PUBLIC NOTICE: The sponsors are proposing to develop the Braun Farm Mitigation Bank. The proposed bank site is approximately 120 acres in size, including upland buffer areas.

PROJECT DESCRIPTION AND PURPOSE:The sponsors are proposing to develop the Braun Farm Mitigation Bank. The proposed bank site is approximately 120 acres in size, including upland buffer areas.

SPONSOR:

Minnesota Board of Water and Soil Resources & Dakota County

REFER TO: 2015-00466-LED

Public Notice ISSUED: January 25, 2018 EXPIRES: February 24, 2018

SECTION:404 - Clean Water Act

1. WETLAND COMPENSATORY MITIGATION BANK PROPOSAL 2. SPECIFIC INFORMATION SPONSOR'S ADDRESS:

Board of Water and Soil Resources 520 Lafayette Road North St. Paul, MN 55155 Dakota County 4100 220th Street West Suite 102 Farmington, MN 55024

PROJECT LOCATION: The project site is located in Section 12, Township 113North, Range 19 West, Dakota County, Minnesota. The approximate coordinates are Latitude 44.604502, Longitude -93.050643. BANK SERVICE AREA: The proposed bank service area is the Lower Mississippi River Basin in Minnesota (Bank Service Area 8). DESCRIPTION OF PROJECT: The sponsors are proposing to develop the Braun Farm Mitigation Bank. The proposed bank site is approximately 120 acres in size, including upland buffer areas. NEED AND OBJECTIVE OF PROJECT: The Sponsors' stated objectives of this project are: (1) Restore approximately 120 acres of fresh wet meadow and shallow marsh wetlands in the South Branch of the Vermillion River watershed. (2) Improve water storage, groundwater recharge, and water quality functions in the Mississippi River-Lake Pepin major watershed, which has been significantly altered by drainage and crop production over the past 100 hundred years. (3) Increase the riparian habitat in a drained landscape. The Sponsors state that there are two programmatic needs addressed by this project. First, Minnesota statute requires the Board of Wetland and Soil Resources (BWSR), through the Local Government Roads Wetland Replacement Program (LGRWRP), to provide compensatory mitigation for qualifying local government road improvement/rehabilitation projects. Currently few credits are available in BSA 8, and BWSR has only one other project being developed. The annual credit demands for road projects exceed the current supply in the LGRWRP, and a project of this magnitude is essential for BWSR to fulfill its statutory requirements. The second need is for mitigation for Dakota County projects that do not qualify for the LGRWRP, but are important public service projects. The County's proposal to be a co-sponsor on this bank is due to anticipated wetland impacts requiring mitigation for increasing infrastructure related to development,

Regulatory Branch (File No. 2015-00466-LED) which may or may not qualify for the LGRWRP. Wetland mitigation within the minor watersheds of Dakota County is their preferred siting for wetland replacement rather than at the much larger bank service area scale. However, no credits are currently available within these minor watersheds. This project will allow Dakota County to partially satisfy the requirements of this policy. In addition, from a watershed perspective, the Braun Farm project restores wetlands in an area that has been affected by land use practices that have resulted in altered streams, artificial drainage, loss of habitat, and reduced wetland functions. Analysis for this basin shows a significant loss of water storage function in this minor watershed. This area is also a high risk area for phosphorus loading so there is a documented need for projects that address these issues. The wetland functions restored by the Braun project will contribute towards improving watershed health. ESTABLISHMENT, OPERATION AND MANAGEMENT: The general design strategy proposed for the site is to disable both the subsurface tile and open ditch drainage network that exists on-site. This will occur thru a number of different construction strategies including; constructing tile blocks at limited, strategic locations, ripping the entire site generally perpendicular to the vast network of pattern tile lines, filling certain reaches of open ditches, and removing a lift station. Prior to seeding, site preparation would include aggressive measures to kill the few existing reed canary grass and other non-native perennials alongside the existing ditch banks. During the monitoring period, the Sponsors will focus on regular control of perennial non-native species through clipping, herbicide applications, and prescribed burn. Mowing will only be used if the equipment will not cause ruts or compaction of soil. See Prospectus (located in the Regulatory In-Lieu Fee and Bank Information Tracking System (RIBITS)) and enclosed maps and images for additional details. Through the above activities, BWSR and Dakota County propose that the site could generate the following credits. See enclosed maps and images for additional details.

OWNERSHIP AND LONG-TERM MANAGEMENT: BWSR and Dakota County are partners for this restoration project. BWSR would be responsible for project development (planning, design, and agency approvals) and Dakota County would be responsible for project implementation (construction, vegetation establishment, oversight, and monitoring). The details of these roles are defined in a Joint Powers Agreement (JPA) between BWSR and the County. Both agencies will sign the Corps Final Mitigation Banking Instrument (FMBI), and will be ultimately responsible for compliance with the conditions in the FMBI and the conservation easement. BWSR would purchase a perpetual conservation easement over the site from the landowner, Mr. Craig Braun. Long-term management would be the responsibility of both Dakota County and BWSR. Monitoring of the site will occur periodically, and either Dakota County, BWSR, or the landowner will service any issues that arise. TECHNICAL FEASIBILITY AND QUALIFICATIONS: During multiple site visits conducted by the Sponsors, areas with broken tile had water seeping to the surface. Disabling the drainage system will

Page 2 of 5

Regulatory Branch (File No. 2015-00466-LED) uniformly disperse the ground water, ensuring the hydrologic restoration of the site. In addition, these areas with broken tile were also dominated by native hydrophytic vegetation indicating a viable native seed bank. The proposed vegetation management plan, along with the seed bank, will ensure reestablishment of a native plant community. The Sponsors believe that wetland hydrology can be restored to the site resulting in plant communities that closely resemble what are believed to have been present prior to cropping and installation of drainage features. BWSR and Dakota County are staffed by professional engineers, hydrologists, soil scientists and vegetation specialists. BWSR has completed hundreds of wetland restoration projects in Minnesota for both regulatory purposes and conservation programs such as Reinvest in Minnesota (RIM) and the Conservation Reserve Enhancement Program (CREP). BWSR will draw from this experience to design and build a project that restores wetlands at the Braun Farm site in a sustainable and ecologically suitable approach. ECOLOGICAL SUITABILITY: Currently the parcel is comprised of agricultural row crops. This site is located in a landscape position that receives overland flow as well as base flow prior to discharge into Tributary 3. Dismantling the drainage network will allow this water to hold on the site for much longer periods. Holding water on site achieves the objectives of improving downstream water quality by allowing trapping sediment and assimilating nutrients by the vegetation. Holding the water on the landscape also increases the floodwater retention of the site and reduces peak flows into tributaries after rain events. By restoring a drained agricultural field to native vegetation, the bio-diversity would be increased creating suitable habitat for wildlife and supporting pollinators. Since this site is adjacent to a riparian system, it is anticipated to increase the riparian habitat in the region. HYDROLOGY: General overland flow is from south to north eventually draining into Tributary #3, which drains into the South Branch of the Vermillion River. However, the subsurface flow is significantly manipulated, and is illustrated in Figure 11. This site has been extensively pattern tiled to remove surface and groundwater for the production of sod and row crops. The drainage network within the site consists of 4-6-inch diameter perforated drain tile, 8-24 inch diameter non-perforated collector tile mains, three open ditches and two lift stations. The perforated drain tiles are spaced every 50-feet and approximately 2-3 feet below the surface within the organic soil, but above the mineral soil layer. These collect ground water and discharge into the larger non-perforated tile mains. These tile mains then discharge into the open ditches and/or directly into the lift station sump basins. The first lift station takes water from the south central portion of Field 3 and all the water from Field 1 and pumps it into an excavated ditch, which drains into Tributary 3. The second lift station takes water from Field 2 and the eastern portion of Field 3, and is discharged directly into Tributary 3. Three main open ditches assist draining the site into Tributary 3. This private drainage system is contained within the property and proposed easement boundary of the landowner. No tile line, ditch or outlet structure is shared with another landowner. Additionally, there are no drainage agreements, rights either formal or informal with the adjoining landowners. Any drainage benefit the neighboring properties receive is unintended, and comes at the expense of the landowner and their cost of maintaining the network. The drainage system is in good operational condition and effectively drains the site well enough for consistent sod or row crop production but requires consistent maintenance. Therefore, a complete dismantling of the drainage network will allow wetland hydrology to reestablish and be sustainable. COORDINATION WITH RESOURCE AGENCIES: This project has been coordinated with the following members of the Interagency Review Team (IRT) and other resource agencies: Minnesota Department of Natural Resources, U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service.

Page 3 of 5

Regulatory Branch (File No. 2015-00466-LED) 3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR THEIR CRITICAL HABITAT None were identified by the bank sponsor or are known to exist in the action area. However, Dakota County is within the known historic range for the following Federally-listed species: Northern Long-Eared Bat

Hibernates in caves and mines ­ swarming in surrounding wooded areas in autumn. Roosts and forages in upland forests during spring and summer.

Higgins eye pearlymussel

Mississippi River.

Prairie bush clover

Native Prairie on well-drained soils.

Rusty patched bumble bee

Grasslands with flowering plants from April through October, underground and abandoned rodent cavities or clumps of grasses above ground as nesting sites, and undisturbed soil for hibernating queens to overwinter.

This notice is being coordinated with the U.S. Fish and Wildlife Service. Any comments it may have concerning Federally-listed threatened or endangered wildlife or plants or their critical habitat will be considered in our final assessment of the described work.

4. JURISDICTION This proposal is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act identified in Regulatory Guidance Letter 16-01.

5. HISTORICAL/ARCHAEOLOGICAL The Corps will review information on known cultural resources and/or historic properties within and adjacent to the project area. The Corps will also consider the potential effects of the project on any properties that have yet to be identified. The results of this review and the Corps' determination of effect will be coordinated with the State Historic Preservation Officer independent of this public notice. Any adverse effects on historic properties will be resolved prior to the Corps authorization of the work in connection with this project.

6.

PUBLIC HEARING REQUESTS

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, in detail, the reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.

Page 4 of 5

Regulatory Branch (File No. 2015-00466-LED) 7.

REPLIES/COMMENTS

Interested parties are invited to submit to this office written facts, arguments, or objections within 30 days of the date of this notice. These statements should bear upon the suitability of the location and the adequacy of the project and should, if appropriate, suggest any changes believed to be desirable. Comments received may be forwarded to the applicant. A copy of the full prospectus submitted by the Sponsor is available to the public for review upon request. Replies may be addressed to: Regulatory Branch St. Paul District Corps of Engineers 180 Fifth Street East, Suite 700 St. Paul, MN 55101-1678 Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call Brian Yagle at the St. Paul office of the Corps, telephone number 651-290-5975. To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your information in the New Registration Box.

Chad Konickson, Chief, Regulatory Branch Enclosure(s); Public Notice Figures

Page 5 of 5

Site Location Braun Road Bank T 113N R 19W S 12 Dakota County Figure # 1 Public Notice Figure 1 of 12

Shafer Property

Field 1

Field 2

Shafer Property

Field 3

Hoffman Property

Hoffman Property

Easement Description Braun Road Bank T 113N R 19W S 12 Dakota County Figure # 2 Public Notice Figure 2 of 12

Field 1

Field 2

Field 3

Existing Vegetation and Surrounding Land-Uses Braun Road Bank T 113N R 19W S 12 Dakota County Figure # 10 Public Notice Figure 3 of 12

Field 1 Field 2

Field 3

Drainage System Braun Road Bank T 113N R 19W S 12 Dakota County Figure # 11 Public Notice Figure 4 of 12

Site Soils Braun Road Bank T 113N R 19W S 12 Dakota County Figure # 12 Public Notice Figure 5 of 12

Surrounding Soils Braun Road Bank T 113N R 19W S 12 Dakota County Figure # 13 Public Notice Figure 6 of 12

Field 1

Field 2

Field 3

Existing Wetland and Contour Map Braun Road Bank T 113N R 19W S 12 Dakota County Figure # 14 Public Notice Figure 7 of 12

National Wetland Inventory Braun Road Bank T 113N R 19W S 12 Dakota County Figure # 15 Public Notice Figure 8 of 12

Credit Area Map Braun Road Bank T 113N R 19W S 12 Dakota County Figure # 16 Public Notice Figure 9 of 12

Proposed Vegetation Conditions Braun Road Bank T 113N R 19W S 12 Dakota County Figure # 17 Public Notice Figure 10 of 12

LEGEND

TILE PUMP

8" PVC IRRIGATION LINE

.

.

CHECKED BY:

EXISTING PVC IRRIGATION LINE PROPOSED EASEMENT LINE . CHECKED BY:

. DRAWN BY:

SURVEYED BY:

.

IVE

FIELD DRIVE

WWW.BWSR.STATE.MN.US

ALL TILE IN THIS NON-EASEMENT AREA FLOWS TO THE NORTH

TILE OUTLETS QTY 3

SURVEY DATE:

STATE OFMN HORZ DATUM: BOARD OF NAD83 WATER & VERT DATUM: BWSR SOIL RESOURCES NAVD88

EXISTING CONTOUR MINOR

.

EXISTING CONTOUR MAJOR

BLAINE AVE.

ELECTRIC POLE

EXISTING 12" TILE EXISTING UNDERGROUND ELECTRIC

DRAWN BY:

FIELD DRIVE

TILE PUMP

DESIGNED BY

EXISTING 6" TILE EXISTING 8" TILE

10"HDPE CULVERT

DESIGN DATE:

EXISTING 5" TILE

8" PVC IRRIGATION LINE UNDERGROUND ELECTRIC

.

EXISTING 4 TILE

8" PVC IRRIGATION LINE

.

EXISTING DITCH

OLD QUARRY

APPROX. 1000' OF 24" HDPE PIPE CONNECTING DITCHES

PIPE INLET

AG WETLAND BANK

BLAINE AVE. / CTY 79

BRAUN PROJECT

UTILITY POLES OVERHEAD ELECTRIC LINE

EXISTING FEATURES PLAN VIEW

LD FIE

DR

PIPE OUTLET

PROJECT #:

0

350

700

2017-040 SHEET NO.

SCALE ( IN FEET ) PLOT DATE: 12/15/2017 3:57 PM G:\Engineering\Projects\2017 projects\2017-040\2017-040.dwg

Public Notice Figure 11 of 12

1 2 OF

LEGEND

TILE PUMP

8" PVC IRRIGATION LINE PROPOSED ARMORED OUTLET

.

.

EXISTING PVC IRRIGATION LINE PROPOSED EASEMENT LINE

PROPOSED TILE BREAKS

PROPOSED TILE BREAKS

PROPOSED SPILLWAY PROPOSED DITCH FILL

ALL TILE IN THIS NON-EASEMENT AREA FLOWS TO THE NORTH

PROPOSED DIVERSION BERM

.

.

IVE

PROPOSED TILE BREAKS

PROPOSED DITCH FILL

PROPOSED DITCH FILL

TO BE REMOVED APPROX. 1000' OF 24" HDPE PIPE CONNECTING DITCHES

OLD QUARRY

BRAUN PROJECT

PROPOSED SHALLOW SCRAPE / BORROW MATERIAL SOURCE

PROPOSED TILE BREAK BLAINE AVE. / CTY 79

PIPE INLET

AG WETLAND BANK

UTILITY POLES OVERHEAD ELECTRIC LINE

PROPOSED FEATURES PLAN VIEW

LD FIE

PIPE OUTLET

DR

PROPOSED TILE BREAKS

TILE OUTLETS QTY 3

FIELD DRIVE

PROPOSED DIVERSION BERM PROPOSED SHALLOW SCRAPE / BORROW MATERIAL SOURCE

.

WWW.BWSR.STATE.MN.US

PROPOSED TILE RIPPING APPROX LOCATION

CHECKED BY:

PROPOSED EXCAVATION

DRAWN BY:

PROPOSED TILE BREAK

PROPOSED DIVERSION BERM

SURVEY DATE:

EXISTING CONTOUR MINOR

PROPOSED TILE BREAKS

SURVEYED BY:

.

EXISTING CONTOUR MAJOR

STATE OFMN HORZ DATUM: BOARD OF NAD83 WATER & VERT DATUM: BWSR SOIL RESOURCES NAVD88

BLAINE AVE.

ELECTRIC POLE

EXISTING 12" TILE EXISTING UNDERGROUND ELECTRIC

CHECKED BY:

TILE PUMP

DRAWN BY:

FIELD DRIVE

TO BE REMOVED

DESIGNED BY

EXISTING 6" TILE EXISTING 8" TILE

10"HDPE CULVERT

DESIGN DATE:

EXISTING 5" TILE

8" PVC IRRIGATION LINE UNDERGROUND ELECTRIC

.

EXISTING 4 TILE

8" PVC IRRIGATION LINE

.

EXISTING DITCH

PROJECT #:

0

350

700

2017-040 SHEET NO.

SCALE ( IN FEET ) PLOT DATE: 12/18/2017 11:08 AM G:\Engineering\Projects\2017 projects\2017-040\2017-040.dwg

Public Notice Figure 12 of 12

2 2 OF

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas