Broward County. Fort Lauderdale Marina Partners, LLC. Charleston, South Carolina.
PROJECT PURPOSE:
Basic: The basic project purpose is to improve navigation to an existing multi-family residence.
Overall: The basic project purpose is to improve navigation to an existing multi-family residence in Hillsboro Beach, Broward County Florida.
TO WHOM IT MAY CONCERN: This district has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT:
Fort Lauderdale Marina Partners, LLC
Attn: Joe Miller
33 Lockwood Drive,
Charleston, SC, 29401
WATERWAY AND LOCATION: The project would affect waters of the United States associated with dredging of tidally influenced water. The project site is located in the South Fork of the New River adjacent to 1915 SW 21st Avenue, Ft. Lauderdale (Section 17, Township 50 South, Range 42 East), Broward County, Florida.
Directions to the site are as follows: Take I-95 South toward Ft. Lauderdale and exit onto Davie Blvd West. Turn right onto SW 21st Ave. and keep left, following the road all the way south and the marina will be at the end of the road.
APPROXIMATE CENTRAL COORDINATES:
Latitude 26.097641°
Longitude -80.170165°
PROJECT PURPOSE:
Basic: The basic project purpose is to improve navigation to an existing multi-family residence.
Overall: The basic project purpose is to improve navigation to an existing multi-family residence in Hillsboro Beach, Broward County Florida.
EXISTING CONDITIONS: The existing marina has 90 existing wet slips and 362 dry slips, as well as 15,943 square feet of existing in-water structures. A benthic survey was conducted in May 2016, which stated that the area consisted mostly of silty muck that was devoid of seagrass or any submerged aquatic vegetation. Depth of the muck was found to be between two and four feet deep.
PROJECT HISTORY: The Corps issued a permit on April 10, 2007, that authorized to redevelop the Jackson Marine Center consisting of the following: (1) dredging approximately 21,346 cy of material from the existing 3.16-acre basin to a depth of -10 and -12 feet NGVD; (2) removing 11,975 square feet of docks currently providing 90 slips and constructing 20,865 square feet of new docks providing 15 slips (the overall number of slips will be reduce from 362 dry slips and 90 wet slips to 300 dry slips and 15 wet slips); (3) backfilling a 0.06-acre basin in the southwest corner of the site with approximately 1.068 cy of material; (4) excavating approximately 2,818 cy of upland material along the eastern property line; (5) relocating two existing boat launching slips; and (6 replacing 1,456 linear feet of seawall.
PROPOSED WORK: The applicant seeks authorization to reconfigure an existing marina that will reduce the number of wet slips from 90 to 35. The reconfiguration will also include the following activities:
1. Mechanical dredge approximately 93,176 square feet (11,345 cy) from an existing marina to a depth of -5' NGVD along the east basin section of the marina and to -8' NGVD along the western section of the basin and to -9’ NGVD in the center section of the marine basin;
2. Repair and replace 505 linear feet of seawall and cap, and install 515 linear feet of new and seawall and cap;
3. Backfill three areas (total of 10,664 square feet) (total of 2,895 cubic yards), in the existing boat basin: northwest, west and southwest corner with clean fill;
4. Remove approximately 322 wood piles and install 72 wood piles, 22 steel piles and 102 concrete batter piles;
5. Reconfigure approximately 15,943 square feet of existing dockage to become approximately 7,988 square feet of dockage:
Description
Area (feet)
Square foot
Finger Pier -1
230 x 5
1,150
Finger Pier -2
130 x 8
1,040
Finger Pier -3
100 x 8
800
Finger Pier -4
100 x 8
800
Finger Pier -5
80 x 8
640
Finger Pier -6
80 x 8
640
Finger Pier -7
73 x 8
584
Finger Pier -8
93 x 8
744
Marginal dock-1
100 x 5
500
Marginal dock-2
80 x 5
400
Marginal dock-3
137.5 x 5
688.5
The marina renovation is designed to accommodate up to 150 foot vessels with a maximum draft of 7.5’.
Avoidance and Minimization Information: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: No impacts to submerged aquatic vegetation are proposed or anticipated. The applicant will adhere to the construction conditions for the manatee, swimming sea turtle and smalltooth sawfish. Employing the use of best management practices, including closed bucket mechanical excavators, vibratory equipment for pile installation and installing adequate depth turbidity curtains, re-suspension of sediments, disturbance and turbidity will be controlled through industry best management practices.
Compensatory Mitigation: The applicant has provided the following explanation why compensatory mitigation should not be required: No compensatory mitigation is required due to no proposed or anticipated impacts to submerged aquatic vegetation.
Endangered Species: The U.S. Army Corps of Engineers (Corps) has determined the project may affect, but is not likely to adversely affect the endangered West Indian manatee (Trichechus manatus), and would not adversely modify their designated critical habitat. The Corps has receive programmatic concurrence with this determination and therefore, no further coordination with FWS is required for the above listed species pursuant to Section 7 of the Endangered Species Act.
The Corps has determined the proposed project may affect, but is not likely to adversely affect the threatened and endangered swimming sea turtles; loggerhead (Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea), hawksbill (Eretmochelys imbricata), and Kemp's Ridley (Lepidochelys kempii), and the threatened smalltooth sawfish (Pristis pectinata) and would not adversely modify their designated critical habitat. The Corps will request National Marine Fisheries Service concurrence with these determinations pursuant to Section 7 of the Endangered Species Act by separate letter.
Essential Fish Habitat (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 10,664 square feet of un-vegetated benthic habitat from the backfilling of existing basins, and approximately 16,772 square feet of un-vegetated benthic habitat from the removing or installation of structures. The benthic habitat is utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic Region. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Gardens Regulatory Permits Section, 4400, Palm Beach Gardens within 15 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck at the letterhead address, by electronic mail at Linda.C.Knoeck@usace.army.mil, or by telephone at 561-472-3530.
ADDITIONAL INFORMATION: After reviewing all available information pertaining to the completed work, the Department of the Army has not recommended legal action at this time. Final determination regarding legal action will be made after review of the project through the permit procedure.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
4400 PGA BOULEVARD, SUITE 500
PAML BEACH GARDENS, FL 33410
January 24, 2018
REPLY TO
ATTENTION OF
Regulatory Division
South Branch
Palm Beach Gardens Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-2005-07911(SP-LCK)
TO WHOM IT MAY CONCERN: This district has received an application for a
Department of the Army permit pursuant to Section 404 of the Clean Water Act (33
U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403)
as described below:
APPLICANT:
Fort Lauderdale Marina Partners, LLC
Attn: Joe Miller
33 Lockwood Drive,
Charleston, SC, 29401
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with dredging of tidally influenced water. The project site is located in the
South Fork of the New River adjacent to 1915 SW 21st Avenue, Ft. Lauderdale (Section
17, Township 50 South, Range 42 East), Broward County, Florida.
Directions to the site are as follows: Take I-95 South toward Ft. Lauderdale and exit
onto Davie Blvd West. Turn right onto SW 21st Ave. and keep left, following the road all
the way south and the marina will be at the end of the road.
APPROXIMATE CENTRAL COORDINATES:
Latitude 26.097641°
Longitude -80.170165°
PROJECT PURPOSE:
Basic: The basic project purpose is to improve navigation to an existing multi-family
residence.
Overall: The basic project purpose is to improve navigation to an existing multi-family
residence in Hillsboro Beach, Broward County Florida.
EXISTING CONDITIONS: The existing marina has 90 existing wet slips and 362 dry
slips, as well as 15,943 square feet of existing in-water structures. A benthic survey was
conducted in May 2016, which stated that the area consisted mostly of silty muck that
was devoid of seagrass or any submerged aquatic vegetation. Depth of the muck was
found to be between two and four feet deep.
PROJECT HISTORY: The Corps issued a permit on April 10, 2007, that authorized to
redevelop the Jackson Marine Center consisting of the following: (1) dredging
approximately 21,346 cy of material from the existing 3.16-acre basin to a depth of -10
and -12 feet NGVD; (2) removing 11,975 square feet of docks currently providing 90
slips and constructing 20,865 square feet of new docks providing 15 slips (the overall
number of slips will be reduce from 362 dry slips and 90 wet slips to 300 dry slips and
15 wet slips); (3) backfilling a 0.06-acre basin in the southwest corner of the site with
approximately 1.068 cy of material; (4) excavating approximately 2,818 cy of upland
material along the eastern property line; (5) relocating two existing boat launching slips;
and (6 replacing 1,456 linear feet of seawall.
PROPOSED WORK: The applicant seeks authorization to reconfigure an existing
marina that will reduce the number of wet slips from 90 to 35. The reconfiguration will
also include the following activities:
1. Mechanical dredge approximately 93,176 square feet (11,345 cy) from an existing
marina to a depth of -5' NGVD along the east basin section of the marina and to -8'
NGVD along the western section of the basin and to -9' NGVD in the center section of
the marine basin;
2. Repair and replace 505 linear feet of seawall and cap, and install 515 linear feet of
new and seawall and cap;
3. Backfill three areas (total of 10,664 square feet) (total of 2,895 cubic yards), in the
existing boat basin: northwest, west and southwest corner with clean fill;
4. Remove approximately 322 wood piles and install 72 wood piles, 22 steel piles and
102 concrete batter piles;
5. Reconfigure approximately 15,943 square feet of existing dockage to become
approximately 7,988 square feet of dockage:
Description
Area (feet) Square foot
Finger Pier -1
230 x 5
1,150
Finger Pier -2
130 x 8
1,040
Finger Pier -3
100 x 8
800
Finger Pier -4
100 x 8
800
2
Finger Pier -5
80 x 8
640
Finger Pier -6
80 x 8
640
Finger Pier -7
73 x 8
584
Finger Pier -8
93 x 8
744
Marginal dock-1
100 x 5
500
Marginal dock-2
80 x 5
400
Marginal dock-3
137.5 x 5
688.5
The marina renovation is designed to accommodate up to 150 foot vessels with a
maximum draft of 7.5'.
Avoidance and Minimization Information: The applicant has provided the following
information in support of efforts to avoid and/or minimize impacts to the aquatic
environment: The applicant has provided the following information in support of efforts
to avoid and/or minimize impacts to the aquatic environment: No impacts to submerged
aquatic vegetation are proposed or anticipated. The applicant will adhere to the
construction conditions for the manatee, swimming sea turtle and smalltooth sawfish.
Employing the use of best management practices, including closed bucket mechanical
excavators, vibratory equipment for pile installation and installing adequate depth
turbidity curtains, re-suspension of sediments, disturbance and turbidity will be
controlled through industry best management practices.
Compensatory Mitigation: The applicant has provided the following explanation why
compensatory mitigation should not be required: No compensatory mitigation is
required due to no proposed or anticipated impacts to submerged aquatic vegetation.
ENDANGERED SPECIES: The U.S. Army Corps of Engineers (Corps) has determined
the project may affect, but is not likely to adversely affect the endangered West Indian
manatee (Trichechus manatus), and would not adversely modify their designated critical
habitat. The Corps has receive programmatic concurrence with this determination and
therefore, no further coordination with FWS is required for the above listed species
pursuant to Section 7 of the Endangered Species Act.
The Corps has determined the proposed project may affect, but is not likely to
adversely affect the threatened and endangered swimming sea turtles; loggerhead
(Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea),
hawksbill (Eretmochelys imbricata), and Kemp's Ridley (Lepidochelys kempii), and the
threatened smalltooth sawfish (Pristis pectinata) and would not adversely modify their
designated critical habitat. The Corps will request National Marine Fisheries Service
3
concurrence with these determinations pursuant to Section 7 of the Endangered
Species Act by separate letter.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposal would impact approximately
10,664 square feet of un-vegetated benthic habitat from the backfilling of existing
basins, and approximately 16,772 square feet of un-vegetated benthic habitat from the
removing or installation of structures. The benthic habitat is utilized by various life
stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic
fish, and snapper/grouper complex. Our initial determination is that the proposed action
would not have a substantial adverse impact on EFH or Federally managed fisheries in
the South Atlantic Region. Our final determination relative to project impacts and the
need for mitigation measures is subject to review by and coordination with the National
Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Palm Beach
Gardens Regulatory Permits Section, 4400, Palm Beach Gardens within 15 days from
the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms.
Linda C. Knoeck at the letterhead address, by electronic mail at
Linda.C.Knoeck@usace.army.mil, or by telephone at 561-472-3530.
ADDITIONAL INFORMATION: After reviewing all available information pertaining to the
completed work, the Department of the Army has not recommended legal action at this
time. Final determination regarding legal action will be made after review of the project
through the permit procedure.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
4
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
5
Ft Lauderdale Marina Partners
1915 SW 21st Avenue
Fort Lauderdale, FL 33312
Figure 1
Aerial View
EnviroCare, Inc.
832 Ne 26th Street
Wilton Manors, FL 33305
(954)730-7707
Widtih of River
172'
(SEE TABLE 1)
MARINA
RENOVATION
PLAN
Existing
Site Plan
(SEE TABLE 2)
Proposed
Site Plan PLAN
MARINA
RENOVATION
#3 STIRRUPS @ I 2" O.C.
w/ ADDITIONAL STIRRUP @
EACH SIDE OF BATTER PILE
DOWEL .$ EPOXY GROUT #5 BAR
BENT I 2"x I 2" @ I 2" O.C.
STAGGERED MIN. 4" EMBEDMENT IN
EX. SEAWALL CAP
----42"--~
r
2411
1>415 BAR CONTINUOUS
I
r---.----.-
DOWELL .$ EPOXY #5
BAR BENT 8"x8" @
I 2" O.C. STAGGERED
MIN. 4" EMBEDMENT
INTO EX. CONC. CAP
TOP
OFCAP5.0 NAVD
-
·
12''±
nm.
.
~h3" r'
:
1
I.· ,
TEE PILE @ TEE PILE WALL
I
/
I·
lt'%I
NEW I 2"x 12"
PRESTRESSED CONC.
BATTER PILE @ 9.0 O.C.
o
..
_MHW +2.80_
_MLW +0.GO
I
EXISTING TIE B : ;
R:~
:
ELEV. -2.5 NAVD
Licensed Contractor shall verify the existing cond1t1ons
prior to commencement of the work. Any conflicts or
om1ss1ons between existing cond1t1ons or the various
elements of the working drawings shall be brought to the
attention of the Engineer prior to the commencement of
the work. The Licensed Contractor and all subcontractors
are responsible for all lines, elevations, and
measurements.
2. For all prestressed piles, extend pile strands a min. of
I 8 11 into cap steel or cut strands even w/ top of pile $
dowel $ epoxy (2) #5 L-bars, I 2" long w/ I 2" bend, into
top of pile, w/ a min. of 4" embedment.
3. New batter p1l1ngs, p1l1ngs and existing seawall panels to
have a minimum 4" penetration into new cap.
4. Concrete piling to be I 2"x I 2" prestressed plies with (4)
71 I G" strands.
5. All plies to be driven a minimum of 8' into strata to a
minimum bearing capacity of I 0 tons. If hard strata 1s
encountered, a minimum 2' penetration 1s required.
G. Reinforcing steel shall be 1n conformist of the latest
version of ASTM AG I 5 Grade GO Spec1f1cations. All
reinforcement shall be placed in accordance w/ ACI 3 I 5
and ACI manual of standard Practice. Splices 1n
reinforcing bars shall not be less than 48 bar diameter
and reinforcing shall be continuous around all corners and
changes 1n d1rect1on. Continuity shall be provided at
corners or changes in d1rect1on by bending the
longitudinal steel around the corner 48 bar diameters.
Concrete cover shall be e inches unless otherwise noted
on the approved drawings.
7. Concrete for new seawall cap to be min. 5000 psi @ 28
days, .40 water/cement ratio.
8. Approved contractor to verify all d1mens1ons. The
approved contractor 1s responsible for all methods,
means, sequences and procedures of work.
9. Elevations shown are based on the national geodetic
vertical datum of 1929.
I 0. Design in accordance with 2014 Florida Building Code.
___
I
I .- l_t
ft____ ~Il~=t=~~--.----.----.--1 0
-r;---~-
I
NI
~
1.
_I
'.I
W
~I
·
..
t
' - I 8"x24" DEEP GRADE BEAM
w/ 2-#G BAR TOP, BOTTOM.$
MIDDLE w/ #3 HOOPS @ I 2"
O.C. w/ ONE @ CENTER$
EACH SIDE OF PILE
EX. I 2"x I 2"
CONC. CAP
~~6"
-=
6"+
-
~
EXISTING I 2" WIDE
CONCRETE PANEL
SEAWALL
EACH PANEL
I.
3'-0" -1--i
1·
I' I
TIE ROD, WASHER$ NUT
_ _ _ _ _MLW+O.GO
--1- ---
I I J
I~'_,,
t
"""'"" I\
3 " PRIME $ SEAL OVER EXISTING
General Notes:
3' CANTILEVER@
BENCH AREA
"I
12
I"- I I/2"0 EXISTING WEEP HOLES
INSTALL NEW FILTER SCREEN MIN.
OF IO' SPACING FOR WEEP HOLES
INSTALL NEW I 1/2" WEEP HOLES A5
REQUIRED
----- 5'-0"
__
f t = I\I"!_-,~
of Cap Elevation
Top
5.01\JAVD
EXISTING I 2"x I 2" SEAWALL CAP
ELEV. VARIES .$ SIZE VARIES
_ _ _ _ _MHW +2.80
#5 BAR@ 12" O.C.
MAX. EACH WAY
/
I 2"x I 2" CONC. PILE
@ IO' MAX. O.C.
SEE DETAIL
EX. BERM ELEV -5.0+ NAVD
'
EXISTING 12" OR 24" WIDE
TRAPEZOID SHAPED PANEL WALL
OR EXISTING TEE PILE WALL
FOOTING IN FRONT OF ---+--~
EXISTING I 2" WIDE
PRECAST PANELS @
NORTH WALL OF BASIN
EX. BERM ELEV -5.0+ NAVD
5 1 Walk Way - Typ1cal Section 11 E11
G' LONG AWL-3
ALUMINUM SHEET
Scale: 1/2"
=
1'-0"
v/
~
.0.95"
2.5·
PATCH .$ REPAIR EXISTING PANEL
FACE.$ JOINTS w/ HYDRAULIC
CONCRETE
New 12xl 2 Prestressed
Concrete Batter Piles
i----
New 12x 12 Prestressed
Concrete King Piles
g'
max
Panel and Seawall
Cap To Remain
Seawall/Cap - Typical Section "A"
1--------12·---------1
AWL -3 Aluminum Sheet
Scale: 1/2"
=
1'-0"
24" wide woven filter fabric
full length of ponel, fasten to
panel with furring
strips full length
,_____ _ g' -10" ------<
!
New Seawall
Panels
3/4" PREMOLDED
EXPANSION JOINT
·
(..)
Existing Seawall
Panel To Remain
Typical New Seawall Lay-Out
Scafe: 3/8" = 1'-0"
I;;~
c
- ...
Q)
rn
en
~
;; ~ e
"' u
~~
1£\
t1 ~
:::J ~ .
rn r- ~
LI.I ~
en~
Q)
u
~~
Eli~~
a: "'
5
U·
,,oP=I:;;:
"1 ~
Eu
....,ca
- 0 "'
"'~
~~
e
~~
.,.,
0
""""
...:I
µ.,
""...:I
z
~-
µ.,
:5a..
w~
~-
E-< w <
§ ·
~
fZ
<(
gj 0 >-!
0
:5 ~
0
...:I
E-< E-<
~
z <11< er:
- µ., u
-~
w gj >
E-< g; I- ffi
er:
oLL >
<( 11< aJ ~ ~
<
i:i...I,....,
I
z
IZl
er:
<(
::::!:
~
N
<(
~
z
L1ft1ng Eyes
N
""
5
QO
-----j
N
~
.,.,
--°'
f-----30"
,,,.---..
~
j
o~!.
< ;'S i2
ffi ~
~
30"
,_:i 0 O?
~,_:i~
~
~~
0 ti
..c
~ s;
"'
;'S <
~ "'
;:!;
,,
_J_
8"
t
8"
Waterside
Face, Light
Broom Finish
- - Land Side
Face
-~-i
(4) #5 Top Contm.
(2) #5 Bottom Cont1n.
#3 Stirrups @ I 4" on
center
42"----1
3"
13"1
Top
of Cap Elevation = 5.0 NAVD
- - - - - - - - - -
T
4"
t 28.5"
,.
13"1
3"
_
Top of Cap Elevation= 5.0 NAVD
~ lil
~-~--++l'--+-+,,..___~_L
28.5" ~
_MHW +2.80_
0 "'
z ~
9) #5 @ I 2" O.C.+/
['-- ~
3'' ---
;3
,,
8) #5 @ 9" O.C.+/
_MLW+O.GO_
New I 2x I 2 Prestressed
Concrete King Pile @ 9'-0" O.C.
3"
14'
~
~
New Precast Wall Panel
See Detail this Sheet
clear
I
--------
~
I
I
I
------------
~
24" wide woven filter fabric full
length of panel, fasten to panel w/
New I 2x I 2 Prestressed
Concrete Batter Pile @ 9'-0" O.C.
~ furring strips full length @ panel jOlst
I
EX. BERM ELEV -5.0+ NAVD
~
0
~
0
·~ Ii:
()
~ '1l 'E
~ ~
"'
.,
0
~
{/} .9
~
g
00
~~
,. ., £
~
I
New I 2x I 2 Prestressed
Concrete Batter Pile @ 9'-0" O.C.
""'.; ~t
New I 2x I 2 Prestressed
Concrete King Pile @ 9'-0" O.C.
I
,,
~
New Precast Wall Panel
See Detail this Sheet
_MLW+O.GO_
Existing broken I 2" wide precast
panel wall. Install panel m front of
ex1st1ng panels
~8
~~~~
> "' "° ~
E-< "' ~ "'
I/
,,
--..._
-
I
·
18"
6"
_MHW +2.80_
42"----1
4"
18"
- ~~~~~·~_L
,,
r ~
(4) #5 Top Contm.
(2) #5 Bottom Contm.
#3 Stirrups @ I 4" on
center
------------ 24" wide woven filter fabric full
----------
length of panel, fasten to panel w/
~ furring strips full length @ panel JOlst
EX. BERM ELEV -5.0+ NAVD
I
I
I
j
3
l .F
-~
8Spo:~',:. 12"±
~-
r
7 l"
2
~3"
12
24"
I
min
I
3
J_~LJ
~
12
Typ. Section (Panel)
Scale: 1/2"
=
1'-0"
Panel Detail
Scale: 1/2''
=
SCALE:
AS NOTED
DATE:
09/0612016
DRAWN BY:
KJS
CHECKEDBY:
JB
JOB No.
1'-0"
Seawall/Cap - Typ1cal Section 11 5 11
Scale: 1/2"
=
1'-0"
Seawall/Cap - Typ1cal Section 11 C 11
Scale: 1/2"
=
16-08-13
C- 3
1'-0"
SHEET No.
OF
·
(.)
-
FINISH TO MATCH BUILDING
8"xl G" BOND BEAM
i!:
LL
0
~
~
0
'~-------,L'-----l---t--------------+--------------1~---.-----------i
k--
u.J
>
::c cl!
~3
0 u.J
/
/
/
/
/
/
( (
/
/
r-----
/
-------------------------'=>-"'------------
~
~
~
~$:
~
~
---------------------------------
~
--------------~-------------
----------------------,
/
/
/
I'
I
I
I
I
I
--\MATCH
I
I
I 8"x24" DEEP GRADE BEAM w/
2-#G BAR TOP, BOTTOM$
1
3
~'.~~~~ ~N~ :~~~~E~$ ~~H
SIDE OF PILE
I I
ff=====
_J_
+I
:
~
'
~
12"x12" PILING 9' O.C.
MAX.
i
:
I ~I
~
~
::f:1:;
<
en
~~
sEl '"'.3. 8
rri
6
Ol
:i: '"
~~~
g
"~
...... 0 ~
Eu
cc
"'z: ..
"' 0
"'
--:>
I
i.:~
;. ~-_, ' ··.. ;'· .:,::;· · ·_:;. :: §'. ~- .'1 _l
LANDSCAPE AREA
TYPE 'D' CURB
~.:· ·:··....: :.: ~.:· ...:~ ·:.··. :.··,."",.\·:-::'. .:· ~: .. ::
. ..
N.T.S.
I·.: . .
____
(:j~-.~~·~::.~~-; ~-~·. ;.. . "'.'. ..
lb 11
lO
0
,
TYPICAL SEAWALL
PANEL. SEE DETAILS
SHEETC-3
~~
ca au
::::J
Q)
I G"x42" CONC. STEM WALL FTG ~//<'/,
WI 4-#5 BAR$ #3 ''<...~'1>
TRANSVERSE BAR.5 @ 24"0C.
b
='~ =======~=-I.=====~
EXISTING PROPERTY
LINE
-CD
~'.8()~.(:'7C~~d~-'""()'"="r
0.(:°'7V~i
b r~~ '1>Jc-j?'f
I >)(
-JC~r(~;;-;-1~'J(
- ;;-;-1~,
,rJ,-W1 \o_-,,~, \lJ,-W,
EXISTING
GROUND.
L_
_.f
N
~
././///
I
I
I I
I I
I I
-~---rr
·I~
"'u
V)
..c ~
en o
'
51_ry·
8"CMU WALL.
PROVIDE I 'x4' WIDE SLOT@
GRADE@ EXISTING CATCH BASIN
FOR DRAINAGE wl 8"x8" PRECAST
LINTEL
~ Lr;_;!..
< :!O ..:
::s !;l e
Oz~
··
,,
ASPHALT
3' CANTILEVER@ BENCH AREA
I
6" 2
12"
1
/
/
8- -'~
/
/
/
-----------~4-----
~
::::J 0
I #5 REBAR @ 24" OC MAX
IN CONC fl LLED CELLS.
<.:i >-:
,----~-
/
"'z
/
518" TEXTURED STUCCO PAINTED---~-<
FINISH TO MATCH BUILDING
'6'+
cl! cl!
LL
12"x12" PILING
9' O.C. MAX.
"'0 '
o~~
en~
"h
.·
WI 1#5 HB
u.J
1 O" REINFORCED
CONC.SLAB
·.
"'<'"
~~~
... rri
~
Q)
EX.12" CONCRETE CAP
~~
c
518" TEXTURED STUCCO PAINTED
42
11
Plan View of Southeast Corner of Basin
PRIVACY WALL
Scale: 1/4" = 1'-0"
SCALE: I 11
-
I 1-0
11
('<)
..-l
z
<(
..-l
~
~
_J
a..
~
Z
Cl
~
~
w~
·
_Jo
~
<(P:i
"O~
0
-
·· ,..,,,.
WP:i
~0:::§
P:i
~ ......
~
[il
r- &:
w
~§ ~o:i
(.)0
8 ::J ~
j
0 P:i
. ..-l <( ~
z
< 0::: ~ f-< _J ~
w ii.> .u -~
0::: ~ z ~ e:l
ffi
t
I
'l.
G"x 12" TYPE "D" CURB
SEE DETAIL THIS SHEET
I I /2" TYPE S-3 ASPHALTIC
CONC SURFACE COURSE
ON PRIME COAT
8" THICK LIMEROCK BASE OR APPROVED
ALTERNATE PRIMED$ COMPACTED TO
98% MAX DENSITY AS DETERMINED BY
AASHTO T- I 80
<(ii.W~~·~
Z
rn
0:::
'5
~
~
. _, .·'
8"x8' HIGH CBS WALL:
~~
~
<(
~·'
I
<(
rll
lO
z
a;:
<'I
.....
('<)
:1·.
00
,
8"
- + - - - - - - - - - - - 2 0 ' - 0 " ASPHALT ROAD
i---42"
Top of Cap Elevation = 5.0 NAVD
18"
_i_ .
1rr=;ri1
SLOPE VARIES(1% MIN.)
I
Tl r
10'-0" LANDSCAPE AREA
. 1\
.
/17 I Lil·/,
!'\>''""'~""'>>'>>~~~''''~'''~'~"~"
· · / //cc//,///
/'7 ;;;;;>>7 ;:7;: \rc: rx :>::>::\'\;r'»>\'\;r'»);'»'»":.'"'7~»»'>»~»~'m"-,~"'»~"'>~~"»'>'>~~~'\:;Y
//%
_MHW +2.80_
,.
'), ...J ,"->'
EXISTING ROAD
MLW +0.GO
New I 2x I 2 Prestressed
Concrete King Pile @ 9'-0" O.C.
New I 2x I 2 Pre5tre55ed
Concrete Batter Pile @ 9'-0" O.C.
EX. BERM ELEV -5.0+ NAVD
T
3
Cl)
L_c,UITABLE SUBGRADE SOILS
I 2" STABILIZED SUBGRADE
TYPE B MIN LBR 40 COMPACTED
TO 98% MAX DENSITY AS
DETERMINED BY AASHTO T-180.
~
/
/
····<>',' ' ·,, «.:~>
/
"'
iil
~
Po.. "'
~ .a~ ~o
S~g:f;J
~lllf:Q
0
..t:l
"';:I I~...0
> "'
~ Ill
E-< "' E-< "'
~~~1
~8~
"'
0
Q;J .......
,.~., cl£
N
)'!
IZI
~
I
----------- 24" wide woven filter fabric full
----------
length of panel, fasten to panel w/
~ furrin'3 strips full len<21th @ panel JOist
24"
min
12
~
New Preca5t Wall Panel
See Detail this Sheet
,,··,,',
'
...
~~
· 0
l_
Typ1cal Section 11 F11
Scale: 1/2'' = 1'-0"
~
SCALE:
AS NOTED
DATE:
09/0612016
DRAWN BY:
KJS
CHECKEDBY:
JB
JOB No.
16-08-13
C-4
SHEET No.
OF
·
(.)
~~
c
1/2" WELDED
32'-6"+ _______________________________,-<
GALVANIZED-~
STEEL WHEEL STOP 24"
WIDE w/ 3/4"0 EPOXY
ANCHORS. TYPICAL OF G
3'-0"
=
I:
34· 6"
I
1s·--0·
_t
1s·-s·-----~
-
i
I
!
[g]
' - - - - - - - - - -1
[2<'.]
, -, - - - - - - - - - - - - l
----'~24"x24" BEAM w/ I 0-#8
BAR CONT. If #4 HOOPS
SPACED @ 4", 8", I 2"
O.C. FROM PILING THEN
inI
Cl
12"
[2<'.] I I
C:::
M ~
___Ml..W +0.GO
;
__
__ i
__L_J __ i
__
L~J
__ i
___
~--- ---~J
Gi ___ lu
__ i
_ _L _ J _ _ i
_ _ L _ J_ _
Q)
I
/ -
~-
-
!_ _
~- - ~ -
-
!_ _
NEW ASPHALT
BEYOND
_\_
~~~ ~ ~
JI
I I
·
-
.
c
(v) ~
<;:;::cl
:ll ~
::::J ~
CD
EX. CONC. PANELS
e
"'u
~~
V)
::+l:
<
au
~~
f'.l ::;
(/) 00
s~ "'"'
o="~
Eu
""<5 "'0:;;
"'
"'~
~~~
--<
"'z<~
z "'
g~
....,co
FROM PILING THEN I 2" O.C.
"
~~~
~ ~
(/) ti
/
00
0 "'~
0 z :g
..c
iii
H
.Jo..!.
Q)~
EXISTING 24" DEEP PILE
CAP ELEV. 4.0+
24"x24" BEAM w/ I 0-#8 --~
BAR CONT. If #4 HOOPS
SPACED @ 4", 8", I 2" O.C.
~
::::J ti
;--.---.--.---.----.--.--,.--91
~----i
~00
"'~
(/)~
I
I
.---.--.---.--1--.---.--.---.--.--.---.--.--.-~.---.--.-p-=--=---=---=e-=i-.---.--.--.---.--.---.---.--.--7'
:~-~--L-~~-~--L j__.__ L--L-~--L_J
!. __
6"
_I
o.c.
=
~----·
l
Cl
_,
I -
~I
N
____MHW +2.80 _
r-r==· = =
&,
'1
,-------------~------------------~
j
I G" REINFORCED CONCRETE
SLAB w/ 2 LAYERS #G BAR @
8" O.C. EACH WAY, TOP If
B~~
~
#5 BAR BENT
I 2"x IG" @ 8" O.C.
STAGGERED. DRILL
If EPOXY GROUT
MIN. G" INTO EX.
PILE CAP
15'-0" ------------~
N
TOP OF CAP 5.0 NAVD
-
..
"'0
"'
l/,/,/,4:/
[2<'.]
I
I
:
[2<'.]
[2<'.]
Cl
_,
"
~
CJ)
EX. BERM ELEV -5.0+ NAVD
[2<'.] I I
_L
- · I 2"x I 2" KING PILE @
~I
10' MAX. O.C.
DRIVEN TO MIN. 25
TON BEARING.
TYPICAL ALL PILES IN
HAUL-OUT AREA
H+- lXi
'
I
A
I
f'V'1
k""'-J
[2<'.]
/
~/
///
//
-'//
~
1
I
I
.,.,
,..,
,..,
,..,
0
~-----1
z
CLEAN COMPACTED
FILL IN EXISTING
TRAVEL LIFT BASIN
:sa..
I
I
/
I
/
/
~
~-
~
w~
w<
<
0 ..-l
oo< u ::::> ·
0 <( t
0 ~o~ ..-l
E-< E-< _J ~
z <11. c::
~ u
. ;:J
w ~>~
g; I- ffi
c:: 11. z ~ oLL
:>
<(
w~ ~ <
E-<
New Boat Haul-Out - Typ1cal Section 11 D 11
0~ <( ;:i
0 E-<
I
z
-c::
Scale: 1/2'' = 1'-o"
/
..-l
..-l
~
I
11
1/
1
I
J
EXISTING I 2"x 12" KING ____________
PILE. TYPICAL OF 4
I'
[2<'.J
CJ)
_,
~
SEE DETAIL If
SECTION "C"
I 2"xl 2" PILE@ 10' MAX. O.C.
SEE DETAIL
.j
co
0
I 2"x I 2" KING PILE @ IO'
MAX. O.C. DRIVEN TO MIN.
25 TON BEARING. TYPICAL
ALL PILES IN HAUL-OUT AREA
7 1/2" PANEL
0'
,;Q,~
rn
<(
~
N
:::2i:
~
I G" REINFORCEDCONCRETE SLAB w/ 2
LAYERS #G BAR @ 8" o.c.
EACH WAY, TOP If BOTTOM
:::2i:
N
<(
--°'
z
,..,
\ \vo,,. %
/
I,....,
i:i..
N
00
'-.\\ C),<'> 0,._
('.Jf'.
..,..;__..
-
~
.,.,
-- - -
___:::,-Lim its Of Con st.
Sh ore Line_____...
CJ)
---- Shore Line
Limits Of Cons~
J
i
L;><:J
+-L;><:J
EXISTING 24" DEEP PILE
--r-7
I
co
I
CJ)
I
I /2" PANEL
SEE DETAIL If
SECTION "C"
:> "'
[2<'.]
[2<'.] :
I
inI
I
CJ)
I
I
I
/
/
I
I
I
t
. ~J
., £
s
)'!
iZl
~
c----L
· · ·
24"x24" BEAM w/ I 0-#8
BAR CONT.¢ #4 HOOPS
SPACED @ 4", 8", I 2"
o.c. FROM PILING THEN
12" O.C.
o
~
----:. J
L_______________ _
e
e I e
~
e
L-------------------------------~--
Current
r
- - - - - - - - - - - 3 2 ' - 6 " - - - - - - - - - - - - i - o - - - - - i 2'-0"
New Boat Haul-Out Plan View
1'-o"
·
I
[2<'.]
Scale: 1/4" =
LEGEND
100
\J'\l\cOI
-
~
Shore Line
~
~
J
~
""'0
J
------~~---~~~=-:-----
L~_ _ _ _ _ _ _ _ _ _
J
1
.....:::::::::
I
,
"'
~]
"'
0
u .......
0
~
If Existing./\\~
- ___,....\-.,---~ -=--=---=-0 Causeway~~-1._
I
-I
i
"'
JI·[
~ ~
i~
1/
·
I
J
~
1-lr---Proposed Toe Of Slope
I
I
~ .s"'~ ~
0
..<:l
z "' ~ "'"'0
I
~
0
P.., N
p:: ~
0""" "'
~
-
fil :;;!
8 :;;! el t;l
:;;! ~ i::: Q
Turbidity
Barriers
-...i...
µj·
Pile Locations
Dredge Or Fill Area
---OJ
Mooring Buoy w/Anchor
__,
Anchor
C>
Barrier Movement Due
To Current Action
~
· ·1· .
2.
3.
Number and spacing of anchors dependent on current velocities.
Deployment of barrier around pile locations may vary to accommodate construction operations.
4.
Navigation may require segmenting barrier during construction operations.
For additional information see Section 104 of the Standard Specifications.
TURBIDITY
~
Structure Alignment
NOTES:
1. Turbidity barriers are to be used in all permanent bodies of water regardless of water depth.
5.
I
BARRIER
APPLICATIONS
SCALE:
ASN01ED
DATE:
09/06/2016
DRAWN BY:
KJS
CHECKEDBY:
IB
JOB No.
16-08-13
C- 5
SHEET No.
OF
r--- r--
5'-0"
SEAWALL CAP
ELEV 5.0
3
-~
n
·
(.)
/7
b
;t.4
REPAIR OF REINFORCING STEEL
DUE TO LOSS OF SECTION
~
2xTRIM
·
·
MHW2.8
1
5
_
,_, _ _ _ MLW 0.6
2
~~~~~
r~~w
~/.~
~~7
/,
/'
~0:-7~~~-
(2) 2"x8" STRINGER@ PILE w/ 5/8" THRU BOLT TO PILE.
5
=
2"x8" SUBSTRINGER w/ (2) 5/8" THRU BOLTS TO PILE AND DROP
HANGER.
6
EXISTING
BERM
OLD~NEW
BAR
LAP
BAR
1) COMPLETE BAR REPLACEMENT, QR
RECOMMENDED CLEARANCE
2) ADDITION OF SUPPLEMENTAL BAR OVER AFFECTED SECTION. NEW BAR MAY BE
=
/,
)-~'/
IF REPAIRS TO THE REINFORCING STEEL ARE REQUIRED, ONE
OF THE FOLLOWING REPAIR METHODS SHOULD BE USED
2"x8" LEDGER w/ 1/2" WEDGE ANCHORS@ 36" O.C., MIN. 4"
EMBEDMENT INTO SEAWALL CAP.
4
:::::::J d
~ ~
~
-··-·
a.>6
A
Lo
2x FACE
BOARD
5
>· ,': '', ;: 'b""' ,':: ,;
3
I
I
II .'.
I I':;·,
I,
.·~_·, .
, tx1,
·"
NEW SEAWALL
CAP
I
~2
0
.a::::::::
~
METHOD B
CUT AT RIGHT ANGLE
TO SURFACE WITH
POWER BREAKERS,
HYDRO DEMO. OR
OTHER EQUIP
~
,·,
:·
. , , , , . . ·.>'l:><'.1,',
. . . . ·······
~
==#=lij=#=
i
l
i
=JI
' '
.
,
,
.
.
.
,
·
.
..
I
I
.
·..
..·.· . . .····?/···""" , , .,..... ,. :
12 1/4"
·,'.r=>
· ·
I~
.~
6
r'
0.20 L
,,,···"'
...
-.··'
~o~
~ ~
g~
"'
..
.,..0
··:.::··'
. '. '·...
·''.,,,. .
' .
..-l
('<')
~
z
~
..-l
·
~
::sa_
.
w
_J
p:l
p:l
:;lQ
:;lo --op:i
<( >z::
0::: §
0 .. w >z::
~ 0::: p:l E=: w <
s
z
~0
ii<(§
[il () j
>z:: 0
.
z < 0::: ~
w
~
8
::::> ~
..-l <(
µ...
> .
E-<
_J
u
.
z~
~z~~ati:~
W
~ I<
0:::
<(
z
rn
<(
::;?
~
I
-S
~
::;? ~
<( rn
p:l
.,..
-
z
;;:
N
('<')
00
··
PREFERRED
PREFERRED
3) AFTER REMOVALS AND EDGE CONDITIONING ARE COMPLETE, REMOVE BOND INHIBITING
MAlERIALS (DIRT, CONCRETE, SWRRY, LOOSELY BONDED AGGREGAlES) BY ABRASIVE
BLASTING OR HIGH PRESSURE WATERBLASllNG WITH OR WITHOUT ABRASIVE.
CHECK THE SURFACES AFTER CLEANING TO INSURE THAT SURFACE IS FREE FROM
ADDITIONAL LOOSE AGGREGATE, OR THAT ADDITIONAL DELAMINATIONS ARE NOT PRESENT.
4) PRIME AREAS TO RECEIVE REPAIR MORTAR WITH SIKAARMATEC 110 ORSTO
POWERPREP AC BONDING AGENT.
5) PATCHING rM.TERIAL TO BE POLYMER MODIFIED REPAIR MORTAR SUCH AS SIKA.TOP 122,
STD POWERMIX PATCH, THORO PRODUCTS THORDCRETE OR OTHER APPROVED EQUAL.
CAUTION! BEFORE STARTING REMOVALS, REVIEW EFFECT OF REMOVALS
ON STRUCTURAL INTEGRITY. PROVIDE SHORING OF MEMBER AS
NECESSARY. PARTICULAR CARE SHA.LL BE EXERCISED AT SLAB/BEAM
CONNECTIONS TO COLUMNS.
~
µl
~
fil
~>"'~el
~~~
~
00:
~
~
·O
p... 10::
of !j ]
"' " ..9
5 .s ""''"'
~ ~
"' ~].9
00
~~~i
rl.ll
IL>
ill
0
!
00
. ~. . oil£
!'\
=
·.
L'
0.60 L
PILE NOTE:
EACH
2-POINT PICKUP
0.20 L
1-POINT PICKUP
CONCRETE COMPRESSIVE STRENGTH;
3000 PSI @ RELEASE
5000 PSI @ DRl"1NG
SPIRAL TO BE ASTM A-82 TIGHT
HARD-DRAWN WIRE
WIRE SPIRAL
·
STRANDS - USE FOUR 7 /16" (27DK)
LOW RELAXATION ASTM 416-87 UNCOATED
7-WIRE STRANDS TENSIONED TO 2.33 KIPS
1-POINT PICKUP-MAXIMUM L
11
6 SP
@
3"
.·
1.16' NGVD M.H.W.
·I
0.29' NGVD M.L.W.
················-···111.ll················································l·ill·
'
7/16" STRANDS
5 GAGE
~
2"
CL
····.
Scale: 3/8" = 1'-0"
0.30 L
I
5i:c:l~
CtS
--:>
1) REMOVE DELAMINATED CONCRElE, UNDERCL.IT REINFORCING STEEL (REFER TO
REINFORCING STEEL UNDERCUTTING GUIDELINE). REMOVED ADDITIONAL CONCRETE AS
REQUIRED TO PROVIDE MINIMUM REQUIRED THICKNESS OF REPAIR MATERIAL.
2) AT EDGE LOCATIONS PROVIDE EITHER METHOD A OR METHOD B RIGHT ANGLE CUTS.
AVOID FEATHER EDGES. FOR SHOTCRETE REPAIRS REFER TO ACl606 EDGE
PREPARATION GUIDELINES. PATCH CONFIGURATIONS SHOULD BE KEPT AS SIMPLE AS
POSSIBLE. FOR EXAMPLE:
FLOATING DOCK
·
11 3/4"
. ...
F-<
PROPOSED ACCESS
GANGWAY
'N
I
.
1111111
APPLICABLE TO HYDRODEMOLITION, HYDROMILLING, PNUEMA.TIC, HYDRAULIC AND
ELECTRIC BREAKERS, APPLICABLE TO HORIZ., VERT. AND OVERHEAD LOCATIONS.
FRAMING PLAN - 5' WOOD DOCK
PILE LENGTH
·
. . ' ,'
N
"' 0
-0:::
SECTION THROUGH
CONCRETE MEMBER
l/2xFACE b
BOARD if,
t----5
5 GAGE
SPIRAL
2 1/2" MIN.
CLEAR.
·
\
:I:
"' ,, "'
,,
Eu
eccccr~cccc:=r=;j ~w~,
I
=
0
·
Ii.a
-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-
7
I
~
(/) 00
OFBAR~
PREPARED SURFACE
METHOD A
TO RECEIVE REPAIR
112· SAWCL.IT MAX.
MATERIAL
OR LESS AS NECESSARY TO
AVOID CUTTING REINFORCING STEEL
4
~~
,, "'
-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-
= 1'-0"
I I
<
ca acj
:::::::J
CLEANING UNDERSIDE
EDGE & SURFACE CONDITIONING
4
::+l:
CLEANING OF STEEL
ALL HEAVY OXIDES AND SCALE SHOULD BE REMOVED FROM THE BAR AS NECESSARY TO
PROMOTE MAXIMUM BOND OF REPLA.CEMENT MATERIAL OIL FREE ABRASIVE BLAST IS THE
PREFERRED METHOD. COAT CLEANED REINFORCING WITH SIKA TOP 106 ARMATEC ANTI
CORROSIVE PROlECTIVE COATING PER MFGR'S INSlRUCTION. PRIME COAT SlEEL WITH SIKA.
ARMATEC 110 OR STO POWERPREP AC BONDING AGENT PRIOR TO APPLYING PATCH MATERIAL
2
~ ::1
LAP LENGTH SHALL BE DETERMINED IN ACCORDANCE WITH ACl318 ALSO REFER TO
CRSI AND AASl-ITO MANUAL
TYPICAL 5' DOCK SECTION
r1
,, u
MECHANICALLY SPLICED TO OLD BAR OR PLACED PARALLEL TO AND APPROXIMATELY
4"x10" DROP HANGER w/ (2) 5/8" WEDGE ANCHORS INTO EXISTING
SEAWALL CAP, MIN. 4" EMBEDMENT.
r1 Zr
~~e
It')
CONCRETE
7
;:;
314" FROM EXISTING BAR OR WELDED WITH 4" WELD.
7 = 12" DIAMETER WOOD PILING@ 10' O.C. MAX SPACING.
Scale: 3116"
0 ::s~
0 z :g
IF REBAR HAS LOST MORE THAN 25% OF ITS CROSS SECTION (20% IF 2 OR MORE CON
SECUTIVE PARALLEL BARS ARE AFFECTED) CONSULTING ENGINEER SHOULD BE NOTIFIED
2"x8" STRINGERS@ 16" O.C. MAX SPACING W/ (2) 16d TOENAILS TO
SUBSTRINGER.
~Ii~
~
(/) d
~ i]
1"x6" COMPOSITE DECKING w/ (2) #8x2-1/2" DECK SCREWS PER
STRINGER.
3
~~~~~~
-~
..c
I~~
iii m~ =illi--~~
MARGINAL DOCK NOTES:
~~~
-l 0 ...!.
00
(/)~
CONCRETE REPAIR SPECIFICATIONS
MAX
6
""<( N
Q)
0'-411
·
~~
c
I
8" SPACING (TYP.)
6 SP
@
3"
11
2"
CL
1" CHAMFERED
EDGES
=
..
.·l----------
PILES TO EXTEND A MIN. OF ~
10' ABOVE FLOATING DOCK
DURING HIGH TIDE
~
..
50'
-9.0 PROPOSED
BERM DEPTH
2-POINT PICKUP-MAXIMUM L = 62'
PILE DETAIL
NOTE; FLOATING DOCK & ACCESS
GANGWAY BY OTHERS.. SEE SHOP
DRAWINGS.
SECTION F-F
FLOATING DOCK SECTION
SCALE:
AS NOTED
DATE:
09/0612016
DRAWN BY:
KJS
CHECKED BY;
lB
JOB No.
16-08-13
c6
SHEET No.
OF
TEMPORARY
EXCAVATED
MATERIAL
CONTAINMENT
Area 3 - (-8.0' MLW)
+/- 3105 C.Y.
60'
20'
30'
Area 2 - (-9.0' MLW)
+/- 8080 C.Y.
NOTES:
1. Three turbidity monitoring locations will
be maintained during dredge operations.
2. Turbidity not to exceed above 29 NTU
above background. All dredge operations
stop if exceedances occur.
3. Proposed dredge depth for marine basin
is (-5.0' in Area 1), (-9.0' in Area 2) &
(-8.0' in Area 3).
4. See C-9 for Cross Sections.
Area 1 - (-5.0 ' MLW)
+/- 115 C.Y.
TURBIDITY
CURTAIN
CONTROL
CROSS SECTION
A-A
(SEE TABLE 2 FOR DETAILS)
MARINA
RENOVATION
Dredge
and
Fill Areas andPLAN
Volumes
CROSS
SECTION
A-A
Basin
Soundings PLAN
MARINA
RENOVATION
CROSS
SECTION
A-A
CROSS
SECTION
A-A
(SEE C-9)
DREDGE CROSS SECTION A-A
AREA 1
(115 CY)
AREA 3 (3105 CY)
PROPOSED DREDGE
DEPTH
MATERIAL TO BE
DREDGED
MARINA RENOVATION
PLAN
'UHGJH&URVV6HFWLRQ
&RQWDLQPHQW
AREA 2 (8080 CY)
C-9