You can copy from here when filling out the rest of the page.
FLOOD PROTECTION PROJECT IN ST. MARY PARISH
NAME OF APPLICANT: St. Mary Levee District, c/o: T. Baker Smith, LLC, Attn: Kodi Babin, P.O. Box 2266, Houma, Louisiana 70361
LOCATION OF WORK: Located on and near Bayou Chene at Amelia, Louisiana, in St. Mary Parish (POB: 29.68279, -91.17206; POE: 29.60593, -91.08512), as shown within the attached drawings. (Hydrologic Unit Code 08090302, Terrebonne Watershed)
CHARACTER OF WORK:
ORIGINAL (Public Notice publish date: July 29, 2013): Proposed Bayou Chene Flood Protection Project which will include the elevation of approx. 33,634’ of Avoca Road on Avoca Island (i.e., Avoca Road Levee) to approx.. 8.5’ elevation, approximately 9,822’ of the Avoca Borrow Canal Levee to approx. 8’elevation, approx. 966’ of the Bayou Chene East Levee to approx. 9.5’ elevation and approx. 6,091’ of the Tabor Canal Levee to approx.. 9.5’ elevation. A flood control structure will be installed at elevation 10.0’ in Bayou Chene consisting of a barge gate at the center of the bayou with fixed flood walls extending outward to the bayou banks on either side. A weir structure will be installed in Tabor Canal consisting of steel gates. These structures will minimize high water induced flooding in St. Mary, Terrebonne, St. Martin, Assumption and Iberville Parishes due to high river stages in the Atchafalaya River. During normal Bayou Chene water levels the gate will be open to allow maritime traffic and water to pass through the opening. At the threat of impending high water events the barge gate will be deballasted to a floating condition, winched or placed by tug into position across Bayou Chene and ballasted into closed position against the receiving structure. Also, an existing weir structure will be removed and replaced on the Borrow Canal Levee, the existing temporary flood control structures used during the 2011 emergency closure will be removed from Bayou Chene and two existing pipelines within Tabor Canal will be crossed with reinforcement installed for pipeline protection. Approx. 470,810 cu. yds. of native material will be excavated from a proposed borrow pit and used for construction activities. An additional 47,798 cu. yds. of native material will be displaced during project activities. Approx. 17,091 cu. yds. of crushed stone/gravel and 19,601 cu. yds. of rock material will be required for project activities. A total of approx. 212.98 acres may be impacted as a result of this proposed activity (approx. 32.40 acres of wetlands and approx. 180.68 acres of non-wetlands/waterbottoms).
MODIFIED (dated 12/21/17): Levee tie-in to USACE Bayou Boeuf Lock was removed. Levee cross section for Avoca Road was revised to stay within existing right-of-way. Proposed borrow area on Avoca, Inc. property was removed. Proposed barge gate opening width was changed from a minimum of 250’ to 400’ (clear opening). Total excavation reduced from +/- 518,608 CY (+/- 93 acres) to 150,764 CY (+/- 26.85 acres). Total fill reduced from +/- 555,300 CY (+/- 93 acres) to 259,021 CY (+/- 48.13 acres). Wetland impacts below the 5’ contour reduced from 18.69 acres to 16.14 acres. Total wetland impacts reduced from 24.73 acres to 21.79 acres.
If a Department of the Army permit is warranted, the applicant has proposed to mitigate any unavoidable wetlands impacts at an approved and acceptable mitigation bank within the N.O. District.
JOINT PUBLIC NOTICE
January 22, 2018
United States Army
Corps of Engineers
New Orleans District
Attn: Regulatory Branch
7400 Leake Ave.
New Orleans, Louisiana 70118-3651
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
Project Manager:
Bobby Quebedeaux
(504) 862-2224
bobby.d.quebedeaux@usace.army.mil
Application #: MVN-2013-0880-WJJ
Project Manager:
Elizabeth Hill
(225) 219-3225
WQC Application Number:
WQC-130708-03
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
The application has also been mailed to the Louisiana Department of Environmental
Quality, for a Water Quality Certification (WQC) in accordance with statutory authority contained
in Louisiana Revised Statute 30:2074 A(3), and provisions of Section 401 of the Clean Water
Act (P.L. 95-17).
FLOOD PROTECTION PROJECT IN ST. MARY PARISH
NAME OF APPLICANT: St. Mary Levee District, c/o: T. Baker Smith, LLC, Attn: Kodi Babin,
P.O. Box 2266, Houma, Louisiana 70361
LOCATION OF WORK: Located on and near Bayou Chene at Amelia, Louisiana, in St. Mary
Parish (POB: 29.68279, -91.17206; POE: 29.60593, -91.08512), as shown within the attached
drawings. (Hydrologic Unit Code 08090302, Terrebonne Watershed)
CHARACTER OF WORK:
ORIGINAL (Public Notice publish date: July 29, 2013): Proposed Bayou Chene Flood Protection
Project which will include the elevation of approx. 33,634' of Avoca Road on Avoca Island (i.e.,
Avoca Road Levee) to approx.. 8.5' elevation, approximately 9,822' of the Avoca Borrow Canal
Levee to approx. 8'elevation, approx. 966' of the Bayou Chene East Levee to approx. 9.5' elevation
and approx. 6,091' of the Tabor Canal Levee to approx.. 9.5' elevation. A flood control structure will
be installed at elevation 10.0' in Bayou Chene consisting of a barge gate at the center of the bayou
with fixed flood walls extending outward to the bayou banks on either side. A weir structure will be
installed in Tabor Canal consisting of steel gates. These structures will minimize high water
induced flooding in St. Mary, Terrebonne, St. Martin, Assumption and Iberville Parishes due to high
river stages in the Atchafalaya River. During normal Bayou Chene water levels the gate will be
open to allow maritime traffic and water to pass through the opening. At the threat of impending
high water events the barge gate will be deballasted to a floating condition, winched or placed by
tug into position across Bayou Chene and ballasted into closed position against the receiving
structure. Also, an existing weir structure will be removed and replaced on the Borrow Canal
Levee, the existing temporary flood control structures used during the 2011 emergency closure will
be removed from Bayou Chene and two existing pipelines within Tabor Canal will be crossed with
reinforcement installed for pipeline protection. Approx. 470,810 cu. yds. of native material will be
excavated from a proposed borrow pit and used for construction activities. An additional 47,798 cu.
yds. of native material will be displaced during project activities. Approx. 17,091 cu. yds. of crushed
stone/gravel and 19,601 cu. yds. of rock material will be required for project activities. A total of
approx. 212.98 acres may be impacted as a result of this proposed activity (approx. 32.40 acres of
wetlands and approx. 180.68 acres of non-wetlands/waterbottoms).
MODIFIED (dated 12/21/17): Levee tie-in to USACE Bayou Boeuf Lock was removed. Levee
cross section for Avoca Road was revised to stay within existing right-of-way. Proposed borrow
area on Avoca, Inc. property was removed. Proposed barge gate opening width was changed
from a minimum of 250' to 400' (clear opening). Total excavation reduced from +/- 518,608 CY
(+/- 93 acres) to 150,764 CY (+/- 26.85 acres). Total fill reduced from +/- 555,300 CY (+/- 93
acres) to 259,021 CY (+/- 48.13 acres). Wetland impacts below the 5' contour reduced from
18.69 acres to 16.14 acres. Total wetland impacts reduced from 24.73 acres to 21.79 acres.
If a Department of the Army permit is warranted, the applicant has proposed to mitigate any
unavoidable wetlands impacts at an approved and acceptable mitigation bank within the N.O.
District.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint public
notice. Written comments, including suggestions for modifications or objections to the
proposed work, stating reasons thereof, are being solicited from anyone having interest in this
permit and/or this WQC request and must be submitted so as to be received before or by the
last day of the comment period. Letters concerning the Corps of Engineers permit application
must reference the applicant's name and the Permit Application Number, and be forwarded to
the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH.
Individuals or parties may request an extension of time in which to comment on the
proposed work by writing, faxing, or e-mailing the Corps of Engineers Project Manager
listed above. Any request must be specific and substantively supportive of the
requested extension, and received by this office prior to the end of the initial comment
period. The Section Chief will review the request and the requestor will be promptly
notified of the decision to grant or deny the request. If granted, the time extension will
be continuous to the initial comment period and, inclusive of the initial comment period,
will not exceed a total of 30 calendar days. Letters concerning the Water Quality
Certification must reference the applicant's name and the WQC Application number and be
mailed to the Louisiana Department of Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30
p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Copies of this public notice are being sent to the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species. Based on the
South Louisiana Standard Local Operating Procedure for Endangered Species (SLOPES), as
signed on October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and the
U.S. Fish and Wildlife Service, it has been determined that the project would have no effect to
any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal may
result in the destruction or alteration of approximately 180 acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed action
would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf
of Mexico. Our final determination relative to project impacts and the need for mitigation
measures is subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, before a Department of the Army permit is issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana Coastal
Resources Program. The Department of the Army permit will not be issued unless the applicant
received approval or a waiver of the Coastal Use Permit by the Department of Natural
Resources.
You are invited to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosure
30 15
M
Texas
is
si
ss
ip
p
i
Arkansas
0
30
60
Scale - Miles
L o u i s i a n a
LOCATION
Gulf
of
Mexico
BEGIN PROPOSED PROJECT
X = 3,332,045.45'
Y = 430,171.90'
LAT = 29° 40' 58.03"
LONG = 91° 10' 19.40"
NAD 83
NAD 83
PROJECT LOCATION
END PROPOSED PROJECT
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\1 VICINITY MAP.DWG
X = 3,359,709.97'
Y = 402,274.51'
LAT = 29° 36' 21.36"
LONG = 91° 05' 06.45"
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
SHEET NO:
KLB
2012.0525
1 VICINITY MAP.DWG
1
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
12000'
6000'
0'
12000'
NAD 83
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
VICINITY MAP
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 12000'
NAD 83
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
2
3
4
LOUISIANA COORDINATE SYSTEM (SOUTH ZONE)
(1983 DATUM)
1
5
6
7
8
9
10
11
14
12
15
13
16
17
19
18
20
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\2 KEY SHEET.DWG
21
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
SHEET NO:
KLB
2012.0525
2 KEY SHEET.DWG
2
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
2000'
0'
KEY SHEET
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 4000'
4000'
22
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
4000'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
LOUISIANA COORDINATE SYSTEM (SOUTH ZONE)
(1983 DATUM)
GIWW
BAYOU BOEUF LOCKS
(USACE)
BEGIN AVOCA ROAD LEVEE - SECTION A-A
STA. 2+16
LIMITS OF CONSTRUCTION
A
40.00'
L.O.C.
MATCHLINE A
AVOCA ROAD
PROJECT BASELINE
A
SEE SHEET 28
FOR DETAILS
AVOCA ISLAND
MHW = 2.30'
MLW = 0.50'
LEGEND
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
NON-WETLANDS
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
WETLAND IMPACTS
OTHER WATER IMPACTS
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
3
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
300'
150'
0'
PLAN VIEW 1
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
LOUISIANA COORDINATE SYSTEM (SOUTH ZONE)
(1983 DATUM)
GIWW
LIMITS OF CONSTRUCTION
A
PROJECT BASELINE
SEE SHEET 28
FOR DETAILS
MATCHLINE B
MATCHLINE A
A RO
AD
A
40.00'
L.O.C.
AVOC
AVOCA ISLAND
MHW = 2.30'
MLW = 0.50'
LEGEND
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
NON-WETLANDS
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
WETLAND IMPACTS
OTHER WATER IMPACTS
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
4
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
300'
150'
0'
PLAN VIEW 2
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
40.00
'
L.O.C
.
LOUISIANA COORDINATE SYSTEM (SOUTH ZONE)
(1983 DATUM)
GIWW
A
WETLAND IMPACTS
(10' x 18')
LIMITS OF CONSTRUCTION
MATCHLINE B
AVOC
A RO
A
AD
SEE SHEET 28
FOR DETAILS
MATCHLINE C
PROJECT BASELINE
AVOCA ISLAND
MHW = 2.30'
MLW = 0.50'
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
NON-WETLANDS
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
WETLAND IMPACTS
OTHER WATER IMPACTS
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
5
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
300'
150'
0'
PLAN VIEW 3
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
MATCHLINE C
40.0
L.O 0'
.C.
LOUISIANA COORDINATE SYSTEM (SOUTH ZONE)
(1983 DATUM)
GIWW
AVO
CA
R
OAD
A
A
LIMITS OF CONSTRUCTION
SEE SHEET 28
FOR DETAILS
WETLAND IMPACTS
(10' x 8')
PROJECT BASELINE
AVOCA ISLAND
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
LIMITS OF CONSTRUCTION
(WORK AREA)
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
LEVEE
NON-WETLANDS
WETLAND IMPACTS
OTHER WATER IMPACTS
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
6
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
PLAN VIEW 4
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
300'
MATCHLINE D
MHW = 2.30'
MLW = 0.50'
LEGEND
PROJECT BASELINE
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
)
ZO
NE
OU
TH
CH
LI
NE
D
CO
OR
D
(1 INA
98 TE
3 SY
DA S
TU TEM
M
) (S
M
LO
UI
SI
AN
A
AT
SEE SHEET 28
FOR DETAILS
A
GIWW
A
40.00'
L.O.C.
AVOCA ISLAND
PROJECT BASELINE
MHW = 2.30'
MLW = 0.50'
AVOCA ROAD
LIMITS OF CONSTRUCTION
WETLAND IMPACTS
(10' x 13')
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
LEGEND
PROJECT BASELINE
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
NON-WETLANDS
WETLAND IMPACTS
MATCHLINE E
OTHER WATER IMPACTS
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
7
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
PLAN VIEW 5
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
OR
D
(1 INA
98 TE
3 SY
DA S
TU TEM
M
) (S
OU
T
H
ZO
NE
)
MATCHLINE E
IS
IA
NA
CO
40.00
'
L.O.C
.
LO
U
A
A
SEE SHEET 28
FOR DETAILS
GIWW
AVOCA ISLAND
WETLAND IMPACTS
(10' x 13')
PROJECT BASELINE
MHW = 2.30'
MLW = 0.50'
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
LIMITS OF CONSTRUCTION
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
NON-WETLANDS
WETLAND IMPACTS
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
OTHER WATER IMPACTS
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
MATCHLINE F
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
8
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
PLAN VIEW 6
ST. MARY LEVEE DISTRICT
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
OR
D
(1 INA
98 TE
3 SY
DA S
TU TEM
M
) (S
OU
T
H
ZO
NE
)
MATCHLINE F
40.00'
L.O.C
.
IS
IA
NA
CO
SEE SHEET 28
FOR DETAILS
LO
U
A
A
LIMITS OF CONSTRUCTION
GIWW
AVOC
A ROA
D
AVOCA ISLAND
MHW = 2.30'
MLW = 0.50'
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
WETLAND IMPACTS
(10' x 4')
LEGEND
PROJECT BASELINE
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
NON-WETLANDS
WETLAND IMPACTS
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
OTHER WATER IMPACTS
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
MATCHLINE G
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
9
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
PLAN VIEW 7
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
OR
D
(1 INA
98 TE
3 SY
DA S
TU TEM
M
) (S
OU
T
H
ZO
NE
)
MATCHLINE G
40.00'
L.O.C
.
LO
U
IS
IA
NA
CO
SEE SHEET 28
FOR DETAILS
A
A
AVOCA ISLAND
LIMITS OF CONSTRUCTION
AVOC
A ROA
D
GIWW
WETLAND IMPACTS
(3' x 7')
MHW = 2.30'
MLW = 0.50'
WETLAND IMPACTS
(10' x 4')
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
PROJECT BASELINE
LEVEE
NON-WETLANDS
WETLAND IMPACTS
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
OTHER WATER IMPACTS
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
MATCHLINE H
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
10
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
PLAN VIEW 8
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
EH
CHLIN
ZO
NE
)
MAT
RD
IN
(19 ATE
83 SYS
DA TEM
TU M
) (SOU
TH
40.00'
L.O.C.
OO
SEE SHEET 28
FOR DETAILS
ISIA
NA
C
A
LOU
A
GIWW
LIMITS OF CONSTRUCTION
WETLAND IMPACTS
(10' x 4')
AVOC
A RO
AD
WETLAND IMPACTS
(10' x 4')
AVOCA ISLAND
MHW = 2.30'
MLW = 0.50'
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
PROJECT BASELINE
NON-WETLANDS
WETLAND IMPACTS
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
OTHER WATER IMPACTS
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
MATCHLINE I
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
11
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
PLAN VIEW 9
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
MATCHLINE I
DIN
(19 ATE
83 SYS
DA T E M
TUM
) (S O
UTH
ZO
N
E)
40.00'
L.O.C.
SEE SHEET 28
FOR DETAILS
A
ISIA
NA
CO
OR
A
LOU
GIWW
LIMITS OF CONSTRUCTION
AVOCA
ROAD
AVOCA ISLAND
MHW = 2.30'
MLW = 0.50'
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
WETLAND IMPACTS
(354' x 3')
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
NON-WETLANDS
WETLAND IMPACTS
PROJECT BASELINE
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
OTHER WATER IMPACTS
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
MATCHLINE J
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
12
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
PLAN VIEW 10
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
NE
)
MATCHLINE J
D IN
(19 ATE
83 SYS
DA TEM
TUM
) (SOU
TH
ZO
40.00'
L.O.C.
GIWW
LO U
ISIA
NA
CO
OR
SEE SHEET 28
FOR DETAILS
A
A
WETLAND IMPACTS
(10' x 7')
LIMITS OF CONSTRUCTION
AVOCA ROAD
PROJECT BASELINE
MHW = 2.30'
MLW = 0.50'
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
WETLAND IMPACTS
(35' x 3')
AVOCA ISLAND
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
NON-WETLANDS
WETLAND IMPACTS
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
OTHER WATER IMPACTS
WETLAND IMPACTS
(10' x 6')
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
MATCHLINE K
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
13
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
PLAN VIEW 11
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
E)
MATCHLINE K
GIWW
DIN
(19 ATE
83 SYS
DA T E M
TUM
) (S O
UTH
ZO
N
'
.00
40 .C.
O
L.
ISIA
NA
CO
OR
SEE SHEET 28
FOR DETAILS
LOU
A
A
WETLAND IMPACTS
(10' x 1')
OC
AV
A
AVOCA ISLAND
AD
RO
PROJECT BASELINE
MHW = 2.30'
MLW = 0.50'
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
LEVEE
NON-WETLANDS
WETLAND IMPACTS
LIMITS OF CONSTRUCTION
WETLAND IMPACTS
(16' x 3')
INE
L
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
14
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
TC
PLAN VIEW 12
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
HL
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
MA
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
OTHER WATER IMPACTS
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
LOUISIANA COORDINATE SYSTEM (SOUTH ZONE)
(1983 DATUM)
MATCHLINE M
GIWW
WETLAND IMPACTS
(1303' X 8')
C
AVO
A
SEE SHEET 28
FOR DETAILS
OAD
AR
WETLAND IMPACTS
(841' X 3')
PROJECT BASELINE
A
LIMITS OF CONSTRUCTION
0'
40.0 .
.C
L.O
MATCHLINE L
AVOCA ISLAND
MHW = 2.30'
MLW = 0.50'
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
LEVEE
NON-WETLANDS
WETLAND IMPACTS
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
OTHER WATER IMPACTS
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
15
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
PLAN VIEW 13
ST. MARY LEVEE DISTRICT
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
MHW = 2.30'
MLW = 0.50'
BAYOU BOEUF
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
LOUISIANA COORDINATE SYSTEM (SOUTH ZONE)
(1983 DATUM)
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
LEVEE
NON-WETLANDS
WETLAND IMPACTS
OTHER WATER IMPACTS
GIWW
A
SEE SHEET 28
FOR DETAILS
WETLAND IMPACTS
(1749' X 8')
PROJECT BASELINE
LIMITS OF CONSTRUCTION
MATCHLINE M
D
WETLAND IMPACTS
(480' X 4')
MATCHLINE N
WETLAND IMPACTS
(1361' X 4')
'
.00
40 .C.
L.O
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
A
OA
AR
C
VO
A
WETLAND IMPACTS
(SEE PREVIOUS)
AVOCA ISLAND
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
16
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
300'
150'
0'
PLAN VIEW 14
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
40.00'
L.O.C.
WETLAND IMPACTS
(SEE PREVIOUS)
A
SEE SHEET 28
FOR DETAILS
PROJECT BASELINE
END AVOCA ROAD LEVEE - SECTION A-A
BEGIN AVOCA BORROW CANAL LEVEE - SECTION B-B
STA. 336+34
AVOCA ROAD
WETLAND IMPACTS
(SEE PREVIOUS)
A
WETLAND IMPACTS
(197' X 2')
LOUISIANA COORDINATE SYSTEM (SOUTH ZONE)
(1983 DATUM)
GIWW
MATCHLINE N
WETLAND IMPACTS
(70' X 2')
WETLAND IMPACTS
(134' X 2')
WETLAND IMPACTS
(213' X 50')
LIMITS OF CONSTRUCTION
B
0'
50.0 .
L.O.C
ANAL
OW C
BORR
G
IN
XIST
B
MATCH
E
WETLAND IMPACTS
(2323' X 28')
SEE SHEET 28
FOR DETAILS
LINE P
MHW = 2.30'
MLW = 0.50'
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
LEVEE
NON-WETLANDS
WETLAND IMPACTS
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
17
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
PLAN VIEW 15
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
AT
C
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
H
LI
N
E
O
-1
OTHER WATER IMPACTS
M
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
AVOCA ISLAND
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
LOUISIAN
A COORDI
NATE SYST
EM (SOU
(1983 DA
TH ZONE)
TUM)
MATCHLINE P
WETLAND IMPACTS
(SEE PREVIOUS)
WETLAND IMPACTS
(69' X 1')
AVOCA ISLAND
WETLAND IMPACTS
(3186' X 19')
TI
IS
EX
NG
PROJECT BASELINE
OW
RR
BO
L
NA
CA
SEE SHEET 28
FOR DETAILS
B
MHW = 2.30'
MLW = 0.50'
WETLAND IMPACTS
(860' X 5')
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
B
0'
.0 .
50 O.C
.
L
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
NON-WETLANDS
NE
HLI
ATC
WETLAND IMPACTS
M
OTHER WATER IMPACTS
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
KLB
2012.0525
3-24 PERMIT PLAN.DWG
18
SHEET NO:
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
PLAN VIEW 16
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
Q
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
MATCHLINE Q
ZON
E)
WETLAND IMPACTS
(SEE PREVIOUS)
RD
IN
(19 ATE S
83
DA YSTEM
TUM
) (SOU
TH
EXISTING 54" RCP AND WEIR
STRUCTURE TO BE REMOVED
AND REPLACED
ISIA
NA
CO
O
SEE SHEET 28
FOR DETAILS
B
LOU
AVOCA ISLAND
B
PROJECT BASELINE
WETLAND IMPACTS
(1347' X 50')
5
L. 0.0
O 0'
.C
.
WETLAND IMPACTS
(130' X 3')
MHW = 2.30'
MLW = 0.50'
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
WETLAND IMPACTS
(403' X 6')
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
ST
IN
G
BO
RR
NON-WETLANDS
O
WETLAND IMPACTS
OTHER WATER IMPACTS
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
EX
I
W
CA
NA
L
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
WETLAND IMPACTS
(473' X 7')
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
19
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
PLAN VIEW 17
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
MATCHLINE R
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
M
AT
CH
LI
NE
R
EM
YST )
ES
NAT DATUM
I
D
R
3
COO (198
NA
ISIA
LOU
Z
UTH
(SO
)
ONE
AVOCA ISLAND
LIMITS OF CONSTRUCTION
50.00'
L.O.C.
SEE SHEET 28
FOR DETAILS
MHW = 2.30'
MLW = 0.50'
B
B
L
RROW CANA
EXISTING BO
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
WETLAND IMPACTS
(674' X 14')
LEGEND
PROJECT BASELINE
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
END AVOCA BORROW CANAL LEVEE - SECTION B-B
BEGIN BAYOU CHENE STRUCTURE - SEE ENLARGED
PLAN SHEET 25 FOR DETAILS
STA. 434+56
LEVEE
NON-WETLANDS
WETLAND IMPACTS
WETLAND IMPACTS
(97' X 50')
OTHER WATER IMPACTS
ES
MATCHLIN
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
20
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
PLAN VIEW 18
ST. MARY LEVEE DISTRICT
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
LOUISIA
NA COO
RDINATE
S
(1983 D YSTEM (SOUTH
ATUM)
ZONE)
WETLAND IMPACTS
PROJECT BASELINE
AVOCA ISLAND
50
L.O .00'
.C.
SEE SHEET 28
FOR DETAILS
END AVOCA BORROW CANAL LEVEE - SECTION B-B
BEGIN BAYOU CHENE STRUCTURE - SEE ENLARGED
PLAN SHEET 25 FOR DETAILS
STA. 434+56
B
B
LIMITS OF CONSTRUCTION
BAYOU CHENE
MA
TC
//
OTHER WATER
IMPACTS
MHW = 2.30'
MLW = 0.50'
//
INE
S
DN
BAYOU CHENE STRUCTURE
SEE SHEET 25 FOR DETAILS
HL
EXISTING TEMPORARY
STRUCTURE TO BE REMOVED
SEE SHEET 25 FOR DETAILS
//
//
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
//
END BAYOU CHENE STRUCTURE
BEGIN BAYOU CHENE EAST LEVEE - SECTION C-C
STA. 445+93
//
//
//
//
MATC
HLINE
T
//
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
LEGEND
//
PROJECT BASELINE
//
LIMITS OF CONSTRUCTION
(WORK AREA)
//
//
LEVEE
//
//
NON-WETLANDS
//
WETLAND IMPACTS
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
//
//
OTHER WATER IMPACTS
//
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
//
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
21
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
PLAN VIEW 19
ST. MARY LEVEE DISTRICT
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
//
BAYOU CHENE
END BAYOU CHENE EAST LEVEE - SECTION C-C
BEGIN TABOR CANAL LEVEE - SECTION D-D
STA. 455+59
C
LOUISIANA COORDINATE SYSTEM (SOUTH ZONE)
(1983 DATUM)
END BAYOU CHENE STRUCTURE
BEGIN BAYOU CHENE EAST LEVEE- SECTION C-C
STA. 445+93
MATCHLINE T
//
//
SEE SHEET 29 FOR DETAILS
115.00'
L.O.C.
//
C
//
//
//
//
//
//
SEE SHEET 29
FOR DETAILS
D
D
//
//
EXISTING ENTERPRISE PIPELINE
(TO REMAIN)
END TABOR CANAL LEVEE - SECTION D-D
BEGIN ENTERPRISE CROSSING LEVEE- SECTION E-E
STA. 461+33
135.00'
L.O.C.
//
//
//
//
//
//
END ENTERPRISE CROSSING LEVEE - SECTION E-E
BEGIN TABOR CANAL LEVEE - SECTION D-D
STA. 461+66
//
//
//
PROPOSED PIPELINE
CROSSING EARTHEN PLUG
(SHEET 30 FOR DETAILS)
E
//
165.00'
L.O.C.
//
//
//
//
//
//
//
E
//
//
//
//
TAB
WETLAND IMPACTS
(11.63 AC)
//
//
OR
CAN
MHW = 2.30'
MLW = 0.50'
AL
PROJECT BASELINE
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
//
LIMITS OF CONSTRUCTION
D
SEE SHEET 29 FOR DETAILS
LEGEND
PROJECT BASELINE
D
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
NON-WETLANDS
WETLAND IMPACTS
'
.00
135 .C.
L.O
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
OTHER WATER IMPACTS
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
MATCHLINE U
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
22
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
PLAN VIEW 20
ST. MARY LEVEE DISTRICT
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
LOUISIANA COORDINATE SYSTEM (SOUTH ZONE)
(1983 DATUM)
MATCHLINE U
LIMITS OF CONSTRUCTION
TABOR
CANAL
WETLAND IMPACTS
(SEE PREVIOUS)
MHW = 2.30'
MLW = 0.50'
PROJECT BASELINE
//
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
//
SEE SHEET 29 FOR DETAILS
LEGEND
//
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
//
D
//
D
LEVEE
//
NON-WETLANDS
//
WETLAND IMPACTS
//
//
//
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
23
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
//
PLAN VIEW 21
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
MATCHLINE V
//
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
//
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
//
//
'
135.00
L.O.C.
OTHER WATER IMPACTS
300'
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
//
//
MATCHLINE V
//
'
165.00
L.O.C.
LIMITS OF CONSTRUCTION
//
//
//
//
//
F
PROPOSED PIPELINE
CROSSING EARTHEN PLUG
(SEE SHEET 30 FOR DETAILS)
LOUISIANA COORDINATE SYSTEM (SOUTH ZONE)
(1983 DATUM)
WETLAND IMPACTS
(176' X 17')
//
END TABOR CANAL LEVEE - SECTION D-D
BEGIN TENNESSEE CROSSING LEVEE- SECTION F-F
STA. 499+85
//
F
//
END TENNESSEE CROSSING LEVEE - SECTION F-F
BEGIN TABOR CANAL LEVEE - SECTION D-D
STA. 500+80
//
//
//
SEE SHEET 29 FOR DETAILS
//
//
D
//
//
//
//
//
//
WETLAND IMPACTS
(3.72 AC)
CANAL
//
135.00'
L.O.C.
TABOR
EXISTING TENNESSEE PIPELINE
(TO REMAIN)
D
END TABOR CANAL LEVEE - SECTION D-D
STA. 516+50
//
//
//
//
PROJECT BASELINE
OTHER WATER
IMPACTS
//
//
//
WETLAND IMPACTS
(0.27 AC)
//
//
//
SEE SHEET 26 FOR TABOR CANAL
WEIR STRUCTURE
MHW = 2.30'
MLW = 0.50'
FILL MATERIAL WILL BE HAULED
IN FROM A PERMITTED BORROW
SOURCE. EXCAVATION WILL BE
USED AS ON-SITE FILL.
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\3-24 PERMIT PLAN.DWG
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
(WORK AREA)
LEVEE
NON-WETLANDS
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
WETLAND IMPACTS
OTHER WATER IMPACTS
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
DRAWING NAME:
2012.0525
3-24 PERMIT PLAN.DWG
24
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
300'
150'
0'
PLAN VIEW 22
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
*NOTE
4- 8' DIAMETER PASS THROUGH CULVERTS (OR EQUIVALENT OPEN AREA)
WILL BE INCLUDED IN THE STRUCTURE TO MAINTAIN FRESHWATER
INPUTS TO MARSHES DOWNSTREAM WHEN THE GATE IS CLOSED. THIS
WILL ALLOW APPROXIMATELY 2,300 CFS OF WATER TO FLOW THROUGH
THE GATE WITH A 2' HEAD DIFFERENTIAL. SEE SHEET 34 FOR DETAILS.
TH
(SOU
STEM
TE SY M)
A
IN
U
T
RD
COO (1983 DA
IANA
LOUIS
)
ZONE
430+00
EXISTING TEMPORARY
STRUCTURE TO BE REMOVED.
*SEE NOTE*
2' RIP RAP OVER
GEOTEXTILE FABRIC
AREA: 745 SY
VOLUME: 497 CY
SEE SHEET 34
FOR DETAILS
L
LIMITS OF CONSTRUCTION
SHEETPILE WALL WITH BATTERED
PIPE PILE SUPPORTS
SEE SHEET 33
FOR DETAILS
DN
5 PILE DOLPHIN (TYP)
250'
ENE
U CH
NEL
AYO
HAN
CL B
C
N
IO
T
IGA
NAV
420'
453'
H
310+00
G
LIMITS OF RIP RAP
AND DREDGING
440+00
315+00
320+00
507'
BAYOU CHENE
00
403'
CLEAR OPENING
H
TIMBER GUIDE WALLS (TYP)
+00
305
RN
THE
NOR
/W
TING
R
IS
L
X
E
E
NN
CHA
325+
SEE SHEET 32
FOR DETAILS
K
J
STEEL GATE (428' X 60' X 31')
(OPEN POSITION)
G
SEE SHEET 31
FOR DETAILS
250'
N
FLOOD SIDE
12/21/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\25-27 ENLARGED PLANS.DWG
//
ENTERPRISE
//
//
//
//
//
//
//
//
PROJECT BASELINE
LIMITS OF CONSTRUCTION
LEVEE
LIMITS OF RIP RAP AND DREDGING
//
DATE:
09/08/2016
DRAWING NAME:
JOB NO:
OF
KLB
2012.0525
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
150'
0'
//
450+00
L
//
//
//
//
//
300'
//
//
//
//
//
//
//
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
BAYOU CHENE STRUCTURE
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
//
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
25-27 ENLARGED PLANS.DWG
25
SHEET NO:
//
//
ALL EXISTING MATERIALS WHICH ARE
A //PART// OF THE
BAYOU CHENE
//
//
//
EMERGENCY STRUCTURE (PERMIT NO. MVN-2011-2288-WJJ)
SHALL
//BE
//
REMOVED AS A PART OF THIS PERMIT. MATERIALS REMOVED FROM THE
EXISTING STRUCTURE SHALL BE RE-USED ON OTHER PORTIONS OF
WORK OUTLINED IN THE PERMIT DRAWINGS AND/OR HAULED OFFSITE
TO A NON-WETLAND SITE.
WETLAND IMPACTS
APPROVED BY:
0
+0
460
* TEMPORARY STRUCTURE REMOVAL
NON-WETLANDS/OTHER WATERS
ADS
EXISTING CHANNEL WIDTH
EXISTING TEMPORARY
STRUCTURE TO BE REMOVED.
*SEE NOTE*
PIPELINE
LEGEND
DRAWN BY:
PROTECTED SIDE
2' THICK RIP RAP OVER
GEOTEXTILE FABRIC
AREA: 990 SY
VOLUME: 660 CY
PROTECTION DOLPHIN
W/NAVIGATION LIGHT AND
OBSTRUCTION SIGN (TYP)
//
K
J
ER
UTH
SO
/W
NG
R
I
T
L
S
E
EXI HANN
C
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
//
H
UT
O
R
CA
NA
L
O
(S
EM
ST )
Y
S M
TE ATU
NA D
DI 983
R
OO (1
TA
B
AC
AN
ISI
U
LO
)
NE
ZO
PROTECTED SIDE
PROJECT BASELINE
PLUMB AND BATTERED PIPE PILES
TIE-IN SHEETPILE WALL
TO EXISTING SPOIL BANK
516+50
SHEETPILE FLOOD WALL
EXISTING SPOIL BANK
WETLAND IMPACTS
OTHER U.S.
WATER IMPACTS
2 - DOUBLE SWING STEEL
GATES. TWO BOAT BAY
OPENINGS @ 11' EACH.
(SEE SHEET 27 FOR DETAILS)
LIMITS OF CONSTRUCTION
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\25-27 ENLARGED PLANS.DWG
FLOOD SIDE
LEGEND
PROJECT BASELINE
LIMITS OF CONSTRUCTION
LEVEE
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
NON-WETLANDS/OTHER WATERS
WETLAND IMPACTS
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
DRAWING NAME:
JOB NO:
2012.0525
25-27 ENLARGED PLANS.DWG
26
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
300'
150'
0'
TABOR CANAL WEIR STRUCTURE
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 300'
300'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
FLOOD SIDE
12.75"Øx0.375"
PIPE PILE WITH
1/2 HP WINCH
GATE REST
C15x33.9 CAP
CHANNEL
18"Øx0.375"
PIPE PILE
18"Øx0.375"
BATTERED PIPE PILE
SHEETPILE WALL
M
12.75"Øx0.375"
PIPE PILE WITH
1/2 HP WINCH
GATE REST
L3x6x0.375
HP12x63
BATTERED HP12x63
PZ-22 SHEETPILE
1/4" NEOPRENE
M
12"x12"x3/8" WINCH PLATFORM
WITH 1/2HP WINCH
PROTECTED SIDE
SEE SHEET 35
FOR DETAILS
STEEL GATE DETAILED PLAN VIEW
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\25-27 ENLARGED PLANS.DWG
SCALE: 1" = 5'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
DRAWING NAME:
JOB NO:
2012.0525
25-27 ENLARGED PLANS.DWG
27
SHEET NO:
KLB
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
5'
2.5'
0'
TABOR CANAL STEEL GATE DETAIL
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 5'
5'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
40' LIMITS OF CONSTRUCTION
15
15' CROWN
10
15
PROPOSED 6" THICK
LIMESTONE SURFACING OVER
GOETEXTILE FABRIC
10
EL +8.0
V
EXISTING GRADE
5
:1
2H
:1
2H
V
5
MHW: +2.3
MLW: +0.5
FILL AREA
OF LEVEE
-5
0
BASELINE
CL OF LEVEE
0
-5
-10
-10
CROSS SECTION A-A - TYPICAL AVOCA ROAD LEVEE
STA. 2+16 - 336+34
HORIZONTAL SCALE: 1" = 30'
VERTICAL SCALE: 1" = 15'
TOTAL VOLUME - SECTION A-A
FILL - LIMESTONE
9,902± (CY)
FILL - EARTHEN
90,547± (CY)
FILL MATERIAL WILL BE HAULED IN FROM A
PERMITTED BORROW SOURCE. EXCAVATION
WILL BE USED AS ON-SITE FILL.
TOTAL AREA - SECTION A-A
FILL
23.02± (AC)
50' LIMITS OF CONSTRUCTION
TIE IN TO EXISTING LEVEE
(EL +8.0')
FILL AREA OF LEVEE
:
3H
5
1V
PROPOSED 8" THICK
LIMESTONE SURFACING OVER
GOETEXTILE FABRIC
-5
BASELINE
C
L OF LEVEE
10
0
EXISTING BERM (LENGTHS VARY)
15' CROWN
15
15
CUT AREA
OF LEVEE
3H
:1
V
10
5
MHW: +2.3
MLW: +0.5
EXISTING GRADE
0
CROSS SECTION B-B - TYPICAL AVOCA BORROW CANAL LEVEE
-5
HORIZONTAL SCALE: 1" = 30'
VERTICAL SCALE: 1" = 15'
-10
STA. 336+34 - 434+56
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\28-35 TYP CROSS SECTIONS.DWG
-10
FILL MATERIAL WILL BE HAULED IN FROM A
PERMITTED BORROW SOURCE. EXCAVATION
WILL BE USED AS ON-SITE FILL.
TOTAL VOLUME - SECTION B-B
FILL - LIMESTONE
3,700± (CY)
FILL - EARTHEN
3,700± (CY)
EXCAVATED
3,700± (CY)
TOTAL AREA - SECTION B-B
FILL
EXCAVATED
4.64± (AC)
3.38± (AC)
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
KLB
2012.0525
DRAWING NAME:28-35 TYP CROSS SECTIONS.DWG
28
SHEET NO:
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
30'
15'
0'
TYPICAL SECTIONS
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 30'
30'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
115.0' LIMITS OF CONSTRUCTION
70.0'
15
45.0'
50.0'
7.6'
10.0'
5.8'
10
MHW: +2.3
MLW: +0.5
0
EL +5.5
V
12.8H:1
15
6.0'
1V
10
PROPOSED EARTHEN LEVEE
EL +8.0
EL +6.0
11H:1V
5
3H EL +4.0
:1V
APPROXIMATE TIE-IN OF
NATURAL GROUND (EL: +2.0)
APPROXIMATE TIE-IN OF
NATURAL GROUND (EL: +1.5)
-5
:1V
3H
C
L OF LEVEE
BASELINE
BAYOU CHENE
5
3H
:
22.7'
60.0' GEOTEXTILE REINFORCEMENT
REMOVE VEGETATION AND
MUCK-OUT TOP 2' BENEATH
LEVEE FOOTPRINT
0
-5
CROSS SECTION C-C - TYPICAL BAYOU CHENE EAST LEVEE
STA. 445+93 - 455+59
HORIZONTAL SCALE: 1" = 30'
VERTICAL SCALE: 1" = 15'
TOTAL VOLUME - SECTION C-C
FILL
13,900± (CY)
EXCAVATED
3,550± (CY)
TOTAL AREA - SECTION C-C
FILL
EXCAVATED
FILL MATERIAL WILL BE HAULED IN FROM A
PERMITTED BORROW SOURCE. EXCAVATION
WILL BE USED AS ON-SITE FILL.
2.26± (AC)
1.24± (AC)
135.0' LIMITS OF CONSTRUCTION
45.0'
15
44.0'
VARIES
46.0'
31.4'
7.6'
10.0'
5.8'
10
5
0
MHW: +2.3
MLW: +0.5
EL: +3.0
APPROXIMATE TIE-IN OF
NATURAL GROUND (EL: +3.0)
TABOR CANAL
-5
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\28-35 TYP CROSS SECTIONS.DWG
V
12.8H:1
REMOVE VEGETATION AND
MUCK-OUT TOP 2' BENEATH
LEVEE FOOTPRINT
EL +5.5
:1V
3H
3H
:
C
L OF LEVEE
BASELINE
EXISTING SPOIL BANK
TO BE DEGRADED
22.7'
15
9.0'
10
EL +8.0
1V
PROPOSED EARTHEN LEVEE
EL +6.0
11H:1V
5
EL +4.0
:1V
EL +1.0
3H
0
60.0' GEOTEXTILE REINFORCEMENT
-5
APPROXIMATE TIE-IN OF
NATURAL GROUND (EL: +1.0)
CROSS SECTION D-D - TYPICAL TABOR CANAL LEVEE
STA. 455+59 - 516+50
HORIZONTAL SCALE: 1" = 30'
VERTICAL SCALE: 1" = 15'
TOTAL VOLUME - SECTION D-D
FILL
99,490± (CY)
EXCAVATED
39,260± (CY)
TOTAL AREA - SECTION D-D
FILL
11.83± (AC)
EXCAVATED
13.30± (AC)
FILL MATERIAL WILL BE HAULED IN FROM A
PERMITTED BORROW SOURCE. EXCAVATION
WILL BE USED AS ON-SITE FILL.
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
KLB
2012.0525
DRAWING NAME:28-35 TYP CROSS SECTIONS.DWG
29
SHEET NO:
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
30'
15'
0'
TYPICAL SECTIONS
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 30'
30'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
180' ALONG PIPELINE CANAL
(165' LIMITS OF CONSTRUCTION)
15
15
PROPOSED EARTHEN LEVEE
10
5
3
0
EL +5.7
27H:1V
EL: +3.5'
:
3H
3H
:
1V
1V
EL +5.4
1V
H:
12.8H:1V
EL: +3.0'
5
0
60.0' GEOTEXTILE REINFORCEMENT
CL OF LEVEE
BASELINE
REMOVE VEGETATION AND
MUCK-OUT TOP 2' BENEATH
LEVEE FOOTPRINT
-5
10
EXISTING BERM TO BE DEGRADED
EL +8.0
-10
EXISTING GRADE
(CL OF PIPELINE CANAL)
-5
-10
8" ENTERPRISE PIPELINE
-15
-15
CROSS SECTION E-E - ENTERPRISE PRODUCTS PIPELINE CROSSING LEVEE
HORIZONTAL SCALE: 1" = 30'
VERTICAL SCALE: 1" = 15'
TOTAL VOLUME - SECTION E-E
FILL
880± (CY)
180± (CY)
EXCAVATED
TOTAL AREA - SECTION E-E
FILL
EXCAVATED
FILL MATERIAL WILL BE HAULED IN FROM A
PERMITTED BORROW SOURCE. EXCAVATION
WILL BE USED AS ON-SITE FILL.
NOTE:
LEVEE SECTION SHOWN IS SKEWED
TO REPRESENT THE PROPOSED
LEVEE ALONG PIPELINE CANAL.
0.15± (AC)
0.07± (AC)
220' ALONG PIPELINE CANAL
( 165' LIMITS OF CONSTRUCTION)
15
15
10
5
0
EL +5.7
27H:1V
EL: +3.5'
:1V
3H
10
PROPOSED EARTHEN LEVEE
EL +8.0
3H
:1V
:1V
3H
EL +5.4
12.8H:1V
5
EL: +3.0'
3H
:1V
60.0' GEOTEXTILE REINFORCEMENT
0
-5
-5
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\28-35 TYP CROSS SECTIONS.DWG
-15
-10
8" TENNESSEE PIPELINE
-15
CROSS SECTION F-F - TENNESSEE GAS PIPELINE CROSSING LEVEE
-20
HORIZONTAL SCALE: 1" = 30'
VERTICAL SCALE: 1" = 15'
FILL MATERIAL WILL BE HAULED IN FROM A
PERMITTED BORROW SOURCE. EXCAVATION
WILL BE USED AS ON-SITE FILL.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
KLB
2012.0525
DRAWING NAME:28-35 TYP CROSS SECTIONS.DWG
30
SHEET NO:
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
15'
0'
TOTAL VOLUME - SECTION F-F
FILL
6,320± (CY)
EXCAVATED
790± (CY)
TOTAL AREA - SECTION F-F
FILL
EXCAVATED
0.49± (AC)
0.26± (AC)
30'
-20
NOTE:
LEVEE SECTION SHOWN IS SKEWED
TO REPRESENT THE PROPOSED
LEVEE ALONG PIPELINE CANAL.
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
TYPICAL SECTIONS
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 30'
30'
EXISTING GRADE
(CL OF PIPELINE CANAL)
C
L OF LEVEE
BASELINE
REMOVE VEGETATION AND
MUCK-OUT TOP 2' BENEATH
LEVEE FOOTPRINT
-10
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
-10
-12
CL PROJECT ALIGNMENT
BAYOU CHENE
STA. 316+09.63
250'
-14
170'
(55 LB)
-16
80'
(130 LB)
1
-24
-14
170'
(55 LB)
-16
-18
48" MINIMUM OF 130 LB.
RIP RAP
36" MINIMUM OF 55 LB.
RIP RAP
-22
-12
250'
80'
(130 LB)
-18
-20
-10
STEEL
BARGE
GATE
5
RIP RAP: -24.5
SILL EL: -24.0
-20
36" MINIMUM OF 55 LB.
RIP RAP
RIP RAP: -24.5
-22
-24
5
1
-26
-26
EXISTING CHANNEL BOTTOM
-28
EL: -28.5
PROPOSED DREDGING MATERIAL
-30
319+00
318+00
317+00
-28
CUT OFF WALL
316+00
315+00
314+00
313+00
-30
NOTE:
·
BARGE GATE SHOWN IN CLOSED POSITION
·
VOLUME AND AREA QUANTITIES ARE SHOWN ON SHEET 33.
CROSS SECTION G-G - BAYOU CHENE CENTERLINE SOUTH
12/21/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\28-35 TYP CROSS SECTIONS.DWG
HORIZONTAL SCALE: 1" = 100'
VERTICAL SCALE: 1" = 50'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
KLB
2012.0525
DRAWING NAME:28-35 TYP CROSS SECTIONS.DWG
31
SHEET NO:
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
100'
50'
0'
TYPICAL SECTIONS
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 100'
100'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\28-35 TYP CROSS SECTIONS.DWG
-50
-60
-70
-50
-60
-70
REV. NO:
5'
01
REV. DATE:
2.5'
12/5/2017
0'
SCALE: 1" = 5'
REV. BY:
JJM
5'
ADS
08/31/2016
JOB NO:
KLB
2012.0525
APPROVED BY:
32
OF
37
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
SHEET NO:
DRAWING NAME:28-35 TYP CROSS SECTIONS.DWG
DATE:
DRAWN BY:
*NOTE
4- 8' DIAMETER PASS THROUGH CULVERTS (OR EQUIVALENT SQUARE
FOOT AREA) WILL BE INCLUDED IN THE STRUCTURE TO MAINTAIN
FRESHWATER INPUTS TO MARSHES DOWNSTREAM WHEN THE GATE IS
CLOSED. THIS WILL ALLOW APPROXIMATELY 2,300 CFS OF WATER TO
FLOW THROUGH THE GATE WITH A 2' HEAD DIFFERENTIAL.
HORIZONTAL SCALE: 1" = 100'
VERTICAL SCALE: 1" = 50'
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
TYPICAL SECTIONS
ST. MARY LEVEE DISTRICT
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
-40
-40
CROSS SECTION H-H - BAYOU CHENE CENTERLINE NORTH
-30
-30
EXISTING MUD LINE
-20
-20
CLOSED STRUCTURE
STORAGE PILES
TOP EL: -26.0'
-10
-10
20
30
0
FENDER GRADE WALL
T/PILE EL: +8.5'
0
STRUCTURE OPEN
STORAGE PILES
T/PILE EL: -15.0'
5 PILE DOLPHINS(TYP.)
EL: +9.5'
PROTECTION DOLPHIN WITH
NAVIGATION LIGHT AND
OBSTRUCTION SIGN TOP
EL: +9.5'
JACKET STRUCTURE
T/PILE EL: +8.0'
10
FENDER WALL
EL: +8.5'
PROPOSED STEEL BARGE GATE
(SHOWN IN CLOSED POSITION)
(428' x 60' x 31')
PROTECTION DOLPHIN WITH
NAVIGATION LIGHT AND
OBSTRUCTION SIGN TOP
EL: +9.5
FLOODWALL PLUMB
AND BATTER PILE
T/PILE EL: +8.0'
10
20
30
5 PILE
DOLPHINS(TYP.)
EL: +9.5
10
SOUTH BANK
NORTH BANK
5
5
MHW EL: +2.3
MLW EL: +0.5
0
10
0
BAYOU CHENE
514.00' (MIN)
-5
-10
EXISTING CHANNEL
BOTTOM
-15
-5
RIP RAP
3' MIN THICKNESS
27" THICK (55 LB CLASS) STONE OVER
9" CRUSHED LIMESTONE
RIP RAP
MAX EL: -24.5
-10
-15
-20
-20
PROPOSED
DREDGING
MATERIAL
-25
-30
PROPOSED
DREDGING
MATERIAL
PROPOSED
CHANNEL BOTTOM
-35
-320
-240
-160
-80
0
80
160
240
-25
-30
-35
320
CROSS SECTION J-J - BAYOU CHENE STA. 314+50
HORIZONTAL SCALE: 1" = 100'
VERTICAL SCALE: 1" = 20'
10
SOUTH BANK
NORTH BANK
5
0
5
MHW EL: +2.3
MLW EL: +0.5
0
BAYOU CHENE
-5
-5
434.00' (MIN)
-10
EXISTING CHANNEL
BOTTOM
-15
-35
-320
-15
PROPOSED
DREDGING
MATERIAL
PROPOSED
CHANNEL
BOTTOM
-30
-10
RIP RAP
4' MIN THICKNESS
36" THICK (130 LB CLASS) STONE OVER
12" CRUSHED LIMESTONE
RIP RAP
MAX EL: -24.5
PROPOSED
DREDGING
-20
MATERIAL
-25
PROPOSED DREDGING MATERIAL
-240
-160
10
-80
0
80
160
-20
-25
-30
-35
320
240
12/21/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\28-35 TYP CROSS SECTIONS.DWG
CROSS SECTION K-K - BAYOU CHENE STA. 315+80
HORIZONTAL SCALE: 1" = 100'
VERTICAL SCALE: 1" = 20'
TOTAL VOLUME OF RIP RAP FOR BAYOU CHENE
FILL
29,425± (CY)
TOTAL VOLUME OF DREDGING FOR BAYOU CHENE
EXCAVATION
103,284± (CY)
TOTAL AREA FOR BAYOU CHENE
FILL
EXCAVATION
DRAWN BY:
DATE:
ADS
5.74± (AC)
7.58± (AC)
APPROVED BY:
09/08/2016
JOB NO:
KLB
2012.0525
DRAWING NAME:28-35 TYP CROSS SECTIONS.DWG
33
SHEET NO:
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
50'
0'
100'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
TYPICAL SECTIONS
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 100'
100'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
*NOTE
4- 8' DIAMETER PASS THROUGH CULVERTS (OR EQUIVALENT OPEN AREA)
WILL BE INCLUDED IN THE STRUCTURE TO MAINTAIN FRESHWATER
INPUTS TO MARSHES DOWNSTREAM WHEN THE GATE IS CLOSED. THIS
WILL ALLOW APPROXIMATELY 2,300 CFS OF WATER TO FLOW THROUGH
THE GATE WITH A 2' HEAD DIFFERENTIAL.
202.50'
80.67'
PZ-22 TIP EL: -20.0'
22 PAIRS
EXISTING
GRADE
20
10
247.50'
PZ-22 TIP EL: -43.0'
67.5 PAIRS
44.00'
PZ-40 TIP EL: -60.0'
14 PAIRS
EL: +10
BAYOU CHENE
MHW EL: +2.3
0
MLW EL: +0.5
-10
PROPOSED
GRADE
TIP EL: -20.0'
-20
-30
SILL EL: -24.0'
MATCHLINE
ABUTMENT PILE
-40
TIP EL: -43.0'
-50
TIP EL: -60.0'
-60
-70
PROPOSED BAYOU
CHENE EAST LEVEE
202.50'
BARGE GATE
(CLOSED POSITION)
BAYOU CHENE
44.00'
PZ-40 TIP EL: -60.0'
14 PAIRS
139.33'
PZ-22 TIP EL: -43.0'
38 PAIRS
EL: +10
80.67'
PZ-22 TIP EL: -20.0'
22 PAIRS
20
EL: +9.5
10
MHW EL: +2.3
EL: -1.0'
4 - 8' DIAMETER
CULVERTS (SEE NOTE)
EXISTING
GRADE
SILL EL: -24.0'
MLW EL: +0.5
0
EXISTING
GRADE
PROPOSED
GRADE
-10
TIP EL: -20.0'
-20
ABUTMENT PILE
-30
-40
MATCHLINE
TIP EL: -43.0'
-50
TIP EL: -60.0'
-60
12/21/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\28-35 TYP CROSS SECTIONS.DWG
-70
CROSS SECTION L-L - BRACED FLOOD WALL
HORIZONTAL SCALE: 1" = 100'
VERTICAL SCALE: 1" = 50'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
KLB
2012.0525
DRAWING NAME:28-35 TYP CROSS SECTIONS.DWG
34
SHEET NO:
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
100'
50'
0'
TYPICAL SECTIONS
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 100'
100'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
1/2 HP WINCH
10
10
18" PIPE PILE
9
11' x 8' x 8"
STEEL GATE
8
STEEL HINGE
7
STEEL BEAM WITH
BATTERED PILE
18" PIPE PILE
11' x 8' x 8"
STEEL GATE
8
EL: +7.0'
STEEL HINGE
EL: +6.0'
6
ELEV. +6.0'
7
6
5
5
4
4
3
3
MHW: +2.3
2
2
EXISTING GRADE
1
1
MLW: +0.5
STEEL HINGE
0
STEEL HINGE
-1
CAP CHANNEL
CAP CHANNEL
0
-1
ELEV. -2.0'
-2
-2
-3
-3
-4
-4
-5
-5
-6
SHEET PILE
SHEET PILE
SHEET PILE
SHEET PILE
-6
-7
-7
-8
-8
-9
-9
-10
-10
-11
-11
-12
-12
-21
-21
-22
-22
TIP ELEV. -23.0'
-23
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\28-35 TYP CROSS SECTIONS.DWG
9
-23
CROSS SECTION M-M - TABOR CANAL WEIR STRUCTURE
HORIZONTAL SCALE: 1" = 5'
VERTICAL SCALE: 1" = 5'
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
APPROVED BY:
09/08/2016
JOB NO:
KLB
2012.0525
DRAWING NAME:28-35 TYP CROSS SECTIONS.DWG
35
SHEET NO:
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
5'
2.5'
0'
TABOR CANAL WEIR STRUCTURE
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
SCALE: 1" = 5'
5'
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
NOTES
As-built drawings will be submitted within 30 days of completion of this project to the
Louisiana Department of Natural Resources, Office of Conservation, Pipeline Division, P. O.
Box 94275 Baton Rouge, LA 70804, and to the Louisiana Department of Natural Resources,
Coastal Management Division, P. O. Box 44487, Baton Rouge, LA 70804-4487.
All structures, facilities, well and pipelines/flowlines occurring in open water areas or in
oilfield canals or slips shall be removed within 120 days of abandonment or the facilities for
the herein permitted use unless prior written approval to leave such structures in place is
received from the Coastal Management Division. This condition does not preclude the
necessity for revising the current permit or obtaining a separate Coastal Use Permit, should
one be required.
Structures must also be marked/lighted in accordance with U. S. Coast Guard regulations.
In order to ensure the safety of all parties, the permittee shall contact the Louisiana One Call
System (1-800-272-3020) a minimum of 48 hours prior to the commencement of any
excavation (digging, dredging, jetting, etc.) or demolition activity.
Applicant is subject to all applicable state laws related to damages which are demonstrated
to have been caused by this proposed action.
TOTAL WETLAND IMPACTS (ABOVE 5' MSL) - 5.65± ACRES
TOTAL WETLAND IMPACTS (BELOW 5' MSL) - 16.14± ACRES
12/20/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\36-37 NOTES.DWG
TOTAL WETLAND IMPACTS - 21.79± ACRES
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
09/08/2016
DRAWING NAME:
SHEET NO:
APPROVED BY:
JOB NO:
KLB
2012.0525
36-37 NOTES.DWG
36
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
NOTES
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM
12/7/2017 - P:\Y-2012\2012.0525\DWG\PERMITTING\36-37 NOTES.DWG
FOR PERMITTING ONLY - THIS DOCUMENT IS
NOT TO BE USED FOR CONSTRUCTION, BIDDING,
RECORDATION, CONVEYANCE OR SALES.
DRAWN BY:
DATE:
ADS
09/08/2016
DRAWING NAME:
SHEET NO:
APPROVED BY:
JOB NO:
KLB
2012.0525
36-37 NOTES.DWG
37
OF
37
PROJECTION: PROJECTION
GEO. DATUM: NAD83 | VERT. DATUM: NAVD88
GRID UNITS: US SURVEY FEET
Kevin O'Gorman, P.E.
LA License No. 35244
Firm: T. Baker Smith, LLC
OPERATION PLAN
ST. MARY LEVEE DISTRICT
BAYOU CHENE FLOOD PROTECTION PROJECT
LOCATED IN SECTIONS 35, 36, 40, 41, 43, 45, & 47, T16S-R13E,
& SECTIONS 1 & 12, T17S-R13E
ST. MARY PARISH, LOUISIANA
REV. NO:
01
REV. DATE:
REVISION DESCRIPTION:
REVISED STRUCTURE WIDTH
12/5/2017
REV. BY:
JJM