Palm Beach County. : Palm Beach County Roadway Production. West Palm Beach. FL. PROJECT PURPOSE: Basic: The basic project purpose is linear transportation. Overall: The overall project purpose is to improve the traffic conditions of the Royal Palm Beach Boulevard transportation corridor within the Indian Trails Improvement District

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:

APPLICANT: Palm Beach County Roadway Production

2300 North Jog Road

West Palm Beach, Florida 33411

WATERWAY AND LOCATION: The project would affect waters of the United States associated with freshwater wetlands and the M-Canal. The project site is located along Royal Palm Beach Boulevard adjacent to the M-Canal to south of Orange Boulevard, Royal Palm Beach (Section 35, Township 42 south, Range 41 east), Palm Beach County, Florida.

Directions to the site are as follows: Exit I-95 onto Okeechobee Boulevard. Head west on Okeechobee Boulevard to Royal Palm Beach Boulevard. Turn right onto Royal Palm Beach Boulevard. The project begins approximately 0.5 mile north of 61st Street North.

APPROXIMATE CENTRAL COORDINATES: Latitude: 26.76603°

Longitude: -80.22671°

PROJECT PURPOSE:

Basic: The basic project purpose is linear transportation.

Overall: The overall project purpose is to improve the traffic conditions of the Royal Palm Beach Boulevard transportation corridor within the Indian Trails Improvement District

EXISTING CONDITIONS: The site is an existing two lane roadway within a rural residential area. The wetland system consists of a freshwater system. The onsite vegetation consists of torpedo grass (Panicum repens), bog button (Lachnocaulon spp.), red root (Lachnanthes carolinana), bushy bluestem (Andropogon glomeratus), soft rush (Juncus effuses), yellow-eyed grasses (Xyris spp.), tickseed (Coreopsis spp.), wedelia (Sphagneticola spp.), and St. John’s wort (Hypericum cistifolium). Algal matting was observed in the wetland area. Exotic/Nuisance canopy (less than five percent vegetative canopy coverage) include Melalueca (Melaleuca quinquenervia), earleaf acacia (Acacia auriculiformis), wax myrtle (Morella cerifera), Australian pine (Casaurina equisetifolia), and slash pine (Pinus elliotii). The existing area surrounding the project area consists of low density residential dwellings and residential drainage canals.

PROPOSED WORK: The applicant seeks authorization to excavate 2.56 acres of wetlands and place fill within 0.16 acres of other surface waters for the purpose of expanding Royal Palm Beach Boulevard from a two-lane highway to a three-lane highway. The excavation will occur within potential pond sites 3 and 4 which totals 2.56 acres for the purposes of providing stormwater treatment.

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:

Project will be designed to meet current standards to improve safety and avoid adverse impact to adjacent properties. Applicable temporary erosion control measures will be utilized during construction to minimize erosion and sediment impacts.

COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:

The applicant believes the project as proposed is self-mitigating. No formal mitigation plan was submitted for review.

CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.

ENDANGERED SPECIES: The project is within the range and consultation area of the threatened Audubon’s crested caracara (Polyborus plancus audobonii), Eastern indigo snake (Drymarchon corais couperi), wood stork (Mycteria americana), endangered Everglade snail kite (Rostrhamus sociabilis plumbeus), threatened Florida scrub jay (Aphelocoma coerulescens), and red-cockaded woodpecker (Picoides borealis).

Based on information available from the applicant our initial determination for the project is listed below:

• Not likely to Adversely Affect the Eastern indigo snake (Drymarchon corais couperi). The project will impact less than 25 acres of xeric habitat. By use of the FWS Eastern Indigo Snake Key dated August 2017, the following key sequence A>B>C>D>E would result in a “Not Likely to Adversely Affect” (NLAA) determination.

• Not Likely to Adversely Affect the wood stork (Mycteria americana). By use of the FWS Wood Stork Key dated January 25, 2010 and the May 18, 2010 addendum, the following key sequence A>B>C>E would result in a “Not Likely to Adversely Affect” (NLAA). The project is located within the Core Foraging Area (CFA) of three wood stork colonies (619315, 619220 PBC SWA, and Loxahatchee 1). Freshwater wetlands and surface waters are present within the project area. Some of the features consist of habitat that is suitable for foraging wood storks, and other wading birds have been observed foraging within the proposed project corridor. The closest colony to the project is 4.73 miles away (619220 PBC SWA). Since impacts to wetlands and surface waters total 2.56 acres, a Wood Stork Foraging Biomass Assessment was not required. Any loss of wood stork foraging biomass resulting from the proposed activity will be compensated by a compensatory mitigation plan and the creation of an onsite surface water management system (ponds and vegetated littoral zones). This determination is dependent on the impending proposal by the applicant that adequate compensation will be provided.

• No Effect to the Everglade snail kite (Rostrhamus sociabilis plumbeus). The project area does not contain suitable habitat to forage (apple snails) or roost such as freshwater marshes and shallow vegetated edges of lakes therefore the project would have no effect on the species.

• No effect to the Red-cockaded woodpecker (Picoides borealis). The project area does not contain suitable Red-cockaded woodpecker habitat (open woodlands with large old growth pines, limited subcanopy, and abundant native bunchgrass and forb groundcover) therefore the Corps has determined the proposal would have no effect on endangered red-cockaded woodpecker.

• No Effect to the Florida Scrub Jay (Aphelocoma coerulescens). The project area does not contain suitable scrub jay habitat (oak scrub and scrubby flatwoods near sand dunes) therefore the Corps has determined the proposal would have no effect on threatened scrub jay.

• No Effect to the Audubon’s crested caracara (Polyborus plancus audobonii). The project area does not contain suitable caracara habitat (wet prairies with cabbage palms, cypress, or scrub oaks) therefore the Corps has determined the proposal would have no effect on endangered caracara.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The project site contains 2.56 acres of freshwater wetlands and 0.16 acres of freshwater residential canals. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic region. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410 within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Samantha L. Rice, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410; by electronic mail at Samantha.L.Rice@usace.army.mil; by facsimile transmission at (561)626-6971; or, by telephone at (561)472-3536.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 4400 PGA BOULEVARD, SUITE 500 PALM BEACH GARDENS, FLORIDA ZIP

February 2, 2018

REPLY TO ATTENTION OF

Regulatory Division South Branch Palm Beach Gardens Permits Section

PUBLIC NOTICE Permit Application No. SAJ-2017-02035 (SP-SLR) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below: APPLICANT: Palm Beach County Roadway Production 2300 North Jog Road West Palm Beach, Florida 33411 WATERWAY AND LOCATION: The project would affect waters of the United States associated with freshwater wetlands and the M-Canal. The project site is located along Royal Palm Beach Boulevard adjacent to the M-Canal to south of Orange Boulevard, Royal Palm Beach (Section 35, Township 42 south, Range 41 east), Palm Beach County, Florida. Directions to the site are as follows: Exit I-95 onto Okeechobee Boulevard. Head west on Okeechobee Boulevard to Royal Palm Beach Boulevard. Turn right onto Royal Palm Beach Boulevard. The project begins approximately 0.5 mile north of 61st Street North. APPROXIMATE CENTRAL COORDINATES: Latitude 26.76603° Longitude -80.22671° PROJECT PURPOSE: Basic: The basic project purpose is linear transportation. Overall: The overall project purpose is to improve the traffic conditions of the Royal Palm Beach Boulevard transportation corridor within the Indian Trails Improvement District EXISTING CONDITIONS: The site is an existing two lane roadway within a rural residential area. The wetland system consists of a freshwater system. The onsite vegetation consists of torpedo grass (Panicum repens), bog button (Lachnocaulon spp.), red root (Lachnanthes carolinana), bushy bluestem (Andropogon glomeratus), soft rush (Juncus effuses), yellow-eyed grasses (Xyris spp.), tickseed (Coreopsis spp.), wedelia (Sphagneticola spp.), and St. John's wort (Hypericum cistifolium). Algal matting was observed in the wetland area. Exotic/Nuisance canopy (less than five percent

vegetative canopy coverage) include Melalueca (Melaleuca quinquenervia), earleaf acacia (Acacia auriculiformis), wax myrtle (Morella cerifera), Australian pine (Casaurina equisetifolia), and slash pine (Pinus elliotii). The existing area surrounding the project area consists of low density residential dwellings and residential drainage canals. PROPOSED WORK: The applicant seeks authorization to excavate 2.56 acres of wetlands and place fill within 0.16 acres of other surface waters for the purpose of expanding Royal Palm Beach Boulevard from a two-lane highway to a three-lane highway. The excavation will occur within potential pond sites 3 and 4 which totals 2.56 acres for the purposes of providing stormwater treatment. AVOIDANCE AND MINIMIZATION INFORMATION ­ The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: Project will be designed to meet current standards to improve safety and avoid adverse impact to adjacent properties. Applicable temporary erosion control measures will be utilized during construction to minimize erosion and sediment impacts. COMPENSATORY MITIGATION ­ The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: The applicant believes the project as proposed is self-mitigating. No formal mitigation plan was submitted for review. CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area. ENDANGERED SPECIES: The project is within the range and consultation area of the threatened Audubon's crested caracara (Polyborus plancus audobonii), Eastern indigo snake (Drymarchon corais couperi), wood stork (Mycteria americana), endangered Everglade snail kite (Rostrhamus sociabilis plumbeus), threatened Florida scrub jay (Aphelocoma coerulescens), and red-cockaded woodpecker (Picoides borealis). Based on information available from the applicant our initial determination for the project is listed below: ·

Not likely to Adversely Affect the Eastern indigo snake (Drymarchon corais couperi). The project will impact less than 25 acres of xeric habitat. By use of the FWS Eastern Indigo Snake Key dated August 2017, the following key sequence A>B>C>D>E would result in a "Not Likely to Adversely Affect" (NLAA) determination. 2

·

Not Likely to Adversely Affect the wood stork (Mycteria americana). By use of the FWS Wood Stork Key dated January 25, 2010 and the May 18, 2010 addendum, the following key sequence A>B>C>E would result in a "Not Likely to Adversely Affect" (NLAA). The project is located within the Core Foraging Area (CFA) of three wood stork colonies (619315, 619220 PBC SWA, and Loxahatchee 1). Freshwater wetlands and surface waters are present within the project area. Some of the features consist of habitat that is suitable for foraging wood storks, and other wading birds have been observed foraging within the proposed project corridor. The closest colony to the project is 4.73 miles away (619220 PBC SWA). Since impacts to wetlands and surface waters total 2.56 acres, a Wood Stork Foraging Biomass Assessment was not required. Any loss of wood stork foraging biomass resulting from the proposed activity will be compensated by a compensatory mitigation plan and the creation of an onsite surface water management system (ponds and vegetated littoral zones). This determination is dependent on the impending proposal by the applicant that adequate compensation will be provided.

·

No Effect to the Everglade snail kite (Rostrhamus sociabilis plumbeus). The project area does not contain suitable habitat to forage (apple snails) or roost such as freshwater marshes and shallow vegetated edges of lakes therefore the project would have no effect on the species.

·

No effect to the Red-cockaded woodpecker (Picoides borealis). The project area does not contain suitable Red-cockaded woodpecker habitat (open woodlands with large old growth pines, limited subcanopy, and abundant native bunchgrass and forb groundcover) therefore the Corps has determined the proposal would have no effect on endangered red-cockaded woodpecker.

·

No Effect to the Florida Scrub Jay (Aphelocoma coerulescens). The project area does not contain suitable scrub jay habitat (oak scrub and scrubby flatwoods near sand dunes) therefore the Corps has determined the proposal would have no effect on threatened scrub jay.

