Supplemental Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869; Mosaic – Ona Phosphate Mine

TO WHOM IT MAY CONCERN: The Regulatory Division, Jacksonville District, U.S. Army Corps of Engineers (Corps) is circulating this notice to provide the public with a supplemental environmental assessment, draft Clean Water Act (CWA) Section 404(b)(1) Guidelines analysis, and draft public interest review for DA permit application SAJ-2011-01869; Mosaic – Ona Phosphate Mine.

BACKGROUND AND PURPOSE: The Corps issued the original public notice for DA Permit Application SAJ-2011-01869 on June 1, 2012. On May 3, 2013, the U.S. Army Corps of Engineers (Corps), U.S. Environmental Protection Agency (EPA), and Florida Department of Environmental Protection (FDEP) published a notice of availability for the Final Areawide Environmental Impact Statement on Phosphate Mining in the Central Florida Phosphate District (Final EIS). The scope of action for the Final EIS includes Department of the Army (DA) Permit Application SAJ-2011-01869. See Final EIS page 1-21 to 1-31. On July 12, 2013, the Corps, EPA, and FDEP published an Addendum to the Final EIS. The Final EIS and the Addendum are available at: http://www.saj.usace.army.mil/Missions/Regulatory/Items-of-Interest/

The Final EIS states, "A draft of the Section 404(b)(1) and public interest review analyses for each project will be made available for public review and comment." See e.g., Final EIS page 5-2. Therefore, the Corps is exercising its discretion pursuant to the CWA (33 U.S.C. § 1344(a)), the National Environmental Policy Act (NEPA) (40 C.F.R. § 1506.6), and its public interest review (33 C.F.R. § 320.4), to provide additional opportunity for public review and comment on the draft CWA Section 404(b)(1) Guidelines analysis and public interest review for DA Permit Application SAJ-2011-01869. Furthermore, pursuant to 40 C.F.R. §§ 1501.3(b) and 1502.9(c)(2), the Corps is also exercising its discretion to prepare an environmental assessment (EA) on DA Permit Application SAJ-2011-01869 in order to assist with the permit decision and further the purposes of NEPA. This draft analysis does not include any of the final determinations required by the CWA Section 404(b)(1) Guidelines or the public interest review as the Corps cannot make such determinations until the conclusion of the permit application review process. Comments made in response to this notice will be considered in making those final determinations. The conclusions of the CWA Section 404(b)(1) analysis and public interest review will be published in the record of decision and statement of findings (RODSOF) for DA Permit Application SAJ-2011-01869. The Corps plans to adopt the Final EIS and this EA in the RODSOF.

Attached to this Public Notice are a copy of the EA/draft 404(b)(1) Guidelines analysis/draft public interest review document and its attachments.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer by e-mail to pn.comment.ona@usace.army.mil, or by mail to 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610, within 30 days from the date of this notice.

QUESTIONS concerning this application should be directed to the project manager, John Fellows, in writing at the West Branch Mining Team, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at john.p.fellows@usace.army.mil; by facsimile transmission at (813)769-7061; or, by telephone at (813)769-7070.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 10117 PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA 33610

January 12, 2018

REPLY TO ATTENTION OF

Regulatory Division

PUBLIC NOTICE Permit Application Number: SAJ-2011-01869 (IP-JPF) Supplemental Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869; Mosaic ­ Ona Phosphate Mine TO WHOM IT MAY CONCERN: The Regulatory Division, Jacksonville District, U.S. Army Corps of Engineers (Corps) is circulating this notice to provide the public with a supplemental environmental assessment, draft Clean Water Act (CWA) Section 404(b)(1) Guidelines analysis, and draft public interest review for DA permit application SAJ-2011-01869; Mosaic ­ Ona Phosphate Mine. BACKGROUND AND PURPOSE: The Corps issued the original public notice for DA Permit Application SAJ-2011-01869 on June 1, 2012. On May 3, 2013, the U.S. Army Corps of Engineers (Corps), U.S. Environmental Protection Agency (EPA), and Florida Department of Environmental Protection (FDEP) published a notice of availability for the Final Areawide Environmental Impact Statement on Phosphate Mining in the Central Florida Phosphate District (Final EIS). The scope of action for the Final EIS includes Department of the Army (DA) Permit Application SAJ-2011-01869. See Final EIS page 1-21 to 1-31. On July 12, 2013, the Corps, EPA, and FDEP published an Addendum to the Final EIS. The Final EIS and the Addendum are available at: http://www.saj.usace.army.mil/Missions/Regulatory/Items-of-Interest/ The Final EIS states, "A draft of the Section 404(b)(1) and public interest review analyses for each project will be made available for public review and comment." See e.g., Final EIS page 5-2. Therefore, the Corps is exercising its discretion pursuant to the CWA (33 U.S.C. § 1344(a)), the National Environmental Policy Act (NEPA) (40 C.F.R. § 1506.6), and its public interest review (33 C.F.R. § 320.4), to provide additional opportunity for public review and comment on the draft CWA Section 404(b)(1) Guidelines analysis and public interest review for DA Permit Application SAJ-201101869. Furthermore, pursuant to 40 C.F.R. §§ 1501.3(b) and 1502.9(c)(2), the Corps is also exercising its discretion to prepare an environmental assessment (EA) on DA Permit Application SAJ-2011-01869 in order to assist with the permit decision and further the purposes of NEPA. This draft analysis does not include any of the final determinations required by the CWA Section 404(b)(1) Guidelines or the public interest review as the Corps cannot make such determinations until the conclusion of the permit application review process. Comments made in response to this notice will be considered in making those final determinations. The conclusions of the CWA Section 404(b)(1) analysis and public interest review will be published in the record of decision

and statement of findings (RODSOF) for DA Permit Application SAJ-2011-01869. The Corps plans to adopt the Final EIS and this EA in the RODSOF. Attached to this Public Notice are a copy of the EA/draft 404(b)(1) Guidelines analysis/draft public interest review document and its attachments. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer by e-mail to pn.comment.ona@usace.army.mil, or by mail to 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610, within 30 days from the date of this notice. QUESTIONS concerning this application should be directed to the project manager, John Fellows, in writing at the West Branch Mining Team, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at john.p.fellows@usace.army.mil; by facsimile transmission at (813)769-7061; or, by telephone at (813)769-7070.

2

CESAJ-RD-W SAJ-2011-01869 (IP-JPF) Supplemental Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 1) Background: On May 3, 2013, the U.S. Army Corps of Engineers (Corps), U.S. Environmental Protection Agency (EPA), and Florida Department of Environmental Protection (FDEP) published a notice of availability for the Final Areawide Environmental Impact Statement on Phosphate Mining in the Central Florida Phosphate District (Final EIS). The scope of proposed action analyzed in the Final EIS includes Department of the Army (DA) Permit Application SAJ-2011-01869. See Final EIS page 1-21 to 1-31. On July 12, 2013, the Corps, EPA, and FDEP published an Addendum to the Final EIS. The Final EIS and the Addendum are available at: http://www.saj.usace.army.mil/Missions/Regulatory/Items-ofInterest/ The Final EIS states, "A draft of the Section 404(b)(1) and public interest review analyses for each project will be made available for public review and comment." See e.g., Final EIS page 5-2. Therefore, the Corps is exercising its discretion pursuant to the Clean Water Act (CWA) (33 U.S.C. § 1344(a)), the National Environmental Policy Act (NEPA) (40 C.F.R. § 1506.6), and its public interest review (33 C.F.R. § 320.4), to provide additional opportunity for public review and comment on the draft CWA Section 404(b)(1) Guidelines analysis and public interest review for DA Permit Application SAJ2011-01869. Furthermore, pursuant to 40 C.F.R. §§ 1501.3(b) and 1502.9(c)(2), the Corps is also exercising its discretion to prepare an environmental assessment (EA) on DA Permit Application SAJ-2011-01869 in order to assist with the permit decision and further the purposes of NEPA. Because there have been no substantial changes to the proposed action that are relevant to environmental concerns and no significant new circumstances or information since the project was analyzed in the Final EIS, supplemental NEPA was not required under 40 C.F.R. § 1502.9(c)(1). However, this EA discloses changes to the proposed action that have occurred since the Final EIS (in Section 2.d), and considers any potential impacts associated with such changes (in Section 5. This draft analysis does not include any of the final determinations required by the CWA Section 404(b)(1) Guidelines or the public interest review as the Corps cannot make such determinations until the conclusion of the permit application review process. Comments made in response to this notice will be considered in making those final determinations. The conclusions of the CWA Section 404(b)(1) analysis and public interest review will be published in the record of decision and statement of findings (RODSOF) for DA Permit Application SAJ-2011-01869. The Corps plans to adopt the Final EIS, Addendum, and this EA in the RODSOF.

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

2) Application: a) Applicant:

Mosaic Fertilizer, LLC 13830 Circa Crossing Drive Lithia, FL 33547

b) Location: The Ona Mine property consists of approximately 22,483 acres located in Sections 4, 8 through 12, 19, 22 through 31, and 36, Township 34 South, Range 23 East; Sections 14 through 23, and 26 through 33, Township 34 South, Range 24 East; and Sections 4 and 5, Township 35 South, Range 24 East, in Hardee County, Florida. The majority of the project area is within the Peace River watershed (HUC 03100101), with approximately 300 acres within the Myakka River watershed (HUC 03100102). There are eight stream basins onsite: the Myakka River, the West Fork of Horse Creek, Oak Creek, Troublesome Creek, Brady Creek, Brushy Creek, Hickory Creek, and Horse Creek. The latter seven are all tributaries to the Peace River. c) Proposed Work: The applicant requests a 30-year construction window to mine phosphate ore from approximately 16,842 acres1 of property in Hardee County, Florida. The applicant proposes mining operations to extract the phosphate ore reserves on the proposed Ona Mine for approximately 24 years, and approximately six additional years to complete the reclamation and mitigation construction. The applicant proposes to process the mined ore at both the South Pasture Extension beneficiation plant and the Four Corners beneficiation plant. The applicant proposes to expand the capacity at the South Pasture plant to handle the additional ore from Ona. Ona is within the ten-mile practicable pumping distance described in Section 3.1.5 of the Final EIS, and Mosaic can construct the necessary pipelines and other infrastructure across areas previously permitted for phosphate mining (South Pasture and South Pasture Extension Mines), as shown on Attachment A ­ Figure 11.

The applicant proposes to disturb a total of 18,776 acres, including the 16,842 acres of mining. 1

2

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

To transport material to and from the Four Corners plant, Mosaic proposes to utilize an existing "operations corridor" (As shown on Attachment A ­ Figure 1) that crosses areas previously permitted for mining, and construct a new `pre-washer' facility between Ona and Four Corners. This plan extends the operational life of the South Pasture plant by 21 years, and of the Four Corners plant by 14 years. Upon completion of mining operations, the applicant proposes to reclaim all land disturbed by mining operations and establish some areas as wetlands mitigation as described below in Section 9.c of this EA. The applicant proposes a total of approximately 3426.1 acres of impact to Corps-jurisdictional wetlands, including 1357.87 acres of forested wetland impacts and 2068.27 acres of herbaceous wetland impacts. By watershed, 38.54 acres of the total wetland impacts (10.27 acres forested, 28.27 acres herbaceous) are within the Myakka River watershed, and the remainder are within the Peace River watershed. All of the stream impacts are within the Peace River watershed. The applicant also proposes approximately 100,766.8 linear feet of impact to Corps-jurisdictional streams. The jurisdictional impacts include up to 14 acres of temporary impacts to WOUS for necessary consolidated dragline and infrastructure corridor crossings of an un-named tributary to Brushy Creek, Horse Creek, and West Fork Horse Creek. Construction of these crossings would result in a total up to 12 acres of temporary impacts to forested wetlands, up to 2 acres of temporary impacts to herbaceous wetlands, and 1,794 linear feet of temporary impacts to streams. Section 9.c of this EA describes the applicant's plan for compensatory mitigation of these impacts to waters to the United States. d) Project Changes Since the June 1, 2012, Public Notice and the Final EIS: i. The applicant avoided an additional 2250 acres of area overall; 3707 acres currently versus 1457 acres. ii. The applicant reduced the impacts to Corps-jurisdictional wetlands from 4615 acres to 3426.1 acres, which includes a reduction in forested wetland

3

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

impacts from 1823.8 acres to 1357.87 acres and a reduction in herbaceous wetland impacts from 2796.6 acres to 2068.27 acres. iii. The applicant reduced the impacts to Corps-jurisdictional streams from 136,731 linear feet to 100,766.8. iv. The applicant reduced the number of crossings of West Fork Horse Creek from two to one. v. The applicant eliminated the on-site beneficiation plant, and now proposes to transport mined ore from the western portion of Ona to the Four Corners beneficiation plant, via an existing "operations corridor" and a proposed `pre-washer' facility, and transport ore from the eastern portion of Ona to an expanded-capacity South Pasture beneficiation plant. vi. The applicant added approximately 160 acres of proposed mining in an area adjacent to the West Fork of Horse Creek, as shown on the attached Attachment A ­ Figure 2 (identified as the Parks-Beckley Parcel), which allowed for the reconfiguration of the clay settling areas in that area and additional avoidance of impacts to aquatic resources. vii. The applicant has updated the compensatory mitigation plan to address the Corps' technical review of its proposed UMAM functional analysis, provisions for long-term management of the mitigation areas, and financial assurances for mitigation implementation and long-term management. viii. The applicant has provided updated analyses of direct, indirect and cumulative impacts associated with the Ona Mine, which the Corps has independently evaluated as it has conducted its review of the proposed work in accordance with NEPA, the 404(b)(1) Guidelines, and the public interest review factors, as described in Sections 5, 6, and 7 of this EA. 3) Authority: Section 404 of the Clean Water Act of 1972 (33 U.S.C. § 1344) a) Jurisdictional Determination Information: The Corps issued an approved jurisdictional determination for the project, as then proposed, on July 23, 2013. The Corps issued an approved jurisdictional determination for the 160-acre addition on August 3, 2017.

4

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

4) Draft Clean Water Act Section 404(b)(1) Alternatives Analysis a) Basic and Overall Project Purpose and Need: Basic: To extract phosphate ore. Overall: To extract phosphate ore from the mineral reserves located in the Central Florida Phosphate District (CFPD) and to construct the associated infrastructure required to extract and process the phosphate ore at separation/beneficiation facilities recognizing that the ore extracted must be within a practicable distance to a new or existing beneficiation plant. Public Need: Section 1.2.1 of the Final EIS describes the public's general need. Applicant's Need: Section 1.2.2 of the Final EIS describes the applicant's general need. In addition, in the most recent (November 14, 2016) update to the Ona permit application the applicant provided the following statements about the specific need for the proposed project at an overall operational level and at a project specific level. That submittal is included by reference, including any sections described in the quoted language below (in italics): Overall Need: Mosaic currently operates the Four Corners, South Fort Meade, South Pasture, and Wingate Creek Mines in the CFPD to meet its phosphate rock needs (Final EIS page 2-6). The Final EIS estimated that Mosaic produces an average of 17.1 million short tons of phosphate rock per year (MTPY) at its CFPD mines as follows: Four Corners ­ 6.1 MTPY; Hookers Prairie (closed in 2014) ­ 1.9 MTPY; South Fort Meade ­ 4.3 MTPY; South Pasture ­ 3.5 MTPY; and Wingate Creek ­ 1.3 MTPY (Final EIS Table 1-3). The Final EIS acknowledged that these estimated production rates were calculated based on mining at 85 percent of capacity and that actual production rates may fluctuate from year to year. (If production rates were calculated based on mining at 100% capacity, the total production rate would be 19.6 MTPY.) Mosaic needs to maintain its overall annual production levels in order to keep its place in the global phosphate product market and thereby remain a competitive and reliable supplier of phosphate products. The Hookers

5

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

Prairie Mine completed extraction of its permitted reserves in 2014. All four of Mosaic's remaining CFPD mines are projected to complete extraction of permitted ore reserves between the end of 2020 and 2025 (Final EIS pages 1-15 to 1-16). In order to maintain an uninterrupted annual average production rate of approximately 17.1 MTPY of phosphate rock and thereby ensure a continuous supply of phosphate rock beyond 2020, Mosaic has developed a comprehensive ore reserves development plan, which consists of: (1) extending mining operations onto the South Pasture Extension beginning in 2017 ­ approximately 3.5 MTPY 2; (2) developing the western portion of the Ona Mine reserves beginning in 2017 ­ approximately 5.9 MTPY and the eastern portion of the Ona Mine reserves beginning in 2020 ­ approximately 3.8 MTPY; (3) extending the mining operations onto the Wingate East reserves beginning in 2017 ­ approximately 1.3 MTPY 3; and (4) developing the DeSoto Mine reserves after 2020 ­ initially at approximately 2.6 MTPY. The plan includes continued use of the Four Corners plant, expansion of the capacity of the South Pasture plant, recent upgrades to increase capacity of the Wingate plant, and construction of a new plant at DeSoto. The final, future stage of the CFPD development plan will be to develop the Pioneer and Pine Level/Keys reserves, beginning in approximately 2040. The mine development sequence is based upon those factors that determine which mines can produce phosphate rock when and where needed, and involve consideration of logistics, production needs, and projected phosphate rock demand. Implementation of the ore reserves development plan will provide Mosaic with the phosphate rock needed to supply its existing concentrates/fertilizer plants beyond 2020 at current production levels. Project Specific Need: The Ona Mine has been planned to replace the Four Corners and South Fort Meade mines as those mines complete extraction of reserves, thereby maintaining an uninterrupted phosphate rock supply to meet projected demand. In 2014, Mosaic purchased the phosphate business assets of CF, including the South Pasture and South The Corps' November 10, 2016, Record of Decision-Statement of Findings for SPE considered an annual need of 3.37 MTPY. 3 The Corps' June 22, 2017 Supplemental Environmental Assessment for Wingate East considered an annual need of 1.7 MTPY. 2

6

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

Pasture Extension ore reserves, as well as the South Pasture beneficiation plant, all of which adjoin the Ona Mine. The proposed Ona Mine's location adjacent to the existing Four Corners and South Pasture mines allows Mosaic to maximize efficiencies by using the existing beneficiation plants at those mines for the Ona Mine project. Rather than construct a new beneficiation plant at the Ona Mine site as previously proposed, Mosaic proposes to process ore reserves from the western portion of the Ona Mine (West Ona) at the Four Corners plant, and to process reserves from the eastern portion of the Ona Mine (East Ona) at the South Pasture plant. Mosaic proposes to begin mining activities on the Ona site in 2017 and continue for approximately 24 years 4. Mosaic would begin mining West Ona in 2017 to replace decreasing Four Corners reserves, and would begin mining East Ona in 2020 to replace decreasing South Fort Meade reserves. Mosaic proposes to expand the capacity of the South Pasture beneficiation plant, which will process reserves from both East Ona as well as Mosaic's now operational South Pasture and South Pasture Extension Mines (simultaneously, at times). Timely development of the Ona Mine is necessary for Mosaic to continue supplying its customers in the United States and over 40 countries with phosphate fertilizer and feed supplements beyond 2017. CSA requirements are ore reserve-specific. At the Ona Mine, the extent of recoverable phosphate rock reserves would be limited by CSA siting constraints described in subsection 1.5.5.3 below. Each ton of phosphate rock produced from the Ona Mine would generate 1.51 dry tons of claysized minerals. Given that each acre of land mined at Ona would yield approximately 9,925 tons of phosphate rock product, recovery and separation of the phosphate rock from one acre would require about 33 acre-feet of CSA capacity. The applicant has also stated that the total expected production from the Ona Mine, based on their currently proposed mine plan (the Applicant's Preferred Alternative described in Section 4.e.i of this EA), is 178 million tons of phosphate. To help replace production from the Four Corners and South Fort Meade mines, the Applicant states that it needs to produce a minimum average of 6 MTPY from the Ona Mine for approximately 24 years. 4

7

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

As stated in 33 CFR Part 325, Appendix B, when defining the purpose and need for a project "while generally focusing on the applicant's statement, the USACE will in all cases, exercise independent judgment in defining the purpose and need for the project from both from the applicant's and the public's perspective." Therefore, the Corps independently reviewed and verified the information in the applicant's statements of need. Section 1.2.1 of the Final EIS includes the information about yearly overall production rates and the plan of mine succession. The Corps determined that this information is valid, and will use it in its alternatives analysis. To independently review and verify the applicant's statement about the project-specific production needed for the Ona project (6 mtpy for 24 years), the Corps evaluated data from the publicly available 10-K Reports, as developed pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934, for the Four Corners and South Fort Meade Mines. The reports provide production data for Four Corners of 7.37 million tons in 2011, 8.14 million tons in 2012, 7.04 million tons in 2013, 5.94 million tons in 2014, 6.27 million tons in 2015, and 5.83 million tons in 2016, which averages out to 6.76 mtpy over that six-year period. For South Fort Meade, the reports show production data for South Fort Meade of 6.05 million tons in 2013, 4.51 million tons in 2014, 4.73 million tons in 2015, and 4.62 million tons in 2016 5, for a four-year average of 4.98 mtpy. The combined average annual production for the Four Corners and South Fort Meade Mines is approximately 11.74 mtpy. The applicant has stated that they will rely on multiple mines to replace this production level, including a proposed minimum average of 6 mtpy from the Ona Mine. Based on the verified production data and the applicant's statement of need, the Corps will consider a need for 6 mtpy for 24 years, or a total of The South Fort Meade Mine operated only part of year in 2011 and 2012 due to litigation, therefore the Corps did not consider these years' production values to be representative and did not include them in the analysis. 5

8

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

144 million tons of phosphate recovered, in its alternatives analysis for this project. b) Water Dependency Determination: Because the project's basic purpose, extracting phosphate ore, does not require siting within a water of the U.S., the proposed discharge is not water dependent. c) Functional Alternatives: Section 2.2.6 of the Final EIS describes how the Corps considered functional alternatives to the proposed activity, such as using dredges instead of draglines, replacing phosphate-based fertilizers with other types of fertilizers, and importing phosphate rock from outside of the Central Florida Phosphate District. As described in that section, the Corps did not consider any of these alternatives to be reasonable under NEPA, and therefore did not carry them forward for further consideration. Based on the analysis of these functional alternatives in Section 2.2.6 of the Final EIS, the Corps has also determined that none of them are practicable alternatives pursuant to 40 CFR 230.10(b)(2). d) Offsite/Avoidance Alternatives Screening Process and Criteria: Section 2.2.4.1 and Appendix B of the Final EIS describe the screening process for offsite, or avoidance, alternatives used for the Final EIS. The Corps' project-specific evaluation of offsite alternatives under Clean Water Act Section 404(b)(1) began with the list of parcels identified in the Final EIS: Pioneer Tract, Desoto, Pine Level/Keys Tract, Site A-2, Site W-2, and Wingate East 6. 40 CFR 230.10(b)(2) states "An alternative is practicable if it is available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes." Section 3.1.5 of the Final EIS discusses a ten-mile practicable pumping distance for transporting material to and from a phosphate beneficiation The Corps issued a permit for the South Pasture Extension Mine project on November 15, 2016, therefore this alternative from the Final EIS is not part of the alternatives analysis. Although there is an active DA permit application review in progress for the Wingate East Mine (SAJ-2009-03221), the Corps has not yet made a final permit decision on that application, and therefore the Corps considers it to be an available alternative. 6

9

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

plant. However, in situations where the applicant can construct an intermediate, `pre-washer' facility between the mine and the plant has a nearby source of power, such as an electrical substation, sufficient to run the facility, and is able to construct the necessary infrastructure such as pipeline corridors, that pumping distance can be increased by an additional ten miles. Therefore, in addition to consideration of a site is more or less than ten miles from a beneficiation plant, in the first step of the projectspecific screening process the Corps also considered whether the applicant could construct a `pre-washer' and the necessary infrastructure and therefore exceed that distance. The Desoto and Pine Level/Keys Tract sites are approximately 20 miles away from the South Pasture beneficiation plant, and 13 miles away from the Wingate Creek plant. Site W-2 is within ten miles of the Wingate Creek plant. The applicant does not own or control all of the land necessary to construct the access corridors between these sites and the two beneficiation plants. The applicant would need to acquire many miles of access corridors, and construct pipelines and dragline crossings within the corridors. County Property Appraiser7 ownership records indicate that the applicant would need to complete numerous real estate transactions to secure access corridor routes, regardless of the corridors' locations. In addition to securing access corridors, the applicant would need to develop mining studies for any of the three parcels, get State and County approvals, complete site designs, and complete construction of CSAs, all before commencement of mining. For the W-2 site, the applicant would also need to acquire the property and complete prospecting. Finally, as shown on Attachment A ­ Figure 11, for Desoto or Pine Level/Keys, even if the applicant could acquire the land, develop a mine plan, and get the necessary approvals in a timely manner, there is no source of electric power, such as a substation, to power a pre-washer in between those sites and the beneficiation plants to the north. From the Hardee County Property Appraiser public website at https://hardeepa.com/, and the Desoto County Property Appraiser public website at http://desotopa.com/

7

10

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

Alternatively, the applicant could construct a new beneficiation plant on any of these three parcels, however such construction would similarly delay the commencement of mining, as well as cost approximately $1 billion dollars, according to the applicant. Based on this information, the Corps did not consider Desoto, Pine Level/Keys Tract, or Site W-2 to be practicable, and eliminated them from further consideration as potential alternatives to Ona. The three remaining sites, Pioneer Tract, Wingate East, and Site A-2, are within ten miles of a beneficiation plant, with no property ownership or other logistical barriers in between, or are further away from a plant and the Corps has assumed that the applicant could construct the necessary infrastructure. As stated in 40 CFR 230.1(a), "No discharge will be permitted if there is a practicable alternative which would have less adverse impact on the aquatic ecosystem provided the alternative does not have other significant adverse environmental consequences." Therefore, for the next step in the projectspecific alternatives analysis the Corps independently reviewed and verified both the practicability of and the environmental impacts for each alternative. The Corps evaluated five alternatives for this step - the Applicant's Preferred Site Alternative (Ona), the No Action Alternative, and the three offsite alternatives (Wingate East, Pioneer Tract, and Site A-2). The specific practicability criteria applied by the Corps included the following: i) The logistics associated with construction of the pipelines needed to carry material between an alternative and the beneficiation plant, including the total combined length of the pipelines and the availability of access corridors; ii) the number of stream crossings needed for pipelines (stream crossings); iii) the ability of an alternative to support other necessary mine infrastructure such as clay settling areas (considering factors such as available area); iv) compliance with state (FDEP) or local permitting requirements, v) the ability of an alternative to produce a total of 144 million tons, and meet the project-specific need as described in Section 4.a of this

11

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

document, and; vi) the ability of an alternative to fulfill the mining development sequence described in the overall need statement in Section 4.a of this document. The pipeline information for criterion i) is based on the distance between each offsite alternative and the beneficiation plant, and on the number of draglines needed to maintain a maximum of 6 mtpy production. The Wingate East alternative assumes only one dragline, due to the size of the alternative. Each dragline requires one matrix pipeline to the beneficiation plant and one sand tailings line back to the current reclamation site. Also, for Ona and Wingate East, the applicant used specific information about the mine plan to provide this data. Because there are no mine plans for Pioneer Tract or Site A-2, the applicant provided estimates for the pipeline information. The stream crossing information also relied on the mine plans for Ona and Wingate East, and on estimated plans for Pioneer Tract and Site A-2. The access corridor part of criterion i) relied on publicly available information about property ownership or control. The stream crossing information for criterion ii) relied on the mine plans for Ona and Wingate East, and on an estimated plan for Site A-2 and Pioneer. For criterion iii), the CSA data used the acreage of an alternative and an estimated volume of phosphate and associated clay that an alternative would produce. The production data considers each site's total mineable reserves, to eliminate any discrepancies in the comparison of the alternatives with mine plans (and their associated onsite avoidance and minimization of wetland impacts), and the two alternatives without a mine plan. Criterion iv) considers either finalized state or local permitting actions, or available information about state or local permitting requirements. For criterion v), the estimated production values for Ona and Wingate East relied on those alternative's mine plans. For Site A-2 and Pioneer, the

12

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

estimated production values assumed 16% preservation 8. For all alternatives, the Corps used prospecting data provided by the Applicant. For criterion vi), the Corps considered the Applicant's overall mining sequence as described in section 4.a of this document. In addition to the practicability criteria, the Corps evaluated the environmental impacts of project alternatives. For the environmental criteria, the Corps considered onsite wetland acreage based on National Wetland Inventory data (NWI wetlands) and Southwest Florida Water Management District data (SWFWMD wetlands), including a comparison of the area of wetland coverage for each parcel as a percentage of the overall acreage based on the SWFWMD wetland data. The Corps chose these criteria to ensure a consistent approach and because the data is publicly available. The Corps also considered the amount/distance of pipelines needed, and the number of stream crossings as environmental factors. Figure 2-8 in Chapter 2 of the Final EIS shows the locations of all of the alternatives considered in the Final EIS, including the offsite alternatives evaluated in Section 4(d) of this EA. Appendix C of the Final EIS has aerial photographs of the alternatives. e) Offsite/Avoidance Alternatives: i. Applicant's Preferred Alternative: This is the 22,483-acre Ona parcel described in Section 2 of this EA. The entire 22,483 acres is either within ten miles of a beneficiation plant, or the applicant could construct a prewasher and the necessary infrastructure to reach a plant; the applicant's current proposal is to use both the South Pasture and Four Corners plants. The proposed mine plan mines or disturbs 18,776 acres within the 22,483acre site. This alternative requires approximately 62.5 miles of pipelines (4 miles from the South Pasture plant, 12.5 miles from the Four Corners plant to the project boundary, and 46 miles within the project boundary), three new stream crossings, and 68 miles of ditch and berm system. The applicant states that this alternative has sufficient space for the necessary clay settling areas. Mining the Ona parcel would produce 178 million tons Based on the current proposal for the Ona Mine, as described in Section 2.d.i of this EA. 8

13

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

of phosphate, based on the applicant's prospecting data. FDEP has issued a permit for Ona. The Ona parcel contains 5581 acres of NWI wetlands and 6140 acres of SWFWMD wetlands. The SWFWMD wetlands constitute 27.3% of the total area of the site. This alternative is practicable, and meets the overall project purpose and the applicant's need on both the overall and the project-specific levels. ii. No Action Alternative: Section 4.1.9 of the Final EIS describes the two No Action Alternatives ­ No Mining and Upland Only Mining. This section of the EA will address the No Action ­ No Mining alternative. Section 4.e.i below describes the Corps' evaluation of the No Action­ Upland Only Mining alternative as a minimization alternative. Under the No Action ­ No Mining alternative, the applicant would not mine Ona at all. There would be no construction of any mine infrastructure, including pipelines, crossings, clay settling areas and ditch and berm system, within the Ona parcel. This alternative does not produce any phosphate rock at all. The Ona parcel contains 5581 acres of NWI wetlands and 6140 acres of SWFWMD wetlands. The SWFWMD wetlands constitute 27.3% of the total area of the site. If there is no new mining, there are no mining-related impacts to these wetlands. This alternative does not satisfy the overall project purpose, and therefore it is not a practicable alternative. The No Action Alternative also does not meet the overall need nor the project-specific need. The No Action Alternative ­ No Mining alternative is the least environmentally damaging alternative of all the avoidance alternatives, including the Applicant's Preferred Alternative. iii. Wingate East: The entire 3,635 acres of Wingate East is within ten miles of a beneficiation plant (the Wingate Creek plant). Based on the current plan to mine 2658 acres of the site, this alternative requires approximately 11 miles of pipelines (2 miles from the plant to the project boundary, 9 miles within the project boundary), no new stream crossings, and 6.3 miles of

14

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

ditch and berm system. Available information indicates that the Applicant owns or controls all of the property needed to construct the necessary access corridors. The Applicant states that this alternative has sufficient space for the necessary CSA. Mining the Wingate East parcel utilizing the Applicant's Preferred Alternative would produce 28 million tons of phosphate. This is based on 2,658 acres of mining and an estimated yield of 10,500 tons of phosphate rock per acre. This alternative has received approval from both FDEP and from Manatee County. The Wingate East parcel contains 893 acres of NWI wetlands and 758 acres of SWFWMD wetlands. The SWFWMD wetlands constitute 20.8% of the total area of the site. The Wingate East alternative meets the overall project purpose and requires less infrastructure such as pipelines, crossings, and ditch and berm system. However, based on the estimated production, it does not meet the project-specific need. In addition, as explained in Section 4(a) of this EA, the applicant's overall mine plan has the phosphate production from the Wingate East Mine replacing the production from the Wingate Mine after that mine's reserves run out, and therefore this alternative does not meet the applicant's overall need. This is not a practicable alternative. Considering the potential wetland impact acreage, the reduced linear footage of pipelines, and the number of stream crossings (zero for Wingate East versus three for Ona), the Wingate East alternative is less environmentally damaging than the Applicant's Preferred Alternative. iv. Pioneer Tract: Approximately 11,750 acres of Pioneer Tract's 25,231 acres is within ten miles of the proposed pre-washer or the South Pasture beneficiation plant, and the Corps has assumed that the applicant could construct the necessary infrastructure to reach either facility. There is no current application to mine this parcel, and no mine plan. Therefore, as stated in Section 4(c) of this EA, the analysis of this alternative relies on an estimated mine plan with an assumed 16% preservation. This alternative requires approximately 67 miles of pipelines (21.75 miles from the Four Corners beneficiation plant, 7.9 miles from the South Pasture beneficiation plant, and 37.7 miles within the project boundary), eight additional stream crossings, and 38 miles of ditch and berm system. Based on the size of the mined area, the Corps assumes that this alternative has sufficient space for

15

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

the necessary clay settling areas. Mining this alternative as described would produce 79 million tons of phosphate, based on an estimated yield of 8000 tons per acre. It is unknown if either FDEP or Hardee County would approve mining on this site. The Corps will conservatively assume that the Applicant could obtain the necessary state and local approvals. This alternative would not disrupt the Applicant's planned overall mining sequence, although the applicant has indicated it intends to mine this site in the future. The Pioneer Tract contains 9,356 acres of NWI wetlands and 9,293 acres of SWFWMD wetlands. The SWFWMD wetlands constitute 36.8% of the total area of the site. The Pioneer Tract alternative meets the overall project purpose, and because it does not disrupt the applicant's mining development sequence, it meets the overall need. However, it requires additional infrastructure compared to the Applicant's Preferred Alternative, and does not meet the project-specific need, based on the estimated production. This is not a practicable alternative. Based on the greater coverage of the site by wetlands (36.8% for Pioneer vs. 27.3% for Ona), the greater distance of pipelines needed, and the additional five stream crossings, the Pioneer alternative is more environmentally damaging than the Applicant's Preferred Alternative. v. Site A-2: All 8,189 acres of Site A-2 is within ten miles of the South Fort Meade beneficiation plant, and the Corps has assumed that the applicant could construct the necessary infrastructure to reach that facility. There is no current application to mine this parcel, and no mine plan. Therefore, as stated in Section 4(c) of this EA, the analysis of this alternative relies on an estimated mine plan with an assumed 16% preservation. This alternative requires approximately 36 miles of pipelines, three new stream crossings, and 36 miles of ditch and berm system. Based on the size of the mined area, the Corps assumes that this alternative has sufficient space for the necessary clay settling areas. It is unknown if either FDEP or Hardee County would approve mining on this site. The Corps will conservatively assume that the Applicant could obtain the necessary state and local approvals. This alternative would not disrupt the Applicant's planned overall mining sequence.

16

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

As described in Section 2.2.4.1 and Appendix B of the Final EIS, the Corps considered prospecting data in screening the offsite alternatives, and determined that there are sufficient phosphate resources to include this parcel as an alternative. However there is insufficient prospecting data to provide an estimated yield of phosphate rock per acre. Therefore, the Corps applied the figure for the adjacent South Fort Meade Mine, 7325 tons of rock per acre, to this alternative to produce an estimated total production of 50.39 million tons of phosphate. Site A-2 contains 1,232 acres of NWI wetlands and 1,362 acres of SWFWMD wetlands. SWFWMD wetlands comprise 16.6 percent of the site. This alternative meets the overall project purpose and the overall need, and requires less infrastructure than Ona. However, it does not meet the project-specific need, based on the estimated production. This is not a practicable alternative. Considering the potential wetland impact acreage and the reduced infrastructure, Site A-2 is less environmentally damaging than the Applicant's Preferred Alternative. f) Onsite/Minimization Alternatives: The Corps evaluated six minimization alternatives for Ona: i. Applicant's Preferred Alternative (November 2016 Mine Plan) ii. No-Action ­ Uplands Only Mining iii. Limited Action - Upland Mining with Crossings of WOUS iv. Maximum Framework Avoidance Plan v. Framework Crossings Plan vi. June 2011 Plan (First PN Plan) Each of these onsite alternatives represents a different mine plan for the project, as shown in Figures 3 through 8 in Attachment A to this EA. As with the consideration of offsite/avoidance alternatives described in Section 4(c) of this EA, the Corps considered both practicability and environmental criteria in its evaluation of the onsite/minimization alternatives.

17

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

The practicability evaluation criteria for these alternatives included the following: 1) The estimated total length of pipelines needed to carry material to the beneficiation plants and the estimated total length of the ditch and berm system around areas not to be mined; 2) the number of crossings needed for pipelines and draglines; 3) the ability of an alternative to support other necessary mine infrastructure such as clay settling areas (considering factors such as available area); 4) compliance with state (FDEP) or local (Hardee County) permitting requirements, and; 5) the ability of an alternative to meet the overall project purpose, and to produce a total of 144 MMT and meet the independently reviewed and verified project-specific need as described in Section 4.a of this document. The environmental criteria included each alternative's expected level of impact to WOUS (based on the approved jurisdictional determinations) and agreement with the mitigation framework described in Section 5.4 of the Final EIS. As stated in Section 5.4.1 of the Final EIS, the mitigation framework applies after consideration of the applicable presumptions for proposed discharges of fill into special aquatic sites under the Section 404(b)(1) Guidelines, and does not modify any law or regulation or the jurisdictional authority of USACE or any other agency. Section 5.4.2 of the Final EIS describes the background and purpose of the mitigation framework, including the input from the public, non-governmental organizations, and local, state, and federal agencies considered in the origin of the framework, and the interagency approach between the Corps, USEPA, USFWS, and NOAA-NMFS used to develop the framework. As further described in Section 5.4.3 of the Final EIS, there are four steps in the mitigation framework. Step 1 is the identification of priority-based avoidance areas (see Final EIS Section 5.4.3.1). Such resources include perennial and intermittent streams, forested wetlands, and high quality herbaceous wetlands (defined as having an overall UMAM score of 0.7 or higher). Section 5.4.3.1 of the Final EIS also describes how the Corps can apply

18

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

other factors in Step 1 of the mitigation framework, such as giving greater priority to areas where multiple criteria apply, higher-quality forested wetlands and streams, and other environmental criteria such as wetland's or stream's location, surrounding land use, prior disturbance, connectivity, hydrology, plant species composition, and usage by wildlife or listed species. The final part of Step 1 describes how the Corps can consider other criteria to support its evaluations, such as Critical Lands and Waters Identification Project (CLIP) priority, the Integrated Habitat Network, and 100-year floodplains. Step 2 of the mitigation framework, as described in Section 5.4.3.2 of the Final EIS, is to determine the extent of onsite avoidance that is practicable under the Section 404(b)(1) Guidelines. Sections 4.e.i-vi below provide the Corps' evaluation of the six alternatives for mine plans for Ona. Step 3 of the mitigation framework, as described in Section 5.4.3.3 of the Final EIS, evaluates opportunities to minimize impacts through best management practices and mine plan design. Section 4.f of this EA describes how the Corps considered Step 3 in its evaluation. Sections 5 ("Evaluation of the CWA Section 404(b)(1) Guidelines") and 6 ("Public Interest Review") of this EA also describe many of these minimization measures. Section 9.c of this EA, "Compensatory Mitigation for Unavoidable Impacts to Aquatic Resources" addresses Step 4 of the mitigation framework (reference Final EIS Section 5.4.3.4). The Corps' evaluations of the six onsite/minimization alternatives for the Ona Mine are as follows: i. Applicant's Preferred Alternative (November 2016 Mine Plan): This is the mine plan described in the most recent (November 2016) revised application. Section 9.b.ii of this EA describes the sequence of project revisions leading up to this alternative. Attachment A - Figure 3 shows this alternative.

19

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

This alternative requires approximately 62.5 miles of pipelines (4 miles from the South Pasture plant, 12.5 miles from the Four Corners plant to the project boundary, and 46 miles within the project boundary), three new stream crossings, and 68 miles of ditch and berm system. The applicant states that this alternative has sufficient space for the necessary clay settling areas. FDEP has issued a permit for Ona. Mining the Ona parcel as proposed for this alternative would produce 178 million tons of phosphate, based on the applicant's prospecting data. This mine plan would impact 3,426 acres of WOUS overall (avoiding approximately 30%), 1,188 acres of mitigation framework priority wetlands (avoiding approximately 46%), and 12,938 linear feet of streams prioritized by the mitigation framework (avoiding approximately 84%). Three of the four key landscape systems would be avoided, with avoidance focused on those areas adjacent to or near the avoided streams. The Applicant's Preferred Alternative meets the overall project purpose. The Applicant's Preferred Alternative also meets the overall and projectspecific need. This is a practicable alternative. The Applicant's Preferred Alternative agrees with Steps 1 and 2 of the mitigation framework. ii. No Action ­ Uplands Only Mining: This alternative involves impacts to only non-Corps-jurisdictional areas on the Ona site, including uplands and aquatic resources not considered to be WOUS, with no onsite impacts to any WOUS, including from dragline and infrastructure crossings. Attachment A - Figure 4 shows this alternative. For this alternative, the applicant would construct an onsite beneficiation plant, to eliminate the potential for offsite impacts to WOUS. For this alternative, the applicant would construct approximately 1.7 miles of pipelines to transport ore matrix to the beneficiation plants and stormwater to the CSAs, and to return process water and tailing sand back to the mine areas. The total length of perimeter ditch and berm systems around avoided jurisdictional areas would be approximately 8.8 miles. The applicant would not need to construct any wetland or stream crossings with this plan, and an alternative CSA, such as an offsite CSA, could

20

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

handle this plan's clay output. Under this plan, the applicant could recover 7.9 million tons, from 824 acres of mined area. The applicant states that both Hardee County and FDEP would not approve this mine plan, due to reduced economic benefits (for Hardee County) and reduced onsite mitigation and reclamation and offsite mitigation (for FDEP). However, the applicant did not provide a specific economic target from Hardee County for the project, and the proposed mitigation and reclamation are only at the proposed levels due to the proposed level of impact associated with the Applicant's Preferred Alternative. Therefore, the Corps will assume that Hardee County and FDEP would both approve this plan. This mine plan avoids 100% of the onsite WOUS overall, and 100% of the wetlands and 100% of the streams prioritized by the mitigation framework. The No Action ­ Uplands Only alternative meets the overall project purpose and there is less infrastructure required, however it does not meet the overall or project-specific need. This is not a practicable alternative. Because there are no impacts to resources prioritized by the mitigation framework, this alternative agrees with Steps 1 and 2 of the mitigation framework. This is the least environmentally damaging alternative compared to the other onsite alternatives, including the Applicant's Preferred Alternative. iii. Upland Mining with Crossings of WOUS: In this plan, the Applicant would only mine upland/non-Corps-jurisdictional areas onsite at Ona, however the Applicant would impact onsite wetlands, streams or other surface waters for dragline or dredge and infrastructure crossings. Attachment A - Figure 5 shows this alternative. For this alternative, the applicant would construct approximately 25.6 miles of pipelines to transport ore matrix to the existing beneficiation plants at Four Corners and South Pasture and stormwater to the CSAs, and to return process water and tailing sand back to the mine areas. The total length of perimeter ditch and berm systems around avoided jurisdictional areas would be approximately 67.2 miles. This alternative requires 13 wetland or stream crossings, and would not have sufficient

21

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

area for a CSA and other mine infrastructure. Under this plan, the applicant could recover 47.2 million tons from 4,880 acres of mined area. The applicant states that both Hardee County and FDEP would not approve this mine plan, due to reduced economic benefits (for Hardee County) and reduced onsite mitigation and reclamation and offsite mitigation (for FDEP). However, the applicant did not provide a specific economic target from Hardee County for the project, and the proposed mitigation and reclamation are only at the proposed levels due to the proposed level of impact associated with the Applicant's Preferred Alternative. Therefore, the Corps will assume that Hardee County and FDEP would both approve this plan. This mine plan impacts 6.3 acres of WOUS overall (avoiding approximately 99.9%), 6.3 acres of mitigation framework priority wetlands (avoiding approximately 99.7%) and 1,794 linear feet streams prioritized by the mitigation framework (97.8% avoidance). The Upland Mining with Crossings alternative meets the overall project purpose, however it does not meet the project-specific need. This is not a practicable alternative. Because there are impacts to only 0.3% of the wetlands prioritized by the mitigation framework and 2.2% of the streams, this alternative agrees with Steps 1 and 2 of the mitigation framework. With less impact to WOUS overall and to framework wetlands and streams, and agreement with the mitigation framework, this alternative is less environmentally damaging than the Applicant's Preferred Alternative. iv. Maximum Framework Avoidance ­ For this alternative, the applicant would avoid all wetlands and streams identified as "priority" under the mitigation framework described in the Final EIS. This limits the mineable area to land located west of Horse Creek and north of West Fork Horse Creek 9, as shown in Attachment A - Figure 6. All ore extracted would be The applicant states that they could not determine if there would be adequate CSA capacity at South Pasture or South Pasture Extension to allow mining east of Horse Creek until near the end of mining at South Pasture in 2035. Therefore this analysis considers mining as described, "west of Horse Creek and north of West Fork Horse 9

22

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

processed at the Four Corners beneficiation plant. Clay settling areas would be located offsite on mined areas at the adjacent Fort Green Mine. For this alternative, the applicant would construct approximately 12.5 miles of pipelines to transport ore matrix to the beneficiation plant and stormwater to the CSAs, and to return process water and tailing sand back to the mine areas. The total length of perimeter ditch and berm systems around avoided jurisdictional areas would be approximately 4.7 miles. This alternative requires 19 wetland or stream crossings, and would use offsite CSAs. Under this plan, the applicant could recover approximately 12 million tons from 1,472 acres of mined area. The applicant states that both Hardee County and FDEP would not approve this mine plan, due to reduced economic benefits (for Hardee County) and reduced onsite mitigation and reclamation and offsite mitigation (for FDEP). However, the applicant did not provide a specific economic target from Hardee County for the project, and the proposed mitigation and reclamation are only at the proposed levels due to the proposed level of impact associated with the Applicant's Preferred Alternative. Therefore, the Corps will assume that Hardee County and FDEP would both approve this plan. This mine plan would impact 25.2 acres of the onsite WOUS (avoiding approximately 99.5%), and no priority WOUS (100% avoidance of priority wetlands and streams). This alternative meets the overall project purpose, however it does not meet the project-specific need. This is not a practicable alternative. Because there are no impacts to resources prioritized by the mitigation framework, this alternative agrees with Steps 1 and 2 of the mitigation framework. This alternative is less environmentally damaging than the Applicant's Preferred Alternative. v. Framework Crossings Plan: A variation on the Maximum Avoidance plan, this alternative avoids impacts to wetlands and streams identified as "priority" under the mitigation framework described in the Final EIS, except Creek". 23

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

for dragline and infrastructure crossings. Attachment A - Figure 7 shows this mine plan. For this alternative, the applicant would construct approximately 20.1 miles of pipelines to transport ore matrix to the beneficiation plant and stormwater to the CSAs, and to return process water and tailing sand back to the mine areas. The total length of perimeter ditch and berm systems around avoided jurisdictional areas would be approximately 23.4 miles. This alternative requires 19 wetland or stream crossings. The applicant could construct onsite CSAs, however there would only be enough capacity to handle 5,750 acres of mining. Under this plan, the applicant could recover approximately 61 million tons from 5750 acres of mined area. The applicant states that both Hardee County and FDEP would not approve this mine plan, due to reduced economic benefits (for Hardee County) and reduced onsite mitigation and reclamation and offsite mitigation (for FDEP). However, the applicant did not provide a specific economic target from Hardee County for the project, and the proposed mitigation and reclamation are only at the proposed levels due to the proposed level of impact associated with the Applicant's Preferred Alternative. Therefore, the Corps will assume that Hardee County and FDEP would both approve this plan. This mine plan impacts 261 acres of WOUS overall (avoiding approximately 94.7%), 6.3 acres of mitigation framework priority wetlands (avoiding approximately 99.7%) and 1,794 linear feet streams prioritized by the mitigation framework (97.8% avoidance). This alternative meets the overall project purpose, however it does not meet the project-specific need. This is not a practicable alternative. Because there are impacts to only 0.3% of the wetlands prioritized by the mitigation framework and 2.2% of the streams, this alternative agrees with Steps 1 and 2 of the mitigation framework. With less impact to WOUS overall and to framework wetlands and streams, and agreement with the mitigation framework, this alternative is less environmentally damaging than the Applicant's Preferred Alternative.

24

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

vi. June 2011 Plan (First PN Plan): The basis for this alternative is the mine plan as described in June 2011, and as shown in the June 1, 2012, public notice, with the mining of the site of the eliminated onsite beneficiation plant and the additional 160 acres described in Section 2.d, as shown in Attachment A - Figure 8. For this alternative, the applicant would construct approximately 41 miles of pipelines to transport ore matrix to the beneficiation plants and stormwater to the CSAs, and to return process water and tailing sand back to the mine areas. The total length of perimeter ditch and berm systems around avoided jurisdictional areas would be approximately 66.8 miles. This alternative requires five wetland or stream crossings, and would have sufficient area for a CSA and other mine infrastructure. Under this plan, the applicant could recover 185 million tons from 18,929 acres of mined area. The applicant states that both Hardee County and FDEP would not approve this mine plan. For Hardee County, this is due to reduced economic benefits. However, the applicant did not provide a specific economic target from Hardee County for the project. Therefore, the Corps will assume that Hardee County and FDEP would approve this plan. FDEP considered this mine plan, and as part of its review requested that the applicant eliminate and reduce impacts, ultimately permitting a minimized mining footprint. Based on this information, the Corps agrees that FDEP would not approve this mine plan. This mine plan impacts 4,173 acres of the onsite WOUS overall (avoiding approximately 10.9%), 1,265 acres of mitigation framework priority wetlands (avoiding approximately 31.4%) and 56,669 linear feet of streams prioritized by the mitigation framework (31.4% avoidance). This alternative meets the overall project purpose, the overall need and the project-specific need. This is a practicable alternative. This alternative impacts more WOUS overall, framework wetlands, and framework streams than the Applicant's Preferred Alternative. With greater impact to framework wetlands and streams and onsite WOUS overall, and a lack of agreement with the mitigation framework (due to the greater impact to framework wetlands and streams), this alternative is more environmentally damaging than the Applicant's Preferred Alternative. 25

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

g) Additional Minimization Measures ­ As stated in Section 5.4.3.3 of the Final EIS, "Impact minimization considerations may address both physical and temporal impacts as well as direct, indirect, and cumulative impacts. Potential minimization measures include, but are not limited to, reducing the widths of infrastructure corridors; using existing CSAs and constructing contiguous CSAs so that they have a common wall; minimizing CSA footprints through design and operation methods; using existing stream crossings created for agricultural operations; sequentially reusing disturbed areas; using upland buffers; using recharge ditch systems; and maintaining habitat interconnectivity and existing wildlife corridors." The measures described below are part of the mine plan for the Applicant's Preferred Alternative for Ona, as described in Sections 4.d.i and 4.e.i of this EA. As stated in Section 5.4.2 of the Final EIS, the Corps will detail the specific avoidance and minimization measures and approaches determined to be appropriate in the final Record of Decision/Statement of Findings for each project. i. Infrastructure corridors: The Applicant's Preferred Alternative proposes three crossings for infrastructure, one each for Horse Creek, West Fork Horse Creek, and stream number 105 (a tributary to Brushy Creek). The crossings utilize uplands and existing agricultural crossings to the greatest extent possible. The maximum width of each crossing is 220 feet, plus side slopes, which minimizes impacts to the extent technically feasible without compromising mine safety. The 220-foot maximum width includes a 115-foot dragline walkpath, 45 feet of pipelines, 20 feet for a powerline, and 40 feet for roads and power line safety setbacks. The applicant further minimized impacts at the Horse Creek and West Fork Horse Creek crossings with the use of a trestle design, which eliminates the need to clear all vegetation and impact those waterways. ii. CSAs: Implementation of the Applicant's Preferred Alternative allows the applicant to minimize CSA impacts through several means including utilization of existing CSA capacity within adjacent mines and stage filling; proper design of the overall mine backfill plan to advantageously site CSAs in areas with greater overall mining depths, thereby maximizing unit

26

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

storage capacity in terms of disposal capacity per acre of land; strategic location of CSAs contiguous to each other so that common walls may be utilized and thereby reduce the overall footprint; and proper consideration of site hydrology effects in developing the mine backfill plan such that changes in runoff or recharge are not disproportionally assigned to any one subwatershed associated with the project. iii. Buffers: The applicant proposes to preserve non-uniform upland buffers around preserved wetlands, with a minimum width of 125 feet. All avoided intermittent streams have a buffer of greater than 100 feet from the stream banks, and the avoided key landscape systems, as shown on the attached Attachment A - Figure 3, range in width from 200 feet to over 600 feet wide. A mine's ditch and berm system also buffers the adjacent area from the mining activity, providing approximately 125 to 290 feet of separation between the excavation and the boundary of the preserved buffer. In addition to a physical buffer, the applicant proposes to have a "temporal buffer" for avoided streams. Temporal buffers are manipulations of mine/reclamation sequencing that will prevent concurrent disturbance along both sides of avoided streams. iv. Recharge ditches: The ditch and berm systems protect the adjacent WOUS and the surficial aquifer by maintaining water table elevations at sufficient levels to hydrate nearby wetlands or streams while the adjacent mine cuts are temporarily dewatered. The recharge ditch delivers water to the nearby wetland via the surficial aquifer. This delivery mechanism mimics an important natural pathway and provides high quality water. The ditch and berm system also constitutes an effective and recognized BMP to protect downstream waters from water quality impacts and is a requirement of FDEP's ERP permit for the project. v. Maintaining connectivity: The applicant has identified several key landscape features consisting of higher quality wetlands, streams, and upland corridors in large continuous blocks for preservation and enhancement. Preserving these areas will maintain connectivity both onsite and offsite. Where possible, the applicant considered the location of preserved areas on adjacent parcels to further meet these goals.

27

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

5) Final EIS Analysis Updates a) Direct and Indirect Effects: In Chapter 4 of the Final EIS, the Corps considered the direct and indirect effects of the four proposed actions, including the Ona Mine, and their alternatives. The Corps identified the following potential direct and indirect effects as being significant and, therefore, included detailed analysis on them in the Final EIS: surface water resources (hydrology), groundwater resources (hydrology), water quality (surface water and groundwater), ecological resources (aquatic biological communities, wetlands, wildlife habitat, and listed species), economic resources, environmental justice, radiation, cultural resources and historic properties, and surficial geology and soils. The Corps has determined that for the Ona project, the project changes described in Section 2.d of this EA, including reductions in mined area, impacts to aquatic resources, and mining duration, should lead to reduced degrees of effect on listed species, environmental justice, radiation, cultural and historic resources, and surficial geology and soils. No updates to the analyses described in Chapter 4 of the Final EIS for these resources are necessary. To address how the described project changes may affect the project's potential direct and indirect effects on surface water resources, groundwater resources, water quality, aquatic biological communities, wetlands, wildlife habitat, and economic resources, the Corps has reviewed updated analyses of those issues, as described below, including updates to tables and information presented in the Final EIS. i. Surface Water Resources: Section 4.2.3 of the Final EIS 10 described the predicted effects of the proposed Ona project on surface water flows within the Upper Myakka River, Horse Creek, and the Peace River. The Final EIS stated that the project will have an insubstantial effect on the Upper Myakka, minor to no effect on the Peace River, and a potentially moderate effect on Horse Creek. The Final EIS also stated that measures such as monitoring and the use of recharge ditches to maintain flow in Horse Creek would reduce that moderate level of effect. 10

As corrected in the Addendum to the Final EIS 28

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

The Corps independently reviewed and verified an updated analysis of Ona's effects on surface water hydrology in Horse Creek and the Peace River to address the changes in the project since the Final EIS, including the reduction in mined area and mining duration, both of which are critical components to the hydrology analyses 11. Attachment B to this EA includes updates to Tables 4-19 through 4-26, and Figures 45, 50-57 and 90-97. Because there are no project changes within the Upper Myakka River subwatershed portion of the project, there is no update for that analysis. Within the Horse Creek subwatershed, the reduced capture area and duration led to overall smaller reductions in flows with faster recovery times under all conditions. Within the Peace River watershed, the updated results were substantially similar to the results for the Final EIS. Based on the updated analysis, the Corps has determined again that the Ona Mine would have an insubstantial effect on the Upper Myakka, minor to no effect on the Peace River, and a potentially moderate effect on Horse Creek, and that measures such as monitoring and the use of recharge ditches to maintain flow in Horse Creek would reduce that moderate level of effect 12. The Corps does not consider these effects significant. ii. Groundwater Resources: Section 4.3.3 of the Final EIS discusses the Ona Mine's direct and indirect effects on groundwater resources, and states that with mitigation, Ona would have minor impacts to the surficial, intermediate, and Floridan aquifers, none of which would be significant. This analysis considered groundwater withdrawals at Ona to support both the mining activities and the then-proposed beneficiation plant. The applicant has stated that the elimination of the onsite plant, and the separation of Ona into a western part (associated with the Four Corners plant) and eastern part (associated with the South Pasture plant), has Appendix G of the Final EIS details the surface water hydrology impact analysis methodology. 12 The FDEP Environmental Resource Permit (ERP) for Ona includes permit conditions requiring Mosaic to maintain and monitor flows in Horse Creek and other potentially affected waterbodies. If the Corps issues a DA permit for Ona, those ERP conditions will become part of the Corps permit as well. 11

29

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

reduced the proposed onsite groundwater withdrawal rate by almost ten million gallons per day. Based on this reduction in groundwater pumping, the Corps has determined that the Ona project should have a reduced direct and indirect effect on groundwater, which is still not significant. iii. Water Quality: Section 4.4.4 of the Final EIS discusses the Ona Mine's direct and indirect effects on water quality. As stated there, the Corps determined that the Ona Mine would have a minor to moderate degree of effect on surface water and groundwater quality, which is not considered significant. The following three sections describe available new information and changes in regulatory requirements considered by the Corps in its updated review of the Ona Mine, as committed to in Section 4.4.4 of the Final EIS. Based on the updated analysis, the Corps has determined again that the Ona Mine would have a minor to moderate degree of effect on surface water and groundwater quality, which is not considered significant. (1) Horse Creek Stewardship Program: Section 4.4.2.2 of the Final EIS provided the results of monitoring within the study area, which the Corps used to evaluate the alternatives' effects on surface water quality. The information presented in the Final EIS included monitoring results from the Horse Creek Stewardship Program from 2003-2008. The Corps recognizes the public's interest in Horse Creek, as shown in the comments received during the Final EIS review process and at other times. Therefore, using data from the 2014 Horse Creek Stewardship Program Annual Report, the Corps updated Figure 4-16, showing the locations of the biological monitoring stations; Figure 4-17, with Stream Condition Index (SCI scores) shown through November 2014; and Figure 4-18, with fish community assessment results shown through November 2014; as shown in Attachment B to this EA. The updated results13 show that stations HCSW-1 (the most upstream station) and HCSW-4 (the most downstream) continue to As described in the 2014 Annual Report for the Horse Creek Stewardship Program, the updated results omit some of the earlier sampling points, including some shown in the Final EIS, due to changes in FDEP's scoring methodology.

13

30

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

have scores in the `healthy' range (between 40 and 67, as described in Section 3.3.4.2 of the Final EIS), and station HCSW-2 continues to frequently score as `impaired', due to natural conditions. The Corps notes that although the Final EIS describes HCSW-3 as having variable scores (impaired to healthy), the updated results show that station as scoring consistently `healthy' or even `exceptional'. (2) Numeric nutrient criteria: Section 4.4.2.2 of the Final EIS also discusses numeric nutrient criteria. At that time, there were no criteria in place for flowing waters. Numeric nutrient criteria for streams14 and lakes went into effect on October 27, 2014. The applicant states that they will work with FDEP to ensure that new and renewed permitted discharges comply with these criteria in accordance with FDEP rules, including the numeric nutrient criteria. Additional information about numeric nutrient criteria, including the FDEP Numeric Nutrient Criteria Implementation Document, is available from FDEP's website at http://www.dep.state.fl.us/water/wqssp/nutrients/. (3) Groundwater quality: Section 4.4.2.3 of the Final EIS discusses groundwater quality, and provides the results of groundwater sampling below a CSA on the South Pasture Mine from 2005 through 2010. The Corps updated Figure 4-20 to include results through the first quarter of 2017, as shown in Attachment B to this EA. The Corps has determined that as was stated in the Final EIS, the groundwater quality at the compliance wells continued to rarely exceed the primary and secondary drinking water standards. iv. Ecological Resources - Aquatic Biological Communities: Section 4.5.1.3 of the Final EIS described the then-proposed 136,731 linear feet of direct stream impacts, and predicted a minimization of impacts and the As stated in the FDEP Numeric Nutrient Criteria Implementation Document and in Rule 62-302.200(36), F.A.C., these criteria do not apply to non-perennial streams.

14

31

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

development of a compensatory mitigation plan that included offsets to remaining unavoidable impacts. Section 2.c of this EA describes the current project, which includes 100,766.8 linear feet of direct stream impacts, a reduction of 35,964.2 linear feet. Section 9.c of this EA describes the proposed compensatory mitigation, including the stream mitigation. The Final EIS analysis of the Ona Mine's impacts also considered the potential effects of changes in surface water hydrology and surface water quality on aquatic biological communities. Sections 5.a.i and 5.a.iii of this EA describe the Corps' updated analyses of those two issues. Section 4.5.1.3 of the Final EIS also states that the Corps would coordinate its determination that the Ona Mine would not have an adverse effect on essential fish habitat (EFH) in the estuarine reaches of the Peace or Myakka Rivers or in Charlotte Harbor with the National Marine Fisheries Service (NMFS). On December 16, 2015, the NMFS Habitat Conservation Division (NMFS-HCD) stated that they anticipated any adverse effects associated with the proposed project that might occur on marine and anadromous fishery resources would be minimal and, therefore, they did not object to issuance of a permit. The Final EIS states that with mitigative measures to offset unavoidable direct impacts to streams, and to minimize impacts to surface water hydrology and quality, the Ona Mine would have at most a moderate effect on aquatic biological communities, which would not be significant. Based on the project changes, completed EFH coordination, and updated analyses described above, the Corps makes that same determination now. v. Ecological Resources ­ Wetlands: Section 4.5.2.3 of the Final EIS described the then-proposed 4,615 acres of wetland impacts, including 1,824 acres of forested wetland impact and 2,770 acres of non-forested wetland impact. However, the applicant has worked with the Corps, USEPA and FDEP to avoid and minimize impacts, as required by federal and state law. Section 2.c of this EA describes the current project, which includes 3,426.1 acres of impact to Corps-jurisdictional wetlands, including 1,357.87 acres of forested wetland impacts and 2,068.27 acres of herbaceous wetland impacts. Attachment B to this EA has an updated Table 4-71 summarizing the avoidance and impact acreage for Ona. Section 9.c of this EA describes the proposed compensatory mitigation, including the wetland

32

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

mitigation. In addition, Section 4.5.2.3 of the Final EIS stated that the applicant would apply the mitigation framework described in Chapter 5 of the Final EIS to the Ona project. Section 4.e of this EA describes how the Corps considered the mitigation framework in its evaluation, including determining the extent of onsite avoidance that is practicable under the Section 404(b)(1) Guidelines as described in Sections 4.e.i-vi, evaluating opportunities to minimize impacts through best management practices and mine plan design as described in Section 4.f, and evaluating compensatory mitigation as described in Section 9.c. Based on the project changes and the updated analysis, the Corps has determined again that with mitigation, the Ona Mine would have no impact to a minor impact on wetlands, which is not considered significant. vi. Ecological Resources ­ Wildlife Habitat: Section 4.5.3.3 of the Final EIS included Table 4-83 summarizing the upland wildlife habitat avoidance, impact and reclamation for the Ona Mine. That section also stated that the Corps would consider requiring upland buffers along avoided wetlands and streams, including higher quality aquatic resources, as described in the mitigation framework. Section 5.7 of the Final EIS describes the FDEP requirements for reclamation of lands mined for phosphate, including upland habitats. As shown in the updated Table 4-83 included in Attachment B of this EA, the applicant has reduced their overall mining area, including to upland and wetland wildlife habitats. In addition, as shown in Attachment A - Figure 3, as part of the Applicant's Preferred Alternative the applicant proposes to avoid large contiguous areas of wetlands and uplands as "key landscape systems", with upland buffers. Section 4.f of this EA describes how, in addition to those buffers, ditch and berm systems will separate the preservation areas from the active mining, and how the applicant will not mine on both sides of a preservation area at the same time, as a "temporal buffer". Based on the project changes and the updated analysis, the Corps has determined again that with mitigative measures, the Ona Mine would have no impact to a minor impact on wildlife habitat, which is not considered

33

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

significant. vii. Economic Resources: Section 4.6.3 of the Final EIS described the direct and indirect economic effects of the Ona Mine on Hardee County. As shown in Table 4-98 in that section, with the Ona Mine, as compared to the NoAction Alternative described in Section 4.6.1 of the Final EIS, there would be increases in average annual employment, present value labor income, present value added, and present value output 15. The Corps determined that this would be a major beneficial effect, which compared to the NoAction Alternative would be significant. However, the Corps also determined that relative to current conditions, including the continuation of existing phosphate mining in Hardee County, Ona would simply offset job losses predicted under the No Action Alternative, and therefore from that perspective, the effects were not significant. Because some of the project updates described in Section 2.d of this EA that could affect the economic effects, including the elimination of the onsite beneficiation plant and the reduction in the area and duration of mining, the Corps independently reviewed and verified an updated economic analysis. This analysis included updates to Table 4-98, as shown in Attachment B of this EA. As described in the updated table, with the project changes, the Ona Mine will have 382 less jobs in the average annual employment parameter and generate $894,500,00 less in present value labor income, $1,835,500,000 less in present value added, and 3,092,500,000 less in present value output, compared to the results shown in the Final EIS. The Corps has determined that even with those reductions however, the Ona Mine will still have a major beneficial economic effect on Hardee County, which when compared to the No Action Alternative is significant, and when compared to existing conditions is not significant. b) Cumulative Effects: In Section 4.12 of the Final EIS, the Corps considered the cumulative effects of the four proposed actions, two reasonably foreseeable future actions, and other past, present and reasonably Appendix H of the Final EIS explains the methodology used by the Corps to evaluate economic effects, including definitions of the economic parameters considered.

15

34

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

foreseeable actions, including phosphate mining and non-phosphate mining actions. The resource categories determined to have significant potential cumulative impacts were surface water resources, groundwater resources, surface water quality, ecological resources (wetlands and upland habitat), and economic resources. In addition to the changes to the Ona project described in Section 2.d of this EA, other changes within the study area have occurred since the Final EIS, such as the addition of infill parcels (both currently under review by the Corps and reasonably foreseeable) to existing phosphate mines, and updates on the status of phosphate mine reclamation. Therefore, to address how these changes to Ona and within the study area may affect the project's cumulative effects on surface water resources, groundwater resources, ecological resources (wetlands and upland habitat), and economic resources, the Corps has updated its analyses of those issues, as described below, including updates to tables and information presented in the Final EIS. The Corps determined that the changes to the Ona project, as well as other changes such as the implementation of numeric nutrient critieria as described in Section 5.a.iii.2 of this EA, lead to a reduction in the magnitude and significance of potential surface water quality cumulative impacts as described in Section 4.12.4 of the Final EIS. No update to this analysis is necessary. i. Updates to Past Actions: Attachment B to this EA includes a new table Table 2-3(a) - showing information about currently proposed and reasonably foreseeable phosphate mine infill parcels, including overall acreage, mined/disturbed acreage, and overall potential acreage and linear footage of impacts to waters of the United States (for wetland and streams respectively); figures showing the locations of those infill parcels ("Table 23(a) figures 1 and 2"); and an updated Table 4-24 showing the status of phosphate mine reclamation. Additionally, the applicant notes that 80 acres of mined and reclaimed land became a county park and fire station, and that TECO purchased 479 acres of mined and reclaimed land for a solar power facility. ii. Surface Water Resources: Section 4.12.2 of the Final EIS described the

35

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

predicted cumulative impacts on subwatershed and watershed water deliveries to downstream reaches of the affected rivers and to the Charlotte Harbor estuary. The proposed Ona Mine was specifically part of the analyses for Horse Creek, the Peace River, and Charlotte Harbor 16. The cumulative impact analysis included consideration of the use of the Peace River as a public water supply. The Final EIS stated that there will be an insubstantial effect on the Upper Myakka, minor to no effect on the Peace River, and a potentially moderate effect on Horse Creek. The Final EIS also stated that measures such as monitoring and the use of recharge ditches to maintain flow in Horse Creek would reduce that moderate level of effect. The Corps considered an updated cumulative impact analysis using the same spreadsheet model used for the Final EIS. Attachment B to this EA includes updates to Tables 4-113 through 120. Similar to the results of the analysis of potential direct and indirect effects for Ona, within the Horse Creek subwatershed, the updated analysis predicts overall smaller reductions in flows with faster recovery times under all conditions. Within the Peace River watershed, the updated results were substantially similar to the results for the Final EIS. Based on these Peace River watershed results, the Corps did not update the quantitative analysis of the cumulative effects on Charlotte Harbor. Considering these results, the Corps has again determined that for the cumulative effects on surface water resources, there will be insubstantial effect on the Upper Myakka and a minor to no effect on the Peace River, neither of which is significant. For Horse Creek, without mitigation the predicted cumulative effects would continue to have a moderate degree of magnitude, which would be significant. Mitigative measures as described in the Final EIS such as monitoring programs, recharge ditches and wells, and a potentially moderate effect on Horse Creek, should reduce the magnitude, and make the effects insignificant. The Corps has also again determined that the cumulative effects on surface water resources at the Charlotte Harbor level, and on public water supply, would have at most a minor degree of effect and would not be significant. As described in the surface water direct and indirect effects analysis, the Corps determined that the proposed Ona Mine had an insignificant overlap with the Myakka watershed.

16

36

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

iii. Groundwater Resources: Section 4.12.3 of the Final EIS described the predicted cumulative impacts to groundwater resources, and found that there would mostly be minimal impacts to the surficial, intermediate, and Florida aquifers, which would not be significant. The exception to this determination was for Ona, because the Final EIS determined that "pumping Ona Mine at the permitted drought year rate for extended periods could result in a drawdown at ROMP 31", which the Corps considered to be a moderate level of impact, and significant due to potential effects on the Southern Water Use Caution Area. As described in Section 5.a.ii of this EA, the applicant now proposes greatly reduced groundwater withdrawals onsite at Ona. Based on the analyses completed for the Final EIS, the Corps does not expect that these changes will result in increases in degrees of effect for groundwater impacts, or changes in the significance determinations. However, to address other changes, such as the increased duration of groundwater withdrawals at other sites to support Ona, such as at the Four Corners and South Pasture sites, the Corps will require the applicant to update the cumulative effects modeling using the same methods used for the Final EIS. The Corps will review and verify the updated groundwater cumulative effects analysis, and consider the updated results in making its final determination in the RODSOF for the Ona project. iv. Ecological Resources (wetlands and upland habitat): Section 4.12.5 of the Final EIS described the predicted cumulative impacts on ecological resources within the study area, and stated that with the state and federal requirements for compensatory wetland mitigation, land reclamation, and wildlife protection and management, the cumulative effects on ecological resources would have a minor level of magnitude and would not be significant. Since that time, the four proposed actions have moved through the mitigation sequencing process of avoidance, minimization and compensatory mitigation as required by the 404(b)(1) Guidelines, and the applicant has applied the mitigation framework developed for the Final EIS as described in Section 4.e of this EA. As a result, there is a reduction in the impact acreages shown in Table 4-130 of the Final EIS; an updated table is available in Attachment B to this EA.

37

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

As stated above in Section 5.b.i, the Corps also considered a new table Table 2-3(a) - showing information about currently proposed and reasonably foreseeable phosphate mine infill parcels, including overall acreage, mined/disturbed acreage, and overall potential acreage and linear footage of impacts to waters of the United States (for wetland and streams respectively); figures showing the locations of those infill parcels ("Table 23(a) figures 1 and 2"); and an updated Figure 4-24 showing the status of phosphate mine reclamation. Based on the updated information, the Corps has again determined that with the state and federal requirements for compensatory wetland mitigation, land reclamation, and wildlife protection and management, the cumulative effects on ecological resources will have a minor level of magnitude and will not be significant. v. Economic Resources: Section 4.12.6 of the Final EIS described the predicted cumulative impacts of Ona, South Pasture Extension, and Pioneer Tract on Hardee County, and of the four proposed and two reasonably foreseeable mines on the eight-county study area, and compared them to a point of reference without new phosphate mining in Hardee County or the study area. The Final EIS stated that the cumulative effect on both Hardee County and the study area would be beneficial. For Hardee County, the benefit would be of a moderate to major magnitude, and significant, however at a regional level, the Corps determined that the benefit would be relatively minor and insignificant. For the updated analysis of the cumulative effects on Hardee County, the Corps considered the results of the revised economic direct and indirect impact analysis for Ona, and prepared a revised Table 4-137, as shown in Attachment B, to reflect these changes. The Corps also updated the analysis of the cumulative effects on the eight-county study area, as shown in the revised Table 4-139 in Attachment B. Based on the updated analyses, the Corps has again determined that the cumulative effect on both Hardee County and the study area would be beneficial, and for Hardee County the effect would be of a moderate to major magnitude, and significant, and at a regional level, that the benefit would be relatively minor and not significant.

38

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

6) Draft Evaluation of the CWA Section 404(b)(1) Guidelines a) Factual determinations (40 C.F.R. § 230.11). i. Physical Substrate (40 C.F.R. § 230.11(a)): Section 4.10.2 of the Final EIS states that each of the action alternatives, including Ona, would have a moderate to major degree of effect on surficial geology and soils, including soils and substrate present in wetlands and waterbodies. However, the reclamation required by the state, and the mitigation required by the state and the Corps, will offset the adverse direct impacts of mining. In addition, the best management practices described throughout the Final EIS or in Section 4.f of this EA, including the perimeter ditch and berm system that separates the active mine from adjacent wetlands and surface waters, should protect those aquatic resources from adverse effects. As described in Section 5.a of this EA, the Corps has determined that the project changes described in Section 2.d should lead to reduced degrees of effect for this issue, and therefore no updates to the Final EIS analysis or effect determinations are necessary. ii. Water circulation, fluctuation, and salinity (40 C.F.R. § 230.11(b)): Section 5.a.i of this EA describes the Corps' review and verification of the updated analysis of the predicted direct and indirect effects of the Ona project on surface water flows within the Upper Myakka River, Horse Creek, and the Peace River. Section 5.b.ii of this EA describes the updated analysis of the cumulative effects on surface water flows in the Upper Myakka River, Horse Creek, the Peace River, and Charlotte Harbor. Based on the updated analyses, the changes to the Ona project did not alter the Corps' determinations for the direct, indirect, and cumulative effects on surface water hydrology made in the Final EIS. iii. Suspended particulate/turbidity (40 C.F.R. § 230.11(c)): Section 5.a.iii of this EA describes the Corps' review and verification of the updated analysis of the predicted direct and indirect effects of the Ona project on surface water quality. As described in Section 5.b, the Corps determined that no updates to the surface water quality cumulative impact analysis found in

39

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

Section 4.12.4 of the Final EIS was necessary. Based on the updated analyses, the changes to the Ona project did not alter the Corps' determinations for the direct, indirect, and cumulative effects on surface water quality made in the Final EIS. Discharges from the mine will need to comply with both a Section 401 water quality certification (FDEP Environmental Resource Permit) and a Section 402 NPDES permit or permits (also issued by FDEP). iv. Contaminant Availability (40 C.F.R. § 230.11(d)): Section 5.a.iii of this EA describes the Corps' review and verification of the updated analysis of the predicted direct and indirect effects of the Ona project on surface water quality. As described in Section 5.b, the Corps determined that no updates to the surface water quality cumulative impact analysis found in Section 4.12.4 of the Final EIS was necessary. Based on the updated analyses, the changes to the Ona project did not alter the Corps' determinations for the direct, indirect, and cumulative effects on surface water quality made in the Final EIS. Discharges from the mine will need to comply with both a Section 401 water quality certification (FDEP Environmental Resource Permit) and a Section 402 NPDES permit or permits (also issued by FDEP). v. Aquatic Ecosystem Effects (40 C.F.R. § 230.11(e)): Sections 5.a.iv and 5.a.v of this EA describe the Corps' updated analyses of the direct and indirect effects of Ona on aquatic biological communities and wetlands, respectively. Section 5.b.iv describes the Corps' updated cumulative effect analysis for wetlands. Section 9 of this document provides project-specific information about mitigation, including compensatory mitigation for unavoidable impacts to aquatic resources in Section 9.c. Based on the updated analyses, the changes to the Ona project did not alter the Corps' determinations for the direct, indirect, and cumulative effects on aquatic biological communities made in the Final EIS. vi. Proposed Disposal Site (40 C.F.R. § 230.11(f)): The best management practices described throughout the Final EIS, including the perimeter ditch and berm system that separates the active mine from adjacent wetlands and surface waters, will confine the discharged materials within the mine

40

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

boundaries. vii. Cumulative Effects (40 C.F.R. § 230.11(g)): Section 5.b of this EA provides updated cumulative effect analyses for surface water resources, groundwater resources, ecological resources (wetlands and upland habitat), and economic resources and explains why the Corps determined that an update for surface water quality was not necessary. As described in that section, the project changes and changes in existing conditions that have occurred since the publication of the Final EIS did not alter the Corps' cumulative effects determinations in the Final EIS. viii. Secondary Effects (40 C.F.R. § 230.11(h)): As stated in Section 4.1 of the Final EIS, the evaluations of impacts described in the Final EIS included both direct and indirect, or secondary, impacts. Section 5.a of this EA addresses updates to those impact evaluations as the result of project changes described in Section 2.d of this EA. As described in Section 5.a, the changes to Ona that have occurred since the publication of the Final EIS did not alter the Corps' secondary effects determinations. b) Potential Impacts on Physical and Chemical Characteristics of the Aquatic Ecosystem (40 C.F.R. Part 230, Subpart C): Chapter 4 of the Final EIS describes Ona's potential impacts on substrate, suspended particulates/turbidity, water, current patterns and water circulation, normal water fluctuations, and salinity gradients. Section 5 of this EA addresses updates to the evaluations of the Ona project's effects on substrate, suspended particulates/turbidity, water, current patterns and water circulation, normal water fluctuations, and salinity gradients as the result of project changes described in Section 2.d of this EA. Based on the updated analyses, the changes to the Ona project did not alter the Corps' determinations for the direct, indirect, and cumulative effects on substrate, suspended particulates/turbidity, water, current patterns and water circulation, normal water fluctuations, and salinity gradients made in the Final EIS. c) Potential Impacts on Biological Characteristics of the Aquatic Ecosystem (40 C.F.R. Part 230, Subpart D): Chapter 4 of the Final EIS describes Ona's potential impacts on threatened or endangered species, fish, crustaceans, mollusks, and other aquatic organisms, and other wildlife. Section 5 of this EA addresses updates to the effects evaluations for threatened or

41

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

endangered species, fish, crustaceans, mollusks, and other aquatic organisms, and other wildlife as the result of project changes described in Section 2.d of this EA. Based on the updated analyses, the changes to the Ona project did not alter the Corps' determinations for the direct, indirect, and cumulative effects on threatened or endangered species, fish, crustaceans, mollusks, and other aquatic organisms, and other wildlife made in the Final EIS. As described in Section 8.f of this EA, the United States Fish and Wildlife Service (USFWS) is preparing a habitat conservation plan (HCP) and biological opinion (BO) for the proposed project. The Corps will consider the results of the USFWS review in making its final determination on the proposed Ona Mine. As also described in Section 8.f of this EA, as a result of a November 6, 2013, discussion of the project with the National Marines Fisheries Service Protected Resource Division (NMFS-PRD), the Corps determined that the proposed mines would have no effect on the smalltooth sawfish. On December 16, 2015, the NMFS Habitat Conservation Division (NMFS-HCD) stated that they anticipated any adverse effects associated with the proposed project that might occur on marine and anadromous fishery resources would be minimal and, therefore, they did not object to issuance of a permit. d) Potential Impacts on Special Aquatic Sites (40 C.F.R. Part 230, Subpart E): Chapter 4 of the Final EIS describes the Ona project's potential impacts on sanctuaries and refuges, wetlands, mud flats, vegetated shallows, and riffle and pool complexes. Chapter 5 of the Final EIS further describes mitigation, including the Corps' requirements, the sequence of avoidance, minimization, and compensation, and the mitigation framework developed for the evaluation of the four main phosphate mining projects. There are no coral reefs potentially impacted by the proposed Ona project. Section 5 of this EA addresses updates to those impact evaluations as the result of project changes described in Section 2.d of this EA. As described in Section 5, the project changes have not led to changes in the Corps' effects determinations in the Final EIS. Section 9.c of this EA provides additional details about the specific proposed compensatory mitigation for the Ona project.

42

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

e) Potential Impacts on Human Use Characteristics (40 C.F.R. Part 230, Subpart F): Chapter 4 of the Final EIS describes the Ona project's potential impacts on municipal and private water supplies, recreational and commercial fisheries, water-related recreation, and aesthetics. Section 5 of this EA addresses updates to those impact evaluations as the result of project changes described in Section 2.d of this EA. As described in Section 5, the project changes have not led to changes in the Corps' effects determinations in the Final EIS. f) Contaminant Evaluation and Testing (40 C.F.R. Part 230, Subpart G): Section 4.4 and Appendix D of the Final EIS describe the surface water quality monitoring, including aquatic biological monitoring, associated with existing phosphate mines, and reasonably expected to be required for proposed mines, including Ona. Section 5 of this EA addresses updates to those impact evaluations as the result of project changes described in Section 2.d of this EA. As described in Section 5, the project changes have not led to changes in the Corps' effects determinations in the Final EIS. 7) Draft Public Interest Review (33 C.F.R. § 320.4): The Corps considers both cumulative and secondary impacts on these public interest factors within the geographic scope as defined in Chapter 4 of the Final EIS. The Corps has used information as provided in the Final EIS to the maximum extent, as appropriate. Additional information evaluated by the Corps for any of the specific public interest review factors is described below in the section for the specific factor. a) Wetlands (33 C.F.R. § 320.4(b); Corps' Wetland Policy): Section 4.5.2 of the Final EIS describes how the Corps considered direct and secondary impacts to wetlands. Section 4.5.2.3 of the Final EIS describes the specific evaluation of potential wetland impacts associated with the Ona project. Section 4.12.5 of the Final EIS describes the cumulative effects on ecological resources, including wetlands. Section 2.c of this EA describes the currently proposed project, including the level of impacts to Corpsjurisdictional wetlands and surface waters (including streams). Sections 5.a.v and 5.b.iv of this EA describe the updated analyses of the Ona project's direct, indirect, and cumulative effects on wetlands. Section 9.c of this EA describes the compensatory mitigation plan proposed to offset the project's wetland and surface water impacts.

43

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

b) Fish and wildlife (33 C.F.R. § 320.4(c)): Section 4.5.1 of the Final EIS describes how the Corps considered direct and secondary impacts to aquatic biological communities. Section 4.5.1.3 of the Final EIS describes the specific evaluation of aquatic biological community impacts associated with the proposed Ona project. Section 4.5.3 of the Final EIS describes how the Corps considered direct and secondary impacts to wildlife habitat. Section 4.5.3.3 of the Final EIS describes the specific evaluation of wildlife habitat impacts associated with the proposed Ona project. Section 4.12.5 of the Final EIS describes the potential cumulative effects on ecological resources. Sections 5.a.iv and 5.a.vi of this EA describe the updated analyses of Ona's direct and secondary effects on aquatic biological communities and wildlife habitat. Section 5.b.iv of this EA describes the updated cumulative effects analyses for ecological resources. As described in Section 8.f of this EA, the USFWS is preparing an HCP and BO for the proposed project. The Corps will consider the results of the USFWS review in making its final determination on the proposed Ona Mine. As also described in Section 8.f of this EA, as a result of a November 6, 2013, discussion of the project with the NMFS-PRD, the Corps determined that the proposed mines would have no effect on the smalltooth sawfish. On December 16, 2015, the NMFS-HCD stated that they anticipated any adverse effects associated with the proposed project that might occur on marine and anadromous fishery resources would be minimal and, therefore, they did not object to issuance of a permit. c) Water quality (33 C.F.R. § 320.4(d)): Section 4.4 of the Final EIS describes how the Corps considered potential direct and secondary impacts to water quality. Section 4.4.2 of the Final EIS describes the specific evaluation of water quality impacts associated with all of the action alternatives. Section 4.12.4 of the Final EIS describes the potential cumulative effects on surface water quality. Section 5.a.iii of this EA describes the updated analysis of Ona's direct and secondary effects on water quality. Section 5.b of this EA describes why the Corps determined that an updated cumulative effects analysis for water quality was not necessary. The FDEP issued a water quality certification on August 31, 2015, as part of its Environmental Resource Permit (ERP). If the Corps issues a permit for this project, it will include a condition requiring compliance with the conditions specified in the water quality certification.

44

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

d) Historic, cultural, scenic, and recreational values (33 C.F.R. § 320.4(e)): Section 4.9 of the Final EIS describes how the Corps considered potential direct and secondary impacts to cultural resources and historic properties. Section 4.9.3 of the Final EIS describes the specific evaluation of potential cultural resource and historic property impacts associated with the Ona project. Section 4.1.8.5 of the Final EIS describes how the Corps considered potential aesthetic impacts associated with phosphate mining, and Section 4.1.8.7 describes how the Corps considered potential effects on recreation. Section 8.e of this EA describes how the proposed project complies with the National Historic Preservation Act of 1966. e) Effects on limits of the territorial sea (33 C.F.R. § 320.4(f): The proposed Ona project will not affect coastal waters, either by erosion or accretion. f) Consideration of property ownership (33 C.F.R. § 320.4(g): The applicant owns the property that is the subject of this permit application. The proposed project will not affect navigation nor riparian rights to navigable waters. g) Activities affecting coastal zones (33 C.F.R. § 320.4(h): The proposed Ona project will not affect coastal zones. h) Activities in marine sanctuaries (33 C.F.R. § 320.4(i)): The proposed Ona project is not within a marine sanctuary. i) Other Federal, state, or local requirements (33 C.F.R. § 320.4(j)): Section 8 of this EA describes the proposed project's compliance with other federal, state, and local requirements. j) Safety of impoundment structures (33 C.F.R. § 320.4(k)): The construction and operation of the clay settling areas will comply with federal, state and local requirements. Specifically, the FDEP's NPDES permit(s) will require compliance with Rule 62-672, F.A.C., "Minimum Requirements for Earthen Dams Used in Phosphate Mining and Beneficiation Operations and for Dikes Used in Phosphogypsum Stack System Impoundments." Also, the Hardee County Development Order and Master Mine Plan will require additional inspection, reporting, and emergency management elements that apply to the dams proposed for the Ona Mine.

45

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

k) Floodplain management (33 C.F.R. § 320.4(l)): Section 4.1.8.4 of the Final EIS describes how the Corps considered potential floodplain impacts associated with phosphate mining. As stated in that section, FDEP regulations state that no net encroachment into the floodplain, up to that encompassed by the 100-year event, can be allowed unless equivalent compensating storage is provided between the seasonal high water level and the 100-year flood level. FDEP issued an ERP for the project on August 31, 2015. Additionally, the Corps' evaluation of wetland impacts described in Section 7.a of this EA includes consideration of floodplains. l) Water supply and conservation (33 C.F.R. § 320.4(m)): Section 5.a.i of this EA describes the Corps' review and verification of the updated analysis of the predicted direct and indirect effects of the proposed Ona project on surface water flows within the Upper Myakka River, Horse Creek, and the Peace River. Section 5.b.ii of this EA describes the updated analysis of the cumulative effects on surface water flows in the Upper Myakka River, Horse Creek, the Peace River, and Charlotte Harbor. Based on the updated analyses, the changes to the proposed Ona project did not alter the Corps' determinations for the potential direct, indirect, and cumulative effects on surface water hydrology made in the Final EIS. Section 4.12.2.5 of the Final EIS describes the potential cumulative effects of phosphate mining on water supply withdrawals in the lower Peace River, and Section 4.12.2.6 describes the magnitude and significance. As stated in those two sections, the cumulative effect of mining on water supply withdrawals has at most a minor level of effect. As also stated above, the changes to the proposed Ona project did not alter the Corps' determinations for the direct, indirect, and cumulative effects on surface water hydrology made in the Final EIS, including on public water supplies. Section 5.a.iii of this EA describes the Corps' review and verification of the updated analysis of the predicted direct and indirect effects of the proposed Ona project on surface water quality. As described in Section 5.b, the Corps determined that no updates to the surface water quality cumulative impact analysis found in Section 4.12.4 of the Final EIS was necessary. Based on the updated analyses, the changes to the proposed Ona project did not alter the Corps' determinations for the potential direct, indirect, and

46

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

cumulative effects on surface water quality made in the Final EIS. Discharges from the mine will need to comply with both a Section 401 water quality certification (FDEP Environmental Resource Permit) and a Section 402 NPDES permit or permits (also issued by FDEP). Section 4.3.3 of the Final EIS describes the predicted direct and indirect effects of Ona on groundwater resources. Section 4.12.3.12 of the Final EIS describes the potential cumulative effect of phosphate mining on groundwater resources, and Section 4.12.3.13 describes mitigation, monitoring, and adaptive management measures to protect groundwater resources. As stated in those two sections, the potential cumulative effect of phosphate mining on groundwater resources would be at most be minor. Section 5.a.ii of this EA describes the Corps' review and verification of the updated analysis of the predicted direct and indirect effects of the proposed Ona project on groundwater resources. Section 5.b.iii of this EA describes the updated groundwater resources cumulative effects analysis. m) Energy conservation and development (33 C.F.R. § 320.4(n)): The Corps does not consider the proposed action, a phosphate mine, to be an energy project. n) Navigation (33 C.F.R. § 320.4(o)): The proposed project will not have any effects on navigation. o) Environmental benefits (33 C.F.R. § 320.4(p)): The proposed project will cause the short-term disruption of the existing altered ecosystem; however, successful implementation of the proposed reclamation plan and compensatory mitigation plans will result in long term benefits through the reclamation of native habitat and mitigation of aquatic resources. The proposed compensatory mitigation plan provides for the reestablishment, management, and preservation of wetand habitats. p) Economics (33 C.F.R. § 320.4(q)): Section 4.6.3 of the Final EIS describes the predicted direct and indirect effects of the Ona project on the economy of Hardee County. Section 4.12.6 of the Final EIS describes the cumulative effects on the economies of Hardee County and on an eight-county region. Sections 5.a.vii and 5.b.v of this EA described the updated analyses of the potential direct, indirect, and cumulative economic effects. As stated in those sections, the changes to the Ona project did not alter the Corps'

47

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

determinations for the potential direct, indirect, and cumulative economic effects made in the Final EIS. q) Mitigation (33 C.F.R. § 320.4(r)): Chapter 5 of the Final EIS further describes mitigation, including the Corps' requirements, the sequence of avoidance, minimization, and compensation, and the mitigation framework developed for the evaluation of the four pending phosphate mine applications. Section 9 of this document further describes the specific proposed compensatory mitigation for the Ona project. r) Conservation: Decades of agricultural activity have resulted in a degraded condition for many of the onsite wetlands. As described in Section 4 of this EA, and in accordance with the mitigation framework described in Section 5.4 of the Final EIS, the applicant has preferentially avoided forested wetlands, higher-quality herbaceous wetlands, and stream systems in their mine plan. As described in Section 9 of this EA, the applicant also proposes to preserve and manage these avoided areas as part of the compensatory mitigation plan. As also described in Section 9 of this EA, the proposed compensatory mitigation plan also includes restoration, enhancement, and establishment of wetlands and streams on several offsite parcels, with eventual preservation and management of those mitigation areas. s) Shore erosion and accretion: The proposed action will not affect shore erosion or accretion. t) Safety: Industry OSHA requirements will be in place during all construction activities. Section 4.8 of the Final EIS addresses the potential effects of radiation associated with phosphate mining. u) Food and fiber production: The recovered phosphate ore will be processed into fertilizer and animal feed supplements. This is a direct benefit to food and fiber production. 8) Other Federal, State, and Local Requirements: a) Section 401 of the Clean Water Act: The FDEP issued a water quality certification on August 31, 2015, as part of the ERP issued for the proposed project. b) Section 307(c) of the Coastal Zone Management Act: The FDEP issued a coastal zone management consistency determination on August 31, 2015,

48

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

as part of the ERP issued for the proposed project. c) Section 302 of the Marine Protection, Research and Sanctuaries Act: This proposed project is not located in a marine sanctuary as established by the Secretary of Commerce under authority of Section 302 of the Marine Protection, Research and Sanctuaries Act of 1972. d) Fish and Wildlife Act of 1956, Migratory Marine Game-Fish Act, Fish and Wildlife Coordination Act, and other acts protecting fish and wildlife resources: Chapter 4 of the Final EIS describes Ona's potential impacts on threatened or endangered species, fish, crustaceans, mollusks, and other aquatic organisms, and other wildlife. Section 5 of this EA describes how the Corps considered the project changes listed in Section 2.d of this EA in updating effect determinations made in the Final EIS, or why updates were not necessary for some issue categories. As described in Section 8.f of this EA, the USFWS is preparing an HCP and BO for the proposed project. e) National Historic Preservation Act of 1966: Section 6.3 of the Final EIS describes how the actions considered in that document, including this proposed action, will comply with the National Historic Preservation Act of 1966. The SHPO, by letter dated June 20, 2012, stated that its review of the Florida Master Site File indicates that no historical properties are recorded within the project area. Furthermore, because of the location and/or nature of the project, the SHPO determined that it is unlikely that historic properties will be affected. If the Corps issues a permit for this project, it will include a special condition requiring protection of previously unidentified archaeological/cultural materials and notification of appropriate authorities including the SHPO and THPO. The applicant provided a Phase 1 cultural resource survey to the SHPO for the 160-acre addition on July 19, 2013. By letter dated August 14, 2013, the SHPO stated that it concurred with the determination that mining in the project area will have no effect on cultural resources listed in the National Register of Historic Places, eligible for listing, or otherwise of archaeological, historical, or architectural value. The Corps will coordinate directly with the SHPO to confirm those findings, and provide that confirmation in the RODSOF for the Ona project. In addition, the Seminole Tribe of Florida's Tribal Historic Preservation Officer (STOF-THPO), by letter dated July 5, 2012, identified sites within

49

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

the Ona parcel about which they had concerns. The Corps will work with the STOF-THPO to address those concerns and coordinate review of the additional 160 acres, and provide the resolution of that coordination in the RODSOF for the Ona project. f) Endangered Species Act: The June 1, 2012, public notice for the Ona project stated the following about listed species: Wildlife surveys have been conducted on the subject property. Audubon's crested caracara (Polyborus plancus), wood storks (Mycteria americana), and Eastern indigo snakes (Drymarchon couperi) have been confirmed onsite. There is one nesting pair of caracara currently located within the subject property. The project has suitable habitat and is within the consultation area for the Florida grasshopper sparrow (Ammodramus savannarum floridanus). The project has suitable habitat for the Florida panther (Puma concolor coryi) and is outside of the Panther Focus Area. The project has suitable habitat for the Florida scrub jay (Aphelocoma coerulescens), however no scrub jays were detected during speciesspecific surveys. Using the January 25, 2010, effect determination key for the eastern indigo snake (A-B-C-D), the Corps has determined that the proposal may affect the Eastern indigo snake. The applicant has not provided an analysis of the foraging value of the impacted or mitigation wetlands. Using the January 25, 2010, effect determination key for the wood stork (A-B-C-E), the Corps has determined that the proposal may affect the wood stork. Based upon the presence of one confirmed caracara nest on the property, the Corps has determined that the proposal may affect the caracara. Based on the presence of suitable habitat, the Corps has made the preliminary determinations that the proposal may affect, but is not likely to adversely affect the Florida grasshopper sparrow, the Florida panther, and the Florida scrub jay. The Corps will request initiation of formal consultation for the wood stork, the Eastern indigo snake and the caracara, and informal consultation for the Florida grasshopper sparrow and the Florida panther with the Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act by separate letter.

50

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

By letter dated August 1, 2012, the Corps requested initiation of formal consultation for the eastern indigo snake, the caracara, and the wood stork, and concurrence with its effect determinations for the grasshopper sparrow, panther, and scrub jay. The USFWS is currently reviewing an application for an amendment to an Incidental Take Permit for a 900-acre area within the overall Ona project site identified as the "Fort Green Uplands" 17, and a BO for the remaining 21,583 acres of the project site, as shown in Attachment A - Figure 9. The USFWS's review will consider the changes to the proposed project since 2012, including those changes described in Section 2.d of this document. On November 6, 2013, the Corps and NMFS-PRD held a meeting to discuss the effects of phosphate mining, including this project, on the smalltooth sawfish and the sawfish critical habitat unit in Charlotte Harbor. In regards to surface water quality effects, as described in Sections 4.4.6 and 4.12.4 of the Final EIS, and Sections 6 and 7 of this EA, individually and cumulatively the expected level of potential impact is low enough that there will be no effect downstream on the sawfish or its critical habitat. In regards to surface water quantity effects, as described in Sections 4.2.5 and 4.12.2 of the Final EIS, and Sections 6 and 7 of this EA, individually and cumulatively the expected level of potential impact is low enough that there will also be no effect downstream on the sawfish or its critical habitat. Therefore, the Corps determined that the proposed project would have no effect on the smalltooth sawfish. The Corps received notice on October 6, 2017, that manatees were sighted in Horse Creek, south of the Ona project site. On November 27, 2017, the Corps prepared a Memorandum for the Record (MFR) (Attachment C to this document) documenting its determination of `no effect' on the manatee for the Ona project and provided a copy of the MFR to the USFWS. g) Marine Mammal Protection Act of 1972: The proposed project does not affect any marine mammals.

The USFWS published a notice in the Federal Register on December 7, 2017, to request public comments on the proposed amendment; FR2017-26360, pages 5778457785.

17

51

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

h) Section 7(a) of the Wild and Scenic Rivers Act: Section 6.10 of the Final EIS describes how the actions considered in that document, including this proposed action, will comply with Section 7(a) of the Wild and Scenic Rivers Act. As stated in the Final EIS, a segment of the Myakka River is a designated Wild and Scenic River. Chapter 4 of the Final EIS describes the predicted direct, indirect and cumulative effects of the Ona project on surface water flows within the Myakka River. The Final EIS states that the project will have an insubstantial to minimal effect on the Myakka River. i) Section 402 of the Clean Water Act: The state of Florida has issued NPDES permits for the South Pasture and the Four Corners Mines. Prior to operation of the Ona Mine, the applicant will need to request and receive modifications of those NPDES permits to encompass the Ona Mine property. j) Magnuson-Stevens Fishery Conservation and Management Act: On December 16, 2015, the NMFS Habitat Conservation Division (NMFS-HCD) stated that it anticipated any adverse effects associated with the proposed project that might occur on marine and anadromous fishery resources would be minimal and, therefore, it did not object to issuance of a permit. k) Migratory Bird Treaty Act: Section 6.12 of the Final EIS describes how the actions considered in that document, including this proposed action, will comply with the Migratory Bird Treaty Act. 9) Compensation and other mitigation actions. a) Description of impacts: The applicant proposes a total of approximately 3,426.1 acres of impact to Corps-jurisdictional wetlands, including 1,357.87 acres of forested wetland impacts and 2,068.27 acres of herbaceous wetland impacts. The applicant also proposes approximately 100,766.8 linear feet of impact to Corps-jurisdictional streams. The jurisdictional impacts include up to 14 acres of temporary impacts to WOUS for necessary consolidated dragline and infrastructure corridor crossings of an un-named tributary to Brushy Creek, Horse Creek, and West Fork Horse Creek. Construction of these crossings would result in a total up to 12 acres of temporary impacts to forested wetlands, up to 2 acres of temporary

52

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

impacts to herbaceous wetlands, and 1,794 linear feet of temporary impacts to streams. By watershed, 38.54 acres of the wetland impacts (10.27 acres forested, 28.27 acres herbaceous) are within the Myakka River watershed, and the remainder are within the Peace River watershed. All of the stream impacts are within the Peace River watershed. The current UMAM functional analysis, as prepared by the applicant, shows that the project as proposed will result in 606.99 units of functional loss due to the forested wetland impacts (including 5.1 units in the Myakka River watershed), and 783.1 units of functional loss due to the herbaceous wetland impacts (including 12.3 units in the Myakka River watershed). The applicant also provided a functional analysis using the FDEP stream habitat assessment methodology indicating that the project will result in 41,377.21 units of functional loss due to the stream impacts. The Corps has not finalized its review of these functional assessments. b) Mitigative Actions (33 C.F.R. §320.4(r) and 40 C.F.R. Part 230, Subpart F): i. General Actions (as Described in the Final EIS): Chapter 4 of the Final EIS describes actions proposed by the applicant to avoid, minimize, and offset adverse impacts to the human and natural environment associated with phosphate mining in addition to the avoidance, minimization, and compensation of impacts to aquatic resources. For example, Section 3.1.1 describes the installation of a ditch and berm system before the start of mining to help maintain hydrology in adjacent streams and wetlands, Section 4.1.8.1 describes the best management practice of watering down roads within the mine to reduce fugitive dust and protect air quality. Section 4.1.8.5 describes how the berms around the mine function as a visual barrier to protect aesthetics, in addition to being part of the overall water management system. Chapter 5 of the Final EIS provides information about compensatory mitigation for impacts to aquatic resources and mitigation alternatives for phosphate mining within the Central Florida Phosphate District, with consideration of the mitigation proposed at that time for the four pending phosphate mine applications (South Pasture Extension, Ona, Wingate East, and Desoto). ii. Project-specific Actions: Sections 4(d) and 4(e) of this EA describe the applicant's proposed alternatives for avoidance and minimization of impacts to aquatic resources associated with the Ona project. Section 9(c) of this EA describes the applicant's current plan for compensatory mitigation of

53

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

impacts to aquatic resources for South Pasture Extension. The Ona project went through several rounds of minimization and reduction of impacts, including to aquatic resources, before arriving at the current Applicant's Preferred Alternative. As described in the June 1, 2012, public notice, the June 2011 revised application that the prior applicant submitted as part of the Areawide EIS review proposed 20,864 acres of mining or other disturbance, with 4615 acres of impact to Corps-jurisdictional wetlands and other surface waters and 136,731 linear feet of stream impacts. In response to the results of the Final EIS, including the mitigation framework detailed in Section 5.4 of that document, the applicant submitted a revised mine plan in September 2013, with 18,870.9 acres of proposed mining or other disturbance, 3519.4 acres of impact to Corps-jurisdictional wetlands and other surface waters, and 103,978 linear feet of stream impacts. Additional project-specific minimization measures introduced with this revision included the addition of upland buffers to avoided wetlands where practicable, the addition of 160 acres of land to the project to allow redesign of a CSA and minimization of its footprint, and an increase in the use of shared walls for CSAs to also minimize their footprints. In June 2014, the applicant proposed 18,801 acres of proposed mining or other disturbance, 3419 acres of impact to Corps-jurisdictional wetlands and other surface waters, and 103,304 linear feet of stream impacts. This mine plan retained the project-specific minimization measures proposed in September 2013. Currently, as described in Section 2.c of this EA, the applicant proposes 18,776 acres of proposed mining or other disturbance, 3426.1 acres of impact to Corps-jurisdictional wetlands and other surface waters, and 100,766.8 linear feet of stream impacts. c) Compensatory Mitigation for Unavoidable Impacts to Aquatic Resources (33 C.F.R. § 332): As stated in Section 5.1.2 of the Final EIS, on March 31, 2008, the Environmental Protection Agency and the Corps issued revised regulations governing compensatory mitigation for authorized impacts to wetlands, streams, and other waters of the U.S. to advance the federal

54

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

objective of "no net loss" of wetlands. These regulations, 33 C.F.R. Parts 325 and 332 and 40 C.F.R. Part 230 (the 2008 Compensatory Mitigation Rule), are designed to improve the effectiveness of compensatory mitigation to offset the loss of aquatic resource area and function, and to increase the efficiency and predictability of the mitigation project review process. Section 5.5 of the Final EIS provides additional information on compensatory mitigation options as described in the 2008 Compensatory Mitigation Rule. Currently, there are two federally-approved mitigation banks whose service areas cover the Peace River watershed portion of the proposed project ­ Boran Ranch Mitigation Bank and Peace River Mitigation Bank. There is one federally-approved mitigation bank whose service area covers the Myakka River watershed ­ the Myakka River Mitigation Bank. As of January 10 1, 2018 18, Boran Ranch has 107.13 freshwater herbaceous credits available, Peace River has 42.4 freshwater forested credits available, and Myakka River has 61.87 freshwater forested and 59.17 freshwater herbaceous credits available. None of the banks have specific stream credits available. Based on the current functional assessment of the project's impacts as described in Section 9.a of this EA, the available mitigation banks do not have sufficient numbers of credits available to compensate for the proposed wetland impacts within the Peace River watershed, and have no credits available to compensate for the proposed stream impacts. In the case of the proposed mitigation within the Myakka River watershed, although there are sufficient mitigation bank credits available, the Corps has determined that the proposed onsite restoration and reestablishment of wetlands within the headwaters of the Myakka River is the most appropriate, environmentally preferable, and practicable mitigation option. There are no in-lieu fee projects whose service areas cover the proposed project. Therefore, the applicant proposes to implement a program of onsite and offsite, in-kind, permittee-responsible mitigation to offset unavoidable impacts to aquatic resources associated with the construction and operation of the Ona phosphate mine. The applicant states that this permitteeresponsible mitigation is the most appropriate and practicable mitigation As verified using the Regulatory In-lieu Fee and Bank Information Tracking System (RIBITS), at https://ribits.usace.army.mil

18

55

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

alternative based on consideration of project-specific circumstances, such as the availability of mitigation banks or in-lieu fee programs, and the watershed approach. In regard to the watershed approach, the Applicant states that the proposed mitigation plan addresses watershed needs for the Peace and Myakka Rivers identified in the Charlotte Harbor National Estuary Program Comprehensive Conservation and Management Plan (CCMP). The CCMP constitutes a watershed plan pursuant to 33 C.F.R. § 332.3(c). The Charlotte Harbor National Estuary Program stated in a letter to the Applicant dated September 9, 2016, that overall, "on-site and off-site mitigation plans have been designed to support implementation of the CHNEP's Comprehensive Conservation and Management Plan." The applicant also states that the proposed mitigation plan addresses watershed needs for the Myakka River identified in the Southwest Florida Water Management District's Myakka River Comprehensive Watershed Management Plan. In accordance with 33 C.F.R. § 332.4(c), the applicant has provided a draft mitigation plan which includes the following 12 components: i. Objectives: The applicant's proposed mitigation plan includes the following: a. Onsite preservation of 1,483.8 acres of wetlands (1,105.5 acres forested and 378.4 acres herbaceous), 120,855.65 linear feet of streams, and 2,192.9 acres of adjacent native habitat upland buffers before commencement of mining; b. Onsite reestablishment on a rolling basis across the site, as reclamation follows behind mining, of 3,381.3 acres of wetlands (1,476.4 acres forested and 1,904.9 acres herbaceous), 35,437.27 linear feet of streams, and 1,761.5 acres of native habitat upland buffers; with preservation of the reestablished wetlands, streams and buffers after they have achieved the required success criteria; c. Offsite mitigation at the Payne Creek restoration site consisting of 506.7 acres of wetland establishment (88.6 acres forested and 418.1 acres herbaceous), 14,755.00 linear feet of stream establishment, and 385.2 acres of native habitat upland buffers; with preservation of the

56

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

established wetlands, streams and buffers after they have achieved the required success criteria; d. Offsite mitigation at the Bowlegs Creek restoration site consisting of 39.81 acres of wetland establishment (36.18 acres forested and 3.63 acres herbaceous), 77.09 acres of forested wetland preservation, 115.37 acres of wetland enhancement (82.38 acres forested and 32.98 acres herbaceous), 5,507 linear feet of stream establishment and restoration, and 366.9 acres of native habitat upland buffers; with preservation of the established wetlands, streams and buffers after they have achieved the required success criteria; e. Offsite preservation at the Ghost sites consisting of 205.1 acres of wetlands (197.3 acres forested and 7.8 acres herbaceous) and 125.0 acres of adjacent native habitat upland buffer, before commencement of mining; f. Offsite preservation at the Horse Creek/Payne Creek sites consisting of 573.63 acres of wetlands (471.44 acres forested and 102.19 acres herbaceous), and 322.8 acres of adjacent native habitat upland buffers preserved before commencement of mining; g. Offsite preservation at the Payne Creek Connector sites consisting of 266.61 acres of wetlands (254.77 acres forested and 11.84 acres herbaceous), and 3.1 acres of adjacent native habitat upland buffers preserved before commencement of mining; h. Offsite preservation at the Peace River North site consisting of 440.39 acres of wetlands (440.02 acres forested and 0.37 acres herbaceous), and 129.9 acres of adjacent native habitat upland buffers preserved before commencement of mining; i. Offsite preservation at the Peace River South site consisting of 243.65 acres of forested wetland preservation and 119.9 acres of adjacent native habitat upland buffers preserved before commencement of mining; j. Offsite mitigation at the West Fork Horse Creek restoration site consisting of 31.38 acres of wetland establishment (17.96 acres forested and 13.42 acres herbaceous), 63.49 acres of wetland preservation (63.05 acres forested and 0.44 acres herbaceous), 5.44 acres of forested wetland enhancement, and 46.4 acres of native habitat upland buffers; with preservation of the established wetlands and buffers after they have achieved the required success criteria;

57

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

k. Offsite mitigation at the adjacent South Pasture Extension Mine sites consisting of 166.58 acres of herbaceous wetland establishment and 146.9 acres of native habitat upland buffers, with preservation of the established wetlands and buffers after they have achieved the required success criteria. Attachment A-Figure 10 shows the approximate locations and extent of the mitigation sites. ii. Site Selection: As stated above, neither of the two available mitigation banks has sufficient numbers of credits available to compensate for the proposed wetland impacts, or any stream credits at all, therefore the applicant proposed onsite mitigation as the most appropriate and practicable mitigation alternative. The proposed preservation areas include the area avoided as part of the impact minimization as described in Section 4 of this EA. The applicant based the locations of the reestablished wetlands and streams on extensive monitoring, data collection, analyses and modeling. Results of the modeling indicate that the proposed mitigation takes into account watershed needs and will result in ecologically self-sustaining mitigation. iii. Site Protection Instrument: Perpetual conservation easements granted to the FDEP will provide require long-term protection of the mitigation areas. The conservation easements will grant third party rights of notice and enforcement to the Corps. The Corps will review the site protection instrument by the District for compliance with 33 C.F.R. Section 332.7(a). iv. Baseline Information: The 22,483-acre project site includes 4,885 acres of WOUS. Over 40 percent of the property has been converted from native vegetative cover into pastures, roads, livestock watering ponds, or utility corridors. Native upland cover (i.e., rangeland and forest) is present on approximately 35 percent of the site and wetland vegetative cover is present on approximately 24 percent of the site. The historic and physical land use is primarily agricultural, with most of the property used for cattle grazing. The applicant has collected ecological baseline data for the site since 1996 including wetland delineations, wetland quality assessments using UMAM, detailed vegetation and land use mapping, and wildlife and listed species

58

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

surveys. The applicant also completed a hydrologic assessment. Data collected for this assessment included stream and drainage area characteristics, topography, precipitation rates, measurements of evapotranspiration, and hydrogeology. The Corps considered this baseline information both in its evaluation of the proposed impacts associated with the Ona project and its evaluation of the proposed compensatory mitigation. The offsite mitigation areas are primarily areas reclaimed in accordance with FDEP requirements, where the applicant has identified opportunities based on onsite environmental factors such as hydrology to improve the ecological characteristics of the sites and provide viable mitigation sites. v. Determination of Credits: The UMAM functional analysis of the project impacts, as prepared by the applicant, shows that the project as proposed will result in 606.99 units of functional loss due to the forested wetland impacts, and 783.1 units of functional loss due to the herbaceous wetland impacts. The applicant also provided a functional analysis using the FDEP stream habitat assessment methodology indicating that the project will result in 41,377.21 units of functional loss due to the stream impacts. The applicant's proposed functional assessment for the mitigation shows 610.1 units of functional gain for forested wetlands (including 454.2 units from onsite mitigation and 155.9 units from offsite mitigation), 796.91 units of gain for herbaceous wetlands (including 486.21 units onsite and 310.7 units offsite), and 50,714.7 units of gain for streams (including 39,896.26 units onsite and 10,818.44 units offsite). The Corps has not finalized its review of these functional assessments. vi. Mitigation Work Plan: For the onsite wetland re-establishment mitigation, after mining, the applicant proposes to create forested and herbaceous wetlands on sand tailings, and then grade and cap the wetlands with suitable wetland topsoil/muck, if available, or other suitable organic matter with specific depths and structure to be determined by habitat type. To create microhabitat and habitat heterogeneity within the wetlands, the applicant will grade the created systems to provide a range of habitat types and distinct zonations, from seasonal to permanent inundation. In addition, the applicant will install habitat enhancements, including snags to encourage wildlife usage, and stumps, logs, and shrubs to provide hummocks in the created wetlands where appropriate. The applicant will

59

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

directly transfer small shrubs and trees from the future mining areas into the re-established wetlands to the extent practicable. Where direct transfer or natural recruitment of vegetation is not sufficient, the applicant will plant vegetation that is consistent with the species diversity and density of the targeted wetland community type. The stream re-establishment incorporates in-stream channel design, as well as a comprehensive overview of all lotic site conditions, which include headwater wetlands and in-line wetlands and the surrounding habitat zones of flanking wetlands and terrestrial communities within and along the riparian valley. To accomplish these goals, forested corridors and native upland riparian zones will typically replace those that were historically cleared for agriculture on the Ona Mine. The reclaimed valleys will form an unditched drainage network with a flow regime that is not artificially flashy like the existing ditched systems. The stream restoration plan pays significant attention to landscape scale associations important to overall stream function by matching drainage area to valley geomorphology, width of the meander belt, and functional process zone types and sequences. The design covers a full hierarchy of scales, restoring a series of habitat patches and zones progressing from in-stream meso-habitats, such as individual logs and pools a few feet long, to the geomorphic and hydraulic linkages of entire lentic, paralotic, and lotic waterbodies and their associated ecotones encompassing many acres. These landscape linkages are based largely on the historic conditions of the property, prior to land clearing and ditching, which will provide a better overall lotic system versus that existing immediately prior to mining. The successful implementation of the stream restoration plan will result in the restoration of historic native conditions, wherever practical. Offsite wetland and stream establishment and enhancement activities will follow similar plans. For both the onsite and offsite non-preservation-only mitigation, if the Corps issues a permit for Ona, that permit will include conditions requiring compliance with the mitigation work plans that will be part of the final compensatory mitigation plan. vii. Maintenance Plan: The applicant will implement a mitigation maintenance plan to ensure the constructed mitigation sites progress towards success as defined by the permit performance standards and in accordance with the mitigation work plan. Plan elements include

60

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

inspections, nuisance/exotic species control/removal, and supplemental tree and herbaceous plantings. viii. Performance Standards: If issued, the Corps permit for Ona will include required performance standards, or success criteria, for hydrology, water quality, vegetative cover, and other criteria. Appendix I of the Final EIS and the issued DA permit for South Pasture Extension (SAJ-1993-01395) provide examples of ecological performance standards applicable to phosphate mining. Both documents are available at: http://www.saj.usace.army.mil/Missions/Regulatory/Items-of-Interest/ ix. Monitoring Requirements: The applicant will implement a monitoring program to gather the data necessary for the Corps to evaluate the status of the mitigation. Data collected will include but not be limited to coverage of desirable plant species and of nuisance/exotic plant species, dominance of plant species, hydrology, and tree health/viability and density. The applicant will summarize the mitigation wetland monitoring data into a report that will include the above information as well as observed wildlife usage, an overall ecological evaluation, and any actions that may be required to improve the system. To the extent practicable, reports will be tabular in form for ease of review and year-to-year comparisons. The applicant will submit reports prior to the end of the second month following the month in which the monitoring event took place (e.g., monitoring event in September, report submitted no later than 30 November). Subsequent to completion of the compensatory mitigation objectives, the applicant will perform monitor herbaceous and shrub wetland mitigation areas semi-annually for the first three years and annually thereafter for a total of no less than five years of monitoring, and monitor forested wetland mitigation areas semi-annually for the first 5 years and annually thereafter for a total of no less than 10 years of monitoring. x. Long-Term Management Plan: After the Corps' determination that a mitigation area has achieved the necessary performance standards, the applicant will maintain that mitigation area in perpetuity in accordance with mitigation objectives and an approved Long-Term Management Plan. The long-term management plan will include a description of long-term management needs and the annual cost estimates for these active long-

61

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

term management needs, an identified funding mechanism for the longterm management, a requirement for an Ecological Baseline Report, provisions for management of proposed secondary uses of the mitigation areas such as cattle grazing, hunting, and passive recreation, and annual reporting to document the ecological conditions within the post-release mitigation areas, the status of secondary activities conducted within the mitigation areas, and maintenance activities expenses. A surety bond and standby trust fund, reviewed and approved by the Corps, will provide the long term funding mechanism for the long term management needs of the mitigation areas. For areas proposed for preservation only as described in Section 9(c)(i) above, the applicant will manage those areas in accordance with the LongTerm Management Plan immediately following execution of the conservation easement, and ensure that the necessary long-term funding mechanism for those initial management activities is in place prior to the commencement of work. xi. Adaptive Management Plan: If monitoring identifies habitat deficiencies such as low plant survivorship or exotic/nuisance vegetation, or if the Corps determines that any mitigation area is not meeting its goals, the applicant will develop and implement a site-specific adaptive management/corrective action plan that addresses specific construction, maintenance, and/or enhancement measures to be implemented to achieve the design objectives. Items to be considered in the corrective actions may include adjusting wetland hydrology, supplemental plantings, or changes to the maintenance plan to address nuisance species negatively affecting the mitigation. Any such adaptive management plan will be submitted to the Corps for approval prior to implementation. xii. Financial Assurances: Financial assurances for permittee-responsible mitigation are a mechanism that ensures that a sufficient amount of money will be available for use to complete or replace a mitigation provider's obligations to implement a required mitigation project and meet specified ecological performance standards in the event that the mitigation provider proves unable or unwilling to meet those obligations. For the Ona project, the applicant proposes to provide a financial responsibility mechanism equal to 110 percent (%) of the estimated

62

CESAJ-RD-W Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 (IP-JPF)

mitigation costs for WOUS affected in the first three years of operation, including monitoring and maintenance. Further, the applicant will update the financial responsibility yearly to cover, on a rolling basis, the cost of mitigation activities proposed to be undertaken over the next three year period, with a 10% contingency factor for any adaptive management that might be required. The applicant will update the mechanism with revised costs until release. The Corps permit, if issued, will include a special condition requiring the financial assurances to be in place prior to commencement of the authorized activities. The Corps has not yet completed its review of the applicant's compensatory mitigation plan. Prior to permit issuance, the Corps will ensure that the applicant's compensatory mitigation plan fully complies with the requirements of the 2008 Compensatory Mitigation Rule.

63

Supplemental Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 Attachment A ­ Maps

SPE PLANT

Figure 1

Figure 2: Parks-Beckley Parcel (in yellow) ' I

36

Legend

'

31

32

33

34

36

35

31

32

J

l

I

--------!------

I c::J

l

----+-

N

Mosaic· 4::.......

Ona Boundary (June 20 11)

---J Section lines

~--

Ona Mine

i = J Roads - - ACOE Streams

Mosaic Fertilizer, LLC

ACOE Wetlands

i

ACOE 404 Application

1

6

2

__)_

Parks Beckley Parcel 0

2,000

Source: Mosaic

4,000

Feet

12

01-B 13

18

---------.,...___...___ __ 01 -0 I

r 24

24

24

19

t04-B

25

25

30 ' ·---

-

SR64 2

.'

33

34

\

31

35

(

I

' - --- i---.e:.- .r -- - -- - -- - - -- - - --1--

_,

_ ______ .______L-_..____ _________

6

------1--,

-- ----1----

'I

12

! I

'

'

4

'

7

36

2

1

~---------

I

I1

1

l !

35 34

3

2

'' '''

1

! I

6

Legend - Plan B

C ana Boundary (June 2011) C Avoided Area - 3,538 ac. C c1ay Settling Areas D Parks Beckley Parcel

3

l I'

I'

-----1---------------1--------------11

12

8

!l

10

II

I

I

I

I I

r I

I

12

Figure 3: Applicant's Preferred Alternative '' 36

31

32

T33 S I wiw T34 S

:

-- ... ·-----

I

j

i

32

Mosaic·

On.a Boundary

~ ~

- - ACOE Streams

Ona 'i1ine

ACOE Wetlands

Mosaic Fertilizer, LLC

0

I

5

6

t

I

I

I

'

I C\f

I

:

31

.------- ................... ......~====:L.·----------J,- --------------·~:- - -----"-.-------4---·--

I

!a::

35

34

36

I

-·- ------- -,..i

1

33

:

Legend

c:::J

4

02

\,.,

i i

/

6

2

i

ACOE 404 Application Map 5-1-J Alternative Plan F

I

3

N

I I I

01-A

I I I

---···----····1----------------

7

0

2,000

4,000

Feel User. bm Date.: 5·1114/2016 P'iJBl: G:\pro;ects\2013\2013_0001\RA1_2Maps\Map 5-1-J Pian F.mXd

12

10

01-B

13

11

12

18 '

I

---- ·---- .,...___

,..___ __ $1-0

f

24

I 24

I

:

19

24

I

!04-B

~

25

j

25

30

~

j

: I

SR64 2

36

33

34

35

35

36

2

1

34

i

j

I

0

---·-·--- - -----.. .1---·-- - - ---+--------- !------'------------- - ·~----------- '

!

II

I

I I I

1

I

6

i ----r----------I

1

12

:' '

I I

' I

I

7

2

1

6

3

\

Legen d - Plan D

I

C] Clay Settling Areas [J ona Boundary C]Avoided Area (Preserved) - 3,705 ac.

I

!-+.- - - - . . ; . . - - - -- --- --- - -- -

I ,_----..---·n-----;--------------t-----------I

,

11

12

8

j I

'

'

10

12

Figure 4: No Action - Uplands Only I

361 I I

l UJ

~

I

~

1 ,

I 31

J:

~

c::.

: I I

32

33

34

I I

36

I

31

:

I

J._

II

I

I I

S

3

a:: P::

'2

I 1 I

I

I

I

I

32

I

T;4 S I ------....:..------...---,------ : ------:- ----6

I ~ _______ -1--- -___

n

35

I

Legend

0

I

I

I

_______Ir -------','-- - - ---l------4-- - --i\'1 1

Ona Mine

l

I

~

~~~~c:O~~~~~~a~~~ Map 5-1-A No Action Alternative 3-B (J une 2011 App 1·ICati On )

C] Roacts

5

N

~~

c:J0na

1--- -,-:_~ ~~EWeHands I

6

-ACOEStreams Boundaiy (June 20111 Paits Becl

M~ . ic

CJ Plant

c::J CSA ~~480 ac.)

CJ Horse Creek 100 Year Floodplain

O

(ZJ Mining

3,000

6,000

F'eet

~~~~l~7a\150055\0·1 10\Map_51A_no_adion.mxd

11

24

27

25

SR64

32

33

34

35

I I I

\ 31'

I I

+----1!---+------lf------l-+--.- -----l- - - - - l

6

1~

1

I I

I

I

5

4

B

9

I

I

:

3

I

2

I

!

34

Ona

I

6

\

35

--- --- ---------

l

I

I

3

\

2

{-------~---~--~-------~------~- _____ :_______1------+~~~~ . . 1---.~--11 . . I--------i-----I I 10

n

12

1

7

a

10

11

Figure 5: No Action - Upland Mining with Crossings of WOUS N

"1R.4!Jic

1

Ona Mine

[

Mosaic Fertilizer, LLC ACOE 404 Application Map ~1Aii Limited Action Crossing Only Alternative 3-E (June 2011 Application) 0

3,000

6,000

sources: Mosaic, 2017. Feet Q:\projects\mosa.ic\Ona' 150055\011O\Map-_ 5 1Ai_Jitrited_crossing__action_alt3e.mxd

8

;

9

lQ

f

I I I

1--------+------111-r~~~---t--------+------

I

Vandolah Rd.

I I

..+----~---t---~ 15--'---lf-..-~

16

I

\

I

32

33

34

35

II

Jf

35

I

..-~--~----~~--·+-~~-'--+-.-- - - - 1I-

II

j ________l__ _I --- _______ I a

1

: 12 · :

b

7

I I I I

"'

5

I I I I

~

I I

:

I

I I)_

I I I I I

2

3

--·---+-------

- --

- - - - -

\

!

6

\

3

2

I I -'-

- - - - - - - ----- ~-------r----.,. .,.._____,._.. . .,. ._~------+--I I

10

I

"

r2

I I

a

I

I

10

I

I

1~

Figure

1

6

5

· Maximum ramework Avoidance

3

2

6

1

Minable Areas=> 20 Acres # Polygons =19 Acres ~ 11,235.9 Acres Perimeter =776,047 fL

Legend

Mineable Areas < 20 Acres # Polygons= 45 Acres =169.4 Perimeter =72,056.2 Feet 0.. 1~H

tt.th-Ol'~·-~S'.)'.:1~~\..f.,_,_/loldd-1.-

12

7

10 0

13

18 16

11

.

· ""'~"t 15

..."'"'"'

24

21

,.

0

~'

\~

25

27

36

6

32

33

34

5

4

3

-~~" ~ 14

-

1:4

F

'b 13

(l

~~~~

10

9

11

16 18

J ti. 0

~~~ 23 ~ -.~.

' ..

0

·

·24 \l

.-l / .

,:~<>-

2~:.\.' lrC>a \

4t)'O

~

l

0

15 0

~ :z?~

I

~~ -

30

1

c.

22

8

()

·t

ift"1

7

12

25

j l>"

[) 0

~o (J 0

22

.,. I·

·

23

.,

1

Figure

- Framewor Crossing

Ian

~~ 6

5

3

6

2

~C'

Minable Areas=> 20 Acres # Polygons = 19 Acres =11,235.9 Acres Perimeter =776,047!L

4

Ona Mine MOsaic Fertilizer, LLC ACOE 404 Application Rgure!}.G Avoidance Of

Legend

IZ2I

Mineable Areas < 20 Acres # Polygons= 45 Acres = 169.4 Perimeter =72,056.2

w=;,

:'.,~,-:;..

_

Pe~l'ftllil8-trewn~6

-

Fota1e0·11encis

N'3tli~I

D D

r:::::J

lntell':'ltlienl 3ft'1fl'!S

Huwceov1 w e:111mi(>ll.1wRAP· H"1>-=cov· w tteM$ \C 0.1 wRAf') soo FL se1t14Ck ( 309 FT. e~r &

Frarnewcrt Wetlands Except For Crossing

mo FT. Ollch..& 8-e!'fll)

sccnonl.lllle

0

2.000

4,000

Feet °"""" 105t!'00 ..· ..o~........,__.

~o~~~ruou..~lf"9

12

7

13

18

24

10

11

18

23 $

25

36

1

7

12

..

\:i , ..

"

'

l

24

0

8

9

10

11

15

22

.,. I·

·

23

Figure 8 - June 2011 / First PN Plan Legend

33

.4 /

3

\,,

N

1

"!Jl,.1£1iC

- ACOE Streams Clctay Settling Area Ona Mine [ C::lona Boundary (June 2011) Mosaic Fertilizer, LLC ClAvoided Area ACOE 404 Application D Parks BeeKley Parcel Map 5-1-8(1) ACOE Wetlands Modified Alternative Plan A 1:1PLS (June 2011 Application)

02 0

3,000

11

TO I

- -:- - - - T

:

6,000

1--:--

0 3-A / , I

15 -

I I

l

f

24

I I I

19

I 04-8

I

--,t-----27

25

25

I I I , I

I I I I I

i-----

SR64

I I

32

33

35

34

I

31'

l

!

-1-~-i-~--+--~~--.~~~-L---+--.- - - - -~------

6

I

I II I

I I I

5

4

30

Ona

~-·~~~-------

---

I

I

I

I

I I

I

.1

I

10

2

:

35

34

I

6

1

r.f

I

I I

3

l

2

10

I . I

11

{--------~---~--~ -------!-------+- _____ :_______r---~-+~~~~~---='4\\---~----~-~ d :

7

I I I

8

I I I

g

I

1

I

TT

12

1 1 I

8

9

I I

Figure 9: F o rt G re e n Uplands Location -

-

-

+----T--- _

J_ __ _ I

I

-r - - - - ; - - - - + · - - --1 - - - - 1 - - - - r - - -

I I

I I I

I

1---1 - - I I I

I

·--..i.---- I~

I I

--r1

I 34 Range 23 'ar1go@nsnip3'5"Ra n 9 ej23--~----+----~--....,.

nJ'Q~nshi~

~

I

I

~ l ,._- - - -

I

II

l

: - - --

I

I ~----+-----1-

I I I

I

- r-----t-1

---

I I

I ----l- -

-

-

li----1- -l---i---l--..: : !

___ - -- - - - -

-t-- - - 1 - - - -

I

POLK

l ___ 11 ---

I

---l---1---l~Mosaic" ~ 1!!!!119'

County Lines

CJ Township and Range

AR DEE

ES OTO

=

I

I

W.P

Section Lines·

s

Roads

f222I Fort Green Uplands - 900 acres -

Ona Mine Boundary

-

Fort Green

Feet

0

4,000

User: mtiddes Date: 4124/2017 l\Fhfilprd3\gislprojeds\201312013_0001\Fort Greeo\maps\Figure 3 FtGreen Uplaid proximity.mxd

Figure 10

i

~·

..

.,,,

E Couru, Lnu FM

z o1r0\I

Spring!

""4¥·

AJe~k

[=~J Ona Mine ~Mitigation Areas

ll'i!;!':'ll

D D

US Army Corps of Engineers..

200 - Agricultural 300 - Rangeland

ONA MINE

400 - Upland Forests L J 500 - Water -

Mosaic Fertilizer, LLC USACE 404 Application Onsite & Offsite Mitigation Areas

600 - Wetlands 800 - Transportation

0 P\OOOThtOS\017-0oa u··M.AM Ass:istam:e\GIS\BOWLBGS CltBEK

·t · 1.5

3

·---==== Miles 1in = 3 miles

m-.ebel 121512017 11:00:01 M:4

·c\Ona\150055\lJU t\Ona Fealures.mxd

I~

.

Mi es

.,.~

~I

,.

/'

t,,

.... v

Pa,i1

.....

J2 '

\tO,i\tJ

l

l

Hlff

·

!

Fo t~

!'L.1111"511

~

[._,

F»n loh

.....,

~,

I

..

I

I

I I

-

....

o}~

......--~·

............,..,.

fr ~ iNi ll e

- -- --------

1M rt.I lu

Ml

i LEGEND

*+

~ PlantSftes

-

D

Sub-Stations Ona Pre-Washer Access Corridors Power1ines Property Appraiser FAEIS Alternative S~es W2 & A-2

t1

ii

. . Mosaic Property

i

D ona Mine FIGURE 1. STREET MAP MOSAIC - ONA MINE HARDEE COUNTY, FLORIDA S)tn:e6 ECT. 2017; t«l6alc21 t7.

Figure 11

.

"

... ~ . . . . Environmental Consulting & Technology, Inc.

If::

I

Supplemental Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869 Attachment B ­ Updates to Tables and Information Presented in the Final EIS

Updated Table 4-19. Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 100 Percent Capture at the Horse Creek Flow Station with the Ona Mine

Year 2009 2020 2030 2040 2045 2050 2060

Annual Average Flow (cfs) 171 171 163 166 170 175 177

Annual Average Percent Change from 2009 Flows 0% 0% -5% -3% 0% 3% 3%

Dry Season Average Flow (cfs) 78 77 73 75 77 79 79

Dry Season Average Percent Change from 2009 Flows 0% -1% -6% -4% -1% 2% 2%

Wet Season Average Flow (cfs) 404 410 391 399 410 422 424

Wet Season Average Percent Change from 2009 Flows 0% 1% -3% -1% 1% 4% 5%

Updated Table 4-20 Projected Flows and percent Change from 2009 Flows during Average Rainfall Year and 50 Percent Capture at the Horse Creek Flow Station with the Ona Mine

Year 2009 2020 2030 2040 2045 2050 2060

Annual Average Flow (cfs) 171 172 168 170 173 175 177

Annual Average Percent Change from 2009 Flows 0% 1% -2% 0% 1% 2% 3%

Dry Season Average Flow (cfs) 78 77 76 76 78 79 79

Dry Season Average Percent Change from 2009 Flows 0% 0% -3% -1% 0% 2% 2%

Wet Season Average Flow (cfs) 404 411 404 409 416 422 424

Wet Season Average Percent Change from 2009 Flows 0% 2% 0% 1% 3% 4% 5%

Updated Table 4-21 Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 100 Percent Capture at the Horse Creek Flow Stadium with the Ona Mine

Year 2009 2020 2030 2040 2045 2050 2060

Annual Average Flow (cfs) 84 84 80 82 84 86 87

Annual Average Percent Change from 2009 Flows 0% 0% -5% -3% 0% 3% 3%

Dry Season Average Flow (cfs) 38 38 36 37 38 39 39

Dry Season Average Percent Change from 2009 Flows 0% -1% -6% -4% -1% 2% 2%

Wet Season Average Flow (cfs) 199 201 192 196 201 207 209

Wet Season Average Percent Change from 2009 Flows 0% 1% -3% -1% 1% 4% 5%

Updated Table 4-22 Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 50 Percent Capture at the Horse Creek Flow Station with Ona Mine

Year 2009 2020 2030 2040 2045 2050 2060

Annual Average Flow (cfs) 84 84 83 84 85 86 87

Annual Average Percent Change from 2009 Flows 0% 1% -2% 0% 1% 3% 3%

Dry Season Average Flow (cfs) 38 38 37 38 38 39 39

Dry Season Average Percent Change from 2009 Flows 0% 0% -3% -1% 0% 2% 2%

Wet Season Average Flow (cfs) 199 202 198 201 205 207 209

Wet Season Average Percent Change from 2009 Flows 0% 2% 0% 1% 3% 4% 5%

Updated Table 4-23 Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 100 Percent Capture at the Peace River at Arcadia Flow Station with the Ona Mine

Year 2009 2020 2030 2040 2050 2060

Annual Average Flow (cfs) 713 726 734 750 771 782

Annual Average Percent Change from 2009 Flows 0% 2% 3% 5% 8% 10%

Dry Season Average Flow (cfs) 328 332 334 340 350 354

Dry Season Average Percent Change from 2009 Flows 0% 1% 2% 4% 7% 8%

Wet Season Average Flow (cfs) 1,657 1,698 1,738 1,779 1,829 1,858

Wet Season Average Percent Change from 2009 Flows 0% 3% 5% 7% 10% 12%

Updated Table 4-24 Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 50 Percent Capture at the Peace River at Arcadia Flow Station with the Ona Mine

Year 2009 2020 2030 2040 2050 2060

Annual Average Flow (cfs) 713 726 737 753 772 783

Annual Average Percent Change from 2009 Flows 0% 2% 3% 6% 8% 10%

Dry Season Average Flow (cfs) 328 332 335 342 351 355

Dry Season Average Percent Change from 2009 Flows 0% 1% 2% 4% 7% 8%

Wet Season Average Flow (cfs) 1,657 1,700 1,740 1,782 1,829 1,858

Wet Season Average Percent Change from 2009 Flows 0% 3% 5% 8% 10% 12%

Updated Table 4-25 Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 100 Percent Capture at the Peace River at Arcadia Flow Station with the Ona Mine

Year 2009 2020 2030 2040 2050 2060

Annual Average Flow (cfs) 330 336 340 348 358 363

Annual Average Percent Change from 2009 Flows 0% 2% 3% 5% 8% 10%

Dry Season Average Flow (cfs) 152 154 155 158 162 164

Dry Season Average Percent Change from 2009 Flows 0% 1% 2% 4% 7% 8%

Wet Season Average Flow (cfs) 766 786 805 825 848 862

Wet Season Average Percent Change from 2009 Flows 0% 3% 5% 8% 11% 13%

Updated Table 4-26 Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 50 Percent Capture at the Peace River at Arcadia Flow Station with the Ona Mine

Year 2009 2020 2030 2040 2050 2060

Annual Average Flow (cfs) 330 336 342 349 358 363

Annual Average Percent Change from 2009 Flows 0% 2% 4% 6% 9% 10%

Dry Season Average Flow (cfs) 152 154 156 159 163 165

Dry Season Average Percent Change from 2009 Flows 0% 1% 2% 5% 7% 9%

Wet Season Average Flow (cfs) 766 787 806 826 848 862

Wet Season Average Percent Change from 2009 Flows 0% 3% 5% 8% 11% 13%

Updated Figure 45 Peace River at Arcadia Annual Average and Seasonal Projected Flows for Low Annual Rainfall based on 50 Percent Capture of Excess Rainfall with and without Ona Mine 2,000 1,900 1,800 1,700 1,600 1,500 1,400

~,300 §t,200

-~,100 "O'

~1,000

~ 900 u:: Ill

:g

800

~

700

~

.. -~ ~

a:

II

600 500

~ 400 ._~~~~~~~--11--~~~....~~~--~~~--11-~~~....~~~~~~~-- ~ 300 200 10o

0

....~~-t1r--~~--~~--~~~~~~--

--~~~~~--111-~~

-

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

2020

2030

2040

2050

2060

-+- No Mining Dry Season

-+- No Mining Annual Average

No Mining Wet Season

~ With Ona Mine Dry Season

-

With Ona Mine Wet Season

With Ona Mine Annual Average

Updated Figure 50 Horse Creek Annual Average and Seasonal Projected Flows for Average Annual Rainfall based on 100 Percent Capture of Excess Rainfall with and without South Pasture Mine Extension 500 475 450 425 r-"

400

·

a

Ii'.

·

·

·

2040

2050

2060

375 350 ~325

- 300 ~

0

'B 275 Qj

'§' 250 0..

3: 225 0

i:i:

200

~

175

....: Qj u

...5!0 150

-

:c 125 -

100

·

75 50

·

25 0 2020 -

2030

- No Mining Dry Season

-9- With SP Extension Dry Season

-+- No Mining Annual Average

-e- With SP Extension Annual Average

-+- No Mining Wet Season With SP Extension Wet Season

Updated Figure 51 Horse Creek Annual Average and Seasonal Projected Flows for Average Annual Rainfall based on 50 Percent Capture of Excess Rainfall with and without South Pasture Mine Extension 500 475 450 425 400 375 350 u;-325 ~ ~ 300

0

'B 275 QI

·e-250 a.

~225 u:::: ~

200

QI

u~ 175

...05:: 150

J: 125

100 75 50 25 0 2020

2030

- - No Mining Dry Season -+- No Mining Wet Season -e- With SP Extension Annual Average

2040

2050 -+- No Mining Annual Average - - - With SP Extension Dry Season With SP Extension Wet Season

2060

Updated Figure 52 Horse Creek Annual Average and Seasonal Projected Flows for Low Annual Rainfall based on 100 Percent Capture of Excess Rainfall with and without South Pasture Mine Extension 500 475 450 425 400 375 350 "V>325 u

- 300 ~

0

'B 275

-

CIJ

'[ 250 0..

3: 225 0

i:i: ..:.:

200

~

175

CIJ

u

...5!0 150 I

125

100 75 50 25 0 2020 -

2030

- No Mining Dry Season

_.. With SP Extension Dry Season

2040 -+- No Mining Annual Average -

With SP Extension Annual Average

2050

2060

-+- No Mining Wet Season With SP Extension Wet Season

Updated Figure 53 Horse Creek Annual Average and Seasonal Projected Flows for Low Annual Rainfall based on 50 Percent Capture of Excess Rainfall with and without South Pasture Mine Extension 500 475 450 425 400 375 350 'iil325 ~ ~ 300

0

·-e 275 Cl.I

·e-250 CL.

3225

.2

~ 200 Cl.I

~ 175

u ~150 .... 0

J:

125 100 75 50 25 0 2020

2030

- - No Mining Dry Season -+- No Mining Wet Season With SP Extension Annual Average

2040

2050 -+- No Mining Annual Average -9- With SP Extension Dry Season With SP Extension Wet Season

2060

Updated Figure 54

2,000 1,900

l

Peace River at Arcadia Annual Average and Seasonal Projected Flows for Average Annual Rainfall based on 100 Percent Capture of Excess Rajnfall with and without South Pasture Mine Extension

· · '-~--------_:_=--~.:.:...--m=-:~-=~~--------~-:l~------:~~---im

1,800

§

1,700 1,600 1,500 1,400 :[,300

-

~,200

0 -~ , 100 QI

"f,ooo Q.

3: 900 0

ii: 800

....~~~--~~~~~~~~....~~~~~~~~..

~ 700 J....~~~~~~~--tt-~~~ u

< .. 600 RI

... 500 ~

~ 400 ~300

it

. .~~~~~~~--t....~~~...~~~-1t-~~~~~~~--~~~~~~~~..

200 100

0

.+-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

2020 No Mining Dry Season

2030

- - - With SP Extension Dry Season

2040 -.-.. No Mining Annual Average

2050

2060

No Mining Wet Season

- - -With SP Extension Annual Average

With SP Extension Wet Season

Updated Figure 55 Peace River at Arcadia Annual Average and Seasonal Projected Flows for Average Annual Rainfall based on 50 Perc.ent Capture of Excess Rainfall with and without South Pasture Mine Extension

2,mm 1,900 1,800

l -

1,700

·

·

·

·

II

2050

2060

1,600 1,500 1,400 ~1,300 ~

~1,200

0

'£ 1,100 Cll

·e-1,000 Q,

;: 900 0

u:: .!!!

~

800

..."'u

700

....

.."'

600

Cll

500

ct

>

~ Cll

400

u

"' Cll

Q,

300 200 100 0 2020

2030

No Mining Dry Season - - No Mining W et Season . -with SP Extension Annual Average

2040

-+- No Mining Annual Average - - -With SP Extension Dry Season With SP Extension Wet Season

Updated Figure 56 Peace River at Arcadia Annual Average and Seasonal Projected Flows for Low Annual Rainfall based on 100 Percent Capture of Excess Rainfall with and without South Pasture Mine Extension 2,000 1,900 1,800 1,700 1,600 1,500 1,400 :[-300

-

~,200

0 -~,100 Qj

·1,000 ~

·

3: 900 0

ii:

800

:g"'u 700 ~ 600 +'

"'~ 500 >

a: 400

~300 ._~~~~~~~--11-~~~....~~~--~~~~~~~~....~~~~~~~~..

if

200

--~~~~~--411-~~---~~-t1-~~~~~-t1t--~~~~~-11

100

0

+--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

2020 No Mining Dry Season

2030

- - - With SP Extension Dry Season

2040 -+- No Minfng Annual Average

2050 No Mining Wet Season

2060

- - -With SP Extension Annual Average

With SP Extension Wet Season

Updated Figure 57 Peace River at Arcadia Annual Average and Seasonal Projected Flows for Low Annual Rainfall based on 50 Percent Capture of Excess Rainfall with and without South Pasture Mine Extension 2,000 1,900 1,800

-

1,700 1,600 1,500 1,400

~1,300 ~1,200 0

"fll,100 GI

·e-1,000 Q.

.

3 900 .!2 800 nl :0 700

..."'u

...

ct

...nl .c: a:: GI

GI

u

nl GI Q;.

a

600 500 400 300 200 100 0 2020

2030

-+- No Mining Dry Season No Mining Wet Season - - - With SP Extension Annual Average

2040

2050 -+- No Mining Annual Average ~ With SP Extension Dry Season With SP Extension Wet Season

2060

Updated Figure 90 Horse Creek Annual Average and Seasonal Projected Flows for Average Annual Rainfall based on 100 Percent Capture of Excess Rainfall with and without the Three Current Actions and Two Foreseeable Actions 500 475 450 425 l....~~~~~~+-~~.........--~~-+-~~~~~~-t::_============== 400 375 350 ~25 ~

~300

0

~275 Ql

·0250

c;,

3225 0 &!:200 ..ll:: Ql

b175 ~====:::::::::::::~======~~====::::::::::::=:=::===:::s================::t ...5:150 ~ 0

:z:125 100

·

;

' :gr---..--:_ __ ~ 2020

-

- No Mining Ory Season

_.,_ Cumulative Ory Season

2030

2040

-+- No Mining Annual Average -

cumulative Annual Average

2050

__.... No Mining Wet Season Cumulative Wet Season

2060

Updated Figure 91 Horse Creek Seasonal and Annual Average Projected Flows for 50 Percent Capture of Excess Rainfall Case during Average Annual Rainfall with and without the Three Current Actions and Two Foreseeable Actions ----------

500 475 450 425 400 375 350 ~25 u

';"300 c 0

'fi 275 QI

·ei50 ll.

:=225 ;:;:200 ..:.: 0

QI

~175 u

...5:150 0

::x:125

100

...

75 ~---=======~~====::a:=====iti~====--------------------

50 25 0

2020 No Mining Dry Season -9-Cumulative Dry Season

2030

2040 -+- No Mining Annual Average -

cumulative Annual Average

2050 -+-No Mining Wet Season Cumulative Wet Season

2060

Updated Figure 92 Horse Creek Seasonal and Annual Average Projected Flows for 100 Percent Capture of Excess Rainfall Case during Low Annual Rainfall with and without the Three Current Actions and Two Foreseeable Actions 500 475 450 425 400 375 350 ~25 ~

~300

0

t 275 Ql

·02so ;;. 3225 0 iZ200 ~ Ql

~175

u

...0~150

:C125 -

100

75

so

...--------------

25 .----=~======:a:======IF======-r:======-----0

+-~~~~~~~~.----~~~~~~~~~~~~~~~~~~~~~~~~~~

2020 -

- No Mining Dry Season

_.,_ Cumulative Dry Season

2030

2040 -+- No Mining Annual Average - - - cumulat ive Annual Average

2050 -+- No Mining Wet Season -

Cumulative Wet Season

2060

Updated Figure 93 Horse Creek Seasonal and Annual Average Projected Flows for 50 Percent Capture of Excess Rainfall Case during Low Annual Rainfall with and without the Three Current Actions and Two Foreseeable Actions 500 475 450 425 400 375 350 ~25

-

';'300 c ..8275 u QI

'0250 .... ~ 3225 0

~ 200 .:i:. QI

~175

u ~150

~ 125 100

75

..

so 25

--~----------~l======lt==-----....i----------~~--~~~~~~~

0

2020

2030

2040

_.. - No Mining Dry Season

-+- No Mining Annual Average

...._Cumulative Dry Season

- . -cumulative Annual Average

2050 -+- No Mining Wet Season Cumulative Wet Season

2060

Updated Figure 94

2,000 1,900

l

Peace River at Arcadia Annual Average and Seasonal Projected Flows For Average Annual Rainfall based on 100 Percent Capture of Excess Rainfall with and without the Three Current Actions and One Foreseeable Action

·

1,800

ii

1,700

·

·-

·

1,600 1,500 1,400 ~,300 ..!::!..

~,200

-

0

·. g,100 Cll

·~,000 CL

3 900 0

u::: 800

~"' 700 u

...

.., 600

c:(

"'~

... 500 ~ 400 Cll

lil 300 Cll

CL

200 100 0 2020

2040

2030

2050

_..,_ No Mining Dry Season

~ No Mining Annual Average

No Mining Wet Season

- - -Cumulative Dry Season

-

Cumulative Wet Season

Cumulative Annual Average

2060

Updated Figure 95 Peace River at Arcadia Seasonal and Annual Average Projected Flows for 50 Percent Capture of Excess Rainfall Case During Average Rainfall with and without the Three Current Actions and One Foreseeable Action

2,000 1

-- --

1,900

II

.-

1,800 1,700 1,600 1,500

-- . --

1,400

Ft 300 ~· :£1,200 0

" 1,100 Cll

·ei,ooo ~

3: 900 0

u:::

:c"' ..."'u

~

+J

..."'Cll

.le

Cl: Cll

800 700 600 500 400

u

"' Cll

~

300 200 100 0 2020

2030

2040

-+- No Mining Dry Season

-+- No Mining Annual Average

- . . cumulative Dry Season

_._ Cumulative Annual Average

2050 -

- No Mining Wet Season Cumulative Wet Season

2060

Updated Figure 96 Peace River at Arcadia Seasonal and Annual Average Projected Flows for 100 Percent Capture of Excess Rainfall Case During Low Annual Rainfall with and without the Three Current Actions and One Foreseeable Action 2,000 1,900 1,800 1,700 1,600 1,500 1,400 ;a,300 ~ ~,200

-

0

'ij.,100 Cll

·~,000 ll.

~ 0

900 -

ii: 800 IO

:g. 700 u :t 600 ~

..

... 500 ~

ii: 400 ~300 .....~~~~~~~--11--~~~--~~~--~~~~~~~~ Cll

ll.

~~~~~~~---

..

200 -

--~~~~~~--15-~~-11-~~--.--~~~~~~--~~~~~~~

100

0

-t-~~~~~~~~....-~~~~~~~-,..~~~~~~~~~~~~~~~~--1

2020

2040

2030

-+- No Mining Dry Season

~ No

- . -cumulative Dry Season

-

2050

Mining Annual Average

Cumulative Annual Average

No Mining Wet Season -<

Cumulative Wet Season

2060

Updated Figure 97 Peace River at Arcadia Seasonal and Annual Average Projected Flows for 50 Percent Capture of Excess Rainfall Case During Low Annual Rainfall with and without the Three Current Actions and One Foreseeable Action 2,000 1,900 1,800 1,700 1,600 1,500 1,400 ~,300 -

-

~1,200

0

tll,100 QI

'e'i,OOO CL

·

3: 900 0

u:: 800

"' :0 ~ ~ ....

..."'

QI

700 600 500

> ii: 400 QI

u

"' QI

300

CL

200 100 0 2020

2030

2040

2050

...,._ No Mining Dry Season

-+- No Mining Annual Average

No Mining Wet Season

_...Cumulative Dry Season

_._ Cumulative Annual Average

Cumulative Wet Season

2060

Updated Figure 4-1 6

\

;\

~

0

c5

Wi'Z

~

er z<(

~

::E _J

%

,_J

j::

:t:

~

~

er en

la CD er (.)

....r-:' en

::::>

~

@ >:x: 0.. er ::::> ::E

Legend ·

IMC Rainfall Gauges in the Horse Creek Basin SWFWMD Rainfall - 494

{)

NPDES Outfalls

·

Brushy Creek Station

·

Steward'ship Program Monitoring Stations

CSAID

O

csAs

MINE, CSAID

D D

South Pasture CSAs cardno_CSAs

-

Horse·Creek and Tributaries

-

Maj or Roads

-

Horse Creek and Tributaries

-

DAD

- - Hydrologic features

Manson - Jenkins Tract

CR 76 -A

lllllllllil'Ft Green Mine

[~

l

County Boundaries

HorseCreekandSubBasins DRAINAGE BASINS BRANDY BRANCH

'D.

BRUSHY CREEK

....

. . BUZZARD ROOST BRANCH

en

(')

er

HORSE CREEK

11111

w

WEST FORK HORSE CREEK Mosaic_Holdings_20150316

45.000Feet

6400 This map and all data oontmed within are supplied as is wilh no warranty. Catcho Inc. expressly dsdaims responstility for damages or liability frtwn any claims that may arise out of tile USt> or misuse of Ibis map. It is the sole responsibiiry of h! user IO determine if the dala en !his map meets 1he user's needs. This map was not created as 9.lf'VleY dala. nor shotJd it be used as such. It is the user's responsibily to obt:m proper stney data.

pepared try a icensed surwyror, -..he.re ~bylaw.

12800 Meters

Figure 1. Overview of drainage basins, HCSP sampling locations, and Mosaic property in the Horse Creek Basin.

·

(,..f ') Cardno I Shaping tile Future

3905 Crescent Park Drive FWer.iew, Fl 3357S.3625

""· (813)664-4500 Ix (813) 664-0440

ww w.cardno.com

Coordinate System

NAO 1983UThlZone17N feel

i

I»

cc 0

=

~

3

I»

t..()

"-' 0 U1

l\;J ~

0

~

.... 0

....

""

U1

0

!.-:::

C> 0 U1

""'

lO 0

n>

r.Q

D

Nov-14

Sep-1 4

Mar-14

=

~

N

~ .I

fA

fh

~

II

I

0

~__.' I

~

wI

l:I

I

Cl

I

Oct-13

;::;

t6 Dec-13

n

d".

I»

::0

t..()

0 0

I»

=

0

C'.

~

n>

()

r.Q

Q1

IJ1

""

:::c

_.~~~-

0

QJ

Mar·13

Oec-12

Oct-1 2

Mar-12

Oct-11

.AJ.Jg. 11

,Apr-11

Nov-10

Sep-10

.A.pr-10

Oct-09

Ap r-09

Nov-CB

Sep.((!

.Apr-08

Nov-07

Sep-07

Mar-07

Nov·CE

...ld-06

.Apr-06

Dec-05

Sep-05

,A+>r-05

""

-J

=

0

...J

=

e

~

~

::r <

.....

~n

reb·OS

0

,...,.

I»

U1

Nov-04

.Apr-04

Nov-03

..Ll-03

,A+>r-03

0

SCI Score

-...J

~

I

~

n>

..,c::

.,,

n>

a.

I»

...

a.

c:

lil HCSW-1 20

Updated Figure 4-18

18

14 11'1 11'1 Cl>

c

12

12

11'1 Cl>

uCl>

a. rn

DHCSW-3 cHCSW~

·16

'fj

llHCSW-2

10

8

6

4

2

Sampling Event

Updated Figure 4-20. South Pasture Mine Groundwater Monitoring Water Quality Records, 2005-2017

-

i l~ ~ ~iii~~ f ~~ l l~~ ~~~ ~ ~~~~-~~ ~ ~ B 1~~iii~~~~~ 1~ ~ l~ ~ ~ ~ ~

......

- ~

_....,

....

-~- ~-

·· ~

1 f\

·~ ·11<1ul

~/

·.'. ,·, , . .·. ,. ···~ · . ··- . . ~ · ... ~· "~· · · ~- -n~1 tr_'An-~ ~. ' ~~10 ·· l ~ J·,. - ,..._ .. '

-

....

I

. v. \·. ·

',1

v'

t

'

I

--

-"'""' - . .__ _.. . _ --·""'°"-- --- ·-·· Source: Mosaic, 2017

_.....,.

_....,..

-·~·-

· · w:.

'

Updated Table 4-71 Chapter 4 ­ Environmental Consequences

Table 4-71. Current Summary of Avoidance of and Impacts to Waters of the United States for Ona Minea Existing (% of Mine Site)

Avoid (% of Total)

Impact (% of Total)

All Wetlands and Waters (acres)

4,885

1,484

3,426

(22%)

(30%)

(70%)

Forested Wetlands (acres)

2,456

1,105

1,358

(11%)

(45%)

(55%)

2,390

378

2,032

(11%)

(16%)

(85%)

Non-forested Wetlands (acres) Non-stream Surface Waters (acres) Streams (linear feet) a

38.7

<1

36.2

(<1%)

(<1%)

(94%)

120,856

221,622

(55%)

Based on the November 2016 application. Values subject to change.

4-135

100,767 (45%)

Updated Table 4-83 Chapter 4 ­ Environmental Consequences

Table 4-83. Current Summary of Upland Wildlife Habitat Avoidance, Impact, and Reclamation for Ona Minea Habitat Type Rangeland

Upland Forest

Pastureland and Row Crops

Existing (% of Mine Site)

Avoid (% of Total)

Impact (% of Total)

2,858

422

2,391

(13%)

(<1%)

(84%)

6,339

1,881

4,457

(28%)

(30%)

(70%)

9,258

30

8,846

(41%)

(<1%)

(96%)

a

Based on the November 2016, application. Values subject to change. Not under the USACE's authority. Notes: Values = acres b

4-153

Reclaim

PostMining

1,491

2,055

4,191

6,346

8,460

8,490

b

Amount Change (% Change) -803 (-28%) -7 (<-1%) -768 (-8%)

Updated Table 4-98 ­ Ona Project with Changes Net Impacts with Ona Alternative as Compared to No Action Alternative on Hardee County No Action With Mine Difference Average Annual 840 1,691 851 E l Present Value Labor Income $3,296,500,00 $6,145,200,00 $2,848,700,0 0 0 00 Present Value ­ Value $6,798,600,00 $12,622,100,00 $5,823,500,0 A 0 0 Present Value Output $11,459,900,00 $21,266,600,00 00 $9,806,700,0

Mosaic Fertilizer, LLC Ona Mine ACOE 404 Permit Application

Table 2-3(a)

Mine Site

South Fort Meade South Pasture Totals

Waters of the U.S. Potentially Impacted by Additional Infill Parcels Total Area of Infill (Acres)*

717 930 1,647

Land Area to be Disturbed (acres)**

Wetlands Proposed to be Impacted (acres)***

717 930 1,647

Streams Proposed to be Impacted (linear feet)***

48.5 143.38 191.88

6,030 950 6,980

*Includes areas that may be associated with future No Permit Required requests ** Estimate only-Avoidance and minimization analysis has not yet occurred ***Estimates based on preliminary information-Approved jurisdictional determinations are not available for all sites

Table 2-3(a) DATE: 7/11/2017 G:\projects\2013\2013_0001\RAI_3_NEPA\docs\AEIS Updates\Infill Acres Summary update

Page 1 of 1

.-

Mine Boundary

-

·

F\m::hasedPareels

·

South Ft. Meade Mine - Hardee Co. Purchased Parcels

County Lines

C ] Roads Section lines

1.000

2,000

4.000 Feet

User.ang Oa-te:7111f2017 Aerial: December 2016 Path: G:\prc!eccs\2016\2016_0l41\maps\Pun::hased Property.mxd

South Pasture Infill Properties

SP/SPE Mine_BoundaJies

L J lnfill

Section_liles -

Roods

Figure 2 South Pasture Infill Properties

Scale "in Feet

~ 0 2,000

u..-

0..0&\tl015

111121h-

Table 2-3(a) Figure 2

Area Captured by Phosphate Mining Peace and Myakka River Basins 50,000 8 Appficants' Preferred Alternatives

45,000 · Reasonably Foreseeable Future Mines · Present Mines

40,000 ·Past Mines

eu"' ca

35,000

30,000

~

"C

...°' '-

::::J

25,000

Q.

ca

u

ca

°'

20,000

'-

<{

15,000

10,000

5,000

0

1975

1985

1995

2005

2015

2025

2035

2045

2055

Year Ardaman & Associates, Inc.

Updated Figure 4-24

Updated Table 4-113 Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 100 Percent Capture at the Horse Creek Flow Station with Three Current Actions and Two Foreseeable Actions within the Horse Creek Subwatershed

Year 2009 2020 2030 2035 2040 2050 2060

Annual Average Flow (cfs) 171 169 147 145 154 171 171

Annual Average Percent Change from 2009 Flows 0% -1% -14% -15% -10% 0% 0%

Dry Season Average Flow (cfs) 78 76 66 65 69 77 77

Dry Season Average Percent Change from 2009 Flows 0% -2% -15% -16% -11% -1% -1%

Wet Season Average Flow (cfs) 404 404 353 350 371 412 410

Wet Season Average Percent Change from 2009 Flows 0% 0% -13% -14% -8% 2% 1%

Updated Table 4-114 Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 50 Percent Capture at the Horse Creek Flow Station with Three Current Actions and Two Foreseeable Actions within the Horse Creek Subwatershed

Year 2009 2020 2030 2035 2040 2050 2060

Annual Average Flow (cfs) 171 171 160 160 164 173 174

Annual Average Percent Change from 2009 Flows 0% 0% -6% -6% -4% 1% 2%

Dry Season Average Flow (cfs) 78 77 72 72 74 78 78

Dry Season Average Percent Change from 2009 Flows 0% -1% -7% -8% -5% 0% 1%

Wet Season Average Flow (cfs) 404 408 385 385 393 417 417

Wet Season Average Percent Change from 2009 Flows 0% 1% -5% -5% -3% 3% 3%

Updated Table 4-115 Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 100 Percent Capture at the Horse Creek Flow Station with Three Current Actions and Two Foreseeable Actions within the Horse Creek Subwatershed

Year 2009 2020 2030 2035 2040 2050 2060

Annual Average Flow (cfs) 84 83 72 71 76 84 84

Annual Average Percent Change from 2009 Flows 0% -1% -14% -15% -10% 0% 0%

Dry Season Average Flow (cfs) 38 37 32 32 34 38 38

Dry Season Average Percent Change from 2009 Flows 0% -2% -15% -16% -11% -1% -1%

Wet Season Average Flow (cfs) 199 198 174 172 182 202 202

Wet Season Average Percent Change from 2009 Flows 0% 0% -13% -14% -8% 2% 1%

Updated Table 4-116 Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 50 Percent Capture at the Horse Creek Flow Station with Three Current Actions and Two Foreseeable Actions within the Horse Creek Subwatershed

Year 2009 2020 2030 2035 2040 2050 2060

Annual Average Flow (cfs) 84 84 79 79 81 85 85

Annual Average Percent Change from 2009 Flows 0% 0% -6% -6% -4% 1% 2%

Dry Season Average Flow (cfs) 38 38 35 35 36 38 38

Dry Season Average Percent Change from 2009 Flows 0% -1% -7% -7% -5% 0% 1%

Wet Season Average Flow (cfs) 199 200 189 189 193 205 205

Wet Season Average Percent Change from 2009 Flows 0% 1% -5% -5% -3% 3% 3%

Updated Table 4-117 Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 100 Percent Capture at the Peace River at Arcadia Flow Station with Three Current Actions and One Foreseeable Action

Year 2009 2020 2030 2040 2050 2060

Annual Average Flow (cfs) 713 724 732 749 769 776

Annual Average Percent Change from 2009 Flows 0% 2% 3% 5% 8% 9%

Dry Season Average Flow (cfs) 328 331 332 340 349 352

Dry Season Average Percent Change from 2009 Flows 0% 1% 1% 4% 6% 7%

Wet Season Average Flow (cfs) 1,657 1,695 1,733 1,777 1,824 1,846

Wet Season Average Percent Change from 2009 Flows 0% 2% 5% 7% 10% 11%

Updated Table 4-118 Projected Flows and Percent Change from 2009 Flows during Average Rainfall Year and 50 Percent Capture at the Peace River at Arcadia Flow Station with Three Current Actions and One Foreseeable Action

Year 2009 2020 2030 2040 2050 2060

Annual Average Flow (cfs) 713 725 736 753 771 780

Annual Average Percent Change from 2009 Flows 0% 2% 3% 6% 8% 9%

Dry Season Average Flow (cfs) 328 332 335 342 350 354

Dry Season Average Percent Change from 2009 Flows 0% 1% 2% 4% 7% 8%

Wet Season Average Flow (cfs) 1,657 1,699 1,738 1,781 1,826 1,852

Wet Season Average Percent Change from 2009 Flows 0% 3% 5% 8% 10% 12%

Updated Table 4-119 Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 100 Percent Capture at the Peace River at Arcadia Flow Station with Three Current Actions and One Foreseeable Action

Year 2009 2020 2030 2040 2050 2060

Annual Average Flow (cfs) 330 336 340 348 357 361

Annual Average Percent Change from 2009 Flows 0% 2% 3% 5% 8% 9%

Dry Season Average Flow (cfs) 152 154 154 158 162 163

Dry Season Average Percent Change from 2009 Flows 0% 1% 2% 4% 7% 8%

Wet Season Average Flow (cfs) 766 784 803 824 846 856

Wet Season Average Percent Change from 2009 Flows 0% 2% 5% 8% 10% 12%

Updated Table 4-120 Projected Flows and Percent Change from 2009 Flows during Low Rainfall Year and 50 Percent Capture at the Peace River at Arcadia Flow Station with Three Current Actions and One Foreseeable Action

Year 2009 2020 2030 2040 2050 2060

Annual Average Flow (cfs) 330 336 341 349 358 362

Annual Average Percent Change from 2009 Flows 0% 2% 3% 6% 8% 10%

Dry Season Average Flow (cfs) 152 154 155 159 163 164

Dry Season Average Percent Change from 2009 Flows 0% 1% 2% 5% 7% 8%

Wet Season Average Flow (cfs) 766 786 805 826 847 859

Wet Season Average Percent Change from 2009 Flows 0% 3% 5% 8% 11% 12%

Updated Table 4-130 Table 4-130. Combined Currently Proposed Impacts of Applicants' Preferred Alternatives on Ecological Resourcesa Ecological Resource

Existing

Impacted

Total Wetlandsb (acres)

11,965

7,978

Total Stream Lengthb (linear feet)

461,374

197,852

Total Native Uplandsc(acres)

14,110

11,301

Total Upland Wildlife Habitatd (acres)

38,770

31,529

Notes: a Based on the applications and approvals as of June 2017. Values subject to change. b USACE-jurisdictional (natural and ditched natural streams) c Rangelands and Upland Forests d Native Uplands and Pasturelands

Updated Table 4-137. Net Impacts for Hardee County with Ona and South Pasture Extension Mines and the Pioneer Tract No Action With Mines Difference Average Annual Employment 840 2157 1317 Present Value Labor Income $3,296,500,000 $7,283,300,000 $3,986,800,000 Present Value, Value Added $6,798,600,000 $14,950,900,000 $8,152,300,000 Present Value Output $11,459,900,000 $25,189,000,000 $13,729,100,000

Updated Table 4-139. Net Impacts based on Desoto, Wingate East, South Pasture Extension, and Ona Mines plus the Pine Level/Keys and Pioneer Tracts Compared to the No Action Alternative No Action With Mines Difference Average Annual Employment 2053 7853 5800 Present Value Labor Income $6,706,500,000 $20,313,200,000 $13,606,700,000 Present Value, Value Added $13,180,900,000 $39,784,100,000 $26,603,200,000 Present Value Output $22,704,500,000 $68,594,600,000 $45,890,100,000 Note: No changes were made to the original No Action Alternative found in the Final EIS.

Supplemental Environmental Assessment, Draft Clean Water Act Section 404(b)(1) Guidelines Analysis, and Draft Public Interest Review for Department of the Army (DA) Permit Application SAJ-2011-01869

Attachment C ­ November 27, 2017 MFR documenting 'no effect' determination for the manatee

CESAJ-RD-W

November 27, 2017

MEMORANDUM FOR CESAJ-RD-W SUBJECT: Determination of Effects on West Indian Manatee for DA File Number SAJ2011-01869/Mosaic ­ Ona Phosphate Mine 1. REFERENCE: Section 7 of the Endangered Species Act (ESA), as amended; 50 C.F.R. part 402 2. PURPOSE: This memorandum documents the Corps' effects determination under Section 7 of the ESA for the West Indian manatee (manatee) for DA File Number SAJ2011-01869. Specifically, this memorandum describes how the Corps considered the proposed Ona phosphate mine's potential for direct, indirect, and cumulative effects on the manatee and manatee habitat, including sections of Horse Creek, the Peace River, and Charlotte Harbor. In addition, this memorandum documents the Corps' consideration of information presented in a "Sixty-Day Notice of Endangered Species Act Violations Concerning the Federally Threatened Florida Manatee (Trichechus manatus latirostris) in the Central Florida Phosphate District and South Pasture Mine Extension Project Area" dated October 6, 2017, and related Addendum (collectively, "Sixty-Day Notice"). 3.

BACKGROUND:

a) The Ona project is located inland approximately 36 miles (58 km) upstream from the mouth of the Peace River with Charlotte Harbor, and approximately 17 miles north (as measured in a straight line) of the closest areas in Horse Creek and the Peace River designated by the United States Fish and Wildlife Service (USFWS) as critical habitat for the West Indian manatee1. b) The Corps' Final Areawide Environmental Impact Statement for phosphate mining in the Central Florida Phosphate District (Final EIS), issued 26 April 2013, notes in Chapter 3 that manatees have the potential to be found within the Final EIS study area. However, manatees were among the federally listed species that the Corps concluded were not expected "to have a high probability of occurrence on the mine site based on the findings of past surveys and the types and qualities of the habitats that exist on the mine site, or are expected to be directly, indirectly, or cumulatively impacted by the proposed actions." See Final EIS at page 4-174.

As shown on the USFWS webpage "Critical Habitat for Threatened & Endangered Species" https://fws.maps.arcgis.com/home/webmap/viewer.html?webmap=9d8de5e265ad4fe09 893cf75b8dbfb77

1

Section 4.2.3 of the Final EIS2 describes the expected direct and indirect effects of Ona on surface water resources, including Horse Creek (Section 4.2.3.2) and the Peace River at Arcadia (Section 4.2.3.3). As stated in Section 4.2.3.4 of the Final EIS, the Corps determined that Ona would have a minor, insignificant degree of direct and indirect impact on the Peace River and Charlotte Harbor, and with mitigation3 a minor, insignificant degree of direct and indirect impact on Horse Creek. Section 4.2.3.4 of the Final EIS also describes possible mitigation measures such as recharge ditches and wells, and monitoring of flows in Horse Creek. Section 4.4.4 of the Final EIS describes the expected direct and indirect effects of Ona on water quality. As stated in that section, the Corps determined that Ona would have a minor to moderate, insignificant degree of direct and indirect impact on Horse Creek, the Peace River and Charlotte Harbor. Section 4.12.2 of the Final EIS4 describes the expected cumulative effects of Ona, plus the three other then-proposed actions, the two reasonably foreseeable future actions, and other past, present, and reasonably foreseeable future actions, on surface water resources, including Horse Creek (Section 4.12.2.1), the Peace River at Arcadia (Section 4.12.2.2), and Charlotte Harbor (Section 4.12.2.4). As stated in Section 4.12.2.6, Ona and the other actions considered would have a minor, insignificant cumulative effect on the Peace River and Charlotte Harbor, and without mitigation, and moderate, significant cumulative effect on Horse Creek. However, with mitigation, as stated in 4.12.2.7, the cumulative effect on Horse Creek will be minor and insignificant. Section 4.12.4 of the Final EIS describes the expected cumulative effects of Ona, plus the three other then-proposed actions, the two reasonably foreseeable future actions, and other past, present, and reasonably foreseeable future actions, on surface water quality, including Horse Creek, the Peace River at Arcadia, and Charlotte Harbor. With mitigation, Ona and the other actions considered would have a minor, insignificant cumulative effect on water quality in Horse Creek, the Peace River at Arcadia, and Charlotte Harbor. c) On 26 September 2017, the Corps provided the USFWS with a revised Biological Assessment (BA) as part of its ongoing coordination under Section 7 of the ESA, along with a summary of project changes since the 01 June 2012 public notice for Ona. The BA provided information on the species for which the Corps had made `may affect' determinations (the caracara, woodstork, and eastern indigo snake) and `may affect, not Including the updated surface water analyses from the 01 July 2013 Addendum to the Final EIS 3 "Mitigation" as used here refers to avoiding, minimizing, or offsetting impacts to environmental resources, as described in Section 5.1 of the Final EIS and as defined for NEPA in 40 CFR 1508.20. 4 Also including the updated surface water analyses from the 01 July 2013 Addendum to the Final EIS 2 2

likely to adversely affect' determinations (the Florida panther, Florida grasshopper sparrow, and Florida scrub-jay), as well as information on the Florida bonneted bat, based on the documented or potential occurrence of these species or their habitat on the Ona site or within the Ona site's action areas for these species, and the potential for activities associated with Ona to affect these species. The summary of changes included a statement that based on updates to several of the direct, indirect, and cumulative impact analyses (which included the surface water analyses described above), the Corps' preliminary findings were that the project changes have either led to no changes in the determinations of degree of effect and significance made in the Final EIS, or have led to reduced effects. d) On 06 October 2017, the Corps received the Sixty-Day Notice, which includes a report of manatees observed on 20 August 2017 in Horse Creek, approximately six miles south of the Ona project. 4. DISCUSSION: Based on the analyses described in the Background section above that show that Ona would have at most a minimal direct, indirect, or cumulative effect on surface water flows and water quality in Horse Creek (with mitigation), the Peace River, and Charlotte Harbor, Ona will not directly or indirectly affect the manatee, or destroy/adversely modify the manatee's designated critical habitat. Therefore, the Corps reached a `no effect' determination for the manatee. Under the ESA regulations and the U.S. Fish and Wildlife Service's (FWS) and National Marine Fisheries Service's (NMFS)] March 1998, Section 7 Consultation Handbook, for those projects where the Corps makes a finding of `no effect', nothing more will need to be done regarding consultation with the appropriate Service5. The Corps' review of the information presented in the Sixty-Day Notice has not altered this determination. While the report of manatees in Horse Creek is new information, it is not information that reveals effects of the action that may affect listed species or critical habitat in a manner or to an extent not previously considered. The presence of manatees in Horse Creek does not alter the results of the analyses of Ona's effects on surface water flows and water quality in Horse Creek (with mitigation), the Peace River, and Charlotte Harbor, as described in the Background section. Conversely, based on the Corps' determination that with mitigation, Ona will not significantly affect surface water flows and water quality in Horse Creek and the other waterbodies considered, the project will have no effect on manatees in those waterbodies, regardless of how frequently they are present there, or on the sections of those waterbodies designated as critical habitat. In consideration of the level of public interest in the Ona project, the Corps will provide a copy of this `no effect' memorandum to the USFWS. In addition, the Corps will make As described on the Jacksonville District, Regulatory Division's website, at http://www.saj.usace.army.mil/Missions/Regulatory/Source-Book/ 3

5

this memorandum and documents associated with the Corps' provision of the memorandum to the USFWS part of the Ona record. 5. CONCLUSION: Based on information presented to date, including the information presented in the Sixty-Day Notice, for the Ona project the Corps has reached a `no effect' determination for the manatee. Prepared by:

John Fellows Team Leader SAJ-RD Mining Team

4

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas