Brevard County. Green Wing, LLC. Longwood, Florida. PROSPECTUS SUMMARY: Pursuant to 33 CFR 332.8(d)(4), the Corps has posted a full copy of the GWMB prospectus online so that it is available for review by the public. The prospectus may be downloaded from the Regulatory In-Lieu Fee and Bank Information Tracking System (RIBITS) at web address: https://ribits.usace.army.mil.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received a complete prospectus proposing the establishment of a mitigation bank pursuant to the 2008 Compensatory Mitigation for Losses of Aquatic Resources regulations (33 CFR Part 332) as described below:
APPLICANT: Green Wing, LLC
3521 Legacy Hills Ct
Longwood, FL 32779
LOCATION: The proposed project, identified as the 242.45-acre Green Wing Mitigation Bank (GWMB), is located near the town of Scottsmoor; within Sections 27, 34, and 35 of Township 26 south, and Range 26 east, Brevard County, Florida. Further described, the project site is situated directly across the Indian River Lagoon (IRL) from the Merritt Island National Wildlife Refuge (MINWR). Portions of the MINWR are also located on the west shore of the IRL and abut the GWMB property. The location map is included as Figure 1, attached to this public notice.
APPROXIMATE CENTRAL COORDINATES: Latitude: 28.7839°N
Longitude: -80.8512°W
PROSPECTUS SUMMARY: Pursuant to 33 CFR 332.8(d)(4), the Corps has posted a full copy of the GWMB prospectus online so that it is available for review by the public. The prospectus may be downloaded from the Regulatory In-Lieu Fee and Bank Information Tracking System (RIBITS) at web address: https://ribits.usace.army.mil.
Once on the RIBITS homepage, select "Jacksonville" from the "ALL DISTRICTS" drop down menu located in the lower left corner of the screen. Once the district filter has been selected, click on the “Banks & ILF Sites” link located in the Navigation box (upper left corner). This will generate a list of projects, scroll down the list and click on the “Green Wing MB” link. On this page, click on the "Cyber Repository" link located on the menu bar above the General Information box, then click on the Prospectus Documents folder to access the prospectus associated with the GWMB project.
If you are unable to access the web address, a copy of the prospectus is available upon request to the project manager listed at the end of this public notice.
PROJECT GOALS AND OBJECTIVES: The applicant seeks authorization to bank generated wetland credits that could be used to offset impacts to wetland impacts in the final approved Mitigation Service Area. The overall primary ecological goal of the GWMB is to restore, reconnect and permanently protect the hydrology and wildlife habitat of 242.45 acres of wetland habitats and adjacent upland buffer habitats while increasing the wetland function on a watershed level. Specific restoration objectives as further noted in Table 1 and Figures 5, 12, and 13, affixed at the end of this public notice, include:
• Hydrological enhancement through the regrading of portions of the levee and canal system and reconnection of the impounded waters with the IRL.
• Treatment and control of nuisance and exotic vegetation.
• Reconnection of historic tidal creek systems.
• Rehabilitation of saltwater habitat.
• Preservation of all 242.45 acres of rehabilitated/re-established wetland habitat.
ECOLOGICAL SUITABILITY OF THE SITE: Information provided by the applicant indicate the following:
With the exception of the levees, all onsite habitat, shown on Figure 2, attached to this public notice, is either salt marsh, coastal hydric hammock, mangrove, ditches/canals, impoundments, ponds, or tidal flats.
Historically, the site was ecologically identical to the adjacent marshes and coastal hydric hammock to the north. Its hydrology was primarily supplied by the ebb and flow of IRL waters. Occasionally, it received stormwater sheet flow following strong rainfall events. However, beginning with the installation of the Florida East Coast railway (FEC) around 1893, the site experienced changes in freshwater flow patterns through the excavation of drainage ditches that exist to this day.
Additionally, the salt marsh areas within the GWMB were contained within two newly created mosquito impoundments around 1960, which appear to have created the greatest impact on the hydrology and ecology of the salt marshes. It effectively cut off the marsh areas from the IRL, resulting in a drop in salinity and a rise in water levels. In 1991, a study was conducted that found cattails had invaded the T-4 impoundment and covered approximately 70 percent of the area. The same study found only five species of fish within the impoundments. This is likely attributable to the drop in salinity and lack of connectivity of the impoundments. Subsequently, several culverts and a pump were installed to arrest and reverse the trend toward freshwater marshes. These improvements seemed to work well in that cattails were nearly eradicated in a short amount of time. However, these efforts were ceased a few years later. Now the flapgate culverts are no longer operable and remain closed. The result is a gradual return to freshwater-like conditions unlike the saline conditions that existed historically.
ESTABLISHMENT AND OPERATION OF THE BANK: The proposed GWMB would be established and operated by Green Wing, LLC, as the Sponsor with the assistance of Bio-Tech Consulting, Inc. The property that comprises the GWMB is owned by Green Wing, LLC. The GWMB is proposed to be established as a single and complete project. Following GWMB successful implementation and attainment of final success criteria, long-term management activities will be implemented in order to ensure the sustainability of GWMB. In addition, the Sponsor will provide sufficient financial assurances to ensure construction and long-term management of the proposed GWMB.
PROPOSED SERVICE AREA: The project is located entirely within the Cape Canaveral watershed (HUC No. 03080202). The Applicant proposes a Mitigation Service Area (MSA) that includes the entirety of the Cape Canaveral HUC as well as the Daytona – St. Augustine (HUC No. 03080201) and the Vero Beach (HUC No.
03080203. The GWMB MSA is anticipated to include wetland habitat communities that could reasonably be expected to occur on the GWMB. This area is shown on Figure 6, attached to the end of this public notice.
CULTURAL RESOURCES: No information has been provided regarding onsite cultural resources. Project review will, however, include review of the site for potential cultural resources.
ENDANGERED SPECIES: The site will be reviewed for potential critical habitat and presence of endangered species. The findings will be coordinated with the U.S. Fish and Wildlife service.
ESSENTIAL FISH HABITAT (EFH): The project proposal will be coordinated with the pertinent federal agencies to minimize the risk for any potential impact to EFH.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
COMMENTS: Comments regarding the proposed mitigation bank should be submitted in writing to the District Engineer at the address below within 30 days from the date of this notice.
The initial evaluation pertaining to whether or not this mitigation bank proposal has the potential for providing compensatory mitigation for activities authorized by issued Department of the Army permits will be based on the information contained in the prospectus, received from this public notice and obtained during an inspection of the project site.
If you have questions concerning this proposal, you may contact Ms. Marie L. Huber by electronic mail at Marie.L.Huber@usace.army.mil, by fax at 904-232-1904, or by telephone at 904-232-1683 or at the following address:
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
P. O. BOX 4970
JACKSONVILLE, FLORIDA 32232-0019
IMPACT ON NATURAL RESOURCES: Preliminary review of this application indicates that an Environmental Impact Statement will not be required. Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. By means of this notice, we are soliciting comments on the potential effects of the project on threatened or endangered species or their habitat
EVALUATION: After the end of the comment period, the district engineer will review all comments received and make an initial determination as to the potential of the proposed project to provide compensatory mitigation for activities authorized by Department of the Army permits. That determination will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. Factors relevant to the proposal will be considered including conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the proposed activity. All comments received will be considered by the Corps during the formulation of the initial determination of potential for the proposed activity.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
POST OFFICE BOX 4970
JACKSONVILLE, FLORIDA 32232-0019
REPLY TO
ATTENTION OF
February 8, 2018
Regulatory Division
North Permits Branch
Mitigation Bank Team
PUBLIC NOTICE
Application Number: SAJ-2015-03153-MLH
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received a complete prospectus proposing the establishment of
a mitigation bank pursuant to the 2008 Compensatory Mitigation for Losses of Aquatic
Resources regulations (33 CFR Part 332) as described below:
APPLICANT:
Green Wing, LLC
3521 Legacy Hills Ct
Longwood, FL 32779
LOCATION: The proposed project, identified as the 242.45-acre Green Wing Mitigation
Bank (GWMB), is located near the town of Scottsmoor; within Sections 27, 34, and 35
of Township 26 south, and Range 26 east, Brevard County, Florida. Further described,
the project site is situated directly across the Indian River Lagoon (IRL) from the Merritt
Island National Wildlife Refuge (MINWR). Portions of the MINWR are also located on
the west shore of the IRL and abut the GWMB property. The location map is included as
Figure 1, attached to this public notice.
APPROXIMATE CENTRAL COORDINATES: Latitude:
Longitude:
28.7839°N
-80.8512°W
PROSPECTUS SUMMARY: Pursuant to 33 CFR 332.8(d)(4), the Corps has posted a
full copy of the GWMB prospectus online so that it is available for review by the public.
