You can copy from here when filling out the rest of the page.
SPECIAL PUBLIC NOTICE: This notice announces the effective date, February 21, 2018, for seven RGPs now available for use in Minnesota, Wisconsin, and within the exterior boundaries of American Indian reservations. Regulated activities are described in each RGP pursuant to Section 404 of the Clean Water Act (Section 404) and Section 10 of the Rivers and Harbors Act (Section 10) as applicable.
PROJECT DESCRIPTION AND PURPOSE: This notice announces the effective date, February 21, 2018, for seven RGPs now available for use in Minnesota, Wisconsin, and within the exterior boundaries of American Indian reservations. Regulated activities are described in each RGP pursuant to Section 404 of the Clean Water Act (Section 404) and Section 10 of the Rivers and Harbors Act (Section 10) as applicable.
Public Notice
21 February 2018
EFFECTIVE DATE FOR SEVEN REGIONAL GENERAL
PERMITS (RGPs) IN MINNESOTA, WISCONSIN, AND
AMERICAN INDIAN RESERVATIONS
Authorities:
Section 404 Clean Water Act and
Section 10 Rivers and Harbors Act
Beach Creation &
Minor Discharges RGP
Utilities RGP
Nourishment RGP
Piers and Docks RGP
Wildlife Ponds RGP
Beach Raking RGP
Transportation RGP
This notice announces the effective date, February 21, 2018, for the seven RGPs listed above, now available
for use in Minnesota, Wisconsin, and within the exterior boundaries of American Indian reservations.
Regulated activities are described in each RGP pursuant to Section 404 of the Clean Water Act (Section 404)
and Section 10 of the Rivers and Harbors Act (Section 10) as applicable.
REGIONAL GENERAL PERMIT CONTENT
The full content of each RGP may be reviewed using the web page link indicated below. Each RGP is largely
the same as the RGPs issued on December 20, 2018, with the exception of grammatical corrections and the
five minor changes listed below implemented to improve RGP clarity and interpretation.
1. Calculating tributary losses and temporary impacts: Section D of all seven RGPs have been updated to
clarify how linear tributary impacts should be calculated.
2. Calculating losses and temporary impacts for linear ditches: Section D of the Utility and Transportation
RGPs have been improved to more clearly describe when linear ditches contribute to RGP thresholds.
3. Reporting requirements: Sections B and E of Transportation RGP have been edited to reflect the need to
report, but not supply a pre-construction notification (PCN), for category 2 overall projects which are
proposed to result in the loss of greater than 10,000 square feet of waters of the United States (US). A
requirement to report, rather than supply PCN, was clarified in the Utility RGP for overall projects which
would result in a loss of greater than 0.5 acre of waters of the US.
4. Multiple authorizations: Section G of the Utility and Transportation RGPs more clearly describe the
processing of multiple single and complete linear, and single and complete non-linear, projects.
5. PCN for mechanized land-clearing: The table in Section E of the Utility RGP has been modified to more
clearly articulate when PCN is required for regulated mechanized land-clearing activities.
WATER QUALITY CERTIFICATION
All RGP activities authorized pursuant to Section 404 of the Clean Water Act require 401 Water Quality
Certification (WQC) or waiver from the applicable state agency, tribe or the United States Environmental
Protection Agency. See the following table for general WQC information, but please refer to the RGP link
below for specific information.
401 Water Quality Certification for Regional General Permits
401 Agency
EPA
1
Grand Portage
Lac du Flambeau
MPCA
2
WI DNR
Mole Lake
Bad River
Fond du Lac2
1
2
Beach Creation &
Nourishment RGP
Beach Raking RGP
Minor Discharges
RGP
Piers and Docks
RGP
Transportation RGP
Utilities RGP
Wildlife Ponds RGP
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Certified with conditions Certified with conditions Certified with conditions Certified with conditions Certified with conditions Certified with conditions Certified with conditions
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Certified with conditions Certified with conditions Certified with conditions Certified with conditions Certified with conditions Certified with conditions Certified with conditions
Partially Certified
Individual Certification
Required
Individual Certification
Required
Certified with conditions Certified with conditions Certified with conditions
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Certified with conditions Certified with conditions Certified with conditions Certified with conditions
Partially Certified
Partially Certified
Partially Certified
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Individual Certification
Required
Certified with conditions
Individual Certification
Required
EPA has responsibility to evaluate WQC within the exterior boundaries of all 17 Indian Reservations in Minnesota and Wisconsin not listed above.
MPCA and Fond du Lac have restricted the waterbodies certified. See the link below for additional information.
Public Notice, Regional General Permits
COASTAL MANAGEMENT PROGRAM CONSISTENCY CERTIFICATION
Coastal Zone Management Act (CZMA) consistency concurrence from the Minnesota Department of Natural
Resources and the Wisconsin Department of Administration is presumed in the coastal zones of Lake Superior
in Minnesota and Wisconsin, and Lake Michigan in Wisconsin.
ADDITIONAL INFORMATION
All seven RGPs, including WQC information, may be found on the St. Paul District's web page located at:
http://www.mvp.usace.army.mil/Missions/Regulatory/Permitting-Process-Procedures/. Questions concerning
the seven RGPs and conditions within the St. Paul District can be directed to Rebecca Graser in our
Brookfield, Wisconsin office at (651) 290-5728. Alternatively, Mrs. Graser may be contacted via email at
rebecca.m.graser@usace.army.mil.
Chad Konickson
Chief, Regulatory Branch
2