You can copy from here when filling out the rest of the page.
RESIDENTIAL DEVELOPMENT NEAR DENHAM SPRINGS, LOUISIANA IN LIVINGSTON PARISH
NAME OF APPLICANT: CST Land Developers, LLC, Inc., c/o D & S Environmental Services, Attn: David Templet, Post Office Box 510, French Settlement, Louisiana 70733.
LOCATION OF WORK: Located on an approximate 24.47-acre site, located on and south of Buddy Ellis Road, approximately 0.6 mile east of the intersection of Buddy Ellis Road and LA Highway 1026 (Juban Road), near Denham Springs, Louisiana, located in Livingston Parish, as shown on the enclosed drawings (Latitude 30.45675 N Longitude -90.904914 W). This project is located in the Pontchartrain Basin (Amite River HUC 08070202).
CHARACTER OF WORK: The applicant is requesting a Department of the Army permit authorization for the construction of a multi-family apartment development (The Palms at Juban Lakes, Phase 2) and a senior restricted multi-family apartment development (Morningside Senior Living). The project will entail the construction of 10 multi-story apartment buildings for the Morningside Senior Living center with pertinent parking, sidewalks, pool houses / pools and green space to accommodate each facility, two stormwater detention ponds with pertinent discharge outfalls, and appropriate ingress and egress access. Approximately 3,629 cubic yards of native material would be placed in jurisdictional areas as a result of project implementation. Approximately 7,093 cubic yards of hauled in materials (soil cement treated base / concrete) would be placed onsite in jurisdictional areas as a result of project implementation. Approximately 7.51 acres of jurisdictional wetlands would be permanently impacted by the project. The applicant has claimed that the project has been designed to avoid and minimize direct and secondary adverse wetland impacts to the maximum extent practicable. The applicant is proposing to utilize best management practices during and after the construction phase of the project and that the project will receive approval from all appropriate drainage and sewage agencies. The applicant is proposing to compensate for the unavoidable impact by purchasing mitigation credits from an approved mitigation bank.