·

No Effect to the Audubon's crested caracara (Polyborus plancus audobonii). The project area does not contain suitable caracara habitat (wet prairies with cabbage palms, cypress, or scrub oaks) therefore the Corps has determined the proposal would have no effect on endangered caracara.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The project site contains 2.56 acres of freshwater wetlands and 0.16 acres of freshwater residential canals. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic region. Our final

3

determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410 within 21 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Samantha L. Rice, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410; by electronic mail at Samantha.L.Rice@usace.army.mil; by facsimile transmission at (561)626-6971; or, by telephone at (561)472-3536. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on 4

the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

5

COMPONENTS OF CONTRACT PLANS SET ROADNAY PLANS SIGNING AND PAVEMENT MARKING PLANS

COUNTY OF PALM BEACH STATE OF FLORIDA BOARD OF COUNTY

PROJECT NO.

INDEX OF SHEETS 2 - 3

Drainage Mop

4 - 5

Typical Sections

6

General Notes & Details

7

Summary of Quontllfes

10

(M-CANAL TO S. OF ORANGE BOULEVARD) HAL R. V ALECHE DISTRICT 1

Project Network Control Drofnoge Detofls

II - 13

Cano/ Expansion Details

14 - 22

Roodw(]f Plon-Proflles

23 - 26

Intersecting Side Street Profiles

27 - 50

Drlve.voy Proflles

51 - 71

2014501

ROYAL PALM BEACH BOULEVARD

KB/ Sheet

8 - 9

COMMI~IONERS

Cross Sections

72 - 82

Stormwater Pollution Prevention Pion

83 - 91

Roadway Soll Survey

PAULETrE BURDICK DISTRICT 2

DAVE KERNER DISTRICT 3

STEVEN L. ABRAMS DISTRICT 4

MARY LOU BERGER DISTRICT 5

Ii at

PREPMEO FOR PAI.II BEN:H COUNTY

MELI~A

MCKINLAY DISTRICT 6

END PROJECT

ROAO/fAY PRODUCTION DIV. Bf:

~ K-F GROUP, INC.

lfSI CONSULTING ENOINEHRS

12TT:J FO/ft:ST HIU. 800/EVMD, SUITE 12f7

MACK BERNARD DISTRICT 7

VIEUIG#T~ftDRIDA ;J:Hlf

l'trme: f:mlJ 793~ Fo11 f56118J9-S888 CERTIFICATE OF MJTHORIZATION NO.

7T~

SJA 170+97.04

CONST.J

THESE Pl.AllS HAVE BEEN PREPARED llt JCCORDANC£ WITH AND ARE G

~

if ,a $ol#:

/tifll'tlHd: HIC

i

()l'-()1"

I

Cllt#IMI: CJ

DoNl Sll2ll5

I

·-· '

....

T 42 S

l£NGTH OF PROJECT

T 4.! S /GNJlflil

Ll#EM FT.

1111£S

4,fl!l6A!l

O.!IB

BR/DlilES #CT lEJ/tlTll tJF l'flDJ.

OIJO

o.cm

4,fl!l6A!l

O.!IB

£1/'CEl'TlJltS IRJSS ILllSTH OF /WJJ,

OIJO .f,ll!il6A!J

O.!IB

~,

s~

~I

a.cm

ENGINEERING CERTIFICATION : I herflb/ ct1rllfy lha1 fhtt attodltld p/all8 atld dtllllfjtl are 111 8tlb610/lttot t#trJ/fOfJOI wllh lhe Ouf911 SfOfldoit/$ olll/ Crlffrlo In tfftJCt on this dote for Pl1ltrl 8"1dl COUnty Efl(J1-f1/lfl Daporhtttllf and tllfl State of Florido ()tporllRflltf of TrOM1JOrlol/on.

a~

l:

!' i~

l!

ENGINEER OF REOORD : K-F GROOP, INC.

NOTE: THESE PLANS HAVE BEEN PREPARED BASED ON NAVD88 DATUM. CONVERSION FACTOR BETWEEN NAVD88 AND NGVD29 IS (-JJ.434'. (J.e. NAVDBB E/£V. = NGVD29 E/£V. - 1.434') 7/6/

12:31:1/PM

SEC. JS / 'TYi/>. 42 S

DATE :

/ RGE. 41£

D.OCA TOOINI IMIAP N. T. S.

---

SIWl1 I

HIAN C. KOR, P.E. FJJ)RIOA REGISTRATION No : 4S2BJ

Of:

I...

llU I ( ,

25

(-}0.JQ;r.

(·}OJJJr. l+l 0.3!0%

20

- --

NII

1+)0301'/o

---

@

HJ

Xi"ICP

12' ICP

~

~

15

00

GISI. 28J If l'ICP 'om

f .[ . :

H!li'

15

.· 15.(J'

Scale: I" =

00

~

K-F GROUP, INC.

ADDR.155$ ; 12771 w. FOREST mu BOULJWARD, SUlTB 1217 WEUL~GTON.

FLORIDA 3341~

CJ:l:tTlf'ICAil:i Of' AVl'H0RlZA1'10N NO. n36

CONSULTING ENGINEERS

El'G!li EER OF RECORD : JUAN C KOR., P.E.

FLORIDA RF.OlS1'RATlOMN0. '4S280

J/12/2Dl7

12:33:16 PJI

C:'F'rojeclsVS/02''

ApprovOtt: HK Drawn: DP ChoctOt!: CJ Dote: 06/0l/15

Ill-CANAL TO $.OF ORANG£ BWL£VARDJ

DRAINAGE MAP

Of: Project No.: 2Dl450/

25

25

(+l 0 OO'>I

20

20

15

15 FL. 6"~ .

w

F.L. 6$Y l. · .QI'

151

M

w

J/12/2Dl7

K-F GROUP, INC.

ADDR.155$ ; 12771 w. FOREST mu BOULJWARD, SUlTB 1217 WEUL~GTON. FLORIDA 3341~

PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS

Drawn: DP

El'G!li EER OF RECORD : JUAN C KOR., P.E.

Chectod: CJ

ROADWAY PRODUCTION

Dole: 02/0l/17

P.O. llOX 212!9, WEST PALM BEACH. FLORJDA

FLORIDA RF.OlS1'RATlOMN0. '4S280

C:V'rofec lsVSI02'<1gn'drmprd02 .dgn

ShMJ/:

Ill- CANAL TO $ . OF ORANG£ BWL£VARDJ

CJ:l:tTlf'ICAil:i Of' AVl'H0 RlZA1'10N NO. n36

CONSULTING ENGINEERS 12:34:48 Pll

S<;oJe:

Approvod: HK

DRA INAGE MAP

J

Of: Profeet No .: 2Dl450/

@ SURVEY CONST. VARIES f21.42' TO 6.13'J 1- .._~~~~~-40""-'~~~~--i--~~......;.. VA~R-IE ~S;;.....;..f4~0-'_-.....;;.; 50_.4~1~ '!~~~~--...._~---...i

I·

4" CONC. S/W

--------- ' '

""I

- 2X

~ ....._ v_A_R_1E_s__.....,·_5_·...,....~v_A_R_1E_s~--....-'-"~...~1-2_·__....~,_l'__.....,v_A_R_!E~S._..,._...-t

14.5' PGL

27.

fSODJ

~

27.

'

!6' - ll'J WIDENING VARIES !23' - 9.66'J VARIES MILL & RESURFACE/ !0'- 18.34') OVERBUILD

0:

....

--- ------ ' 4" CONC. S/W

-

27.

~/.

~

.u

' ' '-- - __,,.

/

N----'~

t ~

-3 /.

=------- -------===-_,

::r -

EXIST. BASE AND SUBGRADE PAVEMENT WIDENING

C & G TYPE "F"

AND SUBGRADE PAVEMENT WIDENING

WiDENING FRICTION COURSE FC- 9.5 TRAFFIC C (f" AVG. DEPTHJ STRUCTURAL COURSE SP- 12.5 TRAFFIC C fAVG. DEPTH l - 112"J wl PRIME COAT 13- 112· BASEROCK rTRIPLE COURSE - LBR IOOJ w/ RC- 70 PRIME COAT 12" SUBGRADE COMPACTED TO 1007. PER AASHTO T- 99 MAXIMUM DR'f DENSITY

PGL

-d===j~:=;=:=~+:..:.~~~~~':"'.:':~===~':"'.~~~:=~~!f ~ - - - - - - - ~- - - - - '

1:4

ll----4t-~ ========~~X~~ ~ASE C & G TYPE "F"

(lf'- 11.76 J VARIES f28 ' - 28.76'J MILL & RESURFACE/ OVERBUILD

'+

4" CONC. S/W !6" D DRIVEWAYJ

~l<.J

~

!SODJ

· - STA 123+42.24 TO STA 126+48.33 r CONST.J

- - -

- - - -

- - -

· \....Exist. 4 Cone. Swk rTo RemolnJ

Exist. C & G Type "F" rTo RemolnJ

ALTERNATE BASE 8" TYPE B- 12.5 fOPTIONAL BASE GROUP 13J MAY BE USED IN LIEU OF 13- 112" BASEROCK AT NO ADDITIONAL COST

~ MILL EXIST. PAVEMENT I" fAVG. DEPTHJ

BASE WIDENING

RESURFACE

SUBGRADE WIDENING

FRICTION COURSE FC- 9.5 TRAFFIC C

(f"

AVG. DEPTHJ

OVERBUILD

ROADNAY TYPICAL SECTION (PHASE f) STA 122+01.22 TO STA 127+00.00 (~ CONST.J

BASE WIDENING SUBGRADE WIDENING

SUPERPAVE SP- 12.5 TRAFFIC C TYPICAL SECTION NOTES

DESIGN SPEED : 40 M.P.H.

I. EXISTING BASE REMOVED DiJRING CONSTRUCTION MAY NOT BE USED IN THE CONSTRUCTION OF NEW BASEROCK 2 . TACK COAT SHALL BE APPLIED AT A RATE OF 0.05 GAL/SY PRIME COAT SHALL BE APPLIED AT A RA TE OF 0.10 GAL/SY

" Sta 124+00.00 r CONST.)

PAVEMENT CROSS SLOPE TRANSITION STA 122+01.22 TO STA 124+00.00 (lTHfi. CONST.) N. T.S.

....

~ VARIES

~

*-

STA 127+34.55 TO STA 130+31.54 r CONST.!

' 6' 2,VARIES

!SODJ rSODJ 4" CONC. S/W

f4.4' - 6'! !SOD!

- - - - - ' I::.;.4-.::=:=f'....---.:~:==s====j

' ' ,_/,

l.l--~~~-4

PAVEMENT WIDENING

CURB PAD DETAIL

BASE WIDENING

4" CONC. S/W !6" D DRIVEWAY!

4" CONC. S/W f6' o DRIVEWAYJ C & G TYPE "F"

SUBGRADE WIDENING

C & G TYPE "F" CURB PAD

STA 124+97.32 TO STA 126+41.29 rfi. CONST.J N.T.S.

PAVEMENT WIDENING

I. CURB PAD TO BE BASEROCK 2. COST TO BE INCLUDED IN THE PRICE OF CURB & GUTTER J. AS AN OPTION IN LIEU OF 4· BASEROCK, THE CONTRACTOR MAY AT NO ADDITIONAL COST ELECT TO PLACE 4" TYPE B- 12.5 CURB PAD

BASE WIDENING

BASE WIDENING

SUBGRADE WIDENING

SUBGRADE WIDENING

ROAD#AY TYPICAL SECTION fPHASE f) STA 127+00.00 TO STA 132+00.00 (~ CONST.J DESIGN SPEED : 40 M.P.H.

M K-FGROUP, INC.

w

J/12/20/1

CONSULTING ENGINEERS t2:J7:J8 Pll

ADDRESS;

12773 w. fORf.~rr l lLLLOOULVAR0,$UITE 1211 WF.LLINOTO~. FLORIDA 33414

Cl\RTIFlCATIJ OF AUTI10Rl7...i\TION NO. 7736 B.'-:GU~EER OF RECORD

:

HIANCX.O.R.P.B. f·LORl:DA REC1 $fRA·no~ NO. 45280

C:'i'roJeclsV5f02'VypsrdO/v8.

SccJo: NTS Approvod: HK

...

Revision

Date

PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS

Drown: DP Checkod: CJ

ROADWAY PRODUCTION

Doto: 05/06/15

P.O. llOX m29, WEST PALM llBACH. FLORIDA

ROYAL PALM BEACH BOULEVARD !II- CANAL TO $. OF ORANGE BOULEVARDJ

TYPICAL SECTION

ShMJI: 4 Of:

Project No.: 2!11450J

f CONST. I

40' 9' tSOOJ

12'

II '

5'

19' WIDENING

40' II'

9' tSODJ

5'

24' MILL & OVERBUILD

6'

rs

19' WIDENING

·__\ ___ __-t ~

.J4

PGL

- 0.34

+O.O

2/.

FRICTION COURSE FC- 9.5 TRAFFIC C ti" AVG. DEPTHJ STRUCTURAL COURSE SP- 12.5 TRAFFIC C !AVG. DEPTH 1-1/Z"J w/ PRIME COAT 13- 112· BASEROCK

~

~

-- - - -- --

4· CONC. S/W t6" a ORNEWAYJ C & G TYPE °F ·

.....

t..J

'+

E

WIDENING

OJ

ALTERNATE BASE 8 " TYPE B - 12.5 fOPTIONAL BASE GROUP 13J MAY BE USED IN LIEU OF 13- 1/2" BASEROCK AT NO ADDITIONAL COST

4· CONC. SIW t6" a DRNEWAYJ

MILLING

C & G TYPE °F · CURB PAO PAVEMENT WIDENING

EXIST. BASE ANO SUBGRAOE

PAVEMENT WIDENING

MILL EXIST. PAVEMENT 1· tAVG. DEPTHJ RESURFACE FRICTION COURSE FC- 9.5 TRAFFIC C W AVG. DEPTHJ

BASE WIDENING

BASE WIDENING

OVERBUILD

SUBGRADE WIDENING

SUBGRADE WIDENING

SUPERPAVE SP- 12.5 TRAFFIC C

ROADNAY TYPICAL SECTION (PHASE IJ STA 132+00.00 TO STA 171+00.00 r

TYPICAL SECTION NOTES I. EXISTING BASE REMOVED DURING CONSTRUCTION llAY NOT BE USED IN THE CONSTRUCTION OF NEW BASEROCK 2 . TACK COAT SHALL BE APPLIED AT A RA TE OF 0.05 GAL/SY PRiii£ COAT SHALL BE APPLIED AT A RATE OF 0.10 GAL/SY

DESIGN SPEED : 40 M.P.H.

f

!

40'

CONST

40'

I

6'

?

-------------'C = =r

3'

II '

12'

II'

· ·

II'

'+

Jx · E - = :=: =; :;::;: :;::;:

~ ·

rE- -- - - ·- j __ _ - L ------ -

II'

t

3'?

6'

t

U. ·

CURB PAD DETAIL

:U

== == ~ == = == e:::=:z==i:IF = ::::r-----------

-- -

-t--- - _ _j--, ------ - - 1

ROADNAY TYPICAL SECTION (PHASE II -

I. CURB PAD TO BE BASEROCK 2 . COST TO BE INCLUDED IN THE PRICE OF CURB & GUTTER 3. AS AN OPTION IN LIEU OF 4· BASEROCK, THE CONTRACTOR llAY AT NO ADDITIONAL COST ELECT TO PLACE 4" TYPE B- 12.5 CURB PAO

FUTURE ULTIMATEJ

DESIGN SPEED : 40 M.P.H.

MK-F GROUP, INC.

w

J/12/20/1

CONSULTING ENGINEERS 12:38:0/Pll

ADDRESS ;

12773 w. fORf.~rr l lLLLOOULVAR0,$UITE 1211 WF.LLINOTO~. FLORIDA 33414

Cl\RTIFlCATIJ OF AUTI10Rl7...i\TION NO. 7736 B.'-:GU~EER OF RECORD

:

HIANCX.O.R.P.B. f·LORl:DA REC1 $ fRA·no~ N O. 45280

C:'i'roJeclsVS/02'VypsrdO/vB.

SccJo: NTS Approvod: HK

...

Revision

Date

PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS

Drown: DP Chockod: CJ

ROADWAY PRODUCTION

Doto: 05/06/15

P.O. llOX m29, WEST PALM llBACH. FLORIDA

ROYAL PALM BEACH BOULEVARD !II- CANAL TO $. OF ORANGE BOULEVARDJ

TYPICAL SECTION

Sheol: 5 Of:

Project No.: 2!11450J

GENERAL NOTES I.

2. 3. 4.

5. 6. 7.

8.

9.

JO. II.

12.

13. 14. 15. 16.

PRIOR TO COMMENCEMENT OF ANY EXCAVATION, THE CONTRACTOR SHALL COMPLY WITH FLORIDA STATUTE 556.105 FOR THE PROTECTION OF UNDERGROUND GAS PIPELINES. ALL GRADES SH684- 4100 NO CONSTRUCTION SHALL COi.ii/ENCE UNTIL ALL REQVIRED PERMITS AND APPROVALS HAVE BEEN SECURED AND THE CONTRACTOR IS ISSUED A "NOTICE TO PROCEED" CONTRACTOR SHALL UTILIZE CONSTRUCTION llETHODS AND DEVICES AS INDICATED IN FOOT SPECIFICATION AND STANDARD INDEXES WHERE NECESSARY IN ORDER TO COMPLY WITH ALL STATE, LOCAL AND NPOES WATER QUALITY STANDARDS. MAINTENANCE OF TRAFFIC SHALL BE IN ACCORDANCE WITH CURRENT FOOT ROA[N{AY ANO TRAFFIC DESIGN STANDARDS ANO SPECIFICATIONS AND THE llANUAL ON UNIFORM TRAFFIC CONTROL STANDARDS 11./UTCDJ. CONTRACTOR SHALL MAINTAIN TRAFFIC AT ALL TIMES DURING CONSTRUCTION IN ACCORDANCE WITH FOOT INDEX NOS. 600 THRU 660 ANO SHALL PROVIDE ALL BARRICADES, LIGHTING, SJGNAGE AND FLAGMEN AS NECESSARY TO PROVIDE FOR THE SAFE TY OF THE PUBLIC IN THE AREA OF THE WORK.

19. 20. 21. 22.

0

23.

24.

25.

EXISTING DRAINAGE STRUCTURES ANO PIPES WITHIN THE Liii/TS OF CONSTRUCTION ARE TO BE REMOVED, UNLESS OTHERWISE NOTED. DURING CONSTRUCTION, SHOULD ANY DRAINAGE STRUCTURES llNCLUDING PIPES! BE FOUND THAT ARE NOT SH

26.

zr.

A. THE LOCATION OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS SHALL BE DETERlllNED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. IN ADDITION, THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY IF "OTHER" UTILITIES INOT SHOWN ON THE PLANSJEXJST WITHIN THE AREA OF CONSTRUCTION. SHOULD THERE BE UTILITY CONFLICTS, THE CONTRACTOR SHALL INFORll THE ENGINEER AND NOTIFY THE RESPECTNE UTILITY OWNEfl(SJ TO RESOLVE UTILITY CONFLICTS AND UTILITY ADJUSTMENTS, AS REQUIRED.

28. 29. 30.

B. FOR EXISTING UTILITY SYllBOLS, SEE FOOT STANDARD INDEX 002.

!7.

18.

C. WATER FOR SANITARY SEWER UTILITY WORK SHALL BE IN COllFORllANCE WITH ALL CODES, STANDARDS, AND ORDINANCES CURRENTLY AOOPTED BY THE STATE OF FLORIDA D.E.P. PALI/ BEACH COUNTY H.R.S., AND THE LOCAL UTILITY DEPT. OWNING THE FACILITIES. CONTRACTOR SHALL USE EXTREME CAUTION WHEN WORKING IN OR AROUND AREAS OF OVERHEAD OR UNDERGROUND UTILITIES. CONTRACTOR SHALL NOTIFY SUNSHINE STATE "ONE- CALL · OF FLORIDA 0- 800- 432-4770! AND ALL AFFECTED UTILITIES 48 HOURS IN ADVANCE OF ANY CONSTRUCTION SO THAT A COMPANY REPRESENTATNE llAY BE PRESENT.

31.

EXISTING UTILITY

M K-FGROUP, INC.

w

3/12120l7

CONSULTING ENGINEERS 12:39:54 Pl/

WADE A HAGERTY ROBERT C. LOWEN LAURA LE P.£. JOEL R. LINTON NEE.LESH P. SHAH VINCENT P. KREPPS SUPERINTENDENT WANE PALUMBO, P.E. PAT PAINTER

561- 2Zl- 4127 561- 439- 9118 561- 494- 1093 561- 575-6334 561- 694- 3507 561- 838- 1785 561- 233- 3900 561- 493- 6120 561- 494- 1093

ADDRESS: 12n3FOReST 11(1,J,. BOVl.Jl:VAR.D, SUITE 1217 WEl.L.(N"QTO'.'l, FLORIDA l3414

32.

33.

36. ALL JIAILBOXES SERVED FROM THE ROA[N{AY PRIOR TO CONSTRUCTION llUST BE SERVED IN THE SAii£ MANNER AFTER CONSTRUCTION, SEE FOOT INDEX 532. COST OF THIS ITEM SHALL BE INCLUDED IN CONTRACT PRICE FOR CLEARING & GRUBBING. 37. CONTRACTOR SHALL llAINTAIN ACCESS TO ALL ADJACENT PROPERTIES AT ALL TJllES. 38. PAVEllENT MARKINGS AND GEOMETRICS SHALL BE IN ACCORDANCE WITH THE llANUAL ON UNIFORll TRAFFIC CONTROL DEVICES FOR STREETS ANO HIGHWAYS ANO PALI.I BEACH COUNTY TYPICAL NO. T- P- 10- 001 39. ENGRAVING OF CURB FACE: TANGERINE BLVD. AND ROYAL PALI.I BEACH BLVD.

40. ALL DISTURBED AREAS OUT/SOE OF PALI.I BEACH COUNTY RIGHT- OF-WAY AND WITHIN TH£ PROJECT LIMITS AS IOENTll"IED IN THE PLANS SHALL BE SODDED TO llATCH EXISTING GRADE AND ADJACENT PROPERTY. UNLESS OTHERWISE SHOWN IN THE PLANS OR DIRECTED BY TH£ ENGINEER, SOD TYPE WILL MATCH ADJACENT PROPERTY'S EXISTING SOD. 41.

NPDES COllPLIANCE INCLUDING SILT FENCES ARE INCIDENTAL TO CONTRACT.

r A I

6'

I

6' SWK

I

4' I

I

I

VAR/£$

I

fDRIV£WAYJ

I

1 t:~1

2'C & G / TYPE F

4 ' 1 6'

I

I

I

~2~1

I·CURB 6'+

VARIES DROP CURB

LA

TRANS.

+6'·1 CURB TRANS.

/ E x i s t . Rdwy Easement

16'

SWK

'\_2'C&G TYPE F

I

Exist. Rdwy-.._. 1 Easement ..... ,

3'

4'

2'

. . r5··IDRNYJ · ·IDROP · I I

MATCH

1

.

CURB

E~T~~=XI::=~=5/.=.::::::::t·==::r====3=/.=.==!

I

t

SECTION A - A Jf.T.$.

DRIVEWAY DETAILS N. T.$.

34. SURVEY WAS PERFORMED BY ERDMAN ANTHONY OF FLORIDA, INC. MAY 2015 35. AERIAL PHOTOS PROVIDED BY: PALI.I BEACH COUNTY

Na.

Seo!·: Approvod: HK

CERTIFJCATEOF AUTI:IORIZATION NO. m6

Drown: DP

BNGr.-:EER OF RBCORO : HIAN C KOR. P.E. FLORIDA R.fGTh"TR/I.TION NO. 4$2.80

Cl>ectod: CJ

C:V'rojeclSVS/02'V}r!OtosrdOl.dgn

WHEN UTILITY POLES ARE IN AREAS OF EXCAVA TIONS, CONTRACTOR SHALL llAINTAIN A 11/NlllUll SEPARATION OF FIVE !5'JFEET BETWEEN THE POLE AND ANY EXCAVATION. WHEN WORKING WITHIN TEN !IO'J FEET OF A TRAFFIC SIGNAL POLE, PALJJ BEACH COUNTY TRAFFIC OPERATIONS SHALL BE NOTIFIED: 561- 233- 3900 INTERSECTING ROADS AND DRIVEWAYS SHALL BE GRADED AS DIRECTED BY THE ENGINEER, UNLESS OTHERWISE NOTED ON THE PLANS. IN REFERENCE TO THE PROPOSED DRAINAGE STRUCTURES: A. ALL PIPES SHALL BE IN ACCORDANCE WITH FOOT AND PALM BEACH COUNTY REQUIREllENTS. B. SPECIAL ATTENTION IS DIRECTED TO THE FACT THAT PORTIONS OF SOI.IE DRAINAGE STRUCTURES MAY EXTEND INTO THE COMPACTED SUBGRADE PORTION OF THE ROAD BED. EXTREME CAUTION Will BE NECESSARY DURING COMPACTION OPERATIONS IN THESE LOCATIONS. C. CONCRETE PIPE CULVERT IR.C.P.J SHALL BE CLASS I, UNLESS OTHERWISE NOTED. D. ALL STORM STRUCTURE TOPS SHALL BE ADJUSTED AT TIME OF FINAL PAVEllENT OR CURB CONS TRUCT/ON. FINAL ADJUSTMENT OF ALL TOPS SHALL BE THE RESPONSIBILITY OF THE UNDERGROUND CONTRACTOR. E. THE LENGTHS OF PIPE SHOHN HEREON HAVE BEEN DETERlllNED BY CALCULATING THE DISTANCE BETWEEN THE "CENTERLINE" OF THE INLETS AND/OR MANHOLES. F. ALL DITCH BOTTOM INLETS SHALL HAVE EYEBOLT AND CHAIN IN ACCORDANCE WITH FOOT INDEX 201. G. THE CONTRACTOR SHALL VERIFY THE EXISTING INVERT ELEVATIONS AND DIMENSIONS OF ALL EXISTING DRAINAGE STRUCTURES PRIOR TO FABRICATION OF PROPOSED DRAINAGE STRUCTURES. H. OFFSETS TO CURB INLETS ARE TO THE CENTER OF INLETS. /. OFFSETS TO P- X INLETS AND MANHOLES ARE TO THE CENTERLINE OF BOX. J. ALL INLET DRAINAGE STRUCTURES SHALL HAVE A 11/Nll.IUll 2 ' SUllP, EXCEPT CONTROL STRUCTURES. WEEP HOLES SHALL NOT BE A PART OF THESE SUMPS. ALL EXISTING FOOT / PALI/ BEACH COUNTY SIGNS WITHIN THE Liii/TS OF CONSTRUCTION WHICH ARE TO BE RELOCATED OR REllOVED SHALL BE REMOVED BY THE CONTRACTOR AND STOCKPILED WITHIN THE RIGHT- OF- WAY FOR REI/OVAL OR RELOCATION BY PALM BEACH COUNTY FORCES. NOTIFY PALM BEACH COUNTY TRAFFIC OPERATIONS AT 561- 233- 3900. CONTRACTOR SHALL EXERCISE CAUTION WHILE REMOVING AND/OR RELOCATING EXISTING SIGNS IN ORDER TO PREVENT ANY UNNECESSARY DAMAGE TO THE SIGNS. SIGNS WHICH ARE DAMAGED BEYOND USE, AS DETERlllNED BY THE ENGINEER, SHALL BE REPLACED BY THE CONTRACTOR AT HIS EXPENSE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUllENTING THE EXISTING PAVEMENT llARKINGS BEFORE RESURFACING WORK IS STARTED AND THIS INFORMATION SHALL BE USED IN CONJUNCTION WITH TEMPORARY STRIPING AND FINISHED STRIPING. EXCAVATED SOILS AND EXISTING ROCK BASE MAY BE USED FOR EllBANKl.IEN T CONSTRUCTION PROVIDED THAT THE MATERIAL IS CLEAN FILL, FREE OF ORGANIC I.IA TERIALS, ROOTS OR OTHER DELETERIOUS JIATERIAL, AND CONFORllS WITH FOOT SPECIFICATIONS AND FOOT STANDARD INDEX 505. ANY BORRON MATERIAL REQUIRED FOR THE PROJECT SHALL BE FURNISHED BY THE CONTRACTOR FROM AREAS PROVIDED BY HIM, AND THE COST OF FURNISHING SUCH MA TERIAL SHALL BE INCLUDED IN THE LUI.IP SUM CONTRACT PRICE FOR EARTHWORK & GRADING. ALL MUCK AND PLASTIC MATERIAL WITHIN THE LIMITS OF CONSTRUCTION SHALL BE REMOVED BY THE CONTRACTOR IN ACCORDANCE WITH FOOT STANDARD INDEX 500. NONE OF THE EXISTING BASE THAT IS REMOVED DURING CONSTRUCTION SHALL BE USED IN THE CONSTRUCTION OF THE PROPOSED BASE, UNLESS AUTHORIZED BY THE ENGINEER. ALL VEGETATION, DEBRIS, PAVEllENT, CONCRETE OR OTHER UNSUITABLE MA TERIALS SHALL BE LEGALLY DISPOSED OF OFF- SITE IN AN AREA PROVIDED BY THE CONTRACTOR. ALL EXISTING IRRIGATION SYSTEM COMPONENTS CONFLICTING WITH THE PROPOSED CONSTRUCTION SHALL BE REllOVED AND DISPOSED OF BY THE CONTRACTOR. EXISTING PIPES SHALL BE CAPPED PRESSURE TIGHT AT THE R/W LINE OR LJAllTS OF CONSTRUCTION. EXISTING CONTROL WIRING SHALL BE CUT, SEALED AND LEFT BURIED BELON GRADE AT THE RIW LINE OR LIMITS OF CONSTRUCTION. IN ALL CASES, THE CONTRACTOR SHALL CLEARLY MARK IN THE FIELD ALL IRRIGATION SYSTEM BREAKS JN A llANNER ACCEPTABLE TO THE ENGINEER FOR FUTURE RE- CONNECTION OR EXTENSION BY OTHERS. THE COST FOR IRRIGATION SYSTEM REMOVAL, CAPPING PIPE AND SEALING WIRING ANO ALL OTHER WORK RELATING TO EXIS TING IRRIGATION SYSTEllS SHALL BE INCLUDED IN THE CONTRACT PRICE FOR CLEARING & GRUBBING. ALL EXISTING INLET GRATES & MANHOLE CASTING WHICH ARE REllOVED WITHIN THE Liii/TS OF FOOT OR PALI.I BEACH COUNTY RIW'S SHALL BE TRANSPORTED BY THE CONTRACTOR TO THE RESPECTIVE FOOT OR PALll BEACH COUNTY MAINTENANCE YARD. IN AREAS REQUIRING PAVEllENT REMOVAL, THE CONTRACTOR SHALL REllOVE ALL ASPHALT, BASE AND STABILIZATION ANO BACKFILL WITH CLEAN A- 2/A- 3 MA TERIAL AS DIRECTED BY THE ENGINEER.

Doto: 06/0l/15

Revilion

B

Dale

(_· ~

PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS

ROYAL PALM BEACH BOULEVARD (JI- CANAL TO s. OF ORANGE BIJULEVARDI

ROADWAY PRODUCTION P.O. llOX 21229, WEST PALM 111.ACH. FLORIDA

GENERAL NOTES AND DETAILS

S-t: 6 Of:

Project No.: 20J450I

Legend

c::J

POTENTIAL POND SITE 3 & 4 (2.56 ac.)

c:J CANALFILLAREAS (0.16

,- ESA SCH EDA ......

Figure 2 - Canal Fill Areas Map Royal Palm Beach Blvd. from M-Canal to Orange Blvd.

www.seheda.com All data WU\ln. ttll& map a'e 61.JlP'le

Data Source: -ESAScheda Imagery Source: - ESRI Aerial Imagery

Potential Pond Site Locations Palm Beach County, Florida

warranty. TI5 proclJCt

l'la6 not l>eef\ ~ng. ot UVf!'f purposeo. \.l6e($ or · tm:nnaton $llOIJk1 rMeWorcon61Jtihe:ptl'!\al')'oata&OOroe61o a&eel'taln the uwt&ty d fie bfomla1:cn.

wltr'IOl.C

ac.)

prepared llr legal,

· · · · · · · · = = = = = = = = - · · · · · · · Feet 700 1,050 0 350

Coordinate System: NAO 1983 Florida State Plane East

N

A

Legend

c::J SITE BOUNDARY (3.84 ac.) C

PARCEL DATA FIELD VERIFIED FLUCFCS

1110 - FIXED SINGLE FAMILY UNITS (1.14 ac.) 3100 - HERBACEOUS (DRY PRAIRIE) (0.25 ac) 4110- PINE FLATWOODS I EXOTICS - DISTURBED (1.64 ac.) 5120 - CHANNELIZED WATERWAYS, CANALS (0.13 ac.) 641 0-D - FRESHWATER MARSH - DISTURBED (0.49 ac.)

r'""

ESA SCHEDA

Figure 1- Land Use I Land Cover Map - Pond Site 3 & 4

....ii

Royal Palm Beach Blvd. from M-Canal to Orange Blvd. Potential Pond Site Locations Palm Beach County, Florida

www.seheda.com All data WU\ln. ttll& map a'e 61.JlP'le

warranty. TI5 proclJCt

prepared llr legal,

l'la6

not l>eef\ UVf!'f

~ng. ot

purposeo. \.l6e($ or · tm:nnaton $llOIJk1 rMeWorcon61Jtihe:ptl'!\al')'oata&OOroe61o

llllllllllllC:::::::::::..11111111. . F~t

a&eel'taln the uwt&ty d fie bfomla1:cn.

0

80

160

240

Data Sol.l"ce: - Scheda Ecological Associates, Inc. - FLOOR Imagery Sol.l"ce:

A N

- Google Earth

Coordinate System: NAO 1983 Flolida State Plane East

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas