U.S. Army Corps of Engineers publishes request for proposals for beneficial use of dredged materials

U.S. Army Corps of Engineers publishes request for proposals for beneficial use of dredged materials

Washington (February 9, 2018) - The U.S. Army Corps of Engineers today published in the Federal Register its request for proposals for beneficial use of dredged material pilot projects pursuant to Section 1122 of the Water Resources Development Act (WRDA) of 2016, Beneficial Use of Dredged Material.

Proposals must be submitted to USACE on or before March 12, 2018. More information on the program and solicitation can be found in the Federal Register notice, 83 Fed. Reg. 5763 (Feb. 9, 2018). It is available on line at https://www.federalregister.gov/documents/2018/02/09/2018-02613/request-for-proposals-for-beneficial-use-of-dredged-material-pursuant-to-section-1122-of-the-water.

Section 1122 requires USACE to establish a pilot program to carry out 10 projects for the beneficial use of dredged material. The pilot program can include projects for the purposes of: (1) reducing storm damage to property and infrastructure; (2) promoting public safety; (3) protecting, restoring and creating aquatic ecosystem habitats; (4) stabilizing stream systems and enhancing shorelines; (5) promoting recreation; (6) supporting risk management adaptation strategies; and (7) reducing the costs of dredging and dredged material placement or disposal, such as projects that use dredged material for: (A) construction or fill material; (B) civic improvement objectives; and, (C) other innovative uses and placement alternatives that produce public economic or environmental benefits.

Projects identified under Section 1122 must maximize the beneficial placement of dredged material from federal and non-federal navigation channels and ensure that the use of dredged material is consistent with all applicable environmental laws. USACE is required to carry out the pilot program in consultation with relevant state agencies and to establish regional teams to assist in the evaluation of the proposals.

U.S. Army Corps of Engineers publishes request for proposals for beneficial uses of dredged materials/2-2-2

USACE implementation guidance (including selection criteria) for carrying out the provisions of Section 1122 and information on submitting a proposal can be found at http://www.usace.army.mil/Missions/Civil-Works/Project-Planning/Legislative-Links/wrda2016/wrda2016_impguide/.

The ASA(CW) is required to submit a report to the Congress within two years that includes: (1) a description of the projects selected under the pilot program; (2) documentation supporting each of the projects selected; (3) the findings of regional beneficial use teams regarding project selection; and (4) any recommendations of the ASA(CW) or regional beneficial use teams with respect to the pilot program.

The program terminates after completion of the 10 beneficial use pilot projects.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas