Home

Tulsa District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The application is for the placement of fill material in waters of the United States for the proposed construction of a Costco store and associated infrastructure.

The basic purpose of this work is to develop the property for a future commercial wholesale store. There are no special aquatic sites on the project. A water dependency determination is not necessary since no special aquatic sites are located within the project site. The overall purpose of this work is to provide additional commercial wholesale in the northern sector of Oklahoma City to support ongoing and projected future residential and commercial development. This project proposes to meet existing demand for stores with frontage and access along a main arterial roadway, the John Kilpatrick Turnpike service road. The applicant proposes to permanently impact 950 lf of ephemeral stream channel. The proposed project would place 350 lf of unnamed tributary to Chisholm Creek (ES-1) and 600 lf of unnamed tributary to Chisholm Creek (ES-2) into RCBs beneath the proposed parking lot. Approximately 200 cys of concrete material would be discharged in waters of the United States.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas