Broward County. Fort Lauderdale Marina Partners, LLC. Charleston, South Carolina. PROJECT PURPOSE: Basic: The basic project purpose is to improve navigation to an existing multi-family residence. Overall: The basic project purpose is to improve navigation to an existing multi-family residence in Hillsboro Beach, Broward County Florida.

TO WHOM IT MAY CONCERN: This district has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:

APPLICANT: Fort Lauderdale Marina Partners, LLC Attn: Joe Miller 33 Lockwood Drive, Charleston, SC, 29401

WATERWAY AND LOCATION: The project would affect waters of the United States associated with dredging of tidally influenced water. The project site is located in the South Fork of the New River adjacent to 1915 SW 21st Avenue, Ft. Lauderdale (Section 17, Township 50 South, Range 42 East), Broward County, Florida.

Directions to the site are as follows: Take I-95 South toward Ft. Lauderdale and exit onto Davie Blvd West. Turn right onto SW 21st Ave. and keep left, following the road all the way south and the marina will be at the end of the road.

APPROXIMATE CENTRAL COORDINATES: Latitude 26.097641° Longitude -80.170165°

PROJECT PURPOSE: Basic: The basic project purpose is to improve navigation to an existing multi-family residence. Overall: The basic project purpose is to improve navigation to an existing multi-family residence in Hillsboro Beach, Broward County Florida.

EXISTING CONDITIONS: The existing marina has 90 existing wet slips and 362 dry slips, as well as 15,943 square feet of existing in-water structures. A benthic survey was conducted in May 2016, which stated that the area consisted mostly of silty muck that was devoid of seagrass or any submerged aquatic vegetation. Depth of the muck was found to be between two and four feet deep.

PROJECT HISTORY: The Corps issued a permit on April 10, 2007, that authorized to redevelop the Jackson Marine Center consisting of the following: (1) dredging approximately 21,346 cy of material from the existing 3.16-acre basin to a depth of -10 and -12 feet NGVD; (2) removing 11,975 square feet of docks currently providing 90 slips and constructing 20,865 square feet of new docks providing 15 slips (the overall number of slips will be reduce from 362 dry slips and 90 wet slips to 300 dry slips and 15 wet slips); (3) backfilling a 0.06-acre basin in the southwest corner of the site with approximately 1.068 cy of material; (4) excavating approximately 2,818 cy of upland material along the eastern property line; (5) relocating two existing boat launching slips; and (6 replacing 1,456 linear feet of seawall.

PROPOSED WORK: The applicant seeks authorization to reconfigure an existing marina that will reduce the number of wet slips from 90 to 35. The reconfiguration will also include the following activities:

1. Mechanical dredge approximately 93,176 square feet (11,345 cy) from an existing marina to a depth of -5' NGVD along the east basin section of the marina and to -8' NGVD along the western section of the basin and to -9’ NGVD in the center section of the marine basin;

2. Repair and replace 505 linear feet of seawall and cap, and install 515 linear feet of new and seawall and cap;

3. Backfill three areas (total of 10,664 square feet) (total of 2,895 cubic yards), in the existing boat basin: northwest, west and southwest corner with clean fill;

4. Remove approximately 322 wood piles and install 72 wood piles, 22 steel piles and 102 concrete batter piles; 5. Reconfigure approximately 15,943 square feet of existing dockage to become approximately 7,988 square feet of dockage:

Description

Area (feet)

Square foot

Finger Pier -1

230 x 5

1,150

Finger Pier -2

130 x 8

1,040

Finger Pier -3

100 x 8

800

Finger Pier -4

100 x 8

800

Finger Pier -5

80 x 8

640

Finger Pier -6

80 x 8

640

Finger Pier -7

73 x 8

584

Finger Pier -8

93 x 8

744

Marginal dock-1

100 x 5

500

Marginal dock-2

80 x 5

400

Marginal dock-3

137.5 x 5

688.5

The marina renovation is designed to accommodate up to 150 foot vessels with a maximum draft of 7.5’.

Avoidance and Minimization Information: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: No impacts to submerged aquatic vegetation are proposed or anticipated. The applicant will adhere to the construction conditions for the manatee, swimming sea turtle and smalltooth sawfish. Employing the use of best management practices, including closed bucket mechanical excavators, vibratory equipment for pile installation and installing adequate depth turbidity curtains, re-suspension of sediments, disturbance and turbidity will be controlled through industry best management practices.

Compensatory Mitigation: The applicant has provided the following explanation why compensatory mitigation should not be required: No compensatory mitigation is required due to no proposed or anticipated impacts to submerged aquatic vegetation.

Endangered Species: The U.S. Army Corps of Engineers (Corps) has determined the project may affect, but is not likely to adversely affect the endangered West Indian manatee (Trichechus manatus), and would not adversely modify their designated critical habitat. The Corps has receive programmatic concurrence with this determination and therefore, no further coordination with FWS is required for the above listed species pursuant to Section 7 of the Endangered Species Act.

The Corps has determined the proposed project may affect, but is not likely to adversely affect the threatened and endangered swimming sea turtles; loggerhead (Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea), hawksbill (Eretmochelys imbricata), and Kemp's Ridley (Lepidochelys kempii), and the threatened smalltooth sawfish (Pristis pectinata) and would not adversely modify their designated critical habitat. The Corps will request National Marine Fisheries Service concurrence with these determinations pursuant to Section 7 of the Endangered Species Act by separate letter.

Essential Fish Habitat (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 10,664 square feet of un-vegetated benthic habitat from the backfilling of existing basins, and approximately 16,772 square feet of un-vegetated benthic habitat from the removing or installation of structures. The benthic habitat is utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic Region. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Gardens Regulatory Permits Section, 4400, Palm Beach Gardens within 15 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck at the letterhead address, by electronic mail at Linda.C.Knoeck@usace.army.mil, or by telephone at 561-472-3530.

