Bohemia Spillway (“Mardi Gras Pass”) Closure – Phase 1 in Plaquemines Parish, Louisiana
Frank Newell, 700 Papworth Avenue, Suite 202, Metairie, Louisiana 70005.
Location of Work: On the left descending bank of the Mississippi River, at mile marker 43.5 above Head of Passes and adjacent to the Bohemia Control Structure in Plaquemines Parish, Louisiana, as shown on the enclosed drawings.
Latitude: 29.530278, Longitude: -89.729167
Hydrologic Unit Code: 08090100 – Lower Mississippi – New Orleans
08090203 – Eastern Louisiana Coastal
Character of Work: The applicant proposes to install and maintain 360 linear feet of steel sheet pile and 15,000 cubic yards of rock rip rap in order to halt channel scour in the Bohemia Spillway and water flow into Breton Sound. If constructed as proposed, approximately 0.75 acres of Waters of the U.S. would be impacted. Work for Phase 1 would include six soil borings/cone penetrometer test soundings and two water gauges. PPG maintains that Phase 1 will be followed by future phases to repair and rehabilitate the Bohemia Control Structure to restore flow and salinity control.
Preliminary review has determined that no wetlands would be impacted by construction and maintenance of the proposed closure; therefore, no compensatory mitigation has been proposed at this time. Compensatory mitigation could be considered later in the review if it’s determined that construction of the proposed project would directly impact unavoidable jurisdictional wetland areas.
JOINT PUBLIC NOTICE
March 5, 2018
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch, OD-SE
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Water Permits Division
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
Project Manager
Brad LaBorde
(504) 862-2225
Brad.LaBorde@usace.army.mil
Permit Application Number
MVN 2018-0204 EOO
Project Manager
Elizabeth Hill
(225) 219-3225
WQC Application Number
WQC 180227-02
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
Bohemia Spillway ("Mardi Gras Pass") Closure Phase 1 in Plaquemines Parish, Louisiana
Name of Applicant: Plaquemines Parish Government (PPG) Newell Engineering, LLC, ATTN:
Frank Newell, 700 Papworth Avenue, Suite 202, Metairie, Louisiana 70005.
Location of Work: On the left descending bank of the Mississippi River, at mile marker 43.5 above
Head of Passes and adjacent to the Bohemia Control Structure in Plaquemines Parish, Louisiana, as
shown on the enclosed drawings.
Latitude: 29.530278, Longitude: -89.729167
Hydrologic Unit Code:
08090100 Lower Mississippi New Orleans
08090203 Eastern Louisiana Coastal
Character of Work: The applicant proposes to install and maintain 360 linear feet of steel sheet pile
and 15,000 cubic yards of rock rip rap in order to halt channel scour in the Bohemia Spillway and
water flow into Breton Sound. If constructed as proposed, approximately 0.75 acres of Waters of the
U.S. would be impacted. Work for Phase 1 would include six soil borings/cone penetrometer test
soundings and two water gauges. PPG maintains that Phase 1 will be followed by future phases to
repair and rehabilitate the Bohemia Control Structure to restore flow and salinity control.
Preliminary review has determined that no wetlands would be impacted by construction and
maintenance of the proposed closure; therefore, no compensatory mitigation has been proposed at
this time. Compensatory mitigation could be considered later in the review if it's determined that
construction of the proposed project would directly impact unavoidable jurisdictional wetland areas.
-2The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time
in which to comment on the proposed work by writing or e-mailing the Corps of Engineers
Project Manager listed above. Any request must be specific and substantively supportive of
the requested extension, and received by this office prior to the end of the initial comment
period. The Section Chief will review the request and the requestor will be promptly notified of
the decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a total
of 30 calendar days. Similar letters concerning the Water Quality Certification must reference the
applicant's name and the WQC Application number and be mailed to the Louisiana Department of
Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of
this public notice solicits input from the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
-3The New Orleans District has determined that the proposed project is located within waters
known to be utilized by the West Indian manatee (Trichechus manatus) and pallid sturgeon
(Scaphirhynchus albus). Based on the Standard Local Operating Procedure for Endangered
Species of Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of
Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office (USFWS),
it's been determined that the proposed activity "is not likely to adversely affect" the West Indian
manatee. Further coordination with USFWS is required for an effects determination concerning the
pallid sturgeon.
Our initial finding is that the proposed work would neither affect any species listed as endangered
by the U.S. Department of Commerce, nor affect any habitat designated as critical to the
survival and recovery of those species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of N/A acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Enclosure
700 Papworth Avenue, Suite 202
Metairie, Louisiana 70005
(504) 206-3150
NE@newellengineering.com
Newell Engineering, L.L.C.
0
LA
1000
(IN FEET)
2000
PI R
4000
SIP
IVE
R
BOHEMIA
SCALE: 1" = 2000'
VICINITY MAP
MARDI GRAS PASS
SIS
23
MIS
HW
Y
GRAPHIC SCALE
DISTRICT 1 - JOHN L. BARTHELEMY, JR.
DISTRICT 2 - WILLIAM "BEAU" BLACK
DISTRICT 3 - KIRK M. LEPINE
DISTRICT 4 - IRVIN JUNEAU, JR.
DISTRICT 5 - BENEDICT "BENNY"
ROUSSELLE
DISTRICT 6 - CHARLIE BURT
DISTRICT 7 - AUDREY T. SALVANT
DISTRICT 8 - JEFF E. EDGECOMBE
DISTRICT 9 - NICOLE SMITH WILLIAMS
COUNCIL MEMBERS:
AMOS CORMIER, III
PARISH PRESIDENT
PLAQUEMINES PARISH GOVERNMENT
Y
39
SECT 6 T17S - R15E
LAT: 29° 31' 45"
LONG: 89° 43' 38"
PROJECT
LOCATION
BACK LEVEE CANAL
PLAQUEMINES PARISH, LOUISIANA
REHABILITATION OF BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
PHASE 1
LA
HW
EASTERN CLOSURE
PLAN AND SECTIONS
PLAN OF IMPROVEMENTS
EXISTING CONDITIONS
ESTIMATED QUANTITIES
5
4
3
2
1
JANUARY 16, 2018
SHEET 1 OF 5
TABLE OF CONTENTS
TITLE PAGE
N
Newell Engineering, L.L.C.
700 Papworth Avenue, Suite 202
Metairie, Louisiana 70005
(504) 206-3150
NE@newellengineering.com
DENOTES CUBIC YARD
DENOTES LINEAR FOOT
DENOTES EACH
CY
LF
EA
LEGEND
EA
EA
ESTIMATED QUANTITIES
JANUARY 16, 2018
SHEET 2 OF 5
2.) CLOSURE MATERIAL IS A MIXTURE
OF LIMESTONE AND RIPRAP
1.) ALL CLOSURE MATERIAL
QUANTITIES INCLUDE ESTIMATED
INCREASE DUE TO SETTLEMENT
AND CHANNEL GROWTH
2
4
360
LF
WATER GAUGE
15000
NOTES:
QUANTITY
CY
UNIT
SOIL BORING/CPT
CLOSURE MATERIAL
STEEL SHEET PILE
(OPTIONAL)
ITEM
SUMMARY OF ESTIMATED QUANTITIES
STRUCTURE
1. EASTERN CLOSURE
BASE BID
REHABILITATION OF BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
PHASE 1
SIS
S
IR
IPP
IVE
R
0
0
6.
-26.95
-27.55
-36.75
6.
0
-34.95
-17.55
0
6.
0
5.
-22.25
-27.45
0
5
3.
5
2.
0
3.
0
5
3.
0
EDGE OF WATER
-22.15 -12.45
-21.25
-20.85 -22.55
-18.05
-21.35
5
3.
3.
700 Papworth Avenue, Suite 202
Metairie, Louisiana 70005
(504) 206-3150
NE@newellengineering.com
0
250
(IN FEET)
500
EXISTING CONDITIONS
JANUARY 16, 2018
SHEET 3 OF 5
5.) LOT LINES SHOWN BASED ON PLAQUEMINES PARISH ASSESSORS OFFICE ONLINE
MAPS. A BOUNDARY SURVEY WAS NOT COMPLETED FOR THIS PROJECT.
4.) EXIST. GAS LINE (OWNER GULF SOUTH PIPELINE COMPANY) RUNS ALONG NORTH SIDE
OF BACK LEVEE CANAL.
DENOTES LOT LINE
GRAPHIC SCALE
3.) ALL ELEVATIONS ARE EXPRESSED IN FEET AND REFER TO NAVD 88.
DENOTES EXISTING OVERHEAD
ELECTRIC LINES
OHE
Newell Engineering, L.L.C.
2.) BANK ELEVATIONS BASED ON BOHEMIA SPILLWAY FRESHWATER STRUCTURE PLANS
PREPARED BY LOUISIANA DEPARTMENT OF PUBLIC WORKS, DATED MARCH 1969.
DENOTES EXISTING GAS LINE
1.) MARDI GRAS PASS CHANNEL INVERT ELEVATIONS BASED ON SURVEY REPORT
PUBLISHED BY THE LAKE PONTCHARTRAIN BASIN FOUNDATION (LPBF) DATED AUGUST
2017. BANK AND BATHYMETRIC SURVEYS WERE CONDUCTED BY LPBF ON JULY 31 AND
AUGUST 1, 2017.
NOTES:
SCALE: 1" = 500'
EXISTING CONDITIONS
2.
-22.15 -22.25
OVERHEAD UTILITY LINES
& EASEMENT
0
3.
-18.25
3.
G
1000
0
5.
OHE
0
6.
-16.35
0
4.
OHE
-22.75
0
DENOTES BANK ELEVATION
DENOTES AVERAGE BOTTOM ELEVATION
PUBLIC ROAD
(AGGREGATE)
-27.45
0
2.
3.
0
6.
0
7. -23.45
-21.65
5
EDGE OF WATER
BACK LEVEE
CANAL
5
2.
-15.38
-28.65
LEGEND
-23.95
0 .0
2. 3
0
MARDI GRAS PASS
0
0
5.
0
3.
3.
5.
0
3.
EDGE OF
WATER
5
BOHEMIA SPILLWAY
SALINITY CONTROL
STRUCTURE
6
OHE .0
OHE
3.
PUBLIC ROAD
(AGGREGATE)
G
G
REHABILITATION OF BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
PHASE 1
4.
MIS
3.
N
R
250
(IN FEET)
500
1000
700 Papworth Avenue, Suite 202
Metairie, Louisiana 70005
(504) 206-3150
NE@newellengineering.com
Newell Engineering, L.L.C.
1.) WATER LEVELS VARY WITH TIDES AND RIVER LEVELS
2.) MEAN HIGH WATER EL.= 7.5 NAVD
3.) MEAN LOW WATER EL.= 0.0 NAVD
4.) MAXIMUM FULLY LOADED DRAFT OF VESSELS USED
FOR CONSTRUCTION IS 10'.
NOTES:
IVE
0
GRAPHIC SCALE
AGGREGATE ROAD
FUTURE PHASES
OF WORK
OHE
OHE
OHE
OVERHEAD UTILITY LINES
& EASEMENT
EASTERN CLOSURE
SEE SHT. 5 AND
TABLE THIS SHT.
WESTERN GAUGE
EASTERN GAUGE
SOIL BORING/CPT
SOIL BORING/CPT
SOIL BORING/CPT
SOIL BORING/CPT
SOIL BORING/CPT
SOIL BORING/CPT
29°31'43.43"
29°32'05.16"
29°31'39.06"
29°31'44.81"
29°31'54.66"
29°31'59.77"
29°32'07.56"
29°31'51.93"
89°43'39.19"
89°43'14.14"
89°43'45.64"
89°43'35.07"
89°43'28.57"
89°43'21.91"
89°43'13.28"
89°43'33.14"
LATITUDE LONGITUTDE
29°31'53.48" 89°43'29.15"
ITEM
CLOSURE
SCALE: 1" = 500'
PLAN OF IMPROVEMENTS
MARDI GRAS PASS
BACK LEVEE CANAL
PLAN OF IMPROVEMENTS
JANUARY 16, 2018
SHEET 4 OF 5
DENOTES
WATER GAUGE
DENOTES
SOIL BORING/CPT
DENOTES
CLOSURE
LEGEND
EDGE OF WATER
G
REHABILITATION OF BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
PHASE 1
ISS
G
S
MIS
IR
IPP
HE
G
N
700 Papworth Avenue, Suite 202
Metairie, Louisiana 70005
(504) 206-3150
NE@newellengineering.com
Newell Engineering, L.L.C.
OHE
1
5 5
2
5 5
1
1.5
28.5'
SCALE: 1" = 50'
SECTION
CLOSURE MATERIAL
50'
20'
SCALE: 1" = 50'
SECTION
2
5 5
50'
ELEV. +5.0'
OFFSET 160'
BANK ELEV.
+5.0
EXISTING
CHANNEL
BOTTOM
ELEV. -14.0'
ELEV. +5.0'
1
5 5
28.5'
ELEV. -24.0' ELEV. -20.5'
OFFSET 80' OFFSET 120'
160'
SCALE: 1" = 200'
0
ELEV. -24.0'
(IN FEET)
50
100
EASTERN CLOSURE
PLAN AND SECTIONS
JANUARY 16, 2018
SHEET 5 OF 5
NOTE: INCREMENTS REPRESENT FEET.
WATER GAUGE DETAIL
N.T.S.
0'
5'
10'
MEAN HIGH WATER ELEV. +7.5
GRAPHIC SCALE
25
12" DIA PIPE PILE
X 120' LENGTH
WATER LEVEL VARIES
SEE DETAIL THIS PAGE
ELEVATION OF WATER GAUGE (2 REQD)
SCALE: 1"=50'
WATER
BOTTOM
MEAN LOW WATER ELEV. 0.0
EXISTING CHANNEL BOTTOM
MARDI GRAS
PASS
STEEL SHEETING
PLAN EASTERN CLOSURE PHASE 1
(BASE BID)
ELEV. -20.5'
OFFSET 40'
WATER LEVEL VARIES
STEEL SHEETING
ALONG CHANNEL BANK
180' X 100'
CLOSURE MATERIAL
TOP OF STEEL SHEETING
ELEV. +10.0'
EXISTING
GROUND SURFACE
ELEV. +5.0
REHABILITATION OF BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
PHASE 1
OHE
N
LOURIE CONSULTANTS
Project No. 0116-0002, December 17, 2017
N
NOTES
LEGEND
1. USGS Topographic Map: Happy Jack 7.5-Minute
Quadrangle Map, 2015.
Access Route (Open Water and
Existing Mardi Gras Pass; Route
to Site Depends on Dock Used)
2. Locations of all features are approximate.
Boring or CPT Location
3. Exploration personnel will perform over-water work
using barge-mounted equipment and a support
boat for crew transport.
4. Crew and equipment transport will occur from the
launch site to the work location using the Back
Levee Canal and/or the Mississippi River as
appropriate. Overland travel will be limited.
Approximate Scale, feet
5. Historical data and other publically available
information suggests the Back Levee Canal
generally has a water depth greater than about 10 ft
and Mardi Gras Pass has a water depth greater
than about 15 feet. Along the left descending bank
of the Mississippi River between MP 43 and MP 44,
the water depth along the bankline should be about
5 ft, increasing to at least 17 ft over a short
distance, deepening to at least 50 ft and, increasing
to more than 100 ft near the center of the
Mississippi River.
SITE PLAN AND PROPOSED EXPLORATION HOLE LOCATIONS
Mardi Gras Pass Area
Plaquemines Parish, Louisiana
PLATE
1
LOURIE CONSULTANTS
Project No. 0116-0002, December 17, 2017
100-ft-penetration below ground
Existing Ground Surface
CPTs: 2- to 3-in.-dia. Hole
Borings: 4-in.-dia. Hole
100-ft-penetration below mudline
6- to 8-in.-dia. Casing
to Barge Deck
Nominal Hole Diameter
Inches
Feet
Hole
Type
Number
of Holes
CPT Sounding
d6
3
Soil Boring
d6
4
CPTs: 2- to 3-in.-dia. Hole
Borings: 4-in.-dia. Hole
Hole
Depth, ft
Total Hole
Volume, cu yd
0.25
100
1.09
0.33
100
1.90
NOTES
1. See Plate 1 for proposed and approximate exploration hole locations.
2. Cone penetrometer test soundings (CPTs) are accomplished by pushing an instrumented rod into the
ground; soils are displaced and no cuttings are generated.
3. Soil borings will be advanced using wet-rotary drilling methods. Soil cuttings will be discharged at the
mudline.
4. To comply with Louisiana law, LA One Call (1-800-272-3020) will be contacted at least 48 hr before
starting subsurface exploration activities.
5. Boreholes and CPT sounding holes will be sealed following State of Louisiana guidelines by using a
cement-bentonite grout.
EXPLORATION HOLE DETAILS
Mardi Gras Pass Area
Plaquemines Parish, Louisiana
PLATE
2
700 Papworth Avenue, Suite 202
Metairie, Louisiana 70005
(504) 206-3150
NE@newellengineering.com
Newell Engineering, L.L.C.
0
10000
(IN FEET)
20000
GRAPHIC SCALE
REHABILITATION OF BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
PLAQUEMINES PARISH
PHASE 1
40000
SCALE: 1" = 20000'
VICINITY MAP
EMPIRE RIVER GAUGE
1.97 FT @ 2/2/2017 8:00 AM
APPX. 14 MILES DOWNSTREAM
MARDI GRAS PASS
POINTE A LA HACHE RIVER GAUGE
4.16 FT @ 2/2/2017 8:00 AM
APPX. 5 MILES UPSTREAM
N
FIGURE 1
VICINITY MAP
JANUARY 16, 2018
SI
RIV
ER
700 Papworth Avenue, Suite 202
Metairie, Louisiana 70005
(504) 206-3150
NE@newellengineering.com
Newell Engineering, L.L.C.
0
300
(IN FEET)
600
GRAPHIC SCALE
REHABILITATION OF BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
PLAQUEMINES PARISH
PHASE 1
MIS
PI
SSIP
ORIGINAL CHANNEL
(FUTURE MARDI GRAS PASS)
1200
SCALE: 1" = 600'
BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
AERIAL VIEW
BOHEMIA SPILLWAY
SALINITY CONTROL
STRUCTURE
BACK LEVEE CANAL
FIGURE 2
AERIAL VIEW
JANUARY 16, 2018
N
0
1000
PROFILE
SEP 2015
REACH 4B
1969
HIGH BANK
BEYOND, 1969
35+00
0.0'
+10.0'
+20.0'
(IN FEET)
500
AUG 2017 CHANNEL BOTTOM
700 Papworth Avenue, Suite 202
Metairie, Louisiana 70005
(504) 206-3150
NE@newellengineering.com
REACH
4B
REACH
4A
74.5
74.5
90.3
REACH 3
JULY 2016 CHANNEL BOTTOM
90.6
71.2
117.5
113.7
110.9
138.8
140.7
150.2
137.6
137.7
212.9
193.3
162.8
201.1
169.0
227.5
212.4
181.8
245.6
AUG 2017
-40.0'
-30.0'
REACH 4B
REACH 4A
-15.2
-7.6
-19.0
-18.8
-15.9
REACH 2
-12.7
-20.7
-17.1
REACH 3
-12.2
SEP 2015
NO DATA
REACH 1
JULY 2014
-22.0
-20.2
-26.6
-31.4
-25.4
AUG 2017
N
FIGURE 3
HISTORIC CHANNEL WIDTH
AND DEPTH PROFILE
MARDI GRAS PASS
JANUARY 16, 2018
-15.6
-15.2
-16.6
-21.9
-17.7
JULY 2016
MARDI GRAS PASS AVERAGE BOTTOM ELEVATIONS
NOTE: CHANNEL WIDTH AND AVERAGE BOTTOM
ELEVATIONS ARE BASED ON LAKE PONTCHARTRAIN
BASIN FOUNDATION PUBLISHED SURVEYS
HISTORIC CHANNEL WIDTH AND DEPTH PROFILE
MARDI GRAS PASS
72.6
72.6
93.9
102.0
98.7
REACH 2
102.7
JAN 2013 JAN 2014 SEP 2015 JULY 2016 AUG 2017
73.6
MAY
2012
56.2
SEP 2015 CHANNEL BOTTOM
SCALE
1" = 30' V
1" = 500' H
MARDI GRAS PASS AVERAGE CHANNEL WIDTHS (FT)
250
GRAPHIC SCALE
JULY 2016
JULY 2014 CHANNEL BOTTOM REACH 1
1969 CHANNEL BOTTOM
PROFILE LEGEND
AUG 2017 EDGE OF WATER
JULY 2016 EDGE OF WATER
JAN 2014 EDGE OF WATER
MAY 2012 EDGE OF WATER
Newell Engineering, L.L.C.
-40.0'
-30.0'
-20.0'
JULY 2014
REACH 4A
30+00
IMAGERY DATE: JAN 2015
-20.0'
PLAN LEGEND
REACH 3
20+00
AUG 2017
-10.0'
REACH 2
0+00
PLAN
SCALE 1" = 500'
10+00
MAY 2012
JULY 2016
-10.0'
0.0'
+10.0'
-10+00
+20.0'
REACH 1
REHABILITATION OF BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
PLAQUEMINES PARISH
JAN 2014
PHASE 1
0
SEP 2015
JULY 2016
MAY 2012
JULY 2014
700 Papworth Avenue, Suite 202
Metairie, Louisiana 70005
(504) 206-3150
NE@newellengineering.com
REACH 3
0+00
6.8
14.2
12.1
11.8
11.8
REACH 2
REACH 3
REACH 4A
REACH 4B
10+00
1969
16.2
8.6
15.2
20.6
NO DATA
JULY 2014
30+00
35+00
26.8
26.7
31.9
39.7
38.8
JULY 2016
26.5
26.4
35.8
42.2
35.4
AUG 2017
FIGURE 4
HISTORIC THALWAG DEPTH
MARDI GRAS PASS
JANUARY 16, 2018
-50.0'
-40.0'
-30.0'
-20.0'
-10.0'
0.0'
+10.0'
+20.0'
AUG 2017
JULY 2016
SEP 2015
JULY 2014
MAY 2012
1969
LEGEND
ELEVATION OF THALWAG DEPTH BASED
ON WATER SURFACE ELEVATION OF +1.0'
AUG 2017
SOURCE: LAKE PONTCHARTRAIN BASIN FOUNDATION
24.2
23.4
22.8
31.3
17.1
SEP 2015
HIGH BANK
BEYOND, 1969
JULY 2016
SEP 2015
JULY 2014
MARDI GRAS PASS AVERAGE THALWEG DEPTHS
SCALE
1" = 30' V
1" = 500' H
REACH 4B
20+00
MAY 2012
MARDI GRAS PASS HISTORIC
THALWAG DEPTH
REACH 4A
MAY 2012
1000
REACH 1
(IN FEET)
500
GRAPHIC SCALE
AUG 2017
REACH 2
250
Newell Engineering, L.L.C.
-50.0'
-40.0'
-30.0'
-20.0'
-10.0'
0.0'
+10.0'
-10+00
+20.0'
REACH 1
REHABILITATION OF BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
PLAQUEMINES PARISH
PHASE 1
511 0.000476
511 0.000714
511 0.000952
511
511 0.001429
511 0.001667
2
3
4
5
6
7
5.942
5.942
5.942
5.942
5.942
5.942
5.942
700 Papworth Avenue, Suite 202
Metairie, Louisiana 70005
(504) 206-3150
NE@newellengineering.com
Newell Engineering, L.L.C.
0.00119
511 0.000238
4.435
4.106
3.748
3.352
2.903
2.370
1.676
2266.04
2097.94
1915.15
1712.96
1483.47
1211.25
856.48
Initial Conditions
Slope Hydraulic Velocity Flow, Q
(cfs)
(ft/ft) Radius (ft) (ft/s)
1
H Area
(ft) (ft2)
INITIAL CONDITIONS DEPTH = 7'
SCALE: 1" = 100'
80'
1296 0.001667
1296 0.001429
1296 0.00119
1296 0.000952
1296 0.000714
1296 0.000476
1296 0.000238
9.969
9.969
9.969
9.969
9.969
9.969
9.969
6.261
5.797
5.292
4.733
4.099
3.347
2.367
8114.80
7512.84
6858.25
6134.21
5312.38
4337.54
3067.10
2014 Conditions
Slope Hydraulic Velocity Flow, Q
(cfs)
(ft/ft) Radius (ft) (ft/s)
3200
5
7
6
3200 0.000952
4
3200 0.001667
3200 0.001429
0.00119
3200 0.000714
3200 0.000476
3200 0.000238
16.327
16.327
16.327
16.327
16.327
16.327
16.327
18224.5
8.699 27838.39
8.054 25773.34
7.352 23527.73
6.576 21043.84
5.695
4.650 14880.24
3.288 10521.92
2016 Conditions
Slope Hydraulic Velocity Flow, Q
Radius
(cfs)
(ft/s)
(ft/ft)
(ft)
3
2
1
H Area
(ft) (ft2)
2016 CONDITIONS DEPTH = 20'
SCALE:
1" = 100'
180'
7
6
5
4
3
2
1
194'
4225 0.001666
4225 0.001428
4225 0.001190
4225 0.000952
4225 0.000714
4225 0.000476
4225 0.000238
9.8525
9.1217
8.3269
7.4478
6.4500
5.2664
3.7239
41626.85
38538.98
35181.11
31466.94
27251.17
22250.49
15733.47
FIGURE 5
HYDRAULIC ASSESSMENT
MARDI GRAS PASS
JANUARY 16, 2018
19.6776
19.6776
19.6776
19.6776
19.6776
19.6776
19.6776
2017 Conditions
Slope Hydraulic Velocity Flow, Q
Radius
(cfs)
(ft/s)
(ft/ft)
(ft)
2017 CONDITIONS DEPTH = 25'
SCALE:
1" = 100'
H Area
(ft) (ft2)
NOTE: CHANNEL FLOWS AND VELOCITIES WERE COMPUTED USING MANNING'S EQUATION
WITH A CHANNEL LENGTH OF 4200FT AND ROUGHNESS COEFFICIENT OF 0.045.
7
6
5
4
3
2
1
120'
2014 CONDITIONS DEPTH = 12'
SCALE:
1" = 100'
H Area
(ft) (ft2)
REHABILITATION OF BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
PLAQUEMINES PARISH
PHASE 1
R
250
(IN FEET)
500
1000
700 Papworth Avenue, Suite 202
Metairie, Louisiana 70005
(504) 206-3150
NE@newellengineering.com
Newell Engineering, L.L.C.
1.) WATER LEVELS VARY WITH TIDES AND RIVER LEVELS
2.) MEAN HIGH WATER EL.= 7.5 NAVD
3.) MEAN LOW WATER EL.= 0.0 NAVD
4.) MAXIMUM FULLY LOADED DRAFT OF VESSELS USED
FOR CONSTRUCTION IS 10'.
NOTES:
IVE
0
GRAPHIC SCALE
AGGREGATE ROAD
FUTURE PHASES
OF WORK
OHE
OHE
OHE
OVERHEAD UTILITY LINES
& EASEMENT
EASTERN CLOSURE
SEE SHT. 5 AND
TABLE THIS SHT.
WESTERN GAUGE
EASTERN GAUGE
SOIL BORING/CPT
SOIL BORING/CPT
SOIL BORING/CPT
SOIL BORING/CPT
SOIL BORING/CPT
SOIL BORING/CPT
29°31'43.43"
29°32'05.16"
29°31'39.06"
29°31'44.81"
29°31'54.66"
29°31'59.77"
29°32'07.56"
29°31'51.93"
89°43'39.19"
89°43'14.14"
89°43'45.64"
89°43'35.07"
89°43'28.57"
89°43'21.91"
89°43'13.28"
89°43'33.14"
LATITUDE LONGITUTDE
29°31'53.48" 89°43'29.15"
ITEM
CLOSURE
SCALE: 1" = 500'
PLAN OF IMPROVEMENTS
MARDI GRAS PASS
BACK LEVEE CANAL
FIGURE 6
PLAN OF IMPROVEMENTS
MARDI GRAS PASS
JANUARY 16, 2018
DENOTES
WATER GAUGE
DENOTES
SOIL BORING/CPT
DENOTES
CLOSURE
LEGEND
EDGE OF WATER
G
REHABILITATION OF BOHEMIA SPILLWAY
SALINITY CONTROL STRUCTURE
PHASE 1
ISS
G
S
MIS
IR
IPP
HE
G
N