Broward County. Madison Ft. Lauderdale LLC. Greenwood Village, Colorado. PROJECT PURPOSE: Basic: The basic project purpose is to improve the navigation of an existing marina. Overall: The overall project purpose is to improve the navigation of an existing marina in the Seminole River, Ft. Lauderdale, Broward County Florida.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:

APPLICANT: Madison Ft. Lauderdale LLC. Attn: David Behnke (Officer) 5619 DTC PKWY #800 Greenwood Village, CO. 80111

WATERWAY AND LOCATION: The project would affect waters of the United States associated with the Intracoastal Waterway. The project site is located within the Seminole River (manmade canal) adjacent to 1335 SE 16th Street, Section 14, Township 50 South, Range 42 East, Ft. Lauderdale Broward County, Florida.

APPROXIMATE CENTRAL COORDINATES: Latitude 26.1023° Longitude -80.1293°

PROJECT PURPOSE: Basic: The basic project purpose is to improve the navigation of an existing marina. Overall: The overall project purpose is to improve the navigation of an existing marina in the Seminole River, Ft. Lauderdale, Broward County Florida.

EXISTING CONDITIONS: The property contains approximately 835 linear feet of a concrete seawall along the shoreline and 5,127 square feet of finger piers and marginal docks. A seagrass survey was conducted in April 2017. The benthic community of the project site consisted of silt, detritus, and debris. Depth of the survey area varied from 4-feet to 14-feet with depth increasing with the distance towards the center of the canal and toward the easternmost slips. One species of seagrass, Halophila decipiens, was observed within the survey area. The seagrass was observed within two patches (64 SF and 15 SF), within the central portion of the survey area, beginning outside of the existing finger piers and extending towards the center of the canal.

PROPOSED WORK: The applicant seeks authorization to conduct the following activities for the reconfiguration of an existing commercial marina from 21 to 23 wet slips: Excavate 2,800 SF of upland (1,350 CY) to a depth of -8.0 NGVD for a lift well; Removal of 5,127 SF of existing docks; Install a 3-foot by 82-foot access walkway; Install a 42 SF platform that connects to the 35-foot gangway; Install a 6-foot floating aluminum marginal floating dock with 14 finger piers of various widths and lengths (3,525 SF); Repair and replace 360 linear feet of seawall no more than 12-inches from the wet face of the existing seawall; Install 180 linear feet of new seawall in the proposed lift well area.

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The applicant has agreed to install turbidity curtains during all in-water work. The applicant agrees to abide by the Sea Turtle and Smalltooth Sawfish Construction Conditions and the Standard Manatee Conditions. The project avoids impacts to the two patches (64 SF and 15 SF), by locating the proposed structures landward of the seagrass.

COMPENSATORY MITIGATION –The applicant has provided the following explanation why compensatory mitigation should not be required: The applicant has provided the following explanation why compensatory mitigation should not be required: No impacts to submerged aquatic vegetation is proposed or anticipated therefore no compensatory mitigation should be required.

CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.

Endangered Species: The Corps has determined the proposal may affect but is not likely to adversely affect the West Indian Manatee or its designated critical habitat. The Corps evaluated potential project related effects to the manatee by using The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, (Key) dated April 2013. Using the Key, A>B>C>G> H>I>J>K resulted in a “May Affect” determination (project has not been reviewed by FWC to be found consistent with the County’s State approved manatee projection plan.

The Corps has determined the proposed project may affect, but is not likely to adversely affect the threatened and endangered swimming sea turtles; loggerhead (Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea), hawksbill (Eretmochelys imbricata), and Kemp's Ridley (Lepidochelys kempii), and the threatened smalltooth sawfish (Pristis pectinata), and would not adversely modify their designated critical habitat. The Corps will request National Marine Fisheries Service concurrence with these determinations pursuant to Section 7 of the Endangered Species Act by separate letter.

Essential Fish Habitat (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would shade approximately 4,173 square feet of un-vegetated habitat utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the South Atlantic Region. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Ms. Linda C. Knoeck Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410, within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410; by electronic mail at Linda.C.Knoeck@usace.army.mil; or by telephone at (561) 472-3531.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 4400 PGA BOULEVARD, SUITE 500 PALM BEACH GARDENS, FL 33410

January 22, 2018

REPLY TO ATTENTION OF

Regulatory Division South Branch Palm Beach Gardens Permits Section

PUBLIC NOTICE Permit Application No. SAJ-2017-02330(SP-LCK) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below: APPLICANT: Madison Ft. Lauderdale LLC. Attn: David Behnke (Officer) 5619 DTC PKWY #800 Greenwood Village, CO. 80111 WATERWAY AND LOCATION: The project would affect waters of the United States associated with the Intracoastal Waterway. The project site is located within the Seminole River (manmade canal) adjacent to 1335 SE 16th Street, Section 14, Township 50 South, Range 42 East, Ft. Lauderdale Broward County, Florida. Directions to the site are as follows: APPROXIMATE CENTRAL COORDINATES: Latitude 26.1023° Longitude -80.1293° PROJECT PURPOSE: Basic: The basic project purpose is to improve the navigation of an existing marina. Overall: The overall project purpose is to improve the navigation of an existing marina in the Seminole River, Ft. Lauderdale, Broward County Florida. EXISTING CONDITIONS: The property contains approximately 835 linear feet of a concrete seawall along the shoreline and 5,127 square feet of finger piers and marginal docks. A seagrass survey was conducted in April 2017. The benthic community of the project site consisted of silt, detritus, and debris. Depth of the survey area varied from 4feet to 14-feet with depth increasing with the distance towards the center of the canal and toward the easternmost slips. One species of seagrass, Halophila decipiens, was observed within the survey area. The seagrass was observed within two patches (64 SF

and 15 SF), within the central portion of the survey area, beginning outside of the existing finger piers and extending towards the center of the canal. PROPOSED WORK: The applicant seeks authorization to conduct the following activities for the reconfiguration of an existing commercial marina from 21 to 23 wet slips: 1. 2. 3. 4. 5.

Excavate 2,800 SF of upland (1,350 CY) to a depth of -8.0 NGVD for a lift well; Removal of 5,127 SF of existing docks; Install a 3-foot by 82-foot access walkway; Install a 42 SF platform that connects to the 35-foot gangway; Install a 6-foot floating aluminum marginal floating dock with 14 finger piers of various widths and lengths (3,525 SF); 6. Repair and replace 360 linear feet of seawall no more than 12-inches from the wet face of the existing seawall; 7. Install 180 linear feet of new seawall in the proposed lift well area.

AVOIDANCE AND MINIMIZATION INFORMATION ­ The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The applicant has agreed to install turbidity curtains during all inwater work. The applicant agrees to abide by the Sea Turtle and Smalltooth Sawfish Construction Conditions and the Standard Manatee Conditions. The project avoids impacts to the two patches (64 SF and 15 SF), by locating the proposed structures landward of the seagrass. COMPENSATORY MITIGATION ­The applicant has provided the following explanation why compensatory mitigation should not be required: The applicant has provided the following explanation why compensatory mitigation should not be required: No impacts to submerged aquatic vegetation is proposed or anticipated therefore no compensatory mitigation should be required. CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area. ENDANGERED SPECIES: The Corps has determined the proposal may affect but is not likely to adversely affect the West Indian Manatee or its designated critical habitat. The Corps evaluated potential project related effects to the manatee by using The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, (Key) dated April 2013. Using the Key, A>B>C>G> H>I>J>K resulted in a "May Affect" determination (project has not been reviewed by FWC to be found consistent with the County's State approved manatee projection plan.

2

The Corps has determined the proposed project may affect, but is not likely to adversely affect the threatened and endangered swimming sea turtles; loggerhead (Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea), hawksbill (Eretmochelys imbricata), and Kemp's Ridley (Lepidochelys kempii), and the threatened smalltooth sawfish (Pristis pectinata), and would not adversely modify their designated critical habitat. The Corps will request National Marine Fisheries Service concurrence with these determinations pursuant to Section 7 of the Endangered Species Act by separate letter. ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would shade approximately 4,173 square feet of un-vegetated habitat utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the South Atlantic Region. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Ms. Linda C. Knoeck Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410, within 21 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410; by electronic mail at Linda.C.Knoeck@usace.army.mil; or by telephone at (561) 472-3531. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and 3

concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

4

ALABAMA

GEORGIA

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

-------------------------------~~~----------------------------- ------------------------------------------------------------------------------------------------------------------- GULF OF MEXlco----------------------------------------------------------~---------.----------------------------------------------------------------------------------~----------------------------------------------------------------------------------------------------------------------------------------~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

~-~---~~------~~------~-------~-~~~-

~~----~-~~----~-~----~----------~--

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

·

~~------~-------~~-------~-------~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

--~-------~-------~--~-------~---- -~------~----~-----------~--------~

FLORIDA

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

~ ~\~~~============ PROJECT LOCATION 8E 17TM STREET

Edge':Ys~1~f 518 BROAD STREFJ.i.SUITE 200 ST. JOSEPl:'.i. Ml 4wog

P: 289 932 4002 F: 289 932 3542

LOCATION APPLICANT: WATERWAY: CITY: COUNTY: DATE:

CORDOVA BOAT a.ue STRANAHAN RIVER FORT LAUDERDALE BROWARD

DATIJM:

NGVD29

713112017 SHEET:

1 OF 6

cg

NOTES 1. DIMENSIONS BASED ON 2012 BOUNDARY SURVEY BY OTHERS. 2. WATER LEVEL RANGE VARIES FROM --0.7 FT. TO 3.2 FT.

N

E9

II.

0

"' fiiw

.c,

SCALE: 1"=70'

:I:

Ill

0

0

36

(I')

3a:

~ ~~~

70 ~

~ ';Jia:.I~

1

'

i ~I§§

mo

~

o~~CJ

OUJU..llll'"Z

...

~

..."" C"'I

· EXISTING FINGER PIERS (5,004 SF)

·

(TO BE REMOVED)

SEMINOLE RNER

....

I-< z;: ..

\'l

~~~5~~ ~3:0000

ti

5'

--11--

1

EXISTING FIXED DOCK (1,064 SF) (TO BE REMOVED)

··)..'.

<$

O!

~

~

EXISTING SEAWALL (TO BE REMOVED)

CONCRETE WALKWAY EXISTING PARKING LOT

I I I ~ I I I I

EXISTING CONCRETE PLATFORM (1,657 SF) (TO BE REMOVED)

.c, EXISTING BUILDINGS (TO BE REMOVED) " - V'l

PROPERTY LINES

cu~ +-'~

ttJ~

==~~

cu

~

---------------------J SE 16TH STREET

\JI

~ til UJIO

-c ~~-i~

UJ ~~aa 0

~ 11UB

:NN '°1- .... ~UHi.ii.

cg

II.

0

.., SEMINOLE RIVER

\

~

l-------+--------------390'

I

PROPOSED FLOATING LIFT

fiiw

~ 3a:~

:I: (I')

ig i-~o~i!§

·1

....

ti

~

a:lffi

~I ~h§ ~ li:~ ... 0

..:;..:

l...,

...,,

.EP LF) PROPOSED ACCESS STAIRWAY (TYP.) PROPOSED 3' x 82' PIER (246 SF)

Cl

~ OUJ~lll~Z

PROPOSED ALUMINUM FRAMED FLOATING DOCK (1700 SF)

I-< z;: ..

~!<~5~~ ~3:0000

1 PROPOSED LIFT WELL SEAWALL (1 BO LF) PROPOSED LIFT WELL EXCAVATION (TO -8.01 (1350 CY)

l I

I " - V'l

EIJT

7 ____ _

~~~~~---------

-:-~:

SE 16TH STREET N

E9 25

ttJ~

==~~

cu

~

SCALE: 1"=50'

0

cu~ +-'~

50

NOTES 1. DIMENSIONS BASED ON 2012 BOUNDARY SURVEY BY OTHERS. 2. ELEVATIONS IN REFERENCE TO NGVD29 DATUM (NGVD29 = NAVD88 + 1.59j. 3. WATER LEVEL RANGE VARIES FROM -0.7 FT. TO 3.2 FT. 4. TOTAL DOCK AREA OVER WATER= 3,813 SF.

\JI

~ til UJIO

-c ~~-i~

UJ ~~aa 0

~ 11UB

:NN '°1- .... ~UHi.ii.

cg

II.

0

EXISTING BUILDING

TYPICAL SECTION A-A {EXISTING)

"""

fiiw

SCALE: 1"=20'

z

~ -'a:~

__. lH ~

'.'(

(IJ

EXISTING CONCRETE PLATFORM (TO BE REMOVED)

EXISTING FLOATING DOCK SYSTEM (TO BE REMOVED)

-------------95.7'------------t

I

...

b '

,....

o~~CJ

OPPOSING SHORELINE

·

a:lffic::::>

~ o~ ~I§§

EXISTING CONCRETE SEAWALL (TO BE REMOVED)

26'

(IJ

~ ~~~~

EXISTING CONCRElE WALKWAY

,.,I ·

:I:

UUJll.llll'"Z

··)..'.

I-< z;: ..

EXISTING RIVER BOTTOM

~i~:~)§~it?1;;~;-t22~;tl~~D~mrt1l~-:~'~;fa.J~~~'.r:;~:1@!S0~::\:;·:~~~*l~~fi(t TYPICAL SECTION A-A (PROPOSED) SCALE: 1""'20'

PROPOSED BUILDING

" - V'l

PROPOSED CONCRETE PANEL SEAWALL PROPOSED~

OPPOSING SHORELINE

MARGINAL DOCK

PROPOSED FINGER PIER

-----------107.7'-----------

141 - i - - - - 1 . . - - - . . . . l - - - - - - - - - - - - - . - - - - - - - - - - = = - - - - - - - 1 EXISTING RIVER BOTTOM b l-15'

...

;t;~!,::,;:;~~i)J);{:i:>~:;;~:z~t~::>:\";S~{~~;~;::{:'~.~;:::;~\\:y~:;:s;~~~;:::{;;~:?~i~;{i~;iiW~

NOTE: 1. ELEVATIONS IN REFERENCE TO NGVD29 DATUM (NGVD29 =NAVD88 + 1.59').

cu~ +-'~

ttJ~

==~~

cu

~

\JI

~ til

(IJIO

-c ~~-i~

UJ ~~aa 0

~ 11UB

:NN '°1- .... ~UHi.ii.

cg

II.

0

U)

8"lc2" STEEL TUBE

3· DIA. X .250 WALL UPPER HANDRAIL

GROOVED TIMBER DECKING 1S- MAXIMUM JOIST SPACING

1 114· SCH-40 PIPE LOWER HANDRAIL WITH RAIL RETURN SEAWALL ABUTMENT

fiiw

UJ

.....

:I:

Ill ::I

(I')

;~ ~~~ ~~~ ~1=>9,...

1/4"X3"FLAT INTERMEDIATE RAIL

~ ~ ~i§§

0

o~~CJ < o UUJU..llll'"Z ··)..'. I-< z;: ..

0

2'" SCH. 40 DIAGONAL RAILING POST 2"x8" TIMBER JOINTS

8"lc2"xi\" STEEL TUBE C8x11.5 STEEL CHANNEL 12" TIMBER OR STEELPILE

114" FLAT CURB I EDGE PROTECTION 1" GAP ABOVE DECK 2" X 12" TIMBER SKIRT BOARD (MATCH DECKING)

-w .. z··~

~!<~5~~ ~3:uuoo

~-+--60"

I· I

4· CHANNEL X 2.16 LBS/FT

3· SQ. TUBE X .250 WALL

WITH CAPPED ENDS NOTE: CONTRACTOR RESPONSIBLE FOR COMPLIANCE WITH 2010 ADA STANDARDS NOT WITHSTANDING ANYTHING HEREIN.

0

0

GANGWAY PLATFORM DETAIL

GANGWAY SECTION

PROPOSED ARTICULATING ACCESS STAIRCASE (3' WIDE) PROPOSED CONCRETE PANEL SEAWALL

" - V'l

cu~ +-'~

ttJ~

==~~

cu

~

0

\JI

DOCK STAIR ELEVATION ICALE:tl&._t'f"

F1.E PATM

~ til

UJio

-c ~~-i~

UJ ~~aa 0

~ 11UB

:NN '°1- .... ~UHi.ii.

cg

II.

0

co

fiiw

UJ ...I

ii

Ill ::I

;~ ~~~ ~~~ ~1::::>9,.._ 0

~ 0~ O~"'Cl ~i§§

o<

I-< z;: ..

PROPOSED SEAWAU.

GALVANIZED STEEL H-BEAM GUIDE PILE

MOORING CLEAT (TYP)

'----WIDTH VARIES WIDTH VARIES

·

_j_

...-~~~~~~~&·~~~~~~~--.

MOORING CLEAT (TYP)

PILE GUIDE BRACKET TIMBER OR PANEL DECKING

TIMBER OR PANEL DECKING

STANDARD FENDER (TYP)

owu..111f:;:z ··)..'.

STANDARD FENDEI (TYP) ALUMINUM FRAME

ALUMINUM FRAME (TYP)

(TYP)

~WATER LINE

0

TYPCIAL FINGER PIER SECTION

0

T"..~~~ MARGINAL DOCK SECTION

__

" - V'l

cu~ +-'~

ttJ~

==~~

cu

~

\JI

~ til

UJio

-c ~~-i~

UJ ~~aa 0

~ 11UB

:NN '°1- .... ~UHi.ii..

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas