PUBLIC NOTICE: The sponsor is proposing to develop the Fifield Wetland Mitigation Bank. The proposed bank site is approximately 365.0 acres in size, with an additional 87.7 acres of upland buffer areas.
PROJECT DESCRIPTION AND PURPOSE: The sponsor is proposing to develop the Fifield Wetland Mitigation Bank. The proposed bank site is approximately 365.0 acres in size, with an additional 87.7 acres of upland buffer areas. The proposed bank service area is Chippewa in Wisconsin (Upper Chippewa 8-digit HUC of the Mississippi River Basin, and Upper South Fork Flambeau River Watershed).
Public Notice
SPONSOR:
Mr. John C. Seramur
REFER TO: 2018-00054-JMB
ISSUED: February 1, 2018
EXPIRES: March 2, 2018
SECTION: 404 - Clean Water Act
1. WETLAND COMPENSATORY MITIGATION BANK PROPOSAL
2. SPECIFIC INFORMATION
SPONSOR'S ADDRESS:
John C. Seramur
4931 Bonita Bay Blvd
#1702
Bonita Springs, FL 34134
SPONSOR'S AGENT
Jon Gumtow, PWS, PSS
Stantec
1165 Schuering Road
De Pere, WI 54115
PROJECT LOCATION: The project site is located in Sections 16, 17, 20, and 21, Township 39 North,
Range 1 East, Price County, Wisconsin. The approximate UTM coordinates are 704044.299954,
5081716.083782. Latitude 45.858771, Longitude -90.371522.
BANK SERVICE AREA: The proposed bank service area is Chippewa in Wisconsin (Upper
Chippewa 8-digit HUC of the Mississippi River Basin, and Upper South Fork Flambeau River
Watershed).
DESCRIPTION OF PROJECT: The sponsor is proposing to develop the Fifield Wetland Mitigation
Bank. The proposed bank site is approximately 365.0 acres in size, with an additional 87.7 acres of
upland buffer areas.
NEED AND OBJECTIVE OF PROJECT: The purpose of this project is to create a private commercial
mitigation bank to serve the need for wetland compensatory mitigation within the Chippewa BSA and
the Mississippi River Basin. This Site will provide a necessary alternative for purchase of wetland
mitigation credits within the BSA versus permittee-responsible mitigation or purchase from the
Wisconsin Wetland Conservation Trust (WWCT) in-lieu fee mitigation program. This Site is also
expected to provide in-kind wetland mitigation credits for the Bog wetland type. Bog credits are
typically in short supply within most Bank Service Areas, and the Site will fulfill a need for in-kind
wetland mitigation of bog communities.
Based on the discretion of the regulatory agencies, this bank site could also serve neighboring
BSAs within the Mississippi River Basin. By permanently returning approximately 365 acres of
agricultural land (cranberry beds) and associated degraded wetlands to high quality wetland, this
project will restore lost ecological and hydrologic functions to the watershed, improve wildlife habitat,
and improve downstream water quality.
Regulatory Branch (File No. 2018-00054-JMB)
Based on a preliminary field evaluation of Site conditions, plant communities, and drainage features,
the initial proposed credits and ratios for the Site are provided in Table 1.
ESTABLISHMENT, OPERATION AND MANAGEMENT: The sponsor proposes to restore, via reestablishment and rehabilitation, approximately 365 acres to high-quality wetland communities. The
project objectives include increasing wildlife habitat, restoring native bog wetlands, improving water
quality, and restoring natural hydrologic functions that were previously lost or impaired as a result of
conversion of wetlands to intensive cranberry production. In order to protect existing bog wetlands
around the perimeter of the Site, and to maintain contiguous habitat corridors, a 200-foot buffer of
wetland and upland habitat (87.7 acres) will be enhanced around the Site perimeter. The proposed
plant communities for the Site include bog, wooded swamp, shallow/deep marsh, and upland forest.
The Site will be designed and established as a diverse wetland complex, with the goal of restoring
wetland communities and functions similar to what occurred on the Site prior to conversion to
cranberry production.
The primary mitigation goal is to re-establish high quality wetland communities within the existing
cranberry beds. Wetland hydrology will be restored through re-grading the bed surface as needed,
removing dikes, ditches, and disabling drain tiles, and modifying water diversion and control
infrastructure to restore the Site's natural topography and hydrology. The final concept for hydrology
modification will be completed following analysis of water table data collected from shallow
groundwater monitoring wells during the growing season, and upon completion of hydrologic analyses
of surface water flows and lateral effects of existing drainage ditches and tiles. It is expected that
grading will be included in the final design to remove ditches, dikes, and berms and to return
excavated beds to pre-disturbance elevations where appropriate. Existing cranberry vines are
proposed to be harvested prior to Site establishment. Plant species for the restoration will be selected
that are appropriate to the acidic bog wetlands that are characteristic of the Site and the North Central
Forest ecological landscape.
OWNERSHIP AND LONG-TERM MANAGEMENT: The Sponsor will record a conservation easement
on the Site which shall preserve the Site as wetland and associated buffer habitat in perpetuity. The
Sponsor also plans to retain ownership of the Site beyond the performance period and will be
responsible for periodic site inspections and long-term management of the Site. It is anticipated that
long-term management will primarily consist of invasive species control and maintenance of water
control structures to ensure appropriate hydrologic conditions. The Bank sponsor has not previously
completed a wetland mitigation banking project but intends to contract with Stantec Consulting
Services Inc. (Stantec) as the owner's agent to assess, design, monitor, and manage the Site.
Page 2 of 5
Regulatory Branch (File No. 2018-00054-JMB)
The site would be adaptively managed for development of vegetative plant communities dominated by
native species common to the bank area. Credit sales would be tracked by sponsor and reported to
the state as required by state law. The reported credit releases and sales would be tracked on both
Corps and state databases using ledger data supplied by the state. By state law, long-term
management of the property would be the responsibility of the landowner and the sponsor until all
released credits have been debited. After all credits are debited, long-term management obligations
would fall to the Sponsor under state law. Additional protections and management limitations would
be spelled out in both a conservation easement and in an approved bank plan.
TECHNICAL FEASIBILITY AND QUALIFICATIONS: Stantec has been involved with designing and
implementing wetland mitigation bank sites within the Midwest for over twenty years, for both State
and private sector proponents. They have experience in successfully managing restoration of former
commercial cranberry beds to diverse herbaceous and wooded wetland communities, and have
designed and implemented wetland mitigation projects on organic and sandy soils that have been
drained or hydrologically altered and converted to agriculture. The project team is comprised of
qualified Stantec staff with extensive experience completing similar wetland restoration projects in
Wisconsin.
ECOLOGICAL SUITABILITY: The physical, chemical, and biological characteristics of the Site are
representative of the North Central Forest Ecological Landscape (WDNR, 2015). These
characteristics make the Site suitable to service wetland impacts in the Chippewa BSA and
Mississippi River Basin and to achieve the stated objectives of the proposed mitigation bank. This Site
has a history of hydrologic modifications including rerouting and impoundments of waterways,
excavation, conversion of bog wetlands to agricultural use, and inputs of agricultural chemicals.
Historic field notes from the US Public Land Survey, WWI mapping, and the presence of hydric soils
across the Site provide evidence of wetland history, and suggest a high potential for restoration
success on the Site. Similar wetland mitigation projects have been successfully implemented on
comparable sites, demonstrating feasibility of this project.
HYDROLOGY: The cranberry beds and associated drainage, water control, and conveyance
infrastructure within the Site have resulted in a significant alteration of natural hydrologic patterns
relative to predisturbance conditions. Currently, water is circulated through a controlled closed-loop
system, from the reservoir to the beds, and back to the reservoir via a network of ditches and pumps.
Hydrologic modifications are proposed to return natural hydrologic connections, and wetland
hydroperiod, to the system. It is anticipated that wetlands will become re-established within their
historic extent across the Site following implementation of hydrologic restoration. The soils and
landscape position within the proposed wetland area are conducive to restoration of wetland
hydrologic functions. A detailed grading plan for the Site will be developed in concert with a watershed
and groundwater analysis. Proper implementation of grade modifications will be critical to successful
achievement of wetland hydrology. The Site and the surrounding 2,546-acre property are under the
ownership of the Sponsor, and no hydrologic impacts to off-site properties are anticipated.
Wetland extent has been estimated based on WWI mapping and observations during the field review.
Hydrology for the Site appears to be primarily influenced by runoff from precipitation and snow melt
and is routinely manipulated for cranberry crop production. Hydrology manipulation includes routine
draining, flooding, and irrigation which has significantly altered potential wetlands within the cranberry
operation and adjacent wetlands. The Site is adjacent to Threemile Creek and an
impoundment/reservoir associated with the cranberry operation. Shallow groundwater is likely a
primary source of hydrology for the Site. Monitoring wells have not yet been installed on the Site;
however, they are proposed to collect baseline hydrology data for the wetland restoration design.
Shallow groundwater monitoring will also continue into the performance period for the Site to evaluate
performance standard achievement.
Page 3 of 5
Regulatory Branch (File No. 2018-00054-JMB)
CURRENT LAND USES: Existing plant communities have been identified based on an initial field
review, and from aerial imagery, and include commercial cranberry beds, bog wetland, wooded
swamp wetland, open water, upland maintained berms and mowed (developed) areas, and upland
forest. The existing cranberry beds within the Site are maintained and planted with commercially
propagated forms of cranberry (Vaccinium macrocarpon). One partially constructed cranberry bed
also exists within the adjacent bog wetland in the northwestern portion of the Site, and consists of
native wetland vegetation surrounded by a perimeter ditch and spoil banks.
The perimeter of the Site consists of an extensive area of bog wetland, within which the cranberry
farming operation was established. An open water reservoir serving as a water source for the
cranberry operation is located adjacent to the northeast boundary of the Site, and a small pond is
located within the eastern Site buffer. These aquatic environments support deep marsh submerged
plant communities, as well as emergent shallow marsh. Upland portions of the Site buffer are currently
a combination of upland forest, mowed, and developed areas.
COORDINATION WITH RESOURCE AGENCIES: This project has been coordinated with the
following members of the Interagency Review Team (IRT) and other resource agencies: the
Wisconsin Department of Natural Resources (WDNR) and the U.S. Environmental Protection Agency.
3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR THEIR
CRITICAL HABITAT
None were identified by the bank sponsor or are known to exist in the action area. However, Price
County is within the known historic range for the following Federally-listed species:
Northern Long-Eared Bat
Hibernates in caves and mines swarming in surrounding
wooded areas in autumn. During summer, roosts and forages
in upland forests.
Canada lynx
While no resident populations are known from Wisconsin, the
species occasionally occurs in northern forested areas, and
counties listed are those with the highest likelihood of
occurrence.
Gray wolf
Northern forested areas.
This notice is being coordinated with the U.S. Fish and Wildlife Service. Any comments it may have
concerning Federally-listed threatened or endangered wildlife or plants or their critical habitat will be
considered in our final assessment of the described work.
4. JURISDICTION
This proposal is being reviewed in accordance with the practices for documenting Corps jurisdiction
under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act
identified in Regulatory Guidance Letter 16-01.
Page 4 of 5
Regulatory Branch (File No. 2018-00054-JMB)
5. HISTORICAL/ARCHAEOLOGICAL
The Corps will review information on known cultural resources and/or historic properties within and
adjacent to the project area. The Corps will also consider the potential effects of the project on any
properties that have yet to be identified. The results of this review and the Corps' determination of
effect will be coordinated with the State Historic Preservation Officer independent of this public notice.
Any adverse effects on historic properties will be resolved prior to the Corps authorization of the work
in connection with this project.
The latest version of the Wisconsin Historic Preservation Database has been consulted and no listed
properties (known to be eligible for inclusion, or included in the Register) are located within, or
adjacent to the project area.
6.
PUBLIC HEARING REQUESTS
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, in detail, the
reasons for holding a public hearing. A request may be denied if substantive reasons for holding a
hearing are not provided or if there is otherwise no valid interest to be served.
7.
REPLIES/COMMENTS
Interested parties are invited to submit to this office written facts, arguments, or objections within 30
days of the date of this notice. These statements should bear upon the suitability of the location and
the adequacy of the project and should, if appropriate, suggest any changes believed to be desirable.
Comments received may be forwarded to the applicant. A copy of the full prospectus submitted by
the Sponsor is available to the public for review upon request.
Replies may be addressed to:
Regulatory Branch
St. Paul District Corps of Engineers
180 Fifth Street East, Suite 700
St. Paul, MN 55101-1678
Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call Jonathan Bakken at the Hayward office
of the Corps, telephone number 651-290-5884.
To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your information in
the New Registration Box.
Chad Konickson,
Chief, Regulatory Branch
Enclosure(s)
Page 5 of 5
Figure No.
1
Title
Project Location
Client/Project
Fifield Cranberries Wetland
Mitigation Bank Prospectus
Project Location
193705812
Prepared by MPG o n 2017-11-29
Technical Review by DG on 2017-11-29
Independent Review by JG on 2017-12-13
T39N, R1E, S7-9, 16, 17, 21, 20,
T. of Fifield, Price C o., W I
0
1,000
¯
(
2,000
Feet
$ $
1:24,000 (At original document size of 11x17)
Legend
Property Boundary (2546.4 acres)
Project Area (365.0 acres)
V:\1937\Active\193705812\03_data\gis_cad\gis\mxds\prospectus_figures\fig1_topo_193705812.mxd
Revised: 2017-12-14 By: mgalarneau
Project Area 200ft Buffer (87.7 acres)
EISENSTEIN
182
T
S
LAKE
13
T
S
70
S
T
NE / NC
Supplement
Price
FLAMBEAU
WORCESTER
FIFIELD
EMERY
Notes
1. Coordinate System: NAD 1983 StatePlane Wisconsin North FIPS 4801
Feet
2. Data Sources Include: Stantec, WisDOT, WDNR
3. Background: USGS 7.5' Topographic Quadrangles
Disclaimer: Stante c assumes no responsibility for data supplied in electronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its office rs, employees, consultants and agents, from any and all claims arising in any way from the content or provision of the data.
Page 1 of 1
MVP-2018-00054-JMB Page 1 of 3
Figure No.
d
Rd
Boruta Rd
Existing Conditions
s
Sugar B u
Client/Project
Fifield Cranberries Wetland
Mitigation Bank Prospectus
Bob Cat Rd
Project Location
193705812
Prepared by MPG o n 2017-12-14
Technical Review by MP on 2017-12-14
Independent Review by JS on 2017-12-14
T39N, R1E, S7-9, 16, 17, 21, 20,
T. of Fifield, Price C o., W I
70
S
T
Bush R
d
ve
Willow A
Old 13
d
0
1,000
2,000
Feet
1:24,000 (At original document size of 11x17)
Rd
Hilgart R d
a l Av e
St
N Boruta Rd
T
S
Bals am
Title
Rapid s
Div ine
13
Old 70 R
5
R
d
Briske R
Krucky Rd
Ash St
ahl
hR
d
Lo
fd
¯
(
$ $
Legend
W Centr
Property Boundary (2546.4 acres)
Project Area (365.0 acres)
Project Area 200ft Buffer (87.7 acres)
Existing Community
Bog (86.6 acres)
Cranberry Bed (312.5 acres)
Developed (17.4 acre)
Open Water (18.4 acres)
Upland Forest (1.8 acres)
Wooded Swamp (14.6 acres)
NG
s
a te
Lak
d
eR
NE / NC
Supplement
EISENSTEIN
182
T
S
LAKE
70
T
S
13
S
T
Price
FIFIELD
FLAMBEAU
WORCESTER
Pet ers Rd
m Rd
Da
anding
Hic ks L
Ki n g
EMERY
Notes
Rd
Rd
V:\1937\Active\193705812\03_data\gis_cad\gis\mxds\prospectus_figures\fig3_existing_communities_193705812.mxd
Revised: 2017-12-14 By: mgalarneau
Chada Rd
1. Coordinate System: NAD 1983 StatePlane Wisconsin North FIPS 4801
Feet
2. Data Sources Include: Stantec, WisDOT, WDNR
3. Orthophotography: 2017 NAIP
E Club
Rd
Disclaimer: Stante c assumes no responsibility for data supplied in electronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its office rs, employees, consultants and agents, from any and all claims arising in any way from the content or provision of the data.
Page 1 of 1
MVP-2018-00054-JMB Page 2 of 3
Figure No.
d
Rd
Boruta Rd
Proposed Plant Communities
by Compensation Method
s
Sugar B u
Client/Project
Fifield Cranberries Wetland
Mitigation Bank Prospectus
Bob Cat Rd
Project Location
193705812
Prepared by MPG o n 2017-12-14
Technical Review by MP on 2017-12-14
Independent Review by JS on 2017-12-14
T39N, R1E, S7-9, 16, 17, 21, 20,
T. of Fifield, Price C o., W I
70
S
T
Bush R
d
ve
Willow A
Old 13
d
0
1,000
2,000
Feet
1:24,000 (At original document size of 11x17)
Rd
Hilgart R d
a l Av e
St
N Boruta Rd
T
S
Bals am
Title
Rapid s
Div ine
13
Old 70 R
9
R
d
Briske R
Krucky Rd
Ash St
ahl
hR
d
Lo
fd
¯
(
$ $
Legend
W Centr
Property Boundary (2546.4 acres)
Project Area (365.0 acres)
Project Area 200ft Buffer (87.7 acres)
Proposed Community
Re-establishment - Bog (330.9 acres)
Rehabilitation - Bog (34.1 acres)
Buffer - Bog (52.6 acres)
Buffer - Shallow/Deep Marsh (1.3 acres)
Buffer - Wooded Swamp (14.6 acres)
Buffer - Upland Forest (19.2 acres)
NG
s
a te
Lak
d
eR
NE / NC
Supplement
EISENSTEIN
182
T
S
LAKE
70
T
S
13
S
T
Price
FIFIELD
FLAMBEAU
WORCESTER
Pet ers Rd
m Rd
Da
anding
Hic ks L
Ki n g
EMERY
Notes
Rd
Rd
V:\1937\Active\193705812\03_data\gis_cad\gis\mxds\prospectus_figures\fig7_proposed_communities_193705812.mxd
Revised: 2018-01-03 By: mgalarneau
Chada Rd
1. Coordinate System: NAD 1983 StatePlane Wisconsin North FIPS 4801
Feet
2. Data Sources Include: Stantec, WisDOT, WDNR
3. Orthophotography: 2017 NAIP
E Club
Rd
Disclaimer: Stante c assumes no responsibility for data supplied in electronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its office rs, employees, consultants and agents, from any and all claims arising in any way from the content or provision of the data.
Page 1 of 1
MVP-2018-00054-JMB Page 3 of 3