Home

Tulsa District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The application is for the placement of fill material related to the proposed repair of the Interstate 44 (I-44) Bridge over the Deep Fork River.

The proposed channel stabilization construction would consist of a concrete channel (bottom and side slopes) with a bottom width of 28 feet and a trickle channel (4-foot wide and 1-foot deep) running along the stream centerline designed to pool water during low flow periods. Additionally, baffling blocks would be constructed on the downstream end to promote oxygenation of the river during normal flows. Side slopes would vary above the OHWM. This effort is intended to stabilize the area beneath and around the bridges and prevent future undercutting. The northern portion of the project area has been previously deed restricted as a Corps mitigation area for permit SWT-2009-624. Approximately 0.44 ac of this site occurs within the project area. The applicant is proposing additional offsetting mitigation in order to use the restricted site.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas