You can copy from here when filling out the rest of the page.
CONSTRUCT A NEW LIQUIFIED NATURAL GAS (LNG) FACILITY AND PIPELINE IN CAMERON PARISH
CONSTRUCT A NEW LIQUIFIED NATURAL GAS (LNG) FACILITY AND PIPELINE IN CAMERON PARISH
NAME OF APPLICANT: Venture Global Calcasieu Pass, LLC and TransCameron Pipeline, LLC, c/o ERM, Inc., Attn: Mr. Ross Hargrove, 80 South 81h Street, 1000 IDS Center, Minneapolis, MN 55402.
LOCATION OF WORK: In Cameron Parish, Louisiana; LNG terminal located at North 29.77399, West -93.33399 on the Calcasieu Ship Channel near Cameron and pipeline located east of terminal, as shown on the attached vicinity map. Hydrologic Unit Codes 08080206 Calcasieu River Basin and 08080202 Mermentau River Basin.
CHARACTER OF WORK: Clear, grade, fill, and excavate to develop a tract of land, totaling approximately 413.2 acres, in order to construct the proposed LNG facility, access roads, and appurtenant structures. In addition, approximately 51.4 acres of adjacent developed upland property will be used for support facilities during construction. (See additional details in attached PN)
1
H
3
4
5
6
7
TION
CONSTRUC
LIMITS
8
IDENTIFICATION LIST
ITEM
55'-0"
Calcasieu Pass Terminal
PLANT & TRUE
NORTH
2
127-X0002
127-P0210 to 213
DESCRIPTION
OILY WATER TREATMENT PACKAGE H
FINAL DISCHARGE PUMPS
127-M0210
RUN OFF SUMP
127-P0036-A/B
LNG SPILL AUXILIARY SUMP PUMPS
EL. +2'-0"
G
(NOTE 5)
127-P0210
127-P0211
127-P0212
127-P0213
NOTE 4
F
NOTES :
OUTGOIING
CLEAN
WATER
AT THIS SECTION
C
FOR PERMITTING PURPOSES ONLY
NOT FOR CONSTRUCTION
27-SS-01
WATER
TREATMENT
SUBSTATION
DISCHARGE TO CHANNEL
B.O.P. ELEVATION -3'-0"
Sheet 44
D
EL. +5'-0"
CALCASIEU CHANNEL
E
EL. -44'- 4"
F
RIPRAP REVETMENT.
G
127-M0031
LNG SPILL
AUXILIARY SUMP
INCOMING
RAIN
WATER
127-M0210
RUN OFF SUMP
127-P0036-A
127-P0036-B
INCOMING
OILY
WATER
127-X0002
INCOMING
OILY
WATER
ROAD
N. 469389'-6"
B
1. ALL DISTANCES AND ELEVATIONS ARE
E
EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
2. COORDINATES SYSTEM IS REFERENCED
TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM. LOUISIANA
SOUTH.
3. THE ELEVATION 0'-0" IS CORRESPONDING D
TO 0'-0" BASED NAVD 88 DATUM.
4. EROSION PROTECTION WILL BE
DEVELOPED DURING DETAIL ENGINEERING.
5. RIPRAP REVETMENT. QUARRY STONE
2 R-150 (24''). ASTM 6092-57.
6. GENERAL REVIEW.
C
7. OILY WATER TREATMENT PLANT
CAPACITY ON HOLD.
4
10/19/17
ISSUED FOR DESIGN
JPR
JHM
MN
3
06/24/16
ISSUED FOR DESIGN
JPR
JHM
MN
2
02/24/16
ISSUED FOR DESIGN
JPR
JHM
MN
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
© Técnicas Reunidas S.A.
November 2017
TECNICAS REUNIDAS
A
TR Proj.:
8581
1
2
3
4
5
6
OIL AND WATER TREATMENT
PLANT
Doc. Number:
Scale: Sheet: Rev. :
8581-127-CC-E01-A 1"-80' 1 of 1
7
A
8
4
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
8581-100-CS-002-AS
SUPERFICIAL & UNDERGROUND DRAINAGE DETAILS
INDEX
F
DRAWING
E
F
DESCRIPTION
Sheet 45
8581-100-CS-002-AS-H01
SURFICIAL & UNDERGROUND DRAINAGE DETAILS - INDEX.
8581-100-CS-002-AS-H02
SURFICIAL & UNDERGROUND DRAINAGE DETAILS - 127-M0003 AND SECTION A.
8581-100-CS-002-AS-H03
SURFICIAL & UNDERGROUND DRAINAGE DETAILS - 127-M0006 AND SECTION B.
8581-100-CS-002-AS-H04
SURFICIAL & UNDERGROUND DRAINAGE DETAILS - 127-M0011 AND SECTION C.
8581-100-CS-002-AS-H05
SURFICIAL & UNDERGROUND DRAINAGE DETAILS - 127-M0021 AND SECTION D.
8581-100-CS-002-AS-H06
SURFICIAL & UNDERGROUND DRAINAGE DETAILS - 127-M0031 AND SECTION E, F AND G.
8581-100-CS-002-AS-H07
SURFICIAL & UNDERGROUND DRAINAGE DETAILS - 127-M0041 AND SECTION H.
E
D
D
C
C
B
8
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
7
30/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
6
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
© Técnicas Reunidas S.A.
November 2017
TECNICAS REUNIDAS
A
TR Proj.:
8581
1
2
3
4
5
6
SUPERFICIAL & UNDERGROUND
DRAINAGE. DETAILS
INDEX
Doc. Number:
8581-100-CS-002-AS
7
Scale: Sheet: Rev. :
1/7
8
8
A
2
1
3
3.- COORDINATES SYSTEM REFERENCED TO THE NATIONAL
GEODETIC SURVEY NAD 83 HORIZONTAL DATUM.
LOUISIANA SOUTH.
G
4.- GENERAL REVIEW.
REFERENCE DRAWINGS:
1.- LAYOUT SEE DWG. 8581-000-DP-001-AE.
2.- VERTICAL LADDERS SEE DWG. 8581-000-CZ-003-S.
3.- GRATING SEE DWG. 8581-000-CZ-005-S.
4.- HANDRAILS & STAIRWAYS SEE DWG. 8581-000-CZ-004-S.
H
1.- ALL DISTANCES AND ELEVATIONS ARE EXPOSED IN TERMS
OF FEET UNLESS OTHERWISE NOTED.
2.- THE ELEVATION 100'-0" IS CORRESPONDING TO 0'-0" BASED
NAVD 88 DATUM.
-
8
NOTES:
A
G
F
7
H
6
5
4
Calcasieu Pass Terminal
PLANT & TRUE
NORTH
F
6015)4-)
E
E
Sheet 46
D
November 2017
A
N.T.S.
C
8
10/16/17
ISSUED FOR DESIGN
FRM
DIL
MNP
7
30/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
6
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
1
KEY PLAN
B
!"#$#
%&
© Técnicas Reunidas S.A.
D
C
2
'
A
3
4
5
6
TR Proj.:
8581
SURFICIAL & UNDERGROUND
DRAINAGE. DETAILS
127-M0003 AND SECTION A
Doc. Number:
8581-100-CS-002-AS
7
A
Scale: Sheet: Rev. :
2/7
-
8
8
2
1
3
4
Calcasieu Pass Terminal
PLANT & TRUE
NORTH
H
-
7
8
H
G
6
B
5
G
F
Sheet 47
E
F
E
B
6015)4-)
-
D
D
C
KEY PLAN
C
N.T.S.
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPOSED IN TERMS OF FEET UNLESS
OTHERWISE NOTED.
2.- THE ELEVATION 100'-0" IS CORRESPONDING TO 0'-0" BASED NAVD 88 DATUM.
3.- COORDINATES SYSTEM REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM. LOUISIANA SOUTH.
4.- GENERAL REVIEW.
B
© Técnicas Reunidas S.A.
November 2017
A
REFERENCE DRAWINGS:
1.- LAYOUT SEE DWG. 8581-000-DP-001-AE.
2.- VERTICAL LADDERS SEE DWG. 8581-000-CZ-003-S.
3.- GRATING SEE DWG. 8581-000-CZ-005-S.
4.- HANDRAILS & STAIRWAYS SEE DWG. 8581-000-CZ-004-S.
8
10/16/17
ISSUED FOR DESIGN
FRM
DIL
MNP
7
30/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
6
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
2
3
4
5
TECNICAS REUNIDAS
6
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
SURFICIAL & UNDERGROUND
DRAINAGE. DETAILS
127-M0006 AND SECTION B
Doc. Number:
8581-100-CS-002-AS
7
A
Scale: Sheet: Rev. :
3/7
-
8
8
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
PLANT & TRUE
NORTH
H
C
-
G
F
C
-
E
6015)4-)
Sheet 48
D
E
F
G
H
D
KEY PLAN
C
B
November 2017
© Técnicas Reunidas S.A.
C
N.T.S.
NOTES:
8
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- ALL DISTANCES AND ELEVATIONS ARE EXPOSED IN TERMS OF FEET UNLESS
OTHERWISE NOTED.
2.- THE ELEVATION 100'-0" IS CORRESPONDING TO 0'-0" BASED NAVD 88 DATUM.
3.- COORDINATES SYSTEM REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM. LOUISIANA SOUTH.
4.- GENERAL REVIEW.
7
30/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
6
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
REFERENCE DRAWINGS:
1.- LAYOUT SEE DWG. 8581-000-DP-001-AE.
2.- VERTICAL LADDERS SEE DWG. 8581-000-CZ-003-S.
3.- GRATING SEE DWG. 8581-000-CZ-005-S.
4.- HANDRAILS & STAIRWAYS SEE DWG. 8581-000-CZ-004-S.
A
2
3
4
5
TECNICAS REUNIDAS
6
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
SURFICIAL & UNDERGROUND
DRAINAGE. DETAILS
127-M0011 AND SECTION C
Doc. Number:
8581-100-CS-002-AS
7
A
Scale: Sheet: Rev. :
4/7
-
8
8
2
1
3
4
5
6
7
8
H
H
D
-
G
F
Sheet 49
D
E
F
G
E
D
-
Calcasieu Pass Terminal
PLANT & TRUE
NORTH
6015)4-)
D
KEY PLAN
C
C
N.T.S.
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPOSED IN TERMS OF FEET UNLESS
OTHERWISE NOTED.
2.- THE ELEVATION 100'-0" IS CORRESPONDING TO 0'-0" BASED NAVD 88 DATUM.
3.- COORDINATES SYSTEM REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM. LOUISIANA SOUTH.
4.- GENERAL REVIEW.
B
November 2017
© Técnicas Reunidas S.A.
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
30/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
6
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
REFERENCE DRAWINGS:
1.- LAYOUT SEE DWG. 8581-000-DP-001-AE.
2.- VERTICAL LADDERS SEE DWG. 8581-000-CZ-003-S.
3.- GRATING SEE DWG. 8581-000-CZ-005-S.
4.- HANDRAILS & STAIRWAYS SEE DWG. 8581-000-CZ-004-S.
A
8
7
6
SURFICIAL & UNDERGROUND
DRAINAGE. DETAILS
127-M0021 AND SECTION D
Doc. Number:
8581-100-CS-002-AS
7
A
Scale: Sheet: Rev. :
5/7
-
8
8
2
1
3
Calcasieu Pass Terminal
PLANT & TRUE
NORTH
4
5
6
H
7
8
H
"
G
F
F
!
F
E
G
-
E
E
Sheet 50
G
-
!
D
F
-
D
# $
B
© Técnicas Reunidas S.A.
November 2017
!
"
-
A
E
-
!
N.T.S.
G
-
C
$ !
KEY PLAN
C
8
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
7
30/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
6
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
2
3
-
4
B
TECNICAS REUNIDAS
!
TR Proj.:
8581
1
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
PREPARED CHECKED APPROVED
5
6
SURFICIAL & UNDERGROUND
DRAINAGE. DETAILS
127-M0031 AND SECTION E, F AND G
Doc. Number:
8581-100-CS-002-AS
7
Scale: Sheet: Rev. :
6/7
-
8
8
A
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
PLANT & TRUE
NORTH
NOTES:
H
-
H
G
REFERENCE DRAWINGS:
1.- LAYOUT SEE DWG. 8581-000-DP-001-AE.
2.- VERTICAL LADDERS SEE DWG. 8581-000-CZ-003-S.
3.- GRATING SEE DWG. 8581-000-CZ-005-S.
4.- HANDRAILS & STAIRWAYS SEE DWG. 8581-000-CZ-004-S.
F
F
G
H
1.- ALL DISTANCES AND ELEVATIONS ARE EXPOSED IN TERMS OF FEET UNLESS
OTHERWISE NOTED.
2.- THE ELEVATION 100'-0" IS CORRESPONDING TO 0'-0" BASED NAVD 88 DATUM.
3.- COORDINATES SYSTEM REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM. LOUISIANA SOUTH.
4.- GENERAL REVIEW.
E
E
Sheet 51
6015)4-)
D
D
C
KEY PLAN
B
© Técnicas Reunidas S.A.
November 2017
H
-
8
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
7
30/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
6
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
TR Proj.:
8581
3
OWNER
B
TECNICAS REUNIDAS
2
PREPARED CHECKED APPROVED
VENTURE GLOBAL CALCASIEU PASS, LLC
A
1
C
N.T.S.
4
5
6
SURFICIAL & UNDERGROUND
DRAINAGE. DETAILS
127-M0041 AND SECTION H
Doc. Number:
8581-100-CS-002-AS
7
A
Scale: Sheet: Rev. :
7/7
-
8
8
Calcasieu Pass Terminal
Sheet 52
SHEET PURPOSELY OMITTED
November 2017
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 53
D
D
C
C
E
E
F
F
D
B
NOTES :
A
A
November 2017
B
B
C
C
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
B
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
VENTURE GLOBAL CALCASIEU PASS, LLC
4.- ALL COORDINATES & LENGTHS ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
D
A
6.- FOR PERMITING PURPOSES ONLY - NOT FOR CONSTRUCTION.
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
A
TYPICAL SECTION PROFILES
WEST-EAST SECTION A-A
Doc. Number:
8581-000-UR-002-A
Size:
Scale: Sheet:
ANSI B
8
Rev. :
1/11 6
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
Calcasieu Pass Terminal
G
G
F
F
E
E
Sheet 54
D
D
C
C
E
E
F
F
NOTES :
D
B
A
A
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
November 2017
B
B
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
C
C
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
B
VENTURE GLOBAL CALCASIEU PASS, LLC
4.- ALL COORDINATES & LENGTHS ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
A
D
6.- FOR PERMITING PURPOSES ONLY - NOT FOR CONSTRUCTION.
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
A
TYPICAL SECTION PROFILES
WEST-EAST SECTION A-A
Doc. Number:
8581-000-UR-002-A
Size:
Scale: Sheet:
ANSI B
8
Rev. :
2/11 6
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 55
D
D
C
C
E
E
F
F
NOTES :
D
B
A
A
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
November 2017
B
B
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
C
C
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
B
VENTURE GLOBAL CALCASIEU PASS, LLC
4.- ALL COORDINATES & LENGTHS ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
A
D
6.- FOR PERMITING PURPOSES ONLY - NOT FOR CONSTRUCTION.
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
A
TYPICAL SECTION PROFILES
WEST-EAST SECTION A-A
Doc. Number:
8581-000-UR-002-A
Size:
Scale: Sheet:
ANSI B
8
Rev. :
3/11 6
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 56
D
D
C
C
E
E
F
F
NOTES :
D
B
November 2017
A
A
A
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
B
B
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
C
C
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
B
VENTURE GLOBAL CALCASIEU PASS, LLC
4.- ALL COORDINATES & LENGTHS ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
D
6.- FOR PERMITING PURPOSES ONLY - NOT FOR CONSTRUCTION.
TECNICAS REUNIDAS
TR Proj.:
8581
A
TYPICAL SECTION PROFILES
WEST-EAST SECTION B-B
Doc. Number:
8581-000-UR-002-A
Size:
Scale: Sheet:
ANSI B
Rev. :
4/11 6
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 57
D
D
C
C
E
E
F
F
D
B
NOTES :
A
A
November 2017
B
B
C
C
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
B
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
VENTURE GLOBAL CALCASIEU PASS, LLC
4.- ALL COORDINATES & LENGTHS ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
A
D
6.- FOR PERMITING PURPOSES ONLY - NOT FOR CONSTRUCTION.
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
A
TYPICAL SECTION PROFILES
WEST-EAST SECTION B-B
Doc. Number:
8581-000-UR-002-A
Size:
Scale: Sheet:
ANSI B
8
Rev. :
5/11 6
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 58
D
D
C
C
E
E
F
F
NOTES :
D
B
A
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
A
November 2017
B
B
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
C
C
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
B
VENTURE GLOBAL CALCASIEU PASS, LLC
4.- ALL COORDINATES & LENGTHS ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
A
D
6.- FOR PERMITING PURPOSES ONLY - NOT FOR CONSTRUCTION.
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
A
TYPICAL SECTION PROFILES
WEST-EAST SECTION C-C
Doc. Number:
8581-000-UR-002-A
Size:
Scale: Sheet:
ANSI B
8
Rev. :
6/11 6
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 59
D
D
C
C
E
E
F
F
D
B
NOTES :
A
A
November 2017
B
B
C
C
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
B
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
VENTURE GLOBAL CALCASIEU PASS, LLC
4.- ALL COORDINATES & LENGTHS ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
A
D
6.- FOR PERMITING PURPOSES ONLY - NOT FOR CONSTRUCTION.
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
A
TYPICAL SECTION PROFILES
WEST-EAST SECTION C-C
Doc. Number:
8581-000-UR-002-A
Size:
Scale: Sheet:
ANSI B
8
Rev. :
7/11 6
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 60
D
D
C
C
E
E
F
F
D
B
NOTES :
A
A
November 2017
B
B
C
C
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
B
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
VENTURE GLOBAL CALCASIEU PASS, LLC
4.- ALL COORDINATES & LENGTHS ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
A
D
6.- FOR PERMITING PURPOSES ONLY - NOT FOR CONSTRUCTION.
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
A
TYPICAL SECTION PROFILES
NORTH-SOUTH SECTION D-D
Doc. Number:
8581-000-UR-002-A
Size:
Scale: Sheet:
ANSI B
8
Rev. :
8/11 6
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 61
D
D
C
C
E
E
F
F
D
B
NOTES :
A
A
November 2017
B
B
C
C
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
B
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
VENTURE GLOBAL CALCASIEU PASS, LLC
4.- ALL COORDINATES & LENGTHS ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
A
D
6.- FOR PERMITING PURPOSES ONLY - NOT FOR CONSTRUCTION.
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
A
TYPICAL SECTION PROFILES
NORTH-SOUTH SECTION D-D
Doc. Number:
8581-000-UR-002-A
Size:
Scale: Sheet:
ANSI B
8
Rev. :
9/11 6
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 62
D
D
C
C
E
E
F
F
D
B
NOTES :
A
A
November 2017
B
B
C
C
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
B
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
VENTURE GLOBAL CALCASIEU PASS, LLC
4.- ALL COORDINATES & LENGTHS ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
A
D
6.- FOR PERMITING PURPOSES ONLY - NOT FOR CONSTRUCTION.
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
A
TYPICAL SECTION PROFILES
WEST-EAST SECTION E-E
Doc. Number:
8581-000-UR-002-A
Size:
Scale: Sheet:
ANSI B
8
Rev. :
10/11 6
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 63
D
D
C
C
E
E
F
F
D
B
NOTES :
A
A
November 2017
B
B
C
C
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
B
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
VENTURE GLOBAL CALCASIEU PASS, LLC
4.- ALL COORDINATES & LENGTHS ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
A
D
6.- FOR PERMITING PURPOSES ONLY - NOT FOR CONSTRUCTION.
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
A
TYPICAL SECTION PROFILES
WEST-EAST SECTION F-F
Doc. Number:
8581-000-UR-002-A
Size:
Scale: Sheet:
ANSI B
8
Rev. :
11/11 6
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
8581-000-UR-001-A
ACCESS ROAD GENERAL LAYOUT AND
TYPICAL SECTION
H
H
INDEX
DRAWING
G
F
E
Sheet 64
D
C
B
DESCRIPTION
8581-000-UR-001-A-H01
ACCESS ROAD GENERAL LAYOUT (INDEX)
8581-000-UR-001-A-H02
NORTHEAST ACCESS ROAD GENERAL LAYOUT
8581-000-UR-001-A-H03
NORTHEAST ACCESS ROAD TYPICAL SECTIONS
8581-000-UR-001-A-H04
NORTHEAST ACCESS ROAD. PLANS
8581-000-UR-001-A-H05
NORTHEAST ACCESS ROAD. PLANS
8581-000-UR-001-A-H06
NORTHEAST ACCESS ROAD. PLANS
8581-000-UR-001-A-H07
NORTHEAST ACCESS ROAD. PLANS
8581-000-UR-001-A-H08
NORTHEAST ACCESS ROAD. PLANS
8581-000-UR-001-A-H09
NORTHEAST ACCESS ROAD. PLANS
8581-000-UR-001-A-H10
NORTHEAST ACCESS ROAD. PLANS
8581-000-UR-001-A-H11
NORTHEAST ACCESS ROAD. PLANS
8581-000-UR-001-A-H12
NORTHEAST ACCESS ROAD. PLANS
8581-000-UR-001-A-H13
NORTHEAST ACCESS ROAD. PLANS
8581-000-UR-001-A-H14
MARTIN ACCESS ROAD. PLANS
8581-000-UR-001-A-H15
MARTIN ACCESS ROAD. PLANS
8581-000-UR-001-A-H16
NORTHEAST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H17
NORTHEAST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H18
NORTHEAST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H19
NORTHEAST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H20
NORTHEAST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H21
NORTHEAST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H22
NORTHEAST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H23
NORTHEAST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H24
NORTHEAST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H25
NORTHEAST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H26
NORTHEAST ACCESS ROAD. CULVERT STA. 5+24.26
8581-000-UR-001-A-H27
NORTHEAST ACCESS ROAD. EARTHWORKS REPORT
8581-000-UR-001-A-H28
NORTHEAST ACCESS ROAD. EARTHWORKS REPORT
G
F
E
D
C
November 2017
8581-000-UR-001-A-H29
NORTHEAST ACCESS ROAD. EARTHWORKS REPORT
8581-000-UR-001-A-H30
NORTHWEST ACCESS ROAD. GENERAL LAYOUT AND TYPICAL SECTIONS
8581-000-UR-001-A-H31
NORTHWEST ACCESS ROAD. PLANS
8581-000-UR-001-A-H32
NORTHWEST ACCESS ROAD. PLANS
8581-000-UR-001-A-H33
NORTHWEST ACCESS ROAD. PLANS
8581-000-UR-001-A-H34
NORTHWEST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H35
NORTHWEST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H36
NORTHWEST ACCESS ROAD. PROFILES
8581-000-UR-001-A-H37
NORTHWEST ACCESS ROAD. EARTHWORKS REPORT
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
2
3
4
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
A
1
PREPARED CHECKED APPROVED
TR Proj.:
8581
5
6
ACCESS ROAD GENERAL LAYOUT
INDEX
Doc. Number:
8581-000-UR-001-A
7
Scale:
-
8
Sheet: Rev. :
1/37
9
A
1
2
3
4
5
6
7
8
H
H
SHEET 5
SHEET 6
SHEET 7
SHEET 8
SHE
ET 9
SHEET 4
SH
EE
T1
0
SH
EE
T1
5
G
G
SH
EE
T1
1
SH
EE
T1
4
Calcasieu Pass Terminal
PLANT & TRUE
NORTH
F
SH
EE
T
F
12
E
SH
E
E
1
ET
3
Sheet 65
D
D
C
C
NOTES:
B
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
OTHERWISE NOTED.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TECNICAS REUNIDAS
A
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
N.T.S.
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
GENERAL LAYOUT
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
2/37
-
8
A
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 66A
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
D
D
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
5.- POST-CONSTRUCTION RESTORATION OF MARTIN ACCESS ROAD FOOTPRINT
C
C
WILL REQUIRE PARTIAL REPLACEMENT OF AGGREGATE WITH APROXIMATELY
6 INCHES OF STOCKPILED NATIVE SOIL TO RETURN TO ORIGINAL GRADE.
B
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
6
04/28/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
TECNICAS REUNIDAS
A
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
TYPICAL SECTIONS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
3/37
-
8
A
9
Martin Access Road (Temporary Construction Use Only)
Calcasieu Pass Terminal
x
x
x
Martin Access Road to be constructed at start of Terminal Site construction and used for heavy equipment and materials delivery from Martin Support Facility, potentially
throughout duration of Terminal construction (estimated 36 months); restoration will commence within one year of Terminal's full operational start-up.
Construction Sequence
o Concrete bridge over ditch on east side of Davis Road to be installed first, to allow access for subsequent road construction
o Bridge to be installed according to following sequence:
Precast concrete foundation piles to be driven
Concrete abutments to be poured
Precast slab beams to be positioned over foundation piles
Concrete surface slab to be poured
o Upper 2 feet of soil within 1.51-acre road footprint to be excavated (4,872 cyds), stockpiled on site, and replaced with crushed stone to existing ground elevation for
road foundation
o 20-inch-diameter culvert to be installed at a minimum depth of 12 inches from surface of crushed stone layer
o 6-inch-thick layer (1,218 cyds) of crushed limestone to be placed on foundation layer of crushed rock
o 6-inch-thick layer (1,218 cyds) of gravel to be placed on layer of crushed limestone, constituting road surface
Land Restoration Sequence
o Restoration will involve removal of surface layers of crushed limestone and gravel (2,436 cyds) above pre-construction ground elevation and replacement with 6-inchthick layer of previously stockpiled soil (removal of crushed limestone and gravel surface layers will restore previous wetland hydrology; placement of soil over base
layer of crushed stone [left in place] will allow regeneration of native wetland vegetation from adjacent root and seed stock).
Sheet 66B
All areas, volumes, and dimensions as stated are approximate values
November 2017
Venture Global Calcasieu Pass, LLC
SHEET 66B Additional Notes for Martin Access Road Construction and Land Restoration
DeHyCo Access Road (Temporary Construction Use Only)
Calcasieu Pass Terminal
DeHyCo Access Road to be constructed at start of Terminal Site construction and used for delivery of heavy and/or bulky equipment and materials from DeHyCo and/or
Baker Hughes Support Facilities.
When road is no longer required, Terminal's administrative center, which overlaps sections of the road footprint, will be constructed and other road sections that lie beyond
the administrative center footprint will be removed and land in these sections restored.
Construction Sequence
o Upper 2 feet of soil within 1.12-acre road footprint to be excavated (3,615 cyds), stockpiled on site, and replaced with crushed stone to existing ground elevation for
road foundation
o 18-inch-thick layer (2,711 cyds) of crushed limestone to be placed on foundation layer of crushed rock
o 6-inch-thick layer (904 cyds) of gravel to be placed on layer of crushed limestone, constituting road surface
Land Restoration Sequence
o Restoration will involve removal of gravel/crushed limestone/crushed stone outside administrative center and Northwest TWS footprints and replacement with
previously stockpiled native soil material; pre-existing drainage and topography to be restored to allow natural revegetation from adjacent root and seed stock (e.g.,
Borrichia frustescens, Distichlis spicata, Spartina spartinae)
o Within overlapping administrative center footprint, road materials to be left in place or removed as necessary to construct building foundations
o Within Northwest TWS, surface materials to be redistributed to achieve even grading across workspace
All areas, volumes, and dimensions as stated are approximate values
Sheet 66C
November 2017
Venture Global Calcasieu Pass, LLC
SHEET 66C Additional Notes for DeHyCo Access Road Construction and Land Restoration
Calcasieu Pass Terminal
Northeast Access Road (Temporary Construction and Permanent Operational Use)
x
Northeast Access Road to be constructed at start of Terminal Site construction and used temporarily for delivery of heavy and/or bulky equipment and materials from
Liberty Support Facility and Davis Road throughout Terminal construction duration (estimated 36 months); thereafter, narrower portion of road surface to be upgraded and
used permanently for secondary access to walled facilities during Terminal operation.
x
All sections of Northeast Access Road to be retained following construction, although only upgraded portion will be used for vehicle traffic.
x
Existing oil field service road to be retained and incorporated into cross-sectional design of Northeast Access Road.
x
Construction sequence:
o Cameron Parish Gravity Drainage District No. 3 culvert (40-footlong pipe) and flap gate to be removed and replaced with 95-foot-long pipe culvert with flap gate;
removal to involve excavation and temporary stockpiling of 275 cyds of native soil/sediments, to be returned with 700 cubic yards of sand/topsoil as additional fill
during replacement
o Three additional drainage culverts and one steel pipe south of Cameron Parish Gravity Drainage District No. 3 culvert to be replaced or upgraded
o Land within new road footprint either side of Northeast Access Road to be graded, then crushed limestone (85,997 cyds) added to match elevation of existing oil field
service road
o 6-inch-thick layer of gravel (10,503 cyds) to be placed as top layer across entirety of new access road (including existing oil field service road)
o Following construction delivery use, additional gravel to be placed in road width designated for operational use and asphalt surface applied as necessary
All areas, volumes, and dimensions as stated are approximate values
Sheet 66D
November 2017
Venture Global Calcasieu Pass, LLC
SHEET 66D Additional Notes for Northeast Access Road Construction
1
2
3
Calcasieu Pass Terminal
NOTES:
H
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
4
5
6
7
8
PLANT & TRUE
NORTH
H
OTHERWISE NOTED.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
G
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
G
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
F
F
E
E
Sheet 67
D
32:(532/(
',7&+
),5(+<'5$17
)(1&(
6,*1
&8/9(57
(;,67,1*52$'
D
75((
:$7(5%27720(/(9$7,21
C
C
B
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
TECNICAS REUNIDAS
A
TR Proj.:
8581
1
2
3
4
5
6
7
NORTHEAST ACCESS ROAD
PLANS
Doc. Number:
Scale:
8581-000-UR-001-A
8
-
A
Sheet: Rev. :
4/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
PLANT & TRUE
NORTH
G
F
F
E
E
D
D
C
C
Sheet 68
G
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
',7&+
),5(+<'5$17
)(1&(
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
6,*1
&8/9(57
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
(;,67,1*52$'
75((
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
TECNICAS REUNIDAS
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
32:(532/(
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
5/37
-
8
A
9
1
2
Calcasieu Pass Terminal
H
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
E
E
D
D
C
C
Sheet 69
G
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
32:(532/(
',7&+
),5(+<'5$17
)(1&(
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
6,*1
&8/9(57
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
(;,67,1*52$'
75((
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
6/37
-
8
A
9
1
2
Calcasieu Pass Terminal
H
3
4
5
PLANT & TRUE
NORTH
6
7
8
H
PI 2: E: 2649555.824
N: 472079.374
C 2 : R:700.00', : 160° 19' 40"
G
F
F
E
E
D
D
Sheet 70
G
PI 3: E: 2649383.631
N: 471888.468
C 3 : R:535.79', : 156° 38' 47"
C
C
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
',7&+
),5(+<'5$17
)(1&(
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
6,*1
&8/9(57
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
(;,67,1*52$'
75((
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
32:(532/(
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
7/37
-
8
A
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
PLANT & TRUE
NORTH
G
F
F
E
E
D
D
C
C
Sheet 71
G
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
32:(532/(
',7&+
),5(+<'5$17
)(1&(
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
6,*1
&8/9(57
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
(;,67,1*52$'
75((
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
8/37
-
8
A
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
PLANT & TRUE
NORTH
PI 4: E: 2649045.100
N: 470884.805
C 4 : R:780.79', : 148° 22' 14"
G
F
F
E
E
D
D
C
C
Sheet 72
G
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
32:(532/(
',7&+
),5(+<'5$17
)(1&(
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
6,*1
&8/9(57
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
(;,67,1*52$'
75((
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
9/37
-
8
A
9
1
2
Calcasieu Pass Terminal
H
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
E
E
D
D
C
C
Sheet 73
G
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
32:(532/(
',7&+
),5(+<'5$17
)(1&(
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
6,*1
&8/9(57
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
(;,67,1*52$'
75((
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
10/37
-
8
A
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
PLANT & TRUE
NORTH
G
F
F
E
E
D
D
C
C
Sheet 74
G
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
',7&+
),5(+<'5$17
)(1&(
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
6,*1
&8/9(57
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
(;,67,1*52$'
75((
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
32:(532/(
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
11/37
-
8
A
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
PLANT & TRUE
NORTH
G
F
F
E
E
D
D
C
C
Sheet 75
G
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
32:(532/(
',7&+
),5(+<'5$17
)(1&(
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
6,*1
&8/9(57
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
(;,67,1*52$'
75((
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
12/37
-
8
A
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
PLANT & TRUE
NORTH
PI 6: E: 2647424.347
N: 469582.005
C 6 : R:1000.00', : 142° 16' 9"
G
G
F
E
E
D
D
C
C
Sheet 76
F
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
32:(532/(
',7&+
),5(+<'5$17
)(1&(
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
6,*1
&8/9(57
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
(;,67,1*52$'
75((
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
13/37
-
8
A
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
PLANT & TRUE
NORTH
G
F
F
E
E
D
D
C
C
Sheet 77
G
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
',7&+
),5(+<'5$17
)(1&(
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
6,*1
&8/9(57
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
(;,67,1*52$'
75((
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
TR Proj.:
8581
1
MARTIN ACCESS ROAD
PLANS
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
32:(532/(
2
3
4
5
6
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
14/37
-
8
A
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
PLANT & TRUE
NORTH
G
F
F
E
E
D
D
C
C
Sheet 78
G
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
',7&+
),5(+<'5$17
)(1&(
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
6,*1
&8/9(57
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
(;,67,1*52$'
75((
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
TECNICAS REUNIDAS
TR Proj.:
8581
1
MARTIN ACCESS ROAD
PLANS
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
32:(532/(
2
3
4
5
6
Doc. Number:
Scale:
8581-000-UR-001-A
7
Sheet: Rev. :
15/37
8
A
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 79
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
16/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 80
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
17/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 81
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
18/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 82
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
19/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 83
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
20/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 84
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
21/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 85
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
22/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 86
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
23/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 87
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
24/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 88
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
25/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 89
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
D
D
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
C
C
B
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
TECNICAS REUNIDAS
A
TR Proj.:
8581
1
2
3
4
5
6
NORTHEAST ACCESS ROAD
CULVERT STA. 5+24.26
Doc. Number:
8581-000-UR-001-A
Scale:
Sheet: Rev. :
26/37
9
1
2
Calcasieu Pass Terminal
6WDWLRQ1R
H
G
F
E
Sheet 90
D
C
B
&XW$UHD
VTIW
&XW
9ROXPH
FXIW
3
8VDEOH
9ROXPH
FXIW
)LOO$UHD
VTIW
4
)LOO9ROXPH
FXIW
&XPPXODWLYH
&XW9ROXPH
FXIW
5
&XPPXODWLYH
&XPXODWLYH
8VDEOH
)LOO9ROXPH
9ROXPH
FXIW
FXIW
1HW
&XPXODWLYH
9ROXPH
FXIW
6WDWLRQ1R
6
&XW$UHD
VTIW
&XW
9ROXPH
FXIW
8VDEOH
9ROXPH
FXIW
7
)LOO$UHD
VTIW
&XPPXODWLYH
&XW9ROXPH
FXIW
&XPPXODWLYH
&XPXODWLYH
8VDEOH
)LOO9ROXPH
9ROXPH
FXIW
FXIW
1HW
&XPXODWLYH
9ROXPH
FXIW
November 2017
4
D
C
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
TR Proj.:
8581
3
F
E
A
2
H
G
1
8
)LOO9ROXPH
FXIW
5
6
NORTHEAST ACCESS ROAD
EARTHWORKS REPORT
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
27/37
9
1
Calcasieu Pass Terminal
6WDWLRQ1R
H
2
&XW$UHD
VTIW
&XW
9ROXPH
FXIW
3
8VDEOH
9ROXPH
FXIW
)LOO$UHD
VTIW
4
)LOO9ROXPH
FXIW
&XPPXODWLYH
&XW9ROXPH
FXIW
&XPPXODWLYH
&XPXODWLYH
8VDEOH
)LOO9ROXPH
9ROXPH
FXIW
FXIW
5
1HW
&XPXODWLYH
9ROXPH
FXIW
&XW
9ROXPH
FXIW
8VDEOH
9ROXPH
FXIW
7
)LOO$UHD
VTIW
)LOO9ROXPH
FXIW
&XPPXODWLYH
&XW9ROXPH
FXIW
8
&XPPXODWLYH
&XPXODWLYH
8VDEOH
)LOO9ROXPH
9ROXPH
FXIW
FXIW
1HW
&XPXODWLYH
9ROXPH
FXIW
G
F
6WDWLRQ1R
6
&XW$UHD
VTIW
H
G
F
E
E
Sheet 91
D
D
C
C
B
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
November 2017
TECNICAS REUNIDAS
TR Proj.:
8581
2
3
4
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
A
1
PREPARED CHECKED APPROVED
5
6
NORTHEAST ACCESS ROAD
EARTHWORKS REPORT
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
28/37
9
1
Calcasieu Pass Terminal
H
G
F
E
Sheet 92
D
C
B
November 2017
A
6WDWLRQ1R
2
&XW$UHD
VTIW
&XW
9ROXPH
FXIW
3
8VDEOH
9ROXPH
FXIW
)LOO$UHD
VTIW
4
)LOO9ROXPH
FXIW
&XPPXODWLYH
&XW9ROXPH
FXIW
&XPPXODWLYH
&XPXODWLYH
8VDEOH
)LOO9ROXPH
9ROXPH
FXIW
FXIW
5
1HW
&XPXODWLYH
9ROXPH
FXIW
6
6WDWLRQ1R
&XW$UHD
VTIW
&XW
9ROXPH
FXIW
8VDEOH
9ROXPH
FXIW
5RDGWR0DUWLQ6XSSRUW)DFLOLW\
-XQFWLRQEHWZHHQ0DUWLQ6XSSRUW)DFLOLW\URDG
DQG&RQVWUXFWLRQ6XSSRUW)DFLOLW\URDG
)LOO$UHD
VTIW
F
E
D
C
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
2
3
4
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
TR Proj.:
8581
1
H
G
1HW
&XPXODWLYH
9ROXPH
FXIW
&XPPXODWLYH
&XPXODWLYH
8VDEOH
)LOO9ROXPH
9ROXPH
FXIW
FXIW
&XPPXODWLYH
&XW9ROXPH
FXIW
8
)LOO9ROXPH
FXIW
-XQFWLRQEHWZHHQ0DUWLQ6XSSRUW
)DFLOLW\URDGDQG'DYLVURDG
7
5
6
NORTHEAST ACCESS ROAD
EARTHWORKS REPORT
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
29/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
PLANT & TRUE
NORTH
H
H
SHEET 31
SHEET 33
SHEET 32
G
F
F
E
E
D
D
C
C
Sheet 93
G
B
NOTES:
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
OTHERWISE NOTED.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
TECNICAS REUNIDAS
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
A
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
N.T.S.
1
TR Proj.:
8581
2
3
4
5
6
NORTHWEST ACCESS ROAD
GENERAL LAYOUT AND
TYPICAL SECTIONS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
30/37
-
8
A
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
PLANT & TRUE
NORTH
G
F
F
E
E
D
D
C
C
Sheet 94
G
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
32:(532/(
',7&+
),5(+<'5$17
)(1&(
6,*1
&8/9(57
(;,67,1*52$'
75((
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TR Proj.:
8581
1
2
3
4
5
6
NORTHWEST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
31/37
-
8
A
9
1
2
Calcasieu Pass Terminal
H
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
E
E
D
D
Sheet 95
G
P1(II) 1: E: 2645185.492
N: 470364.764
C1(II) : R:200.00', : 143° 22' 32"
C
C
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
32:(532/(
',7&+
),5(+<'5$17
)(1&(
6,*1
&8/9(57
(;,67,1*52$'
75((
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TR Proj.:
8581
1
2
3
4
5
6
NORTHWEST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
32/37
-
8
A
9
1
2
3
4
5
6
7
Calcasieu Pass Terminal
H
8
H
PLANT & TRUE
NORTH
G
F
F
E
E
D
D
C
C
Sheet 96
G
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
November 2017
A
32:(532/(
',7&+
),5(+<'5$17
)(1&(
6,*1
&8/9(57
(;,67,1*52$'
75((
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
TECNICAS REUNIDAS
DIAMETER SHALL BE AT LEAST 12" AND MINIMUM COVER OF 9" IS REQUIRED
BETWEEN THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
:$7(5%27720(/(9$7,21
VENTURE GLOBAL CALCASIEU PASS, LLC
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
TR Proj.:
8581
1
2
3
4
5
6
NORTHWEST ACCESS ROAD
PLANS
Doc. Number:
8581-000-UR-001-A
7
Scale:
Sheet: Rev. :
33/37
-
8
A
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 97
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHWEST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
34/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 98
H
B
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
NOTES:
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
TECNICAS REUNIDAS
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
A
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
LA. FUGRO REPORT No. 04.10140306. JULY 2016
1
2
3
4
TR Proj.:
8581
5
6
NORTHWEST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
35/37
9
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
G
G
F
F
E
E
D
D
C
C
Sheet 99
H
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
NOTES:
B
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
PREPARED CHECKED APPROVED
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
CONDITIONS.
2.- `WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
TECNICAS REUNIDAS
CALCASIEU PASS LNG TERMINAL PROJECT VENTURE GLOBAL LNG CAMERON,
A
LA. FUGRO REPORT No. 04.10140306. JULY 2016
TR Proj.:
8581
1
2
3
4
5
6
NORTHWEST ACCESS ROAD
PROFILES
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
36/37
9
1
Calcasieu Pass Terminal
6WDWLRQ1R
2
&XW$UHD
VTIW
H
G
F
E
Sheet 100
D
&XW
9ROXPH
FXIW
3
8VDEOH
9ROXPH
FXIW
)LOO$UHD
VTIW
4
5
&XPPXODWLYH
&XPPXODWLYH
&XPXODWLYH
)LOO9ROXPH
8VDEOH
&XW9ROXPH
)LOO9ROXPH
9ROXPH
FXIW
FXIW
FXIW
FXIW
6
7
8
1HW
&XPXODWLYH
9ROXPH
FXIW
6WDWLRQ1R
&XW$UHD
VTIW
&XW
9ROXPH
FXIW
8VDEOH
9ROXPH
FXIW
)LOO$UHD
VTIW
&XPPXODWLYH
&XPPXODWLYH
&XPXODWLYH
)LOO9ROXPH
8VDEOH
&XW9ROXPH
)LOO9ROXPH
9ROXPH
FXIW
FXIW
FXIW
FXIW
5RDGIURP'DYLVMXQFWLRQWR
'HK\FR6XSSRUW)DFLOLW\
1HW
&XPXODWLYH
9ROXPH
FXIW
H
G
F
E
D
C
C
B
November 2017
9
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
8
08/12/16
ISSUED FOR DESIGN
MMG
DIL
MNP
7
06/27/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
1
2
3
4
OWNER
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
A
PREPARED CHECKED APPROVED
TR Proj.:
8581
5
6
NORTHWEST ACCESS ROAD
EARTHWORKS REPORT
Doc. Number:
8581-000-UR-001-A
Scale:
-
Sheet: Rev. :
37/37
9
Calcasieu Pass Terminal
Sheet 101
November 2017
1
2
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
G
G
F
F
E
E
Sheet 102
NOTES:
D
D
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
C
C
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
B
2
10/16/17
ISSUED FOR DESIGN
FRM
DIL
MNP
1
04/18/16
ISSUED FOR DESIGN
FRM
DIL
MNP
0
04/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
November 2017
CULVERT STA. 5+70.00
MARTIN ROAD ACCESS
TECNICAS REUNIDAS
A
TR Proj.:
8581
1
2
3
4
5
6
Doc. Number:
8581-000-UR-005-A
7
Scale:
Sheet: Rev. :
1 of 1
-
8
A
2
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
8581-000-UR-006-A
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY
H
INDEX
DRAWING
F
E
Sheet 103
D
DESCRIPTION
8581-000-UR-006-A-H01
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. INDEX
8581-000-UR-006-A-H02
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. GENERAL LAYOUT
8581-000-UR-006-A-H03
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H04
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H05
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H06
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H07
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H08
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H09
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H10
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H11
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H12
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H13
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H14
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H15
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H16
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PLANS
8581-000-UR-006-A-H17
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H18
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H19
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H20
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H21
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H22
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H23
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H24
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H25
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H26
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
G
F
E
D
C
C
8581-000-UR-006-A-H27
A
November 2017
© Técnicas Reunidas S.A.
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H28
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H29
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H30
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. PROFILES
8581-000-UR-006-A-H31
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. EARTHWORKS REPORT
8581-000-UR-006-A-H32
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. EARTHWORKS REPORT
8581-000-UR-006-A-H33
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. EARTHWORKS REPORT
8581-000-UR-006-A-H34
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. EARTHWORKS REPORT
8581-000-UR-006-A-H35
SOUTHWEST SERVICE ROAD TO JETTY PIER FACILITY. EARTHWORKS REPORT
2
3
4
5
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
TR Proj.:
8581
1
MNP
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
INDEX
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
1/37
-
8
5
1
PLANT & TRUE
NORTH
4
5
6
7
8
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
H
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SH
EE
T8
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SH
EE
T9
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SH
EE
T
:
:
7
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SH
EE
T1
0
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
6
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SH
EE
T
:
:
G
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
G
3
Calcasieu Pass Terminal
H
2
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SH
EE
T
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
DAVIS ROAD
13
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
3
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SH
EE
T
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
E
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SHEET 15
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Sheet 104
:
:
SH
EE
T1
4
4
:
:
:
:
:
:
:
:
:
:
:
:
SH
EE
T
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SH
EE
T
:
:
:
12
:
E
F
5
:
:
:
SH
EE
T
:
FLOODWALL
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SH
EE
T1
1
:
:
F
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SHEET 16
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
D
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
D
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
SOUTHWEST SERVICE ROAD TO
JETTY PIER FACILITY
November 2017
© Técnicas Reunidas S.A.
B
!
"
KEY PLAN
N.T.S.
6015)4-)
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
2
3
4
TECNICAS REUNIDAS
5
MNP
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
TR Proj.:
8581
1
C
5
A
# $ %
&' ( #
C
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
GENERAL LAYOUT
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
2/37
-
8
5
1
3
4
5
6
7
8
:
:
H
:
:
PLANT & TRUE
NORTH
:
:
:
:
:
:
:
:
:
:
G
:
:
:
:
:
:
:
:
:
:
:
:
:
G
Calcasieu Pass Terminal
H
2
:
:
F
:
:
F
:
:
:
:
:
:
:
:
:
:
:
:
:
E
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
D
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Sheet 105
E
:
:
:
:
:
:
D
PI 1: E: 2648421.282
N: 470366.124
C 1 : R:500.00', D : 131° 9' 17"
C
C
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
3/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
E
E
Sheet 106
D
D
C
C
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
4/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
E
E
Sheet 107
D
D
C
C
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
5/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
E
:
:
E
:
:
:
:
:
:
:
:
Sheet 108
D
:
:
:
D
:
:
:
:
:
:
C
:
:
:
C
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
6/37
-
8
5
1
4
5
6
7
8
:
3
:
H
:
:
:
:
:
:
:
:
PLANT & TRUE
NORTH
G
:
:
:
:
:
G
Calcasieu Pass Terminal
H
2
:
:
:
:
:
F
:
:
F
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
E
E
:
:
:
Sheet 109
:
:
:
:
:
:
D
:
D
:
:
:
:
:
:
:
:
:
C
C
:
:
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
7/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
PI 2: E: 2648349.045
N: 467453.747
C 2 : R:175.00', D : 100° 0' 18"
G
F
F
E
E
Sheet 110
D
D
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
C
:
"
:
:
:
:
C
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
8/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
E
E
Sheet 111
D
C
:
:
:
:
:
:
:
"
:
:
:
:
$
:
:
:
:
&
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
D
:
:
:
:
:
:
:
:
:
:
:
:
:
C
:
:
:
:
:
:
:
:
:
:
:
:
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
:
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
:
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
9/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
E
E
Sheet 112
D
D
C
C
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
10/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
E
E
Sheet 113
D
D
C
C
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
11/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
PI 3: E: 2645949.089
N: 467091.413
C 3 : R:300.00', D : 171° 25' 49"
G
F
F
E
E
Sheet 114
D
D
C
C
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
12/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
E
E
Sheet 115
D
D
C
C
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
13/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
E
E
Sheet 116
D
D
C
C
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
14/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
G
F
F
E
E
Sheet 117
D
D
PI 4: E: 2644245.456
N: 467091.413
C 4 : R:2000', D : 140° 17' 22"
C
C
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
15/37
-
8
5
1
3
4
5
6
7
8
H
PLANT & TRUE
NORTH
F
G
G
Calcasieu Pass Terminal
H
2
F
E
E
Sheet 118
D
D
C
C
"
$
&
NOTES:
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN TERMS ON FEET UNLESS
OTHERWISE NOTED.
B
A
November 2017
© Técnicas Reunidas S.A.
2.- COORDINATE SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
LEGEND
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
FIRE HYDRANT
:
:
:
:
5.- PVC EQUALIZERS SHALL BE INSTALLED EACH 250ft THROUGH WETLAND AREA.
SIGN
CULVERT
DIAMETER SHALL BE 12" AND MINIMUM COVER OF 9" IS REQUIRED BETWEEN
WATER BOTTOM ELEVATION
TREE
THE TOP OF THE PIPE AND THE LOWEST PART OF THE SUBGRADE.
2
OWNER
B
4.- THE BASE ELEVATION 0'-0" IS RELATIVE TO THE NAVD 88 DATUM.
FENCE
TECNICAS REUNIDAS
TR Proj.:
8581
1
PREPARED CHECKED APPROVED
3.- ALL SLOPES ARE 3:1 UNLESS NOTED OTHERWISE.
DITCH
:
MNP
VENTURE GLOBAL CALCASIEU PASS, LLC
NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
POWER POLE
-2.7
5
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PLANS
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
16/37
-
8
5
2
1
3
4
5
6
7
8
G
&%'
H
*)
* $
# * )
# *
!"
"
%
*) $$
* $$
(*
* $%
*)
* $$
# *)
# * $$
*)%
*
(*%%
*
& '
&
#
%
%
$
E
$ $
Sheet 119
D
#
%
E
%
F
%
F
G
Calcasieu Pass Terminal
H
# ( )
D
C
C
%
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
17/37
-
8
5
2
1
3
4
5
6
7
8
& "' "!!
&
(&
&
H
& !'!!
&
& #'!!
&
"
%
G
%
F
!
!
E
Sheet 120
D
" "
E
F
"# "#
G
Calcasieu Pass Terminal
H
D
C
C
"
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
18/37
-
8
5
2
1
3
4
5
6
7
8
H
"'$(%%
" '$
'%(
'$%
"'(
" '%$
'($#
'%
)'$#%
'
'(%%%
'%
' (%
'%#
)' $
'
"' (%%
" '
G
Calcasieu Pass Terminal
H
!
!
#
&
&
%
G
F
F
"
%$
%%
$
%
$
%
%
#
E
$
%
#$ #$
Sheet 121
D
"
E
D
C
C
%
#
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
19/37
-
8
5
2
1
3
4
5
6
7
8
%(& (
% (
'%
%
%&
%" "
'%(((
%!
%&
%"
G
(
H
%&((
%"
% &
%"
'%
%!
%&
%!
%&
%!
G
Calcasieu Pass Terminal
H
# !$
#$
"
F
F
" ""
"!
D
"
!
!
"!
!
E
Sheet 122
D
E
C
C
"
(
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
20/37
-
8
5
2
1
3
4
5
6
7
8
% !& "
%
(%
%
F
!"
"
E
"
! !
'
!
" "
Sheet 123
!
E
D
% '&"
%!
% '&"'
%!
#
$#
"#
!
G
F
H
% & '
%!!
% !&""
%!!
% '&
%"
(%""'
%
% &""
%"'
% &"'
%'
G
Calcasieu Pass Terminal
H
D
C
C
!
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
21/37
-
8
5
2
1
3
4
5
6
7
8
' ( )
'#
*')) #
'
' ( $ #
' $
*' #
'
H
' ( #
'
"' ($ #
" ' #
' ( )
'# #
G
Calcasieu Pass Terminal
H
$
G
!
!
% $&
#
F
F
"
E
$
# ##
#
Sheet 124
D
"
$$
E
$$
D
C
C
#
$
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
22/37
-
8
5
2
1
3
4
5
6
7
8
G
Calcasieu Pass Terminal
H
H
G
"#
!
F
F
D
" "
"
E
"
!! !!
Sheet 125
D
! !
E
C
C
!
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
23/37
-
8
5
2
1
3
4
5
6
7
8
!&'%
! !&%
(&
!&
!&%'
!&%
H
$!&'
$!&%
G
Calcasieu Pass Terminal
H
G
!"#
#
%
F
F
$
%
D
% %
%
%
E
Sheet 126
D
$
%
E
C
C
%
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
24/37
-
8
5
2
1
3
4
5
6
7
8
%"&
%#
'%#!
%#"
%" &"#
%##
H
%"
%#
G
Calcasieu Pass Terminal
H
#
#
G
#
$
!
F
F
D
" "
#
!
#
#
#
"
! #"
E
#
Sheet 127
D
#
E
!
C
C
!
#
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
25/37
-
8
5
2
1
3
4
5
6
7
8
"
G
Calcasieu Pass Terminal
H
"
H
%
%
$
G
%
&% '
F
F
"
!
E
%
" %
D
"" "
"" "
"
$
Sheet 128
D
!
"$$ $$
E
"# #
C
C
"
$
%
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
26/37
-
8
5
2
1
3
4
5
6
7
8
!'%(
!!'
)' %
!'
!'%(
!'
H
$!'%(
$!'
G
Calcasieu Pass Terminal
H
G
!"#
#
%
&
F
F
$
%
E
%
Sheet 129
D
$
E
D
C
C
%
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
27/37
-
8
5
2
1
3
4
5
6
7
8
!&'
!!&
(&
!&
H
$!& ' %
$!&
G
Calcasieu Pass Terminal
H
G
! "#
#
F
F
$
D
E
% %
Sheet 130
D
$
E
C
C
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
28/37
-
8
5
2
1
3
4
5
6
7
8
"
H
% "&" '
% !!
G
Calcasieu Pass Terminal
H
"
'
# $
F
G
F
"
!
!
E
!
!
"
Sheet 131
D
E
D
C
C
"
'
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
29/37
-
8
5
2
1
3
4
5
7
8
H
" #$##
G
Calcasieu Pass Terminal
H
6
#
%
G
F
F
E
!
!
Sheet 132
D
E
D
C
C
%
#
B
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
MNP
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
NOTES:
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
1.- WATER TABLE INDICATES SHORT-TERM MEASUREMENTS TAKEN BETWEEN
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MARCH 2015 AND MAY 2016, AND MAY NOT CORRESPOND TO LONG-TERM
A
November 2017
© Técnicas Reunidas S.A.
CONDITIONS.
PREPARED CHECKED APPROVED
OWNER
B
VENTURE GLOBAL CALCASIEU PASS, LLC
2.- WATER TABLE DATA SOURCE AS PER REPORT GEOTECHNICAL STUDY
CALCASIEU PASSLNG TERMINAL PROJECT VENTURE GLOBAL LNG
CAMERON, LA. FUGRO REPORT No. 04.10140306. July 2016
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
PROFILE
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
30/37
-
8
5
1
G
Calcasieu Pass Terminal
H
2
Station No.
F
E
Sheet 133
D
Cut Area
(sqft)
Cut
Volume
(cuft)
3
Usable
Volume
(cuft)
Fill Area
(sqft)
4
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
5
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
Station No.
Cut Area
(sqft)
6
Cut
Volume
(cuft)
Usable
Volume
(cuft)
7
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Fill Area
(sqft)
8
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
0 25.000
0.0000
0.0000
0.0000
158.2900
0.0000
0.0000
0.0000
0.0000
0.0000
6 75.000
0.0000
0.0000
0.0000
76.0500
70.0700
0.0000
0.0000
2084.5000 -2084.5000
0 50.000
0.0000
0.0000
0.0000
143.3200
139.6300
0.0000
0.0000
139.6300
-139.6300
7 00.000
0.0000
0.0000
0.0000
82.9700
73.6200
0.0000
0.0000
2158.1200 -2158.1200
0 75.000
0.0000
0.0000
0.0000
150.0300
135.8100
0.0000
0.0000
275.4500
-275.4500
7 25.000
0.0000
0.0000
0.0000
71.8200
71.6600
0.0000
0.0000
2229.7800 -2229.7800
1 00.000
0.0000
0.0000
0.0000
145.9700
137.0400
0.0000
0.0000
412.4800
-412.4800
7 50.000
0.0000
0.0000
0.0000
69.6800
65.5100
0.0000
0.0000
2295.2900 -2295.2900
1 25.000
0.0000
0.0000
0.0000
131.3800
128.4000
0.0000
0.0000
540.8800
-540.8800
7 75.000
0.0000
0.0000
0.0000
64.9000
62.3100
0.0000
0.0000
2357.6000 -2357.6000
1 50.000
0.0000
0.0000
0.0000
127.4600
119.8300
0.0000
0.0000
660.7100
-660.7100
8 00.000
0.0000
0.0000
0.0000
49.9500
53.1700
0.0000
0.0000
2410.7700 -2410.7700
1 75.000
0.0000
0.0000
0.0000
123.5900
116.2300
0.0000
0.0000
776.9400
-776.9400
8 25.000
0.0000
0.0000
0.0000
36.3300
39.9400
0.0000
0.0000
2450.7100 -2450.7100
2 00.000
0.0000
0.0000
0.0000
119.7100
112.6400
0.0000
0.0000
889.5700
-889.5700
8 50.000
0.0000
0.0000
0.0000
41.9600
36.2500
0.0000
0.0000
2486.9600 -2486.9600
2 25.000
0.0000
0.0000
0.0000
115.9500
109.1000
0.0000
0.0000
998.6800
-998.6800
8 75.000
0.0000
0.0000
0.0000
42.7300
39.2100
0.0000
0.0000
2526.1700 -2526.1700
2 50.000
0.0000
0.0000
0.0000
121.6600
110.0100
0.0000
0.0000
1108.6800 -1108.6800
9 00.000
0.0000
0.0000
0.0000
44.1100
40.2000
0.0000
0.0000
2566.3700 -2566.3700
2 75.000
0.0000
0.0000
0.0000
102.9200
103.9700
0.0000
0.0000
1212.6500 -1212.6500
9 25.000
0.0000
0.0000
0.0000
45.9000
41.6700
0.0000
0.0000
2608.0400 -2608.0400
3 00.000
0.0000
0.0000
0.0000
81.4600
85.3600
0.0000
0.0000
1298.0100 -1298.0100
9 50.000
0.0000
0.0000
0.0000
47.7200
43.3400
0.0000
0.0000
2651.3800 -2651.3800
3 25.000
0.0000
0.0000
0.0000
49.9100
60.8200
0.0000
0.0000
1358.8300 -1358.8300
9 75.000
0.0000
0.0000
0.0000
41.4800
41.2900
0.0000
0.0000
2692.6800 -2692.6800
3 50.000
0.0000
0.0000
0.0000
32.5300
38.1700
0.0000
0.0000
1397.0000 -1397.0000
10 00.000
0.0000
0.0000
0.0000
43.2600
39.2300
0.0000
0.0000
2731.9100 -2731.9100
3 75.000
0.0000
0.0000
0.0000
31.3300
29.5600
0.0000
0.0000
1426.5700 -1426.5700
10 25.000
0.0000
0.0000
0.0000
45.0600
40.8900
0.0000
0.0000
2772.8000 -2772.8000
4 00.000
0.0000
0.0000
0.0000
30.5500
28.6500
0.0000
0.0000
1455.2100 -1455.2100
10 50.000
0.0000
0.0000
0.0000
46.8700
42.5600
0.0000
0.0000
2815.3500 -2815.3500
4 25.000
0.0000
0.0000
0.0000
34.4700
30.1000
0.0000
0.0000
1485.3100 -1485.3100
10 75.000
0.0000
0.0000
0.0000
48.6900
44.2400
0.0000
0.0000
2859.5900 -2859.5900
4 50.000
0.0000
0.0000
0.0000
68.2600
47.5600
0.0000
0.0000
1532.8700 -1532.8700
11 00.000
0.0000
0.0000
0.0000
50.5200
45.9300
0.0000
0.0000
2905.5200 -2905.5200
4 75.000
0.0000
0.0000
0.0000
61.3300
60.0000
0.0000
0.0000
1592.8700 -1592.8700
11 25.000
0.0000
0.0000
0.0000
52.8400
47.8500
0.0000
0.0000
2953.3700 -2953.3700
5 00.000
0.0000
0.0000
0.0000
64.4700
58.2400
0.0000
0.0000
1651.1100 -1651.1100
11 50.000
0.0000
0.0000
0.0000
69.1000
56.4500
0.0000
0.0000
3009.8300 -3009.8300
5 25.000
0.0000
0.0000
0.0000
67.7900
61.2300
0.0000
0.0000
1712.3400 -1712.3400
H
G
F
E
D
C
C
5 50.000
0.0000
0.0000
0.0000
66.0800
61.9800
0.0000
0.0000
1774.3100 -1774.3100
5 75.000
0.0000
0.0000
0.0000
64.8200
60.6000
0.0000
0.0000
1834.9200 -1834.9200
B
6 00.000
0.0000
0.0000
0.0000
61.7400
58.5900
0.0000
0.0000
1893.5100 -1893.5100
6 25.000
0.0000
0.0000
0.0000
62.0700
57.3200
0.0000
0.0000
1950.8300 -1950.8300
6 50.000
0.0000
0.0000
0.0000
75.3000
63.6000
0.0000
0.0000
2014.4300 -2014.4300
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MNP
PREPARED CHECKED APPROVED
OWNER
B
A
November 2017
© Técnicas Reunidas S.A.
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
EARTHWORKS REPORT
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
31/37
-
8
5
1
G
Calcasieu Pass Terminal
H
F
E
Sheet 134
D
Station No.
2
Cut Area
(sqft)
Cut
Volume
(cuft)
3
Usable
Volume
(cuft)
Fill Area
(sqft)
4
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
5
Station No.
Cut Area
(sqft)
6
Cut
Volume
(cuft)
Usable
Volume
(cuft)
7
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Fill Area
(sqft)
8
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
11 75.000
0.0000
0.0000
0.0000
59.5100
59.5400
0.0000
0.0000
3069.3700 -3069.3700
18 25.000
0.0000
0.0000
0.0000
35.5600
34.2600
0.0100
0.0100
4164.2900 -4164.2800
12 00.000
0.0000
0.0000
0.0000
57.9700
54.3900
0.0000
0.0000
3123.7600 -3123.7600
18 50.000
0.0000
0.0000
0.0000
39.8600
34.9200
0.0100
0.0100
4199.2100 -4199.2000
12 25.000
0.0000
0.0000
0.0000
68.4000
58.5100
0.0000
0.0000
3182.2600 -3182.2600
18 75.000
0.0000
0.0000
0.0000
44.2600
38.9400
0.0100
0.0100
4238.1500 -4238.1400
12 50.000
0.0000
0.0000
0.0000
50.0300
54.8300
0.0000
0.0000
3237.0900 -3237.0900
19 00.000
0.0000
0.0000
0.0000
55.8500
46.3400
0.0100
0.0100
4284.5000 -4284.4900
12 75.000
0.0000
0.0000
0.0000
38.8000
41.1200
0.0000
0.0000
3278.2200 -3278.2200
19 25.000
0.0000
0.0000
0.0000
66.6600
56.7100
0.0100
0.0100
4341.2100 -4341.2000
13 00.000
0.0000
0.0000
0.0000
34.1600
33.7800
0.0000
0.0000
3311.9900 -3311.9900
19 50.000
0.0000
0.0000
0.0000
80.0000
67.9000
0.0100
0.0100
4409.1100 -4409.1000
13 25.000
0.0000
0.0000
0.0000
36.0000
32.4800
0.0000
0.0000
3344.4700 -3344.4700
19 75.000
0.0000
0.0000
0.0000
60.1400
64.8800
0.0100
0.0100
4473.9900 -4473.9700
13 50.000
0.0000
0.0000
0.0000
45.9300
37.9300
0.0000
0.0000
3382.4000 -3382.4000
20 00.000
0.0000
0.0000
0.0000
49.0000
50.5300
0.0100
0.0100
4524.5100 -4524.5000
13 75.000
0.0000
0.0000
0.0000
39.9600
39.7600
0.0000
0.0000
3422.1700 -3422.1600
20 25.000
0.0000
0.0000
0.0000
38.4000
40.4600
0.0100
0.0100
4564.9800 -4564.9700
14 00.000
0.0000
0.0000
0.0000
49.9600
41.6300
0.0000
0.0000
3463.7900 -3463.7900
20 50.000
0.0000
0.0000
0.0000
32.0300
32.6100
0.0100
0.0100
4597.5800 -4597.5700
14 25.000
0.0000
0.0000
0.0000
43.7500
43.3800
0.0000
0.0000
3507.1800 -3507.1700
20 75.000
0.0000
0.0000
0.0000
39.7600
33.2400
0.0100
0.0100
4630.8200 -4630.8100
14 50.000
0.0000
0.0000
0.0000
46.6100
41.8300
0.0100
0.0100
3549.0100 -3549.0000
21 00.000
0.0000
0.0000
0.0000
45.3300
39.3900
0.0100
0.0100
4670.2200 -4670.2000
14 75.000
0.0000
0.0000
0.0000
49.5200
44.5000
0.0100
0.0100
3593.5100 -3593.5000
21 25.000
0.0000
0.0000
0.0000
42.3300
40.5800
0.0100
0.0100
4710.8000 -4710.7900
15 00.000
0.0000
0.0000
0.0000
52.4100
47.1900
0.0100
0.0100
3640.7000 -3640.6900
21 50.000
0.0000
0.0000
0.0000
47.6200
41.6400
0.0100
0.0100
4752.4400 -4752.4300
15 25.000
0.0000
0.0000
0.0000
54.9700
49.7100
0.0100
0.0100
3690.4200 -3690.4000
21 75.000
0.0000
0.0000
0.0000
40.5700
40.8300
0.0100
0.0100
4793.2600 -4793.2500
15 50.000
0.0000
0.0000
0.0000
57.2000
51.9300
0.0100
0.0100
3742.3500 -3742.3300
22 00.000
0.0000
0.0000
0.0000
45.7200
39.9500
0.0100
0.0100
4833.2100 -4833.2000
15 75.000
0.0000
0.0000
0.0000
42.7000
46.2500
0.0100
0.0100
3788.5900 -3788.5800
22 25.000
0.0000
0.0000
0.0000
44.9900
41.9900
0.0100
0.0100
4875.2000 -4875.1900
16 00.000
0.0000
0.0000
0.0000
29.4200
33.3900
0.0100
0.0100
3821.9800 -3821.9700
22 50.000
0.0000
0.0000
0.0000
44.2600
41.3200
0.0100
0.0100
4916.5200 -4916.5100
16 25.000
0.0000
0.0000
0.0000
30.8100
27.8800
0.0100
0.0100
3849.8600 -3849.8500
22 75.000
0.0000
0.0000
0.0000
43.5300
40.6400
0.0100
0.0100
4957.1600 -4957.1500
16 50.000
0.0000
0.0000
0.0000
32.0400
29.1000
0.0100
0.0100
3878.9700 -3878.9500
23 00.000
0.0000
0.0000
0.0000
35.0200
36.3600
0.0100
0.0100
4993.5200 -4993.5100
16 75.000
0.0000
0.0000
0.0000
33.2000
30.2000
0.0100
0.0100
3909.1700 -3909.1600
H
G
F
E
D
C
C
17 00.000
17 25.000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
36.0000
54.0600
32.0400
41.6900
0.0100
0.0100
0.0100
0.0100
3941.2000 -3941.1900
3982.9000 -3982.8900
B
17 50.000
0.0000
0.0000
0.0000
58.4500
52.0900
0.0100
0.0100
4034.9900 -4034.9700
17 75.000
0.0000
0.0000
0.0000
54.2000
52.1600
0.0100
0.0100
4087.1400 -4087.1300
18 00.000
0.0000
0.0000
0.0000
38.4400
42.8900
0.0100
0.0100
4130.0300 -4130.0200
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MNP
PREPARED CHECKED APPROVED
OWNER
B
A
November 2017
© Técnicas Reunidas S.A.
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
EARTHWORKS REPORT
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
32/37
-
8
5
1
G
Calcasieu Pass Terminal
H
F
E
Sheet 135
D
Station No.
2
Cut Area
(sqft)
Cut
Volume
(cuft)
3
Usable
Volume
(cuft)
Fill Area
(sqft)
4
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
5
Station No.
Cut Area
(sqft)
6
Cut
Volume
(cuft)
Usable
Volume
(cuft)
7
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Fill Area
(sqft)
8
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
23 25.000
0.0000
0.0000
0.0000
38.4900
34.0300
0.0100
0.0100
5027.5600 -5027.5400
29 75.000
0.0000
0.0000
0.0000
65.6100
57.1600
0.2600
0.2600
6145.1900 -6144.9200
23 50.000
0.0000
0.0000
0.0000
16.0400
25.2500
0.0100
0.0100
5052.8000 -5052.7900
30 00.000
0.0000
0.0000
0.0000
61.2200
58.7200
0.2600
0.2600
6203.9000 -6203.6400
23 75.000
0.2700
0.1300
0.1300
9.0100
11.5900
0.1400
0.1400
5064.3900 -5064.2600
30 25.000
0.0000
0.0000
0.0000
57.1100
54.7800
0.2600
0.2600
6258.6900 -6258.4200
24 00.000
0.0000
0.1300
0.1300
33.6800
19.7600
0.2600
0.2600
5084.1600 -5083.8900
30 50.000
0.0000
0.0000
0.0000
49.5800
49.4000
0.2600
0.2600
6308.0800 -6307.8200
24 25.000
0.0000
0.0000
0.0000
40.8900
34.5200
0.2600
0.2600
5118.6800 -5118.4100
30 75.000
0.0000
0.0000
0.0000
75.2800
57.8100
0.2600
0.2600
6365.8900 -6365.6300
24 50.000
0.0000
0.0000
0.0000
43.9700
39.2800
0.2600
0.2600
5157.9600 -5157.7000
31 00.000
0.0000
0.0000
0.0000
71.0400
67.7400
0.2600
0.2600
6433.6400 -6433.3700
24 75.000
0.0000
0.0000
0.0000
47.1900
42.2000
0.2600
0.2600
5200.1600 -5199.9000
31 25.000
0.0000
0.0000
0.0000
77.2700
68.6600
0.2600
0.2600
6502.3000 -6502.0400
25 00.000
0.0000
0.0000
0.0000
50.4600
45.2100
0.2600
0.2600
5245.3700 -5245.1100
31 50.000
0.0000
0.0000
0.0000
64.5900
65.6800
0.2600
0.2600
6567.9800 -6567.7200
25 25.000
0.0000
0.0000
0.0000
53.7500
48.2400
0.2600
0.2600
5293.6200 -5293.3500
31 75.000
0.0000
0.0000
0.0000
70.0600
62.3400
0.2600
0.2600
6630.3200 -6630.0600
25 50.000
0.0000
0.0000
0.0000
56.7800
51.1700
0.2600
0.2600
5344.7900 -5344.5300
32 00.000
0.0000
0.0000
0.0000
58.2500
59.4100
0.2600
0.2600
6689.7300 -6689.4700
25 75.000
0.0000
0.0000
0.0000
59.4600
53.8200
0.2600
0.2600
5398.6000 -5398.3400
32 25.000
0.0000
0.0000
0.0000
69.1000
58.9600
0.2600
0.2600
6748.6900 -6748.4300
26 00.000
0.0000
0.0000
0.0000
47.4300
49.4900
0.2600
0.2600
5448.0900 -5447.8300
32 50.000
0.0000
0.0000
0.0000
57.4800
58.6000
0.2600
0.2600
6807.2900 -6807.0300
26 25.000
0.0000
0.0000
0.0000
37.5800
39.3600
0.2600
0.2600
5487.4500 -5487.1800
32 75.000
0.0000
0.0000
0.0000
58.7300
53.8000
0.2600
0.2600
6861.0900 -6860.8300
26 50.000
0.0000
0.0000
0.0000
42.4500
37.0500
0.2600
0.2600
5524.5000 -5524.2300
33 00.000
0.0000
0.0000
0.0000
55.1400
52.7100
0.2600
0.2600
6913.8000 -6913.5400
26 75.000
0.0000
0.0000
0.0000
47.9700
41.8600
0.2600
0.2600
5566.3600 -5566.0900
33 25.000
0.0000
0.0000
0.0000
49.7600
48.5600
0.2600
0.2600
6962.3700 -6962.1000
27 00.000
0.0000
0.0000
0.0000
54.0000
47.2100
0.2600
0.2600
5613.5700 -5613.3000
33 50.000
0.0000
0.0000
0.0000
54.0300
48.0500
0.2600
0.2600
7010.4200 -7010.1500
27 25.000
0.0000
0.0000
0.0000
60.1100
52.8300
0.2600
0.2600
5666.4000 -5666.1300
33 75.000
0.0000
0.0000
0.0000
48.9700
47.6900
0.2600
0.2600
7058.1000 -7057.8400
27 50.000
0.0000
0.0000
0.0000
39.4900
46.1100
0.2600
0.2600
5712.5100 -5712.2500
34 00.000
0.0000
0.0000
0.0000
40.1300
41.2500
0.2600
0.2600
7099.3500 -7099.0900
27 75.000
0.0000
0.0000
0.0000
39.9600
36.7800
0.2600
0.2600
5749.2900 -5749.0300
34 25.000
0.0000
0.0000
0.0000
48.6200
41.0900
0.2600
0.2600
7140.4400 -7140.1800
28 00.000
0.0000
0.0000
0.0000
54.3400
43.6600
0.2600
0.2600
5792.9500 -5792.6900
34 50.000
0.0000
0.0000
0.0000
42.7300
42.2900
0.2600
0.2600
7182.7400 -7182.4700
28 25.000
0.0000
0.0000
0.0000
51.7100
49.1000
0.2600
0.2600
5842.0500 -5841.7900
H
G
F
E
D
C
C
28 50.000
28 75.000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
56.9600
66.3000
50.3100
57.0700
0.2600
0.2600
0.2600
0.2600
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
5892.3600 -5892.1000
5949.4300 -5949.1600
B
29 00.000
0.0000
0.0000
0.0000
38.5000
48.5200
0.2600
0.2600
5997.9500 -5997.6800
29 25.000
0.0000
0.0000
0.0000
49.0900
40.5500
0.2600
0.2600
6038.5000 -6038.2400
29 50.000
0.0000
0.0000
0.0000
57.8700
49.5200
0.2600
0.2600
6088.0200 -6087.7600
MNP
PREPARED CHECKED APPROVED
OWNER
B
A
November 2017
© Técnicas Reunidas S.A.
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
EARTHWORKS REPORT
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
33/37
-
8
5
1
G
Calcasieu Pass Terminal
H
F
E
Sheet 136
D
Station No.
2
Cut Area
(sqft)
Cut
Volume
(cuft)
3
Usable
Volume
(cuft)
Fill Area
(sqft)
4
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
5
Station No.
Cut Area
(sqft)
6
Cut
Volume
(cuft)
Usable
Volume
(cuft)
7
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Fill Area
(sqft)
8
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
34 75.000
0.0000
0.0000
0.0000
43.2900
39.8300
0.2600
0.2600
7222.5600 -7222.3000
41 25.000
0.0000
0.0000
0.0000
55.4900
51.1000
0.2600
0.2600
8474.4000 -8474.1400
35 00.000
0.0000
0.0000
0.0000
51.6300
43.9500
0.2600
0.2600
7266.5100 -7266.2400
41 50.000
0.0000
0.0000
0.0000
64.7500
55.6700
0.2600
0.2600
8530.0700 -8529.8100
35 25.000
0.0000
0.0000
0.0000
50.9600
47.5000
0.2600
0.2600
7314.0100 -7313.7400
41 75.000
0.0000
0.0000
0.0000
65.1200
60.1300
0.2600
0.2600
8590.2000 -8589.9400
35 50.000
0.0000
0.0000
0.0000
50.4100
46.9300
0.2600
0.2600
7360.9400 -7360.6700
42 00.000
0.0000
0.0000
0.0000
57.1300
56.6000
0.2600
0.2600
8646.8000 -8646.5400
35 75.000
0.0000
0.0000
0.0000
47.8200
45.4800
0.2600
0.2600
7406.4200 -7406.1500
42 25.000
0.0000
0.0000
0.0000
54.4000
51.6300
0.2600
0.2600
8698.4300 -8698.1700
36 00.000
0.0000
0.0000
0.0000
42.1400
41.6500
0.2600
0.2600
7448.0700 -7447.8000
42 50.000
0.0000
0.0000
0.0000
49.5500
48.1200
0.2600
0.2600
8746.5600 -8746.2900
36 25.000
0.0000
0.0000
0.0000
44.3500
40.0400
0.2600
0.2600
7488.1100 -7487.8500
42 75.000
0.0000
0.0000
0.0000
48.1800
45.2400
0.2600
0.2600
8791.8000 -8791.5400
36 50.000
0.0000
0.0000
0.0000
46.9800
42.2800
0.2600
0.2600
7530.3900 -7530.1300
43 00.000
0.0000
0.0000
0.0000
61.4900
50.7700
0.2600
0.2600
8842.5700 -8842.3100
36 75.000
0.0000
0.0000
0.0000
54.8100
47.1300
0.2600
0.2600
7577.5200 -7577.2500
43 25.000
0.0000
0.0000
0.0000
56.6500
54.6900
0.2600
0.2600
8897.2600 -8897.0000
37 00.000
0.0000
0.0000
0.0000
44.5300
45.9900
0.2600
0.2600
7623.5100 -7623.2400
43 50.000
0.0000
0.0000
0.0000
61.7000
54.7900
0.2600
0.2600
8952.0500 -8951.7900
37 25.000
0.0000
0.0000
0.0000
45.7400
41.7900
0.2600
0.2600
7665.3000 -7665.0300
43 75.000
0.0000
0.0000
0.0000
58.4900
55.6500
0.2600
0.2600
9007.7000 -9007.4400
37 50.000
0.0000
0.0000
0.0000
47.2600
43.0500
0.2600
0.2600
7708.3500 -7708.0900
44 00.000
0.0000
0.0000
0.0000
32.8800
42.3000
0.2600
0.2600
9050.0100 -9049.7400
37 75.000
0.0000
0.0000
0.0000
48.0000
44.1000
0.2600
0.2600
7752.4500 -7752.1900
44 25.000
0.0000
0.0000
0.0000
30.4100
29.3000
0.2600
0.2600
9079.3100 -9079.0500
38 00.000
0.0000
0.0000
0.0000
48.6400
44.7400
0.2600
0.2600
7797.1900 -7796.9300
44 50.000
0.0000
0.0000
0.0000
34.4000
30.0100
0.2600
0.2600
9109.3200 -9109.0500
38 25.000
0.0000
0.0000
0.0000
57.3600
49.0700
0.2600
0.2600
7846.2700 -7846.0000
44 75.000
0.0000
0.0000
0.0000
44.5400
36.5500
0.2600
0.2600
9145.8600 -9145.6000
38 50.000
0.0000
0.0000
0.0000
57.7400
53.2900
0.2600
0.2600
7899.5500 -7899.2900
45 00.000
0.0000
0.0000
0.0000
46.6000
42.1900
0.2600
0.2600
9188.0600 -9187.7900
38 75.000
0.0000
0.0000
0.0000
58.2800
53.7100
0.2600
0.2600
7953.2700 -7953.0000
45 25.000
0.0000
0.0000
0.0000
46.0100
42.8800
0.2600
0.2600
9230.9400 -9230.6700
39 00.000
0.0000
0.0000
0.0000
50.5300
50.3800
0.2600
0.2600
8003.6400 -8003.3800
45 50.000
0.0000
0.0000
0.0000
32.7700
36.4700
0.2600
0.2600
9267.4100 -9267.1500
39 25.000
0.0000
0.0000
0.0000
58.6000
50.5300
0.2600
0.2600
8054.1700 -8053.9000
45 75.000
0.0000
0.0000
0.0000
39.7700
33.5800
0.2600
0.2600
9300.9900 -9300.7300
39 50.000
0.0000
0.0000
0.0000
51.0200
50.7500
0.2600
0.2600
8104.9200 -8104.6500
46 00.000
0.0000
0.0000
0.0000
37.7500
35.8900
0.2600
0.2600
9336.8800 -9336.6200
39 75.000
0.0000
0.0000
0.0000
52.0300
47.7100
0.2600
0.2600
8152.6200 -8152.3600
H
G
F
E
D
C
C
40 00.000
40 25.000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
60.8700
61.4100
52.2700
56.6100
0.2600
0.2600
0.2600
0.2600
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
8204.8900 -8204.6300
8261.5000 -8261.2400
B
40 50.000
0.0000
0.0000
0.0000
62.2400
57.2500
0.2600
0.2600
8318.7500 -8318.4900
40 75.000
0.0000
0.0000
0.0000
54.3500
53.9700
0.2600
0.2600
8372.7200 -8372.4600
41 00.000
0.0000
0.0000
0.0000
54.9000
50.5800
0.2600
0.2600
8423.3000 -8423.0400
MNP
PREPARED CHECKED APPROVED
OWNER
B
A
November 2017
© Técnicas Reunidas S.A.
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
EARTHWORKS REPORT
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
34/37
-
8
5
1
G
Calcasieu Pass Terminal
H
F
E
Sheet 137
D
Station No.
2
Cut Area
(sqft)
Cut
Volume
(cuft)
3
Usable
Volume
(cuft)
Fill Area
(sqft)
4
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
5
Station No.
Cut Area
(sqft)
6
Cut
Volume
(cuft)
Usable
Volume
(cuft)
7
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Fill Area
(sqft)
8
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
46 25.000
0.0000
0.0000
0.0000
49.4900
40.3800
0.2600
0.2600
9377.2600 -9377.0000
52 75.000
0.0000
0.0000
0.0000
43.7900
45.1600
0.2600
0.2600 10566.9800 -10566.7200
46 50.000
0.0000
0.0000
0.0000
50.7700
46.4100
0.2600
0.2600
9423.6800 -9423.4100
53 00.000
0.0000
0.0000
0.0000
41.5300
39.5000
0.2600
0.2600 10606.4800 -10606.2200
46 75.000
0.0000
0.0000
0.0000
44.6100
44.1600
0.2600
0.2600
9467.8300 -9467.5700
53 25.000
0.0000
0.0000
0.0000
63.0100
48.4000
0.2600
0.2600 10654.8800 -10654.6100
47 00.000
0.0000
0.0000
0.0000
34.1200
36.4500
0.2600
0.2600
9504.2800 -9504.0200
53 50.000
0.0000
0.0000
0.0000
74.3300
63.5800
0.2600
0.2600 10718.4600 -10718.2000
47 25.000
0.0000
0.0000
0.0000
40.9800
34.7700
0.2600
0.2600
9539.0500 -9538.7900
53 75.000
0.0000
0.0000
0.0000
64.9400
64.4800
0.2600
0.2600 10782.9400 -10782.6700
47 50.000
0.0000
0.0000
0.0000
50.1400
42.1900
0.2600
0.2600
9581.2400 -9580.9800
54 00.000
0.0000
0.0000
0.0000
63.8500
59.6200
0.2600
0.2600 10842.5600 -10842.3000
47 75.000
0.0000
0.0000
0.0000
54.4400
48.4200
0.2600
0.2600
9629.6600 -9629.3900
54 25.000
0.0000
0.0000
0.0000
62.7600
58.6200
0.2600
0.2600 10901.1800 -10900.9100
48 00.000
0.0000
0.0000
0.0000
62.9700
54.3600
0.2600
0.2600
9684.0100 -9683.7500
54 50.000
0.0000
0.0000
0.0000
61.6800
57.6100
0.2600
0.2600 10958.7900 -10958.5200
48 25.000
0.0000
0.0000
0.0000
60.6600
57.2400
0.2600
0.2600
9741.2500 -9740.9900
54 75.000
0.0000
0.0000
0.0000
60.6000
56.6100
0.2600
0.2600 11015.4000 -11015.1300
48 50.000
0.0000
0.0000
0.0000
50.3200
51.3800
0.2600
0.2600
9792.6300 -9792.3700
55 00.000
0.0000
0.0000
0.0000
68.1400
59.6000
0.2600
0.2600 11075.0000 -11074.7300
48 75.000
0.0000
0.0000
0.0000
55.1500
48.8300
0.2600
0.2600
9841.4600 -9841.1900
55 25.000
0.0000
0.0000
0.0000
58.4300
58.6000
0.2600
0.2600 11133.6000 -11133.3300
49 00.000
0.0000
0.0000
0.0000
44.6800
46.2200
0.2600
0.2600
9887.6800 -9887.4100
55 50.000
0.0000
0.0000
0.0000
57.1700
53.5200
0.2600
0.2600 11187.1200 -11186.8500
49 25.000
0.0000
0.0000
0.0000
43.5500
40.8500
0.2600
0.2600
9928.5200 -9928.2600
55 75.000
0.0000
0.0000
0.0000
56.3200
52.5400
0.2600
0.2600 11239.6600 -11239.3900
49 50.000
0.0000
0.0000
0.0000
51.3400
43.9300
0.2600
0.2600
9972.4600 -9972.1900
56 00.000
0.0000
0.0000
0.0000
55.2500
51.6500
0.2600
0.2600 11291.3100 -11291.0500
49 75.000
0.0000
0.0000
0.0000
54.2000
48.8600
0.2600
0.2600 10021.3200 -10021.0600
56 25.000
0.0000
0.0000
0.0000
54.2100
50.6800
0.2600
0.2600 11341.9900 -11341.7300
50 00.000
0.0000
0.0000
0.0000
45.5400
46.1800
0.2600
0.2600 10067.5000 -10067.2300
56 50.000
0.0000
0.0000
0.0000
53.1600
49.7100
0.2600
0.2600 11391.7000 -11391.4400
50 25.000
0.0000
0.0000
0.0000
51.6500
44.9900
0.2600
0.2600 10112.4900 -10112.2300
56 75.000
0.0000
0.0000
0.0000
52.1200
48.7400
0.2600
0.2600 11440.4400 -11440.1800
50 50.000
0.0000
0.0000
0.0000
48.2400
46.2400
0.2600
0.2600 10158.7300 -10158.4700
57 00.000
0.0000
0.0000
0.0000
51.0700
47.7700
0.2600
0.2600 11488.2200 -11487.9500
50 75.000
0.0000
0.0000
0.0000
38.6600
40.2300
0.2600
0.2600 10198.9600 -10198.7000
57 25.000
0.0000
0.0000
0.0000
50.0400
46.8100
0.2600
0.2600 11535.0300 -11534.7600
51 00.000
0.0000
0.0000
0.0000
39.1200
36.0100
0.2600
0.2600 10234.9700 -10234.7100
57 50.000
0.0000
0.0000
0.0000
49.0000
45.8500
0.2600
0.2600 11580.8800 -11580.6100
51 25.000
0.0000
0.0000
0.0000
52.2200
42.2900
0.2600
0.2600 10277.2600 -10277.0000
H
G
F
E
D
C
C
51 50.000
0.0000
0.0000
0.0000
50.2100
47.4200
0.2600
0.2600 10324.6900 -10324.4200
51 75.000
0.0000
0.0000
0.0000
55.3500
48.8700
0.2600
0.2600 10373.5600 -10373.2900
B
52 00.000
0.0000
0.0000
0.0000
55.7800
51.4500
0.2600
0.2600 10425.0100 -10424.7400
52 25.000
0.0000
0.0000
0.0000
49.8000
48.8800
0.2600
0.2600 10473.8800 -10473.6200
52 50.000
0.0000
0.0000
0.0000
53.7500
47.9400
0.2600
0.2600 10521.8300 -10521.5600
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
MNP
PREPARED CHECKED APPROVED
OWNER
B
A
November 2017
© Técnicas Reunidas S.A.
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
EARTHWORKS REPORT
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
35/37
-
8
5
1
G
Calcasieu Pass Terminal
H
F
E
Sheet 138
D
Station No.
2
Cut Area
(sqft)
Cut
Volume
(cuft)
3
Usable
Volume
(cuft)
Fill Area
(sqft)
4
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
5
Station No.
Cut Area
(sqft)
6
Cut
Volume
(cuft)
Usable
Volume
(cuft)
7
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Fill Area
(sqft)
8
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
57 75.000
0.0000
0.0000
0.0000
47.9700
44.9000
0.2600
0.2600 11625.7800 -11625.5100
64 25.000
0.0000
0.0000
0.0000
41.8100
39.7500
0.2600
0.2600 12745.5300 -12745.2700
58 00.000
0.0000
0.0000
0.0000
46.9500
43.9500
0.2600
0.2600 11669.7200 -11669.4600
64 50.000
0.0000
0.0000
0.0000
39.5900
37.6900
0.2600
0.2600 12783.2200 -12782.9500
58 25.000
0.0000
0.0000
0.0000
45.9300
43.0000
0.2600
0.2600 11712.7200 -11712.4600
64 75.000
0.0000
0.0000
0.0000
37.3500
35.6200
0.2600
0.2600 12818.8400 -12818.5700
58 50.000
0.0000
0.0000
0.0000
44.9100
42.0500
0.2600
0.2600 11754.7700 -11754.5100
65 00.000
0.0000
0.0000
0.0000
36.8100
34.3300
0.2600
0.2600 12853.1700 -12852.9000
58 75.000
0.0000
0.0000
0.0000
43.9000
41.1100
0.2600
0.2600 11795.8900 -11795.6200
65 25.000
0.0000
0.0000
0.0000
44.9400
37.8500
0.2600
0.2600 12891.0100 -12890.7500
59 00.000
0.0000
0.0000
0.0000
42.8900
40.1800
0.2600
0.2600 11836.0700 -11835.8000
65 50.000
0.0000
0.0000
0.0000
37.2400
38.0500
0.2600
0.2600 12929.0600 -12928.8000
59 25.000
0.0000
0.0000
0.0000
41.8800
39.2500
0.2600
0.2600 11875.3100 -11875.0500
65 75.000
0.0000
0.0000
0.0000
37.4600
34.5800
0.2600
0.2600 12963.6500 -12963.3800
59 50.000
0.0000
0.0000
0.0000
40.8800
38.3200
0.2600
0.2600 11913.6300 -11913.3700
66 00.000
0.0000
0.0000
0.0000
45.6200
38.4600
0.2600
0.2600 13002.1100 -13001.8400
59 75.000
0.0000
0.0000
0.0000
39.8900
37.3900
0.2600
0.2600 11951.0200 -11950.7600
66 25.000
0.0000
0.0000
0.0000
37.9000
38.6600
0.2600
0.2600 13040.7700 -13040.5100
60 00.000
0.0000
0.0000
0.0000
38.8900
36.4700
0.2600
0.2600 11987.4900 -11987.2300
66 50.000
0.0000
0.0000
0.0000
38.1200
35.1900
0.2600
0.2600 13075.9600 -13075.7000
60 25.000
0.0000
0.0000
0.0000
37.9000
35.5500
0.2600
0.2600 12023.0500 -12022.7800
66 75.000
0.0000
0.0000
0.0000
38.3400
35.3900
0.2600
0.2600 13111.3600 -13111.0900
60 50.000
0.0000
0.0000
0.0000
36.9200
34.6400
0.2600
0.2600 12057.6900 -12057.4300
67 00.000
0.0000
0.0000
0.0000
46.5200
39.2900
0.2600
0.2600 13150.6400 -13150.3800
60 75.000
0.0000
0.0000
0.0000
35.9800
33.7500
0.2600
0.2600 12091.4400 -12091.1800
67 25.000
0.0000
0.0000
0.0000
46.7500
43.1800
0.2600
0.2600 13193.8200 -13193.5600
61 00.000
0.0000
0.0000
0.0000
35.2300
32.9700
0.2600
0.2600 12124.4100 -12124.1400
67 50.000
0.0000
0.0000
0.0000
39.0000
39.7000
0.2600
0.2600 13233.5200 -13233.2600
61 25.000
0.0000
0.0000
0.0000
33.9400
32.0200
0.2600
0.2600 12156.4300 -12156.1600
67 75.000
0.0000
0.0000
0.0000
47.2000
39.9100
0.2600
0.2600 13273.4300 -13273.1600
61 50.000
0.0000
0.0000
0.0000
52.5700
40.0500
0.2600
0.2600 12196.4800 -12196.2200
68 00.000
0.0000
0.0000
0.0000
39.4400
40.1100
0.2600
0.2600 13313.5400 -13313.2700
61 75.000
0.0000
0.0000
0.0000
66.0400
54.9200
0.2600
0.2600 12251.4000 -12251.1300
68 25.000
0.0000
0.0000
0.0000
39.6600
36.6200
0.2600
0.2600 13350.1500 -13349.8900
62 00.000
0.0000
0.0000
0.0000
63.0300
59.7600
0.2600
0.2600 12311.1500 -12310.8900
68 50.000
0.0000
0.0000
0.0000
39.8800
36.8200
0.2600
0.2600 13386.9700 -13386.7100
62 25.000
0.0000
0.0000
0.0000
60.3600
57.1300
0.2600
0.2600 12368.2800 -12368.0200
68 75.000
0.0000
0.0000
0.0000
48.0400
40.7000
0.2600
0.2600 13427.6800 -13427.4100
62 50.000
0.0000
0.0000
0.0000
57.8700
54.7400
0.2600
0.2600 12423.0200 -12422.7600
69 00.000
0.0000
0.0000
0.0000
22.9500
32.8700
0.2600
0.2600 13460.5500 -13460.2800
62 75.000
0.0000
0.0000
0.0000
55.5200
52.5000
0.2600
0.2600 12475.5200 -12475.2500
H
G
F
E
D
C
C
63 00.000
63 25.000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
53.1800
50.8700
50.3200
48.1700
0.2600
0.2600
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
0.2600 12525.8400 -12525.5700
0.2600 12574.0100 -12573.7400
B
63 50.000
0.0000
0.0000
0.0000
48.5700
46.0400
0.2600
0.2600 12620.0400 -12619.7800
63 75.000
0.0000
0.0000
0.0000
46.3000
43.9200
0.2600
0.2600 12663.9600 -12663.7000
64 00.000
0.0000
0.0000
0.0000
44.0400
41.8200
0.2600
0.2600 12705.7900 -12705.5200
MNP
PREPARED CHECKED APPROVED
OWNER
B
A
November 2017
© Técnicas Reunidas S.A.
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
EARTHWORKS REPORT
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
36/37
-
8
5
1
G
Calcasieu Pass Terminal
H
F
E
Sheet 139
D
Station No.
2
Cut Area
(sqft)
Cut
Volume
(cuft)
3
Usable
Volume
(cuft)
Fill Area
(sqft)
4
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
5
Station No.
Cut Area
(sqft)
6
Cut
Volume
(cuft)
Usable
Volume
(cuft)
7
Cummulative
Cummulative
Fill Volume
Usable
Cut Volume
Volume
(cuft)
(cuft)
(cuft)
Fill Area
(sqft)
8
Cumulative
Fill Volume
(cuft)
Net
Cumulative
Volume
(cuft)
69 25.000
0.0000
0.0000
0.0000
11.3000
15.8600
0.2600
0.2600 13476.4100 -13476.1400
76 00.000
0.0000
0.0000
0.0000
17.8000
21.2600
32.7900
32.7900 14101.4300 -14068.6500
69 50.000
7.9900
3.7000
3.7000
5.7700
7.9000
3.9600
3.9600 13484.3100 -13480.3500
76 25.000
2.5400
1.1800
1.1800
16.0700
15.6800
33.9600
33.9600 14117.1100 -14083.1500
69 75.000
13.0900
9.7600
9.7600
0.0000
2.6800
13.7200
13.7200 13486.9900 -13473.2600
76 50.000
6.0500
3.9800
3.9800
12.3100
13.1400
37.9400
37.9400 14130.2500 -14092.3100
70 00.000
0.0000
6.0600
6.0600
18.0100
8.3400
19.7800
19.7800 13495.3200 -13475.5400
76 75.000
8.3500
6.6700
6.6700
8.5300
9.6500
44.6100
44.6100 14139.9000 -14095.2900
70 25.000
2.1800
1.0100
1.0100
1.9400
9.2300
20.7900
20.7900 13504.5600 -13483.7600
77 00.000
5.5900
6.4500
6.4500
1.6400
4.7100
51.0600
51.0600 14144.6100 -14093.5500
70 50.000
11.8600
6.5000
6.5000
6.6800
3.9900
27.3000
27.3000 13508.5500 -13481.2500
77 25.000
6.9900
5.8200
5.8200
0.8300
1.1400
56.8900
56.8900 14145.7500 -14088.8700
70 75.000
0.0000
5.4900
5.4900
22.3000
13.4200
32.7900
32.7900 13521.9600 -13489.1800
77 50.000
5.0500
5.5700
5.5700
3.1600
1.8500
62.4600
62.4600 14147.6000 -14085.1400
71 00.000
0.0000
0.0000
0.0000
37.0100
27.4600
32.7900
32.7900 13549.4200 -13516.6300
77 75.000
10.1100
7.0200
7.0200
0.2300
1.5700
69.4800
69.4800 14149.1700 -14079.6900
71 25.000
0.0000
0.0000
0.0000
37.7000
34.5900
32.7900
32.7900 13584.0100 -13551.2200
78 00.000
11.8500
10.1700
10.1700
0.1100
0.1500
79.6400
79.6400 14149.3200 -14069.6800
71 50.000
0.0000
0.0000
0.0000
43.8800
37.7700
32.7900
32.7900 13621.7700 -13588.9900
78 25.000
13.1800
11.5900
11.5900
1.1700
0.5900
91.2300
91.2300 14149.9100 -14058.6800
71 75.000
0.0000
0.0000
0.0000
34.5500
36.3100
32.7900
32.7900 13658.0900 -13625.3000
78 50.000
12.3500
11.8200
11.8200
0.0700
0.5700
103.0500
103.0500 14150.4900 -14047.4400
72 00.000
0.0000
0.0000
0.0000
35.5000
32.4300
32.7900
32.7900 13690.5200 -13657.7300
78 75.000
7.6700
9.2700
9.2700
1.8000
0.8700
112.3200
112.3200 14151.3600 -14039.0400
72 25.000
0.0000
0.0000
0.0000
34.6900
32.5000
32.7900
32.7900 13723.0100 -13690.2300
79 00.000
12.2000
9.2000
9.2000
0.0500
0.8600
121.5100
121.5100 14152.2200 -14030.7000
72 50.000
0.0000
0.0000
0.0000
32.8600
31.2700
32.7900
32.7900 13754.2900 -13721.5000
79 25.000
12.4700
11.4200
11.4200
0.0700
0.0600
132.9300
132.9300 14152.2700 -14019.3400
72 75.000
0.0000
0.0000
0.0000
17.6300
23.3800
32.7900
32.7900 13777.6600 -13744.8800
79 50.000
13.9600
12.2300
12.2300
2.7700
1.3100
145.1700
145.1700 14153.5900 -14008.4200
73 00.000
0.0000
0.0000
0.0000
26.9300
20.6300
32.7900
32.7900 13798.2900 -13765.5000
79 75.000
15.8100
13.7800
13.7800
2.6000
2.4900
158.9500
158.9500 14156.0700 -13997.1200
73 25.000
0.0000
0.0000
0.0000
30.5900
26.6300
32.7900
32.7900 13824.9200 -13792.1300
80 00.000
17.0100
15.2000
15.2000
1.9700
2.1200
174.1400
174.1400 14158.1900 -13984.0500
73 50.000
0.0000
0.0000
0.0000
29.5900
27.8600
32.7900
32.7900 13852.7800 -13819.9900
80 25.000
12.8700
13.8400
13.8400
2.2200
1.9400
187.9800
187.9800 14160.1300 -13972.1500
73 75.000
0.0000
0.0000
0.0000
28.6000
26.9400
32.7900
32.7900 13879.7200 -13846.9300
80 50.000
18.8400
14.6800
14.6800
1.6800
1.8100
202.6600
202.6600 14161.9400 -13959.2700
74 00.000
0.0000
0.0000
0.0000
35.2100
29.5500
32.7900
32.7900 13909.2600 -13876.4800
80 75.000
17.9400
17.0300
17.0300
1.5200
1.4800
219.6900
219.6900 14163.4200 -13943.7200
74 25.000
0.0000
0.0000
0.0000
26.8800
28.7500
32.7900
32.7900 13938.0100 -13905.2300
H
G
F
E
D
C
C
74 50.000
74 75.000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
25.5800
24.6400
24.2900
23.2500
32.7900
32.7900
5
10/16/17
ISSUED FOR DESIGN
MMG
DIL
4
31/08/16
ISSUED FOR DESIGN
FRM
DIL
MNP
3
08/25/16
ISSUED FOR DESIGN
MMG
DIL
MNP
2
08/18/16
ISSUED FOR DESIGN
MMG
DIL
MNP
REV.
DATE
(mm/dd/yy)
DESCRIPTION
32.7900 13962.3000 -13929.5100
32.7900 13985.5500 -13952.7700
B
75 00.000
0.0000
0.0000
0.0000
30.7700
25.6500
32.7900
32.7900 14011.2000 -13978.4200
75 25.000
0.0000
0.0000
0.0000
22.9400
24.8600
32.7900
32.7900 14036.0700 -14003.2800
75 50.000
0.0000
0.0000
0.0000
22.1100
20.8500
32.7900
32.7900 14056.9200 -14024.1300
75 75.000
0.0000
0.0000
0.0000
28.1200
23.2500
32.7900
32.7900 14080.1800 -14047.3900
MNP
PREPARED CHECKED APPROVED
OWNER
B
A
November 2017
© Técnicas Reunidas S.A.
VENTURE GLOBAL CALCASIEU PASS, LLC
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
SOUTHWEST SERVICE ROAD
TO JETTY PIER FACILITY
EARTHWORKS REPORT
Doc. Number:
8581-000-UR-006-A
7
A
Scale: Sheet: Rev. :
37/37
-
8
5
6KHHW
Calcasieu Pass Terminal
Sheet 140
November 2017
U8RaDU51m ,KLX^5Um OaGOm XQKDEm 'V3&m
Ag1V&bED.m 1V31>4m
ODO3EDI4m
G%V[Bm /V4&_DKIm
$U5(m
eLK14Im G%^Xm V3SaDV41m
@g1U%aED/m OcHOm
,KKX^5Um X^)^DMIm
Lg\^3Vm -bF_-Am &V4&m
X-(E5 m mm #m m
Ag1V&cED-m 1V41?4m
ODO4EDI4m -KVVD1LVm
XOLDEm &V4%m
// .),/ *!#/ %'")# ,-/ / /
&+($/// ()/
) " )
'#%) ) ! &) !!) #
) " ) ) $)
! !
! !! !
2*`6!m
m
H"h-(1h1kjhm
hm h-K)X^+Em aX5m O8UGD_hm m -L)X^)Em aX5m O8UHD_m H$UX@m -U5)^DLIm $U5$ iljm
Calcasieu Pass Terminal
Sheet 141
]C78`m
November 2017
Vam7f« 7WM« i8^« MgQ9aqn«4« « « n8G« //«
p?6vPc^ ((
N<`No« Dto7bokOp« HbdN« { «
BrmCasn« j:_«
Vafg« Mg4« #« m:I« //« % «
M?^Mn« Evn:aniMn« KaeM« ¤} «
¥
toJboX« ;P¦«
;N R?4« ')«
O¡bbp[« \uoJ«
Q:^Rm« Brm>anlMm«
IaeQ« Arq« ?Q:« | «
§ -..«
qG *" S
7d_w)Q_[@_x =QTG
=Ax*QV 3AWe
K%t| F [b8| a/ g/|
\"Zo:]"| 0:AB| F e#]: B|
0P\| F [c8| [$ e:QI|
| \&b
| y|
z}« rV« M>^Mn« Esn?aniQn« LaeM« :«
Rf« &« n?w« 12«
ª«5«c:£5+«
\R` % f \+&
¦«
¦«
j_63!«
¦rmLanW« l>_«
QfM?axn«4«2«
$*« ]Q_
«
>M:]M« M¢aan]« MgM@arm«
b`bp« k;`« FSayp«
=T«4« "(,«
\. 9~{
B-myLB` 8gaz,R`\B`y ;RUB
4hmmg ,nB- yh 5B nBJRXYF;
RzM ;mB>KB; \-zBnR,Y Hnh\ zMB
jnhkhrB; yBm\R`,Y
% \g>%J| QIf ;KF&Ig| :?/|
*3 = $3 4= =
5=
s:/ZC' b | s
% \g>%J| QIf ;KF&Ig|
:?'| Q]]Qt| \$ |
F [b8| a/ g;QI| 1:AB|
(x:bh:I5| 5]RpJ|
{ SijTG| uqXELn;"79-= &= 2:= '22= 7.#
" = 6+"0/= ()!= (/&8=
! !
! !! !
}D# !
]$ 70= =
7e1tx2W t@ lGo[Qw
7d1tx1W t@ lGo]Qw ])otN 7o@1xQd_ tG7xQe_t
uOEG}
Calcasieu Pass Terminal
Sheet 142
November 2017
:42*,J =2J J 74-J >2J
C*?(*0J J J J 2"J
28*%*0,J-B?*21 J H5J GJ
IJ 9!'J 5*6 -*0 J ?2J J
6-!J 20J 3>?2/J 2"J A?J
D*>(J ?36J 2$J 6*6 J -2CJ
>( J !E*<=*0&J ( J .+ J 2?=2/ J
/E*/@/J )*&)?J 2#J ;52*-J
D*,-J B8F J >F6J
JFU*Ha ^ Z O*<6
!=Ia E*E1*8a =JJ*>Ha
D*D.*7a .8$P'a ]*P'+8a
0 L*Xa 0 ,a
_ Z P*=9a HGY*Ha
LD?*0a J a
^*LQ;&a $Ja / a
a `
HFU*Ka ^ Z P*@8a
">Ka <=MQHa EW4Ea LT Q*=9a
C@LSJa EX5Da LP P*@8La
[*P):a . N*Va . ,a
LE<3a H a
^ Z P*@8a IFU*Ha #AHa
<^*LQ*8$a %KBU8a
))(#&) $) !#&') ) 2
%")
) 12
)
0,.'2 2 */2 "**2 ,(
2 -$) $2 # 2 #$ +2
! !
! !! !
4!> >
*8 8 <:8>8> 8-25)> 72"> 0#1+(68> > .25)> 72"> 0#1*(6> *12&> 1"5(.,> 2#5(-,29=;>
3'$#4>
Calcasieu Pass Terminal
Sheet 143
November 2017
I;M,Id F;F,d Rd
FFJB[;>S/=\d d
I;M,Id F;F,d Rd
FFKC[;?R-=]d d
# ( (
$(
-[;NS;@4d
.IS:.@d =.X.,d
&
ZDC).@d >SOd
F=&.*d DY,Ld *;<.d
( !! (
*J-)5-d F;F-=;@-d RCd "/d =;*d DAd
=<.d @*d I;Y,Ld #DRRD>d .['.GTd
3CId 3CI.;6@d F;H,=;@.d &ICMM;@7Pd
@*d $DDMS/Jd FU>Fd M/&S;C@Md
%DCPS,Id FV>Fd
$'( "% ( (
( ( ( ! #(
// .),/ *!#/ %'")# ,-/ / /
&+($/// )*/
(#&* * ! '* !!* #
* $ * * %*
! !
! !! !
+T0d d
?^(*^*b`^d ^d ^(C NS!=d WN-d F/J>;R^d d (D NS =d WN-d F/J?;Rd ?JN8d (J- S;D@d N/(S;C@N_cad
Q91/Td
Calcasieu Pass Terminal
Sheet 144
November 2017
!
A
Calcasieu Pass Terminal
Floating Dredge Disposal Pipe
(Position and Length Variable as Needed)
5
17,20 0 Fe e
t
Submerged Dredge
Disposal Pipe
(Position Approx.)
3,500 F
ee t
!
A
X-S EC A-A
'
X-S EC B-B'
4
!
A
3
1
!
A
Sheet 145
2
!
A
Dredge Disposal Pipe
Jetty Crossing
Submerged Dredge
Disposal Pipe
Ship Channel Crossing
Corner
ID
1
2
3
4
5
Dredge Material
Source Area
Dredge Footprint
Venture Global
Property
Nearshore Dredged
Material Disposal
Area
!
A
!
Louisiana
q
November 2017
NOAA Chart 11347 ,
Calcasieu River and Lake, May 2013
Corner Points
Existing Pipeline
0
1,000
Latitude
Longitude
29° 45' 19.445" N
29° 45' 53.253" N
29° 45' 44.477" N
29° 45' 34.297" N
29° 45' 5.201" N
93° 23' 53.414" W
93° 23' 47.716" W
93° 21' 29.621" W
93° 20' 46.530" W
93° 20' 39.168" W
For Permitting Purposes Only
Not for Construction
Sheet 145
Nearshore Disposal Area Plan Map
Calcasieu Pass Terminal
Cameron Parish, Louisiana
2,000
Feet
FILE: M:\Clients\V-X\VGL\CalcasieuPass\_ArcGIS\_JPA\_CalcasieuPass_JPA_Nearshore_NOAA.mxd | REVISED: 10/11/2017 | SCALE: 1:24,000 when printed at 8.5x11
DRAWN BY: GIS
Calcasieu Pass Terminal
GENERAL NOTES:
1.
The applicant requests authorization for nearshore disposal of
approximately 4,280,000 cubic yards of dredge spoil from the
terminal berthing area.
2.
The sand/silt/clay material will be removed from the terminal
berthing area by hydraulic dredge and pumped to the nearshore
disposal area.
NEARSHORE DREDGE DISPOSAL AREA
CROSS-SECTION A-A'
North American
Vertical Datum of 1988
(NAVD 88)
(NOT TO SCALE)
WESTERN EDGE OF JETTY
APPROXIMATE TEMPORARY ELEVATION +1.0 NAVD88
3. From the dredge area, the dredge disposal pipeline will be submerged
to cross the Calcasieu Ship Channel, then raised to cross the west
jetty near the jetty's approach to the shoreline. No dredge or fill will
be required for this operation.
MHW +1.35 NAVD 88
MLW +0.05 NAVD 88
MAX. FINAL ELEV. ~ -1.0 NAVD 88
4. The dredge pipeline will consist of a combination of submerged and
floating pipe west of the jetty and throughout the nearshore disposal
area as needed for spoil placement.
5. Dredge material placement will proceed from east to west in the
designated nearshore placement area. Discharge pipe will be
repositioned as necessary via use of watercraft or excavators as
necessary to maintain target depths of spoil.
6.
Temporary elevation of the dredge spoils during placement will be
approximately +1.0 foot NAVD88. Final elevation of the dredge spoils
during placement will be a maximum elevation of -1.0 foot NAVD 88,
leaving greater than 1.0 feet of water depth in the spoil area at MLW.
Sheet 146
7. The vertical thickness of the deposited dredged material at any given
location will vary with existing water depth; material will be deposited
at any given location until, at final elevation, the water depth limit
specified in (6.) is reached.
8. The designated 1,328-acre placement area on the corresponding plan
view represents the maximum limits of material deposition based on a
2-foot vertical thickness; the actual acreage of spoil deposition within
this area may be less, as the spoil deposition thickness will exceed 2
feet in many locations.
NEARSHORE DREDGE DISPOSAL AREA
CROSS-SECTION B-B'
North American
Vertical Datum of 1988
(NAVD 88)
(NOT TO SCALE)
APPROXIMATE TEMPORARY ELEVATION +1.0 NAVD88
APPROXIMATE EDGE OF SHORELINE
MHW +1.35 NAVD 88
MLW +0.05 NAVD 88
9. The corners of the disposal area coincide with the geographic
locations provided in the lat/long table located on the corresponding
plan view.
MAX. FINAL ELEV. ~ -1.0 NAVD 88
10. The limits of the dredge spoil area will be marked in accordance with
USCG requirements.
11. The location of the dredge spoil pipeline will be marked in accordance
with USCG requirements.
12. Applicant will provide operational details to the USCG for Notice to
Mariners as required by USCG.
13. Foreign pipeline crossing operations and methods will be subject to
approval and permissions by pipeline owners.
14. Calcasieu Ship Channel crossing by dredge pipeline will be in
accordance with industry standards for notification, installation,
depth and location verification.
November 2017
GENERAL NOTES AND COMMENTS:
SYM. DATE
BY
REVISION INFORMATION
PROJECT/TASK
APP.
0
10/10/17 WTS
ISSUED FOR REVIEW
-
-
1
11/03/17
ISSUED FOR REVIEW
-
-
2
11/07/17
NJB
NJB
ISSUED FOR REVIEW
-
-
SEAL
Environmental
Resources
Management
DRAWN:
NJB
11/07/17
CHECKED:
RH
11/07/17
Venture Global Calcasieu Pass, LLC
CALCASIEU PASS PROJECT
TITLE:
NEARSHORE DISPOSAL AREA
CROSS-SECTION AND NOTES
APP. FOR BID:
APP. FOR CONST.:
SCALE:
DISTRICT:
AS NOTED
DIR/FILE:
-
PARISH:
CAMERON STATE: LA
Nearshore Figure.DWG
GROUP
SHEET
REV.
-
146
2
Calcasieu Pass Terminal
Service Layer Credits: Source: Esri,
DigitalGlobe, GeoEye, Earthstar Geographics,
CNES/Airbus DS, USDA, USGS, AeroGRID,
IGN, and the GIS User Community
Martin Support
Facility
Liberty
Support Facility
Martin
Access
Road
Baker Hughes
Support Facility
Northwestern TWS
See Sheet 150 for cross-section
Northeastern TWS
See Sheet 149 for cross-section
DeHyCo
Support
Facility
Venture Global
Property Boundary
Northeast
Access
Road
Administration Building
and Parking Complex
Eastern TWS
See Sheets 55, 62, 63
for cross-sections
DeHyCo Access Road
See Sheet 148 for
additional plan detail and
Sheet 93 for cross-section
Mudd Support
Facility
Pipeline System Workspace
within Property Boundary
See September CUP Application
P20150858
Sheet 147
Northwest Access Road
Terminal
Site
Floodwall TWS
See Sheets 55, 57, 60, 61
for cross-sections
Area Removed by
Excavation
Southwest TWS
See Sheet 151 for cross-section
Southwest Service Road
November 2017
This information is for environmental review purposes only.
Terminal Site
Operational Footprint
Temporary Workspace
(TWS)
Access Road
Pipeline System
Workspace within
Property Boundary
Construction Support
Facility
Area Removed by
Excavation
0
1:24,000
1,000
p
2,000
Feet
Sheet 147
Facility and Workspace Layout Plan
Calcasieu Pass Terminal and TransCameron Pipeline Project
Cameron Parish, Louisiana
FILE: M:\Clients\V-X\VGL\CalcasieuPass\_ArcGIS\2017\10\31_Layout_Figures\_CalcasieuPass_Sheet_147.mxd | REVISED: 11/08/2017 | SCALE: 1:24,000
DRAWN BY: GIS
Calcasieu Pass Terminal
Service Layer Credits: Source: Esri,
DigitalGlobe, GeoEye, Earthstar Geographics,
CNES/Airbus DS, USDA, USGS, AeroGRID,
IGN, and the GIS User Community
DeHyCo Support Facility
Property
Boundary
Northwestern TWS
Parking Lot
Parking Lot
Sheet 148
Administration Building
Control
Access
Security
Fence
Northwest Access Road
November 2017
This information is for environmental review purposes only.
Terminal Site Operational Footprint
DeHyCo Access Road Footprint
Temporary Workspace (TWS)
Temporary Impact Area
Construction Support Facility
0
1:2,400
100
p
200
Feet
Sheet 148
Workspace Layout for DeHyCo Access Road
and Administration Building/Parking Complex
Calcasieu Pass Terminal and TransCameron Pipeline Project
Cameron Parish, Louisiana
FILE: M:\Clients\V-X\VGL\CalcasieuPass\_ArcGIS\2017\10\31_Layout_Figures\_CalcasieuPass_Sheet_148.mxd | REVISED: 11/09/2017 | SCALE: 1:2,400
DRAWN BY: GIS
Calcasieu Pass Terminal
NORTHEASTERN TEMPORARY WORKSPACE
CROSS-SECTION A-A'
Sheet 149
GENERAL NOTES:
1.
2.
3.
4.
5.
ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC
SURVEY NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
ALL COORDINATES AND LENGTHS ARE IN FEET.
FOR PERMITTING PURPOSES ONLY - NOT FOR CONSTRUCTION.
CROSS-SECTION LOCATION
November 2017
GENERAL NOTES AND COMMENTS:
SYM. DATE
BY
REVISION INFORMATION
PROJECT/TASK
APP.
0
10/10/17 WTS
ISSUED FOR REVIEW
-
-
1
11/03/17
ISSUED FOR REVIEW
-
-
2
11/07/17
NJB
NJB
ISSUED FOR REVIEW
-
-
SEAL
Environmental
Resources
Management
DRAWN:
NJB
11/07/17
CHECKED:
RH
11/07/17
APP. FOR BID:
APP. FOR CONST.:
SCALE:
Venture Global Calcasieu Pass, LLC
CALCASIEU PASS PROJECT
TITLE:
TEMPORARY WORKSPACE - GENERIC CROSS-SECTION
FOR NORTHEASTERN TWS
DISTRICT:
AS NOTED
DIR/FILE:
-
PARISH:
CAMERON STATE: LA
TWS Sites.DWG
GROUP
SHEET
REV.
-
149
2
Calcasieu Pass Terminal
NORTHWESTERN TEMPORARY WORKSPACE
CROSS-SECTION B-B'
North American
Vertical Datum of 1988
(NAVD 88)
ELEVATION (FEET)
(NOT TO SCALE)
APPROXIMATE CENTERLINE OF DEHYCO ACCESS ROAD
2'
TWS FILLING
Sheet 150
GENERAL NOTES:
1.
2.
3.
4.
5.
ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC
SURVEY NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
ALL COORDINATES AND LENGTHS ARE IN FEET.
FOR PERMITTING PURPOSES ONLY - NOT FOR CONSTRUCTION.
CROSS-SECTION LOCATION
November 2017
GENERAL NOTES AND COMMENTS:
SYM. DATE
BY
REVISION INFORMATION
PROJECT/TASK
APP.
0
10/10/17 WTS
ISSUED FOR REVIEW
-
-
1
11/03/17
ISSUED FOR REVIEW
-
-
2
11/07/17
NJB
NJB
ISSUED FOR REVIEW
-
-
SEAL
Environmental
Resources
Management
DRAWN:
NJB
11/07/17
CHECKED:
RH
11/07/17
APP. FOR BID:
APP. FOR CONST.:
SCALE:
Venture Global Calcasieu Pass, LLC
CALCASIEU PASS PROJECT
TITLE:
TEMPORARY WORKSPACE - GENERIC CROSS-SECTION
FOR NORTHWESTERN TWS
DISTRICT:
AS NOTED
DIR/FILE:
-
PARISH:
CAMERON STATE: LA
TWS Sites.DWG
GROUP
SHEET
REV.
-
150
2
Calcasieu Pass Terminal
SOUTHWESTERN TEMPORARY WORKSPACE
CROSS-SECTION C-C'
Sheet 151
GENERAL NOTES:
1.
2.
3.
4.
5.
ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC
SURVEY NAD 83 HORIZONTAL DATUM, LOUISIANA SOUTH.
ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
ALL COORDINATES AND LENGTHS ARE IN FEET.
FOR PERMITTING PURPOSES ONLY - NOT FOR CONSTRUCTION.
CROSS-SECTION LOCATION
November 2017
GENERAL NOTES AND COMMENTS:
SYM. DATE
BY
REVISION INFORMATION
PROJECT/TASK
APP.
0
10/10/17 WTS
ISSUED FOR REVIEW
-
-
1
11/03/17
ISSUED FOR REVIEW
-
-
2
11/07/17
NJB
NJB
ISSUED FOR REVIEW
-
-
SEAL
Environmental
Resources
Management
DRAWN:
NJB
11/07/17
CHECKED:
RH
11/07/17
APP. FOR BID:
APP. FOR CONST.:
SCALE:
Venture Global Calcasieu Pass, LLC
CALCASIEU PASS PROJECT
TITLE:
TEMPORARY WORKSPACE - GENERIC CROSS-SECTION
FOR SOUTHWESTERN TWS
DISTRICT:
AS NOTED
DIR/FILE:
-
PARISH:
CAMERON STATE: LA
TWS Sites.DWG
GROUP
SHEET
REV.
-
151
2
Calcasieu Pass Terminal
Sheet 152
November 2017
Temporary Workspaces
x
Temporary workspaces to be developed at start of and used throughout duration of Terminal Site construction (estimated 36 months); restoration will commence within
one year of Terminal's operational start-up. Development and restoration to be undertaken in accordance with the Project-specific Wetland and Waterbody Construction
and Mitigation Procedures, Upland Erosion Control and Revegetation Plan, and Stormwater Pollution Prevention Plan.
x
Clearing and grubbing of existing land surface to be completed where necessary to remove vegetation, root mass, and loose topsoil to the extent needed (up to a depth of
2 feet from ground surface) to create a surface suitable for installation of geogrid fabric.
x
Gravel/stone fill to be placed and compacted above geogrid (gravel top layer 6-inch nominal thickness; crushed stone base layer 18-inch nominal thickness) to provide
stable, safe, and durable work surface for movement and storage of heavy equipment and materials during construction (exception being the pre-existing boat launch
trailering area in Southwest TWS where the paved surface will support equipment and materials without additional fill).
x
After Terminal's operational start-up, temporary workspaces to be restored as follows:
o Northwest TWS (Total Area = 1.20 acres; Total Fill Volume of Aggregate = 3,872 cyds)
Gravel/stone fill (3,840 cyds) to be left in place in pre-existing upland (1.19-acre graveled industrial area)
Gravel/stone fill (32 cyds) to be removed from peripheral pre-existing wetland (0.01-acre estuarine emergent wetland); pre-existing drainage and topography to be
restored to allow natural revegetation from adjacent root and seed stock (e.g., Borrichia frustescens, Distichlis spicata, Spartina spartinae)
o Northeast TWS (Total Area = 5.24 acres; Total Fill Volume of Aggregate = 16,908 cyds)
Gravel/stone fill (16,063 cyds) to be removed from pre-existing upland (4.26-acre grassland/scrub-shrub area); pre-existing drainage and topography to be
restored and area seeded with annual herbaceous mix to provide temporary cover and/or perennial herbaceous mix (seeding regime and species composition
dependent in part on seasonal timing)
Gravel/stone fill (845 cyds) to be removed from peripheral pre-existing wetland (0.26-acre palustrine emergent wetland); pre-existing drainage and topography to
be restored to allow natural revegetation from adjacent root and seed stock (e.g., Panicum repens, Spartina spartinae)
o Southwest TWS (Total Area = 2.53 acres; Total Fill Volume of Aggregate = 5,324 cyds)
Boat launch trailering area (0.88 acre) to be retained as a paved area
Gravel/stone fill (2,904 cyds) to be removed from pre-existing upland (0.90-acre grassland area); pre-existing drainage and topography to be restored and area
seeded with annual herbaceous mix to provide temporary cover and/or perennial herbaceous mix (seeding regime and species composition dependent in part on
seasonal timing)
Gravel/stone fill (2,420 cyds) to be removed from pre-existing wetland (0.75-acre palustrine emergent wetland); pre-existing drainage and topography to be
restored to allow natural revegetation from adjacent root and seed stock (e.g., Distichlis spicata, Schoenoplectus robustus)
o Floodwall TWS (Total Area = 23.02 acres; Total Fill Volume of Aggregate = 74,279 cyds)
Gravel/stone fill (18,360 cyds) to be removed from pre-existing upland (5.69 acres); pre-existing drainage and topography to be restored and area seeded with
annual herbaceous mix to provide temporary cover and/or perennial herbaceous mix (seeding regime and species composition dependent in part on seasonal
timing)
Gravel/stone fill (55,919 cyds) to be removed from pre-existing wetlands/waters (17.33 acres); pre-existing drainage and topography to be restored to allow
natural revegetation from adjacent root and seed stock (e.g. Baccahris hamilifolia, Iva annua, Phragmites australis, Typha angustifolia, Typha domingensis)
o East TWS (Total Area = 59.72 acres; Total Fill Volume of Aggregate = 199,902 cyds)
Gravel/stone fill (82,160 cyds) to be removed from pre-existing wetlands/waters (24.73 acres); pre-existing drainage and topography to be restored to allow
natural revegetation from adjacent root and seed stock (e.g., Baccahris hamilifolia, Iva annua, Phragmites australis, Typha domingensis), supplemented as
necessary with seeding and/or active planting of locally occurring herbaceous species derived from nursery stock.
Gravel/stone fill (117,742 cyds) to be left in place in pre-existing upland (34.99 acres) and overlain with soil derived from on-site excavation and stockpiled during
facility construction, to recreate and accentuate chenier ridge topography
All areas, volumes, and dimensions as stated are approximate values
Venture Global Calcasieu Pass, LLC
SHEET 152 Additional Notes for Temporary Workspace Construction and Land Restoration
TransCameron Pipeline Project
Sheet Index and Notes
Sheet Number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
Contents
Sheet Index (Sheet 1 of 2)
Sheet Index (Sheet 2 of 2)
Project Vicinity Map
General Notes
Supplemental Table Step 10
East Lateral Cover Sheet
East Lateral Coordinate Information
East Lateral Sheet Location Plan
East Lateral Alignment MP 0.0 to 0.8
East Lateral Alignment MP 0.0 to 0.1
East Lateral Alignment MP 0.8 to 1.7
East Lateral Alignment MP 0.8 to 1.0
East Lateral Alignment MP 1.7 to 2.7
East Lateral Alignment MP 2.7 to 3.7
East Lateral Alignment MP 3.7 to 4.6
East Lateral Alignment MP 4.6 to 5.6
East Lateral Alignment MP 5.6 to 6.5
East Lateral Alignment MP 6.5 to 7.5
East Lateral Alignment MP 7.5 to 8.5
East Lateral Alignment MP 8.0 to 8.3
East Lateral Alignment MP 8.5 to 9.4
East Lateral Alignment MP 9.4 to 10.4
East Lateral Alignment MP 10.4 to 11.4
East Lateral Alignment MP 11.4 to 12.3
East Lateral Alignment MP 12.3 to 13.3
East Lateral Alignment MP 13.3 to 14.3
East Lateral Alignment MP 14.3 to 15.2
East Lateral Alignment MP 15.2 to 16.2
East Lateral Alignment MP 16.2 to 17.1
East Lateral Alignment MP 17.1 to 18.1
East Lateral Alignment MP 18.1 to 19.1
East Lateral Alignment MP 19.1 to 20.1
East Lateral Alignment MP 20.1 to 21.1
East Lateral Alignment MP 21.1 to 22.0
East Lateral Alignment MP 22.0 to 22.9
East Lateral Alignment MP 22.9 to 23.4
East Lateral MP 0.5 Mermantau River HDD
East Lateral MP 0.5 Kings Bayou HDD
East Lateral MP 8.3 E Creole Hwy HDD
East Lateral MP 9.4 W Creole Hwy HDD
East Lateral MP 9.4 Raymond Richard Rd HDD
East Lateral MP 19.1 Amaco Road HDD
East Lateral MP 21.3 Marshall Street - HWY 27 HDD
East Lateral MP 23.0 East Lateral to Terminal HDD
East Lateral MP 15.1 to 15.9 OW027 and OW029 Crossing
East Lateral MP 16.2 to 17.0 OW021 and OW022 Crossing
East Lateral MP 17.0 to 17.8 OW016, OW017, OW018, OW019, and OW021 Crossing
Typical Push Section Row Parallel to Ex. Enlink/Bridgeline Pipeline
Typical HDD Construction Row
Typical HDD Entry Site
Typical HDD Exit Site
Typical Push Site Wetland Crossing
Typical Temporary Access Road and Permanent Access Road Cross Section
Typical Access Road Crossing
Typical Access Road Culvert
Major Waterbody Crossing
Typical Main Line Valve
Plot Plan - ANR/Bridgeline Meter Station
Section Plan - ANR/Bridgeline Meter Station
East Lateral Access Road Cover Sheet
East Lateral Access Road Location Map
TransCameron Pipeline
Sheet 1
Engineering Drawing Reference
TCPPL-M-001A (Sheet 1A)
TCPPL-M-001B (Sheet 1B)
TCPPL-M-100 (Sheet 2)
TCPPL-M-101A (Sheet 3A)
TCPPL-M-101B (Sheet 3B)
TCPPL-M-102A (Sheet 4A)
TCPPL-M-102B (Sheet 4B)
TCPPL-M-103 (Sheet 5)
TCPPL-M-104 (Sheet 6)
TCPPL-M-105 (Sheet 7)
TCPPL-M-106 (Sheet 8)
TCPPL-M-107 (Sheet 9)
TCPPL-M-108 (Sheet 10)
TCPPL-M-109A (Sheet 11A)
TCPPL-M-109B (Sheet 11B)
TCPPL-M-110 (Sheet 12)
TCPPL-M-111 (Sheet 13)
TCPPL-M-112 (Sheet 14)
TCPPL-M-113 (Sheet 15)
TCPPL-M-114 (Sheet 16)
TCPPL-M-115 (Sheet 17)
TCPPL-M-116 (Sheet 18)
TCPPL-M-117 (Sheet 19)
TCPPL-M-118 (Sheet 20)
TCPPL-M-119 (Sheet 21)
TCPPL-M-120 (Sheet 22)
TCPPL-M-121 (Sheet 23)
TCPPL-M-122 (Sheet 24)
TCPPL-M-123 (Sheet 25)
TCPPL-M-124 (Sheet 26)
TCPPL-M-125 (Sheet 27)
TCPPL-M-200
TCPPL-M-201
TCPPL-M-202
TCPPL-M-203
TCPPL-M-204
TCPPL-M-205
TCPPL-M-206
TCPPL-M-207
TCPPL-M-208
TCPPL-M-209
TCPPL-M-210
Figure 1.3-15a(4)
Figure 1.3-15b(1)
Figure 1.3-15b(2)
Figure 1.3-15b(3)
Figure 1.3-15c
Figure 1.3-15d
Figure 1.3-15e
None
Figure 1.3-15f
Figure 1.3-15g
Figure 1.3-16a
Figure 1.3-16b
TCPPL-M-502 (Sheet 1)
TCPPL-M-502.1 (Sheet 2)
November 2017
TransCameron Pipeline Project
Sheet Index and Notes
Sheet Number
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
Contents
East Lateral Access Roads - PAR #1
East Lateral Access Roads - TAR #2
East Lateral Access Roads - TAR #3
East Lateral Access Roads - TAR #4
East Lateral Access Roads - TAR #5
East Lateral Access Roads - TAR #6
East Lateral Access Roads - TAR #7
East Lateral Access Roads - TAR #8
East Lateral Access Roads - TAR #9
East Lateral Access Roads - TAR #10
East Lateral Access Roads - PAR #11
East Lateral Access Roads - TAR #11
East Lateral Access Roads - TAR #12
East Lateral Access Roads - TAR #13
East Lateral Access Roads - TAR #14
East Lateral Access Roads - TAR #15
East Lateral Access Roads - TAR #16
East Lateral Access Roads - TAR #17
East Lateral Access Roads - TAR #17
East Lateral Access Roads - TAR #18
East Lateral Access Roads - TAR #18
East Lateral Access Roads - TAR #18
East Lateral Access Roads - TAR #19
East Lateral Access Roads - TAR #19
East Lateral Access Roads - TAR #19
East Lateral Access Roads - TAR #19
East Lateral Access Roads - TAR #20
East Lateral Access Roads - TAR #21
East Lateral Access Roads - TAR #22
East Lateral Access Roads - TAR #23
East Lateral Access Roads - TAR #23
TransCameron Pipeline
Sheet 2
Engineering Drawing Reference
TCPPL-M-502.2 (Sheet 3)
TCPPL-M-502.3 (Sheet 4)
TCPPL-M-502.4 (Sheet 5)
TCPPL-M-502.5 (Sheet 6)
TCPPL-M-502.6 (Sheet 7)
TCPPL-M-502.7 (Sheet 8)
TCPPL-M-502.8 (Sheet 9)
TCPPL-M-502.9 (Sheet 10)
TCPPL-M-502.10 (Sheet 11)
TCPPL-M-502.11 (Sheet 12)
TCPPL-M-502.12A (Sheet 13)
TCPPL-M-502.12B (Sheet 14)
TCPPL-M-502.13 (Sheet 15)
TCPPL-M-502.14 (Sheet 16)
TCPPL-M-502.15 (Sheet 17)
TCPPL-M-502.16 (Sheet 18)
TCPPL-M-502.17 (Sheet 19)
TCPPL-M-502.18A (Sheet 20)
TCPPL-M-502.18B (Sheet 21)
TCPPL-M-502.19A (Sheet 22)
TCPPL-M-502.19B (Sheet 23)
TCPPL-M-502.19C (Sheet 24)
TCPPL-M-502.20A (Sheet 25)
TCPPL-M-502.20B (Sheet 26)
TCPPL-M-502.20C (Sheet 27)
TCPPL-M-502.20D (Sheet 28)
TCPPL-M-502.21 (Sheet 29)
TCPPL-M-502.22 (Sheet 30)
TCPPL-M-502.23 (Sheet 31)
TCPPL-M-502.24A (Sheet 32)
TCPPL-M-502.24B (Sheet 33)
November 2017
Joi
ntPer
m i
tAppl
i
cat
i
on
Tr
ansCam er
onPi
pel
i
nePr
oj
ect
Applicant: TransCameron Pipeline, LLC
Cameron Parish, Louisiana
EastLat
er
alSt
ar
t
Lat
i
t
u d e:29° 46'36.
963"
Longi
t
u d e:93° 0'1.
674"
ANR/
Br
i
d gel
i
ne
Met
erSt
at
i
on
!
.
EastLat
er
alEnd
Lat
i
t
u d e:29° 46'30.
461"
Longi
t
u d e:93° 19'49.
967"
Venture Global Property
Construction Support
Facilities
Proposed East Lateral
Pipeline
!
.
Meter Station
Access Road
Hydraulic Dredge Pipeline
Marsh Creation Area
Nearshore Placement Area
Dredge Footprint
0
2
4
Miles
ForPer
m i
t
t
i
ngPu r
posesOnl
y
NotforConst
r
u ct
i
on
p
Pr
oj
ectVi
ci
ni
t
y Map
Calcasieu Pass Terminal and TransCameron Pipeline Project
Cameron Parish, Louisiana
M:\Clients\V-X\VGL\CalcasieuPass\_ArcGIS\_JPA\_CalcasieuPass_JPA_Fig_NRG_P1.mxd | REVISED: 08/18/2017 | SCALE: 1:223,000
TransCameron Pipeline
Sheet 3
DRAWN BY: JSnyder
November 2017
General Notes:
1. Descriptions of the proposed work are provided in the Joint Permit Application Narrative.
2. Impact quantities are provided in the Joint Permit Application Narrative unless specifically shown on an individual Permit
Drawing.
3. The Joint Permit Application Drawings contained herein are issued to accompany the Joint Permit Application Form and
Joint Permit Application Narrative.
4. The Joint Permit Application Drawings contained herein are issued for permitting purposes, not for construction.
5. As-built drawings and/or plats shall have written on them the date of completion of said activities and shall be submitted to
the Louisiana Department of Natural Resources, Office of Coastal Management, P. O. Box 44487, Baton Rouge, LA 708044487 within 30 days following project completion.
6. All structures built under the authorization and conditions of this permit shall be removed from the site within 120 days of
abandonment of the facilities for the herein permitted use, or when these structures fall into a state of disrepair such that
they can no longer function as intended. This condition does not preclude the necessity for revising the current permit or
obtaining a separate Coastal Use Permit, should one be required, for such removal activities.
7. Structures must also be marked/lighted in accordance with U. S. Coast Guard regulations.
8. In order to ensure the safety of all parties, the permittee shall contact the Louisiana One Call System (1-800-272-3020) a
minimum of 48 hours prior to the commencement of any excavation (digging, dredging, jetting, etc.) or demolition activity.
9. The work and features shown on the Permit Drawings are the responsibility of the Applicant as defined on the Joint Permit
Application Form. The description of the work and features, including itemization and quantification of impacts, are contained
in the Joint Permit Application Narrative, submitted with the application. The Joint Permit Application Narrative describes the
work and features shown on the Permit Drawings herein as well as work and features to be performed by the Applicant's
affiliated company. The Applicant's affiliated company has submitted an independent Joint Permit Application for the work and
features it will perform. For the purposes of understanding the complete project, refer to the Joint Permit Application Narrative.
Application materials submitted and correspondence pertaining to the work and features to be performed by the Applicant's
affiliated company are available under the permit application file of the affiliated company with the LDNR and USACE.
General Notes
Calcasieu Pass Terminal and TransCameron Pipeline Project
Cameron Parish, Louisiana
M:\Clients\V-X\VGL\CalcasieuPass\_ArcGIS\_JPA\_CalcasieuPass_JPA_Fig_NRG_T2.mxd | REVISED: 04/28/2016 | SCALE: 1:380,160
TransCameron Pipeline
Sheet 4
DRAWN BY: JSnyder
November 2017
TransCameron Pipeline
TABLE A
Calcasieu Pass Terminal and TransCameron Pipeline Project
Step 10 Supplemental Sheet Quantities Summary for the Pipeline System
Impact Area (acres)
Wetlands
b
c
Waters
Total Acreage
a
Element
Temporary
Impacts
Permanent
Impacts
Temporary
Impacts
Permanent
Impacts
Temporary
Impacts
Permanent
Impacts
0.00
0.00
0.00
231.18
68.81
3.79
6.13
309.91
1.30
0.08
0.00
0.00
0.00
0.00
0.00
1.38
0.00
0.00
0.04
23.77
4.73
0.01
0.02
28.57
0.00
<0.01
0.00
0.00
0.00
0.00
0.00
<0.01
0.00
0.00
0.11
282.13
75.23
9.71
9.82
377.00
1.30
0.25
0.00
0.00
0.00
0.00
0.00
1.55
Permanent Above Ground Facilities
Permanent Access Roads
Existing Crossing at Oilfield Road
Pipeline Alignment
Additional Temporary Work Space
Temporary Access Roads
Temporary Contractor Yards
Subtotal
Percent of
Facility within
wetland
and/or waters
(%)
100
32
36
90
98
39
63
Fill placed onsite (cubic yards)
Excavated
& Placed
Onsite
0
0
0
g
873,641
0
0
0
873,641
Excavated
& Hauled
Offsite
2,092
0
0
14,850
0
0
0
16,942
Crushed Stone
Concrete
1,540
0
0
0
0
0
0
1,540
e
Temporary
Permanent
0
0
0
0
0
49
560
609
1,256
205
100
0
0
0
0
1,561
a
The work areas / elements identified above are described in the JPA Narrative and shown on the JPA Permit Drawings.
The acreages in this table have been rounded for presentation purposes. As a result, the totals may not reflect the exact sum of the addends in all cases.
The acreage associated with the Pipeline System is 378.55 acres, of which 18.06 acres will be undisturbed due to avoidance by HDD. Of the undisturbed acres, about 16.34 acres are mapped as wetlands and waters.
d
Fill quantities presented reflective of LDNR JPA Form Step 10 and represent material quantities placed on lands regardless of whether uplands, wetlands, or waterbodies.
e
Timber Mats and crushed stone associated with temporary access roads and contractor yards are a temporary fill.
f
Amount of fill in wetland/waters was calculated by using the percent of the facility that is wetland/waters, and the volume of fill associated with the facility with the exception of timber mats which are expected to
be used in wetlands/waters only.
g
Native materials excavated from the pipeline trench will be temporarily placed onsite (873,641 cubic yards) and are not included in the fill quantities.
b
c
Sheet 5
TABLE B
Summary of the Excavation, Fill, and Acreages Associated with the Pipeline System
Volume
(cubic Yards)
Volume of Fill Placed
within wetland/waters
(cubic yards)
Total Acres associated with excavation and/or fill
Wetland/Waters
(Acres)
All Lands
(Acres)
Wetland/Waters
(Acres)
All Lands
(Acres)
339.86
378.55
a
Placed Onsite
873,641
254.90
283.91
b
N/A
Hauled Away
16,942
Total
890,583
254.90
283.91
c
Temporary
99,460
99,223
83.58
93.09
d
Fill
Permanent
4,223
3,945
1.38
1.55
Total
103,683
103,168
84.96
94.64
Native materials excavated from the pipeline trench will be temporarily placed onsite (873,641 cubic yards) and are not included in the fill quantities.
Excavation
a
b
Of the 16,942 cubic yards of material excavated and hauled offsite, 14,850 cubic yards is material removed during the HDD process.
c
Temporary fill associated with the Pipeline System include timber mats and crushed stone that will be removed following construction.
d
Permanent fill associated with the Pipeline System include crushed stone and sand in addition to concrete and asphalt.
Revised August 18, 2017
d
Sand
Timber
e
Mats
Asphalt
Total
Total Fill in
wetland /
f
waters
1,048
44
0
0
0
0
0
1,092
0
0
137
0
84,973
13,741
0
98,851
0
0
30
0
0
0
0
30
3,844
249
267
0
84,973
13,790
560
103,683
3,844
80
159
0
84,973
13,760
353
103,168
November 2017
TransCameron Pipeline
TRANSCAMERON PIPELINE, LLC
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
CAMERON PARISH, LOUISIANA
SHEET
NO.
x
x
/ /
OH
Sheet 6
T
FO
/
1A
1B
2
3A
3B
4A
4B
5
6
7
8
9
10
11A
11B
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
DRAWING
NUMBER
TCPPL-M-001A
TCPPL-M-001B
TCPPL-M-100
TCPPL-M-101A
TCPPL-M-101B
TCPPL-M-102A
TCPPL-M-102B
TCPPL-M-103
TCPPL-M-104
TCPPL-M-105
TCPPL-M-106
TCPPL-M-107
TCPPL-M-108
TCPPL-M-109A
TCPPL-M-109B
TCPPL-M-110
TCPPL-M-111
TCPPL-M-112
TCPPL-M-113
TCPPL-M-114
TCPPL-M-115
TCPPL-M-116
TCPPL-M-117
TCPPL-M-118
TCPPL-M-119
TCPPL-M-120
TCPPL-M-121
TCPPL-M-122
TCPPL-M-123
TCPPL-M-124
TCPPL-M-125
REV.
G
C
E
F
C
F
C
E
E
E
E
E
E
F
C
E
E
E
E
E
E
E
F
F
F
E
E
E
E
E
E
TITLE
COVER SHEET
COORDINATE SHEET
SHEET LOCATION PLAN
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 0.0 TO M.P. 0.8
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 0.0 TO M.P. 0.1
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 0.8 TO M.P. 1.7
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 0.8 TO M.P. 1.0
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 1.7 TO M.P. 2.7
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 2.7 TO M.P. 3.7
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 3.7 TO M.P. 4.6
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 4.6 TO M.P. 5.6
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 5.6 TO M.P. 6.5
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 6.5 TO M.P. 7.5
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 7.5 TO M.P. 8.5
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 8.0 TO M.P. 8.3
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 8.5 TO M.P. 9.4
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 9.4 TO M.P. 10.4
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 10.4 TO M.P. 11.4
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 11.4 TO M.P. 12.3
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 12.3 TO M.P. 13.3
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 13.3 TO M.P. 14.3
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 14.3 TO M.P. 15.2
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 15.2 TO M.P. 16.2
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 16.2 TO M.P. 17.1
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 17.1 TO M.P. 18.1
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 18.1 TO M.P. 19.1
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 19.1 TO M.P. 20.1
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 20.1 TO M.P. 21.1
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 21.1 TO M.P. 22.0
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 22.0 TO M.P. 22.9
ALIGNMENT SHEET, PROPOSED EAST LATERAL PIPELINE M.P. 22.9 TO M.P. 23.5
November 2017
COVER SHEET
42" NATURAL GAS PIPELINE - EAST LATERAL
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-001A
TransCameron Pipeline
COORDINATE INFORMATION
COORDINATE INFORMATION
Sheet 7
DESCRIPTION
NORTHING
EASTING
LATITUDE
W
MP13.5
481056.96
2691691.05
29.80968
N
93.19111134
W
93.007067
W
MP14
480971.68
2689053.40
29.80933
N
93.19942296
W
N
93.01507135
W
MP14.5
481019.06
2686418.46
29.80934
N
93.20773282
W
29.7776
N
93.02326858
W
MP15
481933.38
2683953.46
29.81174
N
93.21555178
W
2742159.83
29.77901
N
93.03143164
W
MP15.5
482160.57
2681333.78
29.81225
N
93.22382308
W
469657.38
2739575.45
29.78038
N
93.03960264
W
MP16
482370.97
2678706.89
29.81271
N
93.23211632
W
MP3
470202.40
2736992.33
29.78178
N
93.04777022
W
MP16.5
482519.60
2676077.23
29.813
N
93.24041511
W
MP3.5
470835.75
2734430.37
29.78341
N
93.05587547
W
MP17
482693.22
2673443.46
29.81335
N
93.24872826
W
MP4
471351.56
2731845.12
29.78472
N
93.06404885
W
MP17.5
482939.72
2670814.99
29.81391
N
93.25702858
W
MP4.5
471857.69
2729256.43
29.78601
N
93.0722328
W
MP18
482820.63
2668180.15
29.81346
N
93.26532966
W
MP5
472163.52
2726635.04
29.78674
N
93.0805104
W
MP18.5
482636.68
2665546.57
29.81283
N
93.27362323
W
MP5.5
472450.07
2724010.64
29.78742
N
93.08879668
W
MP19
482464.09
2662912.23
29.81223
N
93.28191971
W
MP6
472887.19
2721415.94
29.78851
N
93.09699675
W
MP19.5
482296.42
2660277.56
29.81165
N
93.29021738
W
MP6.5
474475.66
2719353.20
29.79279
N
93.10357626
W
MP20
481622.85
2657936.60
29.80969
N
93.29756158
W
MP7
476932.37
2718491.39
29.79951
N
93.10641277
W
MP20.5
479417.93
2656484.74
29.80356
N
93.30201953
W
MP7.5
479571.01
2718563.40
29.80676
N
93.10631448
W
MP21
477213.01
2655032.87
29.79743
N
93.30647692
W
MP8
482205.92
2718693.90
29.81401
N
93.10603157
W
MP21.5
475000.18
2653593.10
29.79127
N
93.31089519
W
MP8.5
483948.68
2717794.48
29.81877
N
93.10895259
W
MP22
472784.31
2652158.01
29.78511
N
93.31529803
W
MP9
483996.64
2715154.91
29.81879
N
93.11727783
W
MP22.5
470568.43
2650722.92
29.77895
N
93.31970032
W
MP9.5
484006.91
2712516.34
29.8187
N
93.12559809
W
MP23
469584.71
2648619.25
29.77615
N
93.32627669
W
MP10
483820.61
2709882.92
29.81808
N
93.13389234
W
MP23.5
467970.46
2647592.44
29.77166
N
93.32942422
W
MP10.5
483634.31
2707249.50
29.81745
N
93.14218649
W
EAST M&R STATION
468155.35
2751886.13
29.77675
N
93.00073094
W
MP11
483419.66
2704618.46
29.81675
N
93.15047159
W
MAINLINE VALVE
483729.48
2718709.01
29.8182
N
93.10605824
W
MP11.5
483252.82
2701983.74
29.81617
N
93.15877061
W
CONTRACTOR YARD
479947.41
2695214.54
29.80679
N
93.17994607
W
MP12
482854.14
2699388.61
29.81496
N
93.166933
W
PERMANENT ACCESS ROAD 11 483706.94
2718674.56
29.81814
N
93.10616579
W
MP12.5
482091.84
2696868.23
29.81275
N
93.1748411
W
PERMANENT ACCESS ROAD 1
468059.99
2751762.96
29.77648
N
93.00111476
W
MP13
481564.33
2694281.47
29.81119
N
93.18297005
W
END STA.
2356120.53
13576299.27 30.84011
N
58.06580088
W
DESCRIPTION
NORTHING
EASTING
LATITUDE
LONGITUDE
BEGIN STA.
468220.37
2751971.49
29.77693
N
93.00046488
MP.5
468737.35
2749884.36
29.77827
N
MP1
468083.12
2747335.22
29.77637
MP1.5
468566.83
2744741.57
MP2
469118.31
MP2.5
LONGITUDE
November 2017
COORDINATE
COVER SHEET
SHEET
42" NATURAL GAS PIPELINE - EAST LATERAL
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-001B
TransCameron Pipeline
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
PROPOSED EAST LATERAL PIPELINE
Sheet 8
November 2017
SHEET LOCATION PLAN
42" NATURAL GAS PIPELINE - EAST LATERAL
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-100
TransCameron Pipeline
U
TA
EN RD
M
R R
ME IVE
R
TRACT NO.
EAST - 03.00
KINGS
BAYOU
TRACT NO.
EAST - 02.00
Sheet 9
TRACT NO.
EAST - 03.00
U
TA
EN RD
M
R R
ME IVE
R
KINGS
BAYOU
TRACT NO.
EAST - 02.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 0.0 TO 0.8
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-101A
TransCameron Pipeline
U
TA
EN RD
M
R R
ME IVE
R
TRACT NO.
EAST - 02.00
Sheet 10
AU
NT
ME R RD
R
ME IVE
R
TRACT NO.
EAST - 02.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 0.0 TO 0.1
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-101B
TransCameron Pipeline
TRACT NO.
EAST - 06.00
TRACT NO.
EAST - 04.00
TRACT NO.
EAST - 05.00
KINGS
BAYOU
TRACT NO.
EAST - 03.00
Sheet 11
TRACT NO.
EAST - 06.00
TRACT NO.
EAST - 04.00
TRACT NO.
EAST - 05.00
KINGS
BAYOU
TRACT NO.
EAST - 03.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 0.8 TO 1.7
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-102A
TransCameron Pipeline
TRACT NO.
EAST - 04.00
TRACT NO.
EAST - 03.00
TRACT NO.
EAST - 04.00
TRACT NO.
EAST - 03.00
TRACT NO.
EAST - 05.00
TRACT- 149.00
EAST
NO.
TRACT NO.
EAST - 06.00
Sheet 12
TRACT NO.
EAST - 05.00
TRACT- 149.00
EAST
NO.
TRACT NO.
EAST - 06.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 0.8 TO 1.0
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-102B
TransCameron Pipeline
TRACT NO.
EAST - 07.00
T NO.
TRAC 8.00
-0
EAST
T NO.
TRAC 8.50
-0
EAST
TRACT NO.
EAST - 09.00
TRACT NO.
EAST - 06.00
Sheet 13
TRACT NO.
EAST - 07.00
T NO.
TRAC 8.00
-0
EAST
November 2017
T NO.
TRAC 8.50
-0
EAST
TRACT NO.
EAST - 09.00
TRACT NO.
EAST - 06.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 1.7 TO 2.7
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-103
TRACT - 4.00
EAST
RD
NO TRACT NO.
T NO.
TRAC 4.00
-1
EAST
T NO.
TRAC 5.00
-1
EAST
T NO.
TRAC 4.00
-1
EAST
T NO.
TRAC 5.00
-1
EAST
TRACT NO.
EAST - 11.00
REVISIONS
PRIVATE RD
TRACT NO.
EAST - 11.00
PRIVATE RD
RD
T NO.
TRAC 7.00
-1
EAST
TRACT- 4.00
EAST
NO.
PRIVATE
NO TRACT NO.
T NO.
TRAC 7.00
-1
EAST
November 2017
PIPELINE MATERIAL SUMMARY
NO.
PRIVATE
Sheet 14
TRACT NO.
EAST - 21.00
T NO.
TRAC 0.00
-2
EAST T NO.
TRAC 9.00
-1
EASTCT NO.
TRA
18.00
EAST O.
TN
TRAC 7.00
-1
EAST
T NO.
TRAC 6.00
-1
EAST
O.
N
T
C
TRA
- 15.00RACT NO.
EAST
T
- 14.00
EAST
T NO.
TRAC 3.00
-1
EAST
TransCameron Pipeline
T NO.
TRAC 0.00
-2
EAST T NO.
TRAC 9.00
-1
EASTCT NO.
TRA
18.00
EAST O.
TN
TRAC 7.00
-1
EAST
T NO.
TRAC 6.00
-1
EAST
O.
N
T
C
TRA
- 15.00RACT NO.
EAST
T
- 14.00
EAST
T NO.
TRAC 3.00
-1
EAST
TRACT NO.
EAST - 21.00
TRACT NO.
EAST - 10.00
TRACT NO.
EAST - 9.00
TRACT NO.
EAST - 10.00
TRACT NO.
EAST - 9.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 2.7 TO 3.7
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
TCPPL-M-104
TRACT NO.
EAST - 23.00
NO.
TRACT .00
25
EAST -
TRACT NO.
EAST - 24.00
NO.
TRACT .00
26
EAST -
NO.
TRACT .00
27
T
S
A
E
D RD
R
ERFO
RUTH
TRACT NO.
EAST - 28.00
TRACT NO.
EAST - 22.00
TRACT NO.
EAST - 21.00
PRIVATE RD
T
PRIVA
E RD
TransCameron Pipeline
TRACT NO.
EAST - 30.00
NO.
TRACT .00
25
EAST -
NO.
TRACT .00
26
EAST -
NO.
TRACT .00
27
EAST -
RUTH
TRACT NO.
EAST - 24.00
TRACT NO.
EAST - 23.00
TRACT NO.
EAST - 22.00
TRACT NO.
EAST - 21.00
PRIVATE RD
PRIVA
TE RD
TRACT NO.
EAST - 28.00
ERFO
RD RD
Sheet 15
TRACT NO.
EAST - 30.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 3.7 TO 4.6
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-105
TRACT NO.
EAST - 30.00
LD RD
TRACT NO.
EAST - 34.00
TRACT NO.
EAST - 35.00
OIL FIE
TRACT NO.
EAST - 39.00
TRACT NO.
EAST - 40.00
TRACT NO.
EAST - 41.00
TRACT NO.
EAST - 42.00
TRACT NO.
EAST - 44.00
TRACT NO.
EAST - 43.00
TRACT NO.
EAST - 37.00
TRACT NO.
EAST - 36.00
TransCameron Pipeline
TRACT NO.
EAST - 38.00
TRACT NO.
EAST - 32.00
TRACT NO.
EAST - 33.00
TRACT NO.
EAST - 31.00
TRACT NO.
EAST - 30.00
TRACT NO.
EAST - 33.00
OIL FIE
LD RD
TRACT NO.
EAST - 34.00
TRACT NO.
EAST - 35.00
TRACT NO.
EAST - 39.00
TRACT NO.
EAST - 40.00
TRACT NO.
EAST - 41.00
TRACT NO.
EAST - 42.00
November 2017
TRACT NO.
EAST - 44.00
TRACT NO.
EAST - 43.00
TRACT NO.
EAST - 37.00
TRACT NO.
EAST - 36.00
Sheet 16
TRACT NO.
EAST - 38.00
TRACT NO.
EAST - 32.00
TRACT NO.
EAST - 31.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 4.6 TO 5.6
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-106
November 2017
PIPELINE MATERIAL SUMMARY
O.
T N .00
AC
TR T - 45
S
EA
TRACT NO.
EAST - 57.00
O.
T N .00
AC
TR T - 45
S
EA
TRACT NO.
EAST - 53.00
TRACT NO.
EAST - 55.00
TRACT NO.
EAST - 52.00
TRACT NO.
EAST - 54.00
TRACT NO.
EAST - 53.00
TRACT NO.
EAST - 55.00
REVISIONS
O.
T N .00
AC
TR T - 44
S
EA
TRACT NO.
EAST - 54.00
O.
T N .00
AC
TR T - 44
S
EA
O.
T N .00
AC
TR T - 52
S
EA
O.
TN 0
.
O
N 0 TRAC - 50.0
T
.0
AC
ST
TR T - 51
EA
.
S
NO 0
EA
O.
CT
0
N
T .00 TRA - 48.
C
A
ST
TR T - 49
EA
S
EA
.
O
.
T N .00 T NO
AC
0
TR T - 47 TRAC 46.0
S
T
S
EA
A
E
TRACT NO.
EAST - 52.00
O.
T N .00
AC
TR T - 52
S
EA
O.
TN 0
.
O
N 0 TRAC - 50.0
T
.0
AC
ST
TR T - 51
EA
.
S
NO 0
EA
O.
CT
0
N
T .00 TRA - 48.
C
A
ST
TR T - 49
EA
S
EA
.
O
.
T N .00 T NO
AC
0
TR T - 47 TRAC 46.0
S
T
S
EA
A
E
Sheet 17
TRACT NO.
EAST - 58.00
O.
T N .00
AC
TR T - 56
S
EA
TRACT NO.
EAST - 58.00
O.
T N .00
AC
TR T - 56
S
EA
TransCameron Pipeline
TRACT NO.
EAST - 57.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 5.6 TO 6.5
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
TCPPL-M-107
TransCameron Pipeline
TRACT NO.
EAST - 62.00
TRACT NO.
EAST - 61.00
TRACT NO.
EAST - 60.00
TRACT NO.
EAST - 58.00
TRACT NO.
EAST - 59.00
Sheet 18
TRACT NO.
EAST - 62.00
TRACT NO.
EAST - 61.00
TRACT NO.
EAST - 60.00
TRACT NO.
EAST - 58.00
TRACT NO.
EAST - 59.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 6.5 TO 7.5
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-108
TransCameron Pipeline
TRACT NO.
EAST - 63.50
E CREO
LE HW
Y
TRACT NO.
EAST - 62.00
TRACT NO.
EAST - 66.00
TRACT NO.
EAST - 64.00
TRACT NO.
EAST - 63.00
Sheet 19
TRACT NO.
EAST - 63.50
LE HW
Y
TRACT NO.
EAST - 62.00
November 2017
E CREO
TRACT NO.
EAST - 66.00
TRACT NO.
EAST - 64.00
TRACT NO.
EAST - 63.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 7.5 TO 8.5
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-109A
TransCameron Pipeline
TRACT NO.
EAST - 66.00
Sheet 20
TRACT NO.
EAST - 66.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 8.0 TO 8.3
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-109B
November 2017
PIPELINE MATERIAL SUMMARY
TRACT NO.
EAST - 81.00
REVISIONS
TRACT NO.
EAST - 69.00
TRACT NO.
EAST - 66.00
TRACT NO.
EAST - 66.00
TRACT NO.
EAST - 67.00
TRACT NO.
EAST - 67.00
TRACT NO.
EAST - 70.00
W CREOLE HWY
HWY 27
TRACT NO.
EAST - 71.00
HWY 27
TRACT NO.
EAST - 69.00
W CREOLE HWY
TRACT NO.
EAST - 70.00
TRACT NO.
EAST - 71.00
TRACT NO.
EAST - 80.00
TRACT NO.
EAST - 75.00
TRACT NO.
EAST - 74.00
TRACT NO.
EAST - 73.00
TRACT NO.
EAST - 72.00
TRACT NO.
EAST - 77.00
TRACT NO.
EAST - 80.00
TRACT NO.
EAST - 75.00
TRACT NO.
EAST - 74.00
TRACT NO.
EAST - 73.00
TRACT NO.
EAST - 72.00
TRACT NO.
EAST - 83.50
TRACT NO.
EAST - 77.00
TRACT NO.
EAST - 81.00
TRACT NO.
EAST - 79.00
TRACT NO.
EAST - 83.50
TRACT NO.
EAST - 79.00
TRACT NO.
EAST - 83.75
TRACT NO.
EAST - 82.00
TRACT NO.
EAST - 83.00
TRACT NO.
EAST - 83.75
TRACT NO.
EAST - 82.00
Sheet 21
TRACT NO.
EAST - 84.00
TRACT NO.
EAST - 83.00
TransCameron Pipeline
TRACT NO.
EAST - 84.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 8.5 TO 9.4
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
TCPPL-M-110
TRACT NO.
EAST - 85.00
TRACT NO.
EAST - 90.00
TRACT NO.
EAST - 84.00
TRACT NO.
EAST 87.00
TRACT NO.
EAST - 89.00
TRACT NO.
EAST 88.00
RAYMOND
RICHARD RD
TransCameron Pipeline
TRACT NO.
EAST - 86.00
Sheet 22
TRACT NO.
EAST - 86.00
TRACT NO.
EAST - 90.00
TRACT NO.
EAST - 85.00
TRACT NO.
EAST - 84.00
TRACT NO.
EAST - 89.00
November 2017
TRACT NO.
EAST 88.00
RAYMOND
RICHARD RD
TRACT NO.
EAST 87.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 9.4 TO 10.4
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-111
TRACT NO.
EAST - 92.00
TRACT NO.
EAST - 91.00
Sheet 23
TRACT NO.
EAST - 92.00
TRACT NO.
EAST - 94.00
TRACT NO.
EAST - 93.00
TRACT NO.
EAST - 90.00
TRACT NO.
EAST - 95.00
TRACT NO.
EAST - 93.00
TransCameron Pipeline
TRACT NO.
EAST - 96.00
TRACT NO.
EAST - 95.00
TRACT NO.
EAST - 90.00
TRACT NO.
EAST - 96.00
TRACT NO.
EAST - 94.00
TRACT NO.
EAST - 91.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 10.4 TO 11.4
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-112
TRAC
EAST T NO.
- 100.0
0
TRAC
EAST T NO.
- 101.0
0
TRAC
EAST T NO.
- 105.0
TRAC
0
T
NO.
EAST
- 104.0
0
TRAC
EAST T NO.
- 102.0
0
TransCameron Pipeline
TRACT NO.
EAST - 96.00
TRACT NO.
EAST - 99.00
TRACT NO.
EAST - 98.00
TRAC
EAST T NO.
- 100.0
0
TRAC
EAST T NO.
- 101.0
0
TRAC
EAST T NO.
- 105.0
TRAC
0
T
NO.
EAST
- 104.0
0
TRAC
EAST T NO.
- 102.0
0
Sheet 24
TRACT NO.
EAST - 96.00
TRACT NO.
EAST - 99.00
TRACT NO.
EAST - 98.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 11.4 TO 12.3
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-113
November 2017
PIPELINE MATERIAL SUMMARY
N
RO
ME 332
CA ISH
R
PA
REVISIONS
TRAC
EAST T NO.
- 107
.00
TRAC
EAST T NO.
- 107
.00
TRAC
EAST T NO.
- 106
.00
TRAC
EAST T NO.
- 108
.00
TRAC
EAST T NO.
- 108
.00
TRAC
EAST T NO.
- 105
.00
TRAC
EAST T NO.
- 109
.00
TRAC
EAST T NO.
- 109
.00
TRAC
EAST T NO.
- 106
.00
TRAC
EAST T NO.
- 110
.00
TRACT NO.
EAST - 115.00
TRAC
EAST T NO.
- 110
.00
N
RO
ME 332
CA ISH
R
PA
TRAC
EAST T NO.
- 112
.00
TRAC
T
N
O.
EAST
- 111
.00
TRACT NO.
EAST - 113.00
TRAC
EAST T NO.
- 105
.00
TRAC
EAST T NO.
- 116.0
0
TRACT NO.
EAST - 115.00
TRAC
EAST T NO.
- 112
.00
TRAC
T
N
O.
EAST
- 111
.00
Sheet 25
TRAC
EAST T NO.
- 116.0
0
TransCameron Pipeline
TRACT NO.
EAST - 113.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 12.3 TO 13.3
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
TCPPL-M-114
November 2017
TRACT NO.
EAST - 137.00
PIPELINE MATERIAL SUMMARY
TRACT NO.
EAST - 124.20
TRACT NO.
EAST - 141.00
TRACT NO.
EAST - 140.00
TRACT NO.
EAST - 135.00
TRACT NO.
EAST - 135.00
TRACT NO.
EAST - 124.10
TRACT NO.
EAST - 116.00
Sheet 26
TRACT NO.
EAST - 147.00
TRACT NO.
EAST - 146.00
TRACT NO.
EAST - 145.00
TRACT NO.
EAST - 144.00
TRACT NO.
EAST - 143.00
TRACT NO.
EAST - 142.00
TRACT NO.
EAST - 124.20
TRACT NO.
EAST - 141.00
TRACT NO.
EAST - 140.00
TRACT NO.
EAST - 147.00
TRACT NO.
EAST - 146.00
TRACT NO.
EAST - 145.00
TRACT NO.
EAST - 144.00
TRACT NO.
EAST - 143.00
TRACT NO.
EAST - 142.00
TransCameron Pipeline
TRACT NO.
EAST - 137.00
TRACT NO.
EAST - 124.10
TRACT NO.
EAST - 123.00
TRACT NO.
EAST - 124.00
TRACT NO.
EAST - 123.00
REVISIONS
TRACT NO.
EAST - 122.00
TRACT NO.
EAST - 121.00
TRACT NO.
EAST - 120.00
TRACT NO.
EAST - 119.00
TRACT NO.
EAST - 122.00
TRACT NO.
EAST - 121.00
TRACT NO.
EAST - 120.00
TRACT NO.
EAST - 119.00
TRACT NO.
EAST - 116.00
TRACT NO.
EAST - 124.00
TRACT NO.
EAST - 118.00
TRACT NO.
EAST - 118.00
TRACT NO.
EAST - 117.00
TRACT NO.
EAST - 117.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 13.3 TO 14.3
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
TCPPL-M-115
TRACT NO.
EAST - 177.00
November 2017
PIPELINE MATERIAL SUMMARY
OIL F
ILED
RD
REVISIONS
.
T NO
TRAC 52.00
-1
EAST
.
T NO
TRAC 51.00
-1
EAST
.
T NO
TRAC 50.00
-1
T
S
A
E
.
T NO
TRAC 49.00
-1
EAST NO.
T
TRAC 48.00
-1
EAST
.
T NO
TRAC 53.00
-1
EAST
.
T NO
TRAC 68.00
-1
T
S
EA
.
T NO
TRAC 67.00
1
T
EAS
.
T NO
TRAC 66.00
-1
EAST
.
T NO
TRAC 65.00
-1
EAST
.
T NO
TRAC 63.00
-1
T
S
A
E
.
T NO
TRAC 62.00
1
T
EAS
.
T NO
TRAC 55.00
-1
T
S
A
E
.
T NO
TRAC 54.00
-1
EAST
TRACT NO.
EAST - 182.00
.
T NO
TRAC 70.00
-1
T
S
EA
Sheet 27
TRACT NO.
EAST - 175.00
.
T NO
TRAC 72.00
-1
EAST
.
T NO
TRAC 71.00
-1
T
S
A
E
TRACT NO.
EAST - 177.00
ILED
OIL F
RD
.
T NO
TRAC 70.00
-1
T
S
EA
.
T NO
TRAC 72.00
-1
EAST
.
T NO
TRAC 71.00
-1
T
S
A
E
.
T NO
TRAC 73.00
-1
EAST
TRACT NO.
EAST - 175.00
.
T NO
TRAC 73.00
-1
T
S
A
E
TransCameron Pipeline
.
T NO
TRAC 52.00
-1
EAST
.
T NO
TRAC 51.00
-1
EAST
.
T NO
TRAC 50.00
-1
T
S
A
E
.
T NO
TRAC 49.00
-1
EAST NO.
T
TRAC 48.00
-1
EAST
.
T NO
TRAC 53.00
-1
EAST
.
T NO
TRAC 68.00
-1
T
S
EA
.
T NO
TRAC 67.00
1
T
EAS
.
T NO
TRAC 66.00
-1
EAST
.
T NO
TRAC 65.00
-1
EAST
.
T NO
TRAC 63.00
-1
T
S
A
E
.
T NO
TRAC 62.00
1
T
EAS
.
T NO
TRAC 55.00
-1
T
S
A
E
.
T NO
TRAC 54.00
-1
EAST
TRACT NO.
EAST - 182.00
TRACT NO.
EAST - 147.00
TRACT NO.
EAST - 147.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 14.3 TO 15.2
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
TCPPL-M-116
TransCameron Pipeline
TRACT NO.
EAST - 183.50
TRACT NO.
EAST - 184.00
TRACT NO.
EAST - 182.50
T
TRACT NO.
EAST - 182.00
A
PRIVATE RD
PRIVATE
RD
T
A
Sheet 28
TRACT NO.
EAST - 183.50
TRACT NO.
EAST - 184.00
TRACT NO.
EAST - 182.00
TRACT NO.
EAST - 182.50
T
A
PRIVATE RD
November 2017
PRIVATE
RD
T
A
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 15.2 TO 16.2
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-117
TransCameron Pipeline
TRACT NO.
EAST - 185.00
TRACT NO.
EAST - 184.00
B
B
Sheet 29
TRACT NO.
EAST - 185.00
TRACT NO.
EAST - 184.00
B
B
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 16.2 TO 17.1
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-118
TransCameron Pipeline
TRACT NO.
EAST - 186.00
C
PRIVATE RD
PRIVATE RD
TRACT NO.
EAST - 185.00
C
Sheet 30
TRACT NO.
EAST - 186.00
C
November 2017
PRIVATE RD
PRIVATE RD
C
TRACT NO.
EAST - 185.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 17.1 TO 18.1
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-119
TRACT NO.
EAST - 184.0
0
TransCameron Pipeline
TRACT NO.
EAST - 187.00
TRACT NO.
EAST - 186.00
PRIVATE RD
TRACT NO.
EAST - 184.0
0
Sheet 31
TRACT NO.
EAST - 187.00
TRACT NO.
EAST - 186.00
PRIVATE RD
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 18.1 TO 19.1
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-120
TransCameron Pipeline
TRACT NO.
EAST - 188.00
AMACO
RD
Sheet 32
TRACT NO.
EAST - 188.00
November 2017
RD
AMACO
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 19.1 TO 20.1
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-121
TransCameron Pipeline
O
AC
AM
TRACT NO.
EAST - 189.00
RD
TRACT NO.
EAST - 188.00
Sheet 33
O
AC
AM
TRACT NO.
EAST - 189.00
RD
TRACT NO.
EAST - 188.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 20.1 TO 21.1
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-122
TransCameron Pipeline
TRACT NO.
EAST - 193.00
TRACT NO.
EAST - 193.50
TRACT NO.
EAST - 191.00
TRACT NO.
EAST - 191.00
Sheet 34
MAR
SHA
LL S
TRACT NO.
EAST - 194.00
TRACT NO.
EAST - 190.00
T
O.
T N .00
AC 193
R
T T
S
EA
T
TRACT NO.
EAST - 195.00
TRACT NO.
EAST - 193.00
SHA
TRACT NO.
EAST - 193.50
MAR
TRACT NO.
EAST - 194.00
.
NO 0
CT 93.0
A
1
TR T S
EA
TRACT NO.
EAST - 190.00
LL S
TRACT NO.
EAST - 195.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 21.1 TO 22.0
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-123
TransCameron Pipeline
TRACT NO.
EAST - 196.00
TRACT NO.
EAST - 195.00
Sheet 35
TRACT NO.
EAST - 196.00
TRACT NO.
EAST - 195.00
November 2017
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 22.0 TO 22.9
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-124
TRACT NO.
EAST - 196.00
PRIVATE
RD
TransCameron Pipeline
TRACT NO.
EAST - 197.00
November 2017
TRACT NO.
EAST - 196.00
PRIVATE
RD
Sheet 36
TRACT NO.
EAST - 197.00
42" NATURAL GAS PIPELINE
PROPOSED EAST LATERAL PIPELINE MILEPOST 22.9 TO 23.4
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PIPELINE MATERIAL SUMMARY
REVISIONS
TCPPL-M-125
TransCameron Pipeline
R
IVE
TRACT NO.
EAST - 02.00
RD.
R
AU
ENT
RM
ME
ATWS
1.15 AC
ATWS
0.94 AC
ATWS
5.10 AC
ATWS
0.88 AC
Sheet 37
November 2017
MERMENTAU RIVER ROAD HDD DETAIL
EAST LATERAL - M.P. 0.5
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
RE-ISSUED FOR PERMITTING
PURPOSES ONLY
10/31/2017
NOT FOR CONSTRUCTION
REVISIONS
TCPPL-M-200
TransCameron Pipeline
KINGS BAYOU
ATWS
1.38 AC
TRACT NO.
EAST - 04.00
TRACT NO.
EAST - 03.00
ATWS
1.15 AC
ATWS
2.87 AC
TRACT NO.
EAST - 02.00
Sheet 38
November 2017
RE-ISSUED FOR PERMITTING
PURPOSES ONLY
10/31/2017
NOT FOR CONSTRUCTION
KINGS BAYOU HDD DETAIL
EAST LATERAL - M.P. 0.5
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-201
ATWS
0.63 AC
EAST CREOLE HWY
TransCameron Pipeline
NO TRACT NO.
SURVEY
CORRIDOR
ATWS
5.02 AC
TRACT NO.
EAST - 63.50
ATWS
1.38 AC
TRACT NO.
EAST -63.00
TRACT NO.
EAST - 65.00
TRACT NO.
EAST - 64.00
Sheet 39
November 2017
RE-ISSUED FOR PERMITTING
PURPOSES ONLY
10/31/2017
NOT FOR CONSTRUCTION
E. CREOLE HWY HDD DETAIL
EAST LATERAL - M.P. 8.3
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-202
HWY 27
TransCameron Pipeline
TRACT NO.
EAST - 83.75
TRACT NO.
EAST - 84.00
TRACT NO.
EAST - 75.00
TRACT NO.
EAST - 67.00
ATWS
0.64 AC
ATWS
0.57 AC
W. CREOLE HWY
TRACT NO.
EAST - 70.00
TRACT NO.
EAST - 71.00
TRACT NO.
EAST - 72.00
TRACT NO.
EAST - 73.00
TRACT NO.
EAST - 74.00
TRACT NO.
EAST - 80.00
TRACT NO.
EAST - 77.00
TRACT NO.
EAST - 81.00
TRACT NO.
EAST - 79.00
TRACT NO.
EAST - 82.00
TRACT NO.
EAST - 83.50
TRACT NO.
EAST - 83.00
TRACT NO.
EAST - 69.00
TRACT NO.
EAST - 66.00
Sheet 40
November 2017
RE-ISSUED FOR PERMITTING
PURPOSES ONLY
10/31/2017
NOT FOR CONSTRUCTION
W. CREOLE HWY - HWY 27 HDD DETAIL
EAST LATERAL - M.P. 9.4
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-203
RAYMOND
RICHARD RO
AD
TransCameron Pipeline
TRACT NO.
EAST - 85.00
TRACT NO.
EAST - 87.00
ATWS
0.64 AC
ATWS
1.38 AC
TRACT NO.
EAST - 84.00
TRACT NO.
EAST - 86.00
TRACT NO.
EAST - 88.00
Sheet 41
November 2017
RE-ISSUED FOR PERMITTING
PURPOSES ONLY
08/19/2016
NOT FOR CONSTRUCTION
RAYMOND RICHARD ROAD HDD DETAIL
EAST LATERAL - M.P. 9.4
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-204
TransCameron Pipeline
TRACT NO.
EAST - 184.00
TRACT NO.
EAST - 187.00
AMACO RD
Sheet 42
November 2017
RE-ISSUED FOR PERMITTING
PURPOSES ONLY
10/31/17
NOT FOR CONSTRUCTION
AMACO ROAD HDD DETAIL
EAST LATERAL - M.P. 19.1
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-205
HWY 27
TransCameron Pipeline
TRACT NO.
EAST - 194.00
TRACT NO.
EAST - 193.00
TRACT NO.
EAST - 193.00
ATWS
1.38 AC
ATWS
0.57 AC
MARSH
ALL
STREE
T
TRACT NO.
EAST - 193.50
TRACT NO.
EAST - 190.00
Sheet 43
November 2017
RE-ISSUED FOR PERMITTING
PURPOSES ONLY
10/31/2017
NOT FOR CONSTRUCTION
MARSHALL STREET - HWY 27 HDD DETAIL
EAST LATERAL - M.P. 21.3
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-206
TransCameron Pipeline
ATWS
0.57 AC
TRACT NO.
EAST - 196.00
TRACT NO.
EAST - 197.00
Sheet 44
November 2017
RE-ISSUED FOR PERMITTING
PURPOSES ONLY
10/31/2017
NOT FOR CONSTRUCTION
EAST LATERAL - TO TERMINAL HDD DETAIL
EAST LATERAL - M.P. 23.0
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-207
TransCameron Pipeline
TRACT NO.
EAST - 182.00
TRACT NO.
EAST - 182.50
TRACT NO.
EAST - 183.50
A
T
PRIVATE RD
PRIVATE RD
T
A
PLAN VIEW
Sheet 45
PROFILE VIEW
AMPHIBIOUS
EXCAVATOR
(W/O MATS)
AMPHIBIOUS
EXCAVATOR
(W/O MATS)
CROSS SECTION T-T
TYPICAL SECTION - NO ATWS
CROSS SECTION A-A
November 2017
OW027 AND OW029 CROSSING
EAST LATERAL M.P. 15.1 TO M.P. 15.9
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-208
TransCameron Pipeline
TRACT NO.
EAST - 184.00
B
B
PLAN VIEW
Sheet 46
PROFILE VIEW
AMPHIBIOUS
EXCAVATOR
(W/O MATS)
CROSS SECTION B-B
November 2017
OW021 AND OW022 CROSSING
EAST LATERAL M.P. 16.2 TO M.P. 17.0
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-209
TransCameron Pipeline
C
TRACT NO.
EAST - 185.00
PRIVATE RD
C
PLAN VIEW
Sheet 47
PROFILE VIEW
AMPHIBIOUS
EXCAVATOR
(W/O MATS)
CROSS SECTION C-C
November 2017
OW016, OW017, OW018, OW019 & OW021 CROSSING
EAST LATERAL M.P. 17.0 TO M.P. 17.8
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
REVISIONS
TCPPL-M-210
30' ENLINK/BRIDGELINE
PIPELINE
PERMANENT ROW
15'
CONSTRUCTION ROW LIMITS
EXISTING ENLINK/BRIDGELINE
PERMANENT ROW LIMIT
SPOIL
BANK
SPOIL BANK
CONSTRUCTION ROW LIMITS
15'
PROPOSED
PIPELINE ALIGNMENT
TRENCH
AMPHIBIOUS
EXCAVATOR
(W/O MATS)
PLAN VIEW
NOT TO SCALE
EX.
ENLINK/BRIDGELINE
PIPELINE
4'
PIPELINE
EXISTING ENLINK/BRIDGELINE
PERMANENT ROW LIMIT
CONSTRUCTION ROW LIMITS
1
15'
15'
9.5'-10'
MIN.
SPOIL BANK
4'
2
2
1
1
1
APPROX. CROSS SECTION
OF FLOTATION DITCH
Ø42" PIPE, X70, WT=.500",
WITH 6" CONCRETE WEIGHT
COATING (CWC),
OUTSIDE O.D. WITH CWC= 54"
BOTTOM
OF DITCH
10' APPROX.
20'
TRAFFIC
ACCESS
OR SPOIL
AREA
55'
60' WORKING SIDE/ SPOIL SIDE APPROX.
30' WIDE
DITCH APPROX.
15'
35'
CONSTRUCTION ROW LIMITS
EX. ENLINK/BRIDGELINE
AMPHIBIOUS
EXCAVATOR
(W/O MATS)
3' MIN.
COVER
15'
60' TEMPORARY ROW
50' PERMANENT ROW
30' ENLINK/BRIDGELINE
PIPELINE
PERMANENT ROW
110' CONSTRUCTION ROW
PROFILE VIEW
NOT TO SCALE
NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
CONSTRUCTION RIGHT-OF-WAY (ROW) WILL TYPICALLY BE 110 FEET WIDE CONSISTING OF 50 FEET
PERMANENT EASEMENT AND UP TO 60 FEET OF TEMPORARY WORKSPACE. ATWS WILL BE NECESSARY AT
FOREIGN PIPELINE, GRAVEL ROAD, CANAL CROSSINGS AND OTHER SPECIAL CIRCUMSTANCES.
RESTRICT ROOT GRUBBING TO TRENCH AREA.
TOPSOIL SALVAGE IS NOT REQUIRED IN SATURATED SOIL.
UTILIZES AMPHIBIOUS EXCAVATORS AND OTHER SUPPORT EQUIPMENT.
KEEP SOIL PILES CLEAN OF ALL CONSTRUCTION DEBRIS.
LEAVE GAPS IN SPOIL PILES AT OBVIOUS DRAINAGES. DO NOT PUSH UPLAND SOILS INTO CREEKS OR
WETLANDS.
FABRICATE PIPE IN ATWS STAGING AREAS.
BACKFILL TRENCH WITH NATIVE MATERIAL AS EXCAVATED. AVOID SCALPING VEGETATED GROUND
SURFACE WHEN BACKFILLING.
WORK METHOD
TYPICAL PUSH
TYPICAL PUSH
TYPICAL PUSH
APPLICABLE STATIONING
52+62 - 418+30
532+20 - 996+50
1016+10 - 1122+60
FIGURE 1.3-15a(4)
TYPICAL PUSH SECTION ROW (PARALLEL TO EX. ENLINK/BRIDGELINE PIPELINE)
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
CAMERON PARISH, LOUISIANA
DRAWING NUMBER:
SCALE:
FIGURE 1.3-15a(4)
TransCameron Pipeline
DATE:
NTS
Sheet 48
07/27/2015
REV:
08/19/16
DRAWN BY:
KBI
November 2017
FOR HDD ENTRY SITE
SEE FIGURE 1.3-15b(2)
FOR HDD EXIT SITE
SEE FIGURE 1.3-15b(3)
LENGTH OF DRILL
(1600' - 4800' APPROX.)
HDD
EXIT
35'
PROPOSED
PIPELINE
100' MIN
C/L CROSSING
100' ATWS
100' MIN
210' MAXIMUM
15'
60'
TEMPORARY
ROW
110' CONSTRUCTION ROW
50'
PERMANENT
ROW
HDD
ENTRY
250' MAXIMUM
250' MAXIMUM
PLAN VIEW
NOT TO SCALE
ENTRY SIDE
EXIT SIDE
DRILL RIG
SUPPORT
EQUIPMENT
ENTRY PIT
(SEE NOTE 1)
EXIT PIT
(SEE NOTE 1)
WATERBODY
CONCEPTUAL PIPE PROFILE
15' MIN
NOTES:
1. SEE HDD SITE SPECIFIC PLAN FOR TIE-IN EXCAVATION.
PROFILE VIEW
NOT TO SCALE
FIGURE 1.3-15b(1)
TYPICAL HDD CONSTRUCTION ROW
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
CAMERON PARISH, LOUISIANA
DRAWING NUMBER:
SCALE:
FIGURE 1.3-15b(1)
TransCameron Pipeline
NONE
Sheet 49
DATE:
07/29/2015
REV:
12/21/2015
DRAWN BY:
KBI
November 2017
250' MAXIMUM
VEHICLE
PARKING
LIGHT
PLANT
LIGHT
PLANT
SUPPLY
TRAILER
PIPELINE R.O.W.
210' MAXIMUM
DESILTER
POWER
UNIT
5
9
SURVEY
TRAILER
LIGHT
PLANT
13
SHAKER
DRILLED PATH
CENTERLINE
DRILLING RIG
SEE NOTE 4
2
SPOIL
CONTAINER
3
4
1
1
6
12
MUD
RIG
CONTAIMENT
BERM
ENTRY PIT
11
PIPELINE R.O.W.
8
DRILL
PIPE
10
STORAGE
FOR BULK
MUD AND
AUXILIARY
EQUIPMENT
7
TYPICAL
WORKSPACE
LIMITS
ACCESS ROADLOCATION MAY VARY
EQUIPMENT:
1. SPOIL CONTAINER: 8' x 20'
2. SHAKER: 8' x 12'
3. DESILTER: 8' x 8"
4. MUD RIG: 8.5' x 45'
5. SUPPLY TRAILER: 8' x 25'
6. ENTRY PIT: 10' x 30'
7. STORAGE: 30' x 30'
8. VEHICLE PARKING: 15' x 50'
9. POWER UNIT: 8.5' x 40'
10. DRILL PIPE: 30' x 40'
11. CRANE: 10' x 20'
12. DRILLING RIG: 8.5' x 53'
13. SURVEY TRAILER: 8' x 25'
NOTES:
1.
EQUIPMENT ORIENTATION MAY VARY DEPENDING
ON CONTRACTOR OR SITE CONDITIONS.
2.
EQUIPMENT TO BE SUPPORTED ON THE GROUND
SURFACE OR TIMBER MATS AS CONDITIONS
DICTATE.
3.
SILT FENCE, BERMS AND/OR STRAW BALE BARRIER
TO BE USED AS REQUIRED TO PREVENT IMPACTS
FROM OCCURRING OUTSIDE OF PROJECT LIMITS.
4.
HAND CLEARED ACCESS PATH WILL BE USED TO
OBTAIN WATER FROM SOURCE WHERE PERMITTED.
ENTRY SITE PLAN
SCALE: N.T.S.
FIGURE 1.3-15b(2)
TYPICAL HDD ENTRY SITE
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
CAMERON PARISH, LOUISIANA
DRAWING NUMBER:
SCALE:
FIGURE 1.3-15b(2)
TransCameron Pipeline
NONE
Sheet 50
DATE:
12/23/15
REV:
01/21/16
DRAWN BY:
MFL
November 2017
250' MAXIMUM
VEHICLE
PARKING
8
DEWATERING
UNIT
PIPELINE R.O.W.
4
3
2
CONTAINMENT
SEE NOTE 4
PIPELINE R.O.W.
SPOIL
CONTAINER
1
MUD RIG
PIPE ROLLERS
6
EXIT PIT
DESILTER
60' SPACING
SHAKER
PIPE TRAILER
5
STORAGE
FOR BULK
MUD AND
AUXILIARY
EQUIPMENT
7
210' MAXIMUM
9
10
SUPPLY TRAILER
11
DRILL
PIPE
12
TYPICAL
WORKSPACE
LIMITS
EQUIPMENT:
1. SPOIL CONTAINER: 8' x 20'
2. SHAKER: 8' x 12'
3. DESILTER: 8' x 8"
4. MUD RIG: 8.5' x 45'
5. SUPPLY TRAILER: 8' x 25'
6. EXIT PIT: 10' x 30'
7. STORAGE: 30' x 30'
8. VEHICLE PARKING: 15' x 50'
9. DEWATERING UNIT 15' x 50'
10. PIPE TRAILER 8' x 40'
11. CRANE: 10' x 20'
12. DRILL PIPE: 30' x 40'
16'
NOTES:
1.
EQUIPMENT ORIENTATION MAY VARY DEPENDING
ON CONTRACTOR OR SITE CONDITIONS.
2.
EQUIPMENT TO BE SUPPORTED ON THE GROUND
SURFACE OR TIMBER MATS AS CONDITIONS
DICTATE.
3.
SILT FENCE, BERMS AND/OR STRAW BALE BARRIER
TO BE USED AS REQUIRED TO PREVENT IMPACTS
FROM OCCURRING OUTSIDE OF PROJECT LIMITS.
4.
HAND CLEARED ACCESS PATH WILL BE USED TO
OBTAIN WATER FROM SOURCE WHERE PERMITTED.
EXIT SITE PLAN
SCALE: N.T.S.
FIGURE 1.3-15b(3)
TYPICAL HDD EXIT SITE
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
CAMERON PARISH, LOUISIANA
DRAWING NUMBER:
SCALE:
FIGURE 1.3-15b(3)
TransCameron Pipeline
NONE
Sheet 51
DATE:
12/23/15
REV:
01/06/16
DRAWN BY:
KJP
November 2017
ACCESS ROADLOCATION MAY VARY
SWAMP/MARSH
BOUNDARY
DITCH
SPOIL
35'
PIPE ROLLERS
WELD INSPECTION
STALL
15'
6- WELDING STALLS
1-BEAD &
4-FILL
HOT PASS
1-CAP
60'
TEMPORARY ROW
50'
PERMANENT ROW
DITCH
(FILLED WITH
WATER)
COATING & SANDBLASTING
STALL
DITCH
SPOIL
100' ATWS
PIPELINE
FLOATS
PIPE STORAGE AREA
MATERIAL
&
EQUIPMENT
LAY DOWN
AREA
PIPE
OFFLOADING
AREA
PUSH PAD LENGTH APPROXIMATELY 600 FT.
PLAN VIEW
NOT TO SCALE
AMPHIBIOUS EXCAVATOR
TEMPORARY
BOARD MATS
PIPELINE
± 10'
PIPE DITCH
TO BE
BACKFILLED
NATURAL
GROUND
LOCATION OF PUSH SITES
SIDE VIEW
EAST LATERAL
MP
NOT TO SCALE
0.99
2.77
7.83
10.04
NOTES:
18.79
1.
2.
3.
19.75
WORKSPACE SHOWN IS TYPICAL FOR MARSH-TYPE CONSTRUCTION.
AS THE PIPE IS WELDED, THE BULLDOZER PULLS THE STRING INTO THE DITCH.
TIMBER MATS ARE REQUIRED.
21.16
FIGURE 1.3-15c
TYPICAL PUSH SITE (WETLAND CROSSING)
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
CAMERON PARISH, LOUISIANA
DRAWING NUMBER:
SCALE:
FIGURE 1.3-15c
TransCameron Pipeline
NONE
Sheet 52
DATE:
07/28/2015
REV:
01/28/16
DRAWN BY:
KBI
November 2017
TEMPORARY BOARD MATS
(APPROX. 10" THICK)
16'
EXISTING GRADE
TYPICAL TEMPORARY ACCESS ROAD
CROSS SECTION
NOT TO SCALE
LEGEND
EXISTING FILL
PROPOSED FILL
14' OR 22'
12' OR 20'
EXISTING GRADE
ASSUME EL. 0.00'
(ACTUAL ELEVATION WILL
VARY, DEPENDING ON
LOCATION)
MAX 6" COARSE
BASE
2% SLOPE
(CROWN OR PITCH
ROAD AS NEEDED)
PROPOSED GRADE
ASSUME EL. 0.50'
GEOTEXTILE
FABRIC
TYPICAL PERMANENT ACCESS ROAD
CROSS SECTION
NOT TO SCALE
FIGURE 1.3-15d
TYPICAL TEMPORARY ACCESS ROAD AND PERMANENT ACCESS ROAD CROSS SECTION
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
CAMERON PARISH, LOUISIANA
DRAWING NUMBER:
SCALE:
FIGURE 1.3-15d
TransCameron Pipeline
NONE
Sheet 53
DATE:
07/28/2015
REV:
08/26/16
DRAWN BY:
KBI
November 2017
APPROACH
STONE FILL
APPROACH
STONE FILL
TEMPORARY
BRIDGE
(CONSTRUCTION MATS)
ACCESS ROAD
TRENCH
ACCESS ROAD
CORRUGATED STEEL
SHEET PILES
(30"L x 20'H APPROX.)
PROPOSED
Ø42" PIPE, X70, WT=.500",
WITH 6" CONCRETE
WEIGHT COATING (CWC),
OUTSIDE O.D. WITH CWC= 54"
PIPELINE
FLOATS
PLAN VIEW
NOT TO SCALE
60'
TEMPORARY
BRIDGE
EXISTING GRADE
ASSUMED EL. 0.00'
(ACTUAL ELEVATION
WILL VARY DEPENDING ON
LOCATION)
SLOPE 8-10%
PROPOSED GRADE
ASSUMED EL. 1.00'
MAXIMUM FILL VOLUME 60 CF
BASED ON 10% SLOPE
(L=10'; W=12'; H=1')
APPROACH
STONE FILL
1.5' MIN
CORRUGATED STEEL
SHEET PILES
(30"L x 20'H APPROX.)
10' ±
LEGEND
PIPELINE
FLOATS
10'±
EXISTING FILL
PROPOSED FILL
PROPOSED
PIPELINE
PROFILE VIEW
NOT TO SCALE
EAST LATERAL STA.
185+40
802+90
224+00
818+50
236+50
833+10
257+40
937+50
679+00
1065+50
778+10
FIGURE 1.3-15e
TYPICAL ACCESS ROAD CROSSING
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
CAMERON PARISH, LOUISIANA
DRAWING NUMBER:
SCALE:
FIGURE 1.3-15e
TransCameron Pipeline
DATE:
NTS
Sheet 54
07/29/2015
REV:
08/26/2016
DRAWN BY:
KBI
November 2017
A
EX. TOP OF BANK
EX. DITCH WIDTH
(VARIES 11' to 40')
EX. DITCH BOTTOM
(VARIES 5' to 25')
ACCESS ROAD
CULVERT
EX. DITCH TOE
DRAINAGE
ACCESS ROAD WIDTH
(VARIES 12' to 20')
EX. TOP OF BANK
A
TYPICAL ACCESS ROAD CULVERT
PLAN VIEW
EX. DITCH DEPTH
(VARIES 2' to 5')
NOT TO SCALE
ROAD SECTION
(MATERIAL VARIES)
OUTER DIAMETER
(VARIES 12" to 36")
EXISTING SURFACE
1
EX. DITCH LINE
x
FILL MATERIAL
CULVERT
EX. GROUND
1
4
CIRCUMFERENCE
TYPICAL ACCESS ROAD CULVERT
CROSS SECTION A-A
NOT TO SCALE
PIPELINE LATERAL /
MILEPOST
ROAD WIDTH
(FT)
FILL MATERIAL
GRAVEL
20
GRANULAR
44.4
TIMBER MATS
16
GRAVEL
32.6
16
GRAVEL
16
PIPE
MATERIAL
ACCESS ROAD
NAME
ROAD
SURFACE
EAST LATERAL / 0.00
RCP
PAR 1
EAST LATERAL / 1.04
CMP
TAR 4
EAST LATERAL / 9.46
CMP
TAR 12
TIMBER MATS
ESTIMATED FILL
(CYD)
NOTES:
1.
2.
3.
CULVERT TYPE (MATERIAL) DETERMINED BY LOCAL ORDINANCE.
MULTIPLE CULVERTS MAY BE REQUIRED TO MAINTAIN DITCH FLOW IN SELECT LOCATIONS.
FILL QUANTITIES DO NOT EXCLUDE THE VOLUME OF PROPOSED CULVERT.
TYPICAL ACCESS ROAD CULVERT
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
PLAQUEMINES PARISH, LOUISIANA
DRAWING NUMBER:
SCALE:
DATE:
NTS
TransCameron Pipeline
Sheet 55
02/15/2016
REV:
02/22/2016
DRAWN BY:
MFL
November 2017
WATERBODY
50' MIN.
UPLAND
SPOIL
50' MIN.
10'
MIN.
10'
MIN.
WATERBODY
SPOIL
(IF NECESSARY)
SPOIL
ATWS
(OPTIONAL)
50'
UPLAND
SPOIL
35'
PERMANENT ROW
PERMANENT ROW
(X)
110' CONSTRUCTION ROW
SPOIL
ATWS
(OPTIONAL)
60'
TEMPORARY
ROW
50'
150'
50'
PERMANENT
ROW
150'
PROPOSED
PIPELINE
PLAN VIEW
NOT TO SCALE
WATERBODY
(Y)
3' MIN
PROPOSED
PIPELINE
MUDLINE
SIDE VIEW
NOT TO SCALE
WATERBODY
SPOIL
3' MIN
PIPE
DITCH
50'
PERMANENT
ROW
60'
TEMPORARY
ROW
110' CONSTRUCTION ROW
END VIEW
MAJOR WATERBODY CROSSINGS
CAMERON PARISH, LOUISIANA
LATERAL
#
M.P.
WIDTH (X)
DEPTH (Y)
ATWS
EAST
WB032
0.2
196
2.5'
N/A
HDD
EAST
OW044
0.3
139
3.5'
N/A
HDD
REFERENCE DWG.
EAST
OW037
9.3
131
3.0'
N/A
HDD
EAST
OW036
9.9
244
3.0'
N/A
HDD
EAST
OW052d
14.9
112
2.0'
N/A
TYPICAL
EAST
OW029
15.2
1300
1.7'
N/A
SITE SPECIFIC
EAST
OW027
15.5
1100
0.9'
N/A
SITE SPECIFIC
EAST
OW022
16.4
539
1.3'
N/A
SITE SPECIFIC
EAST
OW021
16.6
3574
1.8'
N/A
SITE SPECIFIC
EAST
OW019
17.4
375
0.8'
N/A
SITE SPECIFIC
EAST
OW018
17.5
694
0.2'
N/A
SITE SPECIFIC
EAST
OW016
17.8
323
1.4'
N/A
SITE SPECIFIC
EAST
OW015
17.9
198
1.2'
N/A
TYPICAL
EAST
OW013
18.0
108
1.2'
N/A
TYPICAL
EAST
OW005
20.3
385
0.6'
YES
TYPICAL
FIGURE 1.3-15f
MAJOR WATERBODY CROSSINGS
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
DRAWING NUMBER:
SCALE:
FIGURE 1.3-15f
TransCameron Pipeline
NONE
Sheet 56
DATE:
08/04/2015
REV:
08/27/2015
DRAWN BY:
KBI
November 2017
PLAN VIEW
NOT TO SCALE
ELEVATION VIEW
NOT TO SCALE
FIGURE 1.3-15g
TYPICAL MAIN LINE VALVE
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
CAMERON PARISH, LOUISIANA
DRAWING NUMBER:
Figure 1.3-15g
TransCameron Pipeline
SCALE:
NONE
Sheet 57
DATE:
07/29/2015
REV:
01/15/16
DRAWN BY:
ENE/KJP
November 2017
FIGURE 1.3-16a
PLOT PLAN - ANR/BRIDGELINE METER STATION
TRANSCAMERON PIPELINE PROJECT
CAMERON PARISH, LOUISIANA
DRAWING NUMBER:
FIGURE 1.3-16a
TransCameron Pipeline
SCALE:
NONE
Sheet 58
DATE:
08/05/2015
REV:
01/28/2016
DRAWN BY:
ENE/KJP
November 2017
FIGURE 1.3-16b
SECTION PLAN - ANR/BRIDGELINE METER STATION
TRANSCAMERON PIPELINE PROJECT
CAMERON PARISH, LOUISIANA
DRAWING NUMBER:
FIGURE 1.3-16b
TransCameron Pipeline
SCALE:
NONE
Sheet 59
DATE:
01/12/2016
REV:
01/28/2016
DRAWN BY:
ENE/KJP
November 2017
TransCameron Pipeline
TRANSCAMERON
PIPELINE,
LLC
CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT
EAST LATERAL ACCESS ROADS
CAMERON PARISH, LOUISANA
Sheet 60
November 2017
SHEET
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
DRAWING
NUMBER
TCPPL-M-502
TCPPL-M-502.1
TCPPL-M-502.2
TCPPL-M-502.3
TCPPL-M-502.4
TCPPL-M-502.5
TCPPL-M-502.6
TCPPL-M-502.7
TCPPL-M-502.8
TCPPL-M-502.9
TCPPL-M-502.10
TCPPL-M-502.11
TCPPL-M-502.12A
TCPPL-M-502.12B
TCPPL-M-502.13
TCPPL-M-502.14
TCPPL-M-502.15
TCPPL-M-502.16
TCPPL-M-502.17
TCPPL-M-502.18A
TCPPL-M-502.18B
TCPPL-M-502.19A
TCPPL-M-502.19B
TCPPL-M-502.19C
TCPPL-M-502.20A
TCPPL-M-502.20B
TCPPL-M-502.20C
TCPPL-M-502.20D
TCPPL-M-502.21
TCPPL-M-502.22
TCPPL-M-502.23
TCPPL-M-502.24A
TCPPL-M-502.24B
REV.
C
B
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
TITLE
COVER SHEET
LOCATION MAP
PERMANENT ACCESS ROAD #1
TEMPORARY ACCESS ROAD #2
TEMPORARY ACCESS ROAD #3
TEMPORARY ACCESS ROAD #4
TEMPORARY ACCESS ROAD #5
TEMPORARY ACCESS ROAD #6
TEMPORARY ACCESS ROAD #7
TEMPORARY ACCESS ROAD #8
TEMPORARY ACCESS ROAD #9
TEMPORARY ACCESS ROAD #10
PERMANENT ACCESS ROAD #11
TEMPORARY ACCESS ROAD #11
TEMPORARY ACCESS ROAD #12
TEMPORARY ACCESS ROAD #13
TEMPORARY ACCESS ROAD #14
TEMPORARY ACCESS ROAD #15
TEMPORARY ACCESS ROAD #16
TEMPORARY ACCESS ROAD #17
TEMPORARY ACCESS ROAD #17
TEMPORARY ACCESS ROAD #18
TEMPORARY ACCESS ROAD #18
TEMPORARY ACCESS ROAD #18
TEMPORARY ACCESS ROAD #19
TEMPORARY ACCESS ROAD #19
TEMPORARY ACCESS ROAD #19
TEMPORARY ACCESS ROAD #19
TEMPORARY ACCESS ROAD #20
TEMPORARY ACCESS ROAD #21
TEMPORARY ACCESS ROAD #22
TEMPORARY ACCESS ROAD #23
TEMPORARY ACCESS ROAD #23
C
B
A
08/19/16
06/21/16
02/23/16
REV.
LEVEL
DATE
TCB REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
FOR REVIEW
TCB
BY
DESCRIPTION
DK
CK.
APP.
REVISIONS
COVER SHEET
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
LOUISIANA
CAMERON PARISH
DATE:
02/03/16
SCALE:
DRAWN BY: LOC. NO:
NTS
AS
DRAWING NUMBER:
TCPPL-M-502
SHEET NO:
1
REV:
C
TransCameron Pipeline
Sheet 61
November 2017
TransCameron Pipeline
U
TA
EN RD
M
ER ER
M RIV
Sheet 62
TRACT NO.
EAST - 02.00
TRACT NO.
EAST - 01.00
D
C
B
A
REV.
LEVEL
08/26/16
08/19/16
06/21/16
02/23/16
TCB
REVISED PER CLIENT COMMENT
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT
AS
ISSUED FOR PERMIT
DATE
BY
NP
NP
TCB
TCB
DK
CK.
APP.
DESCRIPTION
November 2017
REVISIONS
PERMANENT ACCESS ROAD #1
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=300'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.2
SHEET NO:
3
REV:
D
ME
R
RI ME
VE N
R TA
RD U
TransCameron Pipeline
Sheet 63
TRACT NO.
EAST - 02.00
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
TRACT NO.
EAST - 01.00
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #2
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=300'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.3
SHEET NO:
4
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 02.00
TRACT NO.
EAST - 03.00
Sheet 64
U
NTA
ME RD
R
ME VER
RI
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
-
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #3
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=200'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.4
SHEET NO:
5
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 03.00
TRACT NO.
EAST - 03.00
ME
R
RIV MEN
ER TAU
RD
Sheet 65
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #4
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=200'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.5
SHEET NO:
6
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 10.00
TRACT NO.
EAST - 09.00
Sheet 66
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #5
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=300'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.6
SHEET NO:
7
REV:
C
TRACT NO.
EAST - 16.00
TRACT NO.
EAST - 4.00
TRACT NO.
EAST - 17.00
TRACT NO.
EAST - 19.00
TRACT NO.
EAST - 18.00
TransCameron Pipeline
TRACT NO.
EAST - 20.00
TRACT NO.
EAST - 21.00
Sheet 67
TRACT NO.
EAST - 22.00
NO TRACT NO.
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #6
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=300'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.7
SHEET NO:
8
REV:
C
TRACT NO.
EAST - 27.00
Sheet 68
TRACT NO.
EAST - 30.00
TRACT NO.
EAST - 26.00
TransCameron Pipeline
TRACT NO.
EAST - 28.00
NO TRACT NO.
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #7
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=300'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.8
SHEET NO:
9
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 31.00
Sheet 69
TRACT NO.
EAST - 32.00
TRACT NO.
EAST - 30.00
ACCESS ROAD IMPROVEMENTS
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
NO TRACT NO.
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #8
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=300'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.9
SHEET NO:
10
REV:
C
TransCameron Pipeline
Sheet 70
TRACT NO.
EAST - 60.00
TRACT NO.
EAST - 59.00
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #9
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=400'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.10
SHEET NO:
11
REV:
C
TRACT NO.
EAST - 63.50
TRACT NO.
EAST - 63.00
TransCameron Pipeline
NO TRACT NO.
Sheet 71
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #10
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=300'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.11
SHEET NO:
12
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 65.00
NO TRACT NO.
TRACT NO.
EAST - 66.00
Sheet 72
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
TRACT NO.
EAST - 63.50
November 2017
TRACT NO.
EAST - 64.00
TRACT NO.
EAST - 63.00
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
REVISIONS
PERMANENT ACCESS ROAD #11
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=200'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.12A
SHEET NO:
13
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 65.00
NO TRACT NO.
TRACT NO.
EAST - 66.00
Sheet 73
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
TRACT NO.
EAST - 63.50
November 2017
TRACT NO.
EAST - 64.00
TRACT NO.
EAST - 63.00
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
REVISIONS
TEMPORARY ACCESS ROAD #11
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=200'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.12B
SHEET NO:
14
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 84.00
Sheet 74
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #12
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=200'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.13
SHEET NO:
15
REV:
C
TransCameron Pipeline
Sheet 75
November 2017
RAYMOND
RICHARD RD
TRACT NO.
EAST - 88.00
TRACT NO.
EAST - 85.00
TRACT NO.
EAST - 87.00
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
REVISIONS
TEMPORARY ACCESS ROAD #13
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=200'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.14
SHEET NO:
16
REV:
C
TransCameron Pipeline
N
RO 32
E
M H3
CA RIS
PA
TRACT NO.
EAST - 115.00
Sheet 76
TRACT NO.
EAST - 113.00
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #14
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=200'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.15
SHEET NO:
17
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 182.00
TRACT NO.
EAST - 180.00
Sheet 77
NO TRACT NO.
TRACT NO.
EAST - 179.00
NO TRACT NO.
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #15
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=400'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.16
SHEET NO:
18
REV:
C
TRACT NO.
EAST - 182.50
TRACT NO.
EAST - 182.00
TRACT NO.
EAST - 180.00
TransCameron Pipeline
TRACT NO.
EAST - 183.50
Sheet 78
NO TRACT NO.
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
ML REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #16
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=400'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.17
SHEET NO:
19
REV:
C
TransCameron Pipeline
Sheet 79
NO TRACT NO.
TRACT NO.
EAST - 184.00
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #17
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=500'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.18A
SHEET NO:
20
REV:
C
TransCameron Pipeline
NO TRACT NO.
Sheet 80
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #17
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/23/16
SCALE:
1"=500'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.18B
SHEET NO:
21
REV:
C
TransCameron Pipeline
Sheet 81
TRACT NO.
EAST - 185.00
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #18
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/23/16
SCALE:
1"=500'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.19A
SHEET NO:
22
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 185.00
NO TRACT NO.
Sheet 82
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #18
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=500'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.19B
SHEET NO:
23
REV:
C
TransCameron Pipeline
NO TRACT NO.
Sheet 83
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #18
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/23/16
SCALE:
1"=500'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.19C
SHEET NO:
24
REV:
C
TransCameron Pipeline
Sheet 84
TRACT NO.
EAST - 188.00
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #19
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=500'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.20A
SHEET NO:
25
REV:
C
TransCameron Pipeline
Sheet 85
TRACT NO.
EAST - 188.00
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TRACT NO.
EAST - 189.00
TEMPORARY ACCESS ROAD #19
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=500'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.20B
SHEET NO:
26
REV:
C
TransCameron Pipeline
Sheet 86
TRACT NO.
EAST - 189.00
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
NO TRACT NO.
TEMPORARY ACCESS ROAD #19
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=500'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.20C
SHEET NO:
27
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 189.00
Sheet 87
NO TRACT NO.
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #19
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=500'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.20D
SHEET NO:
28
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 188.00
TRACT NO.
EAST - 187.00
Sheet 88
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #20
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=400'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.21
SHEET NO:
29
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 190.00
TRACT NO.
EAST - 191.00
Sheet 89
NO TRACT NO.
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #21
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=200'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.22
SHEET NO:
30
REV:
C
TransCameron Pipeline
TRACT NO.
EAST - 193.00
TRACT NO.
EAST - 193.50
TRACT NO.
EAST - 194.00
Sheet 90
NO TRACT NO.
TRACT NO.
EAST - 195.00
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
TRACT NO.
EAST - 196.00
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #22
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=500'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.23
SHEET NO:
31
REV:
C
TransCameron Pipeline
Sheet 91
TRACT NO.
EAST - 196.00
D
C
B
A
REV.
LEVEL
08/19/16
06/28/16
06/21/16
02/23/16
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT
CNW
REVISED PER NEW TERMINAL SITE PLAN REV. 14
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT
AS
ISSUED FOR PERMIT
DATE
BY
NP
TCB
TCB
TCB
DK
DK
CK.
APP.
DESCRIPTION
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #23
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=400'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.24A
SHEET NO:
32
REV:
D
TransCameron Pipeline
Sheet 92
TRACT NO.
EAST - 196.00
C
08/19/16
B
06/21/16
A
02/23/16
REV.
DATE
LEVEL
MFL REVISED PER LDNR COMMENTS; RE-ISSUED FOR PERMIT NP
CNW TITLE BLOCK REVISED FOR TRANSCAMERON AMENDMENT TCB
AS
ISSUED FOR PERMIT
TCB
BY
DESCRIPTION
DK
CK.
APP.
November 2017
REVISIONS
TEMPORARY ACCESS ROAD #23
EAST LATERAL ACCESS ROADS
CALCASIEU PASS TERMINAL AND
TRANSCAMERON PIPELINE PROJECT
PREPARED BY:
28100 TORCH PARKWAY
WARRENVILLE, IL. 60555
TEL. 630-353-4000
FAX 630-353-7777
WWW.ENENGINEERING.COM
LOUISIANA
CAMERON PARISH
DATE:
02/09/16
SCALE:
1"=400'
DRAWN BY: LOC. NO:
AS
DRAWING NUMBER:
TCPPL-M-502.24B
SHEET NO:
33
REV:
C
CalcasieuPassTerminalandTransCameronPipelineProject
CameronParish,Louisiana
SheetIndexandNotes
JPA Sheet Number
1
2
3
4
5
6
7
8A
8B
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
Contents
Sheet Index (Page 1 of 3)
Sheet Index (Page 2 of 3)
Sheet Index (Page 3 of 3)
Project Vicinity Map
General Notes
Quantities Summary for the Terminal Facilities - Table A
Quantities Summary for the Terminal Facilities - Table B
Estimated Fill Quantities Overview
Estimated Fill Quantities - Terminal Site
Road Plot Plan
Marine General Plan
Dredging Plan
LNG Marine Terminal Dredging Profiles and Sections (1 of 5)
LNG Marine Terminal Dredging Profiles and Sections (2 of 5)
LNG Marine Terminal Dredging Profiles and Sections (3 of 5)
LNG Marine Terminal Dredging Profiles and Sections (4 of 5)
LNG Marine Terminal Dredging Profiles and Sections (5 of 5)
Sand Location in Dredge Area Key Plan
Sand Location in Dredge Area - Section A-A
Sand Location in Dredge Area - Section B-B
Sand Location in Dredge Area - Section C-C and D-D
Sand Location in Dredge Area - Section E-E
River Slope Protection Plan
River Slope Protection Plan Sections (1 of 3)
River Slope Protection Plan Sections (2 of 3)
River Slope Protection Plan Sections (3 of 3)
Marine Berth - Overall Plan General Arrangement Layout (1 of 4)
Marine Berth - Overall Plan General Arrangement Layout (2 of 4)
Marine Berth - Overall Plan General Arrangement Layout (3 of 4)
Marine Berth - Overall Plan General Arrangement Layout (4 of 4)
Working Platform Northern and Southern Berths
Approach Trestle - Northern and Southern Berths (1 of 2)
Approach Trestle - Northern and Southern Berths (2 of 2)
Berthing Dolphins - Northern and Southern Berths
Fenders - Northern and Southern Berths
Mooring Dolphins - Northern and Southern Berths
Walkways - Northern and Southern Berths (1 of 3)
Walkways - Northern and Southern Berths (2 of 3)
Walkways - Northern and Southern Berths (3 of 3)
Pumping Firefighting Platform Index
Pumping Firefighting Platform Key Plan
Pumping Firefighting Platform Plans
Pumping Firefighting Platform Sections and Details
Pumping Firefighting Platform Grating, Handrail, Access & Rigging
Oil and Water Treatment Plant
Surficial and Underground Drainage Details - Index
Surficial and Underground Drainage 127-M0003 and Section A
Surficial and Underground Drainage 127-M0006 and Section B
Surficial and Underground Drainage 127-M0011 and Section C
Surficial and Underground Drainage 127-M0021 and Section D
Surficial and Underground Drainage 127-M0031 and Section E, F, and G
Surficial and Underground Drainage 127-M0041 and Section H
Sheet Purposely Omitted
Typical Section Profiles West-East Section A-A
Typical Section Profiles West-East Section A-A
Typical Section Profiles West-East Section A-A
Typical Section Profiles West-East Section B-B
Typical Section Profiles West-East Section B-B
Typical Section Profiles West-East Section C-C
Typical Section Profiles West-East Section C-C
Typical Section Profiles North-South Section D-D
Typical Section Profiles North-South Section D-D
Typical Section Profiles West-East Section E-E
Calcasieu Pass Terminal
Sheet 1
Drawing Reference
8581-200-OX-001-AE Sheet 1
8581-200-OG-D01-AD Sheet 1
8581-200-OG-D02_AD Sheet 1
8581-200-OG-D02_AD Sheet 2
8581-200-OG-D02_AD Sheet 3
8581-200-OG-D02_AD Sheet 4
8581-200-OG-D02_AD Sheet 5
8581-000-UR-003-A - Sheet 1
8581-000-UR-003-A - Sheet 2
8581-000-UR-003-A - Sheet 3
8581-000-UR-003-A - Sheet 4
8581-000-UR-003-A - Sheet 5
8581-200-OG-R01-AB Sheet 1
8581-200-OG-R02-AB Sheet 1
8581-200-OG-R02-AB Sheet 2
8581-200-OG-R02-AB Sheet 3
8581-200-OX-002-AD Sheet 1
8581-200-OX-002-AD Sheet 2
8581-200-OX-002-AD Sheet 3
8581-200-OX-002-AD Sheet 4
8581-200-OE-P01-AD Sheet 1
8581-200-OE-T01-AD Sheet 1
8581-200-OE-T01-AD Sheet 2
8581-200-OE-B01-AB Sheet 1
8581-200-OM-002-AD Sheet 1
8581-200-OE-M01-AB Sheet 1
8581-200-OE-W01-AD Sheet 1
8581-200-OE-W01-AD Sheet 2
8581-200-OE-W01-AD Sheet 3
8581-200-OE-F01-AB Sheet 1
8581-200-OE-F01-AB Sheet 2
8581-200-OE-F01-AB Sheet 3
8581-200-OE-F01-AB Sheet 4
8581-200-OE-F01-AB Sheet 5
8581-127-CC-E01-A - Sheet 1
8581-100-CS-002-AS - Sheet 1
8581-100-CS-002-AS - Sheet 2
8581-100-CS-002-AS - Sheet 3
8581-100-CS-002-AS - Sheet 4
8581-100-CS-002-AS - Sheet 5
8581-100-CS-002-AS - Sheet 6
8581-100-CS-002-AS - Sheet 7
8581-000-UR-E02-A Sheet 1
8581-000-UR-E02-A Sheet 2
8581-000-UR-E02-A Sheet 3
8581-000-UR-E02-A Sheet 4
8581-000-UR-E02-A Sheet 5
8581-000-UR-E02-A Sheet 6
8581-000-UR-E02-A Sheet 7
8581-000-UR-002-A Sheet 8
8581-000-UR-002-A Sheet 9
8581-000-UR-002-A Sheet 10
November 2017
CalcasieuPassTerminalandTransCameronPipelineProject
CameronParish,Louisiana
SheetIndexandNotes
JPA Sheet Number
63
64
65
66A
66B
66C
66D
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
Contents
Typical Section Profiles West-East Section F-F
Access Road General Layout Index
Northeast Access Road Map Index (Includes Martin Access Road)
Typical Road Cross-Sections Northeast and Martin Access Roads
Drawing Reference
8581-000-UR-002-A Sheet 11
8581-000-UR-001-A Sheet 1
8581-000-UR-001-A Sheet 2
8581-000-UR-001-A Sheet 3
Additional Notes for Martin Access Road Construction and Land Restoration
Additional Notes for DeHyCo Access Road Construction and Land Restoration
Additional Notes for Northeast Access Road Construction
Northeast Access Road Plans (Drawing Index Sheet 4)
Northeast Access Road Plans (Drawing Index Sheet 5)
Northeast Access Road Plans (Drawing Index Sheet 6)
Northeast Access Road Plans (Drawing Index Sheet 7)
Northeast Access Road Plans (Drawing Index Sheet 8)
Northeast Access Road Plans (Drawing Index Sheet 9)
Northeast Access Road Plans (Drawing Index Sheet 10)
Northeast Access Road Plans (Drawing Index Sheet 11)
Northeast Access Road Plans (Drawing Index Sheet 12)
Northeast Access Road Plans (Drawing Index Sheet 13)
Martin Access Road Plans (Drawing Index Sheet 14)
Martin Access Road Plans (Drawing Index Sheet 15)
Northeast Access Road Profiles
Northeast Access Road Profiles
Northeast Access Road Profiles
Northeast Access Road Profiles
Northeast Access Road Profiles
Northeast Access Road Profiles
Northeast Access Road Profiles
Northeast Access Road Profiles
Northeast Access Road Profiles
Northeast Access Road Profiles
Northeast Access Road Culvert STA.5+24.26
Northeast Access Road Earthworks Report
Northeast Access Road Earthworks Report
Northeast Access Road Earthworks Report (Includes Martin Access Road )
Northwest Access Road Index Sheet and Typical Sections
Northwest Access Road Plans (Drawing Index Sheet 31)
Northwest Access Road Plans (Drawing Index Sheet 32)
Northwest Access Road Plans (Drawing Index Sheet 33)
Northwest Access Road Profiles
Northwest Access Road Profiles
Northwest Access Road Profiles
Northwest Access Road Earthworks Report
Structure ST.0+23.60 Martin Access Road
Culvert STA.5+70.00 Martin Access Road
Southwest Service Road to Jetty Pier Facility - Index
Southwest Service Road General Layout
Southwest Service Road Plans (Drawing Index Sheet 3 )
Southwest Service Road Plans (Drawing Index Sheet 4)
Southwest Service Road Plans (Drawing Index Sheet 5)
Southwest Service Road Plans (Drawing Index Sheet 6)
Southwest Service Road Plans (Drawing Index Sheet 7)
Southwest Service Road Plans (Drawing Index Sheet 8)
Southwest Service Road Plans (Drawing Index Sheet 9)
Southwest Service Road Plans (Drawing Index Sheet 10)
Southwest Service Road Plans (Drawing Index Sheet 11)
Southwest Service Road Plans (Drawing Index Sheet 12)
Southwest Service Road Plans (Drawing Index Sheet 13)
Southwest Service Road Plans (Drawing Index Sheet 14)
Southwest Service Road Plans (Drawing Index Sheet 15)
Southwest Service Road Plans (Drawing Index Sheet 16)
Southwest Service Road Profiles
Southwest Service Road Profiles
Southwest Service Road Profiles
Southwest Service Road Profiles
8581-000-UR-001-A Sheet 4
8581-000-UR-001-A Sheet 5
8581-000-UR-001-A Sheet 6
8581-000-UR-001-A Sheet 7
8581-000-UR-001-A Sheet 8
8581-000-UR-001-A Sheet 9
8581-000-UR-001-A Sheet 10
8581-000-UR-001-A Sheet 11
8581-000-UR-001-A Sheet 12
8581-000-UR-001-A Sheet 13
8581-000-UR-001-A Sheet 14
8581-000-UR-001-A Sheet 15
8581-000-UR-001-A Sheet 16
8581-000-UR-001-A Sheet 17
8581-000-UR-001-A Sheet 18
8581-000-UR-001-A Sheet 19
8581-000-UR-001-A Sheet 20
8581-000-UR-001-A Sheet 21
8581-000-UR-001-A Sheet 22
8581-000-UR-001-A Sheet 23
8581-000-UR-001-A Sheet 24
8581-000-UR-001-A Sheet 25
8581-000-UR-001-A Sheet 26
8581-000-UR-001-A Sheet 27
8581-000-UR-001-A Sheet 28
8581-000-UR-001-A Sheet 29
8581-000-UR-001-A Sheet 30
8581-000-UR-001-A Sheet 31
8581-000-UR-001-A Sheet 32
8581-000-UR-001-A Sheet 33
8581-000-UR-001-A Sheet 34
8581-000-UR-001-A Sheet 35
8581-000-UR-001-A Sheet 36
8581-000-UR-001-A Sheet 37
8581-000-UR-004-A - Sheet 1
8581-000-UR-005-A - Sheet 1
8581-000-UR-006-A Sheet 1
8581-000-UR-006-A Sheet 2
8581-000-UR-006-A Sheet 3
8581-000-UR-006-A Sheet 4
8581-000-UR-006-A Sheet 5
8581-000-UR-006-A Sheet 6
8581-000-UR-006-A Sheet 7
8581-000-UR-006-A Sheet 8
8581-000-UR-006-A Sheet 9
8581-000-UR-006-A Sheet 10
8581-000-UR-006-A Sheet 11
8581-000-UR-006-A Sheet 12
8581-000-UR-006-A Sheet 13
8581-000-UR-006-A Sheet 14
8581-000-UR-006-A Sheet 15
8581-000-UR-006-A Sheet 16
8581-000-UR-006-A Sheet 17
8581-000-UR-006-A Sheet 18
8581-000-UR-006-A Sheet 19
8581-000-UR-006-A Sheet 20
Calcasieu Pass Terminal
Sheet 2
November 2017
CalcasieuPassTerminalandTransCameronPipelineProject
CameronParish,Louisiana
SheetIndexandNotes
JPA Sheet Number
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
Contents
Southwest Service Road Profiles
Southwest Service Road Profiles
Southwest Service Road Profiles
Southwest Service Road Profiles
Southwest Service Road Profiles
Southwest Service Road Profiles
Southwest Service Road Profiles
Southwest Service Road Profiles
Southwest Service Road Profiles
Southwest Service Road Profiles
Southwest Service Road Earthworks Report
Southwest Service Road Earthworks Report
Southwest Service Road Earthworks Report
Southwest Service Road Earthworks Report
Southwest Service Road Earthworks Report
Southwest Service Road Earthworks Report
Southwest Service Road Earthworks Report
Project Overview Map - Dredged Material Placement
Marsh Creation Area
Marsh Creation Sections
Hydraulic Dredge Pipeline Corridor Sections
Hydraulic Dredge Pipeline Details
Nearshore Disposal Area - Plan Map
Nearshore Disposal Area - Cross-Sections and Notes
Facility and Workspace Layout Plan
Workspace Layout for DeHyCo Access Road and Administration Building/Parking Complex
Northeastern Temporary Workspace Cross-Section
Northwestern Temporary Workspace Cross-Section
Southwestern Temporary Workspace Cross-Section
Drawing Reference
8581-000-UR-006-A Sheet 21
8581-000-UR-006-A Sheet 22
8581-000-UR-006-A Sheet 23
8581-000-UR-006-A Sheet 24
8581-000-UR-006-A Sheet 25
8581-000-UR-006-A Sheet 26
8581-000-UR-006-A Sheet 27
8581-000-UR-006-A Sheet 28
8581-000-UR-006-A Sheet 29
8581-000-UR-006-A Sheet 30
8581-000-UR-006-A Sheet 31
8581-000-UR-006-A Sheet 32
8581-000-UR-006-A Sheet 33
8581-000-UR-006-A Sheet 34
8581-000-UR-006-A Sheet 35
8581-000-UR-006-A Sheet 36
8581-000-UR-006-A Sheet 37
Additional Notes for Temporary Workspace Construction and Land Restoration
Calcasieu Pass Terminal
Sheet 3
November 2017
Joint Permit Application
Calcasieu Pass Terminal
Applicant: Venture Global Calcasieu Pass, LLC
Cameron Parish, Louisiana
East Lateral Start
Latitude: 29° 46' 36.963"
Longitude: 93° 0' 1.674"
!
.
ANR/Bridgeline
Meter Station
Calcasieu Pass Terminal
Latitude: 29° 46' 30.461"
Longitude: 93° 19' 49.967"
!
.
Venture Global Property
Access Road
Construction Support
Facilities
Hydraulic Dredge Pipeline
Proposed East Lateral
Pipeline
Nearshore Placement Area
Meter Station
Marsh Creation Area
Dredge Footprint
0
2
4
Miles
p
For Permitting Purposes Only
Not for Construction
Project Vicinity Map
Calcasieu Pass Terminal and TransCameron Pipeline Project
Cameron Parish, Louisiana
M:\Clients\V-X\VGL\CalcasieuPass\_ArcGIS\_JPA\_CalcasieuPass_JPA_Fig_NRG_T1.mxd | REVISED: 09/08/2017 | SCALE: 1:223,000
Calcasieu Pass Terminal
Sheet 4
DRAWN BY: JSnyder
November 2017
General Notes:
1. Descriptions of the proposed work are provided in the Joint Permit Application Narrative.
2. Impact quantities are provided in the Joint Permit Application Narrative unless specifically shown on an individual Permit
Drawing.
3. The Joint Permit Application Drawings contained herein are issued to accompany the Joint Permit Application Form and
Joint Permit Application Narrative.
4. The Joint Permit Application Drawings contained herein are issued for permitting purposes, not for construction.
5. As-built drawings and/or plats shall have written on them the date of completion of said activities and shall be submitted to
the Louisiana Department of Natural Resources, Office of Coastal Management, P. O. Box 44487, Baton Rouge, LA 708044487 within 30 days following project completion.
6. All structures built under the authorization and conditions of this permit shall be removed from the site within 120 days of
abandonment of the facilities for the herein permitted use, or when these structures fall into a state of disrepair such that
they can no longer function as intended. This condition does not preclude the necessity for revising the current permit or
obtaining a separate Coastal Use Permit, should one be required, for such removal activities.
7. Structures must also be marked/lighted in accordance with U. S. Coast Guard regulations.
8. In order to ensure the safety of all parties, the permittee shall contact the Louisiana One Call System (1-800-272-3020) a
minimum of 48 hours prior to the commencement of any excavation (digging, dredging, jetting, etc.) or demolition activity.
9. The work and features shown on the Permit Drawings are the responsibility of the Applicant as defined on the Joint Permit
Application Form. The description of the work and features, including itemization and quantification of impacts, are contained
in the Joint Permit Application Narrative, submitted with the application. The Joint Permit Application Narrative describes the
work and features shown on the Permit Drawings herein as well as work and features to be performed by the Applicant's
affiliated company. The Applicant's affiliated company has submitted an independent Joint Permit Application for the work and
features it will perform. For the purposes of understanding the complete project, refer to the Joint Permit Application Narrative.
Application materials submitted and correspondence pertaining to the work and features to be performed by the Applicant's
affiliated company are available under the permit application file of the affiliated company with the LDNR and USACE.
General Notes
Calcasieu Pass Terminal and TransCameron Pipeline Project
Cameron Parish, Louisiana
M:\Clients\V-X\VGL\CalcasieuPass\_ArcGIS\_JPA\_CalcasieuPass_JPA_Fig_NRG_T2.mxd | REVISED: 04/28/2016 | SCALE: 1:380,160
Calcasieu Pass Terminal
Sheet 5
DRAWN BY: JSnyder
November 2017
Calcasieu Pass Terminal
TABLE A
Calcasieu Pass Terminal and TransCameron Pipeline Project
Step 10 Supplemental Sheet Quantities Summary for the Terminal Facilities
b
Impact Area (Acres)
Uplands
Terminal Facilities
Fill Placed Onsite (Cubic Yards)
Wetland
Waters
a
Temporar
y Impact
Permanent
Impact
Temporary
Impact
Permanent
Impact
Temporary
Impact
Permanent
Impact
Total
Percent of
Facility within
wetland
and/or
waters (%)
c
Dredged /
Excavated
(cubic yards)
Concrete
Crushed
Limestone /
Gravel
Crushed
Stone
Rock
(Rip-rap)
Sand
Topsoil
Clay
Asphalt
Dredged
Materials/
Native
Materials
Total
Placed
Onsite
Total Fill in
wetland /
d
waters
PROPERTY BOUNDARY
Sheet 6
Operational Footprint
Terminal Site
Floodwall and Marine Berm
Footprint
Interior to Floodwall/Berm
Admin/Security Buildings
Northeast Access Road
Southwest Service Road to
Jetty Pier
Marine Facilities (Area
Removed by Excavation)
Marine Facilities (Area
Altered by Dredging)
Temporary Footprint
f
Martin Access Road
DeHyCo Access Road
East TWS
Floodwall TWS
0.00
20.41
0.00
31.75
0.00
0.26
52.42
61.1
0
9,340
0
0
70,235
5,850
6,585
284,876
0
0
376,886
230,277
0.00
0.00
0.00
127.17
1.02
9.82
0.00
0.00
0.00
86.87
0.67
3.14
0.00
0.00
0.00
0.96
0.02
0.06
215
1.71
13.02
40.9
40.1
24.6
0
0
275
166,130
270
0
185,330
1,280
96,500
926,641
0
0
0
0
0
0
0
350
0
0
350
0
0
0
462
380
0
0
0
275
1,278,563
1,930
97,475
522,932
774
23,911
15
0.00
0.48
0.00
0.47
0.00
0.00
0.95
49.0
0.00
11.06
0.00
17.07
0.00
1.20
29.33
62.3
0.00
0.00
0.00
0.00
0.00
64.77
64.77
0.00
0.00
34.99
5.69
0.72
0.00
0.00
0.00
0.00
0.06
24.73
17.21
0.79
0.00
0.00
0.00
0.00
0.00
0.00
0.12
0.00
0.00
0.00
0.00
1.51
0.06
59.72
23.02
52.3
100.0
41.1
75.3
Southwest TWS
1.78
0.00
0.75
0.00
<0.01
0.00
2.53
Northeast TWS
Northwest TWS
Dredged Material
Placement
Nearshore at West Beach
Marsh Restoration at
Cameron Prairie National
Wildlife Refuge
Dredge Pipeline & Booster
Pump Access across
Calcasieu Lake/Adjacent
Levee
Subtotal
CONSTRUCTION
SUPPORT FACILITIES
Liberty Support Facility
Martin Support Facility
DeHyCo Support Facility
Mudd Support Facility
Baker Hughes Support
Facility
Subtotal
4.98
1.19
0.00
0.00
0.26
0.01
0.00
0.00
0.00
0.00
0.00
0.00
5.24
1.2
0.00
0.00
0.00
0.00
1,328.0
0.00
0.00
0.00
0.00
0.00
0.00
0.46
0.00
0.00
0.00
49.09
170.68
43.02
21.20
10.47
9.10
7.07
0.00
0.00
0.00
0.00
Total
a
b
November 2017
c
d
e
f
0
7,520
15,022
0
0
0
0
0
15
22,557
11,046
5,320
0
0
48,982
0
0
0
0
0
54,302
33,830
0
0
0
0
0
0
0
0
0
0
0
4,872
3,615
0
0
101
0
0
0
2,436
3,615
199,902
74,279
4,872
3,615
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4,872
3,615
0
0
12,281
10,845
199,902
74,279
3,822
7,230
82,160
55,919
29.6
0
0
5,324
0
0
0
0
0
0
0
5,324
2,420
5.0
0.8
0
0
0
0
16,908
3,872
0
0
0
0
0
0
0
0
0
0
0
0
0
0
16,908
3,872
845
32
1328.0
100.0
0
0
0
0
0
0
0
0
0
4,280,000
4,280,000
4,280,000
137.0
137.0
100.0
0
0
0
0
0
0
0
0
0
720,000
720,000
720,000
47.19
0.00
47.65
99.0
223,333
0
0
0
0
0
0
0
0
223,333
223,333
223,333
140.76
1,375.31
204.27
1,983.13
5,232,110
181,161
596,966
950,150
119,217
6,200
6,935
284,876
842
5,232,110
7,378,457
6,198,531
0.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.12
10.47
9.10
7.07
4.2
0.0
0.0
0.0
0
0
0
0
0
0
0
0
0
0
0
0
23,775
10,900
9,450
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
23,775
10,900
9,450
0
999
0
0
0
0.0
5,000,000
e
2.61
0.00
0.00
0.00
0.00
0.00
2.61
0
0
0
0
0
0
0
0
0
0
0
0
50.45
0
0.92
0
0
0
51.37
0
0
0
44,125
0
0
0
0
0
0
44,125
999
99.54
170.68
43.94
140.76
1,375.31
204.27
2,034.5
5,232,110
181,161
596,966
994,275
119,217
6,200
6,935
284,876
842
5,232,110
7,422,582
6,199,530
The work areas / elements identified above are described in the JPA Narrative and shown on the JPA Permit Drawings.
The acreages in this table have been rounded for presentation purposes. As a result, the totals may not reflect the exact sum of the addends in all cases.
Fill quantities presented are reflective of LDNR JPA Form Step 10 and represent material quantities placed on lands regardless of whether uplands, wetlands, or waterbodies.
Amount of fill in wetland/waters was calculated based on the percent of the facility footprint that is in wetland/waters.
Up to 5,000,000 cubic yards of excavated material will be dredged/excavated and used for offsite marsh restoration (720,000 cubic yards) or disposed of nearshore (4,280,000 cubic yards).
Martin Access Road includes 2,436 cubic yards of crushed limestone/gravel as temporary fill.
Calcasieu Pass Terminal
TABLE B
Calcasieu Pass Terminal and TransCameron Pipeline Project
Step 10 Supplemental Sheet Quantities Summary for the Terminal Facilities
Volume
(cubic Yards)
Volume of Fill Placed within
wetland/waters
(cubic yards)
Wetland/Waters
(Acres)
All Lands
(Acres)
Terminal Site
a
Excavation
Permanent
5,000,000
N/A
83.04
94.1
Fill
Permanent
1,831,713
822,770
124.2
283.1
323,411
152,428
43.93
93.28
5,223,333
5,223,333
1512.19
1512.65
Temporary Footprint
Fill
Permanent/ Temporary
Dredged Material Placement
Fill
Temporary/ Permanent
Construction Support Facilities
Fill
Permanent/ Temporary
Total
a
44,125
999
0.92
51.37
7,422,582
6,199,530
1,764.78
2,034.5
The 5,000,000 cubic yards of excavated materials associated with the Marine Facilities will be used for marsh restoration (720,000 cubic yards) and disposed of nearshore
(4,280,000). This value is excluded from the total to avoid double counting.
Sheet 7
November 2017
Hydraulic Dredge Pipeline
Corridor Dredged/Excavated
and Placed Onsite (Sidecast)
223,333 CY
Marsh Restoration Area
Fill from Dredge Prism
720,000 CY
See Sheet 8B
for Terminal Detail
Nearshore Disposal Area
Fill from Dredge Prism
4,280,000 CY
(See Sheet 145 for Detail)
For Permitting Purposes Only
Not for Construction
Venture Global Property
Hydraulic Dredge Pipeline
Construction Support
Facilities
Marsh Creation Area
Access Road
Dredge Footprint
Nearshore Placement Area
0
0.5
1
Miles
p
Sheet 8A
Estimated Fill Quantities Overview
Calcasieu Pass Terminal and TransCameron Pipeline Project
Cameron Parish, Louisiana
M:\Clients\V-X\VGL\CalcasieuPass\_ArcGIS\_JPA\_CalcasieuPass_JPA_Sheet_8A.mxd | REVISED: 10/11/2017 | SCALE: 1:70,000
Calcasieu Pass Terminal
Sheet 8A
DRAWN BY: JSnyder
November 2017
Liberty Support Facility
Quantities (CY):
Crushed Stone = 23,775
Calcasieu Pass Terminal
Martin Access Road
Excavated and Placed Onsite = 4,872 CY
Fill Quantities (CY):
Crushed Limestone/Gravel = 2,436
Crushed Stone = 4,872
Concrete = 101
Northeast Access Road
Culvert Replacement
Quantities (CY):
Excavated & Placed
Onsite = 275
Sand = 350
Topsoil = 350
Martin Support Facility
Quantities (CY):
Crushed Stone = 10,900
Baker Hughes Support Facility
DeHyCo Support Facility
Quantities (CY):
Crushed Stone = 9,450
Northwest TWS
Quantities (CY):
Crushed Limestone
/Gravel = 3,872
Northeast TWS
Quantities (CY):
Crushed Limestone
/Gravel = 16,908
Calcasieu
Pass
Northeast Access Road
Quantities (CY):
Crushed Limestone
/Gravel = 96,500
DeHyCo Access Road
Excavated and Placed Onsite 3,615 CY
Fill Quantities (CY):
Crushed Limestone/Gravel = 3,615
Crushed Stone = 3,615
Calcasieu
Ship
Channel
Sheet 8B
Admin/Security Buildings
Quantities (CY):
Concrete = 270
Crushed Limestone
/Gravel = 1,280
Asphalt = 380
Eastern TWS
Quantities (CY):
Crushed Limestone
/Gravel = 199,902
Floodwall and Marine Berm
Quantities (CY):
Concrete = 9,340
Rock (rip-rap) = 70,235
Sand = 5,850
Topsoil = 6,585
Clay = 284,876
Mudd Landing Support Facility
Stabilized Shorelines
Fill (rip-rap) (CY)= 48,982
Marine Structures
Concrete (CY)= 5,320
Grading to +5 ft NAVD88
Dredging/Excavation Footprint
Excavated & Placed in Nearshore
Disposal Area and Marsh Restoration
Area (See Sheet 8A) = 5,000,000 CY
November 2017
Gulf of
Mexico
Southwest TWS
Quantities (CY):
Crushed Limestone
/Gravel = 5,324
Venture Global
Property
Construction
Support Facility
Louisiana
Access Road
Temporary
Workspace
Southwest Service Road
Quantities (CY):
Excavated & Placed
Onsite = 15
Crushed Limestone = 7,520
Crushed Stone = 15,022
Gulf of
Mexico
Dredge Footprint
and Excavation
Area
E2EM Wetland
E2EM-Mosaic
Wetland
E2SS Wetland
q
PEM Wetland
PFO Wetland
PSS Wetland
Mudflat
Waterbodies
0
1,000
Interior to Floodwall/Berm
Quantities (CY):
Concrete = 166,130
Crushed Limestone/Gravel = 185,330
Crushed Stone = 926,641
Asphalt = 462
Floodwall TWS
Quantities (CY):
Crushed Limestone
/Gravel = 74,279
For Permitting Purposes Only
Not for Construction
Sheet 8B
Estimated Fill Quantities
Calcasieu Pass Terminal
Cameron Parish, Louisiana
2,000
Feet
FILE: M:\Clients\V-X\VGL\CalcasieuPass\_ArcGIS\_JPA\_CalcasieuPass_JPA_Fig_NRG4.mxd | REVISED: 11/10/2017 | SCALE: 1:20,000 when printed at 8.5x11
DRAWN BY: JMS
Calcasieu Pass Terminal
Martin Access Road
(Temporary)
Northeast Access Road
(Permanent)
DeHyCo Access Road
(Temporary)
Calcasieu
Pass
Sheet 9
Calcasieu
Ship Channel
Northwest Access Road
(Permanent)
Southwest Service Road
(Permanent)
Gulf of
Mexico
November 2017
For Permitting Purposes Only
Not for Construction
Louisiana
Venture Global
Property
Northeast Access
Road
DeHyCo Access
Road
Northwest Access
Road
Martin Access
Road
Southwest
Service Road
q
0
500
Sheet 9
Road Plot Plan
Calcasieu Pass Terminal
Cameron Parish, Louisiana
1,000
Feet
FILE: M:\Clients\V-X\VGL\CalcasieuPass\_ArcGIS\_JPA\_CalcasieuPass_JPA_Road_Plotplan.mxd | REVISED: 10/19/2017 | SCALE: 1:18,000 when printed at 8.5x11
DRAWN BY: GIS
Calcasieu Pass Terminal
Sheet 10
November 2017
Calcasieu Pass Terminal
Sheet 11
November 2017
Calcasieu Pass Terminal
Sheet 12
November 2017
Calcasieu Pass Terminal
Sheet 13
November 2017
Calcasieu Pass Terminal
Sheet 14
November 2017
Calcasieu Pass Terminal
Sheet 15
November 2017
Calcasieu Pass Terminal
Sheet 16
November 2017
1
Calcasieu Pass Terminal
H
2
3
4
5
6
7
8
PLANT & TRUE
NORTH
H
A
B
G
G
C
C
F
F
E
D
E
D
Sheet 17
D
D
E
C
E
C
B
B
B
© Técnicas Reunidas S.A.
November 2017
A
VENTURE GLOBAL CALCASIEU PASS, LLC
A
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
SAND LOCATION IN DREDGE AREA
KEY PLAN
Doc. Number:
8581-000-UR-003-A
Size:
Scale: Sheet:
ANSI B
8
1/5
Rev. :
6
A
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
EXISTING GRADE
G
G
DREDGING DEPTH
GENERALIZED LONGITUDINAL (SECTION A-A)
0'
100'
200'
F
HORIZONTAL
0'
50'
F
100'
EXISTING GRADE
E
E
Sheet 18
DREDGING DEPTH
D
D
GENERALIZED LONGITUDINAL (SECTION A-A)
0'
100'
200'
HORIZONTAL
0'
50'
C
100'
VERTICAL
NOTES :
C
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM. LOUISIANA SOUTH.
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
4.- ALL COORDINATES & LENGTH ARE IN FEET.
B
B
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
6.- FOR PERMITING PURPOSES ONLY NOT FOR CONSTRUCTION.
© Técnicas Reunidas S.A.
November 2017
VENTURE GLOBAL CALCASIEU PASS, LLC
A
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
SAND LOCATION IN DREDGE AREA
SECTION A-A
Doc. Number:
8581-000-UR-003-A
Size:
Scale: Sheet:
ANSI B
8
2/5
Rev. :
6
A
2
1
3
4
5
6
7
8
Calcasieu Pass Terminal
H
H
EXISTING GRADE
G
G
DREDGING DEPTH
GENERALIZED LONGITUDINAL (SECTION B-B)
0'
100'
200'
F
HORIZONTAL
0'
50'
F
100'
EXISTING GRADE
E
E
Sheet 19
DREDGING DEPTH
D
D
GENERALIZED LONGITUDINAL (SECTION B-B)
0'
100'
200'
HORIZONTAL
0'
50'
C
100'
VERTICAL
NOTES :
C
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM. LOUISIANA SOUTH.
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
4.- ALL COORDINATES & LENGTH ARE IN FEET.
B
B
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
6.- FOR PERMITING PURPOSES ONLY NOT FOR CONSTRUCTION.
© Técnicas Reunidas S.A.
November 2017
VENTURE GLOBAL CALCASIEU PASS, LLC
A
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
SAND LOCATION IN DREDGE AREA
SECTION B-B
Doc. Number:
8581-000-UR-003-A
Size:
Scale: Sheet:
ANSI B
8
3/5
Rev. :
6
A
3
4
5
6
Calcasieu Pass Terminal
H
EXISTING GRADE
MHHWMHWMLWMLLW-
+0.66'
+0.55'
-0.73'
-1.27'
EL ± 0.00' (NAVD88)
7
EXISTING
SHORELINE
2
1
8
H
RIP-RAP
PROPOSED BERM
3
1
DREDGING LIMIT
G
G
4
1
EL - 44.3' (NAVD88)
F
F
CROSS SECTION C-C
0'
20'
40'
MHHWMHWMLWMLLW-
E
+0.66'
+0.55'
-0.73'
-1.27'
EXISTING GRADE
EL ± 0.00' (NAVD88)
EXISTING
SHORELINE
HORIZONTAL
PROPOSED BERM
3
DREDGING LIMIT
RIP-RAP
E
1
Sheet 20
4
1
EL - 44.3' (NAVD88)
D
D
CROSS SECTION D-D
0'
20'
C
40'
C
NOTES :
HORIZONTAL
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM. LOUISIANA SOUTH.
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
B
B
4.- ALL COORDINATES & LENGTH ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
© Técnicas Reunidas S.A.
November 2017
6.- FOR PERMITING PURPOSES ONLY NOT FOR CONSTRUCTION.
VENTURE GLOBAL CALCASIEU PASS, LLC
A
TECNICAS REUNIDAS
TR Proj.:
8581
1
2
3
4
5
6
7
SAND LOCATION IN DREDGE AREA
SECTION C-C AND D-D
Doc. Number:
8581-000-UR-003-A
Size:
Scale: Sheet:
ANSI B
8
4/5
Rev. :
6
A
2
1
3
4
5
6
7
8
H
MHHWMHWMLWMLLW-
G
EXISTING GRADE
+0.66'
+0.55'
-0.73'
-1.27'
EL ± 0.00' (NAVD88)
EXISTING
SHORELINE
Calcasieu Pass Terminal
H
G
PROPOSED BERM
RIP-RAP
DREDGING LIMIT
F
3
1
F
4
1
EL - 44.3' (NAVD88)
CROSS SECTION E-E
E
0'
20'
40'
E
HORIZONTAL
Sheet 21
D
D
C
C
NOTES :
1.- ALL DISTANCES AND ELEVATIONS ARE EXPRESSED IN FEET UNLESS
OTHERWISE DENOTED.
2.- COORDINATES SYSTEM IS REFERENCED TO THE NATIONAL GEODETIC SURVEY
NAD 83 HORIZONTAL DATUM. LOUISIANA SOUTH.
3.- ELEVATIONS ARE REFERENCED TO NAVD88 DATUM.
B
B
4.- ALL COORDINATES & LENGTH ARE IN FEET.
5.- ALL SLOPES ARE 3H/1V UNLESS NOTED OTHERWISE.
© Técnicas Reunidas S.A.
November 2017
6.- FOR PERMITING PURPOSES ONLY NOT FOR CONSTRUCTION.
VENTURE GLOBAL CALCASIEU PASS, LLC
A
TECNICAS REUNIDAS
SAND LOCATION IN DREDGE AREA
SECTION E-E
Doc. Number:
8581-000-UR-003-A
1
2
3
4
5
6
7
Size:
Scale: Sheet:
ANSI B
8
5/5
Rev. :
6
A
Calcasieu Pass Terminal
Sheet 22
November 2017
Calcasieu Pass Terminal
Sheet 23
November 2017
Calcasieu Pass Terminal
Sheet 24
November 2017
Calcasieu Pass Terminal
Sheet 25
November 2017
Calcasieu Pass Terminal
Sheet 26
November 2017
Calcasieu Pass Terminal
Sheet 27
November 2017
Calcasieu Pass Terminal
Sheet 28
November 2017
Calcasieu Pass Terminal
Sheet 29
November 2017
Calcasieu Pass Terminal
Sheet 30
November 2017
Calcasieu Pass Terminal
Sheet 31
November 2017
Calcasieu Pass Terminal
Sheet 32
November 2017
Calcasieu Pass Terminal
Sheet 33
November 2017
Calcasieu Pass Terminal
Sheet 34
November 2017
Calcasieu Pass Terminal
Sheet 35
November 2017
Calcasieu Pass Terminal
Sheet 36
November 2017
Calcasieu Pass Terminal
Sheet 37
November 2017
Calcasieu Pass Terminal
Sheet 38
November 2017
Calcasieu Pass Terminal
Sheet 39
November 2017
Calcasieu Pass Terminal
Sheet 40
November 2017
Calcasieu Pass Terminal
Sheet 41
November 2017
Calcasieu Pass Terminal
Sheet 42
November 2017
Calcasieu Pass Terminal
Sheet 43
November 2017