Proposed Barge Fleeting on Dolphins between Tennessee River Mile (TRM) 19.5 to 19.8, Right Bank, Livingston County, Kentucky
Public Notice No. 18-04 (Supersedes PN 17-24)
Nashville District
Application No. LRN-2018-00161
Date: March 1, 2018: Expires: March 30, 2018
Please address all comments to:
Nashville District Corps of Engineers,
Regulatory Division
3701 Bell Road
Nashville, TN 37214 (Attn: Lisa R. Morris)
JOINT PUBLIC NOTICE
US ARMY CORPS OF ENGINEERS
TENNESSEE VALLEY AUTHORITY
SUBJECT: Proposed Barge Fleeting on Dolphins between Tennessee River Mile (TRM) 19.5 to 19.8, Right Bank, Livingston County, Kentucky
TO ALL CONCERNED: The project described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 10 of the 1899 Rivers and Harbors Act and a Tennessee Valley Authority (TVA) permit pursuant to Section 26a of the TVA Act. The U.S. Army Corps of Engineers (USACE) has
lead federal agency role status for the coordination and conduct of environmental reviews for this proposal under the National Environmental Policy Act.
The applicant’s previous application, advertised in Public Notice (PN) 17-24, dated October 24, 2017, for barge fleeting on dolphins between TRM 20.0 to 20.7, Right Bank, was withdrawn.
APPLICANT:Trinity Energy & Infrastructure Group, LLC (Trinity)
8345 Madisonville Road
Hopkinsville, KY 42240
LOCATION: TRM 19.3 to 19.7, Right Bank, Gilbertsville, Livingston County, Kentucky. USGS Map: Little Cypress-KY. Lat: 37.046739; Lon: -88.303183. Navigation Chart No. 3.
DESCRIPTION: The applicant requests to establish a single fleeting area to fleet up to fifty (50) standard sized barges (35’ x 195’) in a five (5) wide x ten (10) long configuration at the subject location. The fleeting area (1,950 linear feet total) would be used to moor both loaded (9’ draft) and unloaded barges. Six (6) 24” diameter steel dolphins, placed 15 to 20 meters off the shoreline (Elevation 302), would secure the barges. Each dolphin would consist of a 72” diameter pipe driven into the river bottom to Elevation 260 and braced by two (2) angled 24” diameter pipes, at the following locations:
Latitude
Longitude
Dolphin 6
37° 2' 48.260''
-88° 18' 11.459'
Dolphin 5
37° 2' 45.218''
-88° 18' 8.701''
Dolphin 4
37° 2' 42.328''
-88° 18' 5.875''
Dolphin 3
37° 2' 38.911''
-88° 18' 3.222''
Dolphin 2
37° 2' 35.632''
-88° 18' 0.400''
Dolphin 1
37° 2' 32.478''
-88° 17' 57.635'
The Tennessee River in this area is approximately 1,350’ +/- feet wide (bank to bank). At full capacity, the fleeting area would not extend riverward more than 295 feet (90 meters). Water depths in the area range from 15.5 feet to 22 feet deep (30 meters from the shoreline), and 19.5 feet to 23 feet deep (90 meters from the shoreline). The applicant has indicated that dredging would not be required and there would be no impacts to the shoreline or to any upland area.
PROJECT PURPOSE: At this location, Winn Materials of Kentucky, Grand Rivers Quarry, (formally CALX Resources) has a commercial barge loading facility, with fleeting area, and a working limestone quarry (DA Permit No. LRN-2009-01103, issued in January 21, 2011). Trinity’s customer, Winn Materials of Kentucky, would use the new additional fleeting area to meet customer demands, and to assure the continued success of their operation. The applicant states the additional fleeting area would improve the efficiency of that company’s commercial operation, and minimize the travel time/distance to store and retrieve loaded/empty barges for processing
The proposed fleeting area would be located within the footprint of upstream mooring cells and a barge conveyor load out that was never constructed but permitted (to CALX Resources) by DA Permit No. LRN-2009-01103, issued in January 21, 2011. The window for construction of those structures has
expired. Winn Materials would utilize its current small low horsepower “switch boat,” stored at their terminal, to move barges in and out of the fleeting area. The barges would be loaded at Winn Material’s existing load out location.
SCOPE OF WORK: The scope of work is the direct impacts in each dolphin location, the footprint of the fleeting area, and the immediately adjacent travel corridor to and from the fleeting area. Plans of the proposed work are attached to this notice.
AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.:
Including areas considered pre-application, and the site previously proposed in PN 17-24, a total of five alternate locations (within one-mile of the user’s existing terminal) were considered prior to choosing the current fleeting location. The alternate sites considered are summarized as follows:
• Alternate Site 1 – Potentially interferes with Federal Mooring buoys and first class landing at TRM 20.1L, water depth marginal.
• Alternate Site 2 – Potentially interferes with Federal Mooring buoys and Landing at TRM 20.1L, water depth marginal, located too close to the USACE Long Term Mussel Community and Habitat Monitoring Site 3 at TRM 19.5L.
• Alternate Site 3 – Located within the USACE Long Term Mussel Community and Habitat Monitoring Site 4 at TRM 17.9R.
• Alternate Site 4U and 4L – Proposed on original permit application (PN 17-24), upper site had only enough water depth for empty barges, generally high mussel concentration.
• Alternate Site 5 – A downstream extension of 4L, higher than desired mussel concentration.
PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of
important resources. The benefit, which reasonably may be expected to accrue from the work, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the work, will be considered including the cumulative effects thereof; among those are conservation,
economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. A permit will be granted unless the District Engineer determines it to be contrary to the public interest.
SOLICITATION OF COMMENTS: USACE is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by USACE to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historical properties, water quality, and general environmental effects, and the other public interest factors listed above.Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to NEPA. Comments are also used to determine the need for a public hearing and determine the overall public interest of the proposed activity. An EA will be prepared by this office prior to a final decision concerning issuance or denial of the requested permit.
HISTORIC AND CULTURAL RESOURCES: The USACE archaeologist has reviewed the project proposal and determined there is little likelihood that a historic property exists or may be effected. A copy of this notice is being sent to the office of the State Historic Preservation Officer. This Public
Notice also serves to initiate public involvement requirements of Section 106 of the National Historic Preservation Act of 1966, as amended. USACE invites responses to this notice from Native American Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and sites of religious and cultural significance at or near the project area.
ENDANGERED/THREATENED SPECIES REVIEW: The proposed project has potential to impact listed mussel species and critical habitat for the Quadrula cylindrica (rabbitsfoot mussel). Seven mussel species potentially affected by the proposed project are: Orangefoot Pimpleback (Plethobasus cooperianus),
Fat Pocketbook (Potamilus capax), Pink Mucket (Lampsilis abrupta), Fanshell (Cyprogenia stegaria), Ringpink (Obovaria retusa), Spectaclecase (Cumberlandia monodonta), and the Rabbitsfoot (Quadrula cylindrica).
This area was included in a USFWS Biological Opinion (BO) issued November 17, 2010, associated with the permit for this site issued to CALX Resources (now Winn Materials of Kentucky, DA Permit No. LRN-2009-01103, issued in January 21, 2011). The BO for the authorized project was completed by
USFWS on November 17, 2010 and covered the effects to federally listed mussel species at the time. A new biological assessment of the current project's potential impact on protected mussel species Lampsilis abrupta (pink mucket) and Plethobasus cooperianus (orangefoot pimpleback) and Quadrula
cylindrica (rabbitsfoot mussel), critical habitat, and protected terrestrial species is being prepared and will be provided, when available, to the USFWS, by separate correspondence. The agencies will initiate consultation with the USFWS necessary to fulfill our obligations under Section 7 of the Endangered Species Act.
OTHER APPROVALS: Other federal, state, and/or local approvals may be required for the proposed work.
PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for hearings shall state, with particularity, the reasons for holding a hearing.
COMMENT PERIOD: Written statements received in this office on or before March 30, 2018, will become a part of the record and considered in the determination. Any response to this notice should be directed to the Regulatory Branch, Attention: Lisa Morris, at the above address, telephone
615-369-7506. It is not necessary to comment separately to TVA since copies of all comments will be sent to them and become part of their records on the proposal.
/s/
Timothy C. Wilder Chief, West Branch
Regulatory Division
U.S. Army Corps of Engineers