Monroe County. Snake Creek Marina of Islamorada, LLC. Islamorada, Florida. PROJECT PURPOSE: Basic: To improve recreational access. Overall: To improve recreational access in Islamorada, Florida.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:

APPLICANT: Snake Creek Marina of Islamorada, LLC C/o Janeth Brody 85401 Overseas Highway Islamorada, Florida 33036

WATERWAY AND LOCATION: The project would affect waters of the United States associated with Atlantic Ocean. The project site is located in Snake Creek Marina at 85401 Overseas Highway adjacent to a canal tributary to the Atlantic Ocean; legally described as Windley Island PB 1-50 Pt Gov Lt 1 (AKA Pt Swamp Lot) and Adj Bay Btm in Section 23, Township 63 South, Range 37 East, Islamorada, Monroe County, Florida. (RE#00093840-000000)

Directions to the site are as follows: US Highway No 1 South to MM85; Project located at Snake Creek Marina at 85401 Overseas Highway.

APPROXIMATE CENTRAL COORDINATES: Latitude: 25.31444º Longitude: -80.27895º

PROJECT PURPOSE: Basic: To improve recreational access. Overall: To improve recreational access in Islamorada, Florida.

EXISTING CONDITIONS: The wetland system consists of a saltwater system. The project site supports a commercial facility adjacent to a canal tributary to the Atlantic Ocean to the north and the Atlantic Ocean to the east and south. The property supports an existing dry stack marina built around 2010 and a wet slip marina. According to the benthic survey conducted on March 25, 2017, the submerged bottom is comprised primarily of muck, gravel, and macroalgae. No mangroves, seagrass or corals are located within the project footprint. A small patch of Thallasia testudinum is located directly outside the project footprint. A large wetland area surrounds the property along the east and south of the development. No impacts to the wetland area is proposed.

PROPOSED WORK: The applicant seeks authorization to remove 9 pilings, piers and floating dock, to abandon an existing boat ramp by placing two bollards or fence to prevent access for launching motorized vessels, to construct nine pile-support piers measuring 4 feet wide totaling 861 square feet, to install 24 new mooring piles, to remove an existing 240 square foot floating pier and replace within the same footprint supported with 6 guide posts and to install another 240 square foot floating pier supported with 6 guide posts for loading and unloading vessels from the existing dry stack facility, to install a 176 square foot floating pier supported with 6 guide posts for fueling, to maintenance dredge 250 cubic yards of submerged bottom within a 7,175 square foot area to minus -5 mean low water by clam shell or similar equipment within the boat basin, to install temporary floating turbidity barriers around all work areas that are in/over U.S. navigable waters and to avoid 154,335 square feet of wetlands in perpetuity. Dewatering area located on uplands onsite and clean fill to be used on upland sites and debris to be transported to landfill. The marina project will accommodate a total of 25 wet slips and 122 dry slips at the existing dry stack facility.

COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: If it is determined that the issuance of a DA permit is appropriate, mitigation will be required. The applicant has indicated that the mitigation proposal will be based on the Keys Restoration Fund (KRF). Time lag and risk will be a required component of any mitigation requirement.

CULTURAL RESOURCES: The Corps has determined the activity within the permit area is of such limited scope there is little likelihood of impact upon a historic property; therefore, the proposed project would have “No Potential to Cause Effect”.

ENDANGERED SPECIES: The U.S. Army Corps of Engineers (Corps) has determined the project may affect, but is not likely to adversely affect (“MANLAA”) the West Indian manatee (Trichechus manatus) or its designated critical habitat. Since the proposal by the applicant is for in-water construction, potential impacts to the endangered manatee were evaluated using The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida (Manatee Key), dated April 2013. Use of the Manatee Key resulted in the following sequential determination: A > B > C > G > H > I > J > L > M2 > “may affect.” However, the agent has proposed additional manatee measures to minimize impacts to the manatee. As such, the Corps will request initiation of informal consultation with the Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act by separate letter.

The Corps has determined the proposed project may affect, but is not likely to adversely affect (“MANLAA”) the swimming green sea turtles (Chelonia mydas), loggerhead sea turtles (Caretta caretta), hawksbill sea turtles (Eretmochelys imbricata), kemps ridley sea turtles (Lepidochelys kempii), leatherback sea turtles (Dermochelys coriacea), the smalltooth sawfish (Pristis pectinata) and Acropora sp. critical habitat. The Corps has reached a no effect determination on Acropora sp. and corals species; (Dendrogyra cylindrus, Orbicella annularis, Orbicella faveolata, Orbicella franksi, Mycetophyllia ferox). The Corps will request National Marine Fisheries Service’s concurrence with this determination pursuant to Section 7 of the Endangered Species Act.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 8,000 square feet of submerged bottom utilized by various life stages of marine life. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Florida Keys. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Miami Permits Section, 9900 SW 107th Avenue, Suite 203, Miami, Florida 33176 within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Maria Bezanilla, in writing at the Miami Permits Section, 9900 SW 107th Avenue, Suite 203, Miami, Florida 33176, by electronic mail at Maria.I.Bezanilla@usace.army.mil, by fax at (305) 526-7184, or by telephone at (305) 779-6057.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 9900 SOUTHWEST 107TH AVENUE, SUITE 203 MIAMI, FLORIDA 33176 REPLY TO ATTENTION OF

January 23, 2018

Regulatory Division South Permits Branch Miami Permits Section

PUBLIC NOTICE Permit Application Number SAJ-2003-07906 (SP-MIB) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below: APPLICANT: Snake Creek Marina of Islamorada, LLC C/o Janeth Brody 85401 Overseas Highway Islamorada, Florida 33036 WATERWAY AND LOCATION: The project would affect waters of the United States associated with Atlantic Ocean. The project site is located in Snake Creek Marina at 85401 Overseas Highway adjacent to a canal tributary to the Atlantic Ocean; legally described as Windley Island PB 1-50 Pt Gov Lt 1 (AKA Pt Swamp Lot) and Adj Bay Btm in Section 23, Township 63 South, Range 37 East, Islamorada, Monroe County, Florida. (RE#00093840-000000) Directions to the site are as follows: US Highway No 1 South to MM85; Project located at Snake Creek Marina at 85401 Overseas Highway. APPROXIMATE CENTRAL COORDINATES: Latitude 25.31444 Longitude -80.27895 PROJECT PURPOSE: Basic: To improve recreational access. Overall: To improve recreational access in Islamorada, Florida. EXISTING CONDITIONS: The wetland system consists of a saltwater system. The project site supports a commercial facility adjacent to a canal tributary to the Atlantic Ocean to the north and the Atlantic Ocean to the east and south. The property supports an existing dry stack marina built around 2010 and a wet slip marina. According to the benthic survey conducted on March 25, 2017, the submerged bottom is comprised primarily of muck, gravel, and macroalgae. No mangroves, seagrass or corals are located within the project footprint. A small patch of Thallasia testudinum is located

directly outside the project footprint. A large wetland area surrounds the property along the east and south of the development. No impacts to the wetland area is proposed. PROPOSED WORK: The applicant seeks authorization to remove 9 pilings, piers and floating dock, to abandon an existing boat ramp by placing two bollards or fence to prevent access for launching motorized vessels, to construct nine pile-support piers measuring 4 feet wide totaling 861 square feet, to install 24 new mooring piles, to remove an existing 240 square foot floating pier and replace within the same footprint supported with 6 guide posts and to install another 240 square foot floating pier supported with 6 guide posts for loading and unloading vessels from the existing dry stack facility, to install a 176 square foot floating pier supported with 6 guide posts for fueling, to maintenance dredge 250 cubic yards of submerged bottom within a 7,175 square foot area to minus -5 mean low water by clam shell or similar equipment within the boat basin, to install temporary floating turbidity barriers around all work areas that are in/over U.S. navigable waters and to avoid 154,335 square feet of wetlands in perpetuity. Dewatering area located on uplands onsite and clean fill to be used on upland sites and debris to be transported to landfill. The marina project will accommodate a total of 25 wet slips and 122 dry slips at the existing dry stack facility. COMPENSATORY MITIGATION ­ The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: If it is determined that the issuance of a DA permit is appropriate, mitigation will be required. The applicant has indicated that the mitigation proposal will be based on the Keys Restoration Fund (KRF). Time lag and risk will be a required component of any mitigation requirement. CULTURAL RESOURCES: The Corps has determined the activity within the permit area is of such limited scope there is little likelihood of impact upon a historic property; therefore, the proposed project would have "No Potential to Cause Effect". ENDANGERED SPECIES: The U.S. Army Corps of Engineers (Corps) has determined the project may affect, but is not likely to adversely affect ("MANLAA") the West Indian manatee (Trichechus manatus) or its designated critical habitat. Since the proposal by the applicant is for inwater construction, potential impacts to the endangered manatee were evaluated using The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida (Manatee Key), dated April 2013. Use of the Manatee Key resulted in the following sequential determination: A > B > C > G > H > I > J > L > M2 > "may affect." However, the agent has proposed additional manatee measures to minimize impacts to the manatee. As such, the Corps will request initiation of informal consultation with the Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act by separate letter. The Corps has determined the proposed project may affect, but is not likely to adversely affect ("MANLAA") the swimming green sea turtles (Chelonia mydas), 2

loggerhead sea turtles (Caretta caretta), hawksbill sea turtles (Eretmochelys imbricata), kemps ridley sea turtles (Lepidochelys kempii), leatherback sea turtles (Dermochelys coriacea), the smalltooth sawfish (Pristis pectinata) and Acropora sp. critical habitat. The Corps has reached a no effect determination on Acropora sp. and corals species; (Dendrogyra cylindrus, Orbicella annularis, Orbicella faveolata, Orbicella franksi, Mycetophyllia ferox). The Corps will request National Marine Fisheries Service's concurrence with this determination pursuant to Section 7 of the Endangered Species Act. ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 8,000 square feet of submerged bottom utilized by various life stages of marine life. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Florida Keys. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Miami Permits Section, 9900 SW 107th Avenue, Suite 203, Miami, Florida 33176 within 21 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Maria Bezanilla, in writing at the Miami Permits Section, 9900 SW 107th Avenue, Suite 203, Miami, Florida 33176, by electronic mail at Maria.I.Bezanilla@usace.army.mil, by fax at (305) 526-7184, or by telephone at (305) 779-6057. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is 3

instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

4

PROJECT LOCATION REI 00093840-000000 PART OF GOVERNMENT LOT 1 (AKA PART SWAMP LOT) ct ADJACENT BAYBOTTOM WINDLEY ISLAND PLAT BOOK 1 PG SO SECTION 23, TOWNSHIP 63 SOUTH, RANGE 37 EAST LATITUDE: 24.9506g9N LONGITUDE: 80.59025.W

Cotto11 Kt>y

Wlndlt!Y Key

Q!RECJ!ONS: U.S. HIGHWAY NO. 1 NORTH TO MM 85:1:. PROJECT SITE: 85401 OLD HIGHWAY Upper

AQJO!N!NG OWNERS CASTAWAYS OF FLORIDA LLC P.O. BOX 101494 FORT LAUDERDALE. FL 33310-1494

Mateeumb" Key

'

'*".tt

KEYS INVESTMENTS LLC 85501 OVERSEAS HIGHWAY ISLAMORADA, FL 33036

.5'.fi

,...,.__r::f _ _ _ _ _ _ _ _ _ _ _ ___

w~·nal~y

f

Gt!ologi col

W1 ndJey K-ey,

1 SHEETt OF' 7

·

·

:EM~

(4) PILINGS

·

lil!I

~:!~ ,~~·@ ...!=I~

"' ~

....

5

I\)

I ~

GLEN BOE AND ASSOCIATES, INC.# 4061 5800 OVERSEAS HIGHWAY. SUITE 4. MARATHON · FL 33050

Talophono (305) 7~121 Email: glenbollQbelllolllh.not

DOCKING FACILITY IMPROVEMENTS FOR SNAKE CREEK MARINA OF ISLAMORADA LLC WINDLEY KEY, MONROE COUNTY, FL

12./17/17

CERTIFIED BY:

SEAN KIRWAN, P.E.11675011

~EX.

a'

MOORING PILES TO BE REMOVED

BOAT BASIN FLOATING 5 PWC DOCK TO BE REMOVED

0

EXISTING PIERS (lYP.) TO BE REMOVED

0

;:INDICATES BOAT SUP COUNT 0

7

EXISTING LAYOUT SCALE: 1"

=

8 ~9 10!§l11

12113

14

0

1

16

0

17

18

EXISTING

WOOD DECKING OVER EXISTING CONCRETE DOCK

EXISTING FLOATING PIER TO BE REMOVED & REPLACED W/ NEW. (ENGINEERING BY MANUFACTURER) (IN FOOTPRINT)

22

21

CONCRETE DOCK

23

APPROX. MHWL ON CONCRETE SEAWALL

(122 EXISTING UPLAND DRY SLIPS)

50'

25

24

26

EXISTING BOAT RAMP TO BE REMOVED FROM SERVICE. INSTALL TWO BOLLARDS OR FENCE TO PREVENT ACCESS FOR LAUNCHING MOTORIZED VESSELS

.liQIES;.

PROPOSED MOORING PILES (24)

1.

SHADING INDICATES PROPOSED MAINTENANCE DREDGING 7,175±SF, 250±CY (PERFORMED WITH CLAMSHELL OR SIMILAR EQUIPMENT)

BOAT BASIN

-5'/MLW WATER DEPTH CONTOUR

EX. 8'x.30' FLOATING PIER TO BE REMOVED & REPLACED W/ NEW. (ENGINEERING BY MANUFACTURER) (6 PILES) 240± SF (IN FOOTPRINT)

2.

PROPOSED 8'x.30' FLOATING PIER (ENGINEERING BY MANUFACTURER) (6 PILES) 240± SF .3.

ROPOSED PIERS (NINE-4' WIDE PIERS 861±SF)

4.

24

PROPOSED LAYOUT SCALE: 1"

!ii ....

50'

EXISTING CONCRETE DOCK·

APPROX. MHWL ON CONCRETE SEAWALL

(122 EXISTING UPLAND DRY SLIPS)

25

EXISTING BOAT RAMP TO BE REMOVED FROM SERVICE. INSTALL TWO BOLLARDS OR FENCE TO PREVENT ACCESS FOR LAUNCHING MOTORIZED VESSELS REVISIONS:

!2

a"'

=

WOOD DECKING OVER EX. CONCRETE DOCK

PROPOSED MANATEE EDUCATIONAL SIGN TO BE INSTALLED WITHIN SITE OF FUEL PUMPS AND EXISTING LAUNCH AREA. ALL VESSEL OWNERS SHALL BE PROVIDED & SIGN SNAKE CREEK MARINA CONTRACT ADDENDUM PRIOR TO HAVING ACCESS TO THE LIFT AND BOAT RACK STORAGE SERVICE . ELEVEN WET SLIPS ARE PROPOSED FOR VESSELS WITH A LENGTH OF LESS THAN 26'. FOURTEEN WET SLIPS ARE PROPOSED FOR VESSELS WITH A LENGTH OF GREATER THAN 26'.

I!

~

(A)

!...

I

GLEN BOE AND ASSOCIATES, INC. #4061 5lllllJ OVERSEAS HIGHWAY, SUITE 4, MARATHON , FL 33050

Telophone (305) 743-11121 Email: glenbaeQball1autll.nat

DOCKING FACILITY IMPROVEMENTS FOR SNAKE CREEK MARINA OF ISLAMORADA LLC WINDLEY KEY, MONROE COUNTY, FL

12/17/17

2 I CERTIFIED BY:

SEAN KIRWAN, P.E. #57506

01/22/18

f - - - , j L - - (RAMP) ----,r

#--9'-2"

WOOD PILE BENT

9'-2"--1

STRINGER

FACE OF DECKING

PLAN VIEW (A) SCALE: 1/8" = 1'-0"

,,____ _ _ _ _ _ _ _ 30'-0" - - - - - - - - ,,_____ (RAMP) - - - ¥ ~- g· -4" ----->f--- g· -4 .. -~r-- g· -4" - - - - - ; f

STRINGER

PILE

FACE OF DECKING

EX. DOCK

PLAN VIEW (B) SCALE: 1/8" = 1'-0"

WOOD PILE BENT

STRINGER

FACE OF DECKING

EX. DOCK

PLAN VIEW (C) SCALE: 1/8" = 1'-0"

~--12' -0" -----,r~--12' -0" - - -

ONCRETE PILE

b

I

Oo

EX. DOCK

FLOATING DOCK (ENGINEERING BY MANUFACTURER) DATeU/Dl/17

PLAN VIEW (30' FLOATING OOCK) SCALE: 1/8" = 1'-0"

4 SHEET-4 OF' 7

r-----

2a·-a· _ _ _ _ __,,

I I ' - - - - - 15'± _ _ _ _.,,.

EXISTING DOCK

- I r DECKING

-

' I/STRINGER

+4.1

-wrP;Jl

/I/

+2.8'

..

.

~.1

--+a.8' MHW - - a.a· MLW

~

~i

BENT

.·.

~-~· ·r· r···i li~im·· · ·~· · · ~·~· · · ~· · · ;· · · ~- · ·~· ·=··r··;;~d,~,!5·:tt~~~:t:~~~A~~~c~~~iic:~gPoSED -·~

SECTION A-A SCALE: 1/8" = 1'-0"

.. ,_________

30'-o" _ _ _ _ _ _ _ _____,,

~----18'±

:. ..

.

-

-

-

_

EXISTING\

VDECKING

1

1, IV-STRINGER

DOCK+~~~-.RB~·\',~,::~

./li

1

+

2

~-- +a.8' MHW a.a' MLW

SHADING INblCATES PRbPOSioI MAINTENANI E DREDGIN·o

'

~?::: 7:. -:-~-:-:-: .. /

\_

BENT

,. 5'

PILE

SECTION B-B SCALE: 1/8" = 1'-a"

r - - - - - 2a·-a· _ _ _ _ __,, ,I<- 5'± --,"

-

-

VDECKING

EXISTING1 DOCK !,_,

/I/STRINGER

~,.,.

/

+2.8'

~

, --+a.8' MHW - - a.a' MLW

,,

i .. / . ~·AINTENI

I r SHADING INDICATES PROP< , D

BENT

NCE DREDGING

"-i'-P1LE

SECTION C-C SCALE: 1/8" = 1 '-a"

,,___ _ _ _ _ _ _ _ 30'-o"

I<-

5'± --, "

-

--------~

-

-

. --+a.8' - - a.a' ~-

ti.

I/

ir-SHADING INDICATE~ ~ROPOSED MAINTENANCE DRE Git-JG

'--FLOATING DOCK (ENGINEERING BY

lf!~~'t~tR;,~5 ·-----H!'Mlllllillillllllillillllllllililldlll!-~~~MA~N:UFACTURER)

DATE:Ol/08/17

"-CONCRETE PILE ~

PLAN VIEW {30' FLOATING OOCK) SCALE: 1/8"

L..

5

= 1'-a" SHEETS OF 7

2"x4"x4' STAKES (TYP.)

~4R

2. EXCAVATE A 4"X4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. FABRIC (F.D.0.T. SEC. 985)

3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH.

4. BACKFILL AND COMPACT THE EXCAVATED SOIL.

F.D.O. T. TYPE Ill FILTER FENCE Cll

8 m

..,0 ....

Ii!

i:!

0)

I :0

REVISIONS:

I GLEN BOE AND ASSOCIATES, INC.# 4061 5800 OVERSEAS HIGHWAY, SUITE 4, MARATHON, F~ 33050 Talaphana (305) 743-11121 Fax (305) 743-9197

Email: glanboe@belloouth.na!

DOCKING FACILITY IMPROVEMENTS FOR SNAKE CREEK MARINA OF ISLAMORADA LLC WINDLEY KEY, MONROE COUNTY, FL

CERTIFIED BY: SEAN KIRWAN, P.E. #67506

CONSTRUCTION NOTES:

1. CONTRACTOR SHALL OBTAIN ALL APPLICABLE PERMITS PRIOR TO COMMENCING WORK. THE REQUIREMENTS OF THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION, THE ARMY CORPS OF ENGINEERS & LOCAL REGULATIONS SHALL GOVERN AUL WORK. 2. WORK SHOWN ON DRAWINGS IS DESIGNED IN ACCORDANCE WITH THE FLORIDA BUILDING CODE (LATEST EDITION). FOULOW ALL APPLICABLE PROVISIONS FOR ALL PHASES OF CONSTRUCTION. 3. THE PROPOSED STRUCTURE(S) IS DESIGNED FOR A LIVE LOAD OF 1OD PSF. WIND LOADS ARE DESIGNED PER THE FLORIDA BUILDING CODE. 4. CONTRACTOR SHALL ADHERE TO THE STANDARD MANATEE CONSTRUCTION CONDITIONS (LATEST EDITION). IF NEEDED, THE CONTRACTOR CAN CONTACT THE ARMY CORPS OF ENGINEERS OR THIS OFFICE TO OBTAIN A COPY OF THE STANDARD MANATEE CONSTRUCTION CONDITIONS. 5. BEST MANAGEMENT PRACTICES, INCLUDING THE USE OF TURBIDITY SCREENS, ARE REQUIRED TO ISOLATE THE CONSTRUCTION AREA FROM THE ADJACENT WATERS. CONTRACTOR SHALL INSTALL TURBIDITY SCREENS AROUND THE IMMEDIATE PROJECT AREA PRIOR TO CONSTRUCTION. THE TURBIDITY SCREENS REMAIN IN PLACE UNTIL WATER QUALITY CONDITIONS RETURN TO PRECONSTRUCTION CONDITIONS. WATER QUALITY MONITORING SHALL ADHERE TO STATE REGULATIONS. 6. ELECTRIC & WATER (DESIGN PROVIDED BY OTHERS UNLESS SHOWN) SHALL BE PROVIDED. CONTRACTOR SHALL COORDINATE FINAL LOCATION OF ALL PROPOSED UTILITIES WITH OWNER PRIOR TO CONSTRUCTION. 7. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & WATER DEPTHS PRIOR TO CONSTRUCTION. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE BROUGHIT TO THE AffiNTION OF THE ENGINEER BEFORE COMMENCING WORK. B. THE STRUCTURAL INTEGRITY OF THE COMPLETED STRUCTURE DEPENDS ON INTERACTION OF VARIOUS CONNECTED COMPONENTS. PROVIDE ADEQUATE BRACING, SHORING, AND OTHER TEMPORARY SUPPORTS AS REQUIRED TO SAFELY COMPLETE THE WORK. 9. EXERCISE EXTREME CARE AND CAUTION WHEN EXCAVATING AND FILLING ADJACENT TO EXISTING STRUCTURES. UNDER NO CIRCUMSTANCES SHALL THE STRUCTURAL INTEGRITY OF THE EXISTING STRUCTURES BE IMPAIRED IN ANY WAY BY CONSTRUCTION OPERATIONS AND PROCEDURES. DO NOT EXCAVATE OR DISTURB SOIL ADJACENT TO OR BENEATH EXISTING FOOTINGS. 1D. CONTRACTOR SHALL COORDINATE INSTALLATION OF CLEATS, LADDERS, PILE CAPS, AND OTHER DOCK ACCESSORIES WITH OWNER PRIOR TO CONSTRUCTION. ALL DOCK ACCESSORIES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. STAINLESS STEEL HARDWARE SHALL BE USED FOR ALL CONNECTIONS TO DOCK .

I

t-+-+--+--t

.Ell.ES;. PILES SHALL BE 12" ROUND ICP PRETENSION SPUN HIGH STRENGTH CONCRETE PILES OR 12"x12" PRESTRESSED CONCRETE PILES W/ FOUR D.6" DIAMETER 27D LOW-RELAXATION STRAND Cl 44 KIPS W/ W3.4 WIRE SPIRAL TIES. MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS SHALL BE 6DDD PSI. CONCRETE SHALL BE FOOT CLASS V SPECIAL. ALL REINFORCING STEEL, EXCEPT SPIRAL TIES, SHALL BE ASTM A615, GRADE 6D. SPIRAL TIES SHALL BE HARD DRAWN BASIC WIRE IN ACCORDANCE WITH ASTM A-82. EACH WRAP OF SPIRAL SHALL BE TIED TO AT LEAST TWO CORNER STRANDS. ALTERNATE STRAND PATTERNS - EIGHT 7 /16" DIAMETER 27D LOW-RELAXATION STRAND @ 23.3 KIPS EIGHT 1/2" DIAMETER 25D STRESS RELIEVED STRAND Cl 24. 1 KIPS TWELVE 3/8" DIAMETER 27D LOW-RELAXATION STRAND @ 17.2 KIPS TWELVE 3/8" DIAMETER 25D STRESS RELIEVED STRAND ii 15.6 KIPS OR ROUND SOUTHERN PINE OR DOUGLAS FlR AND SHALL CONFORM TO ASTM D 25, UNUSED, CLEAN PEELED, UNIFORMLY TAPERED, ONE PIECE FROM BUTT TO TIP. PILES SHALL BE PRESSURE TREATED IN CONFORMANCE WITH AWPA CJ AND C18 FOR MARINE PILES. THE MINIMUM BUTT DIAMETER SHALL BE 12 INCHES, MEASURED AT A SECTION 3 FEET FROM THE END. FOR PILES UP TO 5D FEET IN LENGTH THE MINIMUM TIP DIAMETER SHALL BE 9 INCHES. PILES SHALL BE SET IN PREDRILLED OR PREPUNCHED HOLES AND DRIVEN TO PENETRATE FIRM ROCK

7'

MIN.

PILES SHALL BE SPACED Cl MAXIMUM OF 1D' O.C. UNLESS OTHERWISE SHOWN. DO NOT DRIVE PILES WITHIN 2D FEET OF CONCRETE LESS THAN SEVEN DAYS OLD. RE-DRIVE ANY PILE WHICH IS RAISED DURING DRIVING OF ADJACENT PILES, TO THE ORIGINAL TIP ELEVATION. HEIGHT OF PILES SHALL BE FIELD DETERMINED BY OWNER. CUT OFF PILES AT TOP ELEVATION DIRECTED BY THE OWNER. REPLACE OR REPAIR PILES WHICH ARE DAMAGED WHEN CUT OFF. PILES SHALL DEVIATE FROM PLUMB AND ANGLE OF BATTER NO MORE THAN 14 INCH PER FOOT OF PILE LENGTH, BUT NOT MORE THAN 6 INCHES OVERAUL. PILES SHALL NOT DEVIATE FROM LOCATION OF PILE TOP MORE THAN 6 INCHES. REMOVE CUTOFF SECTIONS OF PILES FROM THE SITE AND LEGALLY DISPOSE. LUMBER DECKING & FASTENERS: ALL BENTS AND STRINGERS SHALL BE SOUTHERN PINE NO. 2 OR DOUGLAS FIR NO. 2. LUMBER SHALL BE PRESSURE TREATED PER AWPA UC4B SPECIFICATIONS. MINIMUM RETENTION OF CCA SHALL BE 0.60 POUNDS/CUBIC FOOT. ALL DECKING SHALL BE SOUTHERN PINE NO. 1 OR DOUGLAS FIR NO. 1 WITH ROUNDED EDGES. LUMBER SHALL BE PRESSURE TREATED. MINIMUM RETENTION OF ACQ SHALL BE 0.40 POUNDS/CUBIC FOOT. STRINGERS: 2x10 BENTS: 3x1D OR DOUBLE 2x1D DECKING: 2x6 (1/2" SPACING) ATTACH DECKING TO EACH STRINGER WITH TWO #10 3" STAINLESS STEEL DECK SCREWS OR TWO 16d STAINLESS STEEL NAILS AT EACH CONNECTION POINT. ATTACH BENTS TO PILING WITH TWO 3/4" STAINLESS STEEL BOLTS, WASHERS, AND NUT AT EACH CONNECTION POINT. BORE HOLES SHALL BE 1/16 INCH GREATER IN DIAMETER THAN THE BOLT. UPON COMPLETION OF THE INSTALLATION, CHECK ALL NUTS FOR TIGHTNESS. ATTACH STRINGER TO BENT WITH STAINLESS STEEL SIMPSON STRONG-TIE HURRICANE STRAP OR APPROVED EQUAL. ALL CONNECTORS SHALL BE HEAVY DUTY TYPE FOR MARINE ENVIRONMENT APPLICATIONS.

DATE:U/oll/17

LAY THE PLANKS WITH THE BEST SIDE UP AND WITH ADJACENT EDGES IN CONTACT UNLESS OTHER SPACING SPECIFIED. PERFORM COUNTERSINKING WHEREVER THE HEADS OF SCREWS OR BOLTS WOULD OTHERWISE INTERFERE WITH THE ASSEMBLY OF THE WORK.

7 SHEET7 OF 7

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas