All Florida Counties. Proposed issuance of GENERAL PERMIT SAJ-33 and SAJ-34 PRIVATE MULTI-FAMILY PIERS, GOVERNMENT PIERS OR PRIVATE COMMERCIAL PIERS IN FLORIDA To simplify and speed processing of Department of the Army permits for a specific type of project involving substantially similar minor in-water work, the Jacksonville District, U.S. Army Corps of Engineers (Corps) proposes to combine General Permits SAJ-33 for Private Multi-Family or Government Piers in Florida and SAJ-34 for Private Commercial Piers in Florida. Reissuance of SAJ-33 will encompass Private Multi-Family Piers, Government Piers and Private Commercial Piers in Florida.

PROPOSAL: To simplify and speed processing of Department of the Army permits for a specific type of project involving substantially similar minor in-water work, the Jacksonville District, U.S. Army Corps of Engineers (Corps) proposes tocombine General Permits SAJ-33 for Private Multi-Family or Government Piers in Florida and SAJ-34 for Private Commercial Piers in Florida. Reissuance of SAJ-33 will encompass Private Multi-Family Piers, Government Piers and Private Commercial Piers in Florida.

BACKGROUND: On April 8, 2013, the Jacksonville District, U.S. Army Corps of Engineers reissued Regional General Permit SAJ-33 for Private Multi-Family or Government Piers in Florida. The Corps, pursuant to Section 10 of the Rivers and Harbors Act of 1899, originally issued SAJ-33 and SAJ-34 in 2007. The Corps has reviewed and reissued SAJ-33 and SAJ-34 every five years since then. According to the Corps’ ORM database, during the years 2007-2017, the Corps has utilized SAJ- 33 a total of one hundred and forty-five (145) times and SAJ-34 a total of forty-six (46) times.

The term “general permit” means a Department of the Army authorization that is issued on a nationwide or regional (District) basis for a category of activities when those activities are substantially similar in nature and cause only minimal individual and cumulative environmental impacts. General permits are a way to reduce the burden of the regulatory program on the public and ensure timely issuance of permits while effectively administering the laws and regulations, which establish and govern the program.

In most instances, anyone meeting the conditions of a general permit can receive project specific authorization. Anyone not meeting the conditions of a general permit may still receive authorization via a “standard permit.” However, when the Corps reviews an application as a standard permit, the Corps conducts an individual review of the particular project and may coordinate with third parties, including the federal and state resource agencies

In the case of categories of work involving similar, minor activities, standard permit reviews are burdensome and typically result in redundant institutional effort over time. For the vast majority of these substantially similar minor projects, the additional effort does not result in any increased benefit to the environment, the applicant, or the public at large.

The Corps performs an assessment of the cumulative impacts of work authorized under a general permit every five years to determine if it is in the Public Interest for the Corps to reissue a general permit and continue to utilize it.

Draft of Proposed Regional General Permit: A draft of the regional general permit proposed for reissuance follows:

Regional General Permit SAJ-33

SAJ-2006-06019 (BJC)

Private Multi-Family Piers, Government Piers or Commercial Piers in Florida

Upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C § 403), general authority is hereby given to construct private multi-family piers, government piers or commercial piers less than 1,000 square feet in surface area in navigable waters of the United States within the State of Florida, subject to the following conditions:

SPECIAL CONDITIONS:

1. Structures authorized under this general permit are private multi-family docks/piers, government docks/piers, or commercial docks/piers less than 1,000 square feet in surface area and designed to accommodate not more than four vessels, including dry storage, unless a Florida Fish and Wildlife Conservation Commission approved Manatee Protection Plan is more restrictive. Slips for non-motorized vessels (e.g., kayak, canoe, and paddleboard) and associated launching areas do not count toward the total slip number. This general permit includes normal appurtenances such as boat hoists, boat shelters with open sides, stairways, walkways (as long as they are designed and clearly marked to prohibit fishing and vessel mooring), mooring pilings, and maintenance of same. This does not include structures that support large commercial vessels including ferries, tankers, and cargo ships such as ferry terminals and large ports.

2. No work shall be performed until the applicant submits satisfactory plans for the proposed structure and receives written authorization from the District Engineer.

3. The following are specifically excluded from authorization under SAJ-33:

a. Installation of metal piles or metal sheet piles by impact hammer.

b. Construction during non-daylight hours.

c. Municipal fishing piers.

d. Living, fueling or storage facilities over navigable waters of the United States

e. Motorboat prohibited zones, no entry zones, and Federal Manatee Sanctuaries.

f. All area regulated under the Lake Okeechobee and Okeechobee Waterway Shoreline Management Plan, located between St. Lucie Lock in Martin County and W. P. Franklin Lock in Lee County.

g. Designated Critical Habitats of the following species:

(1) American Crocodile

(2) Smalltooth Sawfish Critical Habitat Limited Exclusion Zones (Table 1 and Figure 1)

(3) Loggerhead Sea Turtle

(4) Acropora (Elkhorn and staghorn corals)

(5) Atlantic sturgeon Critical Habitat Exclusion Zone (Figure 2)

(6) Johnson Seagrass: New multi-family piers are excluded. Repair, replacement, and reconfiguration of existing multi-family facilities may be covered if it (1) occurs within same overall footprint (out to the perimeter of the facility, including the outer limits of the structure and permitted mooring locations), (2) does not increase the total aerial extent (i.e., area of coverage from the dock structures) of the existing facility, and (3) does not affect Johnson’s seagrass.

h. Biscayne Bay National Park

i. St. Lucie Impoundment (Martin County)

j. Wild and Scenic Rivers Act (16 U.S.C. 1317, et seq.): The entire Wekiva River, including Wekiwa Springs Run, Rock Springs Run, the entire Seminole Creek, and Black Water Creek from its outfall at Lake Norris to its confluence with the Wekiva River, the Loxahatchee River from Riverbend Park downstream to Jonathan Dickinson State Park.

k. State Parks: John Pennekamp Coral Reef State Park, Lignum Vitae Key State Botanical Site and Aquatic Preserve, Long Key State Park, Curry Hammock State Park, and Bahia Honda State Park.

l. Kings Bay/Crystal River/Homosassa/Salt River system (Citrus County) and canals connected to these waterways.

m. Lake Miccosukee, located on the common boundary between Leon and Jefferson Counties.

n. Coastal Lakes: Within, their outfalls, and/or the shore areas between the lakes and the Gulf of Mexico as depicted on the attached map (Figure 3).

o. Areas on or contiguous to ocean beaches.

p. Nearshore sea turtle reproductive habitat:

4. Endangered Species Act (ESA) and Marine Mammal Protection Act (MMPA) Conditions

a. Education and Observation: The permittee must ensure that all personnel associated with the project are instructed about the potential presence of species protected under the ESA and the Marine Mammal Protection Act (MMPA). All on-site project personnel are responsible for observing water-related activities for the presence of protected species. All personnel shall be advised that there are civil and criminal penalties for harming, harassing, or killing ESA-listed species or marine mammals. To determine which species may be found in the project area, please review the relevant Protected Species List at: http://sero.nmfs.noaa.gov/protected_resources/section_7/threatened_endangered/index.html

b. Reporting of interactions with protected species:

(1) Any collision(s) with and/or injury to any sea turtle, sawfish, whale, or sturgeon occurring during the construction of a project, shall be reported immediately to NMFS’s Protected Resources Division (PRD) at (1-727-824-5312) or by email to takereport.nmfsser@noaa.gov and SAJ-RD-Enforcement@usace.army.mil.

(2) Smalltooth sawfish: Report sightings to 1-844-SAWFISH or email Sawfish@MyFWC.com

(3) Sturgeon: Report dead sturgeon to 1-844-STURG 911 (1-844-788-7491) or email nmfs.ser.sturgeonnetwork@noaa.gov

(4) Sea turtles and marine mammals: Report stranded, injured, or dead animals to 1-877-WHALE HELP (1-877-942-5343).

(5) North Atlantic right whale: Report injured, dead, or entangled right whales to the USCG via VHF Channel 16.

c. Vessel Traffic and Construction Equipment: All vessel operators must watch for and avoid collision with species protected under the ESA and MMPA. Vessel operators must avoid potential interactions with protected species and operate in accordance with the following protective measures:

(1) Construction Equipment:

i) All vessels associated with the construction project shall operate at “Idle Speed/No Wake” at all times while operating in water depths where the draft of the vessel provides less than a 4-foot (ft) clearance from the bottom, and in all depths after a protected species has been observed in and has departed the area.

ii) All vessels will follow marked channels and/or routes using the maximum water depth whenever possible.

iii) Operation of any mechanical construction equipment, including vessels, shall cease immediately if a listed species is observed within a 50-ft radius of construction equipment and shall not resume until the species has departed the area of its own volition.

(2) All Vessels:

i) Sea turtles: Maintain a minimum distance of 150 ft.

ii) North Atlantic right whale: Maintain a minimum 1,500-ft distance (500 yards).

iii) Vessels 65 ft in length or longer must comply with the Right Whale Ship Strike Reduction Rule (50 CFR 224.105) which includes reducing speeds to 10 knots or less in Seasonal Management Areas (http://www.fisheries.noaa.gov/pr/shipstrike/).

iv) Mariners shall check various communication media for general information regarding avoiding ship strikes and specific information regarding right whale sightings in the area. These include NOAA weather radio, USCG NAVTEX broadcasts, and Notices to Mariners.

v) Marine mammals (i.e., dolphins, whales [other than North Atlantic right whales], and porpoises): Maintain a minimum distance of 300 ft.

vi) When these animals are sighted while the vessel is underway (e.g., bow-riding), attempt to remain parallel to the animal’s course. Avoid excessive speed or abrupt changes in direction until they have left the area.

vii) Reduce speed to 10 knots or less when mother/calf pairs or groups of marine mammals are observed, when safety permits.

d. Turbidity Control Measures during Construction: Turbidity must be monitored and controlled. Prior to initiating any of the work covered under this Opinion, the Permittee shall install turbidity curtains as described below. In some instances, the use of turbidity curtains may be waived by the USACE project manager if the project is deemed too minimal to generate turbidity (e.g., certain ATON installation, scientific survey device placement, marine debris removal) or if the current is too strong for the curtains to stay in place. Turbidity curtains specifications:

(1) Install floating turbidity barriers with weighted skirts that extend to within 1 ft of the bottom around all work areas that are in, or adjacent to, surface waters.

(2) Use these turbidity barriers throughout construction to control erosion and siltation and ensure that turbidity levels within the project area do not exceed background conditions.

(3) Position turbidity barriers in a way that does not block species’ entry to or exit from designated critical habitat.

(4) Monitor and maintain turbidity barriers in place until the authorized work has been completed and the water quality in the project area has returned to background conditions.

(5) In the range of ESA-listed corals (St. Lucie Inlet, Martin County south to the Dry Tortugas and the U.S. Caribbean) and Johnson’s seagrass (Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida): Projects that include upland earth moving (e.g., grading to install a building or parking lot associated with a dock and seawall project), must install sediment control barriers to prevent any upland sediments from reaching estuarine or marine waters. The turbidity curtain requirement cannot be waived for any project that moves or removes sediment (e.g., dredging, auger to create a pile, trenching to install a cable line). If turbidity curtains are not feasible in an area based on site conditions such as water current, high wave action, or stormy conditions, the project must undergo individual Section 7 consultation and is not covered under this Programmatic Opinion.

e. Entanglement: All turbidity curtains and other in-water equipment must be properly secured with materials that reduce the risk of entanglement of marine species (described below). Turbidity curtains likewise must be made of materials that reduce the risk of entanglement of marine species.

(1) In-water lines (rope, chain, and cable, including the lines to secure turbidity curtains) must be stiff, taut, and non-looping. Examples of such lines are heavy metal chains or heavy cables that do not readily loop and tangle. Flexible in-water lines, such as nylon rope or any lines that could loop or tangle, must be enclosed in a plastic or rubber sleeve/tube to add rigidity and prevent the line from looping and tangling. In all instances, no excess line is allowed in the water.