The prospectus may be downloaded from the Regulatory In-Lieu Fee and Bank
Information Tracking System (RIBITS) at web address: https://ribits.usace.army.mil.
Once on the RIBITS homepage, select "Jacksonville" from the "ALL DISTRICTS" drop
down menu located in the lower left corner of the screen. Once the district filter has
been selected, click on the "Banks & ILF Sites" link located in the Navigation box (upper
left corner). This will generate a list of projects, scroll down the list and click on the
"Green Wing MB" link. On this page, click on the "Cyber Repository" link located on the
menu bar above the General Information box, then click on the Prospectus Documents
folder to access the prospectus associated with the GWMB project.
If you are unable to access the web address, a copy of the prospectus is available upon
request to the project manager listed at the end of this public notice.
PROJECT GOALS AND OBJECTIVES: The applicant seeks authorization to bank
generated wetland credits that could be used to offset impacts to wetland impacts in the
final approved Mitigation Service Area. The overall primary ecological goal of the
GWMB is to restore, reconnect and permanently protect the hydrology and wildlife
habitat of 242.45 acres of wetland habitats and adjacent upland buffer habitats while
increasing the wetland function on a watershed level. Specific restoration objectives as
further noted in Table 1 and Figures 5, 12, and 13, affixed at the end of this public
notice, include:
·
·
·
·
·
Hydrological enhancement through the regrading of portions of the levee and
canal system and reconnection of the impounded waters with the IRL.
Treatment and control of nuisance and exotic vegetation.
Reconnection of historic tidal creek systems.
Rehabilitation of saltwater habitat.
Preservation of all 242.45 acres of rehabilitated/re-established wetland habitat.
ECOLOGICAL SUITABILITY OF THE SITE: Information provided by the applicant
indicate the following:
With the exception of the levees, all onsite habitat, shown on Figure 2, attached to this
public notice, is either salt marsh, coastal hydric hammock, mangrove, ditches/canals,
impoundments, ponds, or tidal flats.
Historically, the site was ecologically identical to the adjacent marshes and coastal
hydric hammock to the north. Its hydrology was primarily supplied by the ebb and flow
of IRL waters. Occasionally, it received stormwater sheet flow following strong rainfall
events. However, beginning with the installation of the Florida East Coast railway (FEC)
around 1893, the site experienced changes in freshwater flow patterns through the
excavation of drainage ditches that exist to this day.
Additionally, the salt marsh areas within the GWMB were contained within two newly
created mosquito impoundments around 1960, which appear to have created the
greatest impact on the hydrology and ecology of the salt marshes. It effectively cut off
the marsh areas from the IRL, resulting in a drop in salinity and a rise in water levels. In
1991, a study was conducted that found cattails had invaded the T-4 impoundment and
covered approximately 70 percent of the area. The same study found only five species
of fish within the impoundments. This is likely attributable to the drop in salinity and lack
of connectivity of the impoundments. Subsequently, several culverts and a pump were
installed to arrest and reverse the trend toward freshwater marshes. These
improvements seemed to work well in that cattails were nearly eradicated in a short
amount of time. However, these efforts were ceased a few years later. Now the flapgate
culverts are no longer operable and remain closed. The result is a gradual return to
freshwater-like conditions unlike the saline conditions that existed historically.
ESTABLISHMENT AND OPERATION OF THE BANK: The proposed GWMB would be
established and operated by Green Wing, LLC, as the Sponsor with the assistance of
Bio-Tech Consulting, Inc. The property that comprises the GWMB is owned by Green
Wing, LLC. The GWMB is proposed to be established as a single and complete project.
Following GWMB successful implementation and attainment of final success criteria,
long-term management activities will be implemented in order to ensure the
sustainability of GWMB. In addition, the Sponsor will provide sufficient financial
assurances to ensure construction and long-term management of the proposed GWMB.
PROPOSED SERVICE AREA: The project is located entirely within the Cape
Canaveral watershed (HUC No. 03080202). The Applicant proposes a Mitigation
Service Area (MSA) that includes the entirety of the Cape Canaveral HUC as well as
the Daytona St. Augustine (HUC No. 03080201) and the Vero Beach (HUC No.
03080203. The GWMB MSA is anticipated to include wetland habitat communities that
could reasonably be expected to occur on the GWMB. This area is shown on Figure 6,
attached to the end of this public notice.
CULTURAL RESOURCES: No information has been provided regarding onsite cultural
resources. Project review will, however, include review of the site for potential cultural
resources.
ENDANGERED SPECIES: The site will be reviewed for potential critical habitat and
presence of endangered species. The findings will be coordinated with the U.S. Fish
and Wildlife service.
ESSENTIAL FISH HABITAT (EFH): The project proposal will be coordinated with the
pertinent federal agencies to minimize the risk for any potential impact to EFH.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
COMMENTS: Comments regarding the proposed mitigation bank should be submitted
in writing to the District Engineer at the address below within 30 days from the date of
this notice.
The initial evaluation pertaining to whether or not this mitigation bank proposal has the
potential for providing compensatory mitigation for activities authorized by issued
Department of the Army permits will be based on the information contained in the
prospectus, received from this public notice and obtained during an inspection of the
project site.
If you have questions concerning this proposal, you may contact Ms. Marie L. Huber by
electronic mail at Marie.L.Huber@usace.army.mil, by fax at 904-232-1904, or by
telephone at 904-232-1683 or at the following address:
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
P. O. BOX 4970
JACKSONVILLE, FLORIDA 32232-0019
IMPACT ON NATURAL RESOURCES: Preliminary review of this application indicates
that an Environmental Impact Statement will not be required. Coordination with U.S.
Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine
Fisheries Services, and other Federal, State, and local agencies, environmental groups,
and concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area. By means of this notice, we are soliciting comments on the
potential effects of the project on threatened or endangered species or their habitat
EVALUATION: After the end of the comment period, the district engineer will review all
comments received and make an initial determination as to the potential of the
proposed project to provide compensatory mitigation for activities authorized by
Department of the Army permits. That determination will reflect the national concern for
both protection and utilization of important resources. The benefits, which reasonably
may be expected to accrue from the proposal, must be balanced against its reasonably
foreseeable detriments. Factors relevant to the proposal will be considered including
conservation, economics, esthetics, general environmental concerns, wetlands,
historical properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food, and fiber production, mineral needs,
considerations of property ownership, and in general, the needs and welfare of the
people.
The Corps is soliciting comments from the public; Federal, State, and local agencies
and officials; Indian Tribes; and other Interested parties in order to consider and
evaluate the proposed activity. All comments received will be considered by the Corps
during the formulation of the initial determination of potential for the proposed activity.
,.........1
Legend
Green Wing MB
Sco ttsm oo r
-w
Sources: Esri, HERE, Delorme, USGS, lntermap, increment P Corp., NRCAN,
Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), Tom Tom,
Mapmylndia, © OpenStreetMap contributors, and the GIS User Community
·.
,.,...,.(···m 1'to·o'"'" , ..,.-o.1......_1, 1J11W1J p1.. c~-,.., ffl, l'll.ttlr'l)ltt.Ot'I'"
l 'i I i l11di1· Rhc-r UGreen Wing Mitigation Bank
Brevard County, Florida
Figure 1
Location Map
N
I
O
I
0.5
1 Miles
Project #:762-01
Produced By: FJT
D ate: 7 / 13/ 2017
,.........I
Legend
Green Wing MB
Assessment Areas
Existing Land Uses
c=J canal
-
D
D
D
D
D
.H3Nl0nl·
l:f'rtlu~.. 1\·4'11"""
0 11.o.1..... I I :N:IMI.> pl"
(+il-)tl'tA ·~tf7 !'\. t ·lr1')1t144St'Tlt
(11J)UJ.o.M~
('7:Zl64J-GJ45
l'il i b1di·· Rhfr U.·llr\'-rd ' 'tm Uudt., V1. J1%0 pb.
info" bM'l--imKUflMlllin1..:~-
r,_
~.....~lf·m!OU.ll·it.c.;'lfQ
Green Wing Mitigation Bank
Brevard County, Florida
Figure 2
Existing Land Use lviap
Coastal Hydric Hammock
Ditch
lmpounctment
Levee
Mangrove - llll>Ounded
Pond
D
D
D
D
lidal Creek
O
350
Salt Marso - Estuarine
Salt Marso - Impounded
Salt Marso - Unimpounded
I
700 Feet
Project #:762-01
Produced By: FJT
D ate: 8/ 29/ 2017
,"···=
....
Legend
Green Wing MB
Assessment Areas
Management
-
HydrOlogic Enhancement
CJ Hydrologic EnhancemenUNuisance vegetation Control
CJ Hydrologic EnhancemenURegrading
CJ Hydrologic EnhancemenURegrading/Nuisance Vegeta ion Control
CJ Nuisance Vegeta ion Control
CJ Preservation
.H3Nl0nl1 l.'f'rt1U·l'd· ,, .......... 0 11.o.1.... n ...»IMIJ p1.. (4oll-)lll't· ·~tf7 ta. t ·lr1')1t1+4St'Tlt
l'i Ii l111di·· Rilfr U.·llr\'-rd Vtm Oum. Fl.11%0 pb. (71J).%J.O.M~ r,_ (T7:ZllS'J-G.U5
~.....~lf·.lllllllll·it.C<:.'lfQ
t1du· bM'l-Green Wing Mitigation Bank
Brevard County, Florida
Figure 5
Proposed Management Activities
I
O
I
350
700 Feet
Project #:762-01
Produced By: FJT
D ate: 11 / 2/ 2017
,.........1
Legend
Green Wing MB
c::::J ServiceArea
Atlantic
Ocean
Green Wing Mitigation Bank
Eu stis
lltu sVi lle
Northern Indian River Lagoon Basin
Central Indian River Lagoon Basin
Avon Part.;
Air Foroo
R·n\>3
K11 1mmoo
Pr ame Pre!h nre
61 Pert.:
Sources: Esri, HERE, De~irme , USGS, lntermap, increment P Corp , NRCAN,
Esri Japan, METI, Esri Ch~a (Hong Kong ), Esri (Thailand), Tom Tom,
Mapmylndi~© OpenStreE!tWlap contributors, and the GIS User Community
J l ~!'.flh ·"11o~Al-01-.-...., t'l. JllMlJ ph.(Mi)ll~69 h.("t"ll'.1-~
~ '·"r.Bt.ch. FJ. Jl'Mt pt.. (1 1l~J.U fx. 1
- l)S6J..el.a5
1717 ..dbn Ri-'f'r
·t·~· lliM-l ~1t1...t·1-~
..,_ b..~Wd·«t9111ih lll!l-C"Ollln
Green Wing Mitigation Bank
Brevard County, Florida
Figure 6
Proposed Service Area Map
N
I
I I I
I
O
5
10
I I I
I
20 Miles
Project #:762-01
Produced By: FJT
D ate: 8/ 23/ 2017
Legend
J t :H°·(·nl· l '""''o~" ''"""'""o'""''.w.n .»1M13 pla.(-M~-)111,A·Mf.' b. 14WT~4dt'T"
l'i I i lndi·· Rhfr lbtlr\llrd Vtm o-1\.. Vl. JU60 pb. (71J"l.~U O.M4 r,,, (77:Z)St.J O..U5
tAfo· biQ..m:fK:uaml tintn........~lf·.m!OU.l htit.Cl.lfQ
Green Wing Mitigation Bank
Brevard County, Florida
Figure 12
Assessment Areas - North
I
O
200
400 Feet
Project # :762-01
Produced By: FJT
D ate: 8/ 10/ 2017
Legend
J t 3Nr.nb l 'tniu~..
,, ...,......,0,1.oo1....,n...»IMIJ p1.. (~1-)ill,4+~'
,.,m Oum. n .11%· pb.
l'i l ilndi.a· Rhfr U.·llr\ ..rd
tAfo · bkl-<1"1K:va"lil tintn-
b. i ·lr'T)lf1~t'Tlt
(11J~.O.M~
,,. (771,s;J O..U5
~.....~lf·m!OU.ll·1t-c.:'lfQ
Green Wing Mitigation Bank
Brevard County, Florida
Figure 13
Assessment Areas - South
I
O
I
200
400 Feet
Project #:762-01
Produced By: FJT
Date: 8/ 30/ 2017
Table 1 - Existing and Proposed Land Use/Community Types
Management Activity
Assessment
Area
Acres
Uplands
2.28
Levee
Levee
52.04
Coastal Hydric
Hammock
Coastal Hydric
Hammock
Wetland
Enhancement
WE-Fo01N
2.21
Coastal Hydric
Hammock
Coastal Hydric
Hammock
Wetland
Enhancement
WE-Fo02
0.15
Coastal Hydric
Hammock
Coastal Hydric
Hammock
0.20
Coastal Hydric
Hammock
Exotic/Nuisance
Species Control
Management
Plan
X
EC
X
EC
X
EC
Wetland
Enhancement
X
EC
Coastal Hydric
Hammock
Wetland
Enhancement
X
EC
16.37
Coastal Hydric
Hammock
Coastal Hydric
Hammock
Wetland
Enhancement
X
EC
WE-Fo04N
2.32
Coastal Hydric
Hammock
Coastal Hydric
Hammock
Wetland
Enhancement
X
EC
WE-Ma05
0.99
Salt Marsh
Salt Marsh
Wetland
Enhancement
X
EC
Salt Marsh
Wetland
Enhancement
X
EC
Salt Marsh
Wetland
Enhancement
X
EC
Salt Marsh
Wetland
Enhancement
X
EC
X
EC
X
EC
WE-Fo01
WE-Fo03
WE-Fo04
WE-Ma09
WE-Ma10
WE-Ma11
0.89
10.01
0.51
Current
Community
Salt Marsh
Salt Marsh
Salt Marsh
Proposed
Community
Activity
Hydrologic
Enhancement
Reconnection
with IRL
WE-Ma12
4.18
Salt Marsh
Salt Marsh
Wetland
Enhancement
WE-Mg01
8.71
Mangrove
Mangrove
Wetland
Enhancement
Salt Marsh
Wetland
Enhancement
X
X
X
EC/HE
Salt Marsh
Wetland
Enhancement
X
X
X
EC/HE
X
X
X
EC/HE
WE-Fr01
WE-Fr02
6.86
0.14
Salt Marsh
Salt Marsh
WE-Fr03
1.16
Salt Marsh
Salt Marsh
Wetland
Enhancement
WE-Fr04
0.28
Salt Marsh
Salt Marsh
Wetland
Enhancement
X
X
X
EC/HE
Salt Marsh
Wetland
Enhancement
X
X
X
EC/HE
Salt Marsh
Wetland
Enhancement
X
X
X
EC/HE
X
X
X
EC/HE
WE-Fr05
WE-Ma06
0.09
38.59
Salt Marsh
Salt Marsh
WE-Ma07
50.58
Salt Marsh
Salt Marsh
Wetland
Enhancement
WE-Ma08
0.43
Salt Marsh
Salt Marsh
Wetland
Enhancement
X
X
X
EC/HE
WE-Ma01
5.00
Canal
Salt Marsh
Wetland
Enhancement
X
X
X
HE/RE
Salt Marsh
Wetland
Restoration
X
X
X
EC/HE/RE
Salt Marsh
Wetland
Enhancement
X
X
HE
X
X
HE
X
X
HE
X
X
HE
X
X
HE
X
X
HE
X
X
HE
X
X
HE
X
X
HE
X
X
HE
WR-Ma01
WE-Ma02
6.33
12.16
Levee
Impoundment
WE-Ma03
0.72
Impoundment
Salt Marsh
Wetland
Enhancement
WE-Ma04
0.88
Impoundment
Salt Marsh
Wetland
Enhancement
WE-Di01
0.27
Ditch
Ditch
WE-Di02
3.27
Ditch
Salt Marsh
WE-Di03
0.72
Ditch
Ditch
WE-Ti01
0.67
Impoundment
Tidal Flat/Creek
WE-Ti02
2.40
Impoundment
Tidal Flat/Creek
WE-Ti03
0.24
Impoundment
Tidal Flat/Creek
WE-Po01
0.88
Pond
Tidal Flat/Creek
WP-Ca01
0.35
Canal
Canal
WP-Im01
8.52
Impoundment
Impoundment
WP-Im02
0.46
Impoundment
Impoundment
WP-Ti05
0.59
Tidal Flat
Tidal Flat/Creek
EC - Exotic/Pest Plant Control
HE - Hydrologic Enhancement
Wetland
Enhancement
Wetland
Enhancement
Wetland
Enhancement
Wetland
Enhancement
Wetland
Enhancement
Wetland
Enhancement
Wetland
Enhancement
Wetland
Preservation
Wetland
Preservation
Wetland
Preservation
Wetland
Preservation
SP - Supplemental Plantings
PR - Preservation
PR
PR
PR
PR
RE - Regrading