ADDITIONAL INFORMATION: After reviewing all available information pertaining to the completed work, the Department of the Army has not recommended legal action at this time. Final determination regarding legal action will be made after review of the project through the permit procedure.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY

JACKSONVILLE DISTRICT CORPS OF ENGINEERS 4400 PGA BOULEVARD, SUITE 500 PAML BEACH GARDENS, FL 33410

January 24, 2018

REPLY TO ATTENTION OF

Regulatory Division South Branch Palm Beach Gardens Permits Section

PUBLIC NOTICE Permit Application No. SAJ-2005-07911(SP-LCK) TO WHOM IT MAY CONCERN: This district has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below: APPLICANT: Fort Lauderdale Marina Partners, LLC Attn: Joe Miller 33 Lockwood Drive, Charleston, SC, 29401 WATERWAY AND LOCATION: The project would affect waters of the United States associated with dredging of tidally influenced water. The project site is located in the South Fork of the New River adjacent to 1915 SW 21st Avenue, Ft. Lauderdale (Section 17, Township 50 South, Range 42 East), Broward County, Florida. Directions to the site are as follows: Take I-95 South toward Ft. Lauderdale and exit onto Davie Blvd West. Turn right onto SW 21st Ave. and keep left, following the road all the way south and the marina will be at the end of the road. APPROXIMATE CENTRAL COORDINATES: Latitude 26.097641° Longitude -80.170165° PROJECT PURPOSE: Basic: The basic project purpose is to improve navigation to an existing multi-family residence. Overall: The basic project purpose is to improve navigation to an existing multi-family residence in Hillsboro Beach, Broward County Florida. EXISTING CONDITIONS: The existing marina has 90 existing wet slips and 362 dry slips, as well as 15,943 square feet of existing in-water structures. A benthic survey was conducted in May 2016, which stated that the area consisted mostly of silty muck that

was devoid of seagrass or any submerged aquatic vegetation. Depth of the muck was found to be between two and four feet deep. PROJECT HISTORY: The Corps issued a permit on April 10, 2007, that authorized to redevelop the Jackson Marine Center consisting of the following: (1) dredging approximately 21,346 cy of material from the existing 3.16-acre basin to a depth of -10 and -12 feet NGVD; (2) removing 11,975 square feet of docks currently providing 90 slips and constructing 20,865 square feet of new docks providing 15 slips (the overall number of slips will be reduce from 362 dry slips and 90 wet slips to 300 dry slips and 15 wet slips); (3) backfilling a 0.06-acre basin in the southwest corner of the site with approximately 1.068 cy of material; (4) excavating approximately 2,818 cy of upland material along the eastern property line; (5) relocating two existing boat launching slips; and (6 replacing 1,456 linear feet of seawall. PROPOSED WORK: The applicant seeks authorization to reconfigure an existing marina that will reduce the number of wet slips from 90 to 35. The reconfiguration will also include the following activities: 1. Mechanical dredge approximately 93,176 square feet (11,345 cy) from an existing marina to a depth of -5' NGVD along the east basin section of the marina and to -8' NGVD along the western section of the basin and to -9' NGVD in the center section of the marine basin; 2. Repair and replace 505 linear feet of seawall and cap, and install 515 linear feet of new and seawall and cap; 3. Backfill three areas (total of 10,664 square feet) (total of 2,895 cubic yards), in the existing boat basin: northwest, west and southwest corner with clean fill; 4. Remove approximately 322 wood piles and install 72 wood piles, 22 steel piles and 102 concrete batter piles; 5. Reconfigure approximately 15,943 square feet of existing dockage to become approximately 7,988 square feet of dockage: Description

Area (feet) Square foot

Finger Pier -1

230 x 5

1,150

Finger Pier -2

130 x 8

1,040

Finger Pier -3

100 x 8

800

Finger Pier -4

100 x 8

800

2

Finger Pier -5

80 x 8

640

Finger Pier -6

80 x 8

640

Finger Pier -7

73 x 8

584

Finger Pier -8

93 x 8

744

Marginal dock-1

100 x 5

500

Marginal dock-2

80 x 5

400

Marginal dock-3

137.5 x 5

688.5

The marina renovation is designed to accommodate up to 150 foot vessels with a maximum draft of 7.5'. Avoidance and Minimization Information: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: No impacts to submerged aquatic vegetation are proposed or anticipated. The applicant will adhere to the construction conditions for the manatee, swimming sea turtle and smalltooth sawfish. Employing the use of best management practices, including closed bucket mechanical excavators, vibratory equipment for pile installation and installing adequate depth turbidity curtains, re-suspension of sediments, disturbance and turbidity will be controlled through industry best management practices. Compensatory Mitigation: The applicant has provided the following explanation why compensatory mitigation should not be required: No compensatory mitigation is required due to no proposed or anticipated impacts to submerged aquatic vegetation. ENDANGERED SPECIES: The U.S. Army Corps of Engineers (Corps) has determined the project may affect, but is not likely to adversely affect the endangered West Indian manatee (Trichechus manatus), and would not adversely modify their designated critical habitat. The Corps has receive programmatic concurrence with this determination and therefore, no further coordination with FWS is required for the above listed species pursuant to Section 7 of the Endangered Species Act. The Corps has determined the proposed project may affect, but is not likely to adversely affect the threatened and endangered swimming sea turtles; loggerhead (Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea), hawksbill (Eretmochelys imbricata), and Kemp's Ridley (Lepidochelys kempii), and the threatened smalltooth sawfish (Pristis pectinata) and would not adversely modify their designated critical habitat. The Corps will request National Marine Fisheries Service 3

concurrence with these determinations pursuant to Section 7 of the Endangered Species Act by separate letter. ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 10,664 square feet of un-vegetated benthic habitat from the backfilling of existing basins, and approximately 16,772 square feet of un-vegetated benthic habitat from the removing or installation of structures. The benthic habitat is utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic Region. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Gardens Regulatory Permits Section, 4400, Palm Beach Gardens within 15 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck at the letterhead address, by electronic mail at Linda.C.Knoeck@usace.army.mil, or by telephone at 561-472-3530. ADDITIONAL INFORMATION: After reviewing all available information pertaining to the completed work, the Department of the Army has not recommended legal action at this time. Final determination regarding legal action will be made after review of the project through the permit procedure. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries 4

Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

5

Ft Lauderdale Marina Partners 1915 SW 21st Avenue Fort Lauderdale, FL 33312

Figure 1 Aerial View

EnviroCare, Inc. 832 Ne 26th Street Wilton Manors, FL 33305 (954)730-7707

Widtih of River 172'

(SEE TABLE 1) MARINA RENOVATION PLAN Existing Site Plan

(SEE TABLE 2) Proposed Site Plan PLAN MARINA RENOVATION

#3 STIRRUPS @ I 2" O.C. w/ ADDITIONAL STIRRUP @ EACH SIDE OF BATTER PILE

DOWEL .$ EPOXY GROUT #5 BAR BENT I 2"x I 2" @ I 2" O.C. STAGGERED MIN. 4" EMBEDMENT IN EX. SEAWALL CAP

----42"--~

r 2411

1>415 BAR CONTINUOUS

I

r---.----.-

DOWELL .$ EPOXY #5 BAR BENT 8"x8" @ I 2" O.C. STAGGERED MIN. 4" EMBEDMENT INTO EX. CONC. CAP

TOP OFCAP5.0 NAVD -

·

12''±

nm. . ~h3" r' : 1

I.· ,

TEE PILE @ TEE PILE WALL

I

/

I·

lt'%I

NEW I 2"x 12" PRESTRESSED CONC. BATTER PILE @ 9.0 O.C.

o ..

_MHW +2.80_

_MLW +0.GO

I

EXISTING TIE B : ;

R:~

:

ELEV. -2.5 NAVD

Licensed Contractor shall verify the existing cond1t1ons prior to commencement of the work. Any conflicts or om1ss1ons between existing cond1t1ons or the various elements of the working drawings shall be brought to the attention of the Engineer prior to the commencement of the work. The Licensed Contractor and all subcontractors are responsible for all lines, elevations, and measurements. 2. For all prestressed piles, extend pile strands a min. of I 8 11 into cap steel or cut strands even w/ top of pile $ dowel $ epoxy (2) #5 L-bars, I 2" long w/ I 2" bend, into top of pile, w/ a min. of 4" embedment. 3. New batter p1l1ngs, p1l1ngs and existing seawall panels to have a minimum 4" penetration into new cap. 4. Concrete piling to be I 2"x I 2" prestressed plies with (4) 71 I G" strands. 5. All plies to be driven a minimum of 8' into strata to a minimum bearing capacity of I 0 tons. If hard strata 1s encountered, a minimum 2' penetration 1s required. G. Reinforcing steel shall be 1n conformist of the latest version of ASTM AG I 5 Grade GO Spec1f1cations. All reinforcement shall be placed in accordance w/ ACI 3 I 5 and ACI manual of standard Practice. Splices 1n reinforcing bars shall not be less than 48 bar diameter and reinforcing shall be continuous around all corners and changes 1n d1rect1on. Continuity shall be provided at corners or changes in d1rect1on by bending the longitudinal steel around the corner 48 bar diameters. Concrete cover shall be e inches unless otherwise noted on the approved drawings. 7. Concrete for new seawall cap to be min. 5000 psi @ 28 days, .40 water/cement ratio. 8. Approved contractor to verify all d1mens1ons. The approved contractor 1s responsible for all methods, means, sequences and procedures of work. 9. Elevations shown are based on the national geodetic vertical datum of 1929. I 0. Design in accordance with 2014 Florida Building Code.

___

I I .- l_t ft____ ~Il~=t=~~--.----.----.--1 0 -r;---~-

I

NI ~

1.

_I

'.I

W

~I

·

..

t

' - I 8"x24" DEEP GRADE BEAM w/ 2-#G BAR TOP, BOTTOM.$ MIDDLE w/ #3 HOOPS @ I 2" O.C. w/ ONE @ CENTER$ EACH SIDE OF PILE

EX. I 2"x I 2" CONC. CAP

~~6"

-=

6"+

-

~

EXISTING I 2" WIDE CONCRETE PANEL SEAWALL

EACH PANEL

I.

3'-0" -1--i

1·

I' I

TIE ROD, WASHER$ NUT _ _ _ _ _MLW+O.GO

--1- ---

I I J

I~'_,,

t

"""'"" I\

3 " PRIME $ SEAL OVER EXISTING

General Notes:

3' CANTILEVER@ BENCH AREA

"

I

12

I"- I I/2"0 EXISTING WEEP HOLES INSTALL NEW FILTER SCREEN MIN. OF IO' SPACING FOR WEEP HOLES INSTALL NEW I 1/2" WEEP HOLES A5 REQUIRED

----- 5'-0"

__ f t = I\I"!_-,~

of Cap Elevation Top 5.01\JAVD

EXISTING I 2"x I 2" SEAWALL CAP ELEV. VARIES .$ SIZE VARIES _ _ _ _ _MHW +2.80

#5 BAR@ 12" O.C. MAX. EACH WAY /

I 2"x I 2" CONC. PILE @ IO' MAX. O.C. SEE DETAIL

EX. BERM ELEV -5.0+ NAVD '

EXISTING 12" OR 24" WIDE TRAPEZOID SHAPED PANEL WALL OR EXISTING TEE PILE WALL

FOOTING IN FRONT OF ---+--~ EXISTING I 2" WIDE PRECAST PANELS @ NORTH WALL OF BASIN

EX. BERM ELEV -5.0+ NAVD

5 1 Walk Way - Typ1cal Section 11 E11

G' LONG AWL-3 ALUMINUM SHEET

Scale: 1/2"

=

1'-0"

v/

~

.0.95"

2.5·

PATCH .$ REPAIR EXISTING PANEL FACE.$ JOINTS w/ HYDRAULIC CONCRETE

New 12xl 2 Prestressed Concrete Batter Piles

i----

New 12x 12 Prestressed Concrete King Piles

g'

max

Panel and Seawall Cap To Remain

Seawall/Cap - Typical Section "A"

1--------12·---------1

AWL -3 Aluminum Sheet

Scale: 1/2"

=

1'-0" 24" wide woven filter fabric full length of ponel, fasten to panel with furring strips full length

,_____ _ g' -10" ------<

!

New Seawall Panels

3/4" PREMOLDED EXPANSION JOINT

· (..)

Existing Seawall Panel To Remain

Typical New Seawall Lay-Out Scafe: 3/8" = 1'-0"

I;;~

c

- ... Q)

rn

en

~

;; ~ e "' u

~~

1£\

t1 ~

:::J ~ . rn r- ~ LI.I ~

en~

Q)

u

~~

Eli~~ a: "'

5

U·

,,oP=I:;;: "1 ~

Eu ....,ca

- 0 "'

"'~

~~

e

~~

.,., 0 """"

...:I

µ.,

""...:I

z

~-

µ.,

:5a..

w~

~-

E-< w < § ·

~

fZ

<(

gj 0 >-!

0

:5 ~

0

...:I E-< E-< ~ z <11< er: - µ., u -~ w gj > E-< g; I- ffi er: oLL > <( 11< aJ ~ ~ < i:i...I,...., I

z

IZl

er: <(

::::!:

~ N

<(

~

z

L1ft1ng Eyes

N

""

5

QO

-----j

N

~ .,.,

--°'

f-----30"

,,,.---..

~

j

o~!.

< ;'S i2

ffi ~

~

30"

,_:i 0 O? ~,_:i~

~

~~ 0 ti ..c

~ s; "' ;'S < ~ "' ;:!;

,,

_J_

8"

t

8"

Waterside Face, Light Broom Finish

- - Land Side Face

-~-i

(4) #5 Top Contm. (2) #5 Bottom Cont1n. #3 Stirrups @ I 4" on center

42"----1

3"

13"1

Top of Cap Elevation = 5.0 NAVD - - - - - - - - - -

T

4"

t 28.5"

,.

13"1

3"

_

Top of Cap Elevation= 5.0 NAVD

~ lil

~-~--++l'--+-+,,..___~_L 28.5" ~

_MHW +2.80_

0 "'

z ~

9) #5 @ I 2" O.C.+/

['-- ~

3'' ---

;3

,,

8) #5 @ 9" O.C.+/

_MLW+O.GO_ New I 2x I 2 Prestressed Concrete King Pile @ 9'-0" O.C.

3"

14' ~

~

New Precast Wall Panel See Detail this Sheet

clear

I

--------

~ I

I

I

------------

~

24" wide woven filter fabric full length of panel, fasten to panel w/

New I 2x I 2 Prestressed Concrete Batter Pile @ 9'-0" O.C.

~ furring strips full length @ panel jOlst

I

EX. BERM ELEV -5.0+ NAVD

~

0

~ 0 ·~ Ii: ()

~ '1l 'E ~ ~

"'

.,

0

~

{/} .9 ~

g

00

~~

,. ., £

~

I

New I 2x I 2 Prestressed Concrete Batter Pile @ 9'-0" O.C.

""'.; ~t

New I 2x I 2 Prestressed Concrete King Pile @ 9'-0" O.C.

I

,,

~

New Precast Wall Panel See Detail this Sheet

_MLW+O.GO_

Existing broken I 2" wide precast panel wall. Install panel m front of ex1st1ng panels

~8

~~~~ > "' "° ~ E-< "' ~ "'

I/

,, --..._

-

I

·

18"

6"

_MHW +2.80_

42"----1

4"

18"

- ~~~~~·~_L

,, r ~

(4) #5 Top Contm. (2) #5 Bottom Contm. #3 Stirrups @ I 4" on center

------------ 24" wide woven filter fabric full ---------- length of panel, fasten to panel w/ ~ furring strips full length @ panel JOlst

EX. BERM ELEV -5.0+ NAVD

I

I

I

j 3

l .F

-~

8Spo:~',:. 12"±

~-

r

7 l" 2

~3" 12

24"

I

min

I

3

J_~LJ

~

12

Typ. Section (Panel) Scale: 1/2"

=

1'-0"

Panel Detail Scale: 1/2''

=

SCALE:

AS NOTED

DATE:

09/0612016

DRAWN BY:

KJS

CHECKEDBY:

JB

JOB No.

1'-0"

Seawall/Cap - Typ1cal Section 11 5 11 Scale: 1/2"

=

1'-0"

Seawall/Cap - Typ1cal Section 11 C 11 Scale: 1/2"

=

16-08-13

C- 3

1'-0" SHEET No.

OF

·

(.)

-

FINISH TO MATCH BUILDING

8"xl G" BOND BEAM

i!: LL

0

~

~

0

'~-------,L'-----l---t--------------+--------------1~---.-----------i

k--

u.J >

::c cl! ~3 0 u.J

/

/ / / /

/

( (

/ / r-----

/

-------------------------'=>-"'------------

~

~

~

~$:

~ ~ ---------------------------------

~

--------------~-------------

----------------------,

/ /

/

I'

I I I I

I

--\MATCH

I

I

I 8"x24" DEEP GRADE BEAM w/ 2-#G BAR TOP, BOTTOM$ 1 3

~'.~~~~ ~N~ :~~~~E~$ ~~H

SIDE OF PILE

I I

ff=====

_J_

+I

:

~

'

~

12"x12" PILING 9' O.C. MAX.

i

:

I ~I

~

~

::f:1:;

