Interested parties are hereby notified that the Walla Walla District has received an application from Burlington Northern Santa Fe Railway Company (BNSF) for a Department of the Army permit for certain work in Waters of the United States, including wetlands, as described in the enclosed documents.

Additionally, interested parties are notified that the Commander, Thirteenth Coast Guard District has received an application from BNSF, requesting approval of location and plans for the construction of new bridges over navigable waterways of the United States. Mariners, maritime stakeholders and the public are highly encouraged to review this notice with attached preliminary plans carefully and provide comment on the proposed project.

Public Notice: Application for Permit

APPLICATION NO.: NWW-2007-01303 WATERWAY: Sand Creek and Lake Pend Oreille APPLICANT: Burlington Northern Santa Fe Railway Company DATE ISSUED: February 26, 2018 END DATE: March 28, 2018

Interested parties are hereby notified that the Walla Walla District has received an application from Burlington Northern Santa Fe Railway Company (BNSF) for a Department of the Army permit for certain work in Waters of the United States, including wetlands, as described in the enclosed documents.

Additionally, interested parties are notified that the Commander, Thirteenth Coast Guard District has received an application from BNSF, requesting approval of location and plans for the construction of new bridges over navigable waterways of the United States. Mariners, maritime stakeholders and the public are highly encouraged to review this notice with attached preliminary plans carefully and provide comment on the proposed project.

APPLICANT: Matthew Keim, Burlington Northern Santa Fe Railway Company (BNSF)

AGENT: Pierre Bordenave, Jacobs Engineering

U.S. ARMY CORPS OF ENGINEERS PROJECT MANAGER: Shane P. Slate, (208) 433-4474, NWW_BNSF_Pendoreille@usace.army.mil

U.S. COAST GUARD DISTRICT 13 BRIDGE PROGRAM ADMINISTRATOR: Steven M. Fischer Thirteenth Coast Guard District 915 2nd Ave, Room 3510 Seattle, WA 98174 D13-PF-D13BRIDGES@uscg.mil

PURPOSE: Discharge rock fill material into Sand Creek, Lake Pend Oreille and adjacent wetlands for the construction of a 2.2 mile long second mainline track crossing.

WATERWAY: Lake Pend Oreille and Sand Creek

LOCATION: The proposed project would be located on Sand Creek, Lake Pend Oreille, and adjacent wetlands, within Sections 15, 22, 23, 25, 26, and 36, of Township 57 North, Range 2 West, near latitude 48.261554º N and longitude –116.532741º W, in Bonner County, Sandpoint, Idaho.

AUTHORITY: The Department of the Army (DA) permit will be issued or denied under the authority of Section 404 of the Clean Water Act (33 U.S.C. 1344) for all fill materials discharged into waters of the United States, including wetlands. A DA permit is required for the discharge of dredged or fill material into waters of the United States (U.S.), including wetlands associated with bridges and causeways.

The DA also has the authority to issue permits under Section 10 of the Rivers & Harbors Act of 1899 (33 U.S.C. 403) for the discharge of fill material into navigable waters of the U.S. A DA permit is required for work or structures, except bridges and causeways, waterward of the ordinary high water mark located in or over navigable waters of the United States, including the excavation, dredging or deposition of material in navigable waters, or any alteration obstructing or affecting the course, location, condition, or capacity of the navigable waterway. The only portion of this project that requires Section 10 authorization is the discharge of fill material at the south end of the project near Mile Post 5.1.

The U.S. Coast Guard (USCG) has the authority to issue or deny permits for bridges and causeways in or over navigable waters of the United States under the General Bridge Act of 1946 (33 U.S.C. 525 et seq.). The Coast Guard permits the location and plans of bridges and causeways and imposes any necessary conditions relating to the construction, maintenance, and operation of these bridges in the interest of public navigation. A bridge permit is the written approval of the location and plans of the bridge or causeway to be constructed or modified across a navigable waterway of the United States. USCG will act as federal lead agency overseeing compliance with Section 106 of the National Historic Preservation Act and Endangered Species Act (ESA) consultation for the proposed bridge projects.

* Please refer to Attachment A for a breakdown of the federal regulatory authorities of this project.

WORK (The US Army Corps of Engineers only has authority over the following): The construction consists of a 2.2-mile-long second mainline track west of the existing BNSF mainline to connect the North Algoma Siding track (MP 5.1) south of Sandpoint, to the Sandpoint Junction switch (MP 2.9), where the BNSF and the Montana Rail Link (MRL) mainlines converge in Sandpoint.

Project activities would permanently discharge 11,220 cubic yards of rock into 1.16 acres of waters (0.88 acre) and wetlands (0.28 acre) and temporarily discharge 3680 cubic yards of rock into 0.38 acres of open water: •0.29-acre permanent fill in Lake Pend Oreille along the lakeshore edge at the south end of the project where the new track will connect to the existing BNSF Algoma Siding north switch. • 0.01-acre permanent fill and 0.03-acre of temporary fill in Lake Pend Oreille at the south end of Bridge 3.9 to accommodate the transition from the bridges to the existing upland grade. • 0.57-acre of permanent fill and 0.30-acre temporary fill in Lake Pend Oreille at the north end of the Bridge 3.9 to accommodate the transition from bridges to the existing upland grade. This fill will essentially match the length of the existing fill on which the existing BNSF mainline is built. • 0.05-acre temporary fill from construction activities to install the Bridge 3.1 upland pilings along the water line north of the navigation channel. • 0.01-acre permanent fill in Sand Creek at the south end of Bridge 3.1 to accommodate the transition from bridge to new rail grade. • 0.28-acre of permanent wetland fill at the south end of Bridge 3.1 between the existing rail grade and the multi-use pedestrian path.

* Please refer to Attachment B detailing the project components within the Corps regulatory authority.

OTHER AUTHORIZATIONS: The Idaho Department Lands (IDL) and the USCG are also reviewing the proposed project under their respective authorities.

Attachments C and D include the additional portions of the proposed project which are regulated by the USCG under the General Bridge Act of 1946 (33 U.S.C. 525 et seq.). Please mail any comments regarding the proposed bridge structures associated with this project to the USCG at: Steven M. Fischer Thirteenth Coast Guard District 915 2nd Ave, Rm 3510 Seattle, WA 98174

Or email: D13-PF-D13BRIDGES@uscg.mil

The Idaho Department of Lands has issued its own separate public notice regarding the proposed project. To view the IDL public notice, and all associated materials, please visit their website at https://www.idl.idaho.gov/lakes-rivers/lake-protection/index.html

CONSTRUCTION PERIOD: Applicant proposes to start construction in the Fall of 2018. The permit would authorize construction for a period of five years.

PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to Waters of the United States from activities involving discharges of dredged or fill material.

BNSF Railway Company has evaluated alternatives to avoid and minimize impacts to Waters of the U.S. In addition, a project-specific Water Quality Monitoring and Protection Plan (WQMPP) and a Storm Water Pollution Prevention Plan (SWPPP) has been prepared and will be implemented for the project. The discharge of fill material and associated construction activities, in nearshore locations and wetlands, will occur at the earliest stages of the project to take advantage of performing that work while lake levels are lower and wetland areas are relatively dry to ensure temporary construction impacts are kept to a minimum.

To offset permanent impacts to 0.28 acres of wetlands, the applicant has proposed compensatory mitigation via the purchase of wetlands mitigation credits from the Valencia Wetland Mitigation Bank, in Priest River, Idaho. The applicant is currently investigating potential mitigation alternatives to offset 0.88 acres of permanent impacts to open water in Sand Creek and Lake Pend Oreille associated with the project’s construction impacts.

WATER QUALITY CERTIFICATION: This notice will also serve as a Public Notice that the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify that the discharge of dredge and/or fill material proposed for this project will not violate existing water quality standards. The DA and USCG permits will not be issued until water quality certification has been issued or waived by the IDEQ, as required by Section 401 of the Clean Water Act. If water quality certification is not issued, waived or denied within sixty (60) days of this public notice date, and an extension of this period is not requested by and granted to the IDEQ, certification will be considered waived. Additionally, within thirty (30) days of this Public Notice, any person may provide written comments to IDEQ as a request in writing that IDEQ provide them notice of their preliminary 401 Certification decision. Comments concerning Water Quality Certification for this project should be mailed to: Idaho Department of Environmental Quality, Coeur d’Alene Regional Office, 2110 Ironwood Parkway, Coeur d’Alene, Idaho 83814.

AQUATIC RESOURCE DESCRIPTION: Lake Pend Oreille and the Pend Oreille River, to which Sand Creek is a tributary to, comprise one of the largest water bodies in the state of Idaho. It is a natural lake that has been enlarged by the construction of the Albeni Falls Dam near Oldtown, ID, a multi-purpose project on the Pend Oreille River operated by the Corps of Engineers. It covers an area exceeding 90,000 acres of water and has a shoreline of 226 miles. The Albeni Falls Project is operated to maintain a water surface elevation of 2062.5 feet NGVD during summer recreation season and can be drawn down to 2051 feet NGVD during the winter.

There are several communities around the lake including Hope, East Hope, Bayview, Laclede, Priest River, Dover and Sandpoint. Most of the riparian lands along the lake and river are privately owned. However, there are substantial areas in the southern portion of Lake Pend Oreille under federal ownership. Residences and summer cabins are common along much of the waterfront properties along the lake and river.

CULTURAL RESOURCES: Coordination is currently being conducted with the office of the Idaho State Historic Preservation Officer to determine if this activity will affect a site that is listed on the National Register of Historic Places, or a site that may be eligible for listing on the Register. We are also coordinating with the appropriate Tribal entity or the Tribal Historic Preservation Offices for the Coeur d’Alene Tribe, the Confederated Salish and Kootenai Tribes of the Flathead Reservation, the Kalispel Tribe of Indians, the Kootenai Tribe of Idaho, and the Spokane Tribe, to determine if there are any tribal historic or cultural interests within the project area.

TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the federal trust responsibility arising from treaties, statutes, executive orders and the historical relations between the United States and American Indian Tribes. The federal government has a unique trust relationship with federally recognized American Indian Tribes, including the Coeur d’Alene Tribe, the Confederated Salish and Kootenai Tribes of the Flathead Reservation, the Kalispel Tribe of Indians, the Kootenai Tribe of Idaho, and the Spokane Tribe. The Corps has a responsibility and obligation to consider and consult on potential effects to Tribal rights, uses and interests. The Corps further recognizes there may be a need for additional and on-going consultation.

ENDANGERED SPECIES: The project is within the known or historic range of the bull trout and its critical habitat. Coordination is currently being conducted with the U.S. Fish and Wildlife Service (USFWS) to determine if the activity will have any effect on species designated as endangered or threatened under the Endangered Species Act, or their critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844).

ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed activities will not require preparation of an Environmental Impact Statement. Comments provided will be considered in preparation of an Environmental Assessment.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. This decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and in general, the needs and welfare of the people. In addition, our evaluation will include application of the EPA Guidelines (40 CFR 230) as required by Section 404(b)(1) of the Clean Water Act.

CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting comments from the general public; Federal, State and local agencies and officials, Tribal entities and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest in the proposed activity.

PUBLIC HEARING: Any person may request in writing, within the comment period specified in this notice, that a public hearing is held to consider this proposed activity. Requests for a public hearing shall state specific reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.

COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on the proposed activity, which will become a part of the record and will be considered in the final decision.

Please mail all comments to: U.S. Army Corps of Engineers Walla Walla District Attn: Shane Slate Coeur d'Alene Regulatory Office 1910 Northwest Boulevard, Suite 210 Coeur d'Alene, Idaho 83814-2676

Or email: NWW_BNSF_Pendoreille@usace.army.mil

Comments should be received no later than the comment due date of March 28, 2018, as indicated on this notice, to receive consideration.

Kelly J. Urbanek Chief, Regulatory Division Walla Walla District

Public Notice: U.S. Army Corps Of Engineers Walla Walla District 201 North Third Avenue Walla Walla, WA 99362-1876

Application for Permit APPLICATION NO.: NWW-2007-01303 WATERWAY: Sand Creek and Lake Pend Oreille APPLICANT: Burlington Northern Santa Fe Railway Company DATE ISSUED: February 26, 2018

30-Day Notice

END DATE: March 28, 2018

Interested parties are hereby notified that the Walla Walla District has received an application from Burlington Northern Santa Fe Railway Company (BNSF) for a Department of the Army permit for certain work in Waters of the United States, including wetlands, as described in the enclosed documents. Additionally, interested parties are notified that the Commander, Thirteenth Coast Guard District has received an application from BNSF, requesting approval of location and plans for the construction of new bridges over navigable waterways of the United States. Mariners, maritime stakeholders and the public are highly encouraged to review this notice with attached preliminary plans carefully and provide comment on the proposed project. APPLICANT: Matthew Keim, Burlington Northern Santa Fe Railway Company (BNSF) AGENT: Pierre Bordenave, Jacobs Engineering U.S. ARMY CORPS OF ENGINEERS PROJECT MANAGER: Shane P. Slate, (208) 433-4474, NWW_BNSF_Pendoreille@usace.army.mil U.S. COAST GUARD DISTRICT 13 BRIDGE PROGRAM ADMINISTRATOR: Steven M. Fischer Thirteenth Coast Guard District 915 2nd Ave, Room 3510 Seattle, WA 98174 D13-PF-D13BRIDGES@uscg.mil

CENWW-RD

February 26, 2018

Application Number: NWW-2007-01303

PURPOSE: Discharge rock fill material into Sand Creek, Lake Pend Oreille and adjacent wetlands for the construction of a 2.2 mile long second mainline track crossing. WATERWAY: Lake Pend Oreille and Sand Creek LOCATION: The proposed project would be located on Sand Creek, Lake Pend Oreille, and adjacent wetlands, within Sections 15, 22, 23, 25, 26, and 36, of Township 57 North, Range 2 West, near latitude 48.261554º N and longitude ­116.532741º W, in Bonner County, Sandpoint, Idaho. AUTHORITY: The Department of the Army (DA) permit will be issued or denied under the authority of Section 404 of the Clean Water Act (33 U.S.C. 1344) for all fill materials discharged into waters of the United States, including wetlands. A DA permit is required for the discharge of dredged or fill material into waters of the United States (U.S.), including wetlands associated with bridges and causeways. The DA also has the authority to issue permits under Section 10 of the Rivers & Harbors Act of 1899 (33 U.S.C. 403) for the discharge of fill material into navigable waters of the U.S. A DA permit is required for work or structures, except bridges and causeways, waterward of the ordinary high water mark located in or over navigable waters of the United States, including the excavation, dredging or deposition of material in navigable waters, or any alteration obstructing or affecting the course, location, condition, or capacity of the navigable waterway. The only portion of this project that requires Section 10 authorization is the discharge of fill material at the south end of the project near Mile Post 5.1. The U.S. Coast Guard (USCG) has the authority to issue or deny permits for bridges and causeways in or over navigable waters of the United States under the General Bridge Act of 1946 (33 U.S.C. 525 et seq.). The Coast Guard permits the location and plans of bridges and causeways and imposes any necessary conditions relating to the construction, maintenance, and operation of these bridges in the interest of public navigation. A bridge permit is the written approval of the location and plans of the bridge or causeway to be constructed or modified across a navigable waterway of the United States. USCG will act as federal lead agency overseeing compliance with Section 106 of the National Historic Preservation Act and Endangered Species Act (ESA) consultation for the proposed bridge projects. * Please refer to Attachment A for a breakdown of the federal regulatory authorities of this project.

-2-

CENWW-RD

February 26, 2018

Application Number: NWW-2007-01303

WORK (The US Army Corps of Engineers only has authority over the following): The construction consists of a 2.2-mile-long second mainline track west of the existing BNSF mainline to connect the North Algoma Siding track (MP 5.1) south of Sandpoint, to the Sandpoint Junction switch (MP 2.9), where the BNSF and the Montana Rail Link (MRL) mainlines converge in Sandpoint. Project activities would permanently discharge 11,220 cubic yards of rock into 1.16 acres of waters (0.88 acre) and wetlands (0.28 acre) and temporarily discharge 3680 cubic yards of rock into 0.38 acres of open water: 0.29-acre permanent fill in Lake Pend Oreille along the lakeshore edge at the south end of the project where the new track will connect to the existing BNSF Algoma Siding north switch. 0.01-acre permanent fill and 0.03-acre of temporary fill in Lake Pend Oreille at the south end of Bridge 3.9 to accommodate the transition from the bridges to the existing upland grade. 0.57-acre of permanent fill and 0.30-acre temporary fill in Lake Pend Oreille at the north end of the Bridge 3.9 to accommodate the transition from bridges to the existing upland grade. This fill will essentially match the length of the existing fill on which the existing BNSF mainline is built. 0.05-acre temporary fill from construction activities to install the Bridge 3.1 upland pilings along the water line north of the navigation channel. 0.01-acre permanent fill in Sand Creek at the south end of Bridge 3.1 to accommodate the transition from bridge to new rail grade. 0.28-acre of permanent wetland fill at the south end of Bridge 3.1 between the existing rail grade and the multi-use pedestrian path. * Please refer to Attachment B detailing the project components within the Corps regulatory authority. OTHER AUTHORIZATIONS: The Idaho Department Lands (IDL) and the USCG are also reviewing the proposed project under their respective authorities. Attachments C and D include the additional portions of the proposed project which are regulated by the USCG under the General Bridge Act of 1946 (33 U.S.C. 525 et seq.). Please mail any comments regarding the proposed bridge structures associated with this project to the USCG at: Steven M. Fischer Thirteenth Coast Guard District 915 2nd Ave, Rm 3510 Seattle, WA 98174 Or email: D13-PF-D13BRIDGES@uscg.mil

-3-

CENWW-RD

February 26, 2018

Application Number: NWW-2007-01303

The Idaho Department of Lands has issued its own separate public notice regarding the proposed project. To view the IDL public notice, and all associated materials, please visit their website at https://www.idl.idaho.gov/lakes-rivers/lake-protection/index.html CONSTRUCTION PERIOD: Applicant proposes to start construction in the Fall of 2018. The permit would authorize construction for a period of five years. PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to Waters of the United States from activities involving discharges of dredged or fill material. BNSF Railway Company has evaluated alternatives to avoid and minimize impacts to Waters of the U.S. In addition, a project-specific Water Quality Monitoring and Protection Plan (WQMPP) and a Storm Water Pollution Prevention Plan (SWPPP) has been prepared and will be implemented for the project. The discharge of fill material and associated construction activities, in nearshore locations and wetlands, will occur at the earliest stages of the project to take advantage of performing that work while lake levels are lower and wetland areas are relatively dry to ensure temporary construction impacts are kept to a minimum. To offset permanent impacts to 0.28 acres of wetlands, the applicant has proposed compensatory mitigation via the purchase of wetlands mitigation credits from the Valencia Wetland Mitigation Bank, in Priest River, Idaho. The applicant is currently investigating potential mitigation alternatives to offset 0.88 acres of permanent impacts to open water in Sand Creek and Lake Pend Oreille associated with the project's construction impacts. WATER QUALITY CERTIFICATION: This notice will also serve as a Public Notice that the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify that the discharge of dredge and/or fill material proposed for this project will not violate existing water quality standards. The DA and USCG permits will not be issued until water quality certification has been issued or waived by the IDEQ, as required by Section 401 of the Clean Water Act. If water quality certification is not issued, waived or denied within sixty (60) days of this public notice date, and an extension of this period is not requested by and granted to the IDEQ, certification will be considered waived. Additionally, within thirty (30) days of this Public Notice, any person may provide written comments to IDEQ as a request in writing that IDEQ provide them notice of their preliminary 401 Certification decision. Comments concerning Water Quality Certification for this project should be mailed to: Idaho Department of Environmental Quality, Coeur d'Alene Regional Office, 2110 Ironwood Parkway, Coeur d'Alene, Idaho 83814.

-4-

CENWW-RD

February 26, 2018

Application Number: NWW-2007-01303

AQUATIC RESOURCE DESCRIPTION: Lake Pend Oreille and the Pend Oreille River, to which Sand Creek is a tributary to, comprise one of the largest water bodies in the state of Idaho. It is a natural lake that has been enlarged by the construction of the Albeni Falls Dam near Oldtown, ID, a multi-purpose project on the Pend Oreille River operated by the Corps of Engineers. It covers an area exceeding 90,000 acres of water and has a shoreline of 226 miles. The Albeni Falls Project is operated to maintain a water surface elevation of 2062.5 feet NGVD during summer recreation season and can be drawn down to 2051 feet NGVD during the winter. There are several communities around the lake including Hope, East Hope, Bayview, Laclede, Priest River, Dover and Sandpoint. Most of the riparian lands along the lake and river are privately owned. However, there are substantial areas in the southern portion of Lake Pend Oreille under federal ownership. Residences and summer cabins are common along much of the waterfront properties along the lake and river. CULTURAL RESOURCES: Coordination is currently being conducted with the office of the Idaho State Historic Preservation Officer to determine if this activity will affect a site that is listed on the National Register of Historic Places, or a site that may be eligible for listing on the Register. We are also coordinating with the appropriate Tribal entity or the Tribal Historic Preservation Offices for the Coeur d'Alene Tribe, the Confederated Salish and Kootenai Tribes of the Flathead Reservation, the Kalispel Tribe of Indians, the Kootenai Tribe of Idaho, and the Spokane Tribe, to determine if there are any tribal historic or cultural interests within the project area. TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the federal trust responsibility arising from treaties, statutes, executive orders and the historical relations between the United States and American Indian Tribes. The federal government has a unique trust relationship with federally recognized American Indian Tribes, including the Coeur d'Alene Tribe, the Confederated Salish and Kootenai Tribes of the Flathead Reservation, the Kalispel Tribe of Indians, the Kootenai Tribe of Idaho, and the Spokane Tribe. The Corps has a responsibility and obligation to consider and consult on potential effects to Tribal rights, uses and interests. The Corps further recognizes there may be a need for additional and on-going consultation. ENDANGERED SPECIES: The project is within the known or historic range of the bull trout and its critical habitat. Coordination is currently being conducted with the U.S. Fish and Wildlife Service (USFWS) to determine if the activity will have any effect on species designated as endangered or threatened under the Endangered Species Act, or their critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844). ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed activities will not require preparation of an Environmental Impact Statement. Comments provided will be considered in preparation of an Environmental Assessment.

-5-

CENWW-RD

February 26, 2018

Application Number: NWW-2007-01303

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. This decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and in general, the needs and welfare of the people. In addition, our evaluation will include application of the EPA Guidelines (40 CFR 230) as required by Section 404(b)(1) of the Clean Water Act. CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting comments from the general public; Federal, State and local agencies and officials, Tribal entities and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest in the proposed activity. PUBLIC HEARING: Any person may request in writing, within the comment period specified in this notice, that a public hearing is held to consider this proposed activity. Requests for a public hearing shall state specific reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served. COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on the proposed activity, which will become a part of the record and will be considered in the final decision. Please mail all comments to: U.S. Army Corps of Engineers Walla Walla District Attn: Shane Slate Coeur d'Alene Regulatory Office 1910 Northwest Boulevard, Suite 210 Coeur d'Alene, Idaho 83814-2676

-6-

CENWW-RD

February 26, 2018

Application Number: NWW-2007-01303

Or email: NWW_BNSF_Pendoreille@usace.army.mil

Comments should be received no later than the comment due date of March 28, 2018, as indicated on this notice, to receive consideration.

Kelly J. Urbanek Chief, Regulatory Division Walla Walla District Enclosures

PN_NWW-2007-01303_Attachment_A.pdf

PN_NWW-2007-01303_Attachment_B.pdf

PN_NWW-2007-01303_Attachment_C.pdf

PN_NWW-2007-01303_Attachment_D.pdf

-7-

Attachment A

North End: MP 2.9 !

La k e

P e n d

Ore i ll e

MP 3 0.05 Acres Temp. Nearshore Impact

Section 9 (USCG) Section 404 (USACE)

Bridge 3.1

Section 9 only (USCG)

0.28 Acres Perm. Wetland Fill

Section 404 (USACE) 0.01 Acres Perm. Nearshore Fill

Section 9 (USCG) Section 404 (USACE)

MP 4

0.57 Acres Perm. Nearshore Fill 0.30 Acres Temp. Nearshore Fill

Section 9 (USCG) Section 404 (USACE) Bridge 3.9

Section 9 only (USCG)

BNSF Mileposts !

Project Ends Project Location BNSF Track

0.01 Acres Perm. Nearshore Fill 0.03 Acres Temp. Nearshore Fill

Project Bridges

Section 9 (USCG) Section 404 (USACE)

MP 5

USCG = US Coast Guard USACE = US Army Corps of Engineers

0

1,000

2,000 Feet

1 inch = 2,000 feet 1:24,000

South End: MP 5.1 !

¯

0.29 Acres Perm. Nearshore Fill

Section 10 (USACE) Section 404 (USACE)

JURISDICTIONAL IMPACT OVERVIEW MAP

Lake Pend Oreille

Sandpoint

Project Location

Idaho

§ ¨ ¦ 95

0

1

2 Mi

USACE REF. NO.: NWW-2007-1303 PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR APPLICANT: BNSF RAILWAY CO. BNSF LOCATION: MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION, MP 2.9 - 5.1 PLSS: IN PARTS OF S15, 22, 23, 25, 26 & 36 T57 R2W - BOISE MERIDIAN NORTH END (MP 2.9): 48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1): 48°14'56.24"N, 116°31'24.02"W WATERWAY: LAKE PEND OREILLE & SAND CREEK CITY: SANDPOINT COUNTY: BONNER STATE: IDAHO DATE: NOVEMBER 2017 DATA SOURCES: ESRI (AERIAL), NATURAL EARTH (STATE MAP), BNSF (TRACK AND MILEPOSTS)

Attachment B North End: MP 2.9 !

La k e

P e n d

Ore i ll e

MP 3 Bridge 3.0

Bridge 3.1 (1) 0.05 Acres Temp. Nearshore Impact

(2) 0.28 Acres Perm. Wetland Fill and 0.01 Acres Perm. Nearshore Fill

MP 4

(3) 0.57 Acres Perm. Nearshore Fill and 0.30 Acres Temp. Nearshore Fill

Bridge 3.9

BNSF Mileposts !

Project Ends (4) 0.01 Acres Perm. Nearshore Fill 0.03 Acres Temp. Nearshore Fill

Project Location

MP 5

BNSF Track South End: MP 5.1

Project Bridges

0

1,000

2,000 Feet

1 inch = 2,000 feet 1:24,000

!

¯

(5) 0.29 Acres Perm. Nearshore Fill

JURISDICTIONAL IMPACT OVERVIEW MAP

Lake Pend Oreille

Sandpoint

Project Location

Idaho

§ ¨ ¦ 95

0

1

2 Mi

USACE REF. NO.: NWW-2007-1303 PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR APPLICANT: BNSF RAILWAY CO. BNSF LOCATION: MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION, MP 2.9 - 5.1 PLSS: IN PARTS OF S15, 22, 23, 25, 26 & 36 T57 R2W - BOISE MERIDIAN NORTH END (MP 2.9): 48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1): 48°14'56.24"N, 116°31'24.02"W WATERWAY: LAKE PEND OREILLE & SAND CREEK CITY: SANDPOINT COUNTY: BONNER STATE: IDAHO DATE: NOVEMBER 2017 DATA SOURCES: ESRI (AERIAL), NATURAL EARTH (STATE MAP), BNSF (TRACK AND MILEPOSTS)

Page 1 of 9

Attachment B

North End: MP 2.9 !

MP 3 Bridge 3.0

! A

Bridge 3.1

Construction Access Point from Bridge Street

! A Construction Access Point from Hwy 95

MP 4

Bridge 3.9

! A

MP 5

Construction Access Point

South End: MP 5.1

BNSF Mileposts !

!

Project Ends Construction Access Route Project Location Project Bridges Staging Area

0

0.25

0.5 Miles

1 inch = 2,500 feet 1:30,000

! A

¯

Construction Access Point from Bottle Bay Road

MP 6

CONSTRUCTION STAGING AREAS AND ACCESS POINTS

Lake Pend Oreille Sandpoint

Project Location

Idaho

§ ¨ ¦ 95

0

1

2 Mi

USACE REF. NO.: NWW-2007-1303 PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR APPLICANT: BNSF RAILWAY CO. BNSF LOCATION: MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION, MP 2.9 - 5.1 PLSS: IN PARTS OF S15, 22, 23, 25, 26 & 36 T57 R2W - BOISE MERIDIAN NORTH END (MP 2.9): 48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1): 48°14'56.24"N, 116°31'24.02"W WATERWAY: LAKE PEND OREILLE & SAND CREEK CITY: SANDPOINT COUNTY: BONNER STATE: IDAHO DATE: NOVEMBER 2017 DATA SOURCES: ESRI (AERIAL), NATURAL EARTH (STATE MAP), BNSF (TRACK AND MILEPOSTS)

Page 2 of 9

Attachment B

0.05 ACRES OF TEMPORARY NEARSHORE FILL JURISDICTIONAL HIGH WATER LINE (2062.5)

EXISTING (TYPICAL) PROPOSED NEARSHORE FILL AREA (TEMPORARY)

(1) JURISDICTIONAL IMPACTS BNSF BRIDGE 3.1 NORTH END USACE REF. NO.: NWW-2007-1303 PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR BNSF LOCATION: MONTANA DIVISION, KOOTENAI SUBDIVISION, MP 2.9-5.1 CITY: SANDPOINT COUNTY: BONNER STATE: IDAHO DATE: NOVEMBER 2017 BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017)

Page 3 of 9

Attachment B

JURISDICTIONAL HIGH WATER LINE (2062.5)

0.01 ACRES OF PERMANENT NEARSHORE FILL

0.28 ACRES OF PERMANENT WETLAND FILL

EXISTING (TYPICAL) PROPOSED NEARSHORE FILL AREA (PERMANENT) WETLAND FILL AREA (PERMANENT)

(2) JURISDICTIONAL IMPACTS BNSF BRIDGE 3.1 SOUTH END USACE REF. NO.: NWW-2007-1303 PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR BNSF LOCATION: MONTANA DIVISION, KOOTENAI SUBDIVISION, MP 2.9-5.1 CITY: SANDPOINT COUNTY: BONNER STATE: IDAHO DATE: NOVEMBER 2017 BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017)

Page 4 of 9

Attachment B

0.30 ACRES OF TEMPORARY NEARSHORE FILL

.5)

2 06 AL E (2 ON LIN TI IC ER SD T RI WA JU GH HI

0.57 ACRES OF PERMANENT NEARSHORE FILL

EXISTING (TYPICAL) PROPOSED NEARSHORE FILL AREA (PERMANENT) NEARSHORE FILL AREA (TEMPORARY)

(3) JURISDICTIONAL IMPACTS BNSF BRIDGE 3.9 NORTH END USACE REF. NO.: NWW-2007-1303 PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR BNSF LOCATION: MONTANA DIVISION, KOOTENAI SUBDIVISION, MP 2.9-5.1 CITY: SANDPOINT COUNTY: BONNER STATE: IDAHO DATE: NOVEMBER 2017 BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017)

Page 5 of 9

Attachment B

0 AL E (2 ON LIN TI IC ER SD T RI WA JU GH HI 62 .5 )

0.01 ACRES OF PERMANENT NEARSHORE FILL

0.03 ACRES TEMPORARY NEARSHORE FILL

EXISTING (TYPICAL) PROPOSED NEARSHORE FILL AREA (PERMANENT) NEARSHORE FILL AREA (TEMPORARY)

(4) JURISDICTIONAL IMPACTS BNSF BRIDGE 3.9 SOUTH END USACE REF. NO.: NWW-2007-1303 PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR BNSF LOCATION: MONTANA DIVISION, KOOTENAI SUBDIVISION, MP 2.9-5.1 CITY: SANDPOINT COUNTY: BONNER STATE: IDAHO DATE: NOVEMBER 2017 BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017)

Page 6 of 9

Attachment B

0.29 ACRES OF PERMANENT NEARSHORE FILL

EXISTING (TYPICAL) PROPOSED REMOVALS NEARSHORE FILL AREA (PERMANENT)

(5) JURISDICTIONAL IMPACTS EAST ALGOMA TURNOUT USACE REF. NO.: NWW-2007-1303 PROJECT: BNSF SANDPOINT JUNCTION CONNECTOR BNSF LOCATION: MONTANA DIVISION, KOOTENAI SUBDIVISION, MP 2.9-5.1 CITY: SANDPOINT COUNTY: BONNER STATE: IDAHO DATE: NOVEMBER 2017 BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017)

Page 7 of 9

Attachment B

82.43

2070.47

85.17

2070.58

OF.

EL.

OF.

EL.

2070.53 EL.

2069.03

70.74 OF.

78.11

2075.07 EL.

EL.

63.91 OF.

OF.

2080.36

W ETLAND BOUNDARY

55.98

EL.

2081.31

OF.

7.99

EL.

W ETLAND BOUNDARY

2090

PROP M AIN 1 TRACK

2095

OF.

EX M AIN 2 TRACK

WETLAND FILL CROSS SECTION

2095

2090

2085

2085

100-YR FLOOD ELEVATION 2073.5 FEET

2080

2080

2075

2075

2070

2070

OHWM = 2062.5 FEET 2065

2065

2060

2060

OLWM = 2051.5 FEET

EXISTING GROUND

2055

2055

PERMANENT WETLAND FILL

2050

2050

2045

2045 -30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

SECTION A-A (STA. 860+10)

2090

2085

116.38

2068.55

125.46

2062.50

139.11

2055.68

EL.

OF.

EL.

OF.

EL.

2080.29 EL.

OF.

49.92 OF.

2069.26

2080.01 EL.

80.05

35.92 OF.

EL.

2077.48 EL.

OF.

30.85 OF.

2080.01

2080.01 EL.

63.92

25.79 OF.

EL.

2080.39

OF.

7.08

EL.

PROP RM AIN 1 TRACK

2095

OF.

EX M AIN 2 TRACK

NEARSHORE FILL CROSS SECTION

2095

2090

2085

2080

2080

100-YR FLOOD ELEVATION 2073.5 FEET

2075

2075

EXISTING GROUND

TEMPORARY ACCESS ROAD

2070

2070

OHWM = 2062.5 FEET 2065

2065

2060

2060

OLWM = 2051.5 FEET 2055

2055

2050

2050

PERMANENT NEARSHORE FILL

TEMPORARY NEARSHORE FILL

2045

2045 -30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

SECTION B-B (STA. 888+00)

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

EXISTING CONDITIONS / PROPOSED WORK

$USER$ PM 4:40:23 12/6/2017

GN\JARPA\SPJ_JARPA_XS1.dgn SC\620DESI P:\W 3X76600\600DI

USACE REF NO.: :NWW-2007-1303 PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

XS-1

PAGE NO.

8 OF 9

SCALE

AS SHOWN

Attachment B

EX M AIN 2 TRACK

PROP MAIN 1 TRACK

NEARSHORE FILL CROSS SECTIONS

2095

2090

2085

2095

WORK BRIDGE 2090

2085

100-YR FLOOD ELEVATION 2073.5 FEET

2080

2080

2075

2075

2070

2070

OHWM = 2062.5 FEET 2065

2065

2060

2060

2055

2055

PERMANENT NEARSHORE FILL 2050

2050

EXISTING GROUND

TEMPORARY NEARSHORE FILL 2045

2045

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

SECTION C-C (STA. 938+20)

EX M AIN 2 TRACK

2100

2095

2090

EXISTING GROUND 2085

EL. 2054.06

OF. 74.13

OF. 57.25

PROP M AIN 1 TRACK

2105

OF. 37.08

2110

EL. 2062.50

2115 EL. 2075.96

2115 EL. 2076.54

2120

OF. 7.99

2120

2110

2105

2100

2095

2090

2085

100-YR FLOOD ELEVATION 2073.5 FEET

2080

2080

2075

2075

2070

2070

OHWM = 2062.5 FEET 2065

2065

2060

OLWM = 2051.5 FEET

2060

PERMANENT NEARSHORE FILL

2055

2055

2050

2050 -40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

SECTION D-D (STA. 953+70)

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

EXISTING CONDITIONS / PROPOSED WORK

$USER$ 4:36:58 PM 12/6/2017

GN\JARPA\SPJ_JARPA_XS2.dgn SC\620DESI P:\W 3X76600\600DI

USACE REF NO.: :NWW-2007-1303 PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

XS-2

PAGE NO.

9 OF 9

SCALE

AS SHOWN

Attachment C

00 85+

0 +0 80

2095 20 95

2095

00 90+

2095

5 209

2095

2095

95 20

2095

00 90+

5 209

2095

0 95+0

NORTH END

00 95+

MP .08 1403

2095

9.34 94+6 STA.

2090

OF PROJECT 90 0 2 2090

2090 2090

+00 100

+00 100

MP 2.9

GAS

20 90 2085

2090 2090

MP

2085

2.86

0 209 2090

G STIN EXI CK TRA MRL

0 209

2090

85 20

2090

85 20 5 208

K EE

85 20

5 8 0 2

00 845+

+00 845

CR

2 08 2 0 0 7 5

2085

CUT

2085

20 70

+00 850

00 850+

80 5 20 207

0 208

3

90 16. 43+ . 8 STA

85 20

MP

2085

0 209

+00 840

840+00

ND SA

00 25. 38+ . 8 STA

2070 5

206 60 20

60 20

LL FI

2060

5 80 70 207 20 5 2085 6 20 5 0 080 208 2 7020752 0 2

855+00 LL FI

855+00

RS-06

?

20 65

2050 60

FI LL 20

65 20 070 2

2070

2080

80 0 2

CUT

70 20

0 06 2 0 6 0 2

5 6 20

2075

5

5 6 20

0 6 0 2

T CU

207

0 0 + 0 6 8

+00 860

70 0 2 2065

2060

+

2060 20 6 0 2065

2050

20 75

5 6 20 70 20

080 2

+

RS-07

0 5 7

0

70+0 8

+31. 9 6 8

. A ST

00 +

870

5 7 0 2

80 0 2

75 0 2

0

65+0 8

5+0 6 8

BRIDGE 3.1

MP 6 4 .

75 0 2

2080

3

LAKE PEND OREILLE 4 53.9 + 873

. STA

0 08 2 0

75+0 8

5+00 7 8

MP 5 5 . 3 20 75 4 9 03. + 5 7 8

.

80 0 2

2075

70 0 2

5 7 0 2

3

75 20

STA

MP 8 5 .

70 20 3 6

0

5 7 0 2

2075

0 0

880+

80+0 8

25. + 9 87

. STA

MP 6 6 .

UT C

70 0 2

0 07 2

3

60 20

2060

5 7 20

2060

065 2

0 8 0 2

5 206

T U C

2070 0 0 + 5 88

+00 5 88

2065

0 7 20

70 20

5 7 0 2

75 20

5 6 0 2

CUT

0 08 2

RS-09

206 0

5 207

E

0 6 0 2

2060

2065

0 7 20

65 0 2 2070 0 206

FI LL

2060

2060

0 0 0+ 9 8

2055

2055

0 0 + 0 89

2060

2055

RS-10 2045

205 0

0 0 + 5 89

0 0 + 95 85 204

0 0 + 0 90

0 0 + 0 0 9

RS-11 50 20 50 0 2

0 5 20

0 05 2

+00 5 0 9

2 0 5 0

20 50

00 + 5 0 9

RS-12

2045

2 04 5 0 0 + 0 1 9

00 + 0 1 9 45 0 2

20 45

2 0 45

BRIDGE 3.9

45 20

2 0 4 5

2045

0 0 + 5 1 9

00 +

915 2 0 45

20 40 20 40

40 0 2

0 4 20

5 204

RS-13 0 +0 0 92

0 0 + 20 9 5

203

2040

2040 20 30

5 203 0 0 + 5 92

2025

2040

20 20 0 +0 5 2 9

20 0 2

20 35

202 5

20 40

2030

20 20

RS-14

2020

0 0 + 0 3 9

2 040

0 0 0+ 3 9

2035

LAKE PEND OREILLE 00 + 5 3 9

0 0 + 5 93

2 060

2045

RS-15

65 20

0 07 2

50 20

LL 75 FI 80 20 20

FI LL

80 5 7 20 20 0 0+0 94

2 0 7 0

LL FI

940+0

0 5 208 2090

0 8 20

2095

5 210

2100 2065 2055

2060

LL FI

20525 060

2075

2060

RS-17 2070

2055

80 20 5 208 2090

0 211

5

FI LL

5 207

65 20

5 205

2070

2060

2080

MP

5 211

20852090

2110

2100

2105

20 95

00 945+

945+00

STA. 948+76.90

955+00

2080 2090 2085 2 095 2100 2105 2110 2115 0 212

2125

2130

2135

SOUTH END 960+00

960+00

OF PROJECT MP 5.1

965+00

965+00

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ PM 12:22:57 12/7/2017

ty.dgn ni ci GN\JARPA\SPJ_JARPA_Vi SC\620DESI P:\W 3X76600\600DI

PROJECT PLAN OVERVIEW AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

VICINITY

PAGE NO.

SCALE

1 OF 13

NOT TO SCALE

5 208

Attachment C PLAN VIEW

CUT

PROPOSED MAIN TRACK 1

EXISTING MAIN TRACK (PROPOSED MAIN TRACK 2)

5 208

LEGEND:

EDGE OF PAVEMENT

PERMANENT WETLAND FILL TEMPORARY NEARSHORE FILL RIGHT-OF-WAY FLOW DIRECTION

0 2

1 2 85

3

SF

2 0 6 5 0 207

00

00

BN

5+

+ 855 LL FI

W

U S - 95

3

OHWM = 2062.5 FEET

RO

4

60 20

60 20

LL FI

5

6

PROPOSED BRIDGE 3.1 PRINCIPLE DIMENSIONS WIDTH OF BRIDGE:21 FEET 2060

AMP O FF R

5

4

5 080 85 5 070 20 2 20 2 5 0 5 7 208 08 2 0 2 7 2 0 2

2

WORK BRIDGE 3.1

LENGTH OF BRIDGE:505 FEET PORTION OF BRIDGE WITH STRUCTURE BELOW OHWM = APPROX. 150 FEET

EXISTING BRIDGE 3.1 PRINCIPLE DIMENSIONS

7 WORK BRIDGE 3.1 PRINCIPLE DIMENSIONS

C R C E H E A K N N E L

6

WIDTH OF BRIDGE:32 FEET LENGTH OF BRIDGE: 510 FEET

WIDTH OF BRIDGE:19 FEET LENGTH OF BRIDGE:155 FEET ?

8

EXISTING BRIDGE: 42 FEET PROPOSED BRIDGE: 72 FEET WORK BRIDGE: 72 FEET

1

9

050 02 205

9

10

SAN D C REE K

3

1'-2"

1'-2,"

WORK BRIDGE LOW CHORD

OHWM = 2062.5 FEET

80 20

0 2

0

6

00

T U C

0+

86

8

5 70 0 2

6

0

SF BN

2

W RO

11

20

0.28 AC OF WETLAND FILL (PERMANENT)

APPROXIMATELY 2078.6 FEET 11,"

FI LL 20

EXISTING DOCKS

LOW CHORD ON EXISTING BRIDGE

20 75

12

60

0.01 AC OF NEARSHORE FILL (PERMANENT)

11,"

11

10

2060 20 5 2 65 0 20 07 2 70

APPROXIMATELY 2071.6 FEET

OHWM = 2062.5 FEET

> OF CHAN NEL

2

0

8

8

7

WIDTH OF NAVIGATION CHANNEL

20 65

S A N D

O F

APPROX. LIMIT OF CUT

1

0.05 AC OF NEARSHORE FILL (TEMPORARY)

>

APPROX. LIMIT OF FILL

CUT

0 8

7 5

0 2

U S - 95

OHWM = 2062.5 FEET

FILL

+

MATCH LINE -- SEE DRAWING NO. RS-07

0

0

50'

0

50'

100'

APPROX. GRAPHIC SCALE: 1" = 100'

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ PM 12:32:53 12/7/2017

GN\JARPA\SPJ_JARPA_RS-06.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

RS-06

PAGE NO.

2 OF 13

SCALE

AS SHOWN

A

Attachment C

00

6

0

8

7

0 8 0 2

0

T U C

0+ 86

2

PLAN VIEW

MATCH LINE -- SEE DRAWING NO. RS-06

0 + 0 0 2

5 7 0 2

0 6 0 2

6

5

70 20

0 6 0 2

0

A

LAKE PEND OREILLE 5 -9 US

7 0 2

5

0 2

0

6

0

5 6

W O R

+

2

F

T CU

S N B

2060

NEW DITCH

5 6 0 2 70 20 +

E SUPERIO R ST

2

0

US -9 TO 5 E OF SU F PE RA RI MP OR ST

OHWM = 2062.5 FEET

8

U S 9 5 E O N S U R P A E M R P I O F R R O S M T

0 8

0.28 AC OF WETLAND FILL (PERMANENT)

5

6

EXISTING MAIN TRACK (PROPOSED MAIN TRACK 2)

+ 0

5

6

0

8 + 0

0 0 2

5

7

5

9 S U

LEGEND: NEW DITCH

PROPOSED MAIN TRACK 1

PERMANENT WETLAND FILL RIGHT-OF-WAY

PROPOSED STRUCTURAL WALL

W O R

0 8 0

F

APPROX. LIMIT OF FILL

CUT

APPROX. LIMIT OF CUT

2

FILL

S N B

FLOW DIRECTION

STRUCTURAL WALL

T

OHWM = 2062.5 FEET

L I A R

LAKE PEND OREILLE

MATCH LINE -- DRAWING NO. RS-08 50'

0

50'

100'

APPROX. GRAPHIC SCALE: 1" = 100'

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ 12:14:49 PM 12/7/2017

GN\JARPA\SPJ_JARPA_RS-07.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

RS-07

PAGE NO.

3 OF 13

SCALE

AS SHOWN

Attachment C PLAN VIEW 0 7 0 2

MATCH LINE -- DRAWING NO. RS-08

0

75 20

EDGE OF PAVEMENT

2

0

8

PROPOSED STRUCTURAL WALL

LAKE PEND OREILLE 20

8 8 0 + 0

8

0

8 0 + 0

75 20

. A T S

0

P M 6 6 . 3

5 7 0 2

L AI TR

70

5 -9 US

3 6 . 5 2 + 9 7 8

F S N B W O R

F S N B R

OHWM = 2062.5 FEET

T U C

2

0

0 7 0 2

7

0

W O

PROPOSED CONSTRUCTION ACCESS

8

0

TRAIL TEMPORARILY RELOCATED

2

0

EXISTING MAIN TRACK (PROPOSED MAIN TRACK 2)

6

0

2 5

20

5

75

7

0.30 AC OF NEARSHORE FILL (TEMPORARY)

2

PROPOSED MAIN TRACK 1

70

PERMANENT NEARSHORE FILL

0

20

LEGEND:

0.57 AC OF NEARSHORE FILL (PERMANENT)

TEMPORARY NEARSHORE FILL

0 7 2

0

6 20

5

T U C

207 0

0

0 0 + 5

8

APPROX. LIMIT OF CUT STRUCTURAL WALL

8

APPROX. LIMIT OF FILL

CUT

0 + 5

8

8

5

FLOW DIRECTION FILL

206

RIGHT-OF-WAY

8 0 2

0

CONSTRUCTION LAYDOWN AREA

PROPOSED LIMIT OF GRADING

50'

0

50'

2

0

6

5

OHWM = 2062.5 FEET

100'

MATCH LINE -- SEE DRAWING NO. RS-10

APPROX. GRAPHIC SCALE: 1" = 100'

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ 11:54:49 AM 12/7/2017

GN\JARPA\SPJ_JARPA_RS-09.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

PAGE NO.

RS-09

4 OF 13

SCALE

AS SHOWN

Attachment C 5

PLAN VIEW

2

0

6

MATCH LINE -- SEE DRAWING NO. RS-09

B S N B

5 7 0 2

LAKE PEND OREILLE

60 20

0 6 0 2

W O R

60 20

F

OHWM = 2062.5 FEET

2

S N B

0 6 0

F 0 2

60 20

B

2065

7

0

W O R

EXISTING SPAN 1 HORIZONTAL CLEARANCE APPROXIMATELY 14 FEET

EXISTING HORIZONTAL CLEARANCE APPROXIMATELY 44 FEET SPAN S 2 - 6S

1

2 0 6 0

5 5 0

60 20

F IL L 55 20

2

2 0 6 0

1

2

0 + 0 9 8

2 0 6 0

0.30 AC OF NEARSHORE FILL (TEMPORARY)

0 0 + 0 9 8

1

EXISTING TIMBER PILES CUTOFF AND SUBMERGED

3

20 55

0

2

0.57 AC OF NEARSHORE FILL (PERMANENT)

2

EXISTING BRIDGE 3.9 EX MAIN TRACK 1 (PROPOSED MAIN TRACK 2)

4

3 PROPOSED SPAN 1 HORIZONTAL CLEARANCE APPROXIMATELY 7 FEET

5

4 PROPOSED HORIZONTAL CLEARANCE APPROXIMATELY 93.5 FEET SPANS 2 - 31

3 6 5 7

6 4 7

PROPOSED BRIDGE 3.9 PROPOSED MAIN TRACK 1

LEGEND:

8

PERMANENT NEARSHORE FILL 20

TEMPORARY NEARSHORE FILL

8

9

50

RIGHT-OF-WAY

5 10

4 0

9

WORK BRIDGE HORIZONTAL CLEARANCE APPROXIMATELY 42 FEET

2

APPROX. LIMIT OF FILL

5

FLOW DIRECTION FILL

9

8

11

0

50'

12

0

50'

6 0 + 5 9 85 4 20

SETOUT/STAGING AREA HORIZONTAL CLEARANCE APPROXIMATELY 44.8 FEET

11

0 0 + 5

10 LAKE PEND OREILLE

12 7

13

MATCH LINE -- SEE DRAWING NO. RS-11

100'

APPROX. GRAPHIC SCALE: 1" = 100'

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ 11:52:59 AM 12/7/2017

GN\JARPA\SPJ_JARPA_RS-10.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

PAGE NO.

RS-10

5 OF 13

SCALE

AS SHOWN

Attachment C

PLAN VIEW

MATCH LINE -- SEE DRAWING NO. RS-10

13

13 7

14

EXISTING HORIZONTAL CLEARANCE APPROXIMATELY 44 FEET SPANS 2 - 6S

14 15 15

8

17

9

17 F S N B

PROPOSED HORIZONTAL CLEARANCE APPROXIMATELY 93.5 FEET SPANS 2 - 31

LAKE PEND OREILLE

16

16

18

W O R

18

EXISTING BRIDGE 3.9 EX MAIN TRACK 1 (PROPOSED MAIN TRACK 2)

19

F S N B

19 10 W O R

20

20 0 + 0 0 9

21 0

21

0 + 0 0 9

11

22

0

22

23 23

12 20

24

24

50

SETOUT/STAGING AREA HORIZONTAL CLEARANCE APPROXIMATELY 44.8 FEET

5 0 2

25

25

0 5 0 2

26

0

13

26 27

PROPOSED BRIDGE 3.9 PROPOSED MAIN TRACK 1

LEGEND:

27

RIGHT-OF-WAY

28

FLOW DIRECTION

14 28

LAKE PEND OREILLE

29 15

30

WORK BRIDGE HORIZONTAL CLEARANCE APPROXIMATELY 42 FEET

29 0

20 50

5 0 2

0 5 0 2

0

50'

MATCH LINE -- SEE DRAWING NO. RS-12 0

50'

30 0 + 5 0 9

31

100'

APPROX. GRAPHIC SCALE: 1" = 100'

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ AM 11:51:42 12/7/2017

GN\JARPA\SPJ_JARPA_RS-11.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

PAGE NO.

RS-11

6 OF 13

SCALE

AS SHOWN

5

0

Attachment C

PLAN VIEW

2

9

0

MATCH LINE -- SEE DRAWING NO. RS-11

0 5

+ 0 0

EXISTING HORIZONTAL CLEARANCE

31

16

32 9

APPROXIMATELY 44 FEET SPANS 2 - 6S

0 5

+ 0 0

32

33

33

34

17 35

LAKE PEND OREILLE

34 36

35 18

PROPOSED HORIZONTAL CLEARANCE

37

APPROXIMATELY 93.5 FEET

36

SPANS 2 - 31

B

38

N F S

37

R O W

39

19 38 40

EXISTING BRIDGE 3.9 EX MAIN TRACK 1 (PROPOSED MAIN TRACK 2)

39

2

0

41

5

2 0 4 5

4

20

1

9 0

0

40

42

PROPOSED BRIDGE 3.9

9 1

PROPOSED MAIN TRACK 1

41

0 +

0

21

0

43 LAKE PEND OREILLE

42

B

44

N F

S R

20 45

O W

43 45

22 5

44 2

0

4

46 LEGEND:

47

RIGHT-OF-WAY

45 23

FLOW DIRECTION 2 0 4 5

48

4 5

46

SETOUT/STAGING AREA HORIZONTAL CLEARANCE APPROXIMATELY 44.8 FEET

49

WORK BRIDGE HORIZONTAL CLEARANCE APPROXIMATELY 42 FEET

24

47

50 MATCH LINE -- SEE DRAWING NO. RS-13

50'

0

50'

100'

APPROX. GRAPHIC SCALE: 1" = 100'

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ AM 11:45:48 12/7/2017

GN\JARPA\SPJ_JARPA_RS-12.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

RS-12

PAGE NO.

7 OF 13

SCALE

AS SHOWN

Attachment C

MATCH LINE -- SEE DRAWING NO. RS-12

PLAN VIEW

50

24 45

48 20

2045

51

49

25

5 1 9

52

+

LAKE PEND OREILLE

5 1 9

53

50

+ 0 0

51

54

26

52

53

56

O R

27

W

2 0 4 5

F

WORK BRIDGE

S N B

55

HORIZONTAL CLEARANCE APPROXIMATELY 42 FEET

20 40

57

54

20 40

55 28

58 59 SETOUT/STAGING AREA

56 57

60

HORIZONTAL CLEARANCE APPROXIMATELY 44.8 FEET

EXISTING BRIDGE 3.9

29

EX MAIN TRACK 1

58

(PROPOSED MAIN TRACK 2)

O

0

4

R

5

0

2

F

S N

204

B

61

0

4

0

W

LAKE PEND OREILLE

2

62

59 0 2 0 0

PROPOSED BRIDGE 3.9

63

60

9

PROPOSED MAIN TRACK 1

+

30 2 0

EXISTING HORIZONTAL

+ 0 0

64

CLEARANCE APPROXIMATELY 4 FEET SPANS 2 - 6S 44

61

PROPOSED HORIZONTAL CLEARANCE

EXISTING HORIZONTAL

APPROXIMATELY 93.5 FEET SPANS 2 - 31

31

65

CLEARANCE APPROX. T 17 FEET SPAN 663

62

LEGEND: 2040

RIGHT-OF-WAY

EXISTING HORIZONTAL

66

CLEARANCE APPROX.

63 32

204

67

65 FEET SPANS443 - 65

0

FLOW DIRECTION

PROPOSED HORIZONTAL CLEARANCE

64

3 0

68

2

SPANS 32 - 34

5

APPROXIMATELY 65.4 FEET

33

MATCH LINE -- SEE DRAWING NO. RS-14

50'

0

50'

100'

APPROX. GRAPHIC SCALE: 1" = 100'

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ PM 4:23:37 12/8/2017

GN\JARPA\SPJ_JARPA_RS-13.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

RS-13

PAGE NO.

8 OF 13

SCALE

AS SHOWN

Attachment C

MATCH LINE -- SEE DRAWING NO. RS-13

33

PLAN VIEW

65

EXISTING HORIZONTAL CLEARANCE B S F R

69

N

APPROXIMATELY 65 FEET S SPANS 44 3 - 6

O

W

L E N N A H C

EXISTING HORIZONTAL CLEARANCE

20

APPROXIMATELY 89.6 FEET SPA S 6

30

70

34

20

71

,

L A N O I T A G I V A N

35

66

PROPOSED HORIZONTAL CLEARANCE APPROXIMATELY 2040

72

F O

20 2

65.4 FEET SPANS 32 - 34

35

APPROXIMATELY 76.6 FEET

L E N N A H C

SPANS 67, 68

20 20

2

5 + 0

73

0

SPANS 35 - 38

EXISTING HORIZONTAL CLEARANCE

9

5

67

PROPOSED HORIZONTAL CLEARANCE APPROXIMATELY 93.5 FEET

>

36 9

2 5

74

LAKE PEND OREILLE

L A N O I T A G I V A N

+ 0 0

F O

68

>

75

LOWEST CHORD ON EXISTING BRIDGE APPROXIMATELY 14 FEET VERTICAL CLEARANCE

76

SPANS 36, 37

APPROXIMATELY 89.6 FEET SPA 69 ,

37

20

APPROXIMATELY 14 FEET

EXISTING HORIZONTAL CLEARANCE

20

PROPOSED VERTICAL CLEARANCE

R

SPANS 67, 68 0 2 0 2

C L A N O EXISTING BRIDGE I 3.9 T A 1 (PROPOSED MAIN TRACK 2) EX MAIN TRACK

69

77 78 79

PROPOSED MAIN TRACK 1

80

SETOUT/STAGING AREA

LAKE PEND OREILLE

20

2030

PROPOSED BRIDGE 3.9

70

EXISTING HORIZONTAL CLEARANCE

20 40

202

35

38

APPROXIMATELY 65 FEET Y 65 FEET SPANS - 6 ; 70,371

39

EXISTING HORIZONTAL CLEARANCE APPROXIMATELY

HORIZONTAL CLEARANCE APPROXIMATELY 44.8 FEET

17 FEET SPAN 72

71

EXISTING HORIZONTAL CLEARANCE APPROXIMATELY

2 0 2 0

81 40 82

PROPOSED HORIZONTAL CLEARANCE

73 83

3

9

APPROXIMATELY 65.4 FEET

44 FEET SPANS 73 - 87

72

0

41

SPANS 39 - 41

+ 0

0

B

4

0

0

5 203

0

W

+

O

FLOW DIRECTION

75

3

R

2

9

F

0

S

RIGHT-OF-WAY

74

84

N

LEGEND:

0

85

WORK BRIDGE HORIZONTAL CLEARANCE

42

APPROXIMATELY 42 FEET

76

86

PROPOSED HORIZONTAL CLEARANCE APPROXIMATELY 93.5 FEET SPANS 42 - 48

87

77

43

MATCH LINE -- SEE DRAWING NO. RS-15

50'

0

50'

100'

APPROX. GRAPHIC SCALE: 1" = 100'

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ PM 4:44:35 12/8/2017

GN\JARPA\SPJ_JARPA_RS-14.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

PAGE NO.

RS-14

9 OF 13

SCALE

AS SHOWN

Attachment C MATCH LINE -- SEE DRAWING NO. RS-14

43

PLAN VIEW

N B

78

88

F S R O W

79

89 44 90

80 EXISTING HORIZONTAL CLEARANCE

PROPOSED HORIZONTAL CLEARANCE

91

APPROXIMATELY 93.5 FEET

APPROXIMATELY 44 FEET

81

SPANS 42 - 48

SPANS 73 - 87

LAKE PEND OREILLE

45 82

92 F S N B

83 9

W O R

93

3

46

5 + 0 0

94

84 3

9 EXISTING BRIDGE 3.9

5 +

95

0

0

85

5

SETOUT/STAGING AREA

47

96

EXISTING HORIZONTAL CLEARANCE

0

4

HORIZONTAL CLEARANCE

EX MAIN TRACK 1 (PROPOSED MAIN TRACK 2)

APPROXIMATELY 7 FEET

86

2

APPROXIMATELY 44.8 FEET

SPAN 88

97

OHWM = 2062.5 FT

87

PROPOSED BRIDGE 3.9 PROPOSED MAIN TRACK 1

98 48

88 0

LAKE PEND OREILLE

0 2

100

2

49

7

0

50 20

C

HORIZONTAL CLEARANCE APPROXIMATELY 42 FEET

2

6

99

WORK BRIDGE

0

PROPOSED HORIZONTAL CLEARANCE APPROXIMATELY 93.5 FEET SPAN 49 0.01 AC OF NEARSHORE

101

PERMANENT NEARSHORE FILL

8 5 7 20

FI LL

0

FILL (PERMANENT)

2

LEGEND:

0

102

TEMPORARY NEARSHORE FILL RIGHT-OF-WAY

PROPOSED GRADING LIMITS

FILL

L L5 7 FI 80 20 20

FLOW DIRECTION APPROX. LIMIT OF FILL

C 0.03 AC OF NEARSHORE

94

FILL (TEMPORARY) 2 0 7 0 L L I F

0+

94

00 0+

OHWM = 2062.5 FEET

00

MATCH LINE -- DRAWING NO. RS-16

50'

0

50'

100'

APPROX. GRAPHIC SCALE: 1" = 100'

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ 4:48:29 PM 12/8/2017

GN\JARPA\SPJ_JARPA_RS-15.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

PAGE NO.

RS-15

10 OF 13

SCALE

AS SHOWN

Attachment C

PLAN VIEW

211

5

MATCH LINE -- DRAWING NO. RS-16

OHWM = 2062.5 FEET

EXISTING CROSSING

5

MP

(TO BE REMOVED)

+76.90 STA. 948

EXISTING MAIN TRACK BAY ROAD BOTTLE

2095

75

5 210

0 211

5 208 2090

20

80

0 210

20

55

2070

20

60

2080

PROPOSED MAIN TRACK 1

950+00

20

65 20

FI LL

(PROPOSED MAIN TRACK 2)

W BNSF RO 2060

2055

W BNSF RO

LAKE PEND OREILLE

REMOVE TRACK

0.29 AC OF NEARSHORE

2065 2060 2055

2070

FLOW DIRECTION APPROX. LIMIT OF FILL

955+00

50'

0

50'

955+00

FILL

D

RIGHT-OF-WAY

20525 060

PERMANENT NEARSHORE FILL

D

LL FI

LEGEND:

2075

FILL (PERMANENT)

100'

APPROX. GRAPHIC SCALE: 1" = 100'

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ 12:12:18 PM 12/7/2017

GN\JARPA\SPJ_JARPA_RS-17.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 36 T57 R2W BOISE MERIDIAN PLSS:IN PARTS OF S15, 22, 23, 25, 26 NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

RS-17

PAGE NO.

OF 13

SCALE

AS SHOWN

Attachment C

82.43

2070.47

85.17

2070.58

OF.

EL.

OF.

EL.

2070.53 EL.

2069.03

70.74 OF.

78.11

2075.07 EL.

EL.

63.91 OF.

OF.

2080.36

W ETLAND BOUNDARY

55.98

EL.

2081.31

OF.

7.99

EL.

W ETLAND BOUNDARY

2090

PROP M AIN 1 TRACK

2095

OF.

EX M AIN 2 TRACK

WETLAND FILL CROSS SECTION

2095

2090

2085

2085

100-YR FLOOD ELEVATION 2073.5 FEET

2080

2080

2075

2075

2070

2070

OHWM = 2062.5 FEET 2065

2065

2060

2060

OLWM = 2051.5 FEET

EXISTING GROUND

2055

2055

PERMANENT WETLAND FILL

2050

2050

2045

2045 -30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

SECTION A-A (STA. 860+10)

2090

2085

116.38

2068.55

125.46

2062.50

139.11

2055.68

EL.

OF.

EL.

OF.

EL.

2080.29 EL.

OF.

49.92 OF.

2069.26

2080.01 EL.

80.05

35.92 OF.

EL.

2077.48 EL.

OF.

30.85 OF.

2080.01

2080.01 EL.

63.92

25.79 OF.

EL.

2080.39

OF.

7.08

EL.

PROP RM AIN 1 TRACK

2095

OF.

EX M AIN 2 TRACK

NEARSHORE FILL CROSS SECTION

2095

2090

2085

2080

2080

100-YR FLOOD ELEVATION 2073.5 FEET

2075

2075

EXISTING GROUND

TEMPORARY ACCESS ROAD

2070

2070

OHWM = 2062.5 FEET 2065

2065

2060

2060

OLWM = 2051.5 FEET 2055

2055

2050

2050

PERMANENT NEARSHORE FILL

TEMPORARY NEARSHORE FILL

2045

2045 -30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

SECTION B-B (STA. 888+00)

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ PM 4:40:23 12/6/2017

GN\JARPA\SPJ_JARPA_XS1.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

XS-1

PAGE NO.

12 OF 13

SCALE

AS SHOWN

Attachment C

EX M AIN 2 TRACK

PROP MAIN 1 TRACK

NEARSHORE FILL CROSS SECTIONS

2095

2090

2085

2095

WORK BRIDGE 2090

2085

100-YR FLOOD ELEVATION 2073.5 FEET

2080

2080

2075

2075

2070

2070

OHWM = 2062.5 FEET 2065

2065

2060

2060

2055

2055

PERMANENT NEARSHORE FILL 2050

2050

EXISTING GROUND

TEMPORARY NEARSHORE FILL 2045

2045

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

SECTION C-C (STA. 938+20)

EX M AIN 2 TRACK

2100

2095

2090

EXISTING GROUND 2085

EL. 2054.06

OF. 74.13

OF. 57.25

PROP M AIN 1 TRACK

2105

OF. 37.08

2110

EL. 2062.50

2115 EL. 2075.96

2115 EL. 2076.54

2120

OF. 7.99

2120

2110

2105

2100

2095

2090

2085

100-YR FLOOD ELEVATION 2073.5 FEET

2080

2080

2075

2075

2070

2070

OHWM = 2062.5 FEET 2065

2065

2060

OLWM = 2051.5 FEET

2060

PERMANENT NEARSHORE FILL

2055

2055

2050

2050 -40

-30

-20

-10

0

10

20

30

40

50

60

70

80

90

100

110

120

130

SECTION D-D (STA. 953+70)

BASED ON: HANSON PRELIMINARY PLANS (30%, NOV. 2017). ELEVATIONS ARE RELATIVE TO NAVD88.

$USER$ 4:36:58 PM 12/6/2017

GN\JARPA\SPJ_JARPA_XS2.dgn SC\620DESI P:\W 3X76600\600DI

EXISTING CONDITIONS / PROPOSED WORK AGENCY REF. NO.: PROJECT:BNSF / SANDPOINT JUNCTION CONNECTOR APPLICANT:BNSF RAILWAY COMPANY CONSULTANT:JACOBS ENGINEERING GROUP LOCATION:BNSF MONTANA DIVISION, KOOTENAI RIVER SUBDIVISION LINE SEGMENT 45, MP 2.9 - MP 5.1 PLSS:IN PARTS OF S15, 22, 23, 25, 26, 36 T57 R2W BOISE MERIDIAN NORTH END (MP 2.9):48°16'54.10"N, 116°32'49.35"W SOUTH END (MP 5.1):48°14'56.24"N, 116°31'24.02"W WATERWAY:LAKE PEND OREILLE, SAND CREEK CITY:SANDPOINTCOUNTY:BONNER STATE:IDAHO DATE:DECEMBER 2017

DRAWN BY:

J. SIEMENS

CHECKED BY:

S. PADELFORD

APPROVED BY: P. BORDENAVE

DRAWING NO.

XS-2

PAGE NO.

13 OF 13

SCALE

AS SHOWN

Attachment D

New Spans (32 - 34)

New Spans (35 - 38)

New Spans (39 - 41)

65'4" Horizontal x 15' Vertical Clearance

93'5" Horizontal x 14' Vertical Clearance

65'4" Horizontal x 15' Vertical Clearance

Existing Spans (64 & 65)

Existing Spans (67 & 68)

Existing Spans (70 & 71)

65' Horizontal x 16.5' Vertical Clearance

76'6" Horizontal x 14' Vertical Clearance

65' Horizontal x 16.5' Vertical Clearance

Existing Spans (2 - 62)

Existing Span (66)

Existing Span (69)

Existing Spans (73 - 87)

44' Horizontal x 12.5' Vertical Clearance

89'6" Horizontal x 16' Vertical Clearance

89'6" Horizontal x 16' Vertical Clearance

44' Horizontal x 12.5' Vertical Clearance

ATTACHMENT - B: REFERENCE MAPS

NORTH

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas