Home

Galveston District

Run scraper

Kathy Bouvier

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to deconstruct and fill an existing boat slip.

Full Public Notice Project Plans PROJECT DESCRIPTION: First, the applicant proposes to deconstruct and fill an existing boat slip with approximately 185 cubic yards (~0.02 acres) of fill material. After filling the boat slip, the applicant proposes to install a 100-foot bulkhead that will be connected to the neighbor’s existing bulkhead. The applicant proposes to construct and maintain a 52-foot by 36-foot structure that consists of a pier, palapa, and boathouse with a lift for recreation. The applicant’s plans are enclosed in 5 sheets.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas