PUBLIC NOTICE: The sponsors are proposing to develop the Braun Farm Mitigation Bank. The proposed bank site is approximately 120 acres in size, including upland buffer areas.
PROJECT DESCRIPTION AND PURPOSE:The sponsors are proposing to develop the Braun Farm Mitigation Bank. The proposed bank site is approximately 120 acres in size, including upland buffer areas.
SPONSOR:
Minnesota Board of
Water and Soil
Resources
&
Dakota County
REFER TO: 2015-00466-LED
Public Notice
ISSUED: January 25, 2018
EXPIRES: February 24, 2018
SECTION:404 - Clean Water Act
1. WETLAND COMPENSATORY MITIGATION BANK PROPOSAL
2. SPECIFIC INFORMATION
SPONSOR'S ADDRESS:
Board of Water and Soil Resources
520 Lafayette Road North
St. Paul, MN 55155
Dakota County
4100 220th Street West
Suite 102
Farmington, MN 55024
PROJECT LOCATION: The project site is located in Section 12, Township 113North, Range 19
West, Dakota County, Minnesota. The approximate coordinates are Latitude 44.604502, Longitude
-93.050643.
BANK SERVICE AREA: The proposed bank service area is the Lower Mississippi River Basin in
Minnesota (Bank Service Area 8).
DESCRIPTION OF PROJECT: The sponsors are proposing to develop the Braun Farm Mitigation
Bank. The proposed bank site is approximately 120 acres in size, including upland buffer areas.
NEED AND OBJECTIVE OF PROJECT: The Sponsors' stated objectives of this project are:
(1) Restore approximately 120 acres of fresh wet meadow and shallow marsh wetlands in the
South Branch of the Vermillion River watershed.
(2) Improve water storage, groundwater recharge, and water quality functions in the
Mississippi River-Lake Pepin major watershed, which has been significantly altered by
drainage and crop production over the past 100 hundred years.
(3) Increase the riparian habitat in a drained landscape.
The Sponsors state that there are two programmatic needs addressed by this project. First,
Minnesota statute requires the Board of Wetland and Soil Resources (BWSR), through the Local
Government Roads Wetland Replacement Program (LGRWRP), to provide compensatory mitigation
for qualifying local government road improvement/rehabilitation projects. Currently few credits are
available in BSA 8, and BWSR has only one other project being developed. The annual credit
demands for road projects exceed the current supply in the LGRWRP, and a project of this magnitude
is essential for BWSR to fulfill its statutory requirements.
The second need is for mitigation for Dakota County projects that do not qualify for the LGRWRP, but
are important public service projects. The County's proposal to be a co-sponsor on this bank is due to
anticipated wetland impacts requiring mitigation for increasing infrastructure related to development,
Regulatory Branch (File No. 2015-00466-LED)
which may or may not qualify for the LGRWRP. Wetland mitigation within the minor watersheds of
Dakota County is their preferred siting for wetland replacement rather than at the much larger bank
service area scale. However, no credits are currently available within these minor watersheds. This
project will allow Dakota County to partially satisfy the requirements of this policy.
In addition, from a watershed perspective, the Braun Farm project restores wetlands in an area that
has been affected by land use practices that have resulted in altered streams, artificial drainage, loss
of habitat, and reduced wetland functions. Analysis for this basin shows a significant loss of water
storage function in this minor watershed. This area is also a high risk area for phosphorus loading so
there is a documented need for projects that address these issues. The wetland functions restored by
the Braun project will contribute towards improving watershed health.
ESTABLISHMENT, OPERATION AND MANAGEMENT: The general design strategy proposed for
the site is to disable both the subsurface tile and open ditch drainage network that exists on-site. This
will occur thru a number of different construction strategies including; constructing tile blocks at
limited, strategic locations, ripping the entire site generally perpendicular to the vast network of pattern
tile lines, filling certain reaches of open ditches, and removing a lift station. Prior to seeding, site
preparation would include aggressive measures to kill the few existing reed canary grass and other
non-native perennials alongside the existing ditch banks. During the monitoring period, the Sponsors
will focus on regular control of perennial non-native species through clipping, herbicide applications,
and prescribed burn. Mowing will only be used if the equipment will not cause ruts or compaction of
soil. See Prospectus (located in the Regulatory In-Lieu Fee and Bank Information Tracking System
(RIBITS)) and enclosed maps and images for additional details.
Through the above activities, BWSR and Dakota County propose that the site could generate the
following credits. See enclosed maps and images for additional details.
OWNERSHIP AND LONG-TERM MANAGEMENT: BWSR and Dakota County are partners for this
restoration project. BWSR would be responsible for project development (planning, design, and
agency approvals) and Dakota County would be responsible for project implementation (construction,
vegetation establishment, oversight, and monitoring). The details of these roles are defined in a Joint
Powers Agreement (JPA) between BWSR and the County. Both agencies will sign the Corps Final
Mitigation Banking Instrument (FMBI), and will be ultimately responsible for compliance with the
conditions in the FMBI and the conservation easement. BWSR would purchase a perpetual
conservation easement over the site from the landowner, Mr. Craig Braun. Long-term management
would be the responsibility of both Dakota County and BWSR. Monitoring of the site will occur
periodically, and either Dakota County, BWSR, or the landowner will service any issues that arise.
TECHNICAL FEASIBILITY AND QUALIFICATIONS: During multiple site visits conducted by the
Sponsors, areas with broken tile had water seeping to the surface. Disabling the drainage system will
Page 2 of 5
Regulatory Branch (File No. 2015-00466-LED)
uniformly disperse the ground water, ensuring the hydrologic restoration of the site. In addition, these
areas with broken tile were also dominated by native hydrophytic vegetation indicating a viable native
seed bank. The proposed vegetation management plan, along with the seed bank, will ensure reestablishment of a native plant community. The Sponsors believe that wetland hydrology can be
restored to the site resulting in plant communities that closely resemble what are believed to have
been present prior to cropping and installation of drainage features.
BWSR and Dakota County are staffed by professional engineers, hydrologists, soil scientists and
vegetation specialists. BWSR has completed hundreds of wetland restoration projects in Minnesota
for both regulatory purposes and conservation programs such as Reinvest in Minnesota (RIM) and the
Conservation Reserve Enhancement Program (CREP). BWSR will draw from this experience to
design and build a project that restores wetlands at the Braun Farm site in a sustainable and
ecologically suitable approach.
ECOLOGICAL SUITABILITY: Currently the parcel is comprised of agricultural row crops. This site is
located in a landscape position that receives overland flow as well as base flow prior to discharge into
Tributary 3. Dismantling the drainage network will allow this water to hold on the site for much longer
periods. Holding water on site achieves the objectives of improving downstream water quality by
allowing trapping sediment and assimilating nutrients by the vegetation. Holding the water on the
landscape also increases the floodwater retention of the site and reduces peak flows into tributaries
after rain events. By restoring a drained agricultural field to native vegetation, the bio-diversity would
be increased creating suitable habitat for wildlife and supporting pollinators. Since this site is adjacent
to a riparian system, it is anticipated to increase the riparian habitat in the region.
HYDROLOGY: General overland flow is from south to north eventually draining into Tributary #3,
which drains into the South Branch of the Vermillion River. However, the subsurface flow is
significantly manipulated, and is illustrated in Figure 11. This site has been extensively pattern tiled to
remove surface and groundwater for the production of sod and row crops. The drainage network
within the site consists of 4-6-inch diameter perforated drain tile, 8-24 inch diameter non-perforated
collector tile mains, three open ditches and two lift stations. The perforated drain tiles are spaced
every 50-feet and approximately 2-3 feet below the surface within the organic soil, but above the
mineral soil layer. These collect ground water and discharge into the larger non-perforated tile mains.
These tile mains then discharge into the open ditches and/or directly into the lift station sump basins.
The first lift station takes water from the south central portion of Field 3 and all the water from Field 1
and pumps it into an excavated ditch, which drains into Tributary 3. The second lift station takes water
from Field 2 and the eastern portion of Field 3, and is discharged directly into Tributary 3. Three main
open ditches assist draining the site into Tributary 3. This private drainage system is contained within
the property and proposed easement boundary of the landowner. No tile line, ditch or outlet structure
is shared with another landowner. Additionally, there are no drainage agreements, rights either formal
or informal with the adjoining landowners. Any drainage benefit the neighboring properties receive is
unintended, and comes at the expense of the landowner and their cost of maintaining the network.
The drainage system is in good operational condition and effectively drains the site well enough for
consistent sod or row crop production but requires consistent maintenance. Therefore, a complete
dismantling of the drainage network will allow wetland hydrology to reestablish and be sustainable.
COORDINATION WITH RESOURCE AGENCIES: This project has been coordinated with the
following members of the Interagency Review Team (IRT) and other resource agencies: Minnesota
Department of Natural Resources, U.S. Environmental Protection Agency, U.S. Fish and Wildlife
Service.
Page 3 of 5
Regulatory Branch (File No. 2015-00466-LED)
3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR THEIR
CRITICAL HABITAT
None were identified by the bank sponsor or are known to exist in the action area. However, Dakota
County is within the known historic range for the following Federally-listed species:
Northern Long-Eared Bat
Hibernates in caves and mines swarming in surrounding
wooded areas in autumn. Roosts and forages in upland forests
during spring and summer.
Higgins eye pearlymussel
Mississippi River.
Prairie bush clover
Native Prairie on well-drained soils.
Rusty patched bumble bee
Grasslands with flowering plants from April through October,
underground and abandoned rodent cavities or clumps of
grasses above ground as nesting sites, and undisturbed soil for
hibernating queens to overwinter.
This notice is being coordinated with the U.S. Fish and Wildlife Service. Any comments it may have
concerning Federally-listed threatened or endangered wildlife or plants or their critical habitat will be
considered in our final assessment of the described work.
4. JURISDICTION
This proposal is being reviewed in accordance with the practices for documenting Corps jurisdiction
under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act
identified in Regulatory Guidance Letter 16-01.
5. HISTORICAL/ARCHAEOLOGICAL
The Corps will review information on known cultural resources and/or historic properties within and
adjacent to the project area. The Corps will also consider the potential effects of the project on any
properties that have yet to be identified. The results of this review and the Corps' determination of
effect will be coordinated with the State Historic Preservation Officer independent of this public notice.
Any adverse effects on historic properties will be resolved prior to the Corps authorization of the work
in connection with this project.
6.
PUBLIC HEARING REQUESTS
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, in detail, the
reasons for holding a public hearing. A request may be denied if substantive reasons for holding a
hearing are not provided or if there is otherwise no valid interest to be served.
Page 4 of 5
Regulatory Branch (File No. 2015-00466-LED)
7.
REPLIES/COMMENTS
Interested parties are invited to submit to this office written facts, arguments, or objections within 30
days of the date of this notice. These statements should bear upon the suitability of the location and
the adequacy of the project and should, if appropriate, suggest any changes believed to be desirable.
Comments received may be forwarded to the applicant. A copy of the full prospectus submitted by
the Sponsor is available to the public for review upon request.
Replies may be addressed to:
Regulatory Branch
St. Paul District Corps of Engineers
180 Fifth Street East, Suite 700
St. Paul, MN 55101-1678
Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call Brian Yagle at the St. Paul office of the
Corps, telephone number 651-290-5975.
To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your information in
the New Registration Box.
Chad Konickson,
Chief, Regulatory Branch
Enclosure(s);
Public Notice Figures
Page 5 of 5
Site Location
Braun Road Bank
T 113N R 19W S 12 Dakota County
Figure # 1
Public Notice Figure 1 of 12
Shafer
Property
Field 1
Field 2
Shafer
Property
Field 3
Hoffman
Property
Hoffman
Property
Easement Description
Braun Road Bank
T 113N R 19W S 12 Dakota County
Figure # 2
Public Notice Figure 2 of 12
Field 1
Field 2
Field 3
Existing Vegetation and Surrounding Land-Uses
Braun Road Bank
T 113N R 19W S 12 Dakota County
Figure # 10
Public Notice Figure 3 of 12
Field 1
Field 2
Field 3
Drainage System
Braun Road Bank
T 113N R 19W S 12 Dakota County
Figure # 11
Public Notice Figure 4 of 12
Site Soils
Braun Road Bank
T 113N R 19W S 12 Dakota County
Figure # 12
Public Notice Figure 5 of 12
Surrounding Soils
Braun Road Bank
T 113N R 19W S 12 Dakota County
Figure # 13
Public Notice Figure 6 of 12
Field 1
Field 2
Field 3
Existing Wetland and Contour Map
Braun Road Bank
T 113N R 19W S 12 Dakota County
Figure # 14
Public Notice Figure 7 of 12
National Wetland Inventory
Braun Road Bank
T 113N R 19W S 12 Dakota County
Figure # 15
Public Notice Figure 8 of 12
Credit Area Map
Braun Road Bank
T 113N R 19W S 12 Dakota County
Figure # 16
Public Notice Figure 9 of 12
Proposed Vegetation Conditions
Braun Road Bank
T 113N R 19W S 12 Dakota County
Figure # 17
Public Notice Figure 10 of 12
LEGEND
TILE PUMP
8" PVC IRRIGATION LINE
.
.
CHECKED BY:
EXISTING PVC IRRIGATION LINE
PROPOSED EASEMENT LINE
.
CHECKED BY:
.
DRAWN BY:
SURVEYED BY:
.
IVE
FIELD DRIVE
WWW.BWSR.STATE.MN.US
ALL TILE IN THIS
NON-EASEMENT AREA
FLOWS TO THE NORTH
TILE OUTLETS QTY 3
SURVEY DATE:
STATE OFMN HORZ DATUM:
BOARD OF NAD83
WATER &
VERT DATUM:
BWSR SOIL
RESOURCES NAVD88
EXISTING CONTOUR MINOR
.
EXISTING CONTOUR MAJOR
BLAINE AVE.
ELECTRIC
POLE
EXISTING 12" TILE
EXISTING UNDERGROUND
ELECTRIC
DRAWN BY:
FIELD DRIVE
TILE PUMP
DESIGNED BY
EXISTING 6" TILE
EXISTING 8" TILE
10"HDPE CULVERT
DESIGN DATE:
EXISTING 5" TILE
8" PVC IRRIGATION LINE
UNDERGROUND
ELECTRIC
.
EXISTING 4 TILE
8" PVC IRRIGATION LINE
.
EXISTING DITCH
OLD QUARRY
APPROX. 1000' OF 24"
HDPE PIPE
CONNECTING DITCHES
PIPE INLET
AG WETLAND BANK
BLAINE AVE. / CTY 79
BRAUN PROJECT
UTILITY POLES OVERHEAD ELECTRIC LINE
EXISTING FEATURES PLAN VIEW
LD
FIE
DR
PIPE OUTLET
PROJECT #:
0
350
700
2017-040
SHEET NO.
SCALE ( IN FEET )
PLOT DATE: 12/15/2017 3:57 PM G:\Engineering\Projects\2017 projects\2017-040\2017-040.dwg
Public Notice Figure 11 of 12
1 2
OF
LEGEND
TILE PUMP
8" PVC IRRIGATION LINE
PROPOSED
ARMORED OUTLET
.
.
EXISTING PVC IRRIGATION LINE
PROPOSED EASEMENT LINE
PROPOSED
TILE BREAKS
PROPOSED
TILE BREAKS
PROPOSED SPILLWAY
PROPOSED DITCH FILL
ALL TILE IN THIS
NON-EASEMENT AREA
FLOWS TO THE NORTH
PROPOSED DIVERSION BERM
.
.
IVE
PROPOSED
TILE BREAKS
PROPOSED
DITCH FILL
PROPOSED
DITCH FILL
TO BE REMOVED
APPROX. 1000' OF 24"
HDPE PIPE
CONNECTING DITCHES
OLD QUARRY
BRAUN PROJECT
PROPOSED SHALLOW SCRAPE
/ BORROW MATERIAL SOURCE
PROPOSED
TILE BREAK
BLAINE AVE. / CTY 79
PIPE INLET
AG WETLAND BANK
UTILITY POLES OVERHEAD ELECTRIC LINE
PROPOSED FEATURES PLAN VIEW
LD
FIE
PIPE OUTLET
DR
PROPOSED
TILE BREAKS
TILE OUTLETS QTY 3
FIELD DRIVE
PROPOSED
DIVERSION BERM
PROPOSED SHALLOW SCRAPE
/ BORROW MATERIAL SOURCE
.
WWW.BWSR.STATE.MN.US
PROPOSED TILE RIPPING
APPROX LOCATION
CHECKED BY:
PROPOSED EXCAVATION
DRAWN BY:
PROPOSED TILE BREAK
PROPOSED
DIVERSION BERM
SURVEY DATE:
EXISTING CONTOUR MINOR
PROPOSED
TILE BREAKS
SURVEYED BY:
.
EXISTING CONTOUR MAJOR
STATE OFMN HORZ DATUM:
BOARD OF NAD83
WATER &
VERT DATUM:
BWSR SOIL
RESOURCES NAVD88
BLAINE AVE.
ELECTRIC
POLE
EXISTING 12" TILE
EXISTING UNDERGROUND
ELECTRIC
CHECKED BY:
TILE PUMP
DRAWN BY:
FIELD DRIVE
TO BE REMOVED
DESIGNED BY
EXISTING 6" TILE
EXISTING 8" TILE
10"HDPE CULVERT
DESIGN DATE:
EXISTING 5" TILE
8" PVC IRRIGATION LINE
UNDERGROUND
ELECTRIC
.
EXISTING 4 TILE
8" PVC IRRIGATION LINE
.
EXISTING DITCH
PROJECT #:
0
350
700
2017-040
SHEET NO.
SCALE ( IN FEET )
PLOT DATE: 12/18/2017 11:08 AM G:\Engineering\Projects\2017 projects\2017-040\2017-040.dwg
Public Notice Figure 12 of 12
2 2
OF