<

en

~~

sEl '"'.3. 8

rri

6

Ol

:i: '"

~~~

g "~ ...... 0 ~

Eu cc

"'z:

..

"' 0

"'

--:> I

i.:~

;. ~-_, ' ··.. ;'· .:,::;· · ·_:;. :: §'. ~- .'1 _l

LANDSCAPE AREA

TYPE 'D' CURB

~.:· ·:··....: :.: ~.:· ...:~ ·:.··. :.··,."",.\·:-::'. .:· ~: .. :: . ..

N.T.S.

I·.: . .

____

(:j~-.~~·~::.~~-; ~-~·. ;.. . "'.'. ..

lb 11

lO

0

, TYPICAL SEAWALL PANEL. SEE DETAILS SHEETC-3

~~

ca au ::::J

Q)

I G"x42" CONC. STEM WALL FTG ~//<'/, WI 4-#5 BAR$ #3 ''<...~'1> TRANSVERSE BAR.5 @ 24"0C.

b

='~ =======~=-I.=====~

EXISTING PROPERTY LINE

-CD ~'.8()~.(:'7C~~d~-'""()'"="r 0.(:°'7V~i b r~~ '1>Jc-j?'f I >)( -JC~r(~;;-;-1~'J( - ;;-;-1~, ,rJ,-W1 \o_-,,~, \lJ,-W,

EXISTING GROUND.

L_

_.f

N ~

././///

I

I

I I I I I I

-~---rr

·I~

"'u V)

..c ~ en o

' 51_ry·

8"CMU WALL. PROVIDE I 'x4' WIDE SLOT@ GRADE@ EXISTING CATCH BASIN FOR DRAINAGE wl 8"x8" PRECAST LINTEL

~ Lr;_;!..

< :!O ..: ::s !;l e

Oz~

··

,, ASPHALT

3' CANTILEVER@ BENCH AREA

I

6" 2

12"

1

/

/

8- -'~

/

/

/

-----------~4-----

~

::::J 0

I #5 REBAR @ 24" OC MAX IN CONC fl LLED CELLS.

<.:i >-:

,----~-

/

"'z

/

518" TEXTURED STUCCO PAINTED---~-< FINISH TO MATCH BUILDING

'6'+

cl! cl!

LL

12"x12" PILING 9' O.C. MAX.

"'0 ' o~~

en~

"h

.·

WI 1#5 HB

u.J

1 O" REINFORCED CONC.SLAB

·.

"'<'" ~~~

... rri ~

Q) EX.12" CONCRETE CAP

~~

c

518" TEXTURED STUCCO PAINTED

42

11

Plan View of Southeast Corner of Basin PRIVACY WALL

Scale: 1/4" = 1'-0"

SCALE: I 11

-

I 1-0

11

('<)

..-l

z <(

..-l ~

~

_J a..

~

Z

Cl

~

~

w~

·

_Jo

~

<(P:i

"O~

0 -

·· ,..,,,. WP:i ~0:::§ P:i ~ ......

~

[il

r- &:

w

~§ ~o:i

(.)0

8 ::J ~

j

0 P:i . ..-l <( ~ z < 0::: ~ f-< _J ~ w ii.> .u -~ 0::: ~ z ~ e:l ffi

t

I

'l. G"x 12" TYPE "D" CURB SEE DETAIL THIS SHEET

I I /2" TYPE S-3 ASPHALTIC CONC SURFACE COURSE ON PRIME COAT

8" THICK LIMEROCK BASE OR APPROVED ALTERNATE PRIMED$ COMPACTED TO 98% MAX DENSITY AS DETERMINED BY AASHTO T- I 80

<(ii.W~~·~

Z

rn

0:::

'5

~

~

. _, .·'

8"x8' HIGH CBS WALL:

~~

~

<( ~·'

I <(

rll

lO

z

a;:

<'I

.....

('<)

:1·.

00

,

8"

- + - - - - - - - - - - - 2 0 ' - 0 " ASPHALT ROAD

i---42" Top of Cap Elevation = 5.0 NAVD

18"

_i_ .

1rr=;ri1

SLOPE VARIES(1% MIN.)

I

Tl r

10'-0" LANDSCAPE AREA

. 1\

.

/17 I Lil·/, !'\>''""'~""'>>'>>~~~''''~'''~'~"~" · · / //cc//,/// /'7 ;;;;;>>7 ;:7;: \rc: rx :>::>::\'\;r'»>\'\;r'»);'»'»":.'"'7~»»'>»~»~'m"-,~"'»~"'>~~"»'>'>~~~'\:;Y //%

_MHW +2.80_ ,.

'), ...J ,"->'

EXISTING ROAD

MLW +0.GO

New I 2x I 2 Prestressed Concrete King Pile @ 9'-0" O.C.

New I 2x I 2 Pre5tre55ed Concrete Batter Pile @ 9'-0" O.C.

EX. BERM ELEV -5.0+ NAVD

T 3

Cl)

L_c,UITABLE SUBGRADE SOILS I 2" STABILIZED SUBGRADE TYPE B MIN LBR 40 COMPACTED TO 98% MAX DENSITY AS DETERMINED BY AASHTO T-180.

~

/

/

····<>',' ' ·,, «.:~> /

"'

iil

~

Po.. "'

~ .a~ ~o

S~g:f;J ~lllf:Q

0 ..t:l

"';:I I~...0

> "'

~ Ill E-< "' E-< "'

~~~1

~8~ "' 0 Q;J .......

,.~., cl£

N

)'! IZI

~

I

----------- 24" wide woven filter fabric full ---------- length of panel, fasten to panel w/ ~ furrin'3 strips full len<21th @ panel JOist

24"

min

12

~

New Preca5t Wall Panel See Detail this Sheet

,,··,,',

'

...

~~ · 0

l_

Typ1cal Section 11 F11 Scale: 1/2'' = 1'-0"

~ SCALE:

AS NOTED

DATE:

09/0612016

DRAWN BY:

KJS

CHECKEDBY:

JB

JOB No.

16-08-13

C-4 SHEET No.

OF

·

(.)

~~

c

1/2" WELDED

32'-6"+ _______________________________,-<

GALVANIZED-~

STEEL WHEEL STOP 24" WIDE w/ 3/4"0 EPOXY ANCHORS. TYPICAL OF G

3'-0"

=

I:

34· 6"

I

1s·--0·

_t

1s·-s·-----~

-

i

I

!

[g]

' - - - - - - - - - -1

[2<'.]

, -, - - - - - - - - - - - - l

----'~24"x24" BEAM w/ I 0-#8 BAR CONT. If #4 HOOPS SPACED @ 4", 8", I 2" O.C. FROM PILING THEN

inI Cl

12"

[2<'.] I I

C:::

M ~

___Ml..W +0.GO

;

__

__ i

__L_J __ i

__

L~J

__ i

___

~--- ---~J Gi ___ lu

__ i

_ _L _ J _ _ i

_ _ L _ J_ _

Q)

I / -

~-

-

!_ _

~- - ~ -

-

!_ _

NEW ASPHALT BEYOND _\_ ~~~ ~ ~

JI

I I

· -

.

c (v) ~

<;:;::cl :ll ~

::::J ~

CD

EX. CONC. PANELS

e

"'u

~~

V)

::+l:

<

au

~~

f'.l ::;

(/) 00

s~ "'"' o="~

Eu

""<5 "'0:;; "' "'~

~~~

--<

"'z<~ z "'

g~

....,co

FROM PILING THEN I 2" O.C.

"

~~~

~ ~

(/) ti

/

00

0 "'~

0 z :g

..c

iii

H

.Jo..!.

Q)~

EXISTING 24" DEEP PILE CAP ELEV. 4.0+

24"x24" BEAM w/ I 0-#8 --~ BAR CONT. If #4 HOOPS SPACED @ 4", 8", I 2" O.C.

~

::::J ti

;--.---.--.---.----.--.--,.--91

~----i

~

00 "'~

(/)~

I

I

.---.--.---.--1--.---.--.---.--.--.---.--.--.-~.---.--.-p-=--=---=---=e-=i-.---.--.--.---.--.---.---.--.--7'

:~-~--L-~~-~--L j__.__ L--L-~--L_J

!. __

6"

_I

o.c.

=

~----·

l

Cl _,

I -

~I

N

____MHW +2.80 _

r-r==· = =

&,

'1

,-------------~------------------~

j

I G" REINFORCED CONCRETE SLAB w/ 2 LAYERS #G BAR @ 8" O.C. EACH WAY, TOP If B~~

~

#5 BAR BENT I 2"x IG" @ 8" O.C. STAGGERED. DRILL If EPOXY GROUT MIN. G" INTO EX. PILE CAP

15'-0" ------------~

N

TOP OF CAP 5.0 NAVD

-

..

"'0

"'

l/,/,/,4:/

[2<'.]

I

I

:

[2<'.]

[2<'.]

Cl _,

"

~ CJ)

EX. BERM ELEV -5.0+ NAVD

[2<'.] I I

_L

- · I 2"x I 2" KING PILE @ ~I 10' MAX. O.C. DRIVEN TO MIN. 25 TON BEARING. TYPICAL ALL PILES IN HAUL-OUT AREA

H+- lXi

'

I

A

I

f'V'1 k""'-J

[2<'.]

/

~/

///

//

-'//

~

1

I I

.,., ,.., ,.., ,.., 0

~-----1

z

CLEAN COMPACTED FILL IN EXISTING TRAVEL LIFT BASIN

:sa..

I I

/

I /

/

~

~-

~

w~

w< < 0 ..-l oo< u ::::> · 0 <( t 0 ~o~ ..-l E-< E-< _J ~ z <11. c:: ~ u . ;:J w ~>~ g; I- ffi c:: 11. z ~ oLL :> <( w~ ~ < E-<

New Boat Haul-Out - Typ1cal Section 11 D 11

0~ <( ;:i 0 E-<

I

z -c::

Scale: 1/2'' = 1'-o"

/

..-l

..-l

~

I 11

1/

1

I

J

EXISTING I 2"x 12" KING ____________ PILE. TYPICAL OF 4

I' [2<'.J

CJ)

_, ~

SEE DETAIL If SECTION "C"

I 2"xl 2" PILE@ 10' MAX. O.C. SEE DETAIL

.j

co

0

I 2"x I 2" KING PILE @ IO' MAX. O.C. DRIVEN TO MIN. 25 TON BEARING. TYPICAL ALL PILES IN HAUL-OUT AREA

7 1/2" PANEL

0'

,;Q,~

rn

<(

~ N

:::2i:

~

I G" REINFORCEDCONCRETE SLAB w/ 2 LAYERS #G BAR @ 8" o.c. EACH WAY, TOP If BOTTOM

:::2i:

N

<(

--°'

z ,..,

\ \vo,,. %

/

I,....,

i:i..

N

00

'-.\\ C),<'> 0,._ ('.Jf'.

..,..;__..

-

~

.,.,

-- - -

___:::,-Lim its Of Con st.

Sh ore Line_____...

CJ)

---- Shore Line

Limits Of Cons~

J

i

L;><:J

+-L;><:J

EXISTING 24" DEEP PILE

--r-7 I

co

I

CJ)

I

I /2" PANEL SEE DETAIL If SECTION "C"

:> "'

[2<'.]

[2<'.] :

I

inI

I

CJ)

I

I

I

/

/

I I I

t

. ~J ., £

s

)'! iZl

~

c----L · · ·

24"x24" BEAM w/ I 0-#8 BAR CONT.¢ #4 HOOPS SPACED @ 4", 8", I 2" o.c. FROM PILING THEN 12" O.C.

o

~ ----:. J

L_______________ _

e

e I e

~

e

L-------------------------------~--

Current

r

- - - - - - - - - - - 3 2 ' - 6 " - - - - - - - - - - - - i - o - - - - - i 2'-0"

New Boat Haul-Out Plan View 1'-o"

·

I

[2<'.]

Scale: 1/4" =

LEGEND

100 \J'\l\cOI

-

~

Shore Line

~

~

J

~

""'0

J

------~~---~~~=-:-----

L~_ _ _ _ _ _ _ _ _ _

J

1

.....:::::::::

I

,

"'

~] "' 0 u .......

0

~

If Existing./\\~ - ___,....\-.,---~ -=--=---=-0 Causeway~~-1._

I

-I

i "'

JI·[ ~ ~

i~

1/

·

I

J

~

1-lr---Proposed Toe Of Slope

I

I

~ .s"'~ ~

0 ..<:l

z "' ~ "'"'0

I

~

0

P.., N

p:: ~

0""" "' ~

-

fil :;;! 8 :;;! el t;l :;;! ~ i::: Q

Turbidity Barriers

-...i...

µj·

Pile Locations Dredge Or Fill Area

---OJ

Mooring Buoy w/Anchor

__,

Anchor

C>

Barrier Movement Due To Current Action

~

· ·1· .

2. 3.

Number and spacing of anchors dependent on current velocities. Deployment of barrier around pile locations may vary to accommodate construction operations.

4.

Navigation may require segmenting barrier during construction operations. For additional information see Section 104 of the Standard Specifications.

TURBIDITY

~

Structure Alignment

NOTES: 1. Turbidity barriers are to be used in all permanent bodies of water regardless of water depth.

5.

I

BARRIER

APPLICATIONS

SCALE:

ASN01ED

DATE:

09/06/2016

DRAWN BY:

KJS

CHECKEDBY:

IB

JOB No.

16-08-13

C- 5 SHEET No.

OF

r--- r-- 5'-0"

SEAWALL CAP ELEV 5.0

3

-~

n

·

(.)

/7

b ;t.4

REPAIR OF REINFORCING STEEL DUE TO LOSS OF SECTION

~

2xTRIM

· ·

MHW2.8

1

5 _

,_, _ _ _ MLW 0.6

2

~~~~~ r~~w ~/.~ ~~7 /,

/'

~0:-7~~~-

(2) 2"x8" STRINGER@ PILE w/ 5/8" THRU BOLT TO PILE.

5

=

2"x8" SUBSTRINGER w/ (2) 5/8" THRU BOLTS TO PILE AND DROP HANGER.

6

EXISTING BERM

OLD~NEW BAR LAP BAR

1) COMPLETE BAR REPLACEMENT, QR RECOMMENDED CLEARANCE 2) ADDITION OF SUPPLEMENTAL BAR OVER AFFECTED SECTION. NEW BAR MAY BE

=

/,

)-~'/

IF REPAIRS TO THE REINFORCING STEEL ARE REQUIRED, ONE OF THE FOLLOWING REPAIR METHODS SHOULD BE USED

2"x8" LEDGER w/ 1/2" WEDGE ANCHORS@ 36" O.C., MIN. 4" EMBEDMENT INTO SEAWALL CAP.

4

:::::::J d

~ ~

~

-··-·

a.>6

A

Lo

2x FACE BOARD

5

>· ,': '', ;: 'b""' ,':: ,; 3

I

I

II .'.

I I':;·, I,

.·~_·, .

, tx1,

·"

NEW SEAWALL CAP

I

~2

0

.a:::::::: ~

METHOD B CUT AT RIGHT ANGLE TO SURFACE WITH POWER BREAKERS, HYDRO DEMO. OR OTHER EQUIP

~

,·,

:·

. , , , , . . ·.>'l:><'.1,',

. . . . ·······

~

==#=lij=#= i l i =JI ' ' . , , . . . , · . .. I I . ·.. ..·.· . . .····?/···""" , , .,..... ,. :

12 1/4"

·,'.r=>

· ·

I~ .~

6

r'

0.20 L

,,,···"' ...

-.··'

~o~

~ ~

g~ "'

..

.,..0

··:.::··' . '. '·...

·''.,,,. .

' .

..-l

('<')

~

z

~

..-l

·

~

::sa_

.

w

_J

p:l

p:l

:;lQ

:;lo --op:i <( >z:: 0::: § 0 .. w >z:: ~ 0::: p:l E=: w <

s

z

~0

ii<(§

[il () j >z:: 0 . z < 0::: ~

w

~

8 ::::> ~ ..-l <(

µ...

> .

E-<

_J

u

.

z~

~z~~ati:~ W ~ I<

0::: <(

z

rn

<( ::;?

~

I

-S ~

::;? ~ <( rn

p:l

.,..

-

z

;;:

N

('<')

00

··

PREFERRED PREFERRED 3) AFTER REMOVALS AND EDGE CONDITIONING ARE COMPLETE, REMOVE BOND INHIBITING MAlERIALS (DIRT, CONCRETE, SWRRY, LOOSELY BONDED AGGREGAlES) BY ABRASIVE BLASTING OR HIGH PRESSURE WATERBLASllNG WITH OR WITHOUT ABRASIVE. CHECK THE SURFACES AFTER CLEANING TO INSURE THAT SURFACE IS FREE FROM ADDITIONAL LOOSE AGGREGATE, OR THAT ADDITIONAL DELAMINATIONS ARE NOT PRESENT. 4) PRIME AREAS TO RECEIVE REPAIR MORTAR WITH SIKAARMATEC 110 ORSTO POWERPREP AC BONDING AGENT. 5) PATCHING rM.TERIAL TO BE POLYMER MODIFIED REPAIR MORTAR SUCH AS SIKA.TOP 122, STD POWERMIX PATCH, THORO PRODUCTS THORDCRETE OR OTHER APPROVED EQUAL. CAUTION! BEFORE STARTING REMOVALS, REVIEW EFFECT OF REMOVALS ON STRUCTURAL INTEGRITY. PROVIDE SHORING OF MEMBER AS NECESSARY. PARTICULAR CARE SHA.LL BE EXERCISED AT SLAB/BEAM CONNECTIONS TO COLUMNS.

~

µl

~

fil

~>"'~el ~~~ ~

00:

~

~

·O

p... 10::

of !j ] "' " ..9

5 .s ""''"'

~ ~ "'

~].9

00

~~~i

rl.ll

IL>

ill

0

!

00

. ~. . oil£

!'\

=

·.

L' 0.60 L

PILE NOTE: EACH 2-POINT PICKUP

0.20 L

1-POINT PICKUP

CONCRETE COMPRESSIVE STRENGTH; 3000 PSI @ RELEASE 5000 PSI @ DRl"1NG SPIRAL TO BE ASTM A-82 TIGHT HARD-DRAWN WIRE

WIRE SPIRAL

·

STRANDS - USE FOUR 7 /16" (27DK) LOW RELAXATION ASTM 416-87 UNCOATED 7-WIRE STRANDS TENSIONED TO 2.33 KIPS

1-POINT PICKUP-MAXIMUM L 11

6 SP

@

3"

.·

1.16' NGVD M.H.W.

·I

0.29' NGVD M.L.W.

················-···111.ll················································l·ill· '

7/16" STRANDS

5 GAGE

~

2" CL

····.

Scale: 3/8" = 1'-0"

0.30 L

I

5i:c:l~

CtS --:>

1) REMOVE DELAMINATED CONCRElE, UNDERCL.IT REINFORCING STEEL (REFER TO REINFORCING STEEL UNDERCUTTING GUIDELINE). REMOVED ADDITIONAL CONCRETE AS REQUIRED TO PROVIDE MINIMUM REQUIRED THICKNESS OF REPAIR MATERIAL. 2) AT EDGE LOCATIONS PROVIDE EITHER METHOD A OR METHOD B RIGHT ANGLE CUTS. AVOID FEATHER EDGES. FOR SHOTCRETE REPAIRS REFER TO ACl606 EDGE PREPARATION GUIDELINES. PATCH CONFIGURATIONS SHOULD BE KEPT AS SIMPLE AS POSSIBLE. FOR EXAMPLE:

FLOATING DOCK

·

11 3/4"

. ...

F-<

PROPOSED ACCESS GANGWAY

'N

I

.

1111111

APPLICABLE TO HYDRODEMOLITION, HYDROMILLING, PNUEMA.TIC, HYDRAULIC AND ELECTRIC BREAKERS, APPLICABLE TO HORIZ., VERT. AND OVERHEAD LOCATIONS.

FRAMING PLAN - 5' WOOD DOCK

PILE LENGTH

·

. . ' ,'

N

"' 0

-0:::

SECTION THROUGH CONCRETE MEMBER

l/2xFACE b BOARD if,

t----5

5 GAGE SPIRAL

2 1/2" MIN. CLEAR.

·

\

:I:

"' ,, "' ,,

Eu

eccccr~cccc:=r=;j ~w~,

I

= 0 ·

Ii.a

-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-

7

I

~

(/) 00

OFBAR~

PREPARED SURFACE METHOD A TO RECEIVE REPAIR 112· SAWCL.IT MAX. MATERIAL OR LESS AS NECESSARY TO AVOID CUTTING REINFORCING STEEL

4

~~ ,, "'

-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-

= 1'-0"

I I

<

ca acj :::::::J

CLEANING UNDERSIDE

EDGE & SURFACE CONDITIONING

4

::+l:

CLEANING OF STEEL

ALL HEAVY OXIDES AND SCALE SHOULD BE REMOVED FROM THE BAR AS NECESSARY TO PROMOTE MAXIMUM BOND OF REPLA.CEMENT MATERIAL OIL FREE ABRASIVE BLAST IS THE PREFERRED METHOD. COAT CLEANED REINFORCING WITH SIKA TOP 106 ARMATEC ANTI CORROSIVE PROlECTIVE COATING PER MFGR'S INSlRUCTION. PRIME COAT SlEEL WITH SIKA. ARMATEC 110 OR STO POWERPREP AC BONDING AGENT PRIOR TO APPLYING PATCH MATERIAL

2

~ ::1

LAP LENGTH SHALL BE DETERMINED IN ACCORDANCE WITH ACl318 ALSO REFER TO CRSI AND AASl-ITO MANUAL

TYPICAL 5' DOCK SECTION

r1

,, u

MECHANICALLY SPLICED TO OLD BAR OR PLACED PARALLEL TO AND APPROXIMATELY

4"x10" DROP HANGER w/ (2) 5/8" WEDGE ANCHORS INTO EXISTING SEAWALL CAP, MIN. 4" EMBEDMENT.

r1 Zr

~~e

It')

CONCRETE

7

;:;

314" FROM EXISTING BAR OR WELDED WITH 4" WELD.

7 = 12" DIAMETER WOOD PILING@ 10' O.C. MAX SPACING.

Scale: 3116"

0 ::s~

0 z :g

IF REBAR HAS LOST MORE THAN 25% OF ITS CROSS SECTION (20% IF 2 OR MORE CON SECUTIVE PARALLEL BARS ARE AFFECTED) CONSULTING ENGINEER SHOULD BE NOTIFIED

2"x8" STRINGERS@ 16" O.C. MAX SPACING W/ (2) 16d TOENAILS TO SUBSTRINGER.

~Ii~

~

(/) d

~ i]

1"x6" COMPOSITE DECKING w/ (2) #8x2-1/2" DECK SCREWS PER STRINGER.

3

~~~~~~

-~

..c

I~~ iii m~ =illi--~~

MARGINAL DOCK NOTES:

~~~ -l 0 ...!.

00

(/)~

CONCRETE REPAIR SPECIFICATIONS

MAX

6

""<( N

Q)

0'-411

·

~~

c

I

8" SPACING (TYP.)

6 SP

@

3"

11

2" CL

1" CHAMFERED EDGES

=

..

.·l----------

PILES TO EXTEND A MIN. OF ~ 10' ABOVE FLOATING DOCK DURING HIGH TIDE

~

..

50'

-9.0 PROPOSED BERM DEPTH

2-POINT PICKUP-MAXIMUM L = 62'

PILE DETAIL

NOTE; FLOATING DOCK & ACCESS GANGWAY BY OTHERS.. SEE SHOP DRAWINGS.

SECTION F-F FLOATING DOCK SECTION

SCALE:

AS NOTED

DATE:

09/0612016

DRAWN BY:

KJS

CHECKED BY;

lB

JOB No.

16-08-13

c6 SHEET No.

OF

TEMPORARY EXCAVATED MATERIAL CONTAINMENT

Area 3 - (-8.0' MLW) +/- 3105 C.Y.

60'

20'

30' Area 2 - (-9.0' MLW) +/- 8080 C.Y.

NOTES: 1. Three turbidity monitoring locations will be maintained during dredge operations. 2. Turbidity not to exceed above 29 NTU above background. All dredge operations stop if exceedances occur. 3. Proposed dredge depth for marine basin is (-5.0' in Area 1), (-9.0' in Area 2) & (-8.0' in Area 3). 4. See C-9 for Cross Sections.

Area 1 - (-5.0 ' MLW) +/- 115 C.Y.

TURBIDITY CURTAIN CONTROL

CROSS SECTION A-A

(SEE TABLE 2 FOR DETAILS)

MARINA RENOVATION Dredge and Fill Areas andPLAN Volumes

CROSS SECTION A-A

Basin Soundings PLAN MARINA RENOVATION

CROSS SECTION A-A

CROSS SECTION A-A (SEE C-9)

DREDGE CROSS SECTION A-A AREA 1 (115 CY)

AREA 3 (3105 CY)

PROPOSED DREDGE DEPTH

MATERIAL TO BE DREDGED

MARINA RENOVATION PLAN 'UHGJH&URVV6HFWLRQ &RQWDLQPHQW

AREA 2 (8080 CY)

C-9

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas