cumulative
effects on Charlotte Harbor.
Considering these results, the Corps has again determined that for the
cumulative effects on surface water resources, there will be insubstantial
effect on the Upper Myakka and a minor to no effect on the Peace River,
neither of which is significant. For Horse Creek, without mitigation the
predicted cumulative effects would continue to have a moderate degree of
magnitude, which would be significant. Mitigative measures as described in
the Final EIS such as monitoring programs, recharge ditches and wells, and
a potentially moderate effect on Horse Creek, should reduce the magnitude,
and make the effects insignificant.
The Corps has also again determined that the cumulative effects on surface
water resources at the Charlotte Harbor level, and on public water supply,
would have at most a minor degree of effect and would not be significant.
As described in the surface water direct and indirect effects analysis, the Corps
determined that the proposed Ona Mine had an insignificant overlap with the Myakka
watershed.
16
36
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
iii. Groundwater Resources: Section 4.12.3 of the Final EIS described the
predicted cumulative impacts to groundwater resources, and found that
there would mostly be minimal impacts to the surficial, intermediate, and
Florida aquifers, which would not be significant. The exception to this
determination was for Ona, because the Final EIS determined that
"pumping Ona Mine at the permitted drought year rate for extended periods
could result in a drawdown at ROMP 31", which the Corps considered to be
a moderate level of impact, and significant due to potential effects on the
Southern Water Use Caution Area.
As described in Section 5.a.ii of this EA, the applicant now proposes greatly
reduced groundwater withdrawals onsite at Ona. Based on the analyses
completed for the Final EIS, the Corps does not expect that these changes
will result in increases in degrees of effect for groundwater impacts, or
changes in the significance determinations. However, to address other
changes, such as the increased duration of groundwater withdrawals at
other sites to support Ona, such as at the Four Corners and South Pasture
sites, the Corps will require the applicant to update the cumulative effects
modeling using the same methods used for the Final EIS. The Corps will
review and verify the updated groundwater cumulative effects analysis, and
consider the updated results in making its final determination in the
RODSOF for the Ona project.
iv. Ecological Resources (wetlands and upland habitat): Section 4.12.5 of
the Final EIS described the predicted cumulative impacts on ecological
resources within the study area, and stated that with the state and federal
requirements for compensatory wetland mitigation, land reclamation, and
wildlife protection and management, the cumulative effects on ecological
resources would have a minor level of magnitude and would not be
significant.
Since that time, the four proposed actions have moved through the
mitigation sequencing process of avoidance, minimization and
compensatory mitigation as required by the 404(b)(1) Guidelines, and the
applicant has applied the mitigation framework developed for the Final EIS
as described in Section 4.e of this EA. As a result, there is a reduction in
the impact acreages shown in Table 4-130 of the Final EIS; an updated
table is available in Attachment B to this EA.
37
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
As stated above in Section 5.b.i, the Corps also considered a new table Table 2-3(a) - showing information about currently proposed and
reasonably foreseeable phosphate mine infill parcels, including overall
acreage, mined/disturbed acreage, and overall potential acreage and linear
footage of impacts to waters of the United States (for wetland and streams
respectively); figures showing the locations of those infill parcels ("Table 23(a) figures 1 and 2"); and an updated Figure 4-24 showing the status of
phosphate mine reclamation.
Based on the updated information, the Corps has again determined that
with the state and federal requirements for compensatory wetland
mitigation, land reclamation, and wildlife protection and management, the
cumulative effects on ecological resources will have a minor level of
magnitude and will not be significant.
v. Economic Resources: Section 4.12.6 of the Final EIS described the
predicted cumulative impacts of Ona, South Pasture Extension, and
Pioneer Tract on Hardee County, and of the four proposed and two
reasonably foreseeable mines on the eight-county study area, and
compared them to a point of reference without new phosphate mining in
Hardee County or the study area. The Final EIS stated that the cumulative
effect on both Hardee County and the study area would be beneficial. For
Hardee County, the benefit would be of a moderate to major magnitude,
and significant, however at a regional level, the Corps determined that the
benefit would be relatively minor and insignificant.
For the updated analysis of the cumulative effects on Hardee County, the
Corps considered the results of the revised economic direct and indirect
impact analysis for Ona, and prepared a revised Table 4-137, as shown in
Attachment B, to reflect these changes. The Corps also updated the
analysis of the cumulative effects on the eight-county study area, as shown
in the revised Table 4-139 in Attachment B.
Based on the updated analyses, the Corps has again determined that the
cumulative effect on both Hardee County and the study area would be
beneficial, and for Hardee County the effect would be of a moderate to
major magnitude, and significant, and at a regional level, that the benefit
would be relatively minor and not significant.
38
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
6) Draft Evaluation of the CWA Section 404(b)(1) Guidelines
a) Factual determinations (40 C.F.R. § 230.11).
i. Physical Substrate (40 C.F.R. § 230.11(a)): Section 4.10.2 of the Final
EIS states that each of the action alternatives, including Ona, would have a
moderate to major degree of effect on surficial geology and soils, including
soils and substrate present in wetlands and waterbodies. However, the
reclamation required by the state, and the mitigation required by the state
and the Corps, will offset the adverse direct impacts of mining. In addition,
the best management practices described throughout the Final EIS or in
Section 4.f of this EA, including the perimeter ditch and berm system that
separates the active mine from adjacent wetlands and surface waters,
should protect those aquatic resources from adverse effects.
As described in Section 5.a of this EA, the Corps has determined that the
project changes described in Section 2.d should lead to reduced degrees
of effect for this issue, and therefore no updates to the Final EIS analysis or
effect determinations are necessary.
ii. Water circulation, fluctuation, and salinity (40 C.F.R. § 230.11(b)): Section
5.a.i of this EA describes the Corps' review and verification of the updated
analysis of the predicted direct and indirect effects of the Ona project on
surface water flows within the Upper Myakka River, Horse Creek, and the
Peace River. Section 5.b.ii of this EA describes the updated analysis of the
cumulative effects on surface water flows in the Upper Myakka River, Horse
Creek, the Peace River, and Charlotte Harbor.
Based on the updated analyses, the changes to the Ona project did not alter
the Corps' determinations for the direct, indirect, and cumulative effects on
surface water hydrology made in the Final EIS.
iii. Suspended particulate/turbidity (40 C.F.R. § 230.11(c)): Section 5.a.iii of
this EA describes the Corps' review and verification of the updated analysis
of the predicted direct and indirect effects of the Ona project on surface
water quality. As described in Section 5.b, the Corps determined that no
updates to the surface water quality cumulative impact analysis found in
39
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
Section 4.12.4 of the Final EIS was necessary.
Based on the updated analyses, the changes to the Ona project did not alter
the Corps' determinations for the direct, indirect, and cumulative effects on
surface water quality made in the Final EIS. Discharges from the mine will
need to comply with both a Section 401 water quality certification (FDEP
Environmental Resource Permit) and a Section 402 NPDES permit or
permits (also issued by FDEP).
iv. Contaminant Availability (40 C.F.R. § 230.11(d)): Section 5.a.iii of this
EA describes the Corps' review and verification of the updated analysis of
the predicted direct and indirect effects of the Ona project on surface water
quality. As described in Section 5.b, the Corps determined that no updates
to the surface water quality cumulative impact analysis found in Section
4.12.4 of the Final EIS was necessary.
Based on the updated analyses, the changes to the Ona project did not alter
the Corps' determinations for the direct, indirect, and cumulative effects on
surface water quality made in the Final EIS. Discharges from the mine will
need to comply with both a Section 401 water quality certification (FDEP
Environmental Resource Permit) and a Section 402 NPDES permit or
permits (also issued by FDEP).
v. Aquatic Ecosystem Effects (40 C.F.R. § 230.11(e)): Sections 5.a.iv and
5.a.v of this EA describe the Corps' updated analyses of the direct and
indirect effects of Ona on aquatic biological communities and wetlands,
respectively. Section 5.b.iv describes the Corps' updated cumulative effect
analysis for wetlands. Section 9 of this document provides project-specific
information about mitigation, including compensatory mitigation for
unavoidable impacts to aquatic resources in Section 9.c.
Based on the updated analyses, the changes to the Ona project did not alter
the Corps' determinations for the direct, indirect, and cumulative effects on
aquatic biological communities made in the Final EIS.
vi. Proposed Disposal Site (40 C.F.R. § 230.11(f)): The best management
practices described throughout the Final EIS, including the perimeter ditch
and berm system that separates the active mine from adjacent wetlands
and surface waters, will confine the discharged materials within the mine
40
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
boundaries.
vii. Cumulative Effects (40 C.F.R. § 230.11(g)): Section 5.b of this EA
provides updated cumulative effect analyses for surface water resources,
groundwater resources, ecological resources (wetlands and upland
habitat), and economic resources and explains why the Corps determined
that an update for surface water quality was not necessary. As described in
that section, the project changes and changes in existing conditions that
have occurred since the publication of the Final EIS did not alter the Corps'
cumulative effects determinations in the Final EIS.
viii. Secondary Effects (40 C.F.R. § 230.11(h)): As stated in Section 4.1 of
the Final EIS, the evaluations of impacts described in the Final EIS included
both direct and indirect, or secondary, impacts. Section 5.a of this EA
addresses updates to those impact evaluations as the result of project
changes described in Section 2.d of this EA. As described in Section 5.a,
the changes to Ona that have occurred since the publication of the Final
EIS did not alter the Corps' secondary effects determinations.
b) Potential Impacts on Physical and Chemical Characteristics of the Aquatic
Ecosystem (40 C.F.R. Part 230, Subpart C): Chapter 4 of the Final EIS
describes Ona's potential impacts on substrate, suspended
particulates/turbidity, water, current patterns and water circulation, normal
water fluctuations, and salinity gradients. Section 5 of this EA addresses
updates to the evaluations of the Ona project's effects on substrate,
suspended particulates/turbidity, water, current patterns and water
circulation, normal water fluctuations, and salinity gradients as the result of
project changes described in Section 2.d of this EA. Based on the updated
analyses, the changes to the Ona project did not alter the Corps'
determinations for the direct, indirect, and cumulative effects on substrate,
suspended particulates/turbidity, water, current patterns and water
circulation, normal water fluctuations, and salinity gradients made in the
Final EIS.
c) Potential Impacts on Biological Characteristics of the Aquatic Ecosystem
(40 C.F.R. Part 230, Subpart D): Chapter 4 of the Final EIS describes Ona's
potential impacts on threatened or endangered species, fish, crustaceans,
mollusks, and other aquatic organisms, and other wildlife. Section 5 of this
EA addresses updates to the effects evaluations for threatened or
41
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
endangered species, fish, crustaceans, mollusks, and other aquatic
organisms, and other wildlife as the result of project changes described in
Section 2.d of this EA. Based on the updated analyses, the changes to the
Ona project did not alter the Corps' determinations for the direct, indirect,
and cumulative effects on threatened or endangered species, fish,
crustaceans, mollusks, and other aquatic organisms, and other wildlife
made in the Final EIS.
As described in Section 8.f of this EA, the United States Fish and Wildlife
Service (USFWS) is preparing a habitat conservation plan (HCP) and
biological opinion (BO) for the proposed project. The Corps will consider the
results of the USFWS review in making its final determination on the
proposed Ona Mine.
As also described in Section 8.f of this EA, as a result of a November 6,
2013, discussion of the project with the National Marines Fisheries Service
Protected Resource Division (NMFS-PRD), the Corps determined that the
proposed mines would have no effect on the smalltooth sawfish. On
December 16, 2015, the NMFS Habitat Conservation Division (NMFS-HCD)
stated that they anticipated any adverse effects associated with the
proposed project that might occur on marine and anadromous fishery
resources would be minimal and, therefore, they did not object to issuance
of a permit.
d) Potential Impacts on Special Aquatic Sites (40 C.F.R. Part 230, Subpart E):
Chapter 4 of the Final EIS describes the Ona project's potential impacts on
sanctuaries and refuges, wetlands, mud flats, vegetated shallows, and riffle
and pool complexes. Chapter 5 of the Final EIS further describes mitigation,
including the Corps' requirements, the sequence of avoidance,
minimization, and compensation, and the mitigation framework developed
for the evaluation of the four main phosphate mining projects. There are no
coral reefs potentially impacted by the proposed Ona project.
Section 5 of this EA addresses updates to those impact evaluations as the
result of project changes described in Section 2.d of this EA. As described
in Section 5, the project changes have not led to changes in the Corps'
effects determinations in the Final EIS. Section 9.c of this EA provides
additional details about the specific proposed compensatory mitigation for
the Ona project.
42
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
e) Potential Impacts on Human Use Characteristics (40 C.F.R. Part 230,
Subpart F): Chapter 4 of the Final EIS describes the Ona project's potential
impacts on municipal and private water supplies, recreational and
commercial fisheries, water-related recreation, and aesthetics. Section 5 of
this EA addresses updates to those impact evaluations as the result of
project changes described in Section 2.d of this EA. As described in Section
5, the project changes have not led to changes in the Corps' effects
determinations in the Final EIS.
f) Contaminant Evaluation and Testing (40 C.F.R. Part 230, Subpart G):
Section 4.4 and Appendix D of the Final EIS describe the surface water
quality monitoring, including aquatic biological monitoring, associated with
existing phosphate mines, and reasonably expected to be required for
proposed mines, including Ona. Section 5 of this EA addresses updates to
those impact evaluations as the result of project changes described in
Section 2.d of this EA. As described in Section 5, the project changes have
not led to changes in the Corps' effects determinations in the Final EIS.
7) Draft Public Interest Review (33 C.F.R. § 320.4): The Corps considers both
cumulative and secondary impacts on these public interest factors within the
geographic scope as defined in Chapter 4 of the Final EIS. The Corps has used
information as provided in the Final EIS to the maximum extent, as appropriate.
Additional information evaluated by the Corps for any of the specific public interest
review factors is described below in the section for the specific factor.
a) Wetlands (33 C.F.R. § 320.4(b); Corps' Wetland Policy): Section 4.5.2 of
the Final EIS describes how the Corps considered direct and secondary
impacts to wetlands. Section 4.5.2.3 of the Final EIS describes the specific
evaluation of potential wetland impacts associated with the Ona project.
Section 4.12.5 of the Final EIS describes the cumulative effects on
ecological resources, including wetlands. Section 2.c of this EA describes
the currently proposed project, including the level of impacts to Corpsjurisdictional wetlands and surface waters (including streams). Sections
5.a.v and 5.b.iv of this EA describe the updated analyses of the Ona
project's direct, indirect, and cumulative effects on wetlands. Section 9.c of
this EA describes the compensatory mitigation plan proposed to offset the
project's wetland and surface water impacts.
43
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
b) Fish and wildlife (33 C.F.R. § 320.4(c)): Section 4.5.1 of the Final EIS
describes how the Corps considered direct and secondary impacts to
aquatic biological communities. Section 4.5.1.3 of the Final EIS describes
the specific evaluation of aquatic biological community impacts associated
with the proposed Ona project. Section 4.5.3 of the Final EIS describes
how the Corps considered direct and secondary impacts to wildlife habitat.
Section 4.5.3.3 of the Final EIS describes the specific evaluation of wildlife
habitat impacts associated with the proposed Ona project. Section 4.12.5
of the Final EIS describes the potential cumulative effects on ecological
resources. Sections 5.a.iv and 5.a.vi of this EA describe the updated
analyses of Ona's direct and secondary effects on aquatic biological
communities and wildlife habitat. Section 5.b.iv of this EA describes the
updated cumulative effects analyses for ecological resources.
As described in Section 8.f of this EA, the USFWS is preparing an HCP and
BO for the proposed project. The Corps will consider the results of the
USFWS review in making its final determination on the proposed Ona Mine.
As also described in Section 8.f of this EA, as a result of a November 6,
2013, discussion of the project with the NMFS-PRD, the Corps determined
that the proposed mines would have no effect on the smalltooth sawfish.
On December 16, 2015, the NMFS-HCD stated that they anticipated any
adverse effects associated with the proposed project that might occur on
marine and anadromous fishery resources would be minimal and, therefore,
they did not object to issuance of a permit.
c) Water quality (33 C.F.R. § 320.4(d)): Section 4.4 of the Final EIS describes
how the Corps considered potential direct and secondary impacts to water
quality. Section 4.4.2 of the Final EIS describes the specific evaluation of
water quality impacts associated with all of the action alternatives. Section
4.12.4 of the Final EIS describes the potential cumulative effects on surface
water quality. Section 5.a.iii of this EA describes the updated analysis of
Ona's direct and secondary effects on water quality. Section 5.b of this EA
describes why the Corps determined that an updated cumulative effects
analysis for water quality was not necessary.
The FDEP issued a water quality certification on August 31, 2015, as part
of its Environmental Resource Permit (ERP). If the Corps issues a permit
for this project, it will include a condition requiring compliance with the
conditions specified in the water quality certification.
44
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
d) Historic, cultural, scenic, and recreational values (33 C.F.R. § 320.4(e)):
Section 4.9 of the Final EIS describes how the Corps considered potential
direct and secondary impacts to cultural resources and historic properties.
Section 4.9.3 of the Final EIS describes the specific evaluation of potential
cultural resource and historic property impacts associated with the Ona
project. Section 4.1.8.5 of the Final EIS describes how the Corps
considered potential aesthetic impacts associated with phosphate mining,
and Section 4.1.8.7 describes how the Corps considered potential effects
on recreation. Section 8.e of this EA describes how the proposed project
complies with the National Historic Preservation Act of 1966.
e) Effects on limits of the territorial sea (33 C.F.R. § 320.4(f): The proposed
Ona project will not affect coastal waters, either by erosion or accretion.
f) Consideration of property ownership (33 C.F.R. § 320.4(g): The applicant
owns the property that is the subject of this permit application. The
proposed project will not affect navigation nor riparian rights to navigable
waters.
g) Activities affecting coastal zones (33 C.F.R. § 320.4(h): The proposed Ona
project will not affect coastal zones.
h) Activities in marine sanctuaries (33 C.F.R. § 320.4(i)): The proposed Ona
project is not within a marine sanctuary.
i) Other Federal, state, or local requirements (33 C.F.R. § 320.4(j)): Section 8
of this EA describes the proposed project's compliance with other federal,
state, and local requirements.
j) Safety of impoundment structures (33 C.F.R. § 320.4(k)): The construction
and operation of the clay settling areas will comply with federal, state and
local requirements. Specifically, the FDEP's NPDES permit(s) will require
compliance with Rule 62-672, F.A.C., "Minimum Requirements for Earthen
Dams Used in Phosphate Mining and Beneficiation Operations and for
Dikes Used in Phosphogypsum Stack System Impoundments." Also, the
Hardee County Development Order and Master Mine Plan will require
additional inspection, reporting, and emergency management elements that
apply to the dams proposed for the Ona Mine.
45
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
k) Floodplain management (33 C.F.R. § 320.4(l)): Section 4.1.8.4 of the Final
EIS describes how the Corps considered potential floodplain impacts
associated with phosphate mining. As stated in that section, FDEP
regulations state that no net encroachment into the floodplain, up to that
encompassed by the 100-year event, can be allowed unless equivalent
compensating storage is provided between the seasonal high water level
and the 100-year flood level. FDEP issued an ERP for the project on August
31, 2015. Additionally, the Corps' evaluation of wetland impacts described
in Section 7.a of this EA includes consideration of floodplains.
l) Water supply and conservation (33 C.F.R. § 320.4(m)): Section 5.a.i of this
EA describes the Corps' review and verification of the updated analysis of
the predicted direct and indirect effects of the proposed Ona project on
surface water flows within the Upper Myakka River, Horse Creek, and the
Peace River. Section 5.b.ii of this EA describes the updated analysis of the
cumulative effects on surface water flows in the Upper Myakka River, Horse
Creek, the Peace River, and Charlotte Harbor.
Based on the updated analyses, the changes to the proposed Ona project
did not alter the Corps' determinations for the potential direct, indirect, and
cumulative effects on surface water hydrology made in the Final EIS.
Section 4.12.2.5 of the Final EIS describes the potential cumulative effects
of phosphate mining on water supply withdrawals in the lower Peace River,
and Section 4.12.2.6 describes the magnitude and significance. As stated
in those two sections, the cumulative effect of mining on water supply
withdrawals has at most a minor level of effect. As also stated above, the
changes to the proposed Ona project did not alter the Corps' determinations
for the direct, indirect, and cumulative effects on surface water hydrology
made in the Final EIS, including on public water supplies.
Section 5.a.iii of this EA describes the Corps' review and verification of the
updated analysis of the predicted direct and indirect effects of the proposed
Ona project on surface water quality. As described in Section 5.b, the Corps
determined that no updates to the surface water quality cumulative impact
analysis found in Section 4.12.4 of the Final EIS was necessary.
Based on the updated analyses, the changes to the proposed Ona project
did not alter the Corps' determinations for the potential direct, indirect, and
46
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
cumulative effects on surface water quality made in the Final EIS.
Discharges from the mine will need to comply with both a Section 401 water
quality certification (FDEP Environmental Resource Permit) and a Section
402 NPDES permit or permits (also issued by FDEP).
Section 4.3.3 of the Final EIS describes the predicted direct and indirect
effects of Ona on groundwater resources. Section 4.12.3.12 of the Final EIS
describes the potential cumulative effect of phosphate mining on
groundwater resources, and Section 4.12.3.13 describes mitigation,
monitoring, and adaptive management measures to protect groundwater
resources. As stated in those two sections, the potential cumulative effect
of phosphate mining on groundwater resources would be at most be minor.
Section 5.a.ii of this EA describes the Corps' review and verification of the
updated analysis of the predicted direct and indirect effects of the proposed
Ona project on groundwater resources. Section 5.b.iii of this EA describes
the updated groundwater resources cumulative effects analysis.
m) Energy conservation and development (33 C.F.R. § 320.4(n)): The Corps
does not consider the proposed action, a phosphate mine, to be an energy
project.
n) Navigation (33 C.F.R. § 320.4(o)): The proposed project will not have any
effects on navigation.
o) Environmental benefits (33 C.F.R. § 320.4(p)): The proposed project will
cause the short-term disruption of the existing altered ecosystem; however,
successful implementation of the proposed reclamation plan and
compensatory mitigation plans will result in long term benefits through the
reclamation of native habitat and mitigation of aquatic resources. The
proposed compensatory mitigation plan provides for the reestablishment,
management, and preservation of wetand habitats.
p) Economics (33 C.F.R. § 320.4(q)): Section 4.6.3 of the Final EIS describes
the predicted direct and indirect effects of the Ona project on the economy
of Hardee County. Section 4.12.6 of the Final EIS describes the cumulative
effects on the economies of Hardee County and on an eight-county region.
Sections 5.a.vii and 5.b.v of this EA described the updated analyses of the
potential direct, indirect, and cumulative economic effects. As stated in
those sections, the changes to the Ona project did not alter the Corps'
47
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
determinations for the potential direct, indirect, and cumulative economic
effects made in the Final EIS.
q) Mitigation (33 C.F.R. § 320.4(r)): Chapter 5 of the Final EIS further
describes mitigation, including the Corps' requirements, the sequence of
avoidance, minimization, and compensation, and the mitigation framework
developed for the evaluation of the four pending phosphate mine
applications. Section 9 of this document further describes the specific
proposed compensatory mitigation for the Ona project.
r) Conservation: Decades of agricultural activity have resulted in a degraded
condition for many of the onsite wetlands. As described in Section 4 of this
EA, and in accordance with the mitigation framework described in Section
5.4 of the Final EIS, the applicant has preferentially avoided forested
wetlands, higher-quality herbaceous wetlands, and stream systems in their
mine plan. As described in Section 9 of this EA, the applicant also proposes
to preserve and manage these avoided areas as part of the compensatory
mitigation plan. As also described in Section 9 of this EA, the proposed
compensatory mitigation plan also includes restoration, enhancement, and
establishment of wetlands and streams on several offsite parcels, with
eventual preservation and management of those mitigation areas.
s) Shore erosion and accretion: The proposed action will not affect shore
erosion or accretion.
t) Safety: Industry OSHA requirements will be in place during all construction
activities. Section 4.8 of the Final EIS addresses the potential effects of
radiation associated with phosphate mining.
u) Food and fiber production: The recovered phosphate ore will be processed
into fertilizer and animal feed supplements. This is a direct benefit to food
and fiber production.
8) Other Federal, State, and Local Requirements:
a) Section 401 of the Clean Water Act: The FDEP issued a water quality
certification on August 31, 2015, as part of the ERP issued for the proposed
project.
b) Section 307(c) of the Coastal Zone Management Act: The FDEP issued a
coastal zone management consistency determination on August 31, 2015,
48
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
as part of the ERP issued for the proposed project.
c) Section 302 of the Marine Protection, Research and Sanctuaries Act: This
proposed project is not located in a marine sanctuary as established by the
Secretary of Commerce under authority of Section 302 of the Marine
Protection, Research and Sanctuaries Act of 1972.
d) Fish and Wildlife Act of 1956, Migratory Marine Game-Fish Act, Fish and
Wildlife Coordination Act, and other acts protecting fish and wildlife
resources: Chapter 4 of the Final EIS describes Ona's potential impacts on
threatened or endangered species, fish, crustaceans, mollusks, and other
aquatic organisms, and other wildlife. Section 5 of this EA describes how
the Corps considered the project changes listed in Section 2.d of this EA in
updating effect determinations made in the Final EIS, or why updates were
not necessary for some issue categories. As described in Section 8.f of this
EA, the USFWS is preparing an HCP and BO for the proposed project.
e) National Historic Preservation Act of 1966: Section 6.3 of the Final EIS
describes how the actions considered in that document, including this
proposed action, will comply with the National Historic Preservation Act of
1966. The SHPO, by letter dated June 20, 2012, stated that its review of
the Florida Master Site File indicates that no historical properties are
recorded within the project area. Furthermore, because of the location
and/or nature of the project, the SHPO determined that it is unlikely that
historic properties will be affected. If the Corps issues a permit for this
project, it will include a special condition requiring protection of previously
unidentified archaeological/cultural materials and notification of appropriate
authorities including the SHPO and THPO.
The applicant provided a Phase 1 cultural resource survey to the SHPO for
the 160-acre addition on July 19, 2013. By letter dated August 14, 2013, the
SHPO stated that it concurred with the determination that mining in the
project area will have no effect on cultural resources listed in the National
Register of Historic Places, eligible for listing, or otherwise of
archaeological, historical, or architectural value. The Corps will coordinate
directly with the SHPO to confirm those findings, and provide that
confirmation in the RODSOF for the Ona project.
In addition, the Seminole Tribe of Florida's Tribal Historic Preservation
Officer (STOF-THPO), by letter dated July 5, 2012, identified sites within
49
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
the Ona parcel about which they had concerns. The Corps will work with
the STOF-THPO to address those concerns and coordinate review of the
additional 160 acres, and provide the resolution of that coordination in the
RODSOF for the Ona project.
f) Endangered Species Act: The June 1, 2012, public notice for the Ona
project stated the following about listed species:
Wildlife surveys have been conducted on the subject property. Audubon's
crested caracara (Polyborus plancus), wood storks (Mycteria americana),
and Eastern indigo snakes (Drymarchon couperi) have been confirmed
onsite. There is one nesting pair of caracara currently located within the
subject property. The project has suitable habitat and is within the
consultation area for the Florida grasshopper sparrow (Ammodramus
savannarum floridanus). The project has suitable habitat for the Florida
panther (Puma concolor coryi) and is outside of the Panther Focus Area.
The project has suitable habitat for the Florida scrub jay (Aphelocoma
coerulescens), however no scrub jays were detected during speciesspecific surveys.
Using the January 25, 2010, effect determination key for the eastern indigo
snake (A-B-C-D), the Corps has determined that the proposal may affect
the Eastern indigo snake. The applicant has not provided an analysis of the
foraging value of the impacted or mitigation wetlands. Using the January
25, 2010, effect determination key for the wood stork (A-B-C-E), the Corps
has determined that the proposal may affect the wood stork. Based upon
the presence of one confirmed caracara nest on the property, the Corps has
determined that the proposal may affect the caracara. Based on the
presence of suitable habitat, the Corps has made the preliminary
determinations that the proposal may affect, but is not likely to adversely
affect the Florida grasshopper sparrow, the Florida panther, and the Florida
scrub jay.
The Corps will request initiation of formal consultation for the wood stork,
the Eastern indigo snake and the caracara, and informal consultation for the
Florida grasshopper sparrow and the Florida panther with the Fish and
Wildlife Service pursuant to Section 7 of the Endangered Species Act by
separate letter.
50
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
By letter dated August 1, 2012, the Corps requested initiation of formal
consultation for the eastern indigo snake, the caracara, and the wood stork,
and concurrence with its effect determinations for the grasshopper sparrow,
panther, and scrub jay.
The USFWS is currently reviewing an application for an amendment to an
Incidental Take Permit for a 900-acre area within the overall Ona project
site identified as the "Fort Green Uplands" 17, and a BO for the remaining
21,583 acres of the project site, as shown in Attachment A - Figure 9. The
USFWS's review will consider the changes to the proposed project since
2012, including those changes described in Section 2.d of this document.
On November 6, 2013, the Corps and NMFS-PRD held a meeting to discuss
the effects of phosphate mining, including this project, on the smalltooth
sawfish and the sawfish critical habitat unit in Charlotte Harbor. In regards
to surface water quality effects, as described in Sections 4.4.6 and 4.12.4
of the Final EIS, and Sections 6 and 7 of this EA, individually and
cumulatively the expected level of potential impact is low enough that there
will be no effect downstream on the sawfish or its critical habitat. In regards
to surface water quantity effects, as described in Sections 4.2.5 and 4.12.2
of the Final EIS, and Sections 6 and 7 of this EA, individually and
cumulatively the expected level of potential impact is low enough that there
will also be no effect downstream on the sawfish or its critical habitat.
Therefore, the Corps determined that the proposed project would have no
effect on the smalltooth sawfish.
The Corps received notice on October 6, 2017, that manatees were sighted
in Horse Creek, south of the Ona project site. On November 27, 2017, the
Corps prepared a Memorandum for the Record (MFR) (Attachment C to this
document) documenting its determination of `no effect' on the manatee for
the Ona project and provided a copy of the MFR to the USFWS.
g) Marine Mammal Protection Act of 1972: The proposed project does not
affect any marine mammals.
The USFWS published a notice in the Federal Register on December 7, 2017, to
request public comments on the proposed amendment; FR2017-26360, pages 5778457785.
17
51
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
h) Section 7(a) of the Wild and Scenic Rivers Act: Section 6.10 of the Final
EIS describes how the actions considered in that document, including this
proposed action, will comply with Section 7(a) of the Wild and Scenic Rivers
Act. As stated in the Final EIS, a segment of the Myakka River is a
designated Wild and Scenic River.
Chapter 4 of the Final EIS describes the predicted direct, indirect and
cumulative effects of the Ona project on surface water flows within the
Myakka River. The Final EIS states that the project will have an
insubstantial to minimal effect on the Myakka River.
i) Section 402 of the Clean Water Act: The state of Florida has issued NPDES
permits for the South Pasture and the Four Corners Mines. Prior to
operation of the Ona Mine, the applicant will need to request and receive
modifications of those NPDES permits to encompass the Ona Mine
property.
j) Magnuson-Stevens Fishery Conservation and Management Act: On
December 16, 2015, the NMFS Habitat Conservation Division (NMFS-HCD)
stated that it anticipated any adverse effects associated with the proposed
project that might occur on marine and anadromous fishery resources would
be minimal and, therefore, it did not object to issuance of a permit.
k) Migratory Bird Treaty Act: Section 6.12 of the Final EIS describes how the
actions considered in that document, including this proposed action, will
comply with the Migratory Bird Treaty Act.
9) Compensation and other mitigation actions.
a) Description of impacts: The applicant proposes a total of approximately
3,426.1 acres of impact to Corps-jurisdictional wetlands, including 1,357.87
acres of forested wetland impacts and 2,068.27 acres of herbaceous
wetland impacts. The applicant also proposes approximately 100,766.8
linear feet of impact to Corps-jurisdictional streams. The jurisdictional
impacts include up to 14 acres of temporary impacts to WOUS for
necessary consolidated dragline and infrastructure corridor crossings of an
un-named tributary to Brushy Creek, Horse Creek, and West Fork Horse
Creek. Construction of these crossings would result in a total up to 12 acres
of temporary impacts to forested wetlands, up to 2 acres of temporary
52
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
impacts to herbaceous wetlands, and 1,794 linear feet of temporary impacts
to streams. By watershed, 38.54 acres of the wetland impacts (10.27 acres
forested, 28.27 acres herbaceous) are within the Myakka River watershed,
and the remainder are within the Peace River watershed. All of the stream
impacts are within the Peace River watershed.
The current UMAM functional analysis, as prepared by the applicant, shows
that the project as proposed will result in 606.99 units of functional loss due
to the forested wetland impacts (including 5.1 units in the Myakka River
watershed), and 783.1 units of functional loss due to the herbaceous
wetland impacts (including 12.3 units in the Myakka River watershed). The
applicant also provided a functional analysis using the FDEP stream habitat
assessment methodology indicating that the project will result in 41,377.21
units of functional loss due to the stream impacts. The Corps has not
finalized its review of these functional assessments.
b) Mitigative Actions (33 C.F.R. §320.4(r) and 40 C.F.R. Part 230, Subpart F):
i. General Actions (as Described in the Final EIS): Chapter 4 of the Final
EIS describes actions proposed by the applicant to avoid, minimize, and
offset adverse impacts to the human and natural environment associated
with phosphate mining in addition to the avoidance, minimization, and
compensation of impacts to aquatic resources. For example, Section 3.1.1
describes the installation of a ditch and berm system before the start of
mining to help maintain hydrology in adjacent streams and wetlands,
Section 4.1.8.1 describes the best management practice of watering down
roads within the mine to reduce fugitive dust and protect air quality. Section
4.1.8.5 describes how the berms around the mine function as a visual
barrier to protect aesthetics, in addition to being part of the overall water
management system. Chapter 5 of the Final EIS provides information about
compensatory mitigation for impacts to aquatic resources and mitigation
alternatives for phosphate mining within the Central Florida Phosphate
District, with consideration of the mitigation proposed at that time for the
four pending phosphate mine applications (South Pasture Extension, Ona,
Wingate East, and Desoto).
ii. Project-specific Actions: Sections 4(d) and 4(e) of this EA describe the
applicant's proposed alternatives for avoidance and minimization of impacts
to aquatic resources associated with the Ona project. Section 9(c) of this
EA describes the applicant's current plan for compensatory mitigation of
53
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
impacts to aquatic resources for South Pasture Extension.
The Ona project went through several rounds of minimization and reduction
of impacts, including to aquatic resources, before arriving at the current
Applicant's Preferred Alternative.
As described in the June 1, 2012, public notice, the June 2011 revised
application that the prior applicant submitted as part of the Areawide EIS
review proposed 20,864 acres of mining or other disturbance, with 4615
acres of impact to Corps-jurisdictional wetlands and other surface waters
and 136,731 linear feet of stream impacts.
In response to the results of the Final EIS, including the mitigation
framework detailed in Section 5.4 of that document, the applicant submitted
a revised mine plan in September 2013, with 18,870.9 acres of proposed
mining or other disturbance, 3519.4 acres of impact to Corps-jurisdictional
wetlands and other surface waters, and 103,978 linear feet of stream
impacts. Additional project-specific minimization measures introduced with
this revision included the addition of upland buffers to avoided wetlands
where practicable, the addition of 160 acres of land to the project to allow
redesign of a CSA and minimization of its footprint, and an increase in the
use of shared walls for CSAs to also minimize their footprints.
In June 2014, the applicant proposed 18,801 acres of proposed mining or
other disturbance, 3419 acres of impact to Corps-jurisdictional wetlands
and other surface waters, and 103,304 linear feet of stream impacts. This
mine plan retained the project-specific minimization measures proposed in
September 2013.
Currently, as described in Section 2.c of this EA, the applicant proposes
18,776 acres of proposed mining or other disturbance, 3426.1 acres of
impact to Corps-jurisdictional wetlands and other surface waters, and
100,766.8 linear feet of stream impacts.
c) Compensatory Mitigation for Unavoidable Impacts to Aquatic Resources
(33 C.F.R. § 332): As stated in Section 5.1.2 of the Final EIS, on March 31,
2008, the Environmental Protection Agency and the Corps issued revised
regulations governing compensatory mitigation for authorized impacts to
wetlands, streams, and other waters of the U.S. to advance the federal
54
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
objective of "no net loss" of wetlands. These regulations, 33 C.F.R. Parts
325 and 332 and 40 C.F.R. Part 230 (the 2008 Compensatory Mitigation
Rule), are designed to improve the effectiveness of compensatory
mitigation to offset the loss of aquatic resource area and function, and to
increase the efficiency and predictability of the mitigation project review
process.
Section 5.5 of the Final EIS provides additional information on
compensatory mitigation options as described in the 2008 Compensatory
Mitigation Rule. Currently, there are two federally-approved mitigation
banks whose service areas cover the Peace River watershed portion of the
proposed project Boran Ranch Mitigation Bank and Peace River
Mitigation Bank. There is one federally-approved mitigation bank whose
service area covers the Myakka River watershed the Myakka River
Mitigation Bank. As of January 10 1, 2018 18, Boran Ranch has 107.13
freshwater herbaceous credits available, Peace River has 42.4 freshwater
forested credits available, and Myakka River has 61.87 freshwater forested
and 59.17 freshwater herbaceous credits available. None of the banks have
specific stream credits available. Based on the current functional
assessment of the project's impacts as described in Section 9.a of this EA,
the available mitigation banks do not have sufficient numbers of credits
available to compensate for the proposed wetland impacts within the Peace
River watershed, and have no credits available to compensate for the
proposed stream impacts. In the case of the proposed mitigation within the
Myakka River watershed, although there are sufficient mitigation bank
credits available, the Corps has determined that the proposed onsite
restoration and reestablishment of wetlands within the headwaters of the
Myakka River is the most appropriate, environmentally preferable, and
practicable mitigation option. There are no in-lieu fee projects whose service
areas cover the proposed project.
Therefore, the applicant proposes to implement a program of onsite and
offsite, in-kind, permittee-responsible mitigation to offset unavoidable
impacts to aquatic resources associated with the construction and operation
of the Ona phosphate mine. The applicant states that this permitteeresponsible mitigation is the most appropriate and practicable mitigation
As verified using the Regulatory In-lieu Fee and Bank Information Tracking System
(RIBITS), at https://ribits.usace.army.mil
18
55
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
alternative based on consideration of project-specific circumstances, such
as the availability of mitigation banks or in-lieu fee programs, and the
watershed approach.
In regard to the watershed approach, the Applicant states that the proposed
mitigation plan addresses watershed needs for the Peace and Myakka
Rivers identified in the Charlotte Harbor National Estuary Program
Comprehensive Conservation and Management Plan (CCMP). The CCMP
constitutes a watershed plan pursuant to 33 C.F.R. § 332.3(c). The
Charlotte Harbor National Estuary Program stated in a letter to the Applicant
dated September 9, 2016, that overall, "on-site and off-site mitigation plans
have been designed to support implementation of the CHNEP's
Comprehensive Conservation and Management Plan." The applicant also
states that the proposed mitigation plan addresses watershed needs for the
Myakka River identified in the Southwest Florida Water Management
District's Myakka River Comprehensive Watershed Management Plan.
In accordance with 33 C.F.R. § 332.4(c), the applicant has provided a draft
mitigation plan which includes the following 12 components:
i. Objectives: The applicant's proposed mitigation plan includes the
following:
a. Onsite preservation of 1,483.8 acres of wetlands (1,105.5 acres
forested and 378.4 acres herbaceous), 120,855.65 linear feet of
streams, and 2,192.9 acres of adjacent native habitat upland
buffers before commencement of mining;
b. Onsite reestablishment on a rolling basis across the site, as
reclamation follows behind mining, of 3,381.3 acres of wetlands
(1,476.4 acres forested and 1,904.9 acres herbaceous), 35,437.27
linear feet of streams, and 1,761.5 acres of native habitat upland
buffers; with preservation of the
reestablished wetlands, streams and buffers after they have
achieved the required success criteria;
c. Offsite mitigation at the Payne Creek restoration site consisting
of 506.7 acres of wetland establishment (88.6 acres forested and
418.1 acres herbaceous), 14,755.00 linear feet of stream
establishment, and 385.2 acres of native habitat upland buffers;
with preservation of the
56
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
established wetlands, streams and buffers after they have achieved
the required success criteria;
d. Offsite mitigation at the Bowlegs Creek restoration site consisting
of 39.81 acres of wetland establishment (36.18 acres forested and
3.63 acres herbaceous), 77.09 acres of forested wetland
preservation, 115.37 acres of wetland enhancement (82.38 acres
forested and 32.98 acres
herbaceous), 5,507 linear feet of stream establishment and
restoration, and 366.9 acres of native habitat upland buffers; with
preservation of the established wetlands, streams and buffers after
they have achieved the required success criteria;
e. Offsite preservation at the Ghost sites consisting of 205.1 acres
of wetlands (197.3 acres forested and 7.8 acres herbaceous) and
125.0 acres of adjacent native habitat upland buffer, before
commencement of mining;
f. Offsite preservation at the Horse Creek/Payne Creek sites
consisting of 573.63 acres of wetlands (471.44 acres forested and
102.19 acres herbaceous), and 322.8 acres of adjacent native
habitat upland buffers preserved before commencement of mining;
g. Offsite preservation at the Payne Creek Connector sites
consisting of 266.61 acres of wetlands (254.77 acres forested and
11.84 acres herbaceous), and 3.1 acres of adjacent native habitat
upland buffers preserved before commencement of mining;
h. Offsite preservation at the Peace River North site consisting of
440.39 acres of wetlands (440.02 acres forested and 0.37 acres
herbaceous), and 129.9 acres of adjacent native habitat upland
buffers preserved before commencement of mining;
i. Offsite preservation at the Peace River South site consisting of
243.65 acres of forested wetland preservation and 119.9 acres of
adjacent native habitat upland buffers preserved before
commencement of mining;
j. Offsite mitigation at the West Fork Horse Creek restoration site
consisting of 31.38 acres of wetland establishment (17.96 acres
forested and 13.42 acres herbaceous), 63.49 acres of wetland
preservation (63.05 acres forested and 0.44 acres herbaceous),
5.44 acres of forested wetland enhancement, and 46.4 acres of
native habitat upland buffers; with preservation of the established
wetlands and buffers after they have achieved the required success
criteria;
57
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
k. Offsite mitigation at the adjacent South Pasture Extension Mine
sites consisting of 166.58 acres of herbaceous wetland
establishment and 146.9 acres of native habitat upland buffers, with
preservation of the established wetlands and buffers after they
have achieved the required success criteria.
Attachment A-Figure 10 shows the approximate locations and extent of
the mitigation sites.
ii. Site Selection: As stated above, neither of the two available mitigation
banks has sufficient numbers of credits available to compensate for the
proposed wetland impacts, or any stream credits at all, therefore the
applicant proposed onsite mitigation as the most appropriate and
practicable mitigation alternative.
The proposed preservation areas include the area avoided as part of the
impact minimization as described in Section 4 of this EA. The applicant
based the locations of the reestablished wetlands and streams on extensive
monitoring, data collection, analyses and modeling. Results of the modeling
indicate that the proposed mitigation takes into account watershed needs
and will result in ecologically self-sustaining mitigation.
iii. Site Protection Instrument: Perpetual conservation easements granted
to the FDEP will provide require long-term protection of the mitigation areas.
The conservation easements will grant third party rights of notice and
enforcement to the Corps. The Corps will review the site protection
instrument by the District for compliance with 33 C.F.R. Section 332.7(a).
iv. Baseline Information: The 22,483-acre project site includes 4,885 acres
of WOUS. Over 40 percent of the property has been converted from native
vegetative cover into pastures, roads, livestock watering ponds, or utility
corridors. Native upland cover (i.e., rangeland and forest) is present on
approximately 35 percent of the site and wetland vegetative cover is present
on approximately 24 percent of the site. The historic and physical land use
is primarily agricultural, with most of the property used for cattle grazing.
The applicant has collected ecological baseline data for the site since 1996
including wetland delineations, wetland quality assessments using UMAM,
detailed vegetation and land use mapping, and wildlife and listed species
58
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
surveys. The applicant also completed a hydrologic assessment. Data
collected for this assessment included stream and drainage area
characteristics, topography, precipitation rates, measurements of
evapotranspiration, and hydrogeology. The Corps considered this baseline
information both in its evaluation of the proposed impacts associated with
the Ona project and its evaluation of the proposed compensatory mitigation.
The offsite mitigation areas are primarily areas reclaimed in accordance
with FDEP requirements, where the applicant has identified opportunities
based on onsite environmental factors such as hydrology to improve the
ecological characteristics of the sites and provide viable mitigation sites.
v. Determination of Credits: The UMAM functional analysis of the project
impacts, as prepared by the applicant, shows that the project as proposed
will result in 606.99 units of functional loss due to the forested wetland
impacts, and 783.1 units of functional loss due to the herbaceous wetland
impacts. The applicant also provided a functional analysis using the FDEP
stream habitat assessment methodology indicating that the project will
result in 41,377.21 units of functional loss due to the stream impacts.
The applicant's proposed functional assessment for the mitigation shows
610.1 units of functional gain for forested wetlands (including 454.2 units
from onsite mitigation and 155.9 units from offsite mitigation), 796.91 units
of gain for herbaceous wetlands (including 486.21 units onsite and 310.7
units offsite), and 50,714.7 units of gain for streams (including 39,896.26
units onsite and 10,818.44 units offsite). The Corps has not finalized its
review of these functional assessments.
vi. Mitigation Work Plan: For the onsite wetland re-establishment mitigation,
after mining, the applicant proposes to create forested and herbaceous
wetlands on sand tailings, and then grade and cap the wetlands with
suitable wetland topsoil/muck, if available, or other suitable organic matter
with specific depths and structure to be determined by habitat type. To
create microhabitat and habitat heterogeneity within the wetlands, the
applicant will grade the created systems to provide a range of habitat types
and distinct zonations, from seasonal to permanent inundation. In addition,
the applicant will install habitat enhancements, including snags to
encourage wildlife usage, and stumps, logs, and shrubs to provide
hummocks in the created wetlands where appropriate. The applicant will
59
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
directly transfer small shrubs and trees from the future mining areas into the
re-established wetlands to the extent practicable. Where direct transfer or
natural recruitment of vegetation is not sufficient, the applicant will plant
vegetation that is consistent with the species diversity and density of the
targeted wetland community type.
The stream re-establishment incorporates in-stream channel design, as
well as a comprehensive overview of all lotic site conditions, which include
headwater wetlands and in-line wetlands and the surrounding habitat zones
of flanking wetlands and terrestrial communities within and along the
riparian valley. To accomplish these goals, forested corridors and native
upland riparian zones will typically replace those that were historically
cleared for agriculture on the Ona Mine. The reclaimed valleys will form an
unditched drainage network with a flow regime that is not artificially flashy
like the existing ditched systems. The stream restoration plan pays
significant attention to landscape scale associations important to overall
stream function by matching drainage area to valley geomorphology, width
of the meander belt, and functional process zone types and sequences.
The design covers a full hierarchy of scales, restoring a series of habitat
patches and zones progressing from in-stream meso-habitats, such as
individual logs and pools a few feet long, to the geomorphic and hydraulic
linkages of entire lentic, paralotic, and lotic waterbodies and their associated
ecotones encompassing many acres. These landscape linkages are based
largely on the historic conditions of the property, prior to land clearing and
ditching, which will provide a better overall lotic system versus that existing
immediately prior to mining. The successful implementation of the stream
restoration plan will result in the restoration of historic native conditions,
wherever practical.
Offsite wetland and stream establishment and enhancement activities will
follow similar plans. For both the onsite and offsite non-preservation-only
mitigation, if the Corps issues a permit for Ona, that permit will include
conditions requiring compliance with the mitigation work plans that will be
part of the final compensatory mitigation plan.
vii. Maintenance Plan: The applicant will implement a mitigation
maintenance plan to ensure the constructed mitigation sites progress
towards success as defined by the permit performance standards and in
accordance with the mitigation work plan.
Plan elements include
60
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
inspections, nuisance/exotic species control/removal, and supplemental
tree and herbaceous plantings.
viii. Performance Standards: If issued, the Corps permit for Ona will include
required performance standards, or success criteria, for hydrology, water
quality, vegetative cover, and other criteria. Appendix I of the Final EIS and
the issued DA permit for South Pasture Extension (SAJ-1993-01395)
provide examples of ecological performance standards applicable to
phosphate mining. Both documents are available at:
http://www.saj.usace.army.mil/Missions/Regulatory/Items-of-Interest/
ix. Monitoring Requirements: The applicant will implement a monitoring
program to gather the data necessary for the Corps to evaluate the status
of the mitigation. Data collected will include but not be limited to coverage
of desirable plant species and of nuisance/exotic plant species, dominance
of plant species, hydrology, and tree health/viability and density.
The applicant will summarize the mitigation wetland monitoring data into a
report that will include the above information as well as observed wildlife
usage, an overall ecological evaluation, and any actions that may be
required to improve the system. To the extent practicable, reports will be
tabular in form for ease of review and year-to-year comparisons. The
applicant will submit reports prior to the end of the second month following
the month in which the monitoring event took place (e.g., monitoring event
in September, report submitted no later than 30 November).
Subsequent to completion of the compensatory mitigation objectives, the
applicant will perform monitor herbaceous and shrub wetland mitigation
areas semi-annually for the first three years and annually thereafter for a
total of no less than five years of monitoring, and monitor forested wetland
mitigation areas semi-annually for the first 5 years and annually thereafter
for a total of no less than 10 years of monitoring.
x. Long-Term Management Plan: After the Corps' determination that a
mitigation area has achieved the necessary performance standards, the
applicant will maintain that mitigation area in perpetuity in accordance with
mitigation objectives and an approved Long-Term Management Plan. The
long-term management plan will include a description of long-term
management needs and the annual cost estimates for these active long-
61
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
term management needs, an identified funding mechanism for the longterm management, a requirement for an Ecological Baseline Report,
provisions for management of proposed secondary uses of the mitigation
areas such as cattle grazing, hunting, and passive recreation, and annual
reporting to document the ecological conditions within the post-release
mitigation areas, the status of secondary activities conducted within the
mitigation areas, and maintenance activities expenses. A surety bond and
standby trust fund, reviewed and approved by the Corps, will provide the
long term funding mechanism for the long term management needs of the
mitigation areas.
For areas proposed for preservation only as described in Section 9(c)(i)
above, the applicant will manage those areas in accordance with the LongTerm Management Plan immediately following execution of the
conservation easement, and ensure that the necessary long-term funding
mechanism for those initial management activities is in place prior to the
commencement of work.
xi. Adaptive Management Plan: If monitoring identifies habitat deficiencies
such as low plant survivorship or exotic/nuisance vegetation, or if the Corps
determines that any mitigation area is not meeting its goals, the applicant
will develop and implement a site-specific adaptive management/corrective
action plan that addresses specific construction, maintenance, and/or
enhancement measures to be implemented to achieve the design
objectives. Items to be considered in the corrective actions may include
adjusting wetland hydrology, supplemental plantings, or changes to the
maintenance plan to address nuisance species negatively affecting the
mitigation. Any such adaptive management plan will be submitted to the
Corps for approval prior to implementation.
xii. Financial Assurances: Financial assurances for permittee-responsible
mitigation are a mechanism that ensures that a sufficient amount of money
will be available for use to complete or replace a mitigation provider's
obligations to implement a required mitigation project and meet specified
ecological performance standards in the event that the mitigation provider
proves unable or unwilling to meet those obligations.
For the Ona project, the applicant proposes to provide a financial
responsibility mechanism equal to 110 percent (%) of the estimated
62
CESAJ-RD-W
Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines
Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit
Application SAJ-2011-01869 (IP-JPF)
mitigation costs for WOUS affected in the first three years of operation,
including monitoring and maintenance. Further, the applicant will update
the financial responsibility yearly to cover, on a rolling basis, the cost of
mitigation activities proposed to be undertaken over the next three year
period, with a 10% contingency factor for any adaptive management that
might be required. The applicant will update the mechanism with revised
costs until release. The Corps permit, if issued, will include a special
condition requiring the financial assurances to be in place prior to
commencement of the authorized activities.
The Corps has not yet completed its review of the applicant's compensatory
mitigation plan. Prior to permit issuance, the Corps will ensure that the
applicant's compensatory mitigation plan fully complies with the
requirements of the 2008 Compensatory Mitigation Rule.
63
Supplemental Environmental Assessment, Draft Clean Water Act Section 404(b)(1)
Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA)
Permit Application SAJ-2011-01869
Attachment A Maps
SPE PLANT
Figure 1
Figure 2: Parks-Beckley Parcel (in yellow)
'
I
36
Legend
'
31
32
33
34
36
35
31
32
J
l
I
--------!------
I c::J
l
----+-
N
Mosaic·
4::.......
Ona Boundary (June 20 11)
---J Section lines
~--
Ona Mine
i = J Roads
- - ACOE Streams
Mosaic Fertilizer, LLC
ACOE Wetlands
i
ACOE 404 Application
1
6
2
__)_
Parks Beckley Parcel
0
2,000
Source: Mosaic
4,000
Feet
12
01-B
13
18
---------.,...___...___ __ 01 -0
I
r 24
24
24
19
t04-B
25
25
30
'
·---
-
SR64
2
.'
33
34
\
31
35
(
I
' - --- i---.e:.- .r -- - -- - -- - - -- - - --1--
_,
_ ______ .______L-_..____ _________
6
------1--,
-- ----1----
'I
12
!
I
'
'
4
'
7
36
2
1
~---------
I
I1
1
l
!
35
34
3
2
''
'''
1
!
I
6
Legend - Plan B
C ana Boundary (June 2011)
C Avoided Area - 3,538 ac.
C c1ay Settling Areas
D Parks Beckley Parcel
3
l
I'
I'
-----1---------------1--------------11
12
8
!l
10
II
I
I
I
I
I
r
I
I
12
Figure 3: Applicant's Preferred Alternative
''
36
31
32
T33 S
I
wiw T34 S
:
-- ... ·-----
I
j
i
32
Mosaic·
On.a Boundary
~
~
- - ACOE Streams
Ona 'i1ine
ACOE Wetlands
Mosaic Fertilizer, LLC
0
I
5
6
t
I
I
I
'
I C\f
I
:
31
.------- ................... ......~====:L.·----------J,- --------------·~:- - -----"-.-------4---·--
I
!a::
35
34
36
I
-·- ------- -,..i
1
33
:
Legend
c:::J
4
02
\,.,
i
i
/
6
2
i
ACOE 404 Application
Map 5-1-J
Alternative Plan F
I
3
N
I
I
I
01-A
I
I
I
---···----····1----------------
7
0
2,000
4,000
Feel
User. bm Date.: 5·1114/2016
P'iJBl: G:\pro;ects\2013\2013_0001\RA1_2Maps\Map 5-1-J Pian F.mXd
12
10
01-B
13
11
12
18
'
I
---- ·---- .,...___
,..___ __ $1-0
f
24
I
24
I
:
19
24
I
!04-B
~
25
j
25
30
~
j
:
I
SR64
2
36
33
34
35
35
36
2
1
34
i
j
I
0
---·-·--- - -----.. .1---·-- - - ---+--------- !------'------------- - ·~----------- '
!
II
I
I
I
I
1
I
6
i
----r----------I
1
12
:'
'
I
I
'
I
I
7
2
1
6
3
\
Legen d - Plan D
I
C] Clay Settling Areas
[J ona Boundary
C]Avoided Area (Preserved) - 3,705 ac.
I
!-+.- - - - . . ; . . - - - -- --- --- - -- -
I
,_----..---·n-----;--------------t-----------I
,
11
12
8
j
I
'
'
10
12
Figure 4: No Action - Uplands Only
I
361
I
I
l
UJ
~
I
~
1
,
I
31
J:
~
c::.
:
I
I
32
33
34
I
I
36
I
31
:
I
J._
II
I
I
I
S
3
a:: P::
'2
I
1
I
I
I
I
I
32
I
T;4 S I ------....:..------...---,------ : ------:- ----6
I
~ _______ -1--- -___
n
35
I
Legend
0
I
I
I
_______Ir -------','-- - - ---l------4-- - --i\'1
1
Ona Mine
l
I
~
~~~~c:O~~~~~~a~~~
Map 5-1-A
No Action Alternative 3-B
(J une 2011 App 1·ICati On )
C] Roacts
5
N
~~
c:J0na
1--- -,-:_~ ~~EWeHands
I
6
-ACOEStreams
Boundaiy (June 20111
Paits BeclM~
. ic
CJ Plant
c::J CSA ~~480 ac.)
CJ Horse Creek 100 Year Floodplain
O
(ZJ Mining
3,000
6,000
F'eet
~~~~l~7a\150055\0·1 10\Map_51A_no_adion.mxd
11
24
27
25
SR64
32
33
34
35
I
I
I
\
31'
I
I
+----1!---+------lf------l-+--.- -----l- - - - - l
6
1~
1
I
I
I
I
5
4
B
9
I
I
:
3
I
2
I
!
34
Ona
I
6
\
35
--- --- ---------
l
I
I
3
\
2
{-------~---~--~-------~------~- _____ :_______1------+~~~~
. . 1---.~--11
. . I--------i-----I
I
10
n
12
1
7
a
10
11
Figure 5: No Action - Upland Mining with Crossings of WOUS
N
"1R.4!Jic
1
Ona Mine
[
Mosaic Fertilizer, LLC
ACOE 404 Application
Map ~1Aii
Limited Action
Crossing Only Alternative 3-E
(June 2011 Application)
0
3,000
6,000
sources: Mosaic, 2017.
Feet
Q:\projects\mosa.ic\Ona' 150055\011O\Map-_ 5 1Ai_Jitrited_crossing__action_alt3e.mxd
8
;
9
lQ
f
I
I
I
1--------+------111-r~~~---t--------+------
I
Vandolah Rd.
I
I
..+----~---t---~ 15--'---lf-..-~
16
I
\
I
32
33
34
35
II
Jf
35
I
..-~--~----~~--·+-~~-'--+-.-- - - - 1I-
II
j ________l__ _I --- _______
I
a
1
:
12
·
:
b
7
I
I
I
I
"'
5
I
I
I
I
~
I
I
:
I
I
I)_
I
I
I
I
I
2
3
--·---+-------
- --
- - - - -
\
!
6
\
3
2
I
I
-'-
- - - - - - - ----- ~-------r----.,. .,.._____,._.. . .,. ._~------+--I
I
10
I
"
r2
I
I
a
I
I
10
I
I
1~
Figure
1
6
5
· Maximum ramework Avoidance
3
2
6
1
Minable Areas=> 20 Acres
# Polygons =19
Acres
~ 11,235.9 Acres
Perimeter =776,047 fL
Legend
Mineable Areas < 20 Acres
# Polygons= 45
Acres
=169.4
Perimeter =72,056.2
Feet
0.. 1~H
tt.th-Ol'~·-~S'.)'.:1~~\..f.,_,_/loldd-1.-
12
7
10
0
13
18
16
11
.
·
""'~"t
15
..."'"'"'
24
21
,.
0
~'
\~
25
27
36
6
32
33
34
5
4
3
-~~" ~
14
-
1:4
F
'b 13
(l
~~~~
10
9
11
16
18
J ti.
0
~~~
23 ~ -.~.
' ..
0
·
·24
\l
.-l / .
,:~<>-
2~:.\.'
lrC>a \
4t)'O
~
l
0
15
0
~ :z?~
I
~~
-
30
1
c.
22
8
()
·t
ift"1
7
12
25
j l>"
[) 0
~o
(J 0
22
.,. I·
·
23
.,
1
Figure
- Framewor Crossing
Ian
~~
6
5
3
6
2
~C'
Minable Areas=> 20 Acres
# Polygons = 19
Acres
=11,235.9 Acres
Perimeter =776,047!L
4
Ona Mine
MOsaic Fertilizer, LLC
ACOE 404 Application
Rgure!}.G
Avoidance Of
Legend
IZ2I
Mineable Areas < 20 Acres
# Polygons= 45
Acres
= 169.4
Perimeter =72,056.2
w=;,
:'.,~,-:;..
_
Pe~l'ftllil8-trewn~6
-
Fota1e0·11encis
N'3tli~I
D
D
r:::::J
lntell':'ltlienl 3ft'1fl'!S
Huwceov1 w e:111mi(>ll.1wRAP·
H"1>-=cov· w tteM$ \C 0.1 wRAf')
soo FL se1t14Ck
( 309 FT. e~r &
Frarnewcrt Wetlands
Except For
Crossing
mo FT. Ollch..& 8-e!'fll)
sccnonl.lllle
0
2.000
4,000
Feet
°"""" 105t!'00
..· ..o~........,__.
~o~~~ruou..~lf"9
12
7
13
18
24
10
11
18
23
$
25
36
1
7
12
..
\:i , ..
"
'
l
24
0
8
9
10
11
15
22
.,. I·
·
23
Figure 8 - June 2011 / First PN Plan
Legend
33
.4 /
3
\,,
N
1
"!Jl,.1£1iC
- ACOE Streams
Clctay Settling Area
Ona Mine
[
C::lona Boundary (June 2011) Mosaic Fertilizer, LLC
ClAvoided Area
ACOE 404 Application
D Parks BeeKley Parcel
Map 5-1-8(1)
ACOE Wetlands
Modified Alternative Plan A
1:1PLS
(June 2011 Application)
02
0
3,000
11
TO
I
- -:- - - - T
:
6,000
1--:--
0 3-A / ,
I
15 -
I
I
l
f
24
I
I
I
19
I 04-8
I
--,t-----27
25
25
I I
I ,
I
I
I
I
I
I
i-----
SR64
I
I
32
33
35
34
I
31'
l
!
-1-~-i-~--+--~~--.~~~-L---+--.- - - - -~------
6
I
I
II
I
I
I
I
5
4
30
Ona
~-·~~~-------
---
I
I
I
I
I
I
I
.1
I
10
2
:
35
34
I
6
1
r.f
I
I
I
3
l
2
10
I
.
I
11
{--------~---~--~
-------!-------+- _____ :_______r---~-+~~~~~---='4\\---~----~-~
d
:
7
I
I
I
8
I
I
I
g
I
1
I
TT
12
1
1
I
8
9
I
I
Figure 9: F o rt G re e n Uplands Location
-
-
-
+----T--- _
J_ __ _
I
I
-r - - - - ; - - - - + · - - --1 - - - - 1 - - - - r - - -
I
I
I
I
I
I
1---1 - - I
I
I
I
·--..i.---- I~
I
I
--r1
I
34 Range 23
'ar1go@nsnip3'5"Ra n 9 ej23--~----+----~--....,.
nJ'Q~nshi~
~
I
I
~
l
,._- - - -
I
II
l
:
- - --
I
I
~----+-----1-
I
I
I
I
- r-----t-1
---
I
I
I
----l- -
-
-
li----1- -l---i---l--..: : !
___ - -- - - - -
-t-- - - 1 - - - -
I
POLK
l
___ 11 ---
I
---l---1---l~Mosaic"
~
1!!!!119'
County Lines
CJ Township and Range
AR DEE
ES OTO
=
I
I
W.P
Section Lines·
s
Roads
f222I Fort Green Uplands - 900 acres
-
Ona Mine Boundary
-
Fort Green
Feet
0
4,000
User: mtiddes Date: 4124/2017
l\Fhfilprd3\gislprojeds\201312013_0001\Fort
Greeo\maps\Figure 3 FtGreen Uplaid proximity.mxd
Figure 10
i
~·
..
.,,,
E Couru, Lnu FM
z o1r0\I
Spring!
""4¥·
AJe~k
[=~J Ona Mine
~Mitigation Areas
ll'i!;!':'ll
D
D
US Army Corps
of Engineers..
200 - Agricultural
300 - Rangeland
ONA MINE
400 - Upland Forests
L J 500 - Water
-
Mosaic Fertilizer, LLC
USACE 404 Application
Onsite & Offsite
Mitigation Areas
600 - Wetlands
800 - Transportation
0
P\OOOThtOS\017-0oa u··M.AM Ass:istam:e\GIS\BOWLBGS CltBEK
·t ·
1.5
3
·---====
Miles
1in = 3 miles
m-.ebel 121512017 11:00:01 M:4
·c\Ona\150055\lJU t\Ona Fealures.mxd
I~
.
Mi es
.,.~
~I
,.
/'
t,,
....
v
Pa,i1
.....
J2 '
\tO,i\tJ
l
l
Hlff
·
!
Fo t~
!'L.1111"511
~
[._,
F»n loh
.....,
~,
I
..
I
I
I
I
-
....
o}~
......--~·
............,..,.
fr ~ iNi ll e
- -- --------
1M rt.I
lu
Ml
i LEGEND
*+
~ PlantSftes
-
D
Sub-Stations
Ona Pre-Washer
Access Corridors
Power1ines
Property Appraiser
FAEIS Alternative S~es W2 & A-2
t1
ii
. . Mosaic Property
i
D ona Mine
FIGURE 1.
STREET MAP
MOSAIC - ONA MINE
HARDEE COUNTY, FLORIDA
S)tn:e6 ECT. 2017; t«l6alc21 t7.
Figure 11
.
"
...
~ . . . . Environmental
Consulting &
Technology, Inc.
If::
I
Supplemental Environmental Assessment, Draft Clean Water Act Section 404(b)(1)
Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA)
Permit Application SAJ-2011-01869
Attachment B Updates to Tables and Information Presented in the Final EIS
Updated Table 4-19.
Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 100 Percent Capture at the
Horse Creek Flow Station with the Ona Mine
Year
2009
2020
2030
2040
2045
2050
2060
Annual Average
Flow (cfs)
171
171
163
166
170
175
177
Annual Average
Percent Change
from 2009 Flows
0%
0%
-5%
-3%
0%
3%
3%
Dry Season
Average Flow
(cfs)
78
77
73
75
77
79
79
Dry Season
Average Percent
Change from
2009 Flows
0%
-1%
-6%
-4%
-1%
2%
2%
Wet Season
Average Flow
(cfs)
404
410
391
399
410
422
424
Wet Season
Average Percent
Change from
2009 Flows
0%
1%
-3%
-1%
1%
4%
5%
Updated Table 4-20
Projected Flows and percent Change from 2009 Flows during Average Rainfall Year and 50 Percent Capture at the
Horse Creek Flow Station with the Ona Mine
Year
2009
2020
2030
2040
2045
2050
2060
Annual Average
Flow (cfs)
171
172
168
170
173
175
177
Annual Average
Percent Change
from 2009 Flows
0%
1%
-2%
0%
1%
2%
3%
Dry Season
Average Flow
(cfs)
78
77
76
76
78
79
79
Dry Season
Average Percent
Change from
2009 Flows
0%
0%
-3%
-1%
0%
2%
2%
Wet Season
Average Flow
(cfs)
404
411
404
409
416
422
424
Wet Season
Average Percent
Change from
2009 Flows
0%
2%
0%
1%
3%
4%
5%
Updated Table 4-21
Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 100 Percent Capture at the
Horse Creek Flow Stadium with the Ona Mine
Year
2009
2020
2030
2040
2045
2050
2060
Annual Average
Flow (cfs)
84
84
80
82
84
86
87
Annual Average
Percent Change
from 2009 Flows
0%
0%
-5%
-3%
0%
3%
3%
Dry Season
Average Flow
(cfs)
38
38
36
37
38
39
39
Dry Season
Average Percent
Change from
2009 Flows
0%
-1%
-6%
-4%
-1%
2%
2%
Wet Season
Average Flow
(cfs)
199
201
192
196
201
207
209
Wet Season
Average Percent
Change from
2009 Flows
0%
1%
-3%
-1%
1%
4%
5%
Updated Table 4-22
Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 50 Percent Capture at the
Horse Creek Flow Station with Ona Mine
Year
2009
2020
2030
2040
2045
2050
2060
Annual Average
Flow (cfs)
84
84
83
84
85
86
87
Annual Average
Percent Change
from 2009 Flows
0%
1%
-2%
0%
1%
3%
3%
Dry Season
Average Flow
(cfs)
38
38
37
38
38
39
39
Dry Season
Average Percent
Change from
2009 Flows
0%
0%
-3%
-1%
0%
2%
2%
Wet Season
Average Flow
(cfs)
199
202
198
201
205
207
209
Wet Season
Average Percent
Change from
2009 Flows
0%
2%
0%
1%
3%
4%
5%
Updated Table 4-23
Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 100 Percent Capture at the
Peace River at Arcadia Flow Station with the Ona Mine
Year
2009
2020
2030
2040
2050
2060
Annual Average
Flow (cfs)
713
726
734
750
771
782
Annual Average
Percent Change
from 2009 Flows
0%
2%
3%
5%
8%
10%
Dry Season
Average Flow
(cfs)
328
332
334
340
350
354
Dry Season
Average Percent
Change from
2009 Flows
0%
1%
2%
4%
7%
8%
Wet Season
Average Flow
(cfs)
1,657
1,698
1,738
1,779
1,829
1,858
Wet Season
Average Percent
Change from
2009 Flows
0%
3%
5%
7%
10%
12%
Updated Table 4-24
Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 50 Percent Capture at the
Peace River at Arcadia Flow Station with the Ona Mine
Year
2009
2020
2030
2040
2050
2060
Annual Average
Flow (cfs)
713
726
737
753
772
783
Annual Average
Percent Change
from 2009 Flows
0%
2%
3%
6%
8%
10%
Dry Season
Average Flow
(cfs)
328
332
335
342
351
355
Dry Season
Average Percent
Change from
2009 Flows
0%
1%
2%
4%
7%
8%
Wet Season
Average Flow
(cfs)
1,657
1,700
1,740
1,782
1,829
1,858
Wet Season
Average Percent
Change from
2009 Flows
0%
3%
5%
8%
10%
12%
Updated Table 4-25
Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 100 Percent Capture at the
Peace River at Arcadia Flow Station with the Ona Mine
Year
2009
2020
2030
2040
2050
2060
Annual Average
Flow (cfs)
330
336
340
348
358
363
Annual Average
Percent Change
from 2009 Flows
0%
2%
3%
5%
8%
10%
Dry Season
Average Flow
(cfs)
152
154
155
158
162
164
Dry Season
Average Percent
Change from
2009 Flows
0%
1%
2%
4%
7%
8%
Wet Season
Average Flow
(cfs)
766
786
805
825
848
862
Wet Season
Average Percent
Change from
2009 Flows
0%
3%
5%
8%
11%
13%
Updated Table 4-26
Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 50 Percent Capture at the
Peace River at Arcadia Flow Station with the Ona Mine
Year
2009
2020
2030
2040
2050
2060
Annual Average
Flow (cfs)
330
336
342
349
358
363
Annual Average
Percent Change
from 2009 Flows
0%
2%
4%
6%
9%
10%
Dry Season
Average Flow
(cfs)
152
154
156
159
163
165
Dry Season
Average Percent
Change from
2009 Flows
0%
1%
2%
5%
7%
9%
Wet Season
Average Flow
(cfs)
766
787
806
826
848
862
Wet Season
Average Percent
Change from
2009 Flows
0%
3%
5%
8%
11%
13%
Updated Figure 45
Peace River at Arcadia Annual Average and Seasonal Projected Flows for
Low Annual Rainfall based on 50 Percent Capture of
Excess Rainfall with and without Ona Mine
2,000
1,900
1,800
1,700
1,600
1,500
1,400
~,300
§t,200
-~,100
"O'
~1,000
~ 900
u::
Ill
:g
800
~
700
~
..
-~
~
a:
II
600
500
~ 400 ._~~~~~~~--11--~~~....~~~--~~~--11-~~~....~~~~~~~--
~ 300 200
10o
0
....~~-t1r--~~--~~--~~~~~~--
--~~~~~--111-~~
-
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
2020
2030
2040
2050
2060
-+- No Mining Dry Season
-+- No Mining Annual Average
No Mining Wet Season
~ With Ona Mine Dry Season
-
With Ona Mine Wet Season
With Ona Mine Annual Average
Updated Figure 50
Horse Creek Annual Average and Seasonal Projected Flows for
Average Annual Rainfall based on 100 Percent Capture of
Excess Rainfall with and without South Pasture Mine Extension
500
475
450
425 r-"
400
·
a
Ii'.
·
·
·
2040
2050
2060
375
350
~325
- 300 ~
0
'B 275
Qj
'§' 250
0..
3: 225
0
i:i:
200
~
175
....:
Qj
u
...5!0 150
-
:c 125 -
100
·
75
50
·
25
0
2020
-
2030
- No Mining Dry Season
-9- With SP Extension Dry Season
-+- No Mining Annual Average
-e- With SP Extension Annual Average
-+- No Mining Wet Season
With SP Extension Wet Season
Updated Figure 51
Horse Creek Annual Average and Seasonal Projected Flows for
Average Annual Rainfall based on 50 Percent Capture of
Excess Rainfall with and without South Pasture Mine Extension
500
475
450
425
400
375
350
u;-325
~
~ 300
0
'B 275
QI
·e-250 a.
~225
u::::
~
200
QI
u~ 175
...05:: 150
J: 125
100
75
50
25
0
2020
2030
- - No Mining Dry Season
-+- No Mining Wet Season
-e- With SP Extension Annual Average
2040
2050
-+- No Mining Annual Average
- - - With SP Extension Dry Season
With SP Extension Wet Season
2060
Updated Figure 52
Horse Creek Annual Average and Seasonal Projected Flows for
Low Annual Rainfall based on 100 Percent Capture of
Excess Rainfall with and without South Pasture Mine Extension
500
475
450
425
400
375
350
"V>325
u
- 300
~
0
'B 275
-
CIJ
'[ 250
0..
3: 225
0
i:i:
..:.:
200
~
175
CIJ
u
...5!0 150
I
125
100
75
50 25
0
2020
-
2030
- No Mining Dry Season
_.. With SP Extension Dry Season
2040
-+- No Mining Annual Average
-
With SP Extension Annual Average
2050
2060
-+- No Mining Wet Season
With SP Extension Wet Season
Updated Figure 53
Horse Creek Annual Average and Seasonal Projected Flows for
Low Annual Rainfall based on 50 Percent Capture of
Excess Rainfall with and without South Pasture Mine Extension
500
475
450
425
400
375
350
'iil325
~
~ 300
0
·-e 275
Cl.I
·e-250
CL.
3225
.2
~ 200
Cl.I
~ 175
u
~150
....
0
J:
125
100
75
50
25
0
2020
2030
- - No Mining Dry Season
-+- No Mining Wet Season
With SP Extension Annual Average
2040
2050
-+- No Mining Annual Average
-9- With SP Extension Dry Season
With SP Extension Wet Season
2060
Updated Figure 54
2,000
1,900
l
Peace River at Arcadia Annual Average and Seasonal Projected Flows for
Average Annual Rainfall based on 100 Percent Capture of
Excess Rajnfall with and without South Pasture Mine Extension
· ·
'-~--------_:_=--~.:.:...--m=-:~-=~~--------~-:l~------:~~---im
1,800
§
1,700
1,600
1,500
1,400
:[,300
-
~,200
0
-~ , 100
QI
"f,ooo
Q.
3: 900
0
ii: 800
....~~~--~~~~~~~~....~~~~~~~~..
~ 700 J....~~~~~~~--tt-~~~
u
<
.. 600
RI
... 500 ~
~ 400
~300
it
. .~~~~~~~--t....~~~...~~~-1t-~~~~~~~--~~~~~~~~..
200
100
0
.+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
2020
No Mining Dry Season
2030
- - - With SP Extension Dry Season
2040
-.-.. No Mining Annual Average
2050
2060
No Mining Wet Season
- - -With SP Extension Annual Average
With SP Extension Wet Season
Updated Figure 55
Peace River at Arcadia Annual Average and Seasonal Projected Flows for
Average Annual Rainfall based on 50 Perc.ent Capture of
Excess Rainfall with and without South Pasture Mine Extension
2,mm
1,900
1,800
l
-
1,700
·
·
·
·
II
2050
2060
1,600
1,500
1,400
~1,300
~
~1,200
0
'£ 1,100
Cll
·e-1,000 Q,
;: 900
0
u::
.!!!
~
800
..."'u
700
....
.."'
600
Cll
500
ct
>
~
Cll
400
u
"'
Cll
Q,
300
200 100
0
2020
2030
No Mining Dry Season
- - No Mining W et Season
. -with SP Extension Annual Average
2040
-+- No Mining Annual Average
- - -With SP Extension Dry Season
With SP Extension Wet Season
Updated Figure 56
Peace River at Arcadia Annual Average and Seasonal Projected Flows for
Low Annual Rainfall based on 100 Percent Capture of
Excess Rainfall with and without South Pasture Mine Extension
2,000
1,900
1,800
1,700
1,600
1,500
1,400
:[-300
-
~,200
0
-~,100
Qj
·1,000
~
·
3: 900
0
ii:
800
:g"'u 700
~
600
+'
"'~ 500
>
a: 400
~300 ._~~~~~~~--11-~~~....~~~--~~~~~~~~....~~~~~~~~..
if
200
--~~~~~--411-~~---~~-t1-~~~~~-t1t--~~~~~-11
100
0
+--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
2020
No Mining Dry Season
2030
- - - With SP Extension Dry Season
2040
-+- No Minfng Annual Average
2050
No Mining Wet Season
2060
- - -With SP Extension Annual Average
With SP Extension Wet Season
Updated Figure 57
Peace River at Arcadia Annual Average and Seasonal Projected Flows for
Low Annual Rainfall based on 50 Percent Capture of
Excess Rainfall with and without South Pasture Mine Extension
2,000
1,900
1,800
-
1,700
1,600
1,500
1,400
~1,300
~1,200
0
"fll,100
GI
·e-1,000
Q.
.
3 900
.!2
800
nl
:0 700
..."'u
...
ct
...nl
.c:
a::
GI
GI
u
nl
GI
Q;.
a
600
500
400
300
200
100
0
2020
2030
-+- No Mining Dry Season
No Mining Wet Season
- - - With SP Extension Annual Average
2040
2050
-+- No Mining Annual Average
~ With SP Extension Dry Season
With SP Extension Wet Season
2060
Updated Figure 90
Horse Creek Annual Average and Seasonal Projected Flows for
Average Annual Rainfall based on 100 Percent Capture of
Excess Rainfall with and without the
Three Current Actions and Two Foreseeable Actions
500
475
450
425 l....~~~~~~+-~~.........--~~-+-~~~~~~-t::_==============
400
375
350
~25
~
~300
0
~275
Ql
·0250
c;,
3225
0
&!:200
..ll::
Ql
b175 ~====:::::::::::::~======~~====::::::::::::=:=::===:::s================::t
...5:150 ~
0
:z:125
100
·
;
'
:gr---..--:_ __ ~
2020
-
- No Mining Ory Season
_.,_ Cumulative Ory Season
2030
2040
-+- No Mining Annual Average
-
cumulative Annual Average
2050
__.... No Mining Wet Season
Cumulative Wet Season
2060
Updated Figure 91
Horse Creek Seasonal and Annual Average Projected Flows for
50 Percent Capture of Excess Rainfall Case during
Average Annual Rainfall with and without the
Three Current Actions and Two Foreseeable Actions
----------
500
475
450
425
400
375
350
~25
u
';"300
c
0
'fi 275 QI
·ei50
ll.
:=225
;:;:200
..:.:
0
QI
~175
u
...5:150
0
::x:125
100
...
75 ~---=======~~====::a:=====iti~====--------------------
50
25
0
2020
No Mining Dry Season
-9-Cumulative Dry Season
2030
2040
-+- No Mining Annual Average
-
cumulative Annual Average
2050
-+-No Mining Wet Season
Cumulative Wet Season
2060
Updated Figure 92
Horse Creek Seasonal and Annual Average Projected Flows for
100 Percent Capture of Excess Rainfall Case during
Low Annual Rainfall with and without the
Three Current Actions and Two Foreseeable Actions
500
475
450
425
400
375
350
~25
~
~300
0
t 275
Ql
·02so
;;.
3225
0
iZ200
~
Ql
~175
u
...0~150
:C125 -
100
75
so
...--------------
25 .----=~======:a:======IF======-r:======-----0
+-~~~~~~~~.----~~~~~~~~~~~~~~~~~~~~~~~~~~
2020
-
- No Mining Dry Season
_.,_ Cumulative Dry Season
2030
2040
-+- No Mining Annual Average
- - - cumulat ive Annual Average
2050
-+- No Mining Wet Season
-
Cumulative Wet Season
2060
Updated Figure 93
Horse Creek Seasonal and Annual Average Projected Flows for
50 Percent Capture of Excess Rainfall Case during
Low Annual Rainfall with and without the
Three Current Actions and Two Foreseeable Actions
500
475
450
425
400
375
350
~25
-
';'300
c
..8275
u
QI
'0250
....
~
3225
0
~ 200
.:i:.
QI
~175
u
~150
~ 125
100
75
..
so 25
--~----------~l======lt==-----....i----------~~--~~~~~~~
0
2020
2030
2040
_.. - No Mining Dry Season
-+- No Mining Annual Average
...._Cumulative Dry Season
- . -cumulative Annual Average
2050
-+- No Mining Wet Season
Cumulative Wet Season
2060
Updated Figure 94
2,000
1,900
l
Peace River at Arcadia Annual Average and Seasonal Projected Flows
For Average Annual Rainfall based on 100 Percent Capture of
Excess Rainfall with and without the
Three Current Actions and One Foreseeable Action
·
1,800
ii
1,700
·
·-
·
1,600
1,500
1,400 ~,300
..!::!..
~,200
-
0
·. g,100
Cll
·~,000 CL
3 900
0
u::: 800
~"'
700
u
...
.., 600
c:(
"'~
... 500
~ 400
Cll
lil
300
Cll
CL
200
100
0
2020
2040
2030
2050
_..,_ No Mining Dry Season
~ No Mining Annual Average
No Mining Wet Season
- - -Cumulative Dry Season
-
Cumulative Wet Season
Cumulative Annual Average
2060
Updated Figure 95
Peace River at Arcadia Seasonal and Annual Average Projected
Flows for 50 Percent Capture of Excess Rainfall Case
During Average Rainfall with and without the
Three Current Actions and One Foreseeable Action
2,000 1
-- --
1,900
II
.-
1,800
1,700
1,600
1,500
-- . --
1,400
Ft 300 ~·
:£1,200
0
" 1,100
Cll
·ei,ooo
~
3: 900
0
u:::
:c"'
..."'u
~
+J
..."'Cll
.le
Cl:
Cll
800
700
600 500
400
u
"'
Cll
~
300
200
100
0
2020
2030
2040
-+- No Mining Dry Season
-+- No Mining Annual Average
- . . cumulative Dry Season
_._ Cumulative Annual Average
2050
-
- No Mining Wet Season
Cumulative Wet Season
2060
Updated Figure 96
Peace River at Arcadia Seasonal and Annual Average Projected
Flows for 100 Percent Capture of Excess Rainfall Case
During Low Annual Rainfall with and without the
Three Current Actions and One Foreseeable Action
2,000
1,900
1,800
1,700
1,600
1,500
1,400 ;a,300
~
~,200
-
0
'ij.,100
Cll
·~,000
ll.
~
0
900 -
ii: 800
IO
:g.
700
u
:t 600
~
..
... 500 ~
ii: 400 ~300 .....~~~~~~~--11--~~~--~~~--~~~~~~~~
Cll
ll.
~~~~~~~---
..
200 -
--~~~~~~--15-~~-11-~~--.--~~~~~~--~~~~~~~
100
0
-t-~~~~~~~~....-~~~~~~~-,..~~~~~~~~~~~~~~~~--1
2020
2040
2030
-+- No Mining Dry Season
~ No
- . -cumulative Dry Season
-
2050
Mining Annual Average
Cumulative Annual Average
No Mining Wet Season
-<
Cumulative Wet Season
2060
Updated Figure 97
Peace River at Arcadia Seasonal and Annual Average Projected
Flows for 50 Percent Capture of Excess Rainfall Case
During Low Annual Rainfall with and without the
Three Current Actions and One Foreseeable Action
2,000
1,900
1,800
1,700
1,600
1,500
1,400
~,300 -
-
~1,200
0
tll,100 QI
'e'i,OOO
CL
·
3: 900
0
u:: 800
"'
:0
~
~
....
..."'
QI
700 600
500
>
ii: 400
QI
u
"'
QI
300
CL
200
100
0
2020
2030
2040
2050
...,._ No Mining Dry Season
-+- No Mining Annual Average
No Mining Wet Season
_...Cumulative Dry Season
_._ Cumulative Annual Average
Cumulative Wet Season
2060
Updated Figure 4-1 6
\
;\
~
0
c5
Wi'Z
~
er
z<(
~
::E
_J
%
,_J
j::
:t:
~
~
er
en
la
CD
er
(.)
....r-:'
en
::::>
~
@
>:x:
0..
er
::::>
::E
Legend
·
IMC Rainfall Gauges in the Horse Creek Basin
SWFWMD Rainfall - 494
{)
NPDES Outfalls
·
Brushy Creek Station
·
Steward'ship Program Monitoring Stations
CSAID
O
csAs
MINE, CSAID
D
D
South Pasture CSAs
cardno_CSAs
-
Horse·Creek and Tributaries
-
Maj or Roads
-
Horse Creek and Tributaries
-
DAD
- - Hydrologic features
Manson - Jenkins Tract
CR 76 -A
lllllllllil'Ft Green Mine
[~
l
County Boundaries
HorseCreekandSubBasins
DRAINAGE BASINS
BRANDY BRANCH
'D.
BRUSHY CREEK
....
. . BUZZARD ROOST BRANCH
en
(')
er
HORSE CREEK
11111
w
WEST FORK HORSE CREEK
Mosaic_Holdings_20150316
45.000Feet
6400
This map and all data oontmed within are
supplied as is wilh no warranty. Catcho Inc.
expressly dsdaims responstility for damages
or liability frtwn any claims that may arise out
of tile USt> or misuse of Ibis map. It is the sole
responsibiiry of h! user IO determine if the
dala en !his map meets 1he user's needs. This
map was not created as 9.lf'VleY dala. nor
shotJd it be used as such. It is the user's
responsibily to obt:m proper stney data.
pepared try a icensed surwyror, -..he.re
~bylaw.
12800 Meters
Figure 1. Overview of drainage basins,
HCSP sampling locations, and
Mosaic property in the Horse Creek Basin.
·
(,..f ') Cardno
I
Shaping tile Future
3905 Crescent Park Drive
FWer.iew, Fl 3357S.3625
""· (813)664-4500
Ix (813) 664-0440
ww w.cardno.com
Coordinate System
NAO 1983UThlZone17N feel
i
I»
cc
0
=
~
3
I»
t..()
"-'
0
U1
l\;J
~
0
~
....
0
....
""
U1
0
!.-:::
C>
0
U1
""'
lO
0
n>
r.Q
D
Nov-14
Sep-1 4
Mar-14
=
~
N
~
.I
fA
fh
~
II
I
0
~__.'
I
~
wI
l:I
I
Cl
I
Oct-13
;::;
t6
Dec-13
n
d".
I»
::0
t..()
0
0
I»
=
0
C'.
~
n>
()
r.Q
Q1
IJ1
""
:::c
_.~~~-
0
QJ
Mar·13
Oec-12
Oct-1 2
Mar-12
Oct-11
.AJ.Jg. 11
,Apr-11
Nov-10
Sep-10
.A.pr-10
Oct-09
Ap r-09
Nov-CB
Sep.((!
.Apr-08
Nov-07
Sep-07
Mar-07
Nov·CE
...ld-06
.Apr-06
Dec-05
Sep-05
,A+>r-05
""
-J
=
0
...J
=
e
~
~
::r
<
.....
~n
reb·OS
0
,...,.
I»
U1
Nov-04
.Apr-04
Nov-03
..Ll-03
,A+>r-03
0
SCI Score
-...J
~
I
~
n>
..,c::
.,,
n>
a.
I»
...
a.
c:
lil HCSW-1
20
Updated Figure 4-18
18
14
11'1
11'1
Cl>
c
12
12
11'1
Cl>
uCl>
a.
rn
DHCSW-3
cHCSW~
·16
'fj
llHCSW-2
10
8
6
4
2
Sampling Event
Updated Figure 4-20. South Pasture Mine Groundwater Monitoring Water Quality Records, 2005-2017
-
i l~ ~ ~iii~~ f ~~ l l~~ ~~~ ~ ~~~~-~~ ~ ~ B 1~~iii~~~~~ 1~ ~ l~ ~ ~ ~
~
......
- ~
_....,
....
-~- ~-
·· ~
1 f\
·~
·11<1ul
~/
·.'. ,·, , . .·. ,. ···~
· . ··- . . ~ · ...
~· "~·
· · ~- -n~1 tr_'An-~
~. ' ~~10
·· l ~
J·,.
- ,..._ .. '
-
....
I
. v. \·.
·
',1
v'
t
'
I
--
-"'""' - . .__ _.. . _ --·""'°"-- --- ·-··
Source: Mosaic, 2017
_.....,.
_....,..
-·~·-
· · w:.
'
Updated Table 4-71
Chapter 4 Environmental Consequences
Table 4-71. Current Summary of Avoidance of
and Impacts to Waters of the United States for Ona Minea
Existing
(% of Mine Site)
Avoid
(% of Total)
Impact
(% of Total)
All Wetlands and Waters
(acres)
4,885
1,484
3,426
(22%)
(30%)
(70%)
Forested Wetlands (acres)
2,456
1,105
1,358
(11%)
(45%)
(55%)
2,390
378
2,032
(11%)
(16%)
(85%)
Non-forested Wetlands
(acres)
Non-stream Surface Waters
(acres)
Streams
(linear feet)
a
38.7
<1
36.2
(<1%)
(<1%)
(94%)
120,856
221,622
(55%)
Based on the November 2016 application. Values subject to change.
4-135
100,767
(45%)
Updated Table 4-83
Chapter 4 Environmental Consequences
Table 4-83. Current Summary of Upland Wildlife Habitat
Avoidance, Impact, and Reclamation for Ona Minea
Habitat Type
Rangeland
Upland Forest
Pastureland and
Row Crops
Existing
(% of Mine Site)
Avoid
(% of Total)
Impact
(% of Total)
2,858
422
2,391
(13%)
(<1%)
(84%)
6,339
1,881
4,457
(28%)
(30%)
(70%)
9,258
30
8,846
(41%)
(<1%)
(96%)
a
Based on the November 2016, application. Values subject to change.
Not under the USACE's authority.
Notes:
Values = acres
b
4-153
Reclaim
PostMining
1,491
2,055
4,191
6,346
8,460
8,490
b
Amount
Change
(% Change)
-803
(-28%)
-7
(<-1%)
-768
(-8%)
Updated Table 4-98 Ona Project with Changes
Net Impacts with Ona Alternative as Compared to No Action Alternative on
Hardee County
No Action
With Mine
Difference
Average Annual
840
1,691
851
E l
Present
Value Labor Income
$3,296,500,00 $6,145,200,00
$2,848,700,0
0
0
00
Present Value Value
$6,798,600,00
$12,622,100,00
$5,823,500,0
A
0
0
Present Value Output
$11,459,900,00 $21,266,600,00 00
$9,806,700,0
Mosaic Fertilizer, LLC
Ona Mine
ACOE 404 Permit Application
Table 2-3(a)
Mine Site
South Fort Meade
South Pasture
Totals
Waters of the U.S. Potentially Impacted by Additional Infill Parcels
Total Area of Infill
(Acres)*
717
930
1,647
Land Area to be Disturbed
(acres)**
Wetlands Proposed to be
Impacted (acres)***
717
930
1,647
Streams Proposed to be
Impacted (linear feet)***
48.5
143.38
191.88
6,030
950
6,980
*Includes areas that may be associated with future No Permit Required requests
** Estimate only-Avoidance and minimization analysis has not yet occurred
***Estimates based on preliminary information-Approved jurisdictional determinations are not available for all sites
Table 2-3(a)
DATE: 7/11/2017
G:\projects\2013\2013_0001\RAI_3_NEPA\docs\AEIS Updates\Infill Acres Summary update
Page 1 of 1
.-
Mine Boundary
-
·
F\m::hasedPareels
·
South Ft. Meade
Mine - Hardee Co.
Purchased Parcels
County Lines
C ] Roads
Section lines
1.000
2,000
4.000 Feet
User.ang Oa-te:7111f2017
Aerial: December 2016
Path: G:\prc!eccs\2016\2016_0l41\maps\Pun::hased Property.mxd
South Pasture Infill Properties
SP/SPE Mine_BoundaJies
L J lnfill
Section_liles
-
Roods
Figure 2
South Pasture
Infill Properties
Scale "in Feet
~
0 2,000
u..-
0..0&\tl015
111121h-
Table 2-3(a) Figure 2
Area Captured by Phosphate Mining
Peace and Myakka River Basins
50,000
8 Appficants' Preferred Alternatives
45,000
· Reasonably Foreseeable Future Mines
· Present Mines
40,000
·Past Mines
eu"'
ca
35,000
30,000
~
"C
...°'
'-
::::J
25,000
Q.
ca
u
ca
°'
20,000
'-
<{
15,000
10,000
5,000
0
1975
1985
1995
2005
2015
2025
2035
2045
2055
Year
Ardaman & Associates, Inc.
Updated Figure 4-24
Updated Table 4-113
Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 100 Percent Capture at the
Horse Creek Flow Station with Three Current Actions and Two Foreseeable Actions within the Horse Creek Subwatershed
Year
2009
2020
2030
2035
2040
2050
2060
Annual Average
Flow (cfs)
171
169
147
145
154
171
171
Annual Average
Percent Change
from 2009 Flows
0%
-1%
-14%
-15%
-10%
0%
0%
Dry Season
Average Flow
(cfs)
78
76
66
65
69
77
77
Dry Season
Average Percent
Change from
2009 Flows
0%
-2%
-15%
-16%
-11%
-1%
-1%
Wet Season
Average Flow
(cfs)
404
404
353
350
371
412
410
Wet Season
Average Percent
Change from
2009 Flows
0%
0%
-13%
-14%
-8%
2%
1%
Updated Table 4-114
Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 50 Percent Capture at the
Horse Creek Flow Station with Three Current Actions and Two Foreseeable Actions within the Horse Creek Subwatershed
Year
2009
2020
2030
2035
2040
2050
2060
Annual Average
Flow (cfs)
171
171
160
160
164
173
174
Annual Average
Percent Change
from 2009 Flows
0%
0%
-6%
-6%
-4%
1%
2%
Dry Season
Average Flow
(cfs)
78
77
72
72
74
78
78
Dry Season
Average Percent
Change from
2009 Flows
0%
-1%
-7%
-8%
-5%
0%
1%
Wet Season
Average Flow
(cfs)
404
408
385
385
393
417
417
Wet Season
Average Percent
Change from
2009 Flows
0%
1%
-5%
-5%
-3%
3%
3%
Updated Table 4-115
Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 100 Percent Capture at the
Horse Creek Flow Station with Three Current Actions and Two Foreseeable Actions within the Horse Creek Subwatershed
Year
2009
2020
2030
2035
2040
2050
2060
Annual Average
Flow (cfs)
84
83
72
71
76
84
84
Annual Average
Percent Change
from 2009 Flows
0%
-1%
-14%
-15%
-10%
0%
0%
Dry Season
Average Flow
(cfs)
38
37
32
32
34
38
38
Dry Season
Average Percent
Change from
2009 Flows
0%
-2%
-15%
-16%
-11%
-1%
-1%
Wet Season
Average Flow
(cfs)
199
198
174
172
182
202
202
Wet Season
Average Percent
Change from
2009 Flows
0%
0%
-13%
-14%
-8%
2%
1%
Updated Table 4-116
Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 50 Percent Capture at the
Horse Creek Flow Station with Three Current Actions and Two Foreseeable Actions within the Horse Creek Subwatershed
Year
2009
2020
2030
2035
2040
2050
2060
Annual Average
Flow (cfs)
84
84
79
79
81
85
85
Annual Average
Percent Change
from 2009 Flows
0%
0%
-6%
-6%
-4%
1%
2%
Dry Season
Average Flow
(cfs)
38
38
35
35
36
38
38
Dry Season
Average Percent
Change from
2009 Flows
0%
-1%
-7%
-7%
-5%
0%
1%
Wet Season
Average Flow
(cfs)
199
200
189
189
193
205
205
Wet Season
Average Percent
Change from
2009 Flows
0%
1%
-5%
-5%
-3%
3%
3%
Updated Table 4-117
Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 100 Percent Capture at the
Peace River at Arcadia Flow Station with Three Current Actions and One Foreseeable Action
Year
2009
2020
2030
2040
2050
2060
Annual Average
Flow (cfs)
713
724
732
749
769
776
Annual Average
Percent Change
from 2009 Flows
0%
2%
3%
5%
8%
9%
Dry Season
Average Flow
(cfs)
328
331
332
340
349
352
Dry Season
Average Percent
Change from
2009 Flows
0%
1%
1%
4%
6%
7%
Wet Season
Average Flow
(cfs)
1,657
1,695
1,733
1,777
1,824
1,846
Wet Season
Average Percent
Change from
2009 Flows
0%
2%
5%
7%
10%
11%
Updated Table 4-118
Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 50 Percent Capture at the
Peace River at Arcadia Flow Station with Three Current Actions and One Foreseeable Action
Year
2009
2020
2030
2040
2050
2060
Annual Average
Flow (cfs)
713
725
736
753
771
780
Annual Average
Percent Change
from 2009 Flows
0%
2%
3%
6%
8%
9%
Dry Season
Average Flow
(cfs)
328
332
335
342
350
354
Dry Season
Average Percent
Change from
2009 Flows
0%
1%
2%
4%
7%
8%
Wet Season
Average Flow
(cfs)
1,657
1,699
1,738
1,781
1,826
1,852
Wet Season
Average Percent
Change from
2009 Flows
0%
3%
5%
8%
10%
12%
Updated Table 4-119
Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 100 Percent Capture at the
Peace River at Arcadia Flow Station with Three Current Actions and One Foreseeable Action
Year
2009
2020
2030
2040
2050
2060
Annual Average
Flow (cfs)
330
336
340
348
357
361
Annual Average
Percent Change
from 2009 Flows
0%
2%
3%
5%
8%
9%
Dry Season
Average Flow
(cfs)
152
154
154
158
162
163
Dry Season
Average Percent
Change from
2009 Flows
0%
1%
2%
4%
7%
8%
Wet Season
Average Flow
(cfs)
766
784
803
824
846
856
Wet Season
Average Percent
Change from
2009 Flows
0%
2%
5%
8%
10%
12%
Updated Table 4-120
Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 50 Percent Capture at the
Peace River at Arcadia Flow Station with Three Current Actions and One Foreseeable Action
Year
2009
2020
2030
2040
2050
2060
Annual Average
Flow (cfs)
330
336
341
349
358
362
Annual Average
Percent Change
from 2009 Flows
0%
2%
3%
6%
8%
10%
Dry Season
Average Flow
(cfs)
152
154
155
159
163
164
Dry Season
Average Percent
Change from
2009 Flows
0%
1%
2%
5%
7%
8%
Wet Season
Average Flow
(cfs)
766
786
805
826
847
859
Wet Season
Average Percent
Change from
2009 Flows
0%
3%
5%
8%
11%
12%
Updated Table 4-130
Table 4-130. Combined Currently Proposed Impacts of Applicants'
Preferred Alternatives on Ecological Resourcesa
Ecological Resource
Existing
Impacted
Total Wetlandsb (acres)
11,965
7,978
Total Stream Lengthb (linear feet)
461,374
197,852
Total Native Uplandsc(acres)
14,110
11,301
Total Upland Wildlife Habitatd (acres)
38,770
31,529
Notes:
a Based on the applications and approvals as of June 2017. Values subject to change.
b USACE-jurisdictional (natural and ditched natural streams)
c Rangelands and Upland Forests
d Native Uplands and Pasturelands
Updated Table 4-137. Net Impacts for Hardee County with Ona
and South Pasture Extension Mines and the Pioneer Tract
No Action
With Mines
Difference
Average Annual Employment
840
2157
1317
Present Value Labor Income
$3,296,500,000
$7,283,300,000
$3,986,800,000
Present Value, Value Added
$6,798,600,000
$14,950,900,000
$8,152,300,000
Present Value Output
$11,459,900,000
$25,189,000,000 $13,729,100,000
Updated Table 4-139. Net Impacts based on Desoto, Wingate East,
South Pasture Extension, and Ona Mines plus the Pine Level/Keys and
Pioneer Tracts Compared to the No Action Alternative
No Action
With Mines
Difference
Average Annual Employment
2053
7853
5800
Present Value Labor Income
$6,706,500,000
$20,313,200,000 $13,606,700,000
Present Value, Value Added
$13,180,900,000
$39,784,100,000 $26,603,200,000
Present Value Output
$22,704,500,000
$68,594,600,000 $45,890,100,000
Note: No changes were made to the original No Action Alternative found in the Final EIS.
Supplemental Environmental Assessment, Draft Clean Water Act Section 404(b)(1)
Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA)
Permit Application SAJ-2011-01869
Attachment C November 27, 2017 MFR documenting
'no effect' determination for the manatee
CESAJ-RD-W
November 27, 2017
MEMORANDUM FOR CESAJ-RD-W
SUBJECT: Determination of Effects on West Indian Manatee for DA File Number SAJ2011-01869/Mosaic Ona Phosphate Mine
1. REFERENCE: Section 7 of the Endangered Species Act (ESA), as amended; 50
C.F.R. part 402
2. PURPOSE: This memorandum documents the Corps' effects determination under
Section 7 of the ESA for the West Indian manatee (manatee) for DA File Number SAJ2011-01869. Specifically, this memorandum describes how the Corps considered the
proposed Ona phosphate mine's potential for direct, indirect, and cumulative effects on
the manatee and manatee habitat, including sections of Horse Creek, the Peace River,
and Charlotte Harbor. In addition, this memorandum documents the Corps'
consideration of information presented in a "Sixty-Day Notice of Endangered Species
Act Violations Concerning the Federally Threatened Florida Manatee (Trichechus
manatus latirostris) in the Central Florida Phosphate District and South Pasture Mine
Extension Project Area" dated October 6, 2017, and related Addendum (collectively,
"Sixty-Day Notice").
3.
BACKGROUND:
a) The Ona project is located inland approximately 36 miles (58 km) upstream from the
mouth of the Peace River with Charlotte Harbor, and approximately 17 miles north (as
measured in a straight line) of the closest areas in Horse Creek and the Peace River
designated by the United States Fish and Wildlife Service (USFWS) as critical habitat
for the West Indian manatee1.
b) The Corps' Final Areawide Environmental Impact Statement for phosphate mining in
the Central Florida Phosphate District (Final EIS), issued 26 April 2013, notes in
Chapter 3 that manatees have the potential to be found within the Final EIS study area.
However, manatees were among the federally listed species that the Corps concluded
were not expected "to have a high probability of occurrence on the mine site based on
the findings of past surveys and the types and qualities of the habitats that exist on the
mine site, or are expected to be directly, indirectly, or cumulatively impacted by the
proposed actions." See Final EIS at page 4-174.
As shown on the USFWS webpage "Critical Habitat for Threatened & Endangered
Species" https://fws.maps.arcgis.com/home/webmap/viewer.html?webmap=9d8de5e265ad4fe09
893cf75b8dbfb77
1
Section 4.2.3 of the Final EIS2 describes the expected direct and indirect effects of Ona
on surface water resources, including Horse Creek (Section 4.2.3.2) and the Peace
River at Arcadia (Section 4.2.3.3). As stated in Section 4.2.3.4 of the Final EIS, the
Corps determined that Ona would have a minor, insignificant degree of direct and
indirect impact on the Peace River and Charlotte Harbor, and with mitigation3 a minor,
insignificant degree of direct and indirect impact on Horse Creek. Section 4.2.3.4 of the
Final EIS also describes possible mitigation measures such as recharge ditches and
wells, and monitoring of flows in Horse Creek.
Section 4.4.4 of the Final EIS describes the expected direct and indirect effects of Ona
on water quality. As stated in that section, the Corps determined that Ona would have a
minor to moderate, insignificant degree of direct and indirect impact on Horse Creek,
the Peace River and Charlotte Harbor.
Section 4.12.2 of the Final EIS4 describes the expected cumulative effects of Ona, plus
the three other then-proposed actions, the two reasonably foreseeable future actions,
and other past, present, and reasonably foreseeable future actions, on surface water
resources, including Horse Creek (Section 4.12.2.1), the Peace River at Arcadia
(Section 4.12.2.2), and Charlotte Harbor (Section 4.12.2.4). As stated in Section
4.12.2.6, Ona and the other actions considered would have a minor, insignificant
cumulative effect on the Peace River and Charlotte Harbor, and without mitigation, and
moderate, significant cumulative effect on Horse Creek. However, with mitigation, as
stated in 4.12.2.7, the cumulative effect on Horse Creek will be minor and insignificant.
Section 4.12.4 of the Final EIS describes the expected cumulative effects of Ona, plus
the three other then-proposed actions, the two reasonably foreseeable future actions,
and other past, present, and reasonably foreseeable future actions, on surface water
quality, including Horse Creek, the Peace River at Arcadia, and Charlotte Harbor. With
mitigation, Ona and the other actions considered would have a minor, insignificant
cumulative effect on water quality in Horse Creek, the Peace River at Arcadia, and
Charlotte Harbor.
c) On 26 September 2017, the Corps provided the USFWS with a revised Biological
Assessment (BA) as part of its ongoing coordination under Section 7 of the ESA, along
with a summary of project changes since the 01 June 2012 public notice for Ona.
The BA provided information on the species for which the Corps had made `may affect'
determinations (the caracara, woodstork, and eastern indigo snake) and `may affect, not
Including the updated surface water analyses from the 01 July 2013 Addendum to the
Final EIS
3
"Mitigation" as used here refers to avoiding, minimizing, or offsetting impacts to
environmental resources, as described in Section 5.1 of the Final EIS and as defined for
NEPA in 40 CFR 1508.20.
4
Also including the updated surface water analyses from the 01 July 2013 Addendum
to the Final EIS
2
2
likely to adversely affect' determinations (the Florida panther, Florida grasshopper
sparrow, and Florida scrub-jay), as well as information on the Florida bonneted bat,
based on the documented or potential occurrence of these species or their habitat on
the Ona site or within the Ona site's action areas for these species, and the potential for
activities associated with Ona to affect these species.
The summary of changes included a statement that based on updates to several of the
direct, indirect, and cumulative impact analyses (which included the surface water
analyses described above), the Corps' preliminary findings were that the project
changes have either led to no changes in the determinations of degree of effect and
significance made in the Final EIS, or have led to reduced effects.
d) On 06 October 2017, the Corps received the Sixty-Day Notice, which includes a
report of manatees observed on 20 August 2017 in Horse Creek, approximately six
miles south of the Ona project.
4. DISCUSSION: Based on the analyses described in the Background section above
that show that Ona would have at most a minimal direct, indirect, or cumulative effect on
surface water flows and water quality in Horse Creek (with mitigation), the Peace River,
and Charlotte Harbor, Ona will not directly or indirectly affect the manatee, or
destroy/adversely modify the manatee's designated critical habitat. Therefore, the Corps
reached a `no effect' determination for the manatee. Under the ESA regulations and the
U.S. Fish and Wildlife Service's (FWS) and National Marine Fisheries Service's (NMFS)]
March 1998, Section 7 Consultation Handbook, for those projects where the Corps
makes a finding of `no effect', nothing more will need to be done regarding consultation
with the appropriate Service5.
The Corps' review of the information presented in the Sixty-Day Notice has not altered
this determination. While the report of manatees in Horse Creek is new information, it is
not information that reveals effects of the action that may affect listed species or critical
habitat in a manner or to an extent not previously considered. The presence of
manatees in Horse Creek does not alter the results of the analyses of Ona's effects on
surface water flows and water quality in Horse Creek (with mitigation), the Peace River,
and Charlotte Harbor, as described in the Background section. Conversely, based on
the Corps' determination that with mitigation, Ona will not significantly affect surface
water flows and water quality in Horse Creek and the other waterbodies considered, the
project will have no effect on manatees in those waterbodies, regardless of how
frequently they are present there, or on the sections of those waterbodies designated as
critical habitat.
In consideration of the level of public interest in the Ona project, the Corps will provide a
copy of this `no effect' memorandum to the USFWS. In addition, the Corps will make
As described on the Jacksonville District, Regulatory Division's website, at
http://www.saj.usace.army.mil/Missions/Regulatory/Source-Book/
3
5
this memorandum and documents associated with the Corps' provision of the
memorandum to the USFWS part of the Ona record.
5. CONCLUSION: Based on information presented to date, including the information
presented in the Sixty-Day Notice, for the Ona project the Corps has reached a `no
effect' determination for the manatee.
Prepared by:
John Fellows
Team Leader
SAJ-RD Mining Team
4