Public Notice No. 18-02

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

This notice announces a prospectus has been submitted for the development of the West Fork Drakes Creek Stream Mitigation Bank pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008.

Public Notice No. 18-02 Nashville District Application No. LRN-2018-00086 Date: February 6, 2018;Expires: March 6, 2018 Please address comments to: Nashville District Corps of Engineers, Regulatory Division 3701 Bell Road, Nashville, TN 37214-2660

SUBJECT: This notice announces a prospectus has been submitted for the development of the West Fork Drakes Creek Stream Mitigation Bank pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008.

BANK SPONSOR: Blue Ridge Waterways

Attention: Mr. Andrew Bick 300 Walker Boulevard

Maryville, Tennessee 37803

LOCATION: The proposed stream mitigation bank is located on a 144-acre farm southeast of Portland in Sumner County, Tennessee (Latitude N 36.558079, Longitude W -86.494856). The proposed mitigation bank is located on West Fork Drakes Creek, which is a major tributary to the Barren River. The project is located on the same parcel as the proposed West Fork Drakes Creek In-Lieu Fee Wetland Mitigation Project (LRN-2012-00692; PN 18-03). Both mitigation sites will be evaluated by Corps independently.

PURPOSE: The West Fork Drakes Creek Stream Mitigation Bank is proposed to provide compensatory stream mitigation for permitted impacts within the primary service area of the Barren River Watershed (HUC05110002). The Bank’s proposed secondary service area includes the following watersheds within the Cumberland River Drainage and Interior Plateau Ecoregion: Red River (HUC05130206) and the Old Hickory Lake Watersheds (HUC05130201).

GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquatic resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army (DA) permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced or preserved wetlands or streams are expressed as “credits” which may subsequently be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor. The operation and use of a mitigation bank are governed by an approved mitigation banking instrument (MBI). The MBI is the legal document for the establishment, operation and the use of a mitigation bank. This bank is intended to be a private commercial bank. The sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.

A group of federal and state regulatory and resource agency representatives known as the Interagency Review Team (IRT) would oversee the establishment and management of the bank. The IRT is chaired by the US Army Corps of Engineers, Nashville District (USACE). The primary role of the IRT is to facilitate the establishment of the mitigation bank through the development of a MBI. The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the USACE.

The approval for the use of the bank for specific projects is the decision of the USACE pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Tennessee Department of Environmental Conservation (TDEC) pursuant to Section 401 of the CWA and/or applicable state of Tennessee statute(s) and regulation(s). The USACE and TDEC provide no guarantee that any particular individual or general permit would be authorized in order to use the bank for compensation. The following is a summary of the prospectus for this project.

PROJECT DESCRIPTION: The proposed project would restore and establish approximately 4,010 linear feet (LF) of stream channel along two unnamed tributaries (UTs) to West Fork Drakes Creek. The existing streams are degraded due to habitat alterations, channelization, excessive fine sediment from bank erosion, unrestricted cattle access, cleared riparian buffers and an impoundment. Project goals include: (1) Re-construct dynamically stable stream channels in order to improve bedform diversity, lateral stability, and floodplain connectivity along project streams that have been channelized, impounded and trampled by cattle; (2) Remove hydrologic modifications (floodplain drainage tiles, berms, levees, pond impoundment, road crossings, culvert, and fence channel blockages) in order to improve overland and subsurface water exchange and sediment transport continuity; (3) Increase channel sinuosity in order to reduce flow velocities, promote the formation of natural riffles and pools, and improve lateral and vertical stability; (4) Permanently remove livestock from the streams and riparian buffers by installing livestock exclusion fence in order to reduce excessive nutrients and pollutants caused by unrestricted cattle access and agricultural activities within the riparian buffers; (5) Re-establish 50 foot wide riparian buffers on both banks of project streams, to be composed of planted native bottomland hardwood forest community; and (6) Permanently protect restored streams, riparian wetlands and riparian areas in a conservation easement. The proposed mitigation approach involves a combination of establishment of 1,000 linear feet of new stream channel, and the restoration and enhancement of 3,010 linear feet of existing stream. Details are contained in the West Fork Drakes Creek Stream Mitigation Bank Prospectus dated December 4, 2017. The plan can be viewed here. Information in the prospectus would serve as the basis for establishing the stream mitigation banking instrument (MBI). The MBI would describe in detail the physical and legal characteristics of the bank and how the bank would be established and operated.

HISTORICAL AND CULTURAL RESOURCES: A search of the National Register returned no findings of Historic properties currently listed on the National Register of Historic Places within the project area. A Phase I cultural/archaeological survey has not been conducted for the site. At this early stage in the regulatory process, no project design plans have been submitted; therefore, USACE cannot complete an effects determination for historic and cultural resources. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the

project area. Upon submittal of the design plans, USACE would evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to historic and cultural resources for Section 106 compliance. If the Corps determines that consultation is required, the Corps would consult with the Tennessee Historic Commission (SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.

ENDANGERED/THREATENED SPECIES REVIEW: A review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ipac identified the following federally-listed species that are known to or believed to occur in Sumner County, Tennessee:

Species Nomenclature

Federal Status

Mammals

Gray bat (Myotis grisescens)

Endangered

Indiana Bat (Myotis sodalist)

Endangered

Northern Long-eared Bat (Myotis septentrionalis)

Threatened

A copy of this notice is being furnished to USFWS for their review. After receipt of any comments, the USACE will evaluate the potential effects to proposed and/or listed species and their designated critical habitat, and initiate consultation with the U.S. Fish & Wildlife Service, if required.

COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Mr. Mark G. McIntosh at the above address or by email: mark.g.mcintosh@usace.army.mil.

\s\

Joshua W. Frost

Chief, Technical Services Branch Regulatory Division

U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas