The City of Sioux Falls requests authorization to construct the Ellis Road Improvement Project from 22nd Street to 41st Street in Sioux Falls, SD. The project will improve the existing two-lane asphalt road to a safer five-lane urban street with a median and turn lanes. The project will widen the existing 24-foot wide road to 60-feet wide and will include a storm water system, lighting, traffic lights, curbs, gutter, grass, and concrete medians. Approximately 3.47 acres of wetlands will be impacted by the project.
The City of Sioux Falls requests authorization to construct the Ellis Road Improvement Project from 22nd Street to 41st Street in Sioux Falls, SD. The project will improve the existing two-lane asphalt road to a safer five-lane urban street with a median and turn lanes. The project will widen the existing 24-foot wide road to 60-feet wide and will include a storm water system, lighting, traffic lights, curbs, gutter, grass, and concrete medians. Approximately 3.47 acres of wetlands will be impacted by the project.
PUBLIC NOTICE
US ARMY CORPS
OF ENGINEERS
OMAHA DISTRICT
APPLICANT:
APPLICATION NO:
WATERWAY:
ISSUE DATE:
EXPIRATION DATE:
CITY OF SIOUX FALLS
NWO-2016-0549-PIE
UNNAMED WETLANDS
JANUARY 31, 2018
FEBRUARY 21, 2018
________________________________________________________________
Regulatory Office, 28563 Powerhouse Rd, Room 118, Pierre, SD 57501
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/SouthDakota.aspx
_____________________________________________________________________________
21-DAY NOTICE
JOINT NOTICE OF PERMIT PENDING
US ARMY CORPS OF ENGINEERS
AND
SOUTH DAKOTA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
The application of the City of Sioux Falls for approval of plans and issuance of a permit under
authority of the Secretary of the Army is being considered by the District Commander, US Army
Engineer District, Omaha, Nebraska. The project described herein is not being proposed by
the Corps, but by the applicant; the Corps will evaluate the proposed work to determine if it
is permittable under current laws and regulations.
Description of Proposed Project: The applicant requests authorization to construct the Ellis
Road Improvement Project from 22nd Street to 41st Street in Sioux Falls, SD. The project will
improve the existing two-lane asphalt road to a safer five-lane urban street with a median and
turn lanes. The project will widen the existing 24-foot wide road to 60-feet wide and will
include a storm water system, lighting, traffic lights, curbs, gutter, grass, and concrete medians.
Approximately 3.47 acres of wetlands will be impacted by the project. See attached design
drawings.
Location: The project is located in Sections 21, 22, 27, and 28, Township 101 North, Range 50
West, Minnehaha County, South Dakota.
Purpose: The purpose of the proposed project is to improve travel safety and storm water
drainage.
Mitigation: The proposed project alternative was selected to avoid wetlands to the greatest
extent possible. Compensatory mitigation for the 3.47 acres of permanent wetland impacts will
be provided by the purchase of credits from a Corps' approved wetland mitigation bank.
Hydrogeomorphic functional assessment scores were calculated to account for the functional loss
of the impacted wetlands. A mitigation ratio of 1 to 1 will be used to compensate for the impacts
and a total of 8.90 credits will be purchased from the mitigation bank.
Existing Conditions: The project area is located along Ellis Road on the western edge of Sioux
Falls and contains ten unnamed wetlands that are connected to an unnamed tributary of Skunk
Creek. The current land use consists of typical grassed road ditches in the right-of-way of Ellis
Road surrounded by residential and commercial development.
The South Dakota Department of Environment and Natural Resources, Division of Environmental
Services, 523 East Capitol Avenue, Pierre, South Dakota, 57501-3181, will review the proposed
project for state certification in accordance with the provisions of Section 401 of the Clean Water
Act. The certification, if issued, will express the State's opinion that the operations undertaken by
the applicant will not result in a violation of applicable water quality standards. The South Dakota
Department of Environment and Natural Resources hereby incorporates this public notice as its own
public notice and procedures by reference (ARSD 74:51:01).
Omaha District will comply with the National Historic Preservation Act of 1966, as amended.
We have checked the National Register of Historic Places and "its current supplements," and no
property listed in the Register or proposed for listing is located in the permit area. This is the
extent of our knowledge about historic properties in the permit area at this time. We will
evaluate input by the State Historic Preservation Officer and the public in response to this public
notice, and we may conduct or require a reconnaissance survey of the permit area or check for
unknown historic properties, if warranted.
In compliance with the Endangered Species Act, a preliminary determination has been made that
the described work will not affect species designated as threatened or endangered or adversely affect
critical habitat. In order to complete our evaluation of this activity, comments are solicited from the
U.S. Fish and Wildlife Service and other interested agencies and individuals.
The decision whether to issue a permit will be based on an evaluation of the probable impacts
including cumulative impacts of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The benefit
which reasonably may be expected to accrue from the proposals must be balanced against its
reasonably foreseeable detriments. All factors which may be relevant to the activity will be
considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood
hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water
supply and conservation, water quality, energy needs, safety, food production, and, in general the
needs and welfare of the people. In addition, the evaluation of the impacts of the project on public
interest will include application of the guidelines promulgated by the Administrator, Environmental
Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 CFR Part 230).
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies
and officials; Indian Tribes; and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To
make this decision, comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and the other public interest factors listed above.
2
Comments are used in the preparation of an Environmental Assessment and/or an Environmental
Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the proposed
activity.
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reason for holding a public hearing. The request must be submitted to the US
Army Corps of Engineers, South Dakota Regulatory Office, 28563 Powerhouse Road, Room 118,
Pierre, South Dakota 57501.
Any interested party (particularly officials of any town, city, county, state, Federal agency, Indian
Tribe, or local association whose interests may be affected by the proposed work) is invited to
submit to this office, written facts, arguments, or objections on or before February 21, 2018. Any
agency or individual having an objection to the proposed work should specifically identify it as an
objection with clear and specific reasons. Comments, both favorable and unfavorable, will be
accepted, made a part of the record and will receive full consideration in subsequent actions on this
permit application. All replies to the public notice should be addressed to the address listed in the
previous paragraph. Cathy Juhas, telephone number (605) 224-8531, may be contacted for
additional information.
Comments received after the close of the business day on the expiration date of this public notice
will not be considered.
This project, if authorized, will be under the provisions of Section 404 of the Clean Water Act.
Drawings showing the location and extent of the work are attached to this notice.
3
1-90
Bu l~ilo Rldo-
, .. , 1 ., 1 t u~·
:·
·
It
··II
I
"O
.u
"I' '' ;·
1¥
0
0::
.~
W lJ t1h
I
..
"'
II'>·· II
101
...
. .
.," '
"
:I:
r"
..
f
41st Street
I
w1u1-.·11
"",,
"
~
f \
1111 l·l · ·
Ii
I
WIU1
111")
Sioux.F.'alls
. ....
i ..
;II
l
N
co
"
..
""
·
I
'fl ,, , - ,
"
r
~
22nd Street
..
1'
z
l··I
.:.
·
~
I '
m
I '"
I· ' I
!
;
t
"
i
...
L IOlh
....
I 1111 " I
'"'''
I
l
I
source~: U ri, HERE, Oplo11\w,..USGS,'(i11ermap~cromem P Co1p.. NRCAN,
Esrl Japan. METI, Esrt chlna ttiono Kong). Es1i (Thailand). Mnpmylndln. O
OponStroolMBil contrl u1015, nnll 111 Gl.~,us.er Communfty
' 'U·
6
Legend
N
WJ5/J)\ I!
'W
S
2ou1 Onhophologrophy
ProJecl:
X17~22
Dole: 1112112017
Ellis Road: 41st to 22nd St.
Map 1: Sile Vicinity
Crcalod By: R. Wolzol
Figure 1: Location Map
Convonllon Conlor Plo10
I~ 10 Wo·I Ruuoll Slrqol
S'ou· f o U1, SD ~7 IO·· l326
Pho no: (60~1 :131 ·2~0~
Fo·: f60SI JJ 1-2602
1iov·lo1Mi clCll k·e11g.eom
(Q[
I
Ct..
I..lI'
22'
PROf'OSEO 8'
PEDESIRWI SIDE P/\lH
~: 1
I
SLOPC TO
so·
ROW
f'ROf>OSW 8'
PEDES1Rlllll SIDE PATH
22'
,- - --
Figure 2: Roadway Cross Sections
r~,--~~=:::;;2~~~6ii~~~~s--=1-
J _/
- - - - -~.......
MATCH EXIS11N(i.
I
....... .......
/'
/
I
........_ __,.- _...
"" ....L \_·-~, . L
~OAD Dl101ES
\_L. ~""
SCl'tf'R PIPC
ftOAO DITCllES
PROPOSED TYPICAL CROSS SECTION OF ELLIS ROAD
PROl'OSt:O O'
PEO(SIRIAN SIDE Pf\IH
------
PROPOSCO -'- LANE
ARlERl/\l ROAD W/ t.iEOl/\N
Cl
·-
, __2_2_'-
1
-9· l.·.c..
3_3'_ __ _ _,
~I
PROPOSED 8'
PtOCS"l'Rll>.14 Siil£ PA'lfl
SLOPC TO
~~=--::c:b~°"~"'~, . --= d:-j=-=td~-; -:=::-='~,,~:;;;:._~_..,_d~-~1-t-: :-:-=-: -: :_: _~:; :o"AT"-CH-:f~~NG
I
l. . . _~\_PRoPOSEO
J
SIOfitJ I
SE.WEA PIPE
Fll.l
~I
EXISTillO
ROAD DITCH
nLL
Ir~ EXISTillC
ROAD DITCH
PROPOSED SECTION· STONEY CREEK OUTFALL DITCH
Oii: tll
DStll1 tJl
11/16/11
11/29/ 17
N>PR: ,ICM
11 /2&/ 17
SOVlll Elli$ ROAD
IZTll SlPffT TO 41ST srneer
, .. tkwnr.
211.)ll. Dt·1"1···"'9
l'rOjKt Htt I
APPENDIX A· ROADWAY DESIGN ALTERNATIVES
~/ml lf\1.J - 1 ol 1
SH:I ~
f .AUS1 SOuTtt DAKOTA
Figure 2: Roadway Cross Sections
'1'"1
SCAl.C: 1· .. 100'
0
100 rt
llO
I
_ 1485
1481-
t!Mt-*l-l+.B 1 inm'1111J11/i
·f
-,---i
PROPOSED EXPANDED
DETENTION AREA
"°'"'P..," .
~
/
8
1480
·1
N
CXISllNO OCltNTION
POllQ_otUNC~TION
CHESAPEAK
Figure 3: Detention Pond Expansion
l sec llon A- td
3+00
4+00
0100
1+00
2+00
10+00
11+00
!section B-BI
12+00
IJ+OO
1480
5+00
1HOO
=
IO-t 00
OSQI: t.ll
11/28/17
11/20/17
11/20/1 7
1460
1475
11+00
D.'.1[
DR· i!JI.
6+75
1'1+ 75
i : - i -1
1 47'. ~-~
6+00
12+00
14+00
141 75
SOUTll Ell lS RO~ll
IZTll STRfet TO ~IS i StnfEI
S10U.k r.uu, Sout H OAKOrA
APPENDIX A · PROPOSED DETENT10 N POND EXPANSION
Figure 3: Detention Pond Expansion
11'tu,.....
1tJN l.,_Or.ir..,.4· t
PtoJHI Ho I
U7UI
, ...., "-' I ol I
B
Figure 4: Wetland Impacts
l""""'1
ENG IN EERING
CL~l=I
U
+aa. qs 4l9Z
22Hclarkabn@nvc.com
Phone: (605) 225-3494
2301 8th Avenue NE
puzz
~~1:r~~~n. so5 7401
·m' ' °"
+aaJ+S
0
(I)
...,)>~
0...
EOE
3
REVISIONS:
I
I ~oc· 00·
I
I
1" =250'
12n 212017
DATE:
·~ I11~
x 1sss2
TLB/ PJC/ Rw
(") a.
OJ Cb
N!:::!:
0
)> :::i
P::E
PROJ. NO.
Cb
r+
()
""O
0
DRAWN BY:
I
I
r-+-
CD
0
'--·
0
l
--0
(/)
Cb I
....,
II
I
Cb
Cb
(/)
a;
a.
Cb
r+
(")
3
""O
0
)>
() a.
0
)> :::i
\0-
~r+
O:;:E
·
Cb
O:;:E
·
a.
Cb
r+
(")
""O
0
3
....,
m
rn
(/)
(") o._
)> :::i
o
or+
(.N-
Welland Mitigation
,
~·
.osi - .~ ers:>s
Ellis Road Improvement
~p~~ll ~
<~ \
oO
o._
:::i
0
r+
::E
I
I
(J)
~
CD
~
...
--
r-
I
) l'I)
~
u
CV
"O'
CV
b
::J
Detention Area
Wetland D Avoided
0.46 Acres
Additional
Wetland
Delineation
()
en
r+....,
(l)
I
Project Boundary
I
VJ
N
c:
ai=::
(l)
0
"O
0
:;:
"O CV
0 3:
0
I
::J
::J
·-~
E
I
0
:;:::
...Q.
I
:Y
0
E
CV
>
0
I
0
.2
c:
I
(f)
c:
A..
.!!!
Wet lad
iii
I
::J
I
0...
I
Wetland D Impacted
1.29 Acres
I
"
~
N
UJ
<
~
~
II
UJ
:;(
-
!:l
0
;;:
:ii
5
ci
z
~
z
~
x
Wetland F Impacted
0 . 16 Acres
cl
Wetland H Impacted
0.01 Acres
it
I
I
Wetland G Impacted
0.53 Acres
~.__,___
~
~
;;:
;:i
0
~
>=
"'
~
hl:i:
u
~
fil
~
"'
w
0w
I
I
Expanded
Detention Area
I
I
I
Additional
Wetland
Delineation
)
I\
Existing
Detention Area
r
(
(
Figure 5: Wetland Impacts
I
I
I
I
I
~
==========================================================================------0