You can copy from here when filling out the rest of the page.
ARTIFICIAL REEF IN THE GULF OF MEXICO
NAME OF APPLICANT: Louisiana Department of Wildlife and Fisheries, Artificial Reef Program, Post Office Box 98000, Baton Rouge, Louisiana 70808.
LOCATION OF WORK: In the Gulf of Mexico, Eugene Island 273, located off the coast of Terrebonne Parish, Louisiana, as shown on the attached drawings.
CHARACTER OF WORK: Deploy Arena Offshore, Eugene Island 252-C jacket in the Eugene Island 273 artificial reef site to provide structural habitat for the purpose of enhancing fishing opportunities in the Gulf of Mexico. Clearance from the top of the deployed platform jackets to the water surface will be approximately 115 feet. This request is pursuant to Act 100, 1986 Louisiana Legislature and the National Fishing Enhancement Act of 1984.
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
7400 LEAKE AVENUE
NEW ORLEANS, LOUISIANA 70118
February 26, 2018
REPLY TO
ATTENTION OF:
Operations Division
Western Evaluation Section
Project Manager
Darlene Herman
(504) 862-2287
Darlene.C.Herman@usace.army.mil
SUBJECT: MVN 2003-2477 WB
PUBLIC NOTICE
Interested parties are hereby notified that an application has been received by the District
engineer for a Department of the Army permit to authorize the following pursuant to (X) Section 10 of
the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or () Section 404 of
the Clean Water Act (86 Stat. 816; 33 USC 1344).
ARTIFICIAL REEF IN THE GULF OF MEXICO
NAME OF APPLICANT: Louisiana Department of Wildlife and Fisheries, Artificial Reef Program,
Post Office Box 98000, Baton Rouge, Louisiana 70808.
LOCATION OF WORK: In the Gulf of Mexico, Eugene Island 273, located off the coast of
Terrebonne Parish, Louisiana, as shown on the attached drawings.
CHARACTER OF WORK: Deploy Arena Offshore, Eugene Island 252-C jacket in the Eugene Island
273 artificial reef site to provide structural habitat for the purpose of enhancing fishing opportunities in
the Gulf of Mexico. Clearance from the top of the deployed platform jackets to the water surface will
be approximately 115 feet. This request is pursuant to Act 100, 1986 Louisiana Legislature and the
National Fishing Enhancement Act of 1984.
The comment period for the Department of the Army Permit will close 15 days from the date of
this joint public notice. Written comments, including suggestions for modifications or objections to the
proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit
and must be submitted so as to be received before or by the last day of the comment period. Letters
concerning the Corps of Engineers permit application must reference the applicant's name and the
Permit Application Number, and be forwarded to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH.
-2-
The decision whether to issue a permit will be based on an evaluation of the probable impact
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. all factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
consideration of property ownership and, in general, the needs and welfare of the people.
The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies
and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts
of this proposed activity. Any comments received will be considered by the Corps of Engineers to
determine whether to issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above. Comments
are used in the preparation of an Environmental Assessment and/or Environmental Impact Statement
pursuant to the National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of
this notice is being forwarded to the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as endangered
by the U.S. Department of Interior nor affect any habitat designated as critical to the survival and
recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 0 acre(s) of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
-3-
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency and certification that the proposed activity will
not violate applicable water quality standards will be required from the Louisiana Department of
Environmental Quality, Water Quality Certifications Section, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Attachments
Louisiana Artificial Reef Planning Areas
Baton Rouge
Lafayette
New Orleans
Cameron
Morgan City
Cocodrie
Leeville
Grand Isle
Venice
8
7
6
3
9
2
4
1
5
0
12.5
25
50
75
100
Nautical Miles
Planning Areas
Planning Areas
Fairways
OCS Blocks
1. West Cameron Planning Area
2. East Cameron Planning Area
3. South Marsh Island (76) Planning Area
4. South Marsh Island (146) Planning Area
5. Eugene Island Planning Area
6. South Timbalier Planning Area
7. West Delta Planning Area
8. Main Pass Planning Area
9. Ship Shoal Planning Area
µ
Louisiana Artificial Reef Program
Intracoastal City
Weeks
Franklin
CentervilleBerwick
Patterson
South Marsh Island Area, North Addition
Vermilion Area
Eugene Island Area
Ship Shoal Area
South Marsh Island Area
South Marsh Island
EI-273 Reef
South Marsh Island Area, South Addition
Vermilion Area, South Addition
Eugene Island Area, South Addition
South Marsh Island
Planning Area
Permitted Reef Sites
Fairways
OCS Blocks
0 2.5 5
10
15
20
Nautical Miles
EI-273 Reef Vicinity Map
Ship Shoal Area, South Addition
µ