PUBLIC NOTICE: The sponsor is proposing to develop the Fifield Wetland Mitigation Bank. The proposed bank site is approximately 365.0 acres in size, with an additional 87.7 acres of upland buffer areas.

PROJECT DESCRIPTION AND PURPOSE: The sponsor is proposing to develop the Fifield Wetland Mitigation Bank. The proposed bank site is approximately 365.0 acres in size, with an additional 87.7 acres of upland buffer areas. The proposed bank service area is Chippewa in Wisconsin (Upper Chippewa 8-digit HUC of the Mississippi River Basin, and Upper South Fork Flambeau River Watershed).

Public Notice SPONSOR:

Mr. John C. Seramur

REFER TO: 2018-00054-JMB

ISSUED: February 1, 2018 EXPIRES: March 2, 2018

SECTION: 404 - Clean Water Act

1. WETLAND COMPENSATORY MITIGATION BANK PROPOSAL 2. SPECIFIC INFORMATION SPONSOR'S ADDRESS:

John C. Seramur 4931 Bonita Bay Blvd #1702 Bonita Springs, FL 34134

SPONSOR'S AGENT

Jon Gumtow, PWS, PSS Stantec 1165 Schuering Road De Pere, WI 54115

PROJECT LOCATION: The project site is located in Sections 16, 17, 20, and 21, Township 39 North, Range 1 East, Price County, Wisconsin. The approximate UTM coordinates are 704044.299954, 5081716.083782. Latitude 45.858771, Longitude -90.371522. BANK SERVICE AREA: The proposed bank service area is Chippewa in Wisconsin (Upper Chippewa 8-digit HUC of the Mississippi River Basin, and Upper South Fork Flambeau River Watershed). DESCRIPTION OF PROJECT: The sponsor is proposing to develop the Fifield Wetland Mitigation Bank. The proposed bank site is approximately 365.0 acres in size, with an additional 87.7 acres of upland buffer areas. NEED AND OBJECTIVE OF PROJECT: The purpose of this project is to create a private commercial mitigation bank to serve the need for wetland compensatory mitigation within the Chippewa BSA and the Mississippi River Basin. This Site will provide a necessary alternative for purchase of wetland mitigation credits within the BSA versus permittee-responsible mitigation or purchase from the Wisconsin Wetland Conservation Trust (WWCT) in-lieu fee mitigation program. This Site is also expected to provide in-kind wetland mitigation credits for the Bog wetland type. Bog credits are typically in short supply within most Bank Service Areas, and the Site will fulfill a need for in-kind wetland mitigation of bog communities. Based on the discretion of the regulatory agencies, this bank site could also serve neighboring BSAs within the Mississippi River Basin. By permanently returning approximately 365 acres of agricultural land (cranberry beds) and associated degraded wetlands to high quality wetland, this project will restore lost ecological and hydrologic functions to the watershed, improve wildlife habitat, and improve downstream water quality.

Regulatory Branch (File No. 2018-00054-JMB) Based on a preliminary field evaluation of Site conditions, plant communities, and drainage features, the initial proposed credits and ratios for the Site are provided in Table 1.

ESTABLISHMENT, OPERATION AND MANAGEMENT: The sponsor proposes to restore, via reestablishment and rehabilitation, approximately 365 acres to high-quality wetland communities. The project objectives include increasing wildlife habitat, restoring native bog wetlands, improving water quality, and restoring natural hydrologic functions that were previously lost or impaired as a result of conversion of wetlands to intensive cranberry production. In order to protect existing bog wetlands around the perimeter of the Site, and to maintain contiguous habitat corridors, a 200-foot buffer of wetland and upland habitat (87.7 acres) will be enhanced around the Site perimeter. The proposed plant communities for the Site include bog, wooded swamp, shallow/deep marsh, and upland forest. The Site will be designed and established as a diverse wetland complex, with the goal of restoring wetland communities and functions similar to what occurred on the Site prior to conversion to cranberry production. The primary mitigation goal is to re-establish high quality wetland communities within the existing cranberry beds. Wetland hydrology will be restored through re-grading the bed surface as needed, removing dikes, ditches, and disabling drain tiles, and modifying water diversion and control infrastructure to restore the Site's natural topography and hydrology. The final concept for hydrology modification will be completed following analysis of water table data collected from shallow groundwater monitoring wells during the growing season, and upon completion of hydrologic analyses of surface water flows and lateral effects of existing drainage ditches and tiles. It is expected that grading will be included in the final design to remove ditches, dikes, and berms and to return excavated beds to pre-disturbance elevations where appropriate. Existing cranberry vines are proposed to be harvested prior to Site establishment. Plant species for the restoration will be selected that are appropriate to the acidic bog wetlands that are characteristic of the Site and the North Central Forest ecological landscape. OWNERSHIP AND LONG-TERM MANAGEMENT: The Sponsor will record a conservation easement on the Site which shall preserve the Site as wetland and associated buffer habitat in perpetuity. The Sponsor also plans to retain ownership of the Site beyond the performance period and will be responsible for periodic site inspections and long-term management of the Site. It is anticipated that long-term management will primarily consist of invasive species control and maintenance of water control structures to ensure appropriate hydrologic conditions. The Bank sponsor has not previously completed a wetland mitigation banking project but intends to contract with Stantec Consulting Services Inc. (Stantec) as the owner's agent to assess, design, monitor, and manage the Site.

