You can copy from here when filling out the rest of the page.
Broward County. Madison Ft. Lauderdale LLC. Greenwood Village, Colorado.
PROJECT PURPOSE:
Basic: The basic project purpose is to improve the navigation of an existing marina.
Overall: The overall project purpose is to improve the navigation of an existing marina in the Seminole River, Ft. Lauderdale, Broward County Florida.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT:
Madison Ft. Lauderdale LLC.
Attn: David Behnke (Officer)
5619 DTC PKWY #800
Greenwood Village, CO. 80111
WATERWAY AND LOCATION: The project would affect waters of the United States associated with the Intracoastal Waterway. The project site is located within the Seminole River (manmade canal) adjacent to 1335 SE 16th Street, Section 14, Township 50 South, Range 42 East, Ft. Lauderdale Broward County, Florida.
APPROXIMATE CENTRAL COORDINATES:
Latitude 26.1023°
Longitude -80.1293°
PROJECT PURPOSE:
Basic: The basic project purpose is to improve the navigation of an existing marina.
Overall: The overall project purpose is to improve the navigation of an existing marina in the Seminole River, Ft. Lauderdale, Broward County Florida.
EXISTING CONDITIONS: The property contains approximately 835 linear feet of a concrete seawall along the shoreline and 5,127 square feet of finger piers and marginal docks. A seagrass survey was conducted in April 2017. The benthic community of the project site consisted of silt, detritus, and debris. Depth of the survey area varied from 4-feet to 14-feet with depth increasing with the distance towards the center of the canal and toward the easternmost slips. One species of seagrass, Halophila decipiens, was observed within the survey area. The seagrass was observed within two patches (64 SF and 15 SF), within the central portion of the survey area, beginning outside of the existing finger piers and extending towards the center of the canal.
PROPOSED WORK: The applicant seeks authorization to conduct the following activities for the reconfiguration of an existing commercial marina from 21 to 23 wet slips:
Excavate 2,800 SF of upland (1,350 CY) to a depth of -8.0 NGVD for a lift well;
Removal of 5,127 SF of existing docks;
Install a 3-foot by 82-foot access walkway;
Install a 42 SF platform that connects to the 35-foot gangway;
Install a 6-foot floating aluminum marginal floating dock with 14 finger piers of various widths and lengths (3,525 SF);
Repair and replace 360 linear feet of seawall no more than 12-inches from the wet face of the existing seawall;
Install 180 linear feet of new seawall in the proposed lift well area.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The applicant has agreed to install turbidity curtains during all in-water work. The applicant agrees to abide by the Sea Turtle and Smalltooth Sawfish Construction Conditions and the Standard Manatee Conditions. The project avoids impacts to the two patches (64 SF and 15 SF), by locating the proposed structures landward of the seagrass.
COMPENSATORY MITIGATION –The applicant has provided the following explanation why compensatory mitigation should not be required: The applicant has provided the following explanation why compensatory mitigation should not be required: No impacts to submerged aquatic vegetation is proposed or anticipated therefore no compensatory mitigation should be required.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
Endangered Species: The Corps has determined the proposal may affect but is not likely to adversely affect the West Indian Manatee or its designated critical habitat. The Corps evaluated potential project related effects to the manatee by using The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, (Key) dated April 2013. Using the Key, A>B>C>G> H>I>J>K resulted in a “May Affect” determination (project has not been reviewed by FWC to be found consistent with the County’s State approved manatee projection plan.
The Corps has determined the proposed project may affect, but is not likely to adversely affect the threatened and endangered swimming sea turtles; loggerhead (Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea), hawksbill (Eretmochelys imbricata), and Kemp's Ridley (Lepidochelys kempii), and the threatened smalltooth sawfish (Pristis pectinata), and would not adversely modify their designated critical habitat. The Corps will request National Marine Fisheries Service concurrence with these determinations pursuant to Section 7 of the Endangered Species Act by separate letter.
Essential Fish Habitat (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would shade approximately 4,173 square feet of un-vegetated habitat utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the South Atlantic Region. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Ms. Linda C. Knoeck Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410, within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410; by electronic mail at Linda.C.Knoeck@usace.army.mil; or by telephone at (561) 472-3531.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
4400 PGA BOULEVARD, SUITE 500
PALM BEACH GARDENS, FL 33410
January 22, 2018
REPLY TO
ATTENTION OF
Regulatory Division
South Branch
Palm Beach Gardens Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-2017-02330(SP-LCK)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT:
Madison Ft. Lauderdale LLC.
Attn: David Behnke (Officer)
5619 DTC PKWY #800
Greenwood Village, CO. 80111
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with the Intracoastal Waterway. The project site is located within the
Seminole River (manmade canal) adjacent to 1335 SE 16th Street, Section 14,
Township 50 South, Range 42 East, Ft. Lauderdale Broward County, Florida.
Directions to the site are as follows:
APPROXIMATE CENTRAL COORDINATES:
Latitude
26.1023°
Longitude -80.1293°
PROJECT PURPOSE:
Basic: The basic project purpose is to improve the navigation of an existing marina.
Overall: The overall project purpose is to improve the navigation of an existing marina
in the Seminole River, Ft. Lauderdale, Broward County Florida.
EXISTING CONDITIONS: The property contains approximately 835 linear feet of a
concrete seawall along the shoreline and 5,127 square feet of finger piers and marginal
docks. A seagrass survey was conducted in April 2017. The benthic community of the
project site consisted of silt, detritus, and debris. Depth of the survey area varied from 4feet to 14-feet with depth increasing with the distance towards the center of the canal and
toward the easternmost slips. One species of seagrass, Halophila decipiens, was
observed within the survey area. The seagrass was observed within two patches (64 SF
and 15 SF), within the central portion of the survey area, beginning outside of the existing
finger piers and extending towards the center of the canal.
PROPOSED WORK: The applicant seeks authorization to conduct the following
activities for the reconfiguration of an existing commercial marina from 21 to 23 wet
slips:
1.
2.
3.
4.
5.
Excavate 2,800 SF of upland (1,350 CY) to a depth of -8.0 NGVD for a lift well;
Removal of 5,127 SF of existing docks;
Install a 3-foot by 82-foot access walkway;
Install a 42 SF platform that connects to the 35-foot gangway;
Install a 6-foot floating aluminum marginal floating dock with 14 finger piers of
various widths and lengths (3,525 SF);
6. Repair and replace 360 linear feet of seawall no more than 12-inches from the
wet face of the existing seawall;
7. Install 180 linear feet of new seawall in the proposed lift well area.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment: The applicant has agreed to install turbidity curtains during all inwater work. The applicant agrees to abide by the Sea Turtle and Smalltooth Sawfish
Construction Conditions and the Standard Manatee Conditions. The project avoids
impacts to the two patches (64 SF and 15 SF), by locating the proposed structures
landward of the seagrass.
COMPENSATORY MITIGATION The applicant has provided the following explanation
why compensatory mitigation should not be required: The applicant has provided the
following explanation why compensatory mitigation should not be required: No impacts
to submerged aquatic vegetation is proposed or anticipated therefore no compensatory
mitigation should be required.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties
within the permit area. By copy of this public notice, the Corps is providing information
for review. Our final determination relative to historic resource impacts is subject to
review by and coordination with the State Historic Preservation Officer and those
federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposal may affect but is
not likely to adversely affect the West Indian Manatee or its designated critical habitat.
The Corps evaluated potential project related effects to the manatee by using The
Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination
Key for the Manatee in Florida, (Key) dated April 2013. Using the Key, A>B>C>G>
H>I>J>K resulted in a "May Affect" determination (project has not been reviewed by
FWC to be found consistent with the County's State approved manatee projection plan.
2
The Corps has determined the proposed project may affect, but is not likely to
adversely affect the threatened and endangered swimming sea turtles; loggerhead
(Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea),
hawksbill (Eretmochelys imbricata), and Kemp's Ridley (Lepidochelys kempii), and the
threatened smalltooth sawfish (Pristis pectinata), and would not adversely modify their
designated critical habitat. The Corps will request National Marine Fisheries Service
concurrence with these determinations pursuant to Section 7 of the Endangered
Species Act by separate letter.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposal would shade approximately
4,173 square feet of un-vegetated habitat utilized by various life stages of penaeid
shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and
snapper/grouper complex. Our initial determination is that the proposed action would
not have a substantial adverse impact on EFH or federally managed fisheries in the
South Atlantic Region. Our final determination relative to project impacts and the need
for mitigation measures is subject to review by and coordination with the National
Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Ms. Linda C.
Knoeck Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410, within
21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms.
Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA
Boulevard, Palm Beach Gardens, FL 33410; by electronic mail at
Linda.C.Knoeck@usace.army.mil; or by telephone at (561) 472-3531.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
3
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
4
ALABAMA
GEORGIA
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
-------------------------------~~~-----------------------------
------------------------------------------------------------------------------------------------------------------- GULF OF MEXlco----------------------------------------------------------~---------.----------------------------------------------------------------------------------~----------------------------------------------------------------------------------------------------------------------------------------~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~-~---~~------~~------~-------~-~~~-
~~----~-~~----~-~----~----------~--
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
·
~~------~-------~~-------~-------~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
--~-------~-------~--~-------~----
-~------~----~-----------~--------~
FLORIDA
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~
~\~~~============
PROJECT LOCATION
8E 17TM STREET
Edge':Ys~1~f
518 BROAD STREFJ.i.SUITE 200
ST. JOSEPl:'.i. Ml 4wog
P: 289 932 4002
F: 289 932 3542
LOCATION
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
CORDOVA BOAT a.ue
STRANAHAN RIVER
FORT LAUDERDALE
BROWARD
DATIJM:
NGVD29
713112017
SHEET:
1 OF 6
cg
NOTES
1. DIMENSIONS BASED ON 2012 BOUNDARY SURVEY BY OTHERS.
2. WATER LEVEL RANGE VARIES FROM --0.7 FT. TO 3.2 FT.
N
E9
II.
0
"'
fiiw
.c,
SCALE: 1"=70'
:I:
Ill
0
0
36
(I')
3a:
~ ~~~
70
~
~ ';Jia:.I~
1
'
i ~I§§
mo
~
o~~CJ
OUJU..llll'"Z
...
~
...""
C"'I
· EXISTING FINGER PIERS (5,004 SF)
·
(TO BE REMOVED)
SEMINOLE RNER
....
I-<
z;: ..
\'l
~~~5~~
~3:0000
ti
5'
--11--
1
EXISTING FIXED DOCK (1,064 SF)
(TO BE REMOVED)
··)..'.
<$
O!
~
~
EXISTING SEAWALL
(TO BE REMOVED)
CONCRETE WALKWAY
EXISTING PARKING LOT
I
I
I
~ I
I
I
I
EXISTING CONCRETE PLATFORM (1,657 SF)
(TO BE REMOVED)
.c,
EXISTING BUILDINGS
(TO BE REMOVED)
" - V'l
PROPERTY LINES
cu~
+-'~
ttJ~
==~~
cu
~
---------------------J
SE 16TH STREET
\JI
~
til
UJIO
-c ~~-i~
UJ ~~aa
0
~ 11UB
:NN
'°1- ....
~UHi.ii.
cg
II.
0
..,
SEMINOLE
RIVER
\
~
l-------+--------------390'
I
PROPOSED FLOATING LIFT
fiiw
~ 3a:~
:I:
(I')
ig i-~o~i!§
·1
....
ti
~
a:lffi
~I
~h§
~
li:~ ...
0
..:;..:
l...,
...,,
.EP
LF)
PROPOSED ACCESS
STAIRWAY (TYP.)
PROPOSED 3' x 82' PIER
(246 SF)
Cl
~ OUJ~lll~Z
PROPOSED ALUMINUM
FRAMED FLOATING DOCK
(1700 SF)
I-<
z;: ..
~!<~5~~
~3:0000
1
PROPOSED LIFT WELL SEAWALL (1 BO LF)
PROPOSED LIFT WELL
EXCAVATION (TO -8.01 (1350 CY)
l
I
I
" - V'l
EIJT
7 ____ _
~~~~~---------
-:-~:
SE 16TH STREET
N
E9
25
ttJ~
==~~
cu
~
SCALE: 1"=50'
0
cu~
+-'~
50
NOTES
1. DIMENSIONS BASED ON 2012 BOUNDARY SURVEY BY OTHERS.
2. ELEVATIONS IN REFERENCE TO NGVD29 DATUM (NGVD29 = NAVD88 + 1.59j.
3. WATER LEVEL RANGE VARIES FROM -0.7 FT. TO 3.2 FT.
4. TOTAL DOCK AREA OVER WATER= 3,813 SF.
\JI
~
til
UJIO
-c ~~-i~
UJ ~~aa
0
~ 11UB
:NN
'°1- ....
~UHi.ii.
cg
II.
0
EXISTING BUILDING
TYPICAL SECTION A-A {EXISTING)
"""
fiiw
SCALE: 1"=20'
z
~
-'a:~
__.
lH
~
'.'(
(IJ
EXISTING CONCRETE PLATFORM (TO BE REMOVED)
EXISTING FLOATING DOCK SYSTEM (TO BE REMOVED)
-------------95.7'------------t
I
...
b '
,....
o~~CJ
OPPOSING SHORELINE
·
a:lffic::::>
~ o~ ~I§§
EXISTING CONCRETE SEAWALL (TO BE REMOVED)
26'
(IJ
~ ~~~~
EXISTING CONCRElE WALKWAY
,.,I ·
:I:
UUJll.llll'"Z
··)..'.
I-<
z;: ..
EXISTING RIVER BOTTOM
~i~:~)§~it?1;;~;-t22~;tl~~D~mrt1l~-:~'~;fa.J~~~'.r:;~:1@!S0~::\:;·:~~~*l~~fi(t
TYPICAL SECTION A-A (PROPOSED)
SCALE: 1""'20'
PROPOSED BUILDING
" - V'l
PROPOSED CONCRETE PANEL SEAWALL
PROPOSED~
OPPOSING SHORELINE
MARGINAL DOCK
PROPOSED FINGER PIER
-----------107.7'-----------
141 - i - - - - 1 . . - - - . . . . l - - - - - - - - - - - - - . - - - - - - - - - - = = - - - - - - - 1
EXISTING RIVER BOTTOM
b
l-15'
...
;t;~!,::,;:;~~i)J);{:i:>~:;;~:z~t~::>:\";S~{~~;~;::{:'~.~;:::;~\\:y~:;:s;~~~;:::{;;~:?~i~;{i~;iiW~
NOTE:
1. ELEVATIONS IN REFERENCE TO NGVD29 DATUM (NGVD29 =NAVD88 + 1.59').
cu~
+-'~
ttJ~
==~~
cu
~
\JI
~
til
(IJIO
-c ~~-i~
UJ ~~aa
0
~ 11UB
:NN
'°1- ....
~UHi.ii.
cg
II.
0
U)
8"lc2" STEEL TUBE
3· DIA. X .250 WALL
UPPER HANDRAIL
GROOVED TIMBER DECKING
1S- MAXIMUM JOIST SPACING
1 114· SCH-40 PIPE
LOWER HANDRAIL
WITH RAIL RETURN
SEAWALL ABUTMENT
fiiw
UJ
.....
:I:
Ill
::I
(I')
;~ ~~~
~~~
~1=>9,...
1/4"X3"FLAT
INTERMEDIATE RAIL
~ ~ ~i§§
0
o~~CJ
< o
UUJU..llll'"Z
··)..'.
I-<
z;: ..
0
2'" SCH. 40 DIAGONAL
RAILING POST
2"x8" TIMBER JOINTS
8"lc2"xi\" STEEL TUBE
C8x11.5 STEEL CHANNEL
12" TIMBER OR STEELPILE
114" FLAT
CURB I EDGE PROTECTION
1" GAP ABOVE DECK
2" X 12" TIMBER
SKIRT BOARD
(MATCH DECKING)
-w .. z··~
~!<~5~~
~3:uuoo
~-+--60"
I· I
4· CHANNEL X 2.16 LBS/FT
3· SQ. TUBE X .250 WALL
WITH CAPPED ENDS
NOTE:
CONTRACTOR RESPONSIBLE FOR COMPLIANCE WITH 2010 ADA
STANDARDS NOT WITHSTANDING ANYTHING HEREIN.
0
0
GANGWAY PLATFORM DETAIL
GANGWAY SECTION
PROPOSED ARTICULATING
ACCESS STAIRCASE (3' WIDE)
PROPOSED CONCRETE
PANEL SEAWALL
" - V'l
cu~
+-'~
ttJ~
==~~
cu
~
0
\JI
DOCK STAIR ELEVATION
ICALE:tl&._t'f"
F1.E PATM
~
til
UJio
-c ~~-i~
UJ ~~aa
0
~ 11UB
:NN
'°1- ....
~UHi.ii.
cg
II.
0
co
fiiw
UJ
...I
ii
Ill
::I
;~ ~~~
~~~
~1::::>9,.._
0
~ 0~ O~"'Cl
~i§§
o<
I-<
z;: ..
PROPOSED SEAWAU.
GALVANIZED STEEL H-BEAM GUIDE PILE
MOORING CLEAT
(TYP)
'----WIDTH VARIES
WIDTH VARIES
·
_j_
...-~~~~~~~&·~~~~~~~--.
MOORING CLEAT
(TYP)
PILE GUIDE BRACKET
TIMBER OR
PANEL DECKING
TIMBER OR
PANEL DECKING
STANDARD FENDER
(TYP)
owu..111f:;:z
··)..'.
STANDARD FENDEI
(TYP)
ALUMINUM FRAME
ALUMINUM FRAME (TYP)
(TYP)
~WATER
LINE
0
TYPCIAL FINGER PIER SECTION
0
T"..~~~ MARGINAL DOCK SECTION
__
" - V'l
cu~
+-'~
ttJ~
==~~
cu
~
\JI
~
til
UJio
-c ~~-i~
UJ ~~aa
0
~ 11UB
:NN
'°1- ....
~UHi.ii..