(2) Turbidity curtains and other in-water equipment must be placed in a manner that does not entrap species within the construction area or block access for them to navigate around the construction area.

5. The project must designed to meet the following PDCs if the project occurs in the critical habitat as described below:

a. Johnson’s Sea Grass: Structures must comply with PDCs for Docks or Other Minor Structures (reference Attached Dock Construction Scenarios): These PDCs address the anticipated dock construction scenarios expected within Florida and the U.S. Caribbean and provide NMFS PRD’s construction guidelines for projects occurring (1) within Johnson’s seagrass critical habitat; (2) within the range of Johnson’s seagrass , but outside of Johnson’s seagrass critical habitat; and (3) outside of both the range and critical habitat for Johnson’s seagrass. These scenarios consider whether a seagrass survey was conducted for projects within the range of Johnson’s seagrass or located in Johnson’s seagrass critical habitat. Surveys must be completed within 1 year prior to submittal of the application to the action agency for project authorization. There is no seasonal restriction for Johnson’s seagrass surveys; however, Johnson’s seagrass is found within the range of other seagrass species that exhibit a seasonal pattern of growth and distribution. For comparison, NMFS Habitat Conservation Division’s recommended sampling window for non-listed species is June 1 to September 30. New marinas or multi-family facilities in Johnson’s seagrass critical habitat are not authorized with this permit. Repair, replacement, and reconfiguration of private multi-family or government piers may be covered if it (1) occurs within same overall footprint (out to the perimeter of the facility, including the outer limits of the structure and permitted mooring locations), (2) does not increase the total aerial extent (i.e., area of coverage from the dock structures) of the existing facility, and (3) does not affect Johnson’s seagrass. Mooring fields are allowed in Johnson’s seagrass critical habitat and within the range of Johnson’s seagrass so long as they occur in waters deeper than -13 feet (-4 meters).

b. Gulf sturgeon: Additional noise restrictions are required for pile and sheet pile installation in the Gulf sturgeon critical habitat migratory restriction zones (Table 2 and Figure 4). The allowable pile and sheet pile driving activities vary depending on the project area (reference attached PDCs Specific to the Gulf Sturgeon Critical Habitat Migratory Restriction Zones).

c. Northern Right Whale: For any dock project (new construction, repair, or replacement) at a private residence located within 11 nautical miles of North Atlantic right whale critical habitat (as measured in a radius from the center of the nearest inlet to open ocean (Figure 5, Table 3 and North Atlantic Right Whale Federal Regulations Information Handout Attachment) the property owner will be provided a handout with their USACE permit describing the presence of North Atlantic right whales in the area and the Federal regulations governing the approach to North Atlantic right whales.

6. West Indian Manatee: For project in waters accessible to manatees:

a. Prior to verification of authorization, the dichotomous key titled, "The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, April 2013" (reference Attachment) shall be used to determine potential manatee impacts. Those determined to be a "may affect" to the manatee will not be authorized unless consistent with the 2013 Manatee Programmatic Consultation or individual consultation on the project is required and has been reinitiated and concluded with the U.S. Fish and Wildlife Service in accordance with the Endangered Species Act. Additionally, depending on the location of the project, some projects determined to be "may affect, not likely to adversely affect" will not be authorized until consultation on the project has been concluded. Note: The manatee key may be subject to revision at any time. It is our intention that the most recent version of this technical tool will be utilized during the evaluation of the permit application.

b. The permittee will utilize the “Standard Manatee Conditions for In-Water Work, 2011” (reference Attachment) and/or requirements, as appropriate for the proposed activity. Note: The manatee conditions may be subject to revision at any time. It is our intention that the most recent version of these conditions will be utilized during the evaluation of the permit application.

7. Freshwater Mussels: In accordance with Section 7 of the Endangered Species Act, projects proposed within habitat for federally listed freshwater mussels and freshwater mussels proposed for listing cannot be authorized until consultation on the project has been concluded with the U.S. Fish and Wildlife Service. These drainages are as follows: Escambia River, Yellow River, Choctawhatchee River, Chipola River, Apalachicola River, Ochlockonee River, Suwannee River, Santa Fe and New Rivers, and Econfina Creek (Florida panhandle) and their creeks and tributaries. No activity shall be authorized under this general permit, which is likely to adversely affect a federally listed threatened or endangered species, or a species proposed for such designation, or destroy or adversely modify its designated critical habitat.

8. Mangroves:

a. All projects must be sited and designed to avoid or minimize impacts to mangroves.

b. Mangrove removal must be conducted in a manner that avoids any unnecessary removal and is limited to the following instances:

1) Removal to install up to a 4-ft-wide walkway for a dock.

2) Removal to install up to an 8-ft-wide walkway for public docks, where the walkway is necessary to address compliance with the Americans with Disability Act (ADA).

3) Removal to install culverts necessary to improve water quality or restore hydrology between 2 water bodies. Such mangrove removal is limited to a maximum of 20 linear feet (lin ft) of shoreline per culvert opening.

4) Removal of mangroves above mean high water (MHW) provided that the tree does not have any prop roots that extend into the water below the MHWL

c. Mangrove Trimming. Mangrove trimming is regulated by FDEP, Puerto Rico Department of Natural and Environmental Resources, and U.S. Virgin Islands Department of Planning and Natural Resources. Consistent with those authorities, when used in this Opinion, mangrove trimming refers to the removal (using hand equipment such as chain saws and/or machetes) of lateral branches (i.e., no alteration of the trunk of the tree) in a manner that ensures survival of the tree. This Opinion does not limit or supersede any restrictions on mangrove removal required under any federal, state, or local law.

1) This Opinion only covers projects with associated mangrove trimming occurring waterward of MHW if such trimming (1) occurs within the area where the authorized structures are placed or will be placed (e.g., removal of branches that overhang a dock), (2) is necessary to provide temporary construction access, and (3) is conducted in a manner that avoids any unnecessary trimming.

2) The Opinion does not apply to projects proposing to remove red mangrove props roots waterward of MHW, except for removal to install the dock walkways, as described above (up to a 4-ft walkway and up to a 8-ft ADA compliant walkway) and to install culverts necessary to improve water quality or restore hydrology between 2 water bodies.

9. Essential Fish Habitat: No work shall be authorized by SAJ-33 which may have direct or indirect adverse impacts to essential fish habitat such as but not limited to hard or soft corals, including listed corals, mangroves, estuarine emergent vegetation, marine emergent vegetation, and/or the following species of submerged aquatic vegetation: shoal grass (Halodule wrightii), paddle grass (Halophila decipiens), star grass (Halophila engelmanni), Johnson's seagrass (Halophila johnsonii), sago pondweed (Potamogeton pectinatus), clasping-leaved pondweed (Potamogeton perfoliatus), widgeon grass (Ruppia maritima), manatee grass (Syringodiumfiliforme), turtle grass (Thalassia testudinum), tapegrass (Vallisneria americana), homed pondweed (Zannichellia palustris), and eel grass (Zostera marina). Indirect effects include secondary and cumulative effects. In addition, the project cannot have adverse effects on any other essential fish habitat.

10. Signs: Must be posted in a visible location(s), alerting users of listed species in the area susceptible to vessel strikes and hook-and-line captures. The most current version of the signs that must be downloaded and sign installation guidance are available at: (http://sero.nmfs.noaa.gov/protected_resources/section_7/protected_species_educational_signs/index.html).

a. All projects in Florida shall use the Save Sea Turtle, Sawfish, and Dolphin sign. These signs shall include contact information to the sea turtle and marine mammal stranding networks and smalltooth sawfish encounter database.

b. Projects within the North Atlantic right whale educational sign zone (Figure 5) shall post the Help Protect North Atlantic Right Whales sign.

c. On the east coast of Florida projects occurring north of the St. Johns River to the Florida-Georgia line shall post the Report Sturgeon sign. On the west coast of Florida, projects occurring from the Cedar Key, Florida north to the Florida-Alabama line.

11. Monofilament Recycling Bins: Must be provided at the docking facility to reduce the risk of turtle or sawfish entanglement in or ingestion of marine debris. Monofilament recycling bins must:

a. Be constructed and labeled according to the instructions provided at http://mrrp.myfwc.com.

b. Be maintained in working order and emptied frequently (according to http://mrrp.myfwc.com standards) so that they do not overflow.

12. Timucuan Ecological and Historical Preserve: No structures shall be authorized by SAJ-33 within the boundaries of the Timucuan Ecological and Historical Preserve (Duval County) until the National Park Service has been contacted and offered the opportunity to submit comments to the Corps on the effects of the proposed project on the preserve.

13. Project construction will take place from uplands or from floating equipment (e.g., barge); prop or wheel-washing is prohibited.

14. Piling Installation:

a. Projects proposing installation of any type of piling greater than 24-inches in diameter, or installation of any size of metal piling or sheet piling by impact hammer cannot be authorized under SAJ-33 until project-specific consultation has been reinitiated and concluded with the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service, as appropriate.

b. All projects involving the installation of piles or sheet piles shall follow PDC’s for In-Water Noise from Pile and Sheet Pile Installation (reference Attachment).

15. Cultural Resources:

a. No structure or work shall adversely affect, impact or disturb properties listed in the National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP.

b. If during the ground disturbing activities and construction work within the permit area, there are archaeological/cultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes, evidence of structures or any other physical remains that could be associated with Native American cultures or early colonial or American settlement), the Permittee shall immediately stop all work in the vicinity and notify the Corps within two calendar days. The Corps shall then notify the Florida State Historic Preservation Officer (SHPO) and the appropriate Tribal Historic Preservation Officer(s) (THPO(s)) to assess the significance of the discovery and devise appropriate actions.

c. A cultural resources assessment may be required of the permit area, if deemed necessary by the SHPO, THPO(s), or Corps, in accordance with 36 CPR 800 or 33 CPR 325, Appendix C (5). Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CPR Part 325.7. Such activity shall not resume on non-federal lands without written authorization from the SHPO and the Corps.

d. In the unlikely event that unmarked human remains are identified on non-federal lands, they will be treated in accordance with Section 872.05 Florida Statutes. All work in the vicinity shall immediately cease and the Permittee shall immediately notify the medical examiner, Corps, and State Archeologist. The Corps shall then notify the appropriate SHPO and THPO(s). Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CPR Part

325.7. Such activity shall not resume without written authorization from the State Archeologist, SHPO and the Corps.

e. In the unlikely event that human remains are encountered on federal or tribal lands, or in situations where Archaeological Resources Protection Act of 1979, or Native American Graves Protection Repatriation Act of 1990 applies, all work in the vicinity shall immediately cease and the Permittee immediately notify the Corps. The Corps shall then notify the appropriate THPO(s) and SHPO. Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CPR Part 325.7. After such notification, project activities on federal lands shall not resume without written authorization from the Corps, and/or appropriate THPO(s), SHPO, and federal manager. After such notification, project activities on tribal lands shall not resume without written authorization from the appropriate THPO(s) and the Corps.

16. Best Management Practices: Turbidity controls measures may be required, and the work must be conducted to prevent violations of State Water Quality Standards as established in sections 62-4.242 and 62.4.244 of the Florida Administrative Code and Chapters 62-302, 62-520, 62-522 and 62.550 of the Florida Administrative Code.

17. Navigation:

a. A structure authorized under this general permit must not interfere with general navigation. Structures constructed within canals must not extend more than 25% of the waterway width.

b. No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals prescribed by the U.S. Coast Guard, through regulation or otherwise, must be installed and maintained at the Permittee’s expense on authorized facilities in navigable waters of the United States.

c. For projects authorized under the SAJ-33 in navigable waters of the United States, the permittee understands and agrees that, if future operations by the United States require the removal, relocation or other alteration of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.

d. For projects proposed adjacent to Federally-maintained channels, no structure, including mooring piles, authorized under this regional general permit shall be within the established setback. Exact locations of the proposed structures relative to the channel may need to be verified by use of the Florida State Plane (x, y) Coordinate System, calculated from the near-bottom edge of the Federal channel. Any activity within Federal rights-of-way may require the Permittee to enter into a consent-to easement with the Real Estate Division, U.S. Army Corps of Engineers, Jacksonville or Mobile District, as appropriate, prior to the commencement of any construction activity. 18. The materials used for construction must consist of suitable material and be free of toxic pollutants in other than trace quantities.

19. Other Agency Approvals: Prior to the initiation of any construction, projects qualifying for this regional general permit must qualify for an exemption under Section 403.813(2)(b), F.S., or be authorized under Part IV of Chapter 373 by the Department of Environmental Protection, a water management district under Section 373.069, F.S., or a local government with delegated authority under Section 373.441 F.S., and receive a Coastal Zone Consistency Concurrence (CZCC) or waiver, as well as any authorizations required for the use of sovereignty submerged lands that must be obtained as part of the associated CZCC.

20. No work shall be performed until after the Permittee provides notification to the owner(s) or operator(s) of any marked utilities in the area of the structure.

21. Any proposed regulatory action that modifies, alters, or is built upon or adjacent to an existing federal project or is constructed within a federal project right-of-way may require permission under Section 408. Any structure within 62.5 feet of a federal navigation project (with the exception of single-family docking structures) shall require coordination under Section 408. Any degradation, relocation, penetration, or work under a Corps levee, dike, dam, or water retaining structure and any proposed work within 15 feet of the toe of a Corps levee, 15 feet of a federal canal top of bank, or within 50 feet of a Corps dam requires coordination under Section 408. All structures within the design edges of a federal project, all structures that do not meet the requirements of the Setback Guidance, and all structures within 15 feet of a federal canal top of bank (such as the Okeechobee Waterway or the Central and South Florida Flood Control Canals) require a project-specific Section 408 approval. Although generally structures along those Federal channels identified in the Setback Guidance will not require project-specific approval under Section 408 provided the structures complies with the Setback Guidance, all structures within 62.5 feet of a federal navigation project with the exception of single-family docking structures require coordination with EN under Section 408. All structures closer than two feet from the top edge slope of a federal navigation channel will require coordination with The Engineering Division (EN).

22. Conformance with the descriptions and criteria contained herein does not necessarily guarantee authorization under this regional general permit. The district Engineer reserves the right to require that any request for authorization under this regional general permit be processed as a standard permit.

23. SAJ-33 will be valid for a period of five years from the date of issuance noted above unless suspended or revoked by the District Engineer prior to that date. If the SAJ-33 expires or is revoked prior to completion of the authorized work, authorization of activities which have commenced or are under contract to commence in reliance upon the SAJ-33 will remain in effect provided the activity is completed within 12 months of the date the SAJ-33 expired or was revoked.

24. The District Engineer reserves the right to require that any request for authorization under this general permit be processed as an Individual Permit.

25. The General Conditions attached hereto are made a part of this permit.

BY AUTHORITY OF THE SECRETARY OF THE ARMY:

Jason A. Kirk

Colonel, U.S. Army

District Commander

ENDANGERED SPECIES: The U.S. Army Corps of Engineers (Corps) has determined the proposed project may affect, but is not likely to adversely affect the West Indian Manatee or its designated critical habitat. The Corps will request, via separate letter, Fish and Wildlife Service’s concurrence with this determination pursuant to Section 7 of the Endangered Species Act.

The U.S. Army Corps of Engineers (Corps) has determined the proposed project may affect, but is not likely to adversely affect Sea turtles (various species), Smalltooth sawfish (Pristis pectinata), or Gulf sturgeon (Acipenser oxyrhynchus desotoi), or these species designated critical habitat. The Corps will request, via separate letter, National Marine Fisheries Service- Protected Resources Division’s concurrence with this determination pursuant to Section 7 of the Endangered Species Act.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Because of possible impacts to the EFH types of mud, sand, shell, rock, and/or estuarine water column, the proposed regional general permit may impact various life stages (primarily larval) of the following species or species complexes: penaeid shrimp complex; red drum; stone crab; spiny lobster; and/or the snapper/grouper complex.

Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico.

Our final determination relative to the proposal impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. The Corps will request, via separate letter, National Marine Fisheries Services- Habitat Conservation Division’s concurrence with this determination pursuant to Magnuson-Stevens Fishery Conservation and Management Act 1996.

IMPACT ON CULTURAL RESOURCES: The Corps has determined, pursuant to Section 106 of the National Historic Preservation Act, that the reissuance of SAJ- 33 has no potential to cause effect to any historic resource listed, or eligible for listing in the National Register of Historic Places.

The Corps bases this determination on two factors. First, all work the Corps authorizes pursuant to SAJ- 33 will have to comply with the standard special condition relating to the protection of historic properties (See Special Condition #6 in the draft provided above). Second, the Corps will utilize the April 2010, or the most recent version available, Jacksonville District Regulatory Section 106 of the National Historic Preservation Act Key to verify that each individual project has no potential to cause effect to any historic resource.

In the event that the Corps is unable to determine that a particular project has no potential to cause effect to any historic resource, the Corps will forgo verifying that the project complies with SAJ- 33 until the Corps solicits comments from the State Historic Preservation Officer.

RESPONSE: Comments regarding this proposed reissuance of General Permit SAJ- 33 should be submitted in writing to Brad Carey at the above address or via email at brad.j.carey@usace.army.mil within 30 days from the date of this notice. If no adverse comments are received, the permit will be reissued without further notice.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS POST OFFICE BOX 4970 JACKSONVILLE, FLORIDA 32232-0019 REPLY TO ATTENTION OF

January 17, 2018 Jacksonville Section Regulatory Office

PUBLIC NOTICE Permit Application Nos. SAJ-2006-06019 (BJC) and SAJ-2006-01735 (SCW) GENERAL PERMIT SAJ-33 and SAJ-34 PRIVATE MULTI-FAMILY PIERS, GOVERNMENT PIERS OR PRIVATE COMMERCIAL PIERS IN FLORIDA PROPOSAL: To simplify and speed processing of Department of the Army permits for a specific type of project involving substantially similar minor in-water work, the Jacksonville District, U.S. Army Corps of Engineers (Corps) proposes combine General Permits SAJ-33 for Private Multi-Family or Government Piers in Florida and SAJ-34 for Private Commercial Piers in Florida. Reissuance of SAJ-33 will encompass Private Multi-Family Piers, Government Piers and Private Commercial Piers in Florida. BACKGROUND: On April 8, 2013, the Jacksonville District, U.S. Army Corps of Engineers reissued Regional General Permit SAJ-33 for Private Multi-Family or Government Piers in Florida. The Corps, pursuant to Section 10 of the Rivers and Harbors Act of 1899, originally issued SAJ-33 and SAJ-34 in 2007. The Corps has reviewed and reissued SAJ-33 and SAJ-34 every five years since then. According to the Corps' ORM database, during the years 20072017, the Corps has utilized SAJ- 33 a total of one hundred and forty-five (145) times and SAJ34 a total of forty-six (46) times. The term "general permit" means a Department of the Army authorization that is issued on a nationwide or regional (District) basis for a category of activities when those activities are substantially similar in nature and cause only minimal individual and cumulative environmental impacts. General permits are a way to reduce the burden of the regulatory program on the public and ensure timely issuance of permits while effectively administering the laws and regulations, which establish and govern the program. In most instances, anyone meeting the conditions of a general permit can receive project specific authorization. Anyone not meeting the conditions of a general permit may still receive authorization via a "standard permit." However, when the Corps reviews an application as a standard permit, the Corps conducts an individual review of the particular project and may coordinate with third parties, including the federal and state resource agencies In the case of categories of work involving similar, minor activities, standard permit reviews are burdensome and typically result in redundant institutional effort over time. For the vast majority of these substantially similar minor projects, the additional effort does not result in any increased benefit to the environment, the applicant, or the public at large.

The Corps performs an assessment of the cumulative impacts of work authorized under a general permit every five years to determine if it is in the Public Interest for the Corps to reissue a general permit and continue to utilize it. Draft of Proposed Regional General Permit: A draft of the regional general permit proposed for reissuance follows: Regional General Permit SAJ-33 SAJ-2006-06019 (BJC) Private Multi-Family Piers, Government Piers or Commercial Piers in Florida Upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C § 403), general authority is hereby given to construct private multi-family piers, government piers or commercial piers less than 1,000 square feet in surface area in navigable waters of the United States within the State of Florida, subject to the following conditions: SPECIAL CONDITIONS: 1. Structures authorized under this general permit are private multi-family docks/piers, government docks/piers, or commercial docks/piers less than 1,000 square feet in surface area and designed to accommodate not more than four vessels, including dry storage, unless a Florida Fish and Wildlife Conservation Commission approved Manatee Protection Plan is more restrictive. Slips for non-motorized vessels (e.g., kayak, canoe, and paddleboard) and associated launching areas do not count toward the total slip number. This general permit includes normal appurtenances such as boat hoists, boat shelters with open sides, stairways, walkways (as long as they are designed and clearly marked to prohibit fishing and vessel mooring), mooring pilings, and maintenance of same. This does not include structures that support large commercial vessels including ferries, tankers, and cargo ships such as ferry terminals and large ports. 2. No work shall be performed until the applicant submits satisfactory plans for the proposed structure and receives written authorization from the District Engineer. 3. The following are specifically excluded from authorization under SAJ-33: a. Installation of metal piles or metal sheet piles by impact hammer. b. Construction during non-daylight hours. c. Municipal fishing piers. d. Living, fueling or storage facilities over navigable waters of the United States e. Motorboat prohibited zones, no entry zones, and Federal Manatee Sanctuaries. f. All area regulated under the Lake Okeechobee and Okeechobee Waterway Shoreline Management Plan, located between St. Lucie Lock in Martin County and W. P. Franklin Lock in Lee County.

2

g. Designated Critical Habitats of the following species: (1) American Crocodile (2) Smalltooth Sawfish Critical Habitat Limited Exclusion Zones (Table 1 and Figure 1) (3) Loggerhead Sea Turtle (4) Acropora (Elkhorn and staghorn corals) (5) Atlantic sturgeon Critical Habitat Exclusion Zone (Figure 2) (6) Johnson Seagrass: New multi-family piers are excluded. Repair, replacement, and reconfiguration of existing multi-family facilities may be covered if it (1) occurs within same overall footprint (out to the perimeter of the facility, including the outer limits of the structure and permitted mooring locations), (2) does not increase the total aerial extent (i.e., area of coverage from the dock structures) of the existing facility, and (3) does not affect Johnson's seagrass. h. Biscayne Bay National Park i. St. Lucie Impoundment (Martin County) j. Wild and Scenic Rivers Act (16 U.S.C. 1317, et seq.): The entire Wekiva River, including Wekiwa Springs Run, Rock Springs Run, the entire Seminole Creek, and Black Water Creek from its outfall at Lake Norris to its confluence with the Wekiva River, the Loxahatchee River from Riverbend Park downstream to Jonathan Dickinson State Park. k. State Parks: John Pennekamp Coral Reef State Park, Lignum Vitae Key State Botanical Site and Aquatic Preserve, Long Key State Park, Curry Hammock State Park, and Bahia Honda State Park. l. Kings Bay/Crystal River/Homosassa/Salt River system (Citrus County) and canals connected to these waterways. m. Lake Miccosukee, located on the common boundary between Leon and Jefferson Counties. n. Coastal Lakes: Within, their outfalls, and/or the shore areas between the lakes and the Gulf of Mexico as depicted on the attached map (Figure 3). o. Areas on or contiguous to ocean beaches. p. Nearshore sea turtle reproductive habitat: 4. Endangered Species Act (ESA) and Marine Mammal Protection Act (MMPA) Conditions a. Education and Observation: The permittee must ensure that all personnel associated with the project are instructed about the potential presence of species protected under the ESA and the Marine Mammal Protection Act (MMPA). All on-site project personnel are responsible for observing water-related activities for the presence of protected species. All personnel shall be advised that there are civil and criminal penalties for harming, harassing, or killing ESA-listed

3

species or marine mammals. To determine which species may be found in the project area, please review the relevant Protected Species List at: http://sero.nmfs.noaa.gov/protected_resources/section_7/threatened_endangered/index.html b. Reporting of interactions with protected species: (1) Any collision(s) with and/or injury to any sea turtle, sawfish, whale, or sturgeon occurring during the construction of a project, shall be reported immediately to NMFS's Protected Resources Division (PRD) at (1-727-824-5312) or by email to takereport.nmfsser@noaa.gov and SAJ-RD-Enforcement@usace.army.mil. (2) Smalltooth sawfish: Report sightings to 1-844-SAWFISH or email Sawfish@MyFWC.com (3) Sturgeon: Report dead sturgeon to 1-844-STURG 911 (1-844-788-7491) or email nmfs.ser.sturgeonnetwork@noaa.gov (4) Sea turtles and marine mammals: Report stranded, injured, or dead animals to 1-877WHALE HELP (1-877-942-5343). (5) North Atlantic right whale: Report injured, dead, or entangled right whales to the USCG via VHF Channel 16. c. Vessel Traffic and Construction Equipment: All vessel operators must watch for and avoid collision with species protected under the ESA and MMPA. Vessel operators must avoid potential interactions with protected species and operate in accordance with the following protective measures: (1) Construction Equipment: i) All vessels associated with the construction project shall operate at "Idle Speed/No Wake" at all times while operating in water depths where the draft of the vessel provides less than a 4-foot (ft) clearance from the bottom, and in all depths after a protected species has been observed in and has departed the area. ii) All vessels will follow marked channels and/or routes using the maximum water depth whenever possible. iii) Operation of any mechanical construction equipment, including vessels, shall cease immediately if a listed species is observed within a 50-ft radius of construction equipment and shall not resume until the species has departed the area of its own volition. (2) All Vessels: i) Sea turtles: Maintain a minimum distance of 150 ft. ii) North Atlantic right whale: Maintain a minimum 1,500-ft distance (500 yards).

4

iii) Vessels 65 ft in length or longer must comply with the Right Whale Ship Strike Reduction Rule (50 CFR 224.105) which includes reducing speeds to 10 knots or less in Seasonal Management Areas (http://www.fisheries.noaa.gov/pr/shipstrike/). iv) Mariners shall check various communication media for general information regarding avoiding ship strikes and specific information regarding right whale sightings in the area. These include NOAA weather radio, USCG NAVTEX broadcasts, and Notices to Mariners. v) Marine mammals (i.e., dolphins, whales [other than North Atlantic right whales], and porpoises): Maintain a minimum distance of 300 ft. vi) When these animals are sighted while the vessel is underway (e.g., bow-riding), attempt to remain parallel to the animal's course. Avoid excessive speed or abrupt changes in direction until they have left the area. vii) Reduce speed to 10 knots or less when mother/calf pairs or groups of marine mammals are observed, when safety permits. d. Turbidity Control Measures during Construction: Turbidity must be monitored and controlled. Prior to initiating any of the work covered under this Opinion, the Permittee shall install turbidity curtains as described below. In some instances, the use of turbidity curtains may be waived by the USACE project manager if the project is deemed too minimal to generate turbidity (e.g., certain ATON installation, scientific survey device placement, marine debris removal) or if the current is too strong for the curtains to stay in place. Turbidity curtains specifications: (1) Install floating turbidity barriers with weighted skirts that extend to within 1 ft of the bottom around all work areas that are in, or adjacent to, surface waters. (2) Use these turbidity barriers throughout construction to control erosion and siltation and ensure that turbidity levels within the project area do not exceed background conditions. (3) Position turbidity barriers in a way that does not block species' entry to or exit from designated critical habitat. (4) Monitor and maintain turbidity barriers in place until the authorized work has been completed and the water quality in the project area has returned to background conditions. (5) In the range of ESA-listed corals (St. Lucie Inlet, Martin County south to the Dry Tortugas and the U.S. Caribbean) and Johnson's seagrass (Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida): Projects that include upland earth moving (e.g., grading to install a building or parking lot associated with a dock and seawall project), must install sediment control barriers to prevent any upland sediments from reaching estuarine or marine waters. The turbidity curtain requirement cannot be waived for any project that moves or removes sediment (e.g., dredging, auger to create a pile, trenching to install a cable line). If turbidity curtains are not feasible in an area based on site conditions such as water current, high

5

wave action, or stormy conditions, the project must undergo individual Section 7 consultation and is not covered under this Programmatic Opinion. e. Entanglement: All turbidity curtains and other in-water equipment must be properly secured with materials that reduce the risk of entanglement of marine species (described below). Turbidity curtains likewise must be made of materials that reduce the risk of entanglement of marine species. (1) In-water lines (rope, chain, and cable, including the lines to secure turbidity curtains) must be stiff, taut, and non-looping. Examples of such lines are heavy metal chains or heavy cables that do not readily loop and tangle. Flexible in-water lines, such as nylon rope or any lines that could loop or tangle, must be enclosed in a plastic or rubber sleeve/tube to add rigidity and prevent the line from looping and tangling. In all instances, no excess line is allowed in the water. (2) Turbidity curtains and other in-water equipment must be placed in a manner that does not entrap species within the construction area or block access for them to navigate around the construction area. 5. The project must designed to meet the following PDCs if the project occurs in the critical habitat as described below: a. Johnson's Sea Grass: Structures must comply with PDCs for Docks or Other Minor Structures (reference Attached Dock Construction Scenarios): These PDCs address the anticipated dock construction scenarios expected within Florida and the U.S. Caribbean and provide NMFS PRD's construction guidelines for projects occurring (1) within Johnson's seagrass critical habitat; (2) within the range of Johnson's seagrass , but outside of Johnson's seagrass critical habitat; and (3) outside of both the range and critical habitat for Johnson's seagrass. These scenarios consider whether a seagrass survey was conducted for projects within the range of Johnson's seagrass or located in Johnson's seagrass critical habitat. Surveys must be completed within 1 year prior to submittal of the application to the action agency for project authorization. There is no seasonal restriction for Johnson's seagrass surveys; however, Johnson's seagrass is found within the range of other seagrass species that exhibit a seasonal pattern of growth and distribution. For comparison, NMFS Habitat Conservation Division's recommended sampling window for non-listed species is June 1 to September 30. New marinas or multi-family facilities in Johnson's seagrass critical habitat are not authorized with this permit. Repair, replacement, and reconfiguration of private multi-family or government piers may be covered if it (1) occurs within same overall footprint (out to the perimeter of the facility, including the outer limits of the structure and permitted mooring locations), (2) does not increase the total aerial extent (i.e., area of coverage from the dock structures) of the existing facility, and (3) does not affect Johnson's seagrass. Mooring fields are allowed in Johnson's seagrass critical habitat and within the range of Johnson's seagrass so long as they occur in waters deeper than -13 feet (-4 meters). b. Gulf sturgeon: Additional noise restrictions are required for pile and sheet pile installation in the Gulf sturgeon critical habitat migratory restriction zones (Table 2 and Figure 4). The allowable pile and sheet pile driving activities vary depending on the project area (reference attached PDCs Specific to the Gulf Sturgeon Critical Habitat Migratory Restriction Zones). c. Northern Right Whale: For any dock project (new construction, repair, or replacement) at a private residence located within 11 nautical miles of North Atlantic right whale critical habitat

6

(as measured in a radius from the center of the nearest inlet to open ocean (Figure 5, Table 3 and North Atlantic Right Whale Federal Regulations Information Handout Attachment) the property owner will be provided a handout with their USACE permit describing the presence of North Atlantic right whales in the area and the Federal regulations governing the approach to North Atlantic right whales. 6. West Indian Manatee: For project in waters accessible to manatees: a. Prior to verification of authorization, the dichotomous key titled, "The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, April 2013" (reference Attachment) shall be used to determine potential manatee impacts. Those determined to be a "may affect" to the manatee will not be authorized unless consistent with the 2013 Manatee Programmatic Consultation or individual consultation on the project is required and has been reinitiated and concluded with the U.S. Fish and Wildlife Service in accordance with the Endangered Species Act. Additionally, depending on the location of the project, some projects determined to be "may affect, not likely to adversely affect" will not be authorized until consultation on the project has been concluded. Note: The manatee key may be subject to revision at any time. It is our intention that the most recent version of this technical tool will be utilized during the evaluation of the permit application. b. The permittee will utilize the "Standard Manatee Conditions for In-Water Work, 2011" (reference Attachment) and/or requirements, as appropriate for the proposed activity. Note: The manatee conditions may be subject to revision at any time. It is our intention that the most recent version of these conditions will be utilized during the evaluation of the permit application. 7. Freshwater Mussels: In accordance with Section 7 of the Endangered Species Act, projects proposed within habitat for federally listed freshwater mussels and freshwater mussels proposed for listing cannot be authorized until consultation on the project has been concluded with the U.S. Fish and Wildlife Service. These drainages are as follows: Escambia River, Yellow River, Choctawhatchee River, Chipola River, Apalachicola River, Ochlockonee River, Suwannee River, Santa Fe and New Rivers, and Econfina Creek (Florida panhandle) and their creeks and tributaries. No activity shall be authorized under this general permit, which is likely to adversely affect a federally listed threatened or endangered species, or a species proposed for such designation, or destroy or adversely modify its designated critical habitat. 8. Mangroves: a. All projects must be sited and designed to avoid or minimize impacts to mangroves. b. Mangrove removal must be conducted in a manner that avoids any unnecessary removal and is limited to the following instances: 1) Removal to install up to a 4-ft-wide walkway for a dock. 2) Removal to install up to an 8-ft-wide walkway for public docks, where the walkway is necessary to address compliance with the Americans with Disability Act (ADA). 3) Removal to install culverts necessary to improve water quality or restore hydrology between 2 water bodies. Such mangrove removal is limited to a maximum of 20 linear feet (lin ft) of shoreline per culvert opening.

7

4) Removal of mangroves above mean high water (MHW) provided that the tree does not have any prop roots that extend into the water below the MHWL c. Mangrove Trimming. Mangrove trimming is regulated by FDEP, Puerto Rico Department of Natural and Environmental Resources, and U.S. Virgin Islands Department of Planning and Natural Resources. Consistent with those authorities, when used in this Opinion, mangrove trimming refers to the removal (using hand equipment such as chain saws and/or machetes) of lateral branches (i.e., no alteration of the trunk of the tree) in a manner that ensures survival of the tree. This Opinion does not limit or supersede any restrictions on mangrove removal required under any federal, state, or local law. 1) This Opinion only covers projects with associated mangrove trimming occurring waterward of MHW if such trimming (1) occurs within the area where the authorized structures are placed or will be placed (e.g., removal of branches that overhang a dock), (2) is necessary to provide temporary construction access, and (3) is conducted in a manner that avoids any unnecessary trimming. 2) The Opinion does not apply to projects proposing to remove red mangrove props roots waterward of MHW, except for removal to install the dock walkways, as described above (up to a 4-ft walkway and up to a 8-ft ADA compliant walkway) and to install culverts necessary to improve water quality or restore hydrology between 2 water bodies. 9. Essential Fish Habitat: No work shall be authorized by SAJ-33 which may have direct or indirect adverse impacts to essential fish habitat such as but not limited to hard or soft corals, including listed corals, mangroves, estuarine emergent vegetation, marine emergent vegetation, and/or the following species of submerged aquatic vegetation: shoal grass (Halodule wrightii), paddle grass (Halophila decipiens), star grass (Halophila engelmanni), Johnson's seagrass (Halophila johnsonii), sago pondweed (Potamogeton pectinatus), clasping-leaved pondweed (Potamogeton perfoliatus), widgeon grass (Ruppia maritima), manatee grass (Syringodiumfiliforme), turtle grass (Thalassia testudinum), tapegrass (Vallisneria americana), homed pondweed (Zannichellia palustris), and eel grass (Zostera marina). Indirect effects include secondary and cumulative effects. In addition, the project cannot have adverse effects on any other essential fish habitat. 10. Signs: Must be posted in a visible location(s), alerting users of listed species in the area susceptible to vessel strikes and hook-and-line captures. The most current version of the signs that must be downloaded and sign installation guidance are available at: (http://sero.nmfs.noaa.gov/protected resources/section 7/protected species educational signs /index.html). a. All projects in Florida shall use the Save Sea Turtle, Sawfish, and Dolphin sign. These signs shall include contact information to the sea turtle and marine mammal stranding networks and smalltooth sawfish encounter database. b. Projects within the North Atlantic right whale educational sign zone (Figure 5) shall post the Help Protect North Atlantic Right Whales sign. c. On the east coast of Florida projects occurring north of the St. Johns River to the FloridaGeorgia line shall post the Report Sturgeon sign. On the west coast of Florida, projects occurring from the Cedar Key, Florida north to the Florida-Alabama line.

8

11. Monofilament Recycling Bins: Must be provided at the docking facility to reduce the risk of turtle or sawfish entanglement in or ingestion of marine debris. Monofilament recycling bins must: a. Be constructed and labeled according to the instructions provided at http://mrrp.myfwc.com. b. Be maintained in working order and emptied frequently (according to http://mrrp.myfwc.com standards) so that they do not overflow. 12. Timucuan Ecological and Historical Preserve: No structures shall be authorized by SAJ-33 within the boundaries of the Timucuan Ecological and Historical Preserve (Duval County) until the National Park Service has been contacted and offered the opportunity to submit comments to the Corps on the effects of the proposed project on the preserve. 13. Project construction will take place from uplands or from floating equipment (e.g., barge); prop or wheel-washing is prohibited. 14. Piling Installation: a. Projects proposing installation of any type of piling greater than 24-inches in diameter, or installation of any size of metal piling or sheet piling by impact hammer cannot be authorized under SAJ-33 until project-specific consultation has been reinitiated and concluded with the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service, as appropriate. b. All projects involving the installation of piles or sheet piles shall follow PDC's for In-Water Noise from Pile and Sheet Pile Installation (reference Attachment). 15. Cultural Resources: a. No structure or work shall adversely affect, impact or disturb properties listed in the National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP. b. If during the ground disturbing activities and construction work within the permit area, there are archaeological/cultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes, evidence of structures or any other physical remains that could be associated with Native American cultures or early colonial or American settlement), the Permittee shall immediately stop all work in the vicinity and notify the Corps within two calendar days. The Corps shall then notify the Florida State Historic Preservation Officer (SHPO) and the appropriate Tribal Historic Preservation Officer(s) (THPO(s)) to assess the significance of the discovery and devise appropriate actions. c. A cultural resources assessment may be required of the permit area, if deemed necessary by the SHPO, THPO(s), or Corps, in accordance with 36 CPR 800 or 33 CPR 325, Appendix C (5). Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CPR Part 325.7. Such activity shall not resume on non-federal lands without written authorization from the SHPO and the Corps.

9

d. In the unlikely event that unmarked human remains are identified on non-federal lands, they will be treated in accordance with Section 872.05 Florida Statutes. All work in the vicinity shall immediately cease and the Permittee shall immediately notify the medical examiner, Corps, and State Archeologist. The Corps shall then notify the appropriate SHPO and THPO(s). Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CPR Part 325.7. Such activity shall not resume without written authorization from the State Archeologist, SHPO and the Corps. e. In the unlikely event that human remains are encountered on federal or tribal lands, or in situations where Archaeological Resources Protection Act of 1979, or Native American Graves Protection Repatriation Act of 1990 applies, all work in the vicinity shall immediately cease and the Permittee immediately notify the Corps. The Corps shall then notify the appropriate THPO(s) and SHPO. Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CPR Part 325.7. After such notification, project activities on federal lands shall not resume without written authorization from the Corps, and/or appropriate THPO(s), SHPO, and federal manager. After such notification, project activities on tribal lands shall not resume without written authorization from the appropriate THPO(s) and the Corps. 16. Best Management Practices: Turbidity controls measures may be required, and the work must be conducted to prevent violations of State Water Quality Standards as established in sections 62-4.242 and 62.4.244 of the Florida Administrative Code and Chapters 62-302, 62520, 62-522 and 62.550 of the Florida Administrative Code. 17. Navigation: a. A structure authorized under this general permit must not interfere with general navigation. Structures constructed within canals must not extend more than 25% of the waterway width. b. No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals prescribed by the U.S. Coast Guard, through regulation or otherwise, must be installed and maintained at the Permittee's expense on authorized facilities in navigable waters of the United States. c. For projects authorized under the SAJ-33 in navigable waters of the United States, the permittee understands and agrees that, if future operations by the United States require the removal, relocation or other alteration of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. d. For projects proposed adjacent to Federally-maintained channels, no structure, including mooring piles, authorized under this regional general permit shall be within the established setback. Exact locations of the proposed structures relative to the channel may need to be verified by use of the Florida State Plane (x, y) Coordinate System, calculated from the nearbottom edge of the Federal channel. Any activity within Federal rights-of-way may require the

10

Permittee to enter into a consent-to easement with the Real Estate Division, U.S. Army Corps of Engineers, Jacksonville or Mobile District, as appropriate, prior to the commencement of any construction activity. 18. The materials used for construction must consist of suitable material and be free of toxic pollutants in other than trace quantities. 19. Other Agency Approvals: Prior to the initiation of any construction, projects qualifying for this regional general permit must qualify for an exemption under Section 403.813(2)(b), F.S., or be authorized under Part IV of Chapter 373 by the Department of Environmental Protection, a water management district under Section 373.069, F.S., or a local government with delegated authority under Section 373.441 F.S., and receive a Coastal Zone Consistency Concurrence (CZCC) or waiver, as well as any authorizations required for the use of sovereignty submerged lands that must be obtained as part of the associated CZCC. 20. No work shall be performed until after the Permittee provides notification to the owner(s) or operator(s) of any marked utilities in the area of the structure. 21. Any proposed regulatory action that modifies, alters, or is built upon or adjacent to an existing federal project or is constructed within a federal project right-of-way may require permission under Section 408. Any structure within 62.5 feet of a federal navigation project (with the exception of single-family docking structures) shall require coordination under Section 408. Any degradation, relocation, penetration, or work under a Corps levee, dike, dam, or water retaining structure and any proposed work within 15 feet of the toe of a Corps levee, 15 feet of a federal canal top of bank, or within 50 feet of a Corps dam requires coordination under Section 408. All structures within the design edges of a federal project, all structures that do not meet the requirements of the Setback Guidance, and all structures within 15 feet of a federal canal top of bank (such as the Okeechobee Waterway or the Central and South Florida Flood Control Canals) require a project-specific Section 408 approval. Although generally structures along those Federal channels identified in the Setback Guidance will not require project-specific approval under Section 408 provided the structures complies with the Setback Guidance, all structures within 62.5 feet of a federal navigation project with the exception of single-family docking structures require coordination with EN under Section 408. All structures closer than two feet from the top edge slope of a federal navigation channel will require coordination with The Engineering Division (EN). 22. Conformance with the descriptions and criteria contained herein does not necessarily guarantee authorization under this regional general permit. The district Engineer reserves the right to require that any request for authorization under this regional general permit be processed as a standard permit. 23. SAJ-33 will be valid for a period of five years from the date of issuance noted above unless suspended or revoked by the District Engineer prior to that date. If the SAJ-33 expires or is revoked prior to completion of the authorized work, authorization of activities which have commenced or are under contract to commence in reliance upon the SAJ-33 will remain in effect provided the activity is completed within 12 months of the date the SAJ-33 expired or was revoked. 24. The District Engineer reserves the right to require that any request for authorization under this general permit be processed as an Individual Permit.

11

25. The General Conditions attached hereto are made a part of this permit. BY AUTHORITY OF THE SECRETARY OF THE ARMY:

Jason A. Kirk Colonel, U.S. Army District Commander ENDANGERED SPECIES: The U.S. Army Corps of Engineers (Corps) has determined the proposed project may affect, but is not likely to adversely affect the West Indian Manatee or its designated critical habitat. The Corps will request, via separate letter, Fish and Wildlife Service's concurrence with this determination pursuant to Section 7 of the Endangered Species Act. The U.S. Army Corps of Engineers (Corps) has determined the proposed project may affect, but is not likely to adversely affect Sea turtles (various species), Smalltooth sawfish (Pristis pectinata), or Gulf sturgeon (Acipenser oxyrhynchus desotoi), or these species designated critical habitat. The Corps will request, via separate letter, National Marine Fisheries ServiceProtected Resources Division's concurrence with this determination pursuant to Section 7 of the Endangered Species Act. ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Because of possible impacts to the EFH types of mud, sand, shell, rock, and/or estuarine water column, the proposed regional general permit may impact various life stages (primarily larval) of the following species or species complexes: penaeid shrimp complex; red drum; stone crab; spiny lobster; and/or the snapper/grouper complex. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to the proposal impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. The Corps will request, via separate letter, National Marine Fisheries Services- Habitat Conservation Division's concurrence with this determination pursuant to Magnuson-Stevens Fishery Conservation and Management Act 1996. IMPACT ON CULTURAL RESOURCES: The Corps has determined, pursuant to Section 106 of the National Historic Preservation Act, that the reissuance of SAJ- 33 has no potential to cause effect to any historic resource listed, or eligible for listing in the National Register of Historic Places. The Corps bases this determination on two factors. First, all work the Corps authorizes pursuant to SAJ- 33 will have to comply with the standard special condition relating to the protection of historic properties (See Special Condition #6 in the draft provided above). Second, the Corps will utilize the April 2010, or the most recent version available, Jacksonville District Regulatory Section 106 of the National Historic Preservation Act Key to verify that each individual project has no potential to cause effect to any historic resource.

12

In the event that the Corps is unable to determine that a particular project has no potential to cause effect to any historic resource, the Corps will forgo verifying that the project complies with SAJ- 33 until the Corps solicits comments from the State Historic Preservation Officer. RESPONSE: Comments regarding this proposed reissuance of General Permit SAJ- 33 should be submitted in writing to Brad Carey at the above address or via email at brad.j.carey@usace.army.mil within 30 days from the date of this notice. If no adverse comments are received, the permit will be reissued without further notice.

13

Figure 2: Atlantic sturgeon critical habitat (Images provided on the NMFS website at http://sero.nmfs.gov/protected_resources/sturgeon/documents/critical_habitat_maps.pdf)

Figure 3: Coastal Dune Lakes

Table 2: Gulf sturgeon critical habitat migratory restriction zones.

Figure 4: Gulf sturgeon critical habitat. Estuarine critical habitat units under NMFS jurisdiction shaded and the rivers under USFWS's jurisdiction labeled (Images provided on the NMFS website at http://sero.nmfs.noaa.gov/maps_gis_data/protected_resources/critical_habitat/index.html).

Table 3. North Atlantic Right Whale Educational Sign Zone Name Latitude Cumberland Sound 30.719564°N Nassau Sound 30.516611°N St. John's River 30.408053°N St Augustine Inlet 29.918411°N Matanzas Inlet 29.713831°N Ponce Inlet 29.083056°N Port Canaveral 28.409306°N Sebastian Inlet 27.860833°N Fort Pierce Inlet 27.471711°N St. Lucie Inlet 27.165567°N Jupiter Inlet 26.943950°N Riviera Beach 26.772353°N

Figure 5. North Atlantic right whale educational sign zones.

32

Longitude 81.449467°W 81.444278°W 81.399467°W 81.288117°W 81.227000°W 80.916494°W 80.586689°W 80.446725°W 80.290378°W 80.157236°W 80.070908°W 80.034508°W

North Atlantic Right Whale Federal Regulations Information Handout

THE CORPS OF ENGINEERS, JACKSONVILLE DISTRICT, AND THE STATE OF FLORIDA EFFECT DETERMINATION KEY FOR THE MANATEE IN FLORIDA April 2013 Purpose and background of the key The purpose of this document is to provide guidance to improve the review of permit applications by U.S. Army Corps of Engineers' (Corps) Project Managers in the Regulatory Division regarding the potential effects of proposed projects on the endangered West Indian manatee (Trichechus manatus) in Florida, and by the Florida Department of Environmental Protection or its authorized designee or Water Management District, for evaluating projects under the State Programmatic General Permit (SPGP) or any other Programmatic General Permits that the Corps may issue for administration by the above agencies. Such guidance is contained in the following dichotomous key. The key applies to permit applications for in-water activities such as, but not limited to: (1) dredging [new or maintenance dredging of not more than 50,000 cubic yards], placement of fill material for shoreline stabilization, and construction/placement of other in-water structures as well as (2) construction of docks, marinas, boat ramps and associated trailer parking spaces, boat slips, dry storage or any other watercraft access structures or facilities. At a certain step in the key, the user is referred to graphics depicting important manatee areas or areas with inadequate protection. The maps can be downloaded from the Corps' web page at http://www.saj.usace.army.mil/Missions/Regulatory/SourceBook.aspx. We intend to utilize the most recent depiction of these areas, so should these areas be modified by statute, rule, ordinance and/or other legal mandate or authorization, we will modify the graphical depictions accordingly. These areas may be shaded or otherwise differentiated for identification on the maps. Explanatory footnotes are provided in the key and must be closely followed whenever encountered. Scope of the key This key should only be used in the review of permit applications for effect determinations on manatees and should not be used for other listed species or for other aquatic resources such as Essential Fish Habitat (EFH). Corps Project Managers should ensure that consideration of the project's effects on any other listed species and/or on EFH is performed independently. This key may be used to evaluate applications for all types of State of Florida (State Programmatic General Permits, noticed general permits, standard general permits, submerged lands leases, conceptual and individual permits) and Department of the Army (standard permits, letters of permission, nationwide permits, and regional general permits) permits and authorizations. The final effect determination will be based on the project location and description; the potential effects to manatees, manatee habitat, and/or manatee critical habitat; and any measures (such as project components, standard construction precautions, or special conditions included in the authorization) to avoid or minimize effects to manatees or manatee critical habitat. Projects that key to a "may affect" determination equate to "likely to adversely affect" situations, and those projects should not be processed under the SPGP or any other programmatic general permit. For __________________________________ Manatee Key April 2013 version

Page 1 of 12

all "may affect" determinations, Corps Project Managers shall refer to the Manatee Programmatic Biological Opinion, dated March 21, 2011, for guidance on eliminating or minimizing potential adverse effects resulting from the proposed project. If unable to resolve the adverse effects, the Corps may refer the applicant to the U.S. Fish and Wildlife Service (Service) for further assistance in attempting to revise the proposed project to a "may affect, not likely to adversely affect" level. The Service will coordinate with the Florida Fish and Wildlife Conservation Commission (FWC) and the counties, as appropriate. Projects that provide new access for watercraft and key to "may affect, not likely to adversely affect" may or may not need to be reviewed individually by the Service.

__________________________________ Manatee Key April 2013 version

Page 2 of 12

MANATEE KEY Florida1 April 2013 The key is not designed to be used by the Corps' Regulatory Division for making their effect determinations for dredging projects greater than 50,000 cubic yards, the Corps' Planning Division in making their effect determinations for civil works projects or by the Corps' Regulatory Division for making their effect determinations for projects of the same relative scope as civil works projects. These types of activities must be evaluated by the Corps independently of the key. A.

Project is not located in waters accessible to manatees and does not directly or indirectly affect manatees (see Glossary)......................................................................................................................................No effect Project is located in waters accessible to manatees or directly or indirectly affects manatees ...................... B

B.

Project consists of one or more of the following activities, all of which are May affect: 1.

blasting or other detonation activity for channel deepening and/or widening, geotechnical surveys or exploration, bridge removal, movies, military shows, special events, etc.;

2.

installation of structures which could restrict or act as a barrier to manatees;

3.

new or changes to existing warm or fresh water discharges from industrial sites, power plants, or natural springs or artesian wells (but only if the new or proposed change in discharge requires a Corps permit to accomplish the work);

4.

installation of new culverts and/or maintenance or modification of existing culverts (where the culverts are 8 inches to 8 feet in diameter, ungrated and in waters accessible, or potentially accessible, to manatees)2;

5.

mechanical dredging from a floating platform, barge or structure3 that restricts manatee access to less than half the width of the waterway;

6.

creation of new slips or change in use of existing slips, even those located in a county with a Stateapproved Manatee Protection Plan (MPP) in place and the number of slips is less than the MPP threshold, to accommodate docking for repeat use vessels, (e.g., water taxis, tour boats, gambling boats, etc; or slips or structures that are not civil works projects, but are frequently used to moor large vessels (>100') for shipping and/or freight purposes; does not include slips used for docking at boat sales or repair facilities or loading/unloading at dry stack storage facilities and boat ramps); [Note: For projects within Bay, Dixie, Escambia, Franklin, Gilchrist, Gulf, Hernando, Jefferson, Lafayette, Monroe (south of Craig Key), Nassau, Okaloosa, Okeechobee, Santa Rosa, Suwannee, Taylor, Wakulla or Walton County, the reviewer should proceed to Couplet C.]

7.

any type of in-water activity in a Warm Water Aggregation Area (WWAA) or No Entry Area (see Glossary and accompanying Maps4); [Note: For residential docking facilities in a Warm Water Aggregation Area that is not a Federal manatee sanctuary or No Entry Area, the reviewer should proceed to couplet C.]

8.

creation or expansion of canals, basins or other artificial shoreline and/or the connection of such features to navigable waters of the U.S.; [Note: For projects proposing a single residential dock, the reviewer should proceed to couplet C; otherwise, project is a May Affect.]

__________________________________ Manatee Key April 2013 version

Page 3 of 12

9.

installation of temporary structures (docks, buoys, etc.) utilized for special events such as boat races, boat shows, military shows, etc., but only when consultation with the U.S. Coast Guard and FWS has not occurred; [Note: See programmatic consultation with the U.S. Coast Guard on manatees dated May 10, 2010.].

Project is other than the activities listed above............................................................................................... C C.

Project is located in an Important Manatee Area (IMA) (see Glossary and accompanying Maps4) .............. D Project is not located in an Important Manatee Area (IMA) (see Glossary and accompanying Maps4) ........ G

D.

Project includes dredging of less than 50,000 cubic yards ............................................................................. E Project does not include dredging .................................................................................................................. G

E.

Project is for dredging a residential dock facility or is a land-based dredging operation ............................... N Project not as above.........................................................................................................................................F

F.

Project proponent does not elect to follow all dredging protocols described on the maps for the respective IMA in which the project is proposed .............................................................................................. May affect Project proponent elects to follow all dredging protocols described on the maps for the respective IMA in which the project is proposed ......................................................................................................................... G

G.

Project provides new5 access for watercraft, e.g., docks or piers, marinas, boat ramps and associated trailer parking spaces, new dredging, boat lifts, pilings, floats, floating docks, floating vessel platforms, boat slips, dry storage, mooring buoys, or other watercraft access (residential boat lifts, pilings, floating docks, and floating vessel platforms installed in existing slips are not considered new access) or improvements allowing increased watercraft usage............................................................................................................... H Project does not provide new5 access for watercraft, e.g., bulkheads, seawalls, riprap, maintenance dredging, boardwalks and/or the maintenance (repair or rehabilitation) of currently serviceable watercraft access structures provided all of the following are met: (1) the number of slips is not increased; (2) the number of existing slips is not in question; and (3) the improvements do not allow increased watercraft usage............................................................................................................................................................... N

H.

Project is located in the Braden River Area of Inadequate Protection (Manatee County) (see Glossary and accompanying AIP Map4) .......................................................................................................................................................... May affect Project is not located in the Braden River Area of Inadequate Protection (Manatee County) (see Glossary and accompanying AIP Map4)......................................................................................................................... I

I.

Project is for a multi-slip facility (see Glossary) ............................................................................................. J Project is for a residential dock facility or is for dredging (see Glossary)...................................................... N

J.

Project is located in a county that currently has a State-approved MPP in place (BREVARD, BROWARD, CITRUS, CLAY, COLLIER, DUVAL, INDIAN RIVER, LEE, MARTIN, MIAMI-DADE, PALM BEACH, ST. LUCIE, SARASOTA, VOLUSIA) or shares contiguous waters with a county having a State-approved MPP in place (LAKE, MARION, SEMINOLE)6 ........................................................................................................................... K Project is located in a county not required to have a State-approved MPP .................................................... L

__________________________________ Manatee Key April 2013 version

Page 4 of 12

K.

Project has been developed or modified to be consistent with the county's State-approved MPP and has been verified by a FWC review (or FWS review if project is exempt from State permitting) or the number of slips is below the MPP threshold ............................................................................................................... N Project has not been reviewed by the FWC or FWS or has been reviewed by the FWC or FWS and determined that the project is not consistent with the county's State-approved MPP ...................... May affect

L.

Project is located in one of the following counties: CHARLOTTE, DESOTO7, FLAGLER, GLADES, HENDRY, 7 7 HILLSBOROUGH, LEVY, MANATEE, MONROE , PASCO , PINELLAS ................................................................... M Project is located in one of the following counties: BAY, DIXIE, ESCAMBIA, FRANKLIN, GILCHRIST, GULF, HERNANDO, JEFFERSON, LAFAYETTE, MONROE (south of Craig Key), NASSAU, OKALOOSA, OKEECHOBEE, PUTNAM, SANTA ROSA, ST. JOHNS, SUWANNEE, TAYLOR, WAKULLA, WALTON ................................................ N

M.

The number of slips does not exceed the residential dock density threshold (see Glossary) ......................... N The number of slips exceeds the residential dock density threshold (see Glossary) ........................ May affect

N.

Project impacts to submerged aquatic vegetation8, emergent vegetation or mangrove will have beneficial, insignificant, discountable9 or no effects on the manatee10 ............................................................................ O Project impacts to submerged aquatic vegetation8, emergent vegetation or mangrove may adversely affect the manatee10 .................................................................................................................................... May affect

O.

Project proponent elects to follow standard manatee conditions for in-water work11 and requirements, as appropriate for the proposed activity, prescribed on the maps4 .......................................................................P Project proponent does not elect to follow standard manatee conditions for in-water work11 and appropriate requirements prescribed on the maps4 .............................................................................................. May affect

P.