Page 2 of 5

Regulatory Branch (File No. 2018-00054-JMB) The site would be adaptively managed for development of vegetative plant communities dominated by native species common to the bank area. Credit sales would be tracked by sponsor and reported to the state as required by state law. The reported credit releases and sales would be tracked on both Corps and state databases using ledger data supplied by the state. By state law, long-term management of the property would be the responsibility of the landowner and the sponsor until all released credits have been debited. After all credits are debited, long-term management obligations would fall to the Sponsor under state law. Additional protections and management limitations would be spelled out in both a conservation easement and in an approved bank plan. TECHNICAL FEASIBILITY AND QUALIFICATIONS: Stantec has been involved with designing and implementing wetland mitigation bank sites within the Midwest for over twenty years, for both State and private sector proponents. They have experience in successfully managing restoration of former commercial cranberry beds to diverse herbaceous and wooded wetland communities, and have designed and implemented wetland mitigation projects on organic and sandy soils that have been drained or hydrologically altered and converted to agriculture. The project team is comprised of qualified Stantec staff with extensive experience completing similar wetland restoration projects in Wisconsin. ECOLOGICAL SUITABILITY: The physical, chemical, and biological characteristics of the Site are representative of the North Central Forest Ecological Landscape (WDNR, 2015). These characteristics make the Site suitable to service wetland impacts in the Chippewa BSA and Mississippi River Basin and to achieve the stated objectives of the proposed mitigation bank. This Site has a history of hydrologic modifications including rerouting and impoundments of waterways, excavation, conversion of bog wetlands to agricultural use, and inputs of agricultural chemicals. Historic field notes from the US Public Land Survey, WWI mapping, and the presence of hydric soils across the Site provide evidence of wetland history, and suggest a high potential for restoration success on the Site. Similar wetland mitigation projects have been successfully implemented on comparable sites, demonstrating feasibility of this project. HYDROLOGY: The cranberry beds and associated drainage, water control, and conveyance infrastructure within the Site have resulted in a significant alteration of natural hydrologic patterns relative to predisturbance conditions. Currently, water is circulated through a controlled closed-loop system, from the reservoir to the beds, and back to the reservoir via a network of ditches and pumps. Hydrologic modifications are proposed to return natural hydrologic connections, and wetland hydroperiod, to the system. It is anticipated that wetlands will become re-established within their historic extent across the Site following implementation of hydrologic restoration. The soils and landscape position within the proposed wetland area are conducive to restoration of wetland hydrologic functions. A detailed grading plan for the Site will be developed in concert with a watershed and groundwater analysis. Proper implementation of grade modifications will be critical to successful achievement of wetland hydrology. The Site and the surrounding 2,546-acre property are under the ownership of the Sponsor, and no hydrologic impacts to off-site properties are anticipated. Wetland extent has been estimated based on WWI mapping and observations during the field review. Hydrology for the Site appears to be primarily influenced by runoff from precipitation and snow melt and is routinely manipulated for cranberry crop production. Hydrology manipulation includes routine draining, flooding, and irrigation which has significantly altered potential wetlands within the cranberry operation and adjacent wetlands. The Site is adjacent to Threemile Creek and an impoundment/reservoir associated with the cranberry operation. Shallow groundwater is likely a primary source of hydrology for the Site. Monitoring wells have not yet been installed on the Site; however, they are proposed to collect baseline hydrology data for the wetland restoration design. Shallow groundwater monitoring will also continue into the performance period for the Site to evaluate performance standard achievement.

Page 3 of 5

Regulatory Branch (File No. 2018-00054-JMB)

CURRENT LAND USES: Existing plant communities have been identified based on an initial field review, and from aerial imagery, and include commercial cranberry beds, bog wetland, wooded swamp wetland, open water, upland maintained berms and mowed (developed) areas, and upland forest. The existing cranberry beds within the Site are maintained and planted with commercially propagated forms of cranberry (Vaccinium macrocarpon). One partially constructed cranberry bed also exists within the adjacent bog wetland in the northwestern portion of the Site, and consists of native wetland vegetation surrounded by a perimeter ditch and spoil banks. The perimeter of the Site consists of an extensive area of bog wetland, within which the cranberry farming operation was established. An open water reservoir serving as a water source for the cranberry operation is located adjacent to the northeast boundary of the Site, and a small pond is located within the eastern Site buffer. These aquatic environments support deep marsh submerged plant communities, as well as emergent shallow marsh. Upland portions of the Site buffer are currently a combination of upland forest, mowed, and developed areas. COORDINATION WITH RESOURCE AGENCIES: This project has been coordinated with the following members of the Interagency Review Team (IRT) and other resource agencies: the Wisconsin Department of Natural Resources (WDNR) and the U.S. Environmental Protection Agency. 3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR THEIR CRITICAL HABITAT None were identified by the bank sponsor or are known to exist in the action area. However, Price County is within the known historic range for the following Federally-listed species: Northern Long-Eared Bat

Hibernates in caves and mines ­ swarming in surrounding wooded areas in autumn. During summer, roosts and forages in upland forests.

Canada lynx

While no resident populations are known from Wisconsin, the species occasionally occurs in northern forested areas, and counties listed are those with the highest likelihood of occurrence.

Gray wolf

Northern forested areas.

This notice is being coordinated with the U.S. Fish and Wildlife Service. Any comments it may have concerning Federally-listed threatened or endangered wildlife or plants or their critical habitat will be considered in our final assessment of the described work. 4. JURISDICTION This proposal is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act identified in Regulatory Guidance Letter 16-01.

Page 4 of 5

Regulatory Branch (File No. 2018-00054-JMB)

5. HISTORICAL/ARCHAEOLOGICAL The Corps will review information on known cultural resources and/or historic properties within and adjacent to the project area. The Corps will also consider the potential effects of the project on any properties that have yet to be identified. The results of this review and the Corps' determination of effect will be coordinated with the State Historic Preservation Officer independent of this public notice. Any adverse effects on historic properties will be resolved prior to the Corps authorization of the work in connection with this project. The latest version of the Wisconsin Historic Preservation Database has been consulted and no listed properties (known to be eligible for inclusion, or included in the Register) are located within, or adjacent to the project area. 6.

PUBLIC HEARING REQUESTS

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, in detail, the reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served. 7.

REPLIES/COMMENTS

Interested parties are invited to submit to this office written facts, arguments, or objections within 30 days of the date of this notice. These statements should bear upon the suitability of the location and the adequacy of the project and should, if appropriate, suggest any changes believed to be desirable. Comments received may be forwarded to the applicant. A copy of the full prospectus submitted by the Sponsor is available to the public for review upon request. Replies may be addressed to: Regulatory Branch St. Paul District Corps of Engineers 180 Fifth Street East, Suite 700 St. Paul, MN 55101-1678 Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call Jonathan Bakken at the Hayward office of the Corps, telephone number 651-290-5884. To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your information in the New Registration Box.

Chad Konickson, Chief, Regulatory Branch Enclosure(s)

Page 5 of 5

Figure No.

1

Title

Project Location

Client/Project

Fifield Cranberries Wetland Mitigation Bank Prospectus

Project Location

193705812

Prepared by MPG o n 2017-11-29 Technical Review by DG on 2017-11-29 Independent Review by JG on 2017-12-13

T39N, R1E, S7-9, 16, 17, 21, 20, T. of Fifield, Price C o., W I

0

1,000

¯ (

2,000 Feet

$ $

1:24,000 (At original document size of 11x17)

Legend Property Boundary (2546.4 acres) Project Area (365.0 acres)

V:\1937\Active\193705812\03_data\gis_cad\gis\mxds\prospectus_figures\fig1_topo_193705812.mxd

Revised: 2017-12-14 By: mgalarneau

Project Area 200ft Buffer (87.7 acres)

EISENSTEIN

182 T S

LAKE

13 T S

70 S T

NE / NC Supplement

Price

FLAMBEAU WORCESTER

FIFIELD

EMERY

Notes

1. Coordinate System: NAD 1983 StatePlane Wisconsin North FIPS 4801 Feet 2. Data Sources Include: Stantec, WisDOT, WDNR 3. Background: USGS 7.5' Topographic Quadrangles

Disclaimer: Stante c assumes no responsibility for data supplied in electronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its office rs, employees, consultants and agents, from any and all claims arising in any way from the content or provision of the data.

Page 1 of 1

MVP-2018-00054-JMB Page 1 of 3

Figure No.

d

Rd

Boruta Rd

Existing Conditions

s Sugar B u

Client/Project

Fifield Cranberries Wetland Mitigation Bank Prospectus

Bob Cat Rd

Project Location

193705812

Prepared by MPG o n 2017-12-14 Technical Review by MP on 2017-12-14 Independent Review by JS on 2017-12-14

T39N, R1E, S7-9, 16, 17, 21, 20, T. of Fifield, Price C o., W I

70 S T

Bush R

d

ve Willow A

Old 13

d

0

1,000

2,000 Feet

1:24,000 (At original document size of 11x17)

Rd

Hilgart R d

a l Av e

St

N Boruta Rd

T S Bals am

Title

Rapid s Div ine

13

Old 70 R

5

R

d Briske R

Krucky Rd

Ash St

ahl

hR d

Lo fd

¯ ( $ $

Legend

W Centr

Property Boundary (2546.4 acres) Project Area (365.0 acres) Project Area 200ft Buffer (87.7 acres)

Existing Community

Bog (86.6 acres) Cranberry Bed (312.5 acres) Developed (17.4 acre) Open Water (18.4 acres) Upland Forest (1.8 acres) Wooded Swamp (14.6 acres)

NG

s a te

Lak

d eR

NE / NC Supplement

EISENSTEIN

182 T S

LAKE

70 T S 13 S T

Price

FIFIELD

FLAMBEAU WORCESTER

Pet ers Rd

m Rd Da

anding Hic ks L

Ki n g

EMERY

Notes

Rd

Rd

V:\1937\Active\193705812\03_data\gis_cad\gis\mxds\prospectus_figures\fig3_existing_communities_193705812.mxd

Revised: 2017-12-14 By: mgalarneau

Chada Rd

1. Coordinate System: NAD 1983 StatePlane Wisconsin North FIPS 4801 Feet 2. Data Sources Include: Stantec, WisDOT, WDNR 3. Orthophotography: 2017 NAIP

E Club

Rd

Disclaimer: Stante c assumes no responsibility for data supplied in electronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its office rs, employees, consultants and agents, from any and all claims arising in any way from the content or provision of the data.

Page 1 of 1

MVP-2018-00054-JMB Page 2 of 3

Figure No.

d

Rd

Boruta Rd

Proposed Plant Communities by Compensation Method

s Sugar B u

Client/Project

Fifield Cranberries Wetland Mitigation Bank Prospectus

Bob Cat Rd

Project Location

193705812

Prepared by MPG o n 2017-12-14 Technical Review by MP on 2017-12-14 Independent Review by JS on 2017-12-14

T39N, R1E, S7-9, 16, 17, 21, 20, T. of Fifield, Price C o., W I

70 S T

Bush R

d

ve Willow A

Old 13

d

0

1,000

2,000 Feet

1:24,000 (At original document size of 11x17)

Rd

Hilgart R d

a l Av e

St

N Boruta Rd

T S Bals am

Title

Rapid s Div ine

13

Old 70 R

9

R

d Briske R

Krucky Rd

Ash St

ahl

hR d

Lo fd

¯ ( $ $

Legend

W Centr

Property Boundary (2546.4 acres) Project Area (365.0 acres) Project Area 200ft Buffer (87.7 acres)

Proposed Community

Re-establishment - Bog (330.9 acres) Rehabilitation - Bog (34.1 acres) Buffer - Bog (52.6 acres) Buffer - Shallow/Deep Marsh (1.3 acres) Buffer - Wooded Swamp (14.6 acres) Buffer - Upland Forest (19.2 acres)

NG

s a te

Lak

d eR

NE / NC Supplement

EISENSTEIN

182 T S

LAKE

70 T S 13 S T

Price

FIFIELD

FLAMBEAU WORCESTER

Pet ers Rd

m Rd Da

anding Hic ks L

Ki n g

EMERY

Notes

Rd

Rd

V:\1937\Active\193705812\03_data\gis_cad\gis\mxds\prospectus_figures\fig7_proposed_communities_193705812.mxd

Revised: 2018-01-03 By: mgalarneau

Chada Rd

1. Coordinate System: NAD 1983 StatePlane Wisconsin North FIPS 4801 Feet 2. Data Sources Include: Stantec, WisDOT, WDNR 3. Orthophotography: 2017 NAIP

E Club

Rd

Disclaimer: Stante c assumes no responsibility for data supplied in electronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its office rs, employees, consultants and agents, from any and all claims arising in any way from the content or provision of the data.

Page 1 of 1

MVP-2018-00054-JMB Page 3 of 3

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas