Application for Permit Lyons Canyon Ranch Residential Development.
To permanently discharge fill material onto 0.23 acres (3,572 linear feet) of non-wetland waters of the United States in association with the construction of a residential development including 56 acres of residential development, 129 acres of natural open space, 255 acres of lots, 10 acres of streets and 2 acres of fire station parcel (Lyons Canyon Ranch Project). The proposed project would develop 232 acres and would support 92 residential units.
PUBLIC NOTICE
_________________________________________________________________________________________
U.S. ARMY CORPS OF ENGINEERS
LOS ANGELES DISTRICT
BUILDING STRONG®
APPLICATION FOR PERMIT
Lyons Canyon Ranch Residential
Development
Public Notice/Application No.: SPL-2017-00134-JMV
Project: Lyons Canyon Ranch Residential Development
Comment Period: March 2, 2018 through April 2, 2018
Project Manager: Pamela Kostka; (213) 452-3420; Pamela.K.Kostka@usace.army.mil
Applicant
David W. Shepherd
DR Horton
100 Spectrum Center Drive, Suite 1400
Irvine, CA 92618
Contact
May Lau
Environmental Science Associates
626 Wilshire Blvd.
Suite 1100
Los Angeles, California 90017
Location
The proposed project is located in Lyons Canyon Creek and five unnamed tributaries (A1-A4)
within the city of Santa Clarita, Los Angeles County, CA (at: 34.367998, -118.563544031972) (Figure
1).
Activity
To permanently discharge fill material onto 0.23 acres (3,572 linear feet) of non-wetland waters of
the United States in association with the construction of a residential development including 56 acres
of residential development, 129 acres of natural open space, 255 acres of lots, 10 acres of streets
and 2 acres of fire station parcel (Lyons Canyon Ranch Project). The proposed project would develop
232 acres and would support 92 residential units. For more information see Additional Project
Information section below.
Interested parties are hereby notified an application has been received for a Department of the
Army permit for the activity described herein and shown on the attached drawing(s). We invite you to
review today's public notice and provide views on the proposed work. By providing substantive, sitespecific comments to the Corps Regulatory Division, you provide information that supports the Corps'
decision-making process. All comments received during the comment period become part of the
record and will be considered in the decision. This permit will be issued, issued with special
conditions, or denied under Section 404 of the Clean Water Act. Comments should be mailed to:
DEPARTMENT OF THE ARMY
LOS ANGELES DISTRICT, U.S. ARMY CORPS OF ENGINEERS
REGULATORY DIVISION
ATTN: Pamela Kostka
915 WILSHIRE BOULEVARD, SUITE 930
LOS ANGELES, CALIFORNIA 90017
Alternatively, comments can be sent electronically to: Pamela.K.Kostka@usace.army.mil
The mission of the U.S. Army Corps of Engineers Regulatory Program is to protect the Nation's
aquatic resources, while allowing reasonable development through fair, flexible and balanced permit
decisions. The Corps evaluates permit applications for essentially all construction activities that occur
in the Nation's waters, including wetlands. The Regulatory Program in the Los Angeles District is
executed to protect aquatic resources by developing and implementing short- and long-term initiatives
to improve regulatory products, processes, program transparency, and customer feedback
considering current staffing levels and historical funding trends.
Corps permits are necessary for any work, including construction and dredging, in the Nation's
navigable water and their tributary waters. The Corps balances the reasonably foreseeable benefits
and detriments of proposed projects, and makes permit decisions that recognize the essential values
of the Nation's aquatic ecosystems to the general public, as well as the property rights of private
citizens who want to use their land. The Corps strives to make its permit decisions in a timely manner
that minimizes impacts to the regulated public.
During the permit process, the Corps considers the views of other Federal, state and local
agencies, interest groups, and the general public. The results of this careful public interest review are
fair and equitable decisions that allow reasonable use of private property, infrastructure development,
and growth of the economy, while offsetting the authorized impacts to the waters of the United States.
The permit review process serves to first avoid and then minimize adverse effects of projects on
aquatic resources to the maximum practicable extent. Any remaining unavoidable adverse impacts to
the aquatic environment are offset by compensatory mitigation requirements, which may include
restoration, enhancement, establishment, and/or preservation of aquatic ecosystem system functions
and services.
Evaluation Factors
The decision whether to issue a permit will be based on an evaluation of the probable impact
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit, which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof. Factors that will be considered include conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood
hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water
supply and conservation, water quality, energy needs, safety, food production and, in general, the
needs and welfare of the people. In addition, if the proposal would discharge dredged or fill material,
the evaluation of the activity will include application of the EPA Guidelines (40 CFR Part 230) as
required by Section 404 (b)(1) of the Clean Water Act.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies
and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts
2
of this proposed activity. Any comments received will be considered by the Corps of Engineers to
determine whether to issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above. Comments
are used in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to determine
the need for a public hearing and to determine the overall public interest of the proposed activity.
Preliminary Review of Selected Factors
EIS Determination- A preliminary determination has been made an environmental impact
statement is not required for the proposed work.
Water Quality- The applicant is required to obtain water quality certification, under Section 401 of
the Clean Water Act, from the California Regional Water Quality Control Board. Section 401 requires
any applicant for an individual Section 404 permit provide proof of water quality certification to the
Corps of Engineers prior to permit issuance.
Coastal Zone Management- This project is located outside the coastal zone and preliminary
review indicates it would not affect coastal zone resources. After a review of the comments received
on this public notice and in consultation with the California Coastal Commission, the Corps will make
a final determination of whether this project affects coastal zone resources after review of the
comments received on this Public Notice.
Essential Fish Habitat- No Essential Fish Habitat (EFH), as defined by the Magnuson-Stevens
Fishery Conservation and Management Act, occurs within the project area and no EFH is affected by
the proposed project.
Cultural Resources- A record search was conducted at the South Central Coastal Information
Center (SCCIC) at California State University, Fullerton. Twelve previous cultural resource studies
have been completed within a 0.5 mile radius of the APE, four of which include all or a portion of the
APE. Six prehistoric archaeological sites have been documented within a 0.5-mile radius of the
project area. Two previously unidentified isolates and a concrete check dam structure were identified
on the site during the pedestrian surveys. Tribal consultation for this project was completed during
March and April of 2016. Based on the above information and after reviewing the records
documentation, field survey results, and tribal consultation, the Corps has determined there would be
no effect to historic properties as a result of the proposed action. The Corps has already conducted
consultation with the SHPO for this action and the SHPO has concurred with the Corps findings.
There have been no changes to the project scope since consultation was completed.
Endangered Species- General and protocol biological surveys of the project site were completed
by Bonterra Consulting, David Magney Environmental Consulting, Rincon, and Environmental
Science Associates in 2003, 2006, 2015, and 2017 for federally listed wildlife and plant species. No
Endangered Special Act listed plants were observed during rare plant surveys. Protocol surveys were
conducted in 2015 for coastal California gnatcatcher (Polioptila californica californica) (CAGN) and
least Bell's vireo (Empidonax traillii extimus) (LBV). Protocol surveys for CAGN and LBV were
negative.
The Corps will determine whether the proposed activity would have any effect on ESA listed
species and/or their critical habitat. The Corps may initiate consultation with the United States Fish
3
and Wildlife Service (USFWS) to determine the adequacy of the biological assessment and the Corps
evaluation of any listed species or critical habitat which may be located within the project's Area of
Potential Effect. Mitigation measures may also be incorporated as part of project implementation to
reduce potential impacts to ESA listed species and/or their critical habitat, if deemed appropriate.
Public Hearing- Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public hearing shall
state with particularity the reasons for holding a public hearing.
Proposed Activity for Which a Permit is Required
Basic Project Purpose- The basic project purpose comprises the fundamental, essential, or
irreducible purpose of the proposed project, and is used by the Corps to determine whether the
applicant's project is water dependent (i.e., requires access or proximity to or siting within the special
aquatic site to fulfill its basic purpose). Establishment of the basic project purpose is necessary only
when the proposed activity would discharge dredged or fill material into a special aquatic site (e.g.,
wetlands, pool and riffle complex, mudflats, coral reefs). Because no fills are proposed within special
aquatic sites, identification of the basic project purpose is not necessary.
Overall Project Purpose- The overall project purpose serves as the basis for the Corps' 404(b)(1)
alternatives analysis and is determined by further defining the basic project purpose in a manner that
more specifically describes the applicant's goals for the project, and which allows a reasonable range
of alternatives to be analyzed. The overall project purpose for the proposed project is to construct an
approximately 230 acre development which includes residential homes and public infrastructure in the
northeastern portion of Los Angeles County.
Additional Project Information
Baseline information- The project site is bounded immediately to the north by limited commercial
and residential uses on Sagecrest Circle and the Stevenson Ranch development north of Sagecrest
Circle; to the south by Towsley Canyon Park and vacant land; to the east by The Old Road, Interstate
5, and residential uses; and on the west by vacant land and open space. The entire upstream
watershed of the project is undeveloped. General habitat andlandcover types present onsite include
grasslands, coastal scrub, chaparral, oak woodlands, riparian scrub, riparian woodlands, disturbed,
paved, and landscaped areas. The project site has been burned twice by wildfires: once during the
Simi Fire of 2003 and most recently in July of 2016.
Lyons Canyon Creek, the primary drainage and watershed within the center of the project site,
drains from southwest to northeast. Lyons Canyon Creek originates in the Santa Susana Mountains
south of the project site and eventually flows into the South Fork of the Santa Clara River. Most of the
drainages within the Lyon Canyon watershed are ephemeral in nature. This watershed drains 911
acres, of which 203 acres are located on the project site.
The project site also has small portions of two adjacent watersheds: 23 acres of Towsley Canyon
watershed to the south, and 8 acres of Gavin Canyon watershed to the east. Southeast portions of the
project site flow eastwards into the South Fork of the Santa Clara River via an unnamed drainage.
Project description- The proposed project consists of discharging fill material within waters of the
U.S. for construction of a residential development. Grading activities for construction of building pads
would result in the permanent loss of 0.23 acres of non-wetland waters, ephemeral streams
designated as A1-A4, of the United States. The proposed project would result in the development of
4
the following features: 56 acres of residential development, 129 acres of natural open space, 255
acres of lots, 10 acres of streets, and 2 acres of fire station parcel (Figure 3).
Proposed Mitigation The proposed mitigation may change as a result of comments received in
response to this public notice, the applicant's response to those comments, and/or the need for the
project to comply with the 404(b)(1) Guidelines. In consideration of the above, the proposed
mitigation sequence (avoidance/minimization/compensation), as applied to the proposed project is
summarized below:
Avoidance: The proposed project was designed to avoid impacting 6.85 acres of existing
riparian area and waters of the United States within the proposed project site and would
preserve a total of 129 acres of combined uplands and waters of the United States as open
space.
Minimization: The applicant would implement best management practices (BMPs) during
construction when in/near riparian areas and waters of the United States. The applicant has
proposed the following BMPs:
· Construction equipment shall only cut back or cut down riparian habitat that is absolutely
necessary for construction equipment access;
· All construction activities, within the banks of Lyon Creek and tributaries, should be conducted
during seasons of no, or minimal, channel flows (summer/early fall);
· A path through the creek channel shall be selected that minimizes impacts to the existing
riparian vegetation;
· A fence shall be placed around any (mature) trees, which are less efficiently replaced by
mitigation/restoration efforts;
· All active wildlife nests existing within the project site riparian vegetation shall be protected and
avoided by construction equipment; and
· A biological monitor shall be present during all construction activities within or adjacent to the
drainages of Lyon Canyon that are not to be impacted
Compensation: The applicant has proposed to complete mitigation activities on their project site
by conducting enhancement activities (removal of invasive and re-planting natives) on 10.2
acres of riparian and aquatic resources. The Corps will determine if the proposed mitigation
activities meet the standards set in the 2008 Mitigation Rule and if the proposed mitigation
compensates for the permanent impacts to 0.23 acre of non-wetland waters of the United
States.
Preliminary Alternatives Analysis- The applicant submitted a preliminary alternatives analysis for
the Corps' consideration in response to the requirement to demonstrate compliance with section
404(b)(1) of the Clean Water Act, i.e., the "404(b)(1) Guidelines". The Corps has not yet evaluated the
preliminary analysis of alternatives for compliance, but is providing the following excerpts from the
submittal for review and comment:
Alternative 1: No Federal Action- The No Federal Action Alternative assumes the Lyons Canyon
Ranch project would be built in a manner that avoids all temporary and/or permanent impacts
to jurisdictional waters of the U.S., as shown in Figure 4. This would result in construction
being limited to the northeast portion of the property, adjacent to The Old Road, with no more
than 25-30 single-family residential lots and the one (1) condominium lot proposed for
5
development with 93 senior condominium units being built. There would not be area available
to construct a fire station parcel.
Alternative 2: Offsite Project The Offsite Project Alternative site encompasses approximately
124 acres of land directly southeast of the Proposed Action project area in unincorporated Los
Angeles County, as shown in Figure 5. The Offsite Alternative Project is directly adjacent to
the Old Road and the Calgrove/Old Road intersection. This alternative considers developing a
high-quality mix of residential dwellings and associated open space lots, and debris/detention
basins on a parcel of land with many similar onsite constraints to the Proposed Action site
(e.g. topographic, biological, hydrologic, geologic), and is located in the same general vicinity.
Alternative 3: Reduced Footprint - The Reduced Footprint Project Alternative would reduce the
project footprint to the northwestern portion of the Project area, as shown in Figure 6. It would
include the development of 126 residential units clustered in the northeast portion of the
project site. These residential units would include a mix of multi-family and single-family
residences. The fire station and recreational park lots are eliminated as part of this alternative,
due to the smaller development area.
Proposed Special Conditions
For additional information please call Pamela Kostka of my staff at (213) 452-3420 or via e-mail at
Pamela.K.Kostka@usace.army.mil. This public notice is issued by the Chief, Regulatory Division.
Regulatory Program Goals:
To provide strong protection of the nation's aquatic environment, including wetlands.
To ensure the Corps provides the regulated public with fair and reasonable decisions.
To enhance the efficiency of the Corps' administration of its regulatory program.
__________________________________________________________
DEPARTMENT OF THE ARMY
LOS ANGELES DISTRICT, U.S. ARMY CORPS OF ENGINEERS
915 WILSHIRE BOULEVARD, SUITE 930
LOS ANGELES, CALIFORNIA 90017
WWW.SPL.USACE.ARMY.MIL/MISSIONS/REGULATORY
6
Figure 1. General Location Map of the Lyons Canyon Ranch Project Site
A4
A
A
A3
A2.2
A2.1 A2
Project Boundary
USACE Jurisdiction
CDFW Jurisdiction
IMPACT TYPES:
Grading within Property/Lot Line
Fuel Modification Zones
Beyond Grading Limits
FM Zone B - 50-ft Buffer from
Property/Lot Line
0
400
Fe et
SOURCE: Google Maps, 2015.
FM Zone C - 150-ft Buffer from
Property/Lot Line
Lyons Canyon
Figure 2
Jurisdictional Features
Project Boundary
USACE Jurisdiction
IMPACT TYPES:
Grading - within Daylight Line
Beyond Grading / Daylight Line
Property/Lot with Structure
FM Zone B - 50-ft Buffer from
Property/Lot Line
FM Zone C - 150-ft Buffer from
Property/Lot Line
A
A
A
A4
A
A3
A
A
A2.2
A3
A2
A2.1
0
500
Feet
SOURCE: NAIP, 2016 (Aerial).
Lyons Canyon
Figure 3
Proposed Action
Project Boundary
Project Footprint
USACE Jurisdiction
A
A
A
A
A4
A4
A
A3
A
A
A2.2
A3
A2
A2.1
0
500
Feet
SOURCE: NAIP, 2016 (Aerial).
Lyons Canyon
Figure 4
Alternative 1: No Federal Action Alternative
Preferred Project Boundary
Offsite Project Alternative
Offsite Project Footprint
National Wetlands Inventory Data
11
9
10
8
0
6
7
5
1
4
3
2
0
500
Feet
SOURCE: NAIP, 2016 (Aerial); US Fish and Wildlife Service, 2015.
Lyons Canyon
Figure 5
Alternative 2: Offsite Project Alternative
Project Boundary
Project Footprint
USACE Jurisdiction
A
A
A
A
A4
A4
A
A3
A
A
A2.2
A3
A2
A2.1
0
500
Feet
SOURCE: NAIP, 2016 (Aerial).
Lyons Canyon
Figure 6
Alternative 3: Reduced Footprint Project Alternative