If project is for a new or expanding5 multi-slip facility and is located in a county with a State-approved MPP in place or in Bay, Dixie, Escambia, Franklin, Gilchrist, Gulf, Hernando, Jefferson, Lafayette, Monroe (south of Craig Key), Nassau, Okaloosa, Okeechobee, Putnam, St. Johns, Santa Rosa, Suwannee, Taylor, Wakulla or Walton County, the determination of "May affect, not likely to adversely affect" is appropriate12 and no further consultation with the Service is necessary. If project is for a new or expanding5 multi-slip facility and is located in Charlotte, Desoto, Flagler, Glades, Hendry, Hillsborough, Levy, Manatee, Monroe (north of Craig Key), Pasco, or Pinellas County, further consultation with the Service is necessary for "May affect, not likely to adversely affect" determinations. If project is for repair or rehabilitation of a multi-slip facility and is located in an Important Manatee Area, further consultation with the Service is necessary for "May affect, not likely to adversely affect" determinations. If project is for repair or rehabilitation of a multi-slip facility and: (1) is not located in an Important Manatee Area; (2) the number of slips is not increased; (3) the number of existing slips is not in question; and (4) the improvements to the existing watercraft access structures do not allow increased watercraft usage, the determination of "May affect, not likely to adversely affect" is appropriate12 and no further consultation with the Service is necessary. If project is a residential dock facility, shoreline stabilization, or dredging, the determination of "May affect, not likely to adversely affect" is appropriate12 and no further consultation with the Service is necessary. Note: For residential dock facilities located in a Warm Water Aggregation Area or in a No Entry area, seasonal restrictions may apply. See footnote 4 below for maps showing restrictions. If project is other than repair or rehabilitation of a multi-slip facility, a new5 multi-slip facility, residential dock facility, shoreline stabilization, or dredging, and does not provide new5 access for watercraft or

__________________________________ Manatee Key April 2013 version

Page 5 of 12

improve an existing access to allow increased watercraft usage, the determination of "May affect, not likely to adversely affect" is appropriate12 and no further consultation with the Service is necessary. 1

On the St. Mary's River, this key is only applicable to those areas that are within the geographical limits of the State of Florida.

2 All culverts 8 inches to 8 feet in diameter must be grated to prevent manatee entrapment. To effectively prevent manatee access, grates must be permanently fixed, spaced a maximum of 8 inches apart (may be less for culverts smaller than 16 inches in diameter) and may be installed diagonally, horizontally or vertically. For new culverts, grates must be attached prior to installation of the culverts. Culverts less than 8 inches or greater than 8 feet in diameter are exempt from this requirement. If new culverts and/or the maintenance or modification of existing culverts are grated as described above, the determination of "May affect, not likely to adversely affect" is appropriate11 and no further consultation with the Service is necessary. 3

If the project proponent agrees to follow the standard manatee conditions for in-water work as well as any special conditions appropriate for the proposed activity, further consultation with the Service is necessary for "May affect, not likely to adversely affect" determinations. These special conditions may include, but are not limited to, the use of dedicated observers (see Glossary for definition of dedicated observers), dredging during specific months (warm weather months vs cold weather months), dredging during daylight hours only, adjusting the number of dredging days, does not preclude or discourage manatee egress/ingress with turbidity curtains or other barriers that span the width of the waterway, etc.

4

Areas of Inadequate Protection (AIPs), Important Manatee Areas (IMAs), Warm Water Aggregation Areas (WWAAs) and No Entry Areas are identified on these maps and defined in the Glossary for the purposes of this key. These maps can be viewed on the Corps' web page. If projects are located in a No Entry Area, special permits may be required from FWC in order to access these areas (please refer to Chapter 68C-22 F.A.C. for boundaries; maps are also available at FWC's web page).

5

New access for watercraft is the addition or improvement of structures such as, but not limited to, docks or piers, marinas, boat ramps and associated trailer parking spaces, boat lifts, pilings, floats, floating docks, floating vessel platforms, (maintenance dredging, residential boat lifts, pilings, floating docks, and floating vessel platforms installed in existing slips are not considered new access), boat slips, dry storage, mooring buoys, new dredging, etc., that facilitates the addition of watercraft to, and/or increases watercraft usage in, waters accessible to manatees. The repair or rehabilitation of any type of currently serviceable watercraft access structure is not considered new access provided all of the following are met: (1) the number of slips is not increased; (2) the number of existing slips is not in question; and (3) the improvements to the existing watercraft access structures do not result in increased watercraft usage.

6

Projects proposed within the St. Johns River portion of Lake, Marion, and Seminole counties and contiguous with Volusia County shall be evaluated using the Volusia County MPP.

7

For projects proposed within the following areas: the Peace River in DeSoto County; all areas north of Craig Key in Monroe County, and the Anclote and Pithlachascotee Rivers in Pasco County, proceed to Couplet M. For all other locations in DeSoto, Monroe (south of Craig Key) and Pasco Counties, proceed to couplet N.

8

Where the presence of the referenced vegetation is confirmed within the area affected by docks and other piling-supported minor structures and the reviewer has concluded that the impacts to SAV, marsh or mangroves would not adversely affect the manatee or its critical habitat, proceed to couplet O.

Where the presence of the referenced vegetation is confirmed within the area affected by docks and other piling-supported minor structures and the reviewer has concluded that the impacts to SAV, marsh or mangroves would adversely affect the manatee or its critical habitat, the applicant can elect to avoid/minimize impacts to that vegetation. In that instance, where impacts are unavoidable and the applicant elects to abide by or employ construction techniques that exceed the criteria in the following documents, the reviewer should conclude that the impacts to SAV, marsh or mangroves would not adversely affect the manatee or its critical habitat and proceed to couplet O. -

"Construction Guidelines in Florida for Minor Piling-Supported Structures Constructed in or over Submerged Aquatic Vegetation (SAV), Marsh or Mangrove Habitat," prepared jointly by the U.S. Army Corps of Engineers and the National Marine Fisheries Service (August 2001) [refer to the Corps' web page], and

-

"Key for Construction Conditions for Docks or Other Minor Structures Constructed in or over Johnson's seagrass (Halophila johnsonii)," prepared jointly by the National Marine Fisheries Service and U.S. Army Corps of Engineers (October 2002), for those projects within the known range of Johnson's seagrass occurrence (Sebastian Inlet to central Biscayne Bay in the lagoon systems on the east coast of Florida) [refer to the Corps' web page],

__________________________________ Manatee Key April 2013 version

Page 6 of 12

Where the presence of the referenced vegetation is confirmed within the area affected by docks and other piling-supported minor structures and the reviewer has concluded that the impacts to SAV, marsh or mangroves would adversely affect the manatee or its critical habitat, and the applicant does not elect to follow the above Guidelines, the Corps will need to request formal consultation on the manatee with the Service as May affect. For activities other than docks and other piling-supported minor structures proposed in SAV, marsh, or mangroves (e.g., new dredging, placement of riprap, bulkheads, etc.), if the reviewer determines the impacts to the SAV, marsh or mangroves will not adversely affect the manatee or its critical habitat, proceed to couplet O, otherwise the Corps will need to request formal consultation on the manatee with the Service as May affect. 9

See Glossary, under "is not likely to adversely affect."

10 Federal reviewers, when making your effects determination, consider effects to manatee designated critical habitat pursuant to section 7(a)(2) of the Endangered Species Act. State reviewers, when making your effects determination, consider effects to manatee habitat within the entire State of Florida, pursuant to Chapter 370.12(2)(b) Florida Statutes. 11

See the Corps' web page for manatee construction conditions. At this time, manatee construction precautions c and f are not required in the following Florida counties: Bay, Escambia, Franklin, Gilchrist, Gulf, Jefferson, Lafayette, Okaloosa, Santa Rosa, Suwannee, and Walton. 12

By letter dated April 25, 2013, the Corps received the Service's concurrence with "May affect, not likely to adversely affect" determinations made pursuant to this key for the following activities: (1) selected non-watercraft access projects; (2) watercraftaccess projects that are residential dock facilities, excluding those located in the Braden River AIP; (3) launching facilities solely for kayaks and canoes, and (4) new or expanding multi-slip facilities located in Bay, Dixie, Escambia, Franklin, Gilchrist, Gulf, Hernando, Jefferson, Lafayette, Monroe (south of Craig Key), Nassau, Okaloosa, Okeechobee, Santa Rosa, Suwannee, Taylor, Wakulla or Walton County. Additionally, in the same letter dated April 25, 2013, the Corps received the Service's concurrence for "May affect, not likely to adversely affect" determinations specifically made pursuant to Couplet G of the key for the repair or rehabilitation of currently serviceable multi-slip watercraft access structures provided all of the following are met: (1) the project is not located in an IMA, (2) the number of slips is not increased; (3) the number of existing slips is not in question; and (4) the improvements to the existing watercraft access structures do not allow increased watercraft usage. Upon receipt of such a programmatic concurrence, no further consultation with the Service for these projects is required.

__________________________________ Manatee Key April 2013 version

Page 7 of 12

GLOSSARY Areas of inadequate protection (AIP) ­ Areas within counties as shown on the maps where the Service has determined that measures intended to protect manatees from the reasonable certainty of watercraft-related take are inadequate. Inadequate protection may be the result of the absence of manatee or other watercraft speed zones, insufficiency of existing speed zones, deficient speed zone signage, or the absence or insufficiency of speed zone enforcement. Boat slip ­ A space on land or in or over the water, other than on residential land, that is intended and/or actively used to hold a stationary watercraft or its trailer, and for which intention and/or use is confirmed by legal authorization or other documentary evidence. Examples of boat slips include, but are not limited to, docks or piers, marinas, boat ramps and associated trailer parking spaces, boat lifts, floats, floating docks, pilings, boat davits, dry storage, etc. Critical habitat ­ For listed species, this consists of: (1) the specific areas within the geographical area occupied by the species, at the time it is listed in accordance with the provisions of section 4 of the Endangered Species Act (ESA), on which are found those physical or biological features (constituent elements) (a) essential to the conservation of the species and (b) which may require special management considerations or protection; and (2) specific areas outside the geographical area occupied by the species at the time it is listed in accordance with the provisions of section 4 of the ESA, upon a determination by the Secretary that such areas are essential for the conservation of the species. Designated critical habitats are described in 50 CFR 17 and 50 CFR 226. Currently serviceable ­ Currently, serviceable means usable as is or with some maintenance, but not so degraded as to essentially require reconstruction. Direct effects ­ The direct or immediate effects of the project on the species or its habitat. Dredging ­ For the purposes of this key, the term dredging refers to all in-water work associated with dredging operations, including mobilization and demobilization activities that occur in water or require vessels. Emergent vegetation ­ Rooted emergent vascular macrophytes such as, but not limited to, cordgrass (Spartina alterniflora and S. patens), needle rush (Juncus roemerianus), swamp sawgrass (Cladium mariscoides), saltwort (Batis maritima), saltgrass (Distichlis spicata), and glasswort (Salicornia virginica) found in coastal salt marsh-related habitats (tidal marsh, salt marsh, brackish marsh, coastal marsh, coastal wetlands, tidal wetlands). Formal consultation ­ A process between the Services and a Federal agency or applicant that: (1) determines whether a proposed Federal action is likely to jeopardize the continued existence of listed species or destroy or adversely modify designated critical habitat; (2) begins with a Federal agency's written request and submittal of a complete initiation package; and (3) concludes with the issuance of a biological opinion and incidental take statement by either of the Services. If a proposed Federal action may affect a listed species or designated critical habitat, formal consultation is required (except when the Services concur, in writing, that a proposed __________________________________ Manatee Key April 2013 version

Page 8 of 12

action "is not likely to adversely affect" listed species or designated critical habitat). [50 CFR 402.02, 50 CFR 402.14] Important manatee areas (IMA) ­ Areas within certain counties where increased densities of manatees occur due to the proximity of warm water discharges, freshwater discharges, natural springs and other habitat features that are attractive to manatees. These areas are heavily utilized for feeding, transiting, mating, calving, nursing or resting as indicated by aerial survey data, mortality data and telemetry data. Some of these areas may be federally-designated sanctuaries or state-designated "seasonal no entry" zones. Maps depicting important manatee areas and any accompanying text may contain a reference to these areas and their special requirements. Projects proposed within these areas must address their special requirements. Indirect effects ­ Those effects that are caused by or will result from the proposed action and are later in time, but are still reasonably certain to occur. Examples of indirect effects include, but are not limited to, changes in water flow, water temperature, water quality (e.g., salinity, pH, turbidity, nutrients, chemistry), prop dredging of seagrasses, and manatee watercraft injury and mortality. Indirect effects also include watercraft access developments in waters not currently accessible to manatees, but watercraft access can, is, or may be planned to waters accessible to manatees by the addition of a boat lift or the removal of a dike or plug. Informal consultation ­ A process that includes all discussions and correspondence between the Services and a Federal agency or designated non-Federal representative, prior to formal consultation, to determine whether a proposed Federal action may affect listed species or critical habitat. This process allows the Federal agency to utilize the Services' expertise to evaluate the agency's assessment of potential effects or to suggest possible modifications to the proposed action which could avoid potentially adverse effects. If a proposed Federal action may affect a listed species or designated critical habitat, formal consultation is required (except when the Services concur, in writing, that a proposed action "is not likely to adversely affect" listed species or designated critical habitat). [50 CFR 402.02, 50 CFR 402.13] In-water activity ­ Any type of activity used to construct/repair/replace any type of in-water structure or fill; the act of dredging. In-water structures ­ watercraft access structures ­ Docks or piers, marinas, boat ramps, boat slips, boat lifts, floats, floating docks, pilings (depending on use), boat davits, etc. In-water structures ­ other than watercraft access structures ­ Bulkheads, seawalls, riprap, groins, boardwalks, pilings (depending on use), etc. Is likely to adversely affect ­ The appropriate finding in a biological assessment (or conclusion during informal consultation) if any adverse effect to listed species may occur as a direct or indirect result of the proposed action or its interrelated or interdependent actions and the effect is not: discountable, insignificant, or beneficial (see definition of "is not likely to adversely affect"). An "is likely to adversely affect" determination requires the initiation of formal consultation under section 7 of the ESA. __________________________________ Manatee Key April 2013 version

Page 9 of 12

Is not likely to adversely affect ­ The appropriate conclusion when effects on listed species are expected to be discountable, insignificant, or completely beneficial. Discountable effects are those extremely unlikely to occur. Insignificant effects relate to the size of the impact and should never reach the scale where take occurs. Beneficial effects are contemporaneous positive effects without any adverse effects to the species. Based on best judgment, a person would not (1) be able to meaningfully measure, detect, or evaluate insignificant effects or (2) expect discountable effects to occur. Manatee Protection Plan (MPP) ­ A manatee protection plan (MPP) is a comprehensive planning document that addresses the long-term protection of the Florida manatee through law enforcement, education, boat facility siting, and habitat protection initiatives. Although MPPs are primarily developed by the counties, the plans are the product of extensive coordination and cooperation between the local governments, the FWC, the Service, and other interested parties. Manatee Protection Plan thresholds ­ The smallest size of a multi-slip facility addressed under the purview of a Manatee Protection Plan (MPP). For most MPPs, this threshold is five slips or more. For Brevard, Clay, Citrus, and Volusia County MPPs, this threshold is three slips or more. Mangroves ­ Rooted emergent trees along a shoreline that, for the purposes of this key, include red mangrove (Rhizophora mangle), black mangrove (Avicennia germinans) and white mangrove (Laguncularia racemosa). May affect ­ The appropriate conclusion when a proposed action may pose any effects on listed species or designated critical habitat. When the Federal agency proposing the action determines that a "may affect" situation exists, then they must either request the Services to initiate formal consultation or seek written concurrence from the Services that the action "is not likely to adversely affect" listed species. For the purpose of this key, all "may affect" determinations equate to "likely to adversely affect" and Corps Project Managers should request the Service to initiate formal consultation on the manatee or designated critical habitat. No effect ­ the appropriate conclusion when the action agency determines its proposed action will not affect a listed species or designated critical habitat. Multi-slip facility ­ Multi-slip facilities include commercial marinas, private multi-family docks, boat ramps and associated trailer parking spaces, dry storage facilities and any other similar structures or activities that provide access to the water for multiple (five slips or more, except in Brevard, Clay, Citrus, and Volusia counties where it is three slips or more) watercraft. In some instances, the Corps and the Service may elect to review multiple residential dock facilities as a multi-slip facility. New access for watercraft ­ New dredging and the addition, expansion or improvement of structures such as, but not limited to, docks or piers, marinas, boat ramps and associated trailer parking spaces, boat lifts, pilings, floats, floating docks, floating vessel platforms, (residential boat lifts, pilings, floats, and floating vessel platforms installed in existing slips are not considered new access), boat slips, dry storage, mooring buoys, etc., that facilitates the addition of watercraft to, and/or increases watercraft usage in, waters accessible to manatees. __________________________________ Manatee Key April 2013 version

Page 10 of 12

Observers ­ During dredging and other in-water operations within manatee accessible waters, the standard manatee construction conditions require all on-site project personnel to watch for manatees to ensure that those standard manatee construction conditions are met. Within important manatee areas (IMA) and under special circumstances, heightened observation is needed. Dedicated Observers are those having some prior experience in manatee observation, are dedicated only for this task, and must be someone other than the dredge and equipment operators/mechanics. Approved Observers are dedicated observers who also must be approved by the Service (if Federal permits are involved) and the FWC (if state permits are involved), prior to work commencement. Approved observers typically have significant and often projectspecific observational experience. Documentation on prior experience must be submitted to these agencies for approval and must be submitted a minimum of 30 days prior to work commencement. When dedicated or approved observers are required, observers must be on site during all in-water activities, and be equipped with polarized sunglasses to aid in manatee observation. For prolonged in-water operations, multiple observers may be needed to perform observation in shifts to reduce fatigue (recommended shift length is no longer than six hours). Additional information concerning observer approval can be found at FWC's web page. Residential boat lift ­ A boat lift installed on a residential dock facility. Residential dock density ratio threshold ­ The residential dock density ratio threshold is used in the evaluation of multi-slip projects in some counties without a State-approved Manatee Protection Plan and is consistent with 1 boat slip per 100 linear feet of shoreline (1:100) owned by the applicant. Residential dock facility ­ A residential dock facility means a private residential dock which is used for private, recreational or leisure purposes for single-family or multi-family residences designed to moor no more than four vessels (except in Brevard, Clay, Citrus, and Volusia counties which allow only two vessels). This also includes normal appurtenances such as residential boat lifts, boat shelters with open sides, stairways, walkways, mooring pilings, dolphins, etc. In some instances, the Corps and the Service may elect to review multiple residential dock facilities as a multi-slip facility. Submerged aquatic vegetation (SAV) ­ Rooted, submerged, aquatic plants such as, but not limited to, shoal grass (Halodule wrightii), paddle grass (Halophila decipiens), star grass (Halophila engelmanni), Johnson's seagrass (Halophila johnsonii), sago pondweed (Potamogeton pectinatus), clasping-leaved pondweed (Potamogeton perfoliatus), widgeon grass (Ruppia maritima), manatee grass (Syringodium filiforme), turtle grass (Thalassia testudinum), tapegrass (Vallisneria americana), and horned pondweed (Zannichellia palustris). Warm Water Aggregation Areas (WWAAs) and No Entry Areas ­ Areas within certain counties where increased densities of manatees occur due to the proximity of artificial or natural warm water discharges or springs and are considered necessary for survival. Some of these areas may be federally-designated manatee sanctuaries or state-designated seasonal "no entry" manatee protection zones. Projects proposed within these areas may require consultation in order to offset expected adverse impacts. In addition, special permits may be required from the FWC in order to access these areas. __________________________________ Manatee Key April 2013 version

Page 11 of 12

Watercraft access structures ­ Docks or piers, marinas, boat ramps and associated trailer parking spaces, boat slips, boat lifts, floats, floating docks, pilings, boat davits, dry storage, etc. Waters accessible to manatees ­ Although most waters of the State of Florida are accessible to the manatee, there are some areas such as landlocked lakes that are not. There are also some weirs, salinity control structures and locks that may preclude manatees from accessing water bodies. If there is any question about accessibility, contact the Service or the FWC.

__________________________________ Manatee Key April 2013 version

Page 12 of 12

STANDARD MANATEE CONDITIONS FOR IN-WATER WORK 2011

The permittee shall comply with the following conditions intended to protect manatees from direct project effects: a.

All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act.

b.

All vessels associated with the construction project shall operate at "Idle Speed/No Wake" at all times while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.

c.

Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement.

d.

All on-site project personnel are responsible for observing water-related activities for the presence of manatee(s). All in-water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving.

e.

Any collision with or injury to a manatee shall be reported immediately to the Florida Fish and Wildlife Conservation Commission (FWC) Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or in Vero Beach (1-772-562-3909) for south Florida, and emailed to FWC at ImperiledSpecies@myFWC.com.

f.

Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the FWC must be used. One sign which reads Caution: Boaters must be posted. A second sign measuring at least 8½ " by 11" explaining the requirements for "Idle Speed/No Wake" and the shut down of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. These signs can be viewed at http://www.myfwc.com/WILDLIFEHABITATS/manatee sign vendors.htm. Questions concerning these signs can be forwarded to the email address listed above.

PDCs for In-Water Noise from Pile and Sheet Pile Installation Page 86

Open Water The letters A-E in the tables below specify the PDC category. Activities labeled A-D must follow the corresponding PDCs for labeled Category A-D below. Activities labeled E are excluded from this Opinion, as stated in Category E below. Pilot hole Trench Impact (auger or Jetting Vibratory and fill hammer drop punch) Wood piles 14-inch (in) diameter or less when installed via impact hammer A A A A B and 36-in or less for all other installation methods Concrete pile 24-in diameter/width or less in open A A A A B water Metal pipe pile 36-in A A A A E diameter or less 2 metal boatlift I-beams A A A A B Concrete slab wall- any size A A A A B Vinyl sheet pile- any size A A A A B Metal sheet pile- any size A A A A E Confined Space In Florida, we consider the confined space to be any area that has a solid object (e.g., shorelines or seawalls) within 150 ft of the pile installation site and in the U.S. Caribbean we consider confined space to be any area that has a solid object within 260 ft of the pile installation site. Pilot hole Trench Impact (auger or Jetting Vibratory hammer and fill drop punch) Wood pile 14-in diameter or less when installed via impact A A A A B hammer and 36-in or less for all other installation methods Concrete pile 24-in diameter/width or less (5 A A A A C piles or less installed/day) Concrete pile 24-in diameter/width or less (6-10 A A A A D piles installed/day) Metal pipe pile 36-in A A A A E diameter or less 12

2 metal boatlift I-beams Vinyl sheet pile ­ any size Concrete slab wall- any size (5 slabs or less installed/day) Concrete slab wall- any size (6-10 slabs installed/day) Metal sheet pile- any size

A A

A A

A A

A A

B B

A

A

A

A

C

A

A

A

A

D

A

A

A

A

E

A. The Projects identified as A above must comply with PDCs identified for all projects in this Opinion. Specific PDCs related to noise include: 1. All work must occur during daylight hours only (PDC AP.6). 2. All construction personnel are responsible for observing water-related activities to detect the presence of these species and avoid them (PDC AP.7). B. The projects identified as B above must follow all of the conditions under A, above, AND also must limit the maximum number of piles installed per day to no more than 10 piles per day. C. The projects identified as C above must follow all of the conditions under A, above, AND also must limit the maximum number of piles installed per day to no more than 5 piles per day. D. The projects identified as D above must follow all of the conditions under A and B, above, AND also must abide by one of the noise abatement measures below, as chosen by the applicant: 1. Bubble curtain: The bubble curtain design must adhere to the guidelines for unconfined and confined bubble curtains described in Appendix B. 2. Temporary noise attenuation pile (TNAP) also known as a pile isolation casing: The TNAP design must be constructed of a double-walled tubular casing (a casing within a larger casing), with at least a 5-in-wide area between the casings that is dewatered to create a hollow space or 5-in wide area between the casings completely filled with closed-cell foam or other noise dampening material between the walls. The TNAP must be long enough to be seated firmly on the sea bottom, fit over the pile being driven, and extend at least 3 ft above the surface of the water. 3. The use of any other alternative noise control method must receive prior approval by NMFS and the USACE, as described in Section 2.3. E. The projects identified as E are not covered under this Opinion.

13

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas