Additionally, interested parties are notified that the Commander, Thirteenth Coast Guard District has received an application from BNSF, requesting approval of location and plans for the construction of new bridges over navigable waterways of the United States. Mariners, maritime stakeholders and the public are highly encouraged to review this notice with attached preliminary plans carefully and provide comment on the proposed project.
Public Notice:
Application for Permit
APPLICATION NO.: NWW-2007-01303
WATERWAY: Sand Creek and Lake Pend Oreille
APPLICANT: Burlington Northern Santa Fe Railway Company
DATE ISSUED: February 26, 2018
END DATE: March 28, 2018
Interested parties are hereby notified that the Walla Walla District has received an application from Burlington Northern Santa Fe Railway Company (BNSF) for a Department of the Army permit for certain work in Waters of the United States, including wetlands, as described in the enclosed documents.
Additionally, interested parties are notified that the Commander, Thirteenth Coast Guard District has received an application from BNSF, requesting approval of location and plans for the construction of new bridges over navigable waterways of the United States. Mariners, maritime stakeholders and the public are highly encouraged to review this notice with attached preliminary plans carefully and provide comment on the proposed project.
APPLICANT: Matthew Keim, Burlington Northern Santa Fe Railway Company (BNSF)
AGENT: Pierre Bordenave, Jacobs Engineering
U.S. ARMY CORPS OF ENGINEERS PROJECT MANAGER:
Shane P. Slate, (208) 433-4474, NWW_BNSF_Pendoreille@usace.army.mil
U.S. COAST GUARD DISTRICT 13 BRIDGE PROGRAM ADMINISTRATOR:
Steven M. Fischer
Thirteenth Coast Guard District
915 2nd Ave, Room 3510
Seattle, WA 98174
D13-PF-D13BRIDGES@uscg.mil
PURPOSE: Discharge rock fill material into Sand Creek, Lake Pend Oreille and adjacent wetlands for the construction of a 2.2 mile long second mainline track crossing.
WATERWAY: Lake Pend Oreille and Sand Creek
LOCATION: The proposed project would be located on Sand Creek, Lake Pend Oreille, and adjacent wetlands, within Sections 15, 22, 23, 25, 26, and 36, of Township 57 North, Range 2 West, near latitude 48.261554º N and longitude
–116.532741º W, in Bonner County, Sandpoint, Idaho.
AUTHORITY: The Department of the Army (DA) permit will be issued or denied under the authority of Section 404 of the Clean Water Act (33 U.S.C. 1344) for all fill materials discharged into waters of the United States, including wetlands. A DA permit is required for the discharge of dredged or fill material into waters of the United States (U.S.), including wetlands associated with bridges and causeways.
The DA also has the authority to issue permits under Section 10 of the Rivers & Harbors Act of 1899 (33 U.S.C. 403) for the discharge of fill material into navigable waters of the U.S. A DA permit is required for work or structures, except bridges and causeways, waterward of the ordinary high water mark located in or over navigable waters of the United States, including the excavation, dredging or deposition of material in navigable waters, or any alteration obstructing or affecting the course, location, condition, or capacity of the navigable waterway. The only portion of this project that requires Section 10 authorization is the discharge of fill material at the south end of the project near Mile Post 5.1.
The U.S. Coast Guard (USCG) has the authority to issue or deny permits for bridges and causeways in or over navigable waters of the United States under the General Bridge Act of 1946 (33 U.S.C. 525 et seq.). The Coast Guard permits the location and plans of bridges and causeways and imposes any necessary conditions relating to the construction, maintenance, and operation of these bridges in the interest of public navigation. A bridge permit is the written approval of the location and plans of the bridge or causeway to be constructed or modified across a navigable waterway of the United States. USCG will act as federal lead agency overseeing compliance with Section 106 of the National Historic Preservation Act and Endangered Species Act (ESA) consultation for the proposed bridge projects.
* Please refer to Attachment A for a breakdown of the federal regulatory authorities of this project.
WORK (The US Army Corps of Engineers only has authority over the following):
The construction consists of a 2.2-mile-long second mainline track west of the existing BNSF mainline to connect the North Algoma Siding track (MP 5.1) south of Sandpoint, to the Sandpoint Junction switch (MP 2.9), where the BNSF and the Montana Rail Link (MRL) mainlines converge in Sandpoint.
Project activities would permanently discharge 11,220 cubic yards of rock into 1.16 acres of waters (0.88 acre) and wetlands (0.28 acre) and temporarily discharge 3680 cubic yards of rock into 0.38 acres of open water:
•0.29-acre permanent fill in Lake Pend Oreille along the lakeshore edge at the south end of the project where the new track will connect to the existing BNSF Algoma Siding north switch.
• 0.01-acre permanent fill and 0.03-acre of temporary fill in Lake Pend Oreille at the south end of Bridge 3.9 to accommodate the transition from the bridges to the existing upland grade.
• 0.57-acre of permanent fill and 0.30-acre temporary fill in Lake Pend Oreille at the north end of the Bridge 3.9 to accommodate the transition from bridges to the existing upland grade. This fill will essentially match the length of the existing fill on which the existing BNSF mainline is built.
• 0.05-acre temporary fill from construction activities to install the Bridge 3.1 upland pilings along the water line north of the navigation channel.
• 0.01-acre permanent fill in Sand Creek at the south end of Bridge 3.1 to accommodate the transition from bridge to new rail grade.
• 0.28-acre of permanent wetland fill at the south end of Bridge 3.1 between the existing rail grade and the multi-use pedestrian path.
* Please refer to Attachment B detailing the project components within the Corps regulatory authority.
OTHER AUTHORIZATIONS: The Idaho Department Lands (IDL) and the USCG are also reviewing the proposed project under their respective authorities.
Attachments C and D include the additional portions of the proposed project which are regulated by the USCG under the General Bridge Act of 1946 (33 U.S.C. 525 et seq.).
Please mail any comments regarding the proposed bridge structures associated with this project to the USCG at:
Steven M. Fischer
Thirteenth Coast Guard District
915 2nd Ave, Rm 3510
Seattle, WA 98174
Or email: D13-PF-D13BRIDGES@uscg.mil
The Idaho Department of Lands has issued its own separate public notice regarding the proposed project. To view the IDL public notice, and all associated materials, please visit their website at https://www.idl.idaho.gov/lakes-rivers/lake-protection/index.html
CONSTRUCTION PERIOD: Applicant proposes to start construction in the Fall of 2018. The permit would authorize construction for a period of five years.
PROPOSED MITIGATION:
The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to Waters of the United States from activities involving discharges of dredged or fill material.
BNSF Railway Company has evaluated alternatives to avoid and minimize impacts to Waters of the U.S. In addition, a project-specific Water Quality Monitoring and Protection Plan (WQMPP) and a Storm Water Pollution Prevention Plan (SWPPP) has been prepared and will be implemented for the project. The discharge of fill material and associated construction activities, in nearshore locations and wetlands, will occur at the earliest stages of the project to take advantage of performing that work while lake levels are lower and wetland areas are relatively dry to ensure temporary construction impacts are kept to a minimum.
To offset permanent impacts to 0.28 acres of wetlands, the applicant has proposed compensatory mitigation via the purchase of wetlands mitigation credits from the Valencia Wetland Mitigation Bank, in Priest River, Idaho. The applicant is currently investigating potential mitigation alternatives to offset 0.88 acres of permanent impacts to open water in Sand Creek and Lake Pend Oreille associated with the project’s construction impacts.
WATER QUALITY CERTIFICATION: This notice will also serve as a Public Notice that the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify that the discharge of dredge and/or fill material proposed for this project will not violate existing water quality standards. The DA and USCG permits will not be issued until water quality certification has been issued or waived by the IDEQ, as required by Section 401 of the Clean Water Act. If water quality certification is not issued, waived or denied within sixty (60) days of this public notice date, and an extension of this period is not requested by and granted to the IDEQ, certification will be considered waived. Additionally, within thirty (30) days of this Public Notice, any person may provide written comments to IDEQ as a request in writing that IDEQ provide them notice of their preliminary 401 Certification decision. Comments concerning Water Quality Certification for this project should be mailed to: Idaho Department of Environmental Quality, Coeur d’Alene Regional Office, 2110 Ironwood Parkway, Coeur d’Alene, Idaho 83814.
AQUATIC RESOURCE DESCRIPTION: Lake Pend Oreille and the Pend Oreille River, to which Sand Creek is a tributary to, comprise one of the largest water bodies in the state of Idaho. It is a natural lake that has been enlarged by the construction of the Albeni Falls Dam near Oldtown, ID, a multi-purpose project on the Pend Oreille River operated by the Corps of Engineers. It covers an area exceeding 90,000 acres of water and has a shoreline of 226 miles. The Albeni Falls Project is operated to maintain a water surface elevation of 2062.5 feet NGVD during summer recreation season and can be drawn down to 2051 feet NGVD during the winter.
