Hillsborough County. Joe Taggart; JT Enterprises, LLC. Tampa, Florida.
PROJECT PURPOSE:
Basic: Commercial Development.
Overall: Commercial development consisting of 5 commercial (retail/restaurant/medical office) outparcels.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Joe Taggart
JT Enterprises, LLC
107 South Franklin Street, Suite 200
Tampa, Florida 33602
WATERWAY AND LOCATION: The project would affect waters of the United States associated with the Hillsborough River. The project site is located along the south side of East Fletcher Avenue (SR 582A) between Telecom Drive and Telecom Parkway North, in Section 11, Township 28 South, Range 19 East, Temple Terrace, Hillsborough County, Florida.
Directions to the site are as follows: Driving north on I-75, take Exit 266 west on to E. Fletcher Ave. Drive approximately 1.2 miles west on E. Fletcher Ave. The project site will be on the left (south) side of the road, between Telecom Parkway N. and Telecom Drive.
APPROXIMATE CENTRAL COORDINATES:
Latitude 28.068234°
Longitude -82.372213°
PROJECT PURPOSE:
Basic: Commercial Development
Overall: Commercial development consisting of 5 commercial (retail/restaurant/medical office) outparcels.
EXISTING CONDITIONS: The wetland system consists of a 5.94 acre freshwater system. The onsite wetland vegetation consists of a 5.94 acre wetland (Wetland 1) (Wetland Forested Mixed - FLUCFCS 630). The periphery of this wetland is dominated by laurel oak (Quercus laurifolia) and red maple (Acer rubrum) in the canopy. The canopy within the interior of the wetland is dominated by cypress (Taxodium spp.) with lesser coverage of sweetbay magnolia (Magnolia virginiana). The shrub layer consists primarily of buttonbush (Cephalanthus occidentalis) and Carolina willow (Salix caroliniana), while groundcover is dominated by Lizard’s tail (Saururus cernuus), pickerelweed (Pontedaria cordata), royal fern (Osmunda regalis), Virginia chain fern (Woodwardia virginica), and soft rush (Juncus effusus). This wetland is hydrologically isolated from adjacent systems by surrounding roads, development, and a berm along the southwest portion of the wetland.
The surrounding project area consists of uplands within the northern, western, southwestern, and southeastern portions of the project area. Dominate vegetation within these areas consist of maintained upland grasses, predominantly bahiagrass (Paspalum notatum), adjacent to surrounding roadways. The southeastern portion of the area contains a small upland fringe directly adjacent to existing development (hotels). This area is dominated by live oak (Quercus virginiana) and laurel oak in the canopy, beautyberry (Callicarpa americana) and Carolina laurelcherry (Prunus caroliniana) in the shrub layer, with sword fern (Nephrolepis exaltata) and blackberry (Rubus spp.) in the herbaceous layer. The northeast portion of the project area includes uplands dominated by live oak and slash pine (Pinus palustris) in the canopy layer, with saw palmetto (Serenoa repens) dominating the shrub layer. The herbaceous stratum provided only minimal coverage, with sword fern and vines including earleaf greenbrier (Smilax auriculata) and poison ivy (Toxicodendron radicans) present.
PROPOSED WORK: The applicant seeks authorization to construct ± 13.86 acre commercial development consisting of 5 commercial (retail/restaurant/medical office) outparcels. The project will also contain related site amenities and improvements inclusive of parking, access roadways, landscaping, utilities, and storm water management facilities. The proposed outparcels total approximately 21,500 square feet. The proposed project also includes a total of 4 acres of impact to the existing on-site wetland as a result of fill required for the construction of the outparcels.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
In order to have an economically viable project, it must be situated along the frontage of
Fletcher Avenue. Given the size and location of the wetland within the central portion of the project boundary and adjacent to Fletcher Avenue, complete avoidance of the wetland was not possible. The upland portion identified on the project site has been maximized for development purposes. Impacts to 4.6 acres of wetlands has been previously approved via letter in 1985 and in 2001 under permit SAJ-1997-01375. Based on additional efforts to avoid or minimize wetland impacts, the proposed project will only impact 4.0 acres of wetlands, less than was previously approved.
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
Compensatory wetland mitigation has already been authorized and provided for the proposed impacts. These areas have also been deemed successful by both SWFWMD and EPC. According to the October 1985 SWFWMD permit (ERP No. 49000390), the total mitigation proposed for the Telecom site included 18.37 acres of ponds including littoral shelves, 6.8 acres of wetlands, and 2.85 acres of wetlands provided specifically for compensation for impacts to wood stork habitat (Woodstork Ponds).
In May 2017, Birkitt Environmental Services, Inc. performed an assessment of the current condition of the mitigation areas within the site. Based on the assessment, vegetative cover within the littoral shelves of the ponds and within the wetlands ranged from 65% to 95%, with cover exceeding 80% in the majority of these areas. Dominant species included mature cypress in the canopy as well as groundcover consisting of swamp flag (Thalia geniculata) and pickerelweed, among others. Nuisance/exotic species coverage was minimal, with only some torpedograss (Panicum repens), less than <5% coverage in all ponds, along the shore line, 5%-10% cover of cattail (Typha spp.) in one pond only, and minimal <5% coverage of Peruvian primrosewillow (Ludwigia peruviana) in a few of the ponds.
The northern Woodstork Pond contained nearly 100% vegetative cover dominated by herbaceous species including swamp flag, soft rush, and lizard’s tail. Nuisance/exotic species coverage in this pond was minimal and consisted of less than <5% cover of Peruvian primrosewillow. Vegetative cover within the southern Woodstork Pond was somewhat less, with approximately 60% cover, however a significant portion of this pond appears to have been designed as shallow open water habitat to provide woodstork Suitable Foraging Habitat (SFH). Dominant species included swamp flag, pickerelweed, soft rush, and Carolina willow. Nuisance/exotic species coverage consisted of approximately 5%-10% cover of Peruvian primrosewillow.
Based on an assessment of the current condition of the mitigation areas, they continue to meet success criterion and provide a full range of habitat values as compensation for the wetlands proposed for impact.
CULTURAL RESOURCES:
The Corps is aware of historic property/properties within or in close proximity of the permit area. The Corps will initiate consultation with the State Historic Preservation Office and those federally recognized tribes with concerns in Florida and the Permit Area, and the Advisory Council on Historic Preservation as applicable pursuant to 33 CFR 325, Appendix C and Section 106 of the National Historic Preservation Act, by separate letter.
ENDANGERED SPECIES:
The Corps has determined the proposed project “May affect, but is not likely to adversely affect (NLAA)” the Wood stork (Mycteria americana) and Eastern indigo snake (Drymarchon corais couperi). Potential impacts to the wood stork were evaluated using the Effect Determination Key for the Wood Stork in Central and North Peninsular Florida, dated September 2008 (Key). The Corps has programmatic concurrence with the sequential determination of A > B > C > NLAA pursuant to the Key. Potential impacts to the eastern indigo snake were evaluated using the Eastern Indigo Snake Key (Key) dated 25 January 2010 and updated 13 August 2013. The Corps has programmatic concurrence with the sequential determination of A > B > C > NLAA pursuant to the Key. This determination is based on the applicant implementing the Standard Protection Measures for the Eastern Indigo Snake. Through the Programmatic Concurrence of above referenced 2 keys, “NLAA” determinations for projects made pursuant to these keys require no further consultation with the U.S. Fish and Wildlife pursuant to Section 7 of the Endangered Species Act.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line [has not] been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610-8302 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ryan Hendren, in writing at the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610-8302; by electronic mail at Ryan.G.Hendren@usace.army.mil or, by telephone at 813-769-7075.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
10117 PRINCESS PALM AVE, SUITE 120
TAMPA, FLORIDA 33610-8302
February 2, 2018
REPLY TO
ATTENTION OF
Regulatory Division
West Branch
Tampa Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-1997-01375 (SP-RGH)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT:
Joe Taggart
JT Enterprises, LLC
107 South Franklin Street, Suite 200
Tampa, Florida 33602
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with the Hillsborough River. The project site is located along the south side
of East Fletcher Avenue (SR 582A) between Telecom Drive and Telecom Parkway
North, in Section 11, Township 28 South, Range 19 East, Temple Terrace, Hillsborough
County, Florida.
Directions to the site are as follows: Driving north on I-75, take Exit 266 west on to E.
Fletcher Ave. Drive approximately 1.2 miles west on E. Fletcher Ave. The project site
will be on the left (south) side of the road, between Telecom Parkway N. and Telecom
Drive.
APPROXIMATE CENTRAL COORDINATES: Latitude 28.068234°
Longitude -82.372213°
PROJECT PURPOSE:
Basic: Commercial Development
Overall: Commercial development consisting of 5 commercial (retail/restaurant/medical
office) outparcels.
EXISTING CONDITIONS: The wetland system consists of a 5.94 acre freshwater
system. The onsite wetland vegetation consists of a 5.94 acre wetland (Wetland 1)
(Wetland Forested Mixed - FLUCFCS 630). The periphery of this wetland is dominated
by laurel oak (Quercus laurifolia) and red maple (Acer rubrum) in the canopy. The
canopy within the interior of the wetland is dominated by cypress (Taxodium spp.) with
lesser coverage of sweetbay magnolia (Magnolia virginiana). The shrub layer consists
primarily of buttonbush (Cephalanthus occidentalis) and Carolina willow (Salix
caroliniana), while groundcover is dominated by Lizard's tail (Saururus cernuus),
pickerelweed (Pontedaria cordata), royal fern (Osmunda regalis), Virginia chain fern
(Woodwardia virginica), and soft rush (Juncus effusus). This wetland is hydrologically
isolated from adjacent systems by surrounding roads, development, and a berm along
the southwest portion of the wetland.
The surrounding project area consists of uplands within the northern, western,
southwestern, and southeastern portions of the project area. Dominate vegetation
within these areas consist of maintained upland grasses, predominantly bahiagrass
(Paspalum notatum), adjacent to surrounding roadways. The southeastern portion of
the area contains a small upland fringe directly adjacent to existing development
(hotels). This area is dominated by live oak (Quercus virginiana) and laurel oak in the
canopy, beautyberry (Callicarpa americana) and Carolina laurelcherry (Prunus
caroliniana) in the shrub layer, with sword fern (Nephrolepis exaltata) and blackberry
(Rubus spp.) in the herbaceous layer. The northeast portion of the project area includes
uplands dominated by live oak and slash pine (Pinus palustris) in the canopy layer, with
saw palmetto (Serenoa repens) dominating the shrub layer. The herbaceous stratum
provided only minimal coverage, with sword fern and vines including earleaf greenbrier
(Smilax auriculata) and poison ivy (Toxicodendron radicans) present.
PROPOSED WORK: The applicant seeks authorization to construct ± 13.86 acre
commercial development consisting of 5 commercial (retail/restaurant/medical office)
outparcels. The project will also contain related site amenities and improvements
inclusive of parking, access roadways, landscaping, utilities, and storm water
management facilities. The proposed outparcels total approximately 21,500 square feet.
The proposed project also includes a total of 4 acres of impact to the existing on-site
wetland as a result of fill required for the construction of the outparcels.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
In order to have an economically viable project, it must be situated along the frontage of
Fletcher Avenue. Given the size and location of the wetland within the central portion of
the project boundary and adjacent to Fletcher Avenue, complete avoidance of the
wetland was not possible. The upland portion identified on the project site has been
maximized for development purposes. Impacts to 4.6 acres of wetlands has been
previously approved via letter in 1985 and in 2001 under permit SAJ-1997-01375.
Based on additional efforts to avoid or minimize wetland impacts, the proposed project
will only impact 4.0 acres of wetlands, less than was previously approved.
2
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
Compensatory wetland mitigation has already been authorized and provided for the
proposed impacts. These areas have also been deemed successful by both SWFWMD
and EPC. According to the October 1985 SWFWMD permit (ERP No. 49000390), the
total mitigation proposed for the Telecom site included 18.37 acres of ponds including
littoral shelves, 6.8 acres of wetlands, and 2.85 acres of wetlands provided specifically
for compensation for impacts to wood stork habitat (Woodstork Ponds).
In May 2017, Birkitt Environmental Services, Inc. performed an assessment of the
current condition of the mitigation areas within the site. Based on the assessment,
vegetative cover within the littoral shelves of the ponds and within the wetlands ranged
from 65% to 95%, with cover exceeding 80% in the majority of these areas. Dominant
species included mature cypress in the canopy as well as groundcover consisting of
swamp flag (Thalia geniculata) and pickerelweed, among others. Nuisance/exotic
species coverage was minimal, with only some torpedograss (Panicum repens), less
than <5% coverage in all ponds, along the shore line, 5%-10% cover of cattail (Typha
spp.) in one pond only, and minimal <5% coverage of Peruvian primrosewillow
(Ludwigia peruviana) in a few of the ponds.
The northern Woodstork Pond contained nearly 100% vegetative cover dominated by
herbaceous species including swamp flag, soft rush, and lizard's tail. Nuisance/exotic
species coverage in this pond was minimal and consisted of less than <5% cover of
Peruvian primrosewillow. Vegetative cover within the southern Woodstork Pond was
somewhat less, with approximately 60% cover, however a significant portion of this
pond appears to have been designed as shallow open water habitat to provide
woodstork Suitable Foraging Habitat (SFH). Dominant species included swamp flag,
pickerelweed, soft rush, and Carolina willow. Nuisance/exotic species coverage
consisted of approximately 5%-10% cover of Peruvian primrosewillow.
Based on an assessment of the current condition of the mitigation areas, they continue
to meet success criterion and provide a full range of habitat values as compensation for
the wetlands proposed for impact.
CULTURAL RESOURCES:
The Corps is aware of historic property/properties within or in close proximity of the
permit area. The Corps will initiate consultation with the State Historic Preservation
Office and those federally recognized tribes with concerns in Florida and the Permit
Area, and the Advisory Council on Historic Preservation as applicable pursuant to 33
CFR 325, Appendix C and Section 106 of the National Historic Preservation Act, by
separate letter.
3
ENDANGERED SPECIES:
The Corps has determined the proposed project "May affect, but is not likely to
adversely affect (NLAA)" the Wood stork (Mycteria americana) and Eastern indigo
snake (Drymarchon corais couperi). Potential impacts to the wood stork were evaluated
using the Effect Determination Key for the Wood Stork in Central and North Peninsular
Florida, dated September 2008 (Key). The Corps has programmatic concurrence with
the sequential determination of A > B > C > NLAA pursuant to the Key. Potential
impacts to the eastern indigo snake were evaluated using the Eastern Indigo Snake Key
(Key) dated 25 January 2010 and updated 13 August 2013. The Corps has
programmatic concurrence with the sequential determination of A > B > C > NLAA
pursuant to the Key. This determination is based on the applicant implementing the
Standard Protection Measures for the Eastern Indigo Snake. Through the
Programmatic Concurrence of above referenced 2 keys, "NLAA" determinations for
projects made pursuant to these keys require no further consultation with the U.S. Fish
and Wildlife pursuant to Section 7 of the Endangered Species Act.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or Federally managed
fisheries. Our final determination relative to project impacts and the need for mitigation
measures is subject to review by and coordination with the National Marine Fisheries
Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line [has
not] been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Tampa Permits
Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610-8302 within 21
days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
4
QUESTIONS concerning this application should be directed to the project manager,
Ryan Hendren, in writing at the Tampa Permits Section, 10117 Princess Palm Avenue,
Suite 120, Tampa, Florida 33610-8302; by electronic mail at
Ryan.G.Hendren@usace.army.mil or, by telephone at 813-769-7075.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
5
comment period of the notice and must state the specific reasons for requesting the
public hearing.
6
Legend
CJ Approx. Project Boundary
N
Figure 1.0
BIRKITT'
ENVIRONMENTAL
SERVICES, INC.
935 Main Street, Suite C-4
Safety Harbor, FL 34695
Project Location
Telecom Lot 7A
Hillsborough County, FL
SCU'ce Aerial (AICMap Ba&en'Op)
Cfea1Cll Dale -06/27/17
AUnor Blltlt GIS OEpartmeflt (JK)
fie Pah T\ltlecom'l.M<¥~ l.OC:Mlon.llXIXI
*
W
Legend
.
B
'
s'
c:J Approx. Project Boundary
5
!
1vfiu 031
1·250
2· 5 ~~et
State Plane Florida West [Feet]
Legend
c:=J Approx. Project Boundary
D
Open Land (FLUCFCS 190)
-
Wetland Forested Mixed (FLUCFCS 630)
~ Hardwood Conifer Mixed (FLUCFCS 434)
~ Commercial (FLUCFCS 140)
D
Reservoirs (FLUCFCS 530)
N
BIRKITT'
ENVIRONMENTAL
SERVICES. INC.
935 Main Street, Suite C-4
Safety Harbor, FL 34695
@>.
FLU CFCS
E
s
FL
TW~ ..-p-dndo,ped W'f .AteGtS 'I0.3. lis~for~lt'~ 0 .ldjed iD dlflrlge ari4isnot .-Wtir«11~1M-0t ~~
nie ~~ct1 ..t.ir:. iJ~bcm'.lrttftilX111'!Cc~Botil~W~""- cid b~etefdieibleb .....l'iibo>u~-dthe~°"' T!Disrl)(·""" °' -Y·
'
W
70
140
280
- - - - = = = = - - - - - - Feet
0
scuce Aer1al6 C2Dt6}. n uacs & oaa Pct"U (Blrtn)
CfN1Cll Date 06/27117
AUnor Blftll GfS Department (JK)
fle Pal\ T\lelecom\Map&Wletlana&J'l..1.ICf"CS.rnul
NAO 83, State Plane Florida West [Feet]
Legend
l::J Approx. Project Boundary
D
D
D
D
BASINGER, HOLOPAW, AND SAMSULA SOILS, DEPRESSIONAL
MYAKKA FINE SAND
TAVARES-MILLHOPPER FINE SANDS, 5 TO 8 PERCENT SLOPES
WINDER FINE SAND
N
BIRKITT'
ENVIRONMENTAL
SERVICES. INC.
935 Main Street, Suite C-4
Safety Harbor, FL 34695
W~B
ws
NRCS Soils
Telecom Lot 7A
Hillsborough County, FL
70
140 ______
280
----====:..
Feet
0
&:uce sal6 (USGs-HRCS 20 1·2)
c:rea1m Date 06!27117
Atinor 811111 GIS OEpartment (JK)
fle Pal\ T\ltlecom\M41&\Stlll5!nXCI
NAO 83, State Plane Florida West [Feet]
CJ Approx. Project Boundary
D
FRESHWATER EMERGENT WETLAND
'----'I
FRESHWATER FORESTED/SHRUB WETLAND
Figure 4.0
BIRKITT'
ENVIRONMENTAL
SERVICES. INC.
935 Main Street, Suite C-4
Safety Harbor, FL 34695
N
National Wetlands
Inventory (NWI)
*
W
.
B
'
s'
FL
0
&:uce NWt {Gloo;,f Mapper 2(11·)
crea1m oaie 06/27/'17
AUtior Bllllt GIS OEpatmeftt (JK)
fie Pal'I T\Telecom\M<1'6'HWtmrd
70
140
280
- - - - = = = = - - - - - - - · Feet
NAO 83, State Plane Florida West (Feet]
-·..
.
....
.:____)
.
I
-----
---
_.Jli&.er_
. ''t!'\ ...~
~ ,
...
,\
'-'·
.
Legend
c:::J Approx. Project Boundary
' "
_...,~.__~~~~~~~~~~
--
···- -
--fJJ!._
....,,.
J'
--- ·-..
I
!'___ ...
~
-
. . .., ..·.....,._v.
'
-... ·-
~
.........
......,
-...._
···.:..
....Wot. -
BIRKITT
--..._,_ -
==
..
~-
· ;.a. l
....
i.!L.
........,;;
...._>.aw ~
r
_,- -.-.,1
J
----
-~Figure 5.0
USGS Topo
ENVIRONMENTAL
SERVICES. INC.
935 Main Street, Suite C-4
Safety Harbor, FL 34695
..........
-
....~ ~.-c::__:-.1;.-:
~
l.. -~~·
..,...., Lp·,_
............_ L) (..-_
---<._
FL
TW~ ntpwedndo,ped lllinf.AtcG&S'lo.J.IOpiomelforgMM~ is M;edlmchengt- arMIOnot.-Wior.,,~1oe«~~
Uie ~ cotWietl ·110 6 ~ficrn-"" !lOlllC6 d ~9 quelly «Ill SOJl9CY. &ors &om~ ofk.'1Pe liornd'-"t "3UU.~
ttWJW~Bilcll~~ IM.ud b~ere td.ietkfoo~rieh« u~~ ci theflboniCIP.\. TM &rde""Pol"""")'·
0
SOU'CE ltlpO(USGS)
CleatCll Date 11/ 15'17
AUhOr 61411 GIS 0Epa1ment (RT)
fle Pall T\ltlecom\Map&1Flg s.o 1b90
125
250
500
--===----Feet
NAO 83, State Plane Florida West (Feet]
Legend
D
Project Boundary
HUG8
HUC12
N
Figure 6.0
BIRKITT
ENVIRONMENTAL
SERVI CES, INC.
935 Main S1reet, Suite C-4
Safety Harbor, FL 34695
Watersheds
*
W
'
B
'
s'
Telecom Lot 7A
Hillsborough County, FL
scuce war~ (HUC}
0
11,500
23,000
46,000
---llllili:=i:=i:=:::::.------- Feet
crea1m Date 11119 17
AUhOr Blltlt GIS Department (RT)
fle Pall T\lelecom\M<4>61H.Jtmnea Map.mxo
NAO 83, State Plane Florida West [ Feet]
Jurisdictional Wetland. Extents - 5.94 ac.
Figure 7.0
BIRKITT
ENVIRONMENTAL
SERVICES. INC.
935 Main S1reet, Suite C-4
Safety Harbor, FL 34695
N
USACE Jurisdictional
Wetlands
FL
*
----====-------Feet
eteatoo oa~ 111161'11
AdhOr 811tll GIS DE'partment (RT)
fie Pall T\Tetecom\M~1f~ 7.0 USA.CEWeftarKl&.mxd
E
'
s'
0
socrce AeC1al6 (20 t6),. ~D (BllUl}
.
W
70
140
280
NAO 83, State Plane Florida West [Feet]
Th;s document, together with the concepts and designs presented herein·. as an instroment of service, is intended only for-the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Rayl Engineering & Surveying, LLC shall be without liability to Rayl Engineering & Surveying, LLC.
.. -
GRAPHIC SCALE
50
0
50
100
·-'
I
I
( IN FEET )
1 inch = 50
-- -
--· - ·- - -
-
--
- · - ··- -·
1
·
·
cr·r-···-
r:_r: ...:::r:·r:....
--·····-······-·--····--·········--· ······-·····--·····--·····------ - -
4\"
I
11111 Ill
w
I
I
>
I
I
Cl2
i
t
I
z
- - ···········--·-··
I
~
----
)
/
//
''
''I
I
I
~ ,. .
.
I
I
I
I
I
I
I
LU :
I
H- '
1.90 AC.
I/
it! II
r~
/
d
... ....:---·--=·
I /
I/
ff3
..
I
--
FLETCHER AVENUE
. -;;·
//
- · -
I
I
I
I
I
!
:'
ft.
I
I
I
I
\
\\
\
\ '\\
\
\
\
\
.,
~
-_/
·'I - - - -
"
'Y /
/
----------- ___
/
_,,.,,...
/
/
4:1 SLOPE FROM EXISTIN~ /
TO ELEV 32.0
/
I
I
"'-,
"'-
NOT INCLUDED
/
/
\
"'-
"'-
I
"'-"
"'-
'~
'\
I
I
I
I
I
I
"'-I I
/
2.78 AC.
/
I
\
/"'-<
I
I
\
\
I
NOT INCLUDED
\
/
\
\
/
)
/
/
- - -----
-
--
/
/
LEGEND
--
-'l.D
SlRIPPED ELEY.
- - 3 2 - - EXIST. CONlJlUR
PRIOR TO STlllPPING
- - 3 0 - - PRQPOSED SF' -
Sl.T FENCE
WOODSTORK ROAD
-
/
/
/
/
/
/
/
'
I
/
\
.....
I
I
\
'
I
I
I
\
'
-
I
"'-
/---'--/
_//
,.!.
d
z
I
I
...-/
\
3.00 AC.
I
-"'
/
/
/
/
---
/
'
'
/
/
SHEET NUMBER
1
1 of 1
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Rayl Engineering & Surveying, LLC shall be without liability to Rayl Engineering & Surveying, LLC.
GRAPHIC SCALE
--
50
50
0
~---
100
-1-....il
( IN FEET )
1 inch
~
ft.
50
'
FLEFCHER AVENUE
ill<
\
c
d
z
R
- ·-····----
"\.
~
--------------------------------------------· ------·-----------
~
--
N
m
9
8E.
-'
L
,_ r
~
I
in
~
.0
~
~ !'--
{V) ~
- o
l
N
~~@
..
~
"
~
w~
Uw
0
N
llN
~
#.
SITES
/
GD
f$.
.!:.I
/
/
,,/
//
~
/
I
<
z
CL
"''"
It'
<
0
, ///
G
1,
'·
z
w
:z
z
"'w
--'
n_
0
"<~
'
"" ;o:
...
i5
"'w
_j
co
<
0
<
<
~
w
o'
::I
/,
·'
~
""
0
"'en
"'
"z
,!
.."
I Ii
/
,
"
w
w
.:J
I
/
" ....
"' "'
""
//
co
,;;
V1
CL
/
0
/
~
*
~
L
n_
1.90 AC.
-
,_
"',_I
d
z
"'0
~
1j
~
ill<
8"'
i<
0
"0
0
LOT 7'A
I
I
;
I
I
'
1
/
I
/
/
)I
SITE DATA
/
PARCEL ID:
199551-0630
ACREAGE:
13.98AC
PlAT BOOK/PAGE:
68133
APPUCANT/OWNER:
JT ENTERPRISES II
30.0
EXISTING ZONING:
PROPOSED ZONING:
TOTAL PROPOSED BUILDING SF:
PROF (PLANNED RESEARCH OFFICE FACILITlES)
PD (WITH OONDmONS)
SITT A
7,500 S.F.
SITES B-F 21,500 S.F.
TOTAL
29,000 S.F.
DENSrTY (FAR):
0.04
MAXIMUM BUILDING HBGHT:
35' (2 STORIES)
NOTE: ANY SITE (A THRO.JGH F) MAY DEVELOP INDEPEM>ENTLY WrTHCXJT RESTRICTlON
ON TIMING. COMMON INFRASTRUCTURE SHALL BE COORDINATED TO THE GREATEST
DEGREE PRACTirABLE.
RADnJS
'
LDIG'Tli
Cl
491.n
512.96
054°55'26"
266.60
473.11
527" 1T 1TW
C2
35.02
25.00
080"15'00"
21.07
32.22
NB5"' ffl' 30"W
C3
201.18
190.00
06()040'07"
111.18
191.92
N7So 20' 04"W
C4
103.88
4'0.00
050"18'19"
216.00
391.03
NSO" 30' 57"W
c;
36.12
25.00
082"4T11"
22.04
33.06
Nil" 58' 13-W
cs
269.73
560.00
027"l.S'4!J"
137.53
267.13
N13° 37' 28"E
DELTA
TANGENT
CHORD
0
I!!
z
:5Cl..
:;!
ICl..
w"
...J ~
w
w~
0
:2 '1
u
z
I- ..
<("
Cl.. 8
/
·
CURVE TABLE
~
u
WG0DSTORK ROAB
-~---~
<(
a...~
:2 Ile
/
16401 AVILA BLVD.
TAMPA, FL 33613-1034
100 YR BASE FLOOD ELEV (PER Pl.AT):
a:: !Ii
- --
TAMPA TELECOM PAAK-5 (A REPLAT OF LOT 7 OF TAMPA TEl.fOOM PARK)
FOLIO:
/
/
PARCEL INFORMATION:
T-11-ZS.19-53H·000000-0007A.0
<
::.::: c
/
BEARING
/
WETI.AND M111GATION'AAEA
ZONING: P8'lF
"""w
.."
~
0
<(:
w
I-~ F'
-"
~
w
0
w
I
"'
SHEET NUMBER
/
1
1 of 1