You can copy from here when filling out the rest of the page.
SCDOT SC-9 Bridge across Broad River and Lockhart
Union and Chester County, South Carolina
Consists of the discharge of fill material into waters of the U.S., specifically the Broad River, in order to construct temporary causeways associated with the construction of the SC-9 Bridge Replacement across Broad River and Lockhart Canal, Union & Chester Counties (SCDOT PIN 34019 RD01). In detail, the activities in waters of the United States include the placement of two separate temporary rock fill causeways (Causeway A & B) within the Broad River for the construction of the new SC-9 bridge across the Broad River and placement of two separate temporary rock fill causeways (Causeway C & D) in the Broad River to allow for the removal of the existing SC-9 Bridge once the new bridge is constructed and put into use. This project will include a total temporary impact of approximately 206 linear feet, measured parallel to flow of the Broad River and a total of 0.83 acres. Each separate temporary causeway would be removed in its entirety within one year (365 days) from the day of initial placement of fill.