There are several communities around the lake including Hope, East Hope, Bayview, Laclede, Priest River, Dover and Sandpoint. Most of the riparian lands along the lake and river are privately owned. However, there are substantial areas in the southern portion of Lake Pend Oreille under federal ownership. Residences and summer cabins are common along much of the waterfront properties along the lake and river.
CULTURAL RESOURCES: Coordination is currently being conducted with the office of the Idaho State Historic Preservation Officer to determine if this activity will affect a site that is listed on the National Register of Historic Places, or a site that may be eligible for listing on the Register. We are also coordinating with the appropriate Tribal entity or the Tribal Historic Preservation Offices for the Coeur d’Alene Tribe, the Confederated Salish and Kootenai Tribes of the Flathead Reservation, the Kalispel Tribe of Indians, the Kootenai Tribe of Idaho, and the Spokane Tribe, to determine if there are any tribal historic or cultural interests within the project area.
TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the federal trust responsibility arising from treaties, statutes, executive orders and the historical relations between the United States and American Indian Tribes. The federal government has a unique trust relationship with federally recognized American Indian Tribes, including the Coeur d’Alene Tribe, the Confederated Salish and Kootenai Tribes of the Flathead Reservation, the Kalispel Tribe of Indians, the Kootenai Tribe of Idaho, and the Spokane Tribe. The Corps has a responsibility and obligation to consider and consult on potential effects to Tribal rights, uses and interests. The Corps further recognizes there may be a need for additional and on-going consultation.
ENDANGERED SPECIES: The project is within the known or historic range of the bull trout and its critical habitat. Coordination is currently being conducted with the U.S. Fish and Wildlife Service (USFWS) to determine if the activity will have any effect on species designated as endangered or threatened under the Endangered Species Act, or their critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844).
ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed activities will not require preparation of an Environmental Impact Statement. Comments provided will be considered in preparation of an Environmental Assessment.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. This decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and in general, the needs and welfare of the people. In addition, our evaluation will include application of the EPA Guidelines (40 CFR 230) as required by Section 404(b)(1) of the Clean Water Act.
CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting comments from the general public; Federal, State and local agencies and officials, Tribal entities and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest in the proposed activity.
PUBLIC HEARING: Any person may request in writing, within the comment period specified in this notice, that a public hearing is held to consider this proposed activity. Requests for a public hearing shall state specific reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.
COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on the proposed activity, which will become a part of the record and will be considered in the final decision.
Please mail all comments to:
U.S. Army Corps of Engineers
Walla Walla District
Attn: Shane Slate
Coeur d'Alene Regulatory Office
1910 Northwest Boulevard, Suite 210
Coeur d'Alene, Idaho 83814-2676
Or email: NWW_BNSF_Pendoreille@usace.army.mil
Comments should be received no later than the comment due date of March 28, 2018, as indicated on this notice, to receive consideration.
Kelly J. Urbanek
Chief, Regulatory Division
Walla Walla District
Public Notice:
U.S. Army Corps
Of Engineers
Walla Walla District
201 North Third Avenue
Walla Walla, WA 99362-1876
Application for Permit
APPLICATION NO.: NWW-2007-01303
WATERWAY: Sand Creek and Lake Pend Oreille
APPLICANT: Burlington Northern Santa Fe Railway
Company
DATE ISSUED: February 26, 2018
30-Day
Notice
END DATE: March 28, 2018
Interested parties are hereby notified that the Walla Walla District has received an
application from Burlington Northern Santa Fe Railway Company (BNSF) for a
Department of the Army permit for certain work in Waters of the United States, including
wetlands, as described in the enclosed documents.
Additionally, interested parties are notified that the Commander, Thirteenth Coast Guard
District has received an application from BNSF, requesting approval of location and
plans for the construction of new bridges over navigable waterways of the United
States. Mariners, maritime stakeholders and the public are highly encouraged to review
this notice with attached preliminary plans carefully and provide comment on the
proposed project.
APPLICANT: Matthew Keim, Burlington Northern Santa Fe Railway Company (BNSF)
AGENT: Pierre Bordenave, Jacobs Engineering
U.S. ARMY CORPS OF ENGINEERS PROJECT MANAGER:
Shane P. Slate, (208) 433-4474, NWW_BNSF_Pendoreille@usace.army.mil
U.S. COAST GUARD DISTRICT 13 BRIDGE PROGRAM ADMINISTRATOR:
Steven M. Fischer
Thirteenth Coast Guard District
915 2nd Ave, Room 3510
Seattle, WA 98174
D13-PF-D13BRIDGES@uscg.mil
CENWW-RD
February 26, 2018
Application Number: NWW-2007-01303
PURPOSE: Discharge rock fill material into Sand Creek, Lake Pend Oreille and
adjacent wetlands for the construction of a 2.2 mile long second mainline track crossing.
WATERWAY: Lake Pend Oreille and Sand Creek
LOCATION: The proposed project would be located on Sand Creek, Lake Pend
Oreille, and adjacent wetlands, within Sections 15, 22, 23, 25, 26, and 36, of Township
57 North, Range 2 West, near latitude 48.261554º N and longitude
116.532741º W, in Bonner County, Sandpoint, Idaho.
AUTHORITY: The Department of the Army (DA) permit will be issued or denied under
the authority of Section 404 of the Clean Water Act (33 U.S.C. 1344) for all fill materials
discharged into waters of the United States, including wetlands. A DA permit is required
for the discharge of dredged or fill material into waters of the United States (U.S.),
including wetlands associated with bridges and causeways.
The DA also has the authority to issue permits under Section 10 of the Rivers & Harbors
Act of 1899 (33 U.S.C. 403) for the discharge of fill material into navigable waters of the
U.S. A DA permit is required for work or structures, except bridges and causeways,
waterward of the ordinary high water mark located in or over navigable waters of the
United States, including the excavation, dredging or deposition of material in navigable
waters, or any alteration obstructing or affecting the course, location, condition, or
capacity of the navigable waterway. The only portion of this project that requires Section
10 authorization is the discharge of fill material at the south end of the project near Mile
Post 5.1.
The U.S. Coast Guard (USCG) has the authority to issue or deny permits for bridges
and causeways in or over navigable waters of the United States under the General
Bridge Act of 1946 (33 U.S.C. 525 et seq.). The Coast Guard permits the location and
plans of bridges and causeways and imposes any necessary conditions relating to the
construction, maintenance, and operation of these bridges in the interest of public
navigation. A bridge permit is the written approval of the location and plans of the bridge
or causeway to be constructed or modified across a navigable waterway of the United
States. USCG will act as federal lead agency overseeing compliance with Section 106
of the National Historic Preservation Act and Endangered Species Act (ESA)
consultation for the proposed bridge projects.
* Please refer to Attachment A for a breakdown of the federal regulatory authorities of
this project.
-2-
CENWW-RD
February 26, 2018
Application Number: NWW-2007-01303
WORK (The US Army Corps of Engineers only has authority over the following):
The construction consists of a 2.2-mile-long second mainline track west of the existing
BNSF mainline to connect the North Algoma Siding track (MP 5.1) south of Sandpoint,
to the Sandpoint Junction switch (MP 2.9), where the BNSF and the Montana Rail Link
(MRL) mainlines converge in Sandpoint.
Project activities would permanently discharge 11,220 cubic yards of rock into 1.16
acres of waters (0.88 acre) and wetlands (0.28 acre) and temporarily discharge 3680
cubic yards of rock into 0.38 acres of open water:
0.29-acre permanent fill in Lake Pend Oreille along the lakeshore edge at the
south end of the project where the new track will connect to the existing BNSF
Algoma Siding north switch.
0.01-acre permanent fill and 0.03-acre of temporary fill in Lake Pend Oreille at
the south end of Bridge 3.9 to accommodate the transition from the bridges to the
existing upland grade.
0.57-acre of permanent fill and 0.30-acre temporary fill in Lake Pend Oreille at
the north end of the Bridge 3.9 to accommodate the transition from bridges to the
existing upland grade. This fill will essentially match the length of the existing fill
on which the existing BNSF mainline is built.
0.05-acre temporary fill from construction activities to install the Bridge 3.1
upland pilings along the water line north of the navigation channel.
0.01-acre permanent fill in Sand Creek at the south end of Bridge 3.1 to
accommodate the transition from bridge to new rail grade.
0.28-acre of permanent wetland fill at the south end of Bridge 3.1 between the
existing rail grade and the multi-use pedestrian path.
* Please refer to Attachment B detailing the project components within the Corps
regulatory authority.
OTHER AUTHORIZATIONS: The Idaho Department Lands (IDL) and the USCG are
also reviewing the proposed project under their respective authorities.
Attachments C and D include the additional portions of the proposed project which are
regulated by the USCG under the General Bridge Act of 1946 (33 U.S.C. 525 et seq.).
Please mail any comments regarding the proposed bridge structures associated with
this project to the USCG at:
Steven M. Fischer
Thirteenth Coast Guard District
915 2nd Ave, Rm 3510
Seattle, WA 98174
Or email: D13-PF-D13BRIDGES@uscg.mil
-3-
CENWW-RD
February 26, 2018
Application Number: NWW-2007-01303
The Idaho Department of Lands has issued its own separate public notice regarding the
proposed project. To view the IDL public notice, and all associated materials, please
visit their website at https://www.idl.idaho.gov/lakes-rivers/lake-protection/index.html
CONSTRUCTION PERIOD: Applicant proposes to start construction in the Fall of
2018. The permit would authorize construction for a period of five years.
PROPOSED MITIGATION:
The applicant proposes the following mitigation measures to avoid, minimize, and
compensate for impacts to Waters of the United States from activities involving
discharges of dredged or fill material.
BNSF Railway Company has evaluated alternatives to avoid and minimize impacts to
Waters of the U.S. In addition, a project-specific Water Quality Monitoring and
Protection Plan (WQMPP) and a Storm Water Pollution Prevention Plan (SWPPP) has
been prepared and will be implemented for the project. The discharge of fill material
and associated construction activities, in nearshore locations and wetlands, will occur at
the earliest stages of the project to take advantage of performing that work while lake
levels are lower and wetland areas are relatively dry to ensure temporary construction
impacts are kept to a minimum.
To offset permanent impacts to 0.28 acres of wetlands, the applicant has proposed
compensatory mitigation via the purchase of wetlands mitigation credits from the
Valencia Wetland Mitigation Bank, in Priest River, Idaho. The applicant is currently
investigating potential mitigation alternatives to offset 0.88 acres of permanent impacts
to open water in Sand Creek and Lake Pend Oreille associated with the project's
construction impacts.
WATER QUALITY CERTIFICATION: This notice will also serve as a Public Notice that
the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify
that the discharge of dredge and/or fill material proposed for this project will not violate
existing water quality standards. The DA and USCG permits will not be issued until
water quality certification has been issued or waived by the IDEQ, as required by
Section 401 of the Clean Water Act. If water quality certification is not issued, waived or
denied within sixty (60) days of this public notice date, and an extension of this period is
not requested by and granted to the IDEQ, certification will be considered waived.
Additionally, within thirty (30) days of this Public Notice, any person may provide written
comments to IDEQ as a request in writing that IDEQ provide them notice of their
preliminary 401 Certification decision. Comments concerning Water Quality Certification
for this project should be mailed to: Idaho Department of Environmental Quality, Coeur
d'Alene Regional Office, 2110 Ironwood Parkway, Coeur d'Alene, Idaho 83814.
-4-
CENWW-RD
February 26, 2018
Application Number: NWW-2007-01303
AQUATIC RESOURCE DESCRIPTION: Lake Pend Oreille and the Pend Oreille River,
to which Sand Creek is a tributary to, comprise one of the largest water bodies in the
state of Idaho. It is a natural lake that has been enlarged by the construction of the
Albeni Falls Dam near Oldtown, ID, a multi-purpose project on the Pend Oreille River
operated by the Corps of Engineers. It covers an area exceeding 90,000 acres of water
and has a shoreline of 226 miles. The Albeni Falls Project is operated to maintain a
water surface elevation of 2062.5 feet NGVD during summer recreation season and can
be drawn down to 2051 feet NGVD during the winter.
There are several communities around the lake including Hope, East Hope, Bayview,
Laclede, Priest River, Dover and Sandpoint. Most of the riparian lands along the lake
and river are privately owned. However, there are substantial areas in the southern
portion of Lake Pend Oreille under federal ownership. Residences and summer cabins
are common along much of the waterfront properties along the lake and river.
CULTURAL RESOURCES: Coordination is currently being conducted with the office of
the Idaho State Historic Preservation Officer to determine if this activity will affect a site
that is listed on the National Register of Historic Places, or a site that may be eligible for
listing on the Register. We are also coordinating with the appropriate Tribal entity or the
Tribal Historic Preservation Offices for the Coeur d'Alene Tribe, the Confederated Salish
and Kootenai Tribes of the Flathead Reservation, the Kalispel Tribe of Indians, the
Kootenai Tribe of Idaho, and the Spokane Tribe, to determine if there are any tribal
historic or cultural interests within the project area.
TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the
federal trust responsibility arising from treaties, statutes, executive orders and the
historical relations between the United States and American Indian Tribes. The federal
government has a unique trust relationship with federally recognized American Indian
Tribes, including the Coeur d'Alene Tribe, the Confederated Salish and Kootenai Tribes
of the Flathead Reservation, the Kalispel Tribe of Indians, the Kootenai Tribe of Idaho,
and the Spokane Tribe. The Corps has a responsibility and obligation to consider and
consult on potential effects to Tribal rights, uses and interests. The Corps further
recognizes there may be a need for additional and on-going consultation.
ENDANGERED SPECIES: The project is within the known or historic range of the bull
trout and its critical habitat. Coordination is currently being conducted with the U.S. Fish
and Wildlife Service (USFWS) to determine if the activity will have any effect on species
designated as endangered or threatened under the Endangered Species Act, or their
critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844).
ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed
activities will not require preparation of an Environmental Impact Statement. Comments
provided will be considered in preparation of an Environmental Assessment.
-5-
CENWW-RD
February 26, 2018
Application Number: NWW-2007-01303
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impact, including cumulative impacts, of the proposed activity on the
public interest. This decision will reflect the national concern for both protection and
utilization of important resources. The benefit which reasonably may be expected to
accrue from the proposal must be balanced against its reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered,
including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion
and accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production, mineral needs, consideration of property ownership
and in general, the needs and welfare of the people. In addition, our evaluation will
include application of the EPA Guidelines (40 CFR 230) as required by Section
404(b)(1) of the Clean Water Act.
CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting
comments from the general public; Federal, State and local agencies and officials,
Tribal entities and other interested parties in order to consider and evaluate the impacts
of this proposed activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue, modify, condition or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects and the other
public interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need for
a public hearing and to determine the overall public interest in the proposed activity.
PUBLIC HEARING: Any person may request in writing, within the comment period
specified in this notice, that a public hearing is held to consider this proposed activity.
Requests for a public hearing shall state specific reasons for holding a public hearing. A
request may be denied if substantive reasons for holding a hearing are not provided or if
there is otherwise no valid interest to be served.
COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on
the proposed activity, which will become a part of the record and will be considered in
the final decision.
Please mail all comments to:
U.S. Army Corps of Engineers
Walla Walla District
Attn: Shane Slate
Coeur d'Alene Regulatory Office
1910 Northwest Boulevard, Suite 210
Coeur d'Alene, Idaho 83814-2676
-6-
CENWW-RD
February 26, 2018
Application Number: NWW-2007-01303
Or email: NWW_BNSF_Pendoreille@usace.army.mil
Comments should be received no later than the comment due date of March 28, 2018,
as indicated on this notice, to receive consideration.
Kelly J. Urbanek
Chief, Regulatory Division
Walla Walla District
Enclosures
PN_NWW-2007-01303_Attachment_A.pdf
PN_NWW-2007-01303_Attachment_B.pdf
PN_NWW-2007-01303_Attachment_C.pdf
PN_NWW-2007-01303_Attachment_D.pdf
-7-
Attachment A
North End: MP 2.9
!
La k e
P e n d
Ore i ll e
MP 3
0.05 Acres Temp. Nearshore Impact
Section 9 (USCG)
Section 404 (USACE)
Bridge 3.1
Section 9 only (USCG)
0.28 Acres Perm. Wetland Fill
Section 404 (USACE)
0.01 Acres Perm. Nearshore Fill
Section 9 (USCG)
Section 404 (USACE)
MP 4
0.57 Acres Perm. Nearshore Fill
0.30 Acres Temp. Nearshore Fill
Section 9 (USCG)
Section 404 (USACE)
Bridge 3.9
Section 9 only (USCG)
BNSF Mileposts
!
Project Ends
Project Location
BNSF Track
0.01 Acres Perm. Nearshore Fill
0.03 Acres Temp. Nearshore Fill
Project Bridges
Section 9 (USCG)
Section 404 (USACE)
MP 5
USCG = US Coast Guard
USACE = US Army Corps of Engineers
0
1,000
2,000 Feet
1 inch = 2,000 feet
1:24,000
South End: MP 5.1
!
¯
0.29 Acres Perm. Nearshore Fill
Section 10 (USACE)
Section 404 (USACE)
JURISDICTIONAL IMPACT OVERVIEW MAP
Lake Pend Oreille
Sandpoint
Project
Location
Idaho
§
¨
¦
95
0
1
2 Mi
USACE REF. NO.: NWW-2007-1303
PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR
APPLICANT: BNSF RAILWAY CO.
BNSF LOCATION: MONTANA DIVISION, KOOTENAI RIVER
SUBDIVISION, MP 2.9 - 5.1
PLSS: IN PARTS OF S15, 22, 23, 25, 26 & 36 T57 R2W - BOISE
MERIDIAN
NORTH END (MP 2.9): 48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1): 48°14'56.24"N, 116°31'24.02"W
WATERWAY: LAKE PEND OREILLE & SAND CREEK
CITY: SANDPOINT
COUNTY: BONNER
STATE: IDAHO
DATE: NOVEMBER 2017
DATA SOURCES: ESRI (AERIAL), NATURAL EARTH (STATE MAP),
BNSF (TRACK AND MILEPOSTS)
Attachment B
North End: MP 2.9
!
La k e
P e n d
Ore i ll e
MP 3
Bridge 3.0
Bridge 3.1
(1) 0.05 Acres Temp. Nearshore Impact
(2) 0.28 Acres Perm. Wetland Fill and
0.01 Acres Perm. Nearshore Fill
MP 4
(3) 0.57 Acres Perm. Nearshore Fill
and 0.30 Acres Temp. Nearshore Fill
Bridge 3.9
BNSF Mileposts
!
Project Ends
(4) 0.01 Acres Perm. Nearshore Fill
0.03 Acres Temp. Nearshore Fill
Project Location
MP 5
BNSF Track
South End: MP 5.1
Project Bridges
0
1,000
2,000 Feet
1 inch = 2,000 feet
1:24,000
!
¯
(5) 0.29 Acres
Perm. Nearshore Fill
JURISDICTIONAL IMPACT OVERVIEW MAP
Lake Pend Oreille
Sandpoint
Project
Location
Idaho
§
¨
¦
95
0
1
2 Mi
USACE REF. NO.: NWW-2007-1303
PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR
APPLICANT: BNSF RAILWAY CO.
BNSF LOCATION: MONTANA DIVISION, KOOTENAI RIVER
SUBDIVISION, MP 2.9 - 5.1
PLSS: IN PARTS OF S15, 22, 23, 25, 26 & 36 T57 R2W - BOISE
MERIDIAN
NORTH END (MP 2.9): 48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1): 48°14'56.24"N, 116°31'24.02"W
WATERWAY: LAKE PEND OREILLE & SAND CREEK
CITY: SANDPOINT
COUNTY: BONNER
STATE: IDAHO
DATE: NOVEMBER 2017
DATA SOURCES: ESRI (AERIAL), NATURAL EARTH (STATE MAP),
BNSF (TRACK AND MILEPOSTS)
Page 1 of 9
Attachment B
North End: MP 2.9
!
MP 3
Bridge 3.0
!
A
Bridge 3.1
Construction Access Point
from Bridge Street
!
A
Construction Access Point
from Hwy 95
MP 4
Bridge 3.9
!
A
MP 5
Construction Access Point
South End: MP 5.1
BNSF Mileposts
!
!
Project Ends
Construction Access Route
Project Location
Project Bridges
Staging Area
0
0.25
0.5 Miles
1 inch = 2,500 feet
1:30,000
!
A
¯
Construction Access Point
from Bottle Bay Road
MP 6
CONSTRUCTION STAGING AREAS AND ACCESS POINTS
Lake Pend Oreille
Sandpoint
Project
Location
Idaho
§
¨
¦
95
0
1
2 Mi
USACE REF. NO.: NWW-2007-1303
PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR
APPLICANT: BNSF RAILWAY CO.
BNSF LOCATION: MONTANA DIVISION, KOOTENAI RIVER
SUBDIVISION, MP 2.9 - 5.1
PLSS: IN PARTS OF S15, 22, 23, 25, 26 & 36 T57 R2W - BOISE
MERIDIAN
NORTH END (MP 2.9): 48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1): 48°14'56.24"N, 116°31'24.02"W
WATERWAY: LAKE PEND OREILLE & SAND CREEK
CITY: SANDPOINT
COUNTY: BONNER
STATE: IDAHO
DATE: NOVEMBER 2017
DATA SOURCES: ESRI (AERIAL), NATURAL EARTH (STATE MAP),
BNSF (TRACK AND MILEPOSTS)
Page 2 of 9
Attachment B
0.05 ACRES OF TEMPORARY NEARSHORE FILL
JURISDICTIONAL
HIGH WATER LINE (2062.5)
EXISTING (TYPICAL)
PROPOSED
NEARSHORE FILL AREA (TEMPORARY)
(1) JURISDICTIONAL IMPACTS
BNSF BRIDGE 3.1 NORTH END
USACE REF. NO.: NWW-2007-1303
PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR
BNSF LOCATION: MONTANA DIVISION,
KOOTENAI SUBDIVISION, MP 2.9-5.1
CITY: SANDPOINT
COUNTY: BONNER
STATE: IDAHO
DATE: NOVEMBER 2017
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017)
Page 3 of 9
Attachment B
JURISDICTIONAL
HIGH WATER LINE (2062.5)
0.01 ACRES OF PERMANENT
NEARSHORE FILL
0.28 ACRES OF PERMANENT WETLAND FILL
EXISTING (TYPICAL)
PROPOSED
NEARSHORE FILL AREA (PERMANENT)
WETLAND FILL AREA (PERMANENT)
(2) JURISDICTIONAL IMPACTS
BNSF BRIDGE 3.1 SOUTH END
USACE REF. NO.: NWW-2007-1303
PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR
BNSF LOCATION: MONTANA DIVISION,
KOOTENAI SUBDIVISION, MP 2.9-5.1
CITY: SANDPOINT
COUNTY: BONNER
STATE: IDAHO
DATE: NOVEMBER 2017
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017)
Page 4 of 9
Attachment B
0.30 ACRES OF TEMPORARY NEARSHORE FILL
.5)
2
06
AL E (2
ON LIN
TI
IC ER
SD T
RI WA
JU GH
HI
0.57 ACRES OF PERMANENT NEARSHORE FILL
EXISTING (TYPICAL)
PROPOSED
NEARSHORE FILL AREA (PERMANENT)
NEARSHORE FILL AREA (TEMPORARY)
(3) JURISDICTIONAL IMPACTS
BNSF BRIDGE 3.9 NORTH END
USACE REF. NO.: NWW-2007-1303
PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR
BNSF LOCATION: MONTANA DIVISION,
KOOTENAI SUBDIVISION, MP 2.9-5.1
CITY: SANDPOINT
COUNTY: BONNER
STATE: IDAHO
DATE: NOVEMBER 2017
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017)
Page 5 of 9
Attachment B
0
AL E (2
ON LIN
TI
IC ER
SD T
RI WA
JU GH
HI
62
.5 )
0.01 ACRES OF PERMANENT NEARSHORE FILL
0.03 ACRES TEMPORARY NEARSHORE FILL
EXISTING (TYPICAL)
PROPOSED
NEARSHORE FILL AREA (PERMANENT)
NEARSHORE FILL AREA (TEMPORARY)
(4) JURISDICTIONAL IMPACTS
BNSF BRIDGE 3.9 SOUTH END
USACE REF. NO.: NWW-2007-1303
PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR
BNSF LOCATION: MONTANA DIVISION,
KOOTENAI SUBDIVISION, MP 2.9-5.1
CITY: SANDPOINT
COUNTY: BONNER
STATE: IDAHO
DATE: NOVEMBER 2017
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017)
Page 6 of 9
Attachment B
0.29 ACRES OF
PERMANENT NEARSHORE FILL
EXISTING (TYPICAL)
PROPOSED
REMOVALS
NEARSHORE FILL AREA (PERMANENT)
(5) JURISDICTIONAL IMPACTS
EAST ALGOMA TURNOUT
USACE REF. NO.: NWW-2007-1303
PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR
BNSF LOCATION: MONTANA DIVISION,
KOOTENAI SUBDIVISION, MP 2.9-5.1
CITY: SANDPOINT
COUNTY: BONNER
STATE: IDAHO
DATE: NOVEMBER 2017
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017)
Page 7 of 9
Attachment B
82.43
2070.47
85.17
2070.58
OF.
EL.
OF.
EL.
2070.53
EL.
2069.03
70.74
OF.
78.11
2075.07
EL.
EL.
63.91
OF.
OF.
2080.36
W ETLAND BOUNDARY
55.98
EL.
2081.31
OF.
7.99
EL.
W ETLAND BOUNDARY
2090
PROP M AIN 1 TRACK
2095
OF.
EX M AIN 2 TRACK
WETLAND FILL CROSS SECTION
2095
2090
2085
2085
100-YR FLOOD ELEVATION
2073.5 FEET
2080
2080
2075
2075
2070
2070
OHWM = 2062.5 FEET
2065
2065
2060
2060
OLWM = 2051.5 FEET
EXISTING GROUND
2055
2055
PERMANENT
WETLAND FILL
2050
2050
2045
2045
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
SECTION A-A (STA. 860+10)
2090
2085
116.38
2068.55
125.46
2062.50
139.11
2055.68
EL.
OF.
EL.
OF.
EL.
2080.29
EL.
OF.
49.92
OF.
2069.26
2080.01
EL.
80.05
35.92
OF.
EL.
2077.48
EL.
OF.
30.85
OF.
2080.01
2080.01
EL.
63.92
25.79
OF.
EL.
2080.39
OF.
7.08
EL.
PROP RM AIN 1 TRACK
2095
OF.
EX M AIN 2 TRACK
NEARSHORE FILL CROSS SECTION
2095
2090
2085
2080
2080
100-YR FLOOD ELEVATION
2073.5 FEET
2075
2075
EXISTING GROUND
TEMPORARY ACCESS ROAD
2070
2070
OHWM = 2062.5 FEET
2065
2065
2060
2060
OLWM = 2051.5 FEET
2055
2055
2050
2050
PERMANENT NEARSHORE FILL
TEMPORARY NEARSHORE FILL
2045
2045
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
SECTION B-B (STA. 888+00)
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
EXISTING CONDITIONS / PROPOSED WORK
$USER$
PM
4:40:23
12/6/2017
GN\JARPA\SPJ_JARPA_XS1.dgn
SC\620DESI
P:\W 3X76600\600DI
USACE REF NO.: :NWW-2007-1303
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
XS-1
PAGE NO.
8 OF 9
SCALE
AS SHOWN
Attachment B
EX M AIN 2 TRACK
PROP MAIN 1 TRACK
NEARSHORE FILL CROSS SECTIONS
2095
2090
2085
2095
WORK BRIDGE
2090
2085
100-YR FLOOD ELEVATION
2073.5 FEET
2080
2080
2075
2075
2070
2070
OHWM = 2062.5 FEET
2065
2065
2060
2060
2055
2055
PERMANENT NEARSHORE FILL
2050
2050
EXISTING GROUND
TEMPORARY NEARSHORE FILL
2045
2045
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
SECTION C-C (STA. 938+20)
EX M AIN 2 TRACK
2100
2095
2090
EXISTING GROUND
2085
EL. 2054.06
OF. 74.13
OF. 57.25
PROP M AIN 1 TRACK
2105
OF. 37.08
2110
EL. 2062.50
2115
EL. 2075.96
2115
EL. 2076.54
2120
OF. 7.99
2120
2110
2105
2100
2095
2090
2085
100-YR FLOOD ELEVATION
2073.5 FEET
2080
2080
2075
2075
2070
2070
OHWM = 2062.5 FEET
2065
2065
2060
OLWM = 2051.5 FEET
2060
PERMANENT
NEARSHORE FILL
2055
2055
2050
2050
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
SECTION D-D (STA. 953+70)
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
EXISTING CONDITIONS / PROPOSED WORK
$USER$
4:36:58 PM
12/6/2017
GN\JARPA\SPJ_JARPA_XS2.dgn
SC\620DESI
P:\W 3X76600\600DI
USACE REF NO.: :NWW-2007-1303
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
XS-2
PAGE NO.
9 OF 9
SCALE
AS SHOWN
Attachment C
00
85+
0
+0
80
2095
20
95
2095
00
90+
2095
5
209
2095
2095
95
20
2095
00
90+
5
209
2095
0
95+0
NORTH END
00
95+
MP
.08
1403
2095
9.34
94+6
STA.
2090
OF PROJECT
90
0
2
2090
2090
2090
+00
100
+00
100
MP 2.9
GAS
20
90
2085
2090
2090
MP
2085
2.86
0
209
2090
G
STIN
EXI
CK
TRA
MRL
0
209
2090
85
20
2090
85
20
5
208
K
EE
85
20
5
8
0
2
00
845+
+00
845
CR
2
08
2
0
0
7
5
2085
CUT
2085
20
70
+00
850
00
850+
80
5 20
207
0
208
3
90
16.
43+
. 8
STA
85
20
MP
2085
0
209
+00
840
840+00
ND
SA
00
25.
38+
. 8
STA
2070
5
206
60
20
60
20
LL
FI
2060
5
80
70 207 20
5
2085
6 20
5
0
080 208
2
7020752
0
2
855+00
LL
FI
855+00
RS-06
?
20
65
2050
60
FI
LL 20
65
20 070
2
2070
2080
80
0
2
CUT
70
20
0
06
2
0
6
0
2
5
6
20
2075
5
5
6
20
0
6
0
2
T
CU
207
0
0
+
0
6
8
+00
860
70
0
2
2065
2060
+
2060 20
6
0
2065
2050
20
75
5
6
20
70
20
080
2
+
RS-07
0
5
7
0
70+0
8
+31.
9
6
8
.
A
ST
00
+
870
5
7
0
2
80
0
2
75
0
2
0
65+0
8
5+0
6
8
BRIDGE 3.1
MP 6
4
.
75
0
2
2080
3
LAKE PEND OREILLE
4
53.9
+
873
.
STA
0
08
2
0
75+0
8
5+00
7
8
MP 5
5
.
3
20
75
4
9
03.
+
5
7
8
.
80
0
2
2075
70
0
2
5
7
0
2
3
75
20
STA
MP 8
5
.
70
20
3
6
0
5
7
0
2
2075
0
0
880+
80+0
8
25.
+
9
87
.
STA
MP 6
6
.
UT
C
70
0
2
0
07
2
3
60
20
2060
5
7
20
2060
065
2
0
8
0
2
5
206
T
U
C
2070
0
0
+
5
88
+00
5
88
2065
0
7
20
70
20
5
7
0
2
75
20
5
6
0
2
CUT
0
08
2
RS-09
206
0
5
207
E
0
6
0
2
2060
2065
0
7
20
65
0
2
2070
0
206
FI
LL
2060
2060
0
0
0+
9
8
2055
2055
0
0
+
0
89
2060
2055
RS-10
2045
205
0
0
0
+
5
89
0
0
+
95
85
204
0
0
+
0
90
0
0
+
0
0
9
RS-11
50
20
50
0
2
0
5
20
0
05
2
+00
5
0
9
2
0
5
0
20
50
00
+
5
0
9
RS-12
2045
2
04
5
0
0
+
0
1
9
00
+
0
1
9
45
0
2
20
45
2
0
45
BRIDGE 3.9
45
20
2
0
4
5
2045
0
0
+
5
1
9
00
+
915
2
0
45
20
40
20
40
40
0
2
0
4
20
5
204
RS-13
0
+0
0
92
0
0
+
20
9
5
203
2040
2040
20
30
5
203
0
0
+
5
92
2025
2040
20
20
0
+0
5
2
9
20
0
2
20
35
202
5
20
40
2030
20
20
RS-14
2020
0
0
+
0
3
9
2
040
0
0
0+
3
9
2035
LAKE PEND OREILLE
00
+
5
3
9
0
0
+
5
93
2
060
2045
RS-15
65
20
0
07
2
50
20
LL
75
FI
80
20
20
FI
LL
80
5
7 20
20
0
0+0
94
2
0
7
0
LL
FI
940+0
0
5
208
2090
0
8
20
2095
5
210
2100
2065
2055
2060
LL
FI
20525
060
2075
2060
RS-17
2070
2055
80
20
5
208 2090
0
211
5
FI
LL
5
207
65
20
5
205
2070
2060
2080
MP
5
211
20852090
2110
2100
2105
20
95
00
945+
945+00
STA. 948+76.90
955+00
2080
2090
2085 2
095
2100
2105
2110
2115
0
212
2125
2130
2135
SOUTH END
960+00
960+00
OF PROJECT
MP 5.1
965+00
965+00
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
PM
12:22:57
12/7/2017
ty.dgn
ni
ci
GN\JARPA\SPJ_JARPA_Vi
SC\620DESI
P:\W 3X76600\600DI
PROJECT PLAN OVERVIEW
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
VICINITY
PAGE NO.
SCALE
1 OF 13
NOT TO SCALE
5
208
Attachment C
PLAN VIEW
CUT
PROPOSED MAIN TRACK 1
EXISTING MAIN TRACK
(PROPOSED MAIN TRACK 2)
5
208
LEGEND:
EDGE OF PAVEMENT
PERMANENT WETLAND FILL
TEMPORARY NEARSHORE FILL
RIGHT-OF-WAY
FLOW DIRECTION
0
2
1
2
85
3
SF
2
0
6
5
0
207
00
00
BN
5+
+
855
LL
FI
W
U S - 95
3
OHWM = 2062.5 FEET
RO
4
60
20
60
20
LL
FI
5
6
PROPOSED BRIDGE 3.1 PRINCIPLE DIMENSIONS
WIDTH OF BRIDGE:21 FEET
2060
AMP
O FF R
5
4
5 080
85
5 070 20
2
20
2 5
0
5
7 208
08
2
0
2
7 2
0
2
2
WORK BRIDGE 3.1
LENGTH OF BRIDGE:505 FEET
PORTION OF BRIDGE WITH STRUCTURE
BELOW OHWM = APPROX. 150 FEET
EXISTING BRIDGE 3.1 PRINCIPLE DIMENSIONS
7
WORK BRIDGE 3.1 PRINCIPLE DIMENSIONS
C
R
C
E
H
E
A
K
N
N
E
L
6
WIDTH OF BRIDGE:32 FEET
LENGTH OF BRIDGE: 510 FEET
WIDTH OF BRIDGE:19 FEET
LENGTH OF BRIDGE:155 FEET
?
8
EXISTING BRIDGE: 42 FEET
PROPOSED BRIDGE: 72 FEET
WORK BRIDGE: 72 FEET
1
9
050
02
205
9
10
SAN
D C
REE
K
3
1'-2"
1'-2,"
WORK BRIDGE LOW CHORD
OHWM = 2062.5 FEET
80
20
0
2
0
6
00
T
U
C
0+
86
8
5 70
0
2
6
0
SF
BN
2
W
RO
11
20
0.28 AC OF WETLAND
FILL (PERMANENT)
APPROXIMATELY 2078.6 FEET
11,"
FI
LL 20
EXISTING DOCKS
LOW CHORD ON EXISTING BRIDGE
20
75
12
60
0.01 AC OF NEARSHORE
FILL (PERMANENT)
11,"
11
10
2060 20
5
2
65 0
20 07
2
70
APPROXIMATELY 2071.6 FEET
OHWM = 2062.5 FEET
> OF
CHAN
NEL
2
0
8
8
7
WIDTH OF NAVIGATION CHANNEL
20
65
S
A
N
D
O
F
APPROX. LIMIT OF CUT
1
0.05 AC OF NEARSHORE
FILL (TEMPORARY)
>
APPROX. LIMIT OF FILL
CUT
0
8
7
5
0
2
U S - 95
OHWM = 2062.5 FEET
FILL
+
MATCH LINE -- SEE DRAWING NO. RS-07
0
0
50'
0
50'
100'
APPROX. GRAPHIC SCALE: 1" = 100'
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
PM
12:32:53
12/7/2017
GN\JARPA\SPJ_JARPA_RS-06.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
RS-06
PAGE NO.
2 OF 13
SCALE
AS SHOWN
A
Attachment C
00
6
0
8
7
0
8
0
2
0
T
U
C
0+
86
2
PLAN VIEW
MATCH LINE -- SEE DRAWING NO. RS-06
0
+
0
0
2
5
7
0
2
0
6
0
2
6
5
70
20
0
6
0
2
0
A
LAKE PEND OREILLE
5
-9
US
7
0
2
5
0
2
0
6
0
5
6
W
O
R
+
2
F
T
CU
S
N
B
2060
NEW DITCH
5
6
0
2
70
20
+
E SUPERIO
R ST
2
0
US
-9
TO
5
E
OF
SU
F
PE
RA
RI
MP
OR
ST
OHWM = 2062.5 FEET
8
U
S
9
5
E
O
N
S
U
R
P
A
E
M
R
P
I
O
F
R
R
O
S
M
T
0
8
0.28 AC OF WETLAND
FILL (PERMANENT)
5
6
EXISTING MAIN TRACK
(PROPOSED MAIN TRACK 2)
+
0
5
6
0
8
+
0
0
0
2
5
7
5
9
S
U
LEGEND:
NEW DITCH
PROPOSED MAIN TRACK 1
PERMANENT WETLAND FILL
RIGHT-OF-WAY
PROPOSED STRUCTURAL WALL
W
O
R
0
8
0
F
APPROX. LIMIT OF FILL
CUT
APPROX. LIMIT OF CUT
2
FILL
S
N
B
FLOW DIRECTION
STRUCTURAL WALL
T
OHWM = 2062.5 FEET
L
I
A
R
LAKE PEND OREILLE
MATCH LINE -- DRAWING NO. RS-08
50'
0
50'
100'
APPROX. GRAPHIC SCALE: 1" = 100'
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
12:14:49 PM
12/7/2017
GN\JARPA\SPJ_JARPA_RS-07.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
RS-07
PAGE NO.
3 OF 13
SCALE
AS SHOWN
Attachment C
PLAN VIEW
0
7
0
2
MATCH LINE -- DRAWING NO. RS-08
0
75
20
EDGE OF PAVEMENT
2
0
8
PROPOSED STRUCTURAL WALL
LAKE PEND OREILLE
20
8
8
0
+
0
8
0
8
0
+
0
75
20
.
A
T
S
0
P
M
6
6
.
3
5
7
0
2
L
AI
TR
70
5
-9
US
3
6
.
5
2
+
9
7
8
F
S
N
B
W
O
R
F
S
N
B
R
OHWM = 2062.5 FEET
T
U
C
2
0
0
7
0
2
7
0
W
O
PROPOSED CONSTRUCTION ACCESS
8
0
TRAIL TEMPORARILY RELOCATED
2
0
EXISTING MAIN TRACK
(PROPOSED MAIN TRACK 2)
6
0
2
5
20
5
75
7
0.30 AC OF NEARSHORE
FILL (TEMPORARY)
2
PROPOSED MAIN TRACK 1
70
PERMANENT NEARSHORE FILL
0
20
LEGEND:
0.57 AC OF NEARSHORE
FILL (PERMANENT)
TEMPORARY NEARSHORE FILL
0
7
2
0
6
20
5
T
U
C
207
0
0
0
0
+
5
8
APPROX. LIMIT OF CUT
STRUCTURAL WALL
8
APPROX. LIMIT OF FILL
CUT
0
+
5
8
8
5
FLOW DIRECTION
FILL
206
RIGHT-OF-WAY
8
0
2
0
CONSTRUCTION LAYDOWN AREA
PROPOSED LIMIT OF GRADING
50'
0
50'
2
0
6
5
OHWM = 2062.5 FEET
100'
MATCH LINE -- SEE DRAWING NO. RS-10
APPROX. GRAPHIC SCALE: 1" = 100'
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
11:54:49 AM
12/7/2017
GN\JARPA\SPJ_JARPA_RS-09.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
PAGE NO.
RS-09
4 OF 13
SCALE
AS SHOWN
Attachment C
5
PLAN VIEW
2
0
6
MATCH LINE -- SEE DRAWING NO. RS-09
B
S
N
B
5
7
0
2
LAKE PEND OREILLE
60
20
0
6
0
2
W
O
R
60
20
F
OHWM = 2062.5 FEET
2
S
N
B
0
6
0
F
0
2
60
20
B
2065
7
0
W
O
R
EXISTING SPAN 1
HORIZONTAL CLEARANCE
APPROXIMATELY 14 FEET
EXISTING HORIZONTAL CLEARANCE
APPROXIMATELY 44 FEET
SPAN S 2 - 6S
1
2
0
6
0
5
5
0
60
20
F
IL
L
55
20
2
2
0
6
0
1
2
0
+
0
9
8
2
0
6
0
0.30 AC OF NEARSHORE
FILL (TEMPORARY)
0
0
+
0
9
8
1
EXISTING TIMBER PILES
CUTOFF AND SUBMERGED
3
20
55
0
2
0.57 AC OF NEARSHORE
FILL (PERMANENT)
2
EXISTING BRIDGE 3.9
EX MAIN TRACK 1 (PROPOSED MAIN TRACK 2)
4
3
PROPOSED SPAN 1
HORIZONTAL CLEARANCE
APPROXIMATELY 7 FEET
5
4
PROPOSED HORIZONTAL CLEARANCE
APPROXIMATELY 93.5 FEET
SPANS 2 - 31
3
6
5
7
6
4
7
PROPOSED BRIDGE 3.9
PROPOSED MAIN TRACK 1
LEGEND:
8
PERMANENT NEARSHORE FILL
20
TEMPORARY NEARSHORE FILL
8
9
50
RIGHT-OF-WAY
5
10
4
0
9
WORK BRIDGE
HORIZONTAL CLEARANCE
APPROXIMATELY 42 FEET
2
APPROX. LIMIT OF FILL
5
FLOW DIRECTION
FILL
9
8
11
0
50'
12
0
50'
6
0
+
5
9
85
4
20
SETOUT/STAGING AREA
HORIZONTAL CLEARANCE
APPROXIMATELY 44.8 FEET
11
0
0
+
5
10
LAKE PEND OREILLE
12
7
13
MATCH LINE -- SEE DRAWING NO. RS-11
100'
APPROX. GRAPHIC SCALE: 1" = 100'
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
11:52:59 AM
12/7/2017
GN\JARPA\SPJ_JARPA_RS-10.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
PAGE NO.
RS-10
5 OF 13
SCALE
AS SHOWN
Attachment C
PLAN VIEW
MATCH LINE -- SEE DRAWING NO. RS-10
13
13
7
14
EXISTING HORIZONTAL CLEARANCE
APPROXIMATELY 44 FEET
SPANS 2 - 6S
14
15
15
8
17
9
17
F
S
N
B
PROPOSED HORIZONTAL CLEARANCE
APPROXIMATELY 93.5 FEET
SPANS 2 - 31
LAKE PEND OREILLE
16
16
18
W
O
R
18
EXISTING BRIDGE 3.9
EX MAIN TRACK 1 (PROPOSED MAIN TRACK 2)
19
F
S
N
B
19
10
W
O
R
20
20
0
+
0
0
9
21
0
21
0
+
0
0
9
11
22
0
22
23
23
12
20
24
24
50
SETOUT/STAGING AREA
HORIZONTAL CLEARANCE
APPROXIMATELY 44.8 FEET
5
0
2
25
25
0
5
0
2
26
0
13
26
27
PROPOSED BRIDGE 3.9
PROPOSED MAIN TRACK 1
LEGEND:
27
RIGHT-OF-WAY
28
FLOW DIRECTION
14
28
LAKE PEND OREILLE
29
15
30
WORK BRIDGE
HORIZONTAL CLEARANCE
APPROXIMATELY 42 FEET
29
0
20
50
5
0
2
0
5
0
2
0
50'
MATCH LINE -- SEE DRAWING NO. RS-12
0
50'
30
0
+
5
0
9
31
100'
APPROX. GRAPHIC SCALE: 1" = 100'
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
AM
11:51:42
12/7/2017
GN\JARPA\SPJ_JARPA_RS-11.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
PAGE NO.
RS-11
6 OF 13
SCALE
AS SHOWN
5
0
Attachment C
PLAN VIEW
2
9
0
MATCH LINE -- SEE DRAWING NO. RS-11
0
5
+
0
0
EXISTING HORIZONTAL CLEARANCE
31
16
32
9
APPROXIMATELY 44 FEET
SPANS 2 - 6S
0
5
+
0
0
32
33
33
34
17
35
LAKE PEND OREILLE
34
36
35
18
PROPOSED HORIZONTAL CLEARANCE
37
APPROXIMATELY 93.5 FEET
36
SPANS 2 - 31
B
38
N
F
S
37
R
O
W
39
19
38
40
EXISTING BRIDGE 3.9
EX MAIN TRACK 1 (PROPOSED MAIN TRACK 2)
39
2
0
41
5
2
0
4
5
4
20
1
9
0
0
40
42
PROPOSED BRIDGE 3.9
9
1
PROPOSED MAIN TRACK 1
41
0
+
0
21
0
43
LAKE PEND OREILLE
42
B
44
N
F
S
R
20
45
O
W
43
45
22
5
44
2
0
4
46
LEGEND:
47
RIGHT-OF-WAY
45
23
FLOW DIRECTION
2
0
4
5
48
4
5
46
SETOUT/STAGING AREA HORIZONTAL CLEARANCE
APPROXIMATELY 44.8 FEET
49
WORK BRIDGE HORIZONTAL CLEARANCE
APPROXIMATELY 42 FEET
24
47
50
MATCH LINE -- SEE DRAWING NO. RS-13
50'
0
50'
100'
APPROX. GRAPHIC SCALE: 1" = 100'
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
AM
11:45:48
12/7/2017
GN\JARPA\SPJ_JARPA_RS-12.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
RS-12
PAGE NO.
7 OF 13
SCALE
AS SHOWN
Attachment C
MATCH LINE -- SEE DRAWING NO. RS-12
PLAN VIEW
50
24
45
48
20
2045
51
49
25
5
1
9
52
+
LAKE PEND OREILLE
5
1
9
53
50
+
0
0
51
54
26
52
53
56
O
R
27
W
2
0
4
5
F
WORK BRIDGE
S
N
B
55
HORIZONTAL CLEARANCE
APPROXIMATELY 42 FEET
20
40
57
54
20
40
55
28
58
59
SETOUT/STAGING AREA
56
57
60
HORIZONTAL CLEARANCE
APPROXIMATELY 44.8 FEET
EXISTING BRIDGE 3.9
29
EX MAIN TRACK 1
58
(PROPOSED MAIN TRACK 2)
O
0
4
R
5
0
2
F
S
N
204
B
61
0
4
0
W
LAKE PEND OREILLE
2
62
59
0
2
0
0
PROPOSED BRIDGE 3.9
63
60
9
PROPOSED MAIN TRACK 1
+
30
2
0
EXISTING HORIZONTAL
+
0
0
64
CLEARANCE APPROXIMATELY
4 FEET SPANS 2 - 6S
44
61
PROPOSED HORIZONTAL CLEARANCE
EXISTING HORIZONTAL
APPROXIMATELY 93.5 FEET
SPANS 2 - 31
31
65
CLEARANCE APPROX.
T
17 FEET SPAN 663
62
LEGEND:
2040
RIGHT-OF-WAY
EXISTING HORIZONTAL
66
CLEARANCE APPROX.
63
32
204
67
65 FEET
SPANS443 - 65
0
FLOW DIRECTION
PROPOSED HORIZONTAL CLEARANCE
64
3
0
68
2
SPANS 32 - 34
5
APPROXIMATELY 65.4 FEET
33
MATCH LINE -- SEE DRAWING NO. RS-14
50'
0
50'
100'
APPROX. GRAPHIC SCALE: 1" = 100'
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
PM
4:23:37
12/8/2017
GN\JARPA\SPJ_JARPA_RS-13.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
RS-13
PAGE NO.
8 OF 13
SCALE
AS SHOWN
Attachment C
MATCH LINE -- SEE DRAWING NO. RS-13
33
PLAN VIEW
65
EXISTING HORIZONTAL CLEARANCE
B
S
F
R
69
N
APPROXIMATELY 65 FEET
S
SPANS
44 3 - 6
O
W
L
E
N
N
A
H
C
EXISTING HORIZONTAL CLEARANCE
20
APPROXIMATELY 89.6 FEET
SPA S 6
30
70
34
20
71
,
L
A
N
O
I
T
A
G
I
V
A
N
35
66
PROPOSED HORIZONTAL
CLEARANCE APPROXIMATELY
2040
72
F
O
20 2
65.4 FEET SPANS 32 - 34
35
APPROXIMATELY 76.6 FEET
L
E
N
N
A
H
C
SPANS 67, 68
20
20
2
5
+
0
73
0
SPANS 35 - 38
EXISTING HORIZONTAL CLEARANCE
9
5
67
PROPOSED HORIZONTAL CLEARANCE
APPROXIMATELY 93.5 FEET
>
36
9
2
5
74
LAKE PEND OREILLE
L
A
N
O
I
T
A
G
I
V
A
N
+
0
0
F
O
68
>
75
LOWEST CHORD ON EXISTING BRIDGE
APPROXIMATELY 14 FEET VERTICAL CLEARANCE
76
SPANS 36, 37
APPROXIMATELY 89.6 FEET
SPA 69
,
37
20
APPROXIMATELY 14 FEET
EXISTING HORIZONTAL CLEARANCE
20
PROPOSED VERTICAL CLEARANCE
R
SPANS 67, 68
0
2
0
2
C
L
A
N
O
EXISTING BRIDGE
I 3.9
T
A 1 (PROPOSED MAIN TRACK 2)
EX MAIN TRACK
69
77
78
79
PROPOSED MAIN TRACK 1
80
SETOUT/STAGING AREA
LAKE PEND OREILLE
20
2030
PROPOSED BRIDGE 3.9
70
EXISTING HORIZONTAL CLEARANCE
20
40
202
35
38
APPROXIMATELY
65 FEET
Y 65 FEET
SPANS
- 6
; 70,371
39
EXISTING HORIZONTAL
CLEARANCE APPROXIMATELY
HORIZONTAL CLEARANCE
APPROXIMATELY 44.8 FEET
17 FEET SPAN 72
71
EXISTING HORIZONTAL
CLEARANCE APPROXIMATELY
2
0
2
0
81
40
82
PROPOSED HORIZONTAL CLEARANCE
73
83
3
9
APPROXIMATELY 65.4 FEET
44 FEET SPANS 73 - 87
72
0
41
SPANS 39 - 41
+
0
0
B
4
0
0
5
203
0
W
+
O
FLOW DIRECTION
75
3
R
2
9
F
0
S
RIGHT-OF-WAY
74
84
N
LEGEND:
0
85
WORK BRIDGE
HORIZONTAL CLEARANCE
42
APPROXIMATELY 42 FEET
76
86
PROPOSED HORIZONTAL
CLEARANCE APPROXIMATELY
93.5 FEET SPANS 42 - 48
87
77
43
MATCH LINE -- SEE DRAWING NO. RS-15
50'
0
50'
100'
APPROX. GRAPHIC SCALE: 1" = 100'
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
PM
4:44:35
12/8/2017
GN\JARPA\SPJ_JARPA_RS-14.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
PAGE NO.
RS-14
9 OF 13
SCALE
AS SHOWN
Attachment C
MATCH LINE -- SEE DRAWING NO. RS-14
43
PLAN VIEW
N
B
78
88
F
S
R
O
W
79
89
44
90
80
EXISTING HORIZONTAL CLEARANCE
PROPOSED HORIZONTAL CLEARANCE
91
APPROXIMATELY 93.5 FEET
APPROXIMATELY 44 FEET
81
SPANS 42 - 48
SPANS 73 - 87
LAKE PEND OREILLE
45
82
92
F
S
N
B
83
9
W
O
R
93
3
46
5
+
0
0
94
84
3
9
EXISTING BRIDGE 3.9
5
+
95
0
0
85
5
SETOUT/STAGING AREA
47
96
EXISTING HORIZONTAL CLEARANCE
0
4
HORIZONTAL CLEARANCE
EX MAIN TRACK 1 (PROPOSED MAIN TRACK 2)
APPROXIMATELY 7 FEET
86
2
APPROXIMATELY 44.8 FEET
SPAN 88
97
OHWM = 2062.5 FT
87
PROPOSED BRIDGE 3.9
PROPOSED MAIN TRACK 1
98
48
88
0
LAKE PEND OREILLE
0
2
100
2
49
7
0
50
20
C
HORIZONTAL CLEARANCE
APPROXIMATELY 42 FEET
2
6
99
WORK BRIDGE
0
PROPOSED HORIZONTAL CLEARANCE
APPROXIMATELY 93.5 FEET
SPAN 49
0.01 AC OF NEARSHORE
101
PERMANENT NEARSHORE FILL
8
5
7 20
FI
LL
0
FILL (PERMANENT)
2
LEGEND:
0
102
TEMPORARY NEARSHORE FILL
RIGHT-OF-WAY
PROPOSED GRADING LIMITS
FILL
L
L5
7
FI
80
20
20
FLOW DIRECTION
APPROX. LIMIT OF FILL
C
0.03 AC OF NEARSHORE
94
FILL (TEMPORARY)
2
0
7
0
L
L
I
F
0+
94
00
0+
OHWM = 2062.5 FEET
00
MATCH LINE -- DRAWING NO. RS-16
50'
0
50'
100'
APPROX. GRAPHIC SCALE: 1" = 100'
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
4:48:29 PM
12/8/2017
GN\JARPA\SPJ_JARPA_RS-15.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
PAGE NO.
RS-15
10 OF 13
SCALE
AS SHOWN
Attachment C
PLAN VIEW
211
5
MATCH LINE -- DRAWING NO. RS-16
OHWM = 2062.5 FEET
EXISTING CROSSING
5
MP
(TO BE REMOVED)
+76.90
STA. 948
EXISTING MAIN TRACK
BAY ROAD
BOTTLE
2095
75
5
210
0
211
5
208 2090
20
80
0
210
20
55
2070
20
60
2080
PROPOSED MAIN TRACK 1
950+00
20
65
20
FI
LL
(PROPOSED MAIN TRACK 2)
W
BNSF RO
2060
2055
W
BNSF RO
LAKE PEND OREILLE
REMOVE TRACK
0.29 AC OF NEARSHORE
2065
2060
2055
2070
FLOW DIRECTION
APPROX. LIMIT OF FILL
955+00
50'
0
50'
955+00
FILL
D
RIGHT-OF-WAY
20525
060
PERMANENT NEARSHORE FILL
D
LL
FI
LEGEND:
2075
FILL (PERMANENT)
100'
APPROX. GRAPHIC SCALE: 1" = 100'
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
12:12:18 PM
12/7/2017
GN\JARPA\SPJ_JARPA_RS-17.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
36 T57 R2W BOISE MERIDIAN
PLSS:IN PARTS OF S15, 22, 23, 25, 26
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
RS-17
PAGE NO.
OF 13
SCALE
AS SHOWN
Attachment C
82.43
2070.47
85.17
2070.58
OF.
EL.
OF.
EL.
2070.53
EL.
2069.03
70.74
OF.
78.11
2075.07
EL.
EL.
63.91
OF.
OF.
2080.36
W ETLAND BOUNDARY
55.98
EL.
2081.31
OF.
7.99
EL.
W ETLAND BOUNDARY
2090
PROP M AIN 1 TRACK
2095
OF.
EX M AIN 2 TRACK
WETLAND FILL CROSS SECTION
2095
2090
2085
2085
100-YR FLOOD ELEVATION
2073.5 FEET
2080
2080
2075
2075
2070
2070
OHWM = 2062.5 FEET
2065
2065
2060
2060
OLWM = 2051.5 FEET
EXISTING GROUND
2055
2055
PERMANENT
WETLAND FILL
2050
2050
2045
2045
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
SECTION A-A (STA. 860+10)
2090
2085
116.38
2068.55
125.46
2062.50
139.11
2055.68
EL.
OF.
EL.
OF.
EL.
2080.29
EL.
OF.
49.92
OF.
2069.26
2080.01
EL.
80.05
35.92
OF.
EL.
2077.48
EL.
OF.
30.85
OF.
2080.01
2080.01
EL.
63.92
25.79
OF.
EL.
2080.39
OF.
7.08
EL.
PROP RM AIN 1 TRACK
2095
OF.
EX M AIN 2 TRACK
NEARSHORE FILL CROSS SECTION
2095
2090
2085
2080
2080
100-YR FLOOD ELEVATION
2073.5 FEET
2075
2075
EXISTING GROUND
TEMPORARY ACCESS ROAD
2070
2070
OHWM = 2062.5 FEET
2065
2065
2060
2060
OLWM = 2051.5 FEET
2055
2055
2050
2050
PERMANENT NEARSHORE FILL
TEMPORARY NEARSHORE FILL
2045
2045
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
SECTION B-B (STA. 888+00)
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
PM
4:40:23
12/6/2017
GN\JARPA\SPJ_JARPA_XS1.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
XS-1
PAGE NO.
12 OF 13
SCALE
AS SHOWN
Attachment C
EX M AIN 2 TRACK
PROP MAIN 1 TRACK
NEARSHORE FILL CROSS SECTIONS
2095
2090
2085
2095
WORK BRIDGE
2090
2085
100-YR FLOOD ELEVATION
2073.5 FEET
2080
2080
2075
2075
2070
2070
OHWM = 2062.5 FEET
2065
2065
2060
2060
2055
2055
PERMANENT NEARSHORE FILL
2050
2050
EXISTING GROUND
TEMPORARY NEARSHORE FILL
2045
2045
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
SECTION C-C (STA. 938+20)
EX M AIN 2 TRACK
2100
2095
2090
EXISTING GROUND
2085
EL. 2054.06
OF. 74.13
OF. 57.25
PROP M AIN 1 TRACK
2105
OF. 37.08
2110
EL. 2062.50
2115
EL. 2075.96
2115
EL. 2076.54
2120
OF. 7.99
2120
2110
2105
2100
2095
2090
2085
100-YR FLOOD ELEVATION
2073.5 FEET
2080
2080
2075
2075
2070
2070
OHWM = 2062.5 FEET
2065
2065
2060
OLWM = 2051.5 FEET
2060
PERMANENT
NEARSHORE FILL
2055
2055
2050
2050
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
100
110
120
130
SECTION D-D (STA. 953+70)
BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.
$USER$
4:36:58 PM
12/6/2017
GN\JARPA\SPJ_JARPA_XS2.dgn
SC\620DESI
P:\W 3X76600\600DI
EXISTING CONDITIONS / PROPOSED WORK
AGENCY REF. NO.:
PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR
APPLICANT:BNSF RAILWAY COMPANY
CONSULTANT:JACOBS ENGINEERING GROUP
LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION
LINE SEGMENT 45, MP 2.9 - MP 5.1
PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN
NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W
SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W
WATERWAY:LAKE PEND OREILLE, SAND CREEK
CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO
DATE:DECEMBER 2017
DRAWN BY:
J. SIEMENS
CHECKED BY:
S. PADELFORD
APPROVED BY: P. BORDENAVE
DRAWING NO.
XS-2
PAGE NO.
13 OF 13
SCALE
AS SHOWN
Attachment D
New Spans (32 - 34)
New Spans (35 - 38)
New Spans (39 - 41)
65'4" Horizontal x 15' Vertical Clearance
93'5" Horizontal x 14' Vertical Clearance
65'4" Horizontal x 15' Vertical Clearance
Existing Spans (64 & 65)
Existing Spans (67 & 68)
Existing Spans (70 & 71)
65' Horizontal x 16.5' Vertical Clearance
76'6" Horizontal x 14' Vertical Clearance
65' Horizontal x 16.5' Vertical Clearance
Existing Spans (2 - 62)
Existing Span (66)
Existing Span (69)
Existing Spans (73 - 87)
44' Horizontal x 12.5' Vertical Clearance
89'6" Horizontal x 16' Vertical Clearance
89'6" Horizontal x 16' Vertical Clearance
44' Horizontal x 12.5' Vertical Clearance
ATTACHMENT - B: REFERENCE MAPS
NORTH