CONSTRUCT A NEW LNG FACILITY IN CALCASIEU PARISH AND A PROPOSED PIPELINE IN CALCASIEU, JEFFERSON DAVIS, ACADIA, AND EVANGELINE PARISHES
NAME OF APPLICANT: Driftwood LNG LLC and Driftwood Pipeline LLC c/o Perennial Environmental Services, LLC, Attn: Marshall Olson, 13100 Northwest Freeway, Suite 150, Houston, Texas 77040.
LOCATION OF WORK: The proposed LNG facility is located on a 790-acre site located in Calcasieu Parish, Louisiana. The site is situated along the west bank of the Calcasieu River, between mile markers 22 and 23. The proposed 96-mile pipeline is located in Calcasieu, Jefferson Davis, Acadia, and Evangeline parishes, Louisiana. The three proposed compressor stations are located in Jefferson Davis, Acadia, and Evangeline parishes. The proposed project is located in the following four watersheds: Lower Calcasieu (HUC 08080206), Upper Calcasieu (HUC 08080203), West Fork Calcasieu (HUC 08080205), and Mermentau Headwaters (HUC 08080201) as shown in the attached drawings.
CHARACTER OF WORK: The applicant has requested a Department of the Army authorization to clear, grade, fill and/or excavate, and develop approximately 718 acres of the 790-acre site to construct the proposed LNG facility. The marine facilities at the LNG facility consist of three berths (one northern and two southern), a materials offloading facility (MOF), and three temporary pioneer docks. Up to 8.25 million cubic yards (yd3) will be removed from the dredge footprint. Approximately 77.6 acres of the site will be dredged to a depth of 46 feet below North American Vertical Datum of 1988 (NAVD 88) utilizing a cutterhead suction dredge. Approximately 4.9 acres of the site will be dredged to a depth of 30 feet below NAVD 88. Approximately 2.5 acres of the site will be dredged using a cutter head suction dredge to a depth of 10 feet below NAVD 88.
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
7400 LEAKE AVENUE
NEW ORLEANS, LOUISIANA 70118
REPLY TO
ATTENTION OF
JOINT PUBLIC NOTICE
March 5, 2018
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118-3651
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
Project Manager
James W. Little, Jr.
(225) 342-3099
james.little@usace.army.mil
Permit Application Number
MVN-2016-01501-WII
Project Manager
Elizabeth Hill
(225) 219-3225
Elizabeth.hill@la.gov
WQC Application Number
WQC 180221-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services for a Water Quality Certification (WQC) in accordance with
statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean
Water Act (P.L. 95-17).
CONSTRUCT A NEW LNG FACILITY IN CALCASIEU PARISH AND A
PROPOSED PIPELINE IN CALCASIEU, JEFFERSON DAVIS, ACADIA, AND
EVANGELINE PARISHES
NAME OF APPLICANT: Driftwood LNG LLC and Driftwood Pipeline LLC c/o Perennial
Environmental Services, LLC, Attn: Marshall Olson, 13100 Northwest Freeway, Suite 150,
Houston, Texas 77040.
LOCATION OF WORK: The proposed LNG facility is located on a 790-acre site located in
Calcasieu Parish, Louisiana. The site is situated along the west bank of the Calcasieu River,
between mile markers 22 and 23. The proposed 96-mile pipeline is located in Calcasieu,
Jefferson Davis, Acadia, and Evangeline parishes, Louisiana. The three proposed compressor
stations are located in Jefferson Davis, Acadia, and Evangeline parishes. The proposed project is
located in the following four watersheds: Lower Calcasieu (HUC 08080206), Upper Calcasieu
(HUC 08080203), West Fork Calcasieu (HUC 08080205), and Mermentau Headwaters (HUC
08080201) as shown in the attached drawings.
CHARACTER OF WORK: The applicant has requested a Department of the Army
authorization to clear, grade, fill and/or excavate, and develop approximately 718 acres of the
790-acre site to construct the proposed LNG facility. The marine facilities at the LNG facility
consist of three berths (one northern and two southern), a materials offloading facility (MOF),
and three temporary pioneer docks. Up to 8.25 million cubic yards (yd3) will be removed from
the dredge footprint. Approximately 77.6 acres of the site will be dredged to a depth of 46 feet
below North American Vertical Datum of 1988 (NAVD 88) utilizing a cutterhead suction
dredge. Approximately 4.9 acres of the site will be dredged to a depth of 30 feet below
NAVD 88. Approximately 2.5 acres of the site will be dredged using a cutter head suction
dredge to a depth of 10 feet below NAVD 88.
The applicant has also requested a Department of the Army authorization to install and
operate a 96-mile pipeline, which consists of approximately 74 miles of a single 48-inch
diameter pipeline, approximately 11 miles of a single 42-inch diameter pipeline, and
approximately 11 miles of a single 36-inch pipeline. Additionally, there will be approximately
3.4 miles of 30-inch diameter pipeline lateral, three new compressor stations, up to 15 meters
stations, and 14 pipeline interconnects. The project activities include clearing the right-of-way,
conducting trenching operations, installing a below ground pipeline, installing aboveground
facilities, temporarily stockpiling materials, and performing horizontal directional drill (HDD)
operations. Following construction, areas temporarily impacted by the project will be restored to
pre-construction grade and allowed to revegetate.
The proposed LNG facility will result in the permanent loss of 319.3 acres of
jurisdictional wetlands. The proposed pipeline and associated facilities will temporarily impact
approximately 367.2 acres of jurisdictional wetlands and 10.1 acres of other waters of the U.S.
In addition, approximately 76.6 acres of forested wetlands and 1.0 acres of scrub-shrub wetland
will be permanently converted to emergent wetlands within the pipeline right-of-way.
Construction of the proposed pipeline and associated facilities will also result in the permanent
loss of 3.4 acres of wetlands and 0.3 acre of other waters of the U.S. The attached tables provide
a summary of the impacts to waters of the U.S. associated with both the proposed LNG facility
and the pipeline.
The applicant has designed the project to avoid and minimize direct and secondary
adverse impacts to the maximum extent practicable by co-locating the proposed route with
existing rights-of-way, utilizing HDDs, reducing the construction footprint in wetlands, and
maximizing the use of existing access roads. The applicant proposes to offset unavoidable
wetland impacts associated with the proposed pipeline by purchasing in-kind / in-basin
mitigation credits from Corps-approved mitigation banks within the New Orleans District.
Similarly, the applicant proposes to offset 134.3 acres of forested and forested mosaic wetland
impacts associated with the proposed LNG facility through the purchase of in-kind / in-basin
mitigation credits from a Corps-approved mitigation bank. The remaining 185.0 acres of
emergent mosaic and estuarine wetland impacts associated with the proposed LNG facility is
proposed by the applicant to be offset through the beneficial use of dredged material. As outlined
in the Beneficial Use of Dredge Material (BUDM) Plan, up to 8.25 million yd3 of dredged
material, which includes material excavated during maintenance operations, will be placed
approximately 2.5 miles southwest of the proposed LNG facility to restore coastal marsh habitat.
Overall, the initial 8.25 million cubic yards of dredged material that will be placed within the
BUDM areas will result in the creation of 1,425 acres of new marsh habitat and will nourish an
additional 617.8 acres of existing marsh habitat, in BUDM Units 1, 5, 7 & 8. In total, the
BUDM areas have the potential to create approximately 3,009 acres of marsh habitat, following
future maintenance dredging cycles.
The comment period for the Department of Army and the Louisiana Department of
Environmental Quality WQC will close in 20 days from the date of this joint public notice.
Written comments, including suggestions for modification or objections to the proposed work,
stating reasons thereof, are being solicited from anyone having interest in this permit and must be
mailed so as to be received before or by the last day of the comment period. Letters concerning
the Corps of Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an
extension of time in which to comment on the proposed work by writing, faxing, or
emailing the Corps of Engineers Project Manager listed above. Any requests must be
specific and substantively supportive of the requested extension, and received by this office
prior to the end of the initial comment period. The Section Chief will review the request
and the requester will be promptly notified of the decision to grant or deny the request. If
granted, the time extension will be continuous to the initial comment period and, inclusive
of the initial comment period, will not exceed a total of 30 calendar days.
Similar letters concerning the Water Quality Certification must reference the applicant's
name and the WQC Application number and be mailed to the Louisiana Department of
Environmental Quality at the address above. The application for the proposed project is on file
with the Louisiana Department of Environmental Quality and may be examined during weekdays
between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the
proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property ownership
and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
The applicant has conducted Phase I cultural resource investigations in compliance with
Section 106 of the National Historic Preservation Act and guidelines set forth by the Louisiana
Division of Archaeology (LDOA) to identify cultural resource sites within the project footprint
and to assess any potential impacts by the project to historic properties or other sensitive cultural
resources. The Draft Phase I Cultural Resources Survey for the Proposed Driftwood Liquefied
Natural Gas Export Facility Report and the Draft Pipeline Phase I Cultural Resources Report,
which provide a detailed analysis of the results of the investigation, were submitted to the LDOA
on June 9, 2016 and October 31, 2016, respectively. The LDOA issued letters concurring with
the applicant's determinations that the project will have no impact on any historic properties
listed or eligible for listing on the National Register of Historic Places on June 29, 2016 and
November 22, 2016.
The applicant submitted concurrence request letters to the U.S. Fish and Wildlife Service
(USFWS) on August 2, 2016. On August 31, 2016, the applicant received a letter from the
USFWS indicating that the agency concurred with the not likely to adversely affect and no effect
determinations for federally listed species based on the information included in the initial
submittal. The applicant submitted additional concurrence request letters to the USFWS on
March 15, 2017 and August 18, 2017, as a result of workspace modifications. On March 31,
2017 and September 19, 2017 (respectively), the applicant received letters from the USFWS
indicating that the agency concurred with the not likely to adversely affect determinations for
federally listed species based on the information included in the submittals. Our initial finding is
that the proposed work would not adversely affect any species listed as threatened or endangered
by the U.S. Department of Interior or Commerce, nor affect any habitat designated as critical to
the survival and recovery of any endangered species. Utilizing the Standard Local Operating
Procedure for Endangered Species in Louisiana (SLOPES) species determination key, dated
October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans District and
USFWS, Louisiana Ecological Services Office, on February 21, 2018, the Corps has determined
that the proposed activity is "Not likely to adversely affect" the West Indian Manatee and would
have no effect on all other listed species.
The applicant initiated the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act on August 25, 2017. The
applicant's proposal would result in the destruction or alteration of up to 322.5 acres of EFH
utilized by various life stages of red drum, gray snapper, lane snapper, and penaeid shrimp. On
October 3, 2017 the National Marine Fisheries Service concurred with the determination that the
project would not result in significant impacts on EFH or federally managed fisheries in the Gulf
of Mexico.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the Department
of Environmental Quality, Water Quality Certification Section before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana Coastal
Resources Program. The Department of the Army permit will not be issued unless the applicant
received approval or a waiver of the Coastal Use Permit by the Department of Natural
Resources.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosures
WCAG003F
WCAG004E
NWI_15
!
25.8
WCAG004F
TAR-18.2
SCAG003
25.7
!
NWI_14
SCAG003
WCAG005F
!
25.6
! 25.5
TAR-18.0
NWI_13
25.4
!
St. Landry
ð
Ú
((
Beauregard
Allen
Evangeline
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
Aboveground Facilities
MLV Site
Permanent Easement
HDD Entry
Access Road
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
L2UBHh Wetland
PEM Wetland
PFO Wetland
PSS Wetland
Farmed Rice
Waterbody
!Parish Boundary
I
Feet
1,000
!
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 40 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
!
SCAG002
26.4
26.3
NWI_16
!
SCAG001
26.2
OCAG002
!
26.1
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
!
25.9
!
MLV Site
HDD Entry
HDD Exit
WCAG002F
26
NWI_15
WCAG003F
26.5
!
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
!
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 41 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SCAF023
NHD_122
SCAF022
27
27.1
!
!
!
27.2
27.3
!
!
26.9
!
NHD_121
OCAG001
!
!
!
!
SCAF024
26.8 !
26.7
26.6
26.5
26.4
!
SCAG001
OCAG002
WCAG002F
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 42 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-19.0
WCAF004F
WCAF004F
WCAF006E
27.7
!
27.6
27.5
27.4
WCAF004F
!
SCAF013
SCAF016
!
SCAF015
!
!
28.2
!
NHD_110
!
27.9
27.8
!
28.1
!
28
SCAF019
WCAF007S
28.3
SCAF018
SCAF020
NHD_24
SCAF014
WCAF004F
SCAF017
!
!
NHD_24
SCAF021
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 43 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WCAF002F
WCAF002F
WCAF002E
SCAF009
NHD_113
NHD_114
WCAF003F
29.2
!
!
WCAF004F
29
28.9
SCAF012
!
29.1
WCAF004F
!
SCAF010
SCAF008
WCAF002E
WCAF002F
28.8
WCAF004F
WCAF004F
29.3
!
TAR-19.1
!
TAR-19.0
NHD_111
SCAF011
!
28.7
!
28.6
!
28.5
!
28.4
NHD_25
!
!
NHD_112
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
((
SCAF013
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 44 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WCAF002F
SCAF005
WCAF002F
SCAF006
SCAF007
!
30.3
29.4
29.5
!
29.6
!
!
29.7
29.9
29.8
!
!
!
30
!
30.1
!
30.2
!
!
NWI_107
NHD_26
WCAF002F
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 45 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-20.0
WCAB002F
WCAF001F
MLV 05
WCAF001F
SCAF004
SCAF003
SCAF002
OCAF001
WCAF002F
TAR-19.2
30.9
30.8
30.7
30.6
!
!
31.3
!
!
TAR-21.0
!
SCAB006
!
SCAF001
!
30.5
31.1
ð
Ú
PAR-6.0
31
!
31.2
!
SCAB007
!
30.4
WCAF001F
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 46 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WCAB002E
SCAB002
WCAB002E
WCAB002F
SCAB003
SCAB004
32.3
WCAB002F
WCAB002F
31.9
!
!
31.7
31.6
!
!
!
31.8
31.5
!
32.1
32
31.4
!
!
32.2
!
!
WCAB002F
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 47 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WCAB004F
SCAB008
WCAB004F
33.3
!
33.2
NHD_27
33
!
32.9
NHD_115
!
32.7
WCAB004E
!
32.6
NHD_116
!
32.8
!
33.1
!
!
32.5
!
32.4
!
SCAB010
SCAB005
WCAB002E
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 48 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
NWI_17
NHD_29
34.3
!
34.2
WCAB004F
33.9
!
33.8
!
!
33.7
33.6
34
!
34.1
!
!
!
33.5
!
33.4
!
NHD_28
!
TAR-22.0
Map Continues on Page 120
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 49 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 121
NHD_36
TAR-23.0
NHD_35
!
!
!
!
NHD_30
!
34.8
NHD_31
34.9
35
35.1
35.3
35.2
RF153
!
34.7
!
34.6
!
34.5
!
34.4
!
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 50 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
Map Continues on Page 123
PAR-7.0
NHD_41
NHD_37
NHD_38
RF156
!
35.7
!
35.6
!
35.5
!
35.4
!
RF154
St. Landry
ð
Ú
((
Beauregard
Evangeline
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
!
HDD Exit
L2UBHh Wetland
Access Road
PFO Wetland
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
!
36.1
!
!
36.2
NHD_39
Aboveground Facilities
Permanent Easement
HDD Entry
!
36
35.9
RF155
NHD_125
RF153
Allen
!
35.8
NHD_40
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 51 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
Map Continues on Page 125
NHD_41
TAR-24.0
PAR-7.0
NHD_42
NHD_41
36.3
36.4
!
36.5
!
!
36.7
36.6
MS 05
!
36.8
!
!
NWI_18
NHD_41
Evangeline
St. Landry
ð
Ú
!
!
!
Acadia
Calcasieu
Cameron
37.1
37
!
!
37.2
!
!
NHD_42
Interconnect
((
Beauregard
Allen
36.9
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 52 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SCAB100
!
37.4
NHD_44
((
NHD_42
37.3
!
WJEB009F
NWI_20
!
!
!
37.6
!
37.5
SCAB100
WJEB009F
37.7
!
37.8
37.9
!
!
38
!
((
NWI_19
NWI_21
!
!
38.2
!
38.1
!
SCAB100
WJEB009F
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 53 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
39.1
NWI_21
39
NWI_21
!
38.9
NHD_45
38.8
39.2
!
!
!
!
NWI_21
38.7
NHD_47
!
38.6
!
NWI_21
38.5
!
WJEB009F
38.4
!
38.3
!
!
TAR-24.1
Map Continues on Page 127
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu and Jefferson Davis Parishes, Louisiana
Page 54 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
WJEB008F
40.4
!
WJEZ009F
!
40.3
PAR-7.9
Interconnect
TAR-25.0
WJEB009F
39.3
39.4
!
39.5
!
!
39.6
!
39.7
!
SJEB034
39.8
Beauregard
Evangeline
St. Landry
ð
Ú
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
HDD Exit
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
NWI_22
PAR-8.0
Permanent Easement
HDD Entry
40
!
!
SJEB031
SJEB032
Allen
39.9
!
TAR-25.2
SJEB033
Feet
1,000
!
CS 01 & MS 06
WJEB009S
((
!
40.2
SJEB031
40.1
!
PAR-8.1
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu and Jefferson Davis Parishes, Louisiana
Page 55 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WJEB007F
SJEB024
WJEB007F
WJEB007F
RF144
41.5
!
41.4
!
41.3
!
RF143
41.2
!
WJEB008E
41.1
!
41
!
SJEB030
WJEB008F
WJEB008F
NWI_108
40.9
!
!
40.8
NHD_48
!
40.7
SJEB025
!
40.6
SJEB030
SJEB028
40.5
SJEB026
SJEB029
WJEB008F
WJEB008F
SJEB027
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
((
!
WJEB008F
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 56 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF140
WJEB006F
SJEB022
WJEB006F
42.3
42.2
!
SJEB023
42.1
RF139
!
RF142
42
41.9
RF143
!
!
!
SJEB021
42.5
42.4
RF157
!
!
41.8
NHD_117
!
41.7
WJEB006F
!
41.6
!
!
TAR-26.0
Map Continues on Page 128
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 57 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
TAR-27.0
WJEF001F
SCAQ001
SJEF003
WJEF001F
WJEF001F
SJEF001
WJEB005F
RF157
NHD_49
SJEB020
43.5
43.2
!
43
!
42.9
!
42.8
WJEB005E
!
SJEF002
WJEF001F
!
42.6
!
!
43.1
42.7
!
43.3
WJEB005F
RF157
!
43.4
SJEB019
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 58 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
Map Continues on Page 130
SJEZ012
RF138
TAR-28.2
RF135
44.1
44.2
!
!
!
RF134
44.4
44.3
!
44.5
44.6
!
!
WJEF002F
SJEF004
!
RF137
44
RF135
RF136
WJEF002F
WJEF001F
!
43.9
!
43.7
43.8
!
43.6
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 59 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on
Page 130
Map Continues on Page 132
OJEZ001
TAR-28.0
45.6
TAR-28.4
SJEZ005
45.4
45.3
WJEZ005S
!
45.5
!
!
!
!
45.2
RF134
!
45
!
44.8
44.7
45.1
!
44.9
!
WJEZ005S
WJEZ005E
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
((
!
SJEZ006
!
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 60 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 132
TAR-28.0
46.5
OJEZ002
WJEZ006F
SJEZ009
WJEZ007F
!
TAR-28.6
!
45.8
!
45.7
!
46.6
!
!
!
46.1
!
46
45.9
46.3
46.2
SJEZ008
46.4
!
!
!
SJEZ007
WJEZ006E
WJEZ006F
Map Continues on Page 133
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 61 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 135
WJEY007F
WJEY007F
SJEY008
46.8
46.7
47.1
!
!
47
St. Landry
ð
Ú
((
Evangeline
!
!
!
Acadia
Cameron
OJEZ004
WJEZ008F
WJEZ008E
SJEZ010
Calcasieu
!
!
!
47.2
WJEY007E
SJEY010
SJEZ011
Beauregard
!
!
WJEY007F
WJEY007F
46.6
Allen
47.4
!
!
!
!
47.5
47.3
WJEZ008F
46.9
WJEY007F
WJEY007F
SJEY009
WJEY007F
WJEY007F
WJEY007F
WJEY007F
TAR-30.0
Jefferson Davis
Vermilion
0
MLV Site
WJEY007F
WJEY007E
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
WJEY007E
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 62 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WJEY007F
47.7
47.6
48.1
48
47.9
47.8
WJEY007F
WJEY007F
WJEY007E
!
!
!
WJEY007F
48.2
!
48.3
48.4
!
48.5
!
!
!
!
!
WJEY006F
WJEY006S
WJEY006S
WJEY006E
WJEY006E
WJEY006E
WJEY007F
WJEY007E
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 63 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 140
TAR-31.0
TAR-31.2
SJEY006
WJEY006F
49.5
WJEY006F
WJEY006F
WJEY007F
49.3
49.2
49.1
!
!
WJEY003E
!
48.8
48.7
WJEY003F
!
!
!
!
49
!
48.9
48.6
!
49.4
!
WJEY006E
OJEY001
WJEY006F
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 64 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-31.2
RF132
50.5
!
WJEY001S
WJEY001S
SJEY001
WJEY001S
WJEY001S
50.4
!
50.3
!
50.2
50.1
!
49.9
49.8
49.7
49.6
!
!
50
!
!
St. Landry
ð
Ú
((
Evangeline
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
SJEY001
WJEY001E
SJEY002
WJEY001E
SJEY004
Allen
SJEY003
WJEY001S
SJEY005
Beauregard
RF133
!
!
SJEY006
!
WJEY001E
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 65 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
PAR-9.0
WJEZ001F
RF132
Interconnect
!
RF131
MS 07
50.6
!
50.8
!
50.7
51.2
51.1
!
51
50.9
!
51.3
SJEZ015
PAR-9.1
!
!
!
!
SJEZ001
!
!
51.5
51.4
Interconnect
RF130
NHD_57
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 66 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF129
WJEZ003F
SJEZ001
SJEZ002
SJEZ003
WJEZ002F
51.6
52
51.9
51.8
!
51.7
!
WJEZ004S
52.2
52.1
52.3
52.4
!
!
!
!
!
!
!
!
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 67 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WJEH006F
WJEH006E
WJEH007F
RF129
!
!
!
!
!
!
52.8
!
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
((
52.6
52.5
!
!
!
Acadia
Calcasieu
Cameron
53
52.9
53.2
53.1
SJEA021
SJEA022
52.7
!
!
53.4
!
53.3
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 68 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SJEB009
RF124
RF125
RF126
RF127
54.2
RF128
54.1
54
53.7
53.6
53.5
53.9
53.8
54.4
54.3
!
!
!
!
!
!
!
!
!
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 69 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SJEB006
WJEB002F
SJEB007
55.1
54.9
54.8
54.7
54.6
54.5
!
Evangeline
St. Landry
ð
Ú
!
!
Acadia
Cameron
!
!
!
WJEB002E
!
Calcasieu
!
!
((
Beauregard
!
!
!
!
!
Allen
55
55.2
(
SJEB008
55.4
55.3
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 70 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 143
WJEB001F
TAR-35.1
TAR-35.0
SJEB004
WJEB002F
55.6
55.5
!
!
!
!
!
!
!
WJEB001E
(
55.7
(
55.9
55.8
56.1
56
56.3
56.2
!
!
!
!
WJEB002E
!
!
SJEB006
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 71 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF119
RF120
RF121
SJEB005
SJEB014
56.9
57
!
!
!
!
!
!
!
(
!
!
!
56.8
56.7
56.6
56.5
56.4
57.1
RF122
WJEB001F
57.3
57.2
!
WJEB001E
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 72 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF116
RF117
SJEB012
RF118
SJEB013
RF119
57.5
57.4
ð
Ú
57.9
57.8
57.7
57.6
58
58.1
58.3
58.2
!
!
!
!
!
!
!
!
!
!
MLV 07
PAR-10.0
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 73 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SJEB010
RF112
RF113
RF114
SJEB011
RF115
RF116
58.6
58.5
58.4
58.8
58.7
59
58.9
!
!
!
TAR-36.0
SJEY014
SJEY015
Evangeline
St. Landry
ð
Ú
((
Allen
!
!
!
Acadia
Cameron
!
!
!
!
Calcasieu
!
!
!
!
Beauregard
59.1
59.3
59.2
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
TAR-37.0
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 74 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF110
SJED020
59.5
59.4
!
!
!
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
!
!
Acadia
Cameron
Jefferson Davis
Vermilion
0
59.8
59.7
59.6
!
!
Calcasieu
RF111
SJED019
((
RF112
!
!
MLV Site
HDD Exit
L2UBHh Wetland
Access Road
PFO Wetland
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Aboveground Facilities
Permanent Easement
HDD Entry
59.9
Feet
1,000
60.2
60.1
60
!
!
!
!
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 75 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SJEY013
TAR-37.3
RF110
TAR-37.1
!
!
!
!
60.9
60.8
60.6
60.5
60.4
60.3
RF106
OJEB001
RF150
RF109
!
SJED017
SJED018
!
!
60.7
61.2
61.1
61
!
!
!
RF107
RF105
RF108
TAR-37.2
SJEY012
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 76 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF103
RF104
RF105
61.4
61.3
SJED016
61.7
!
61.6
61.5
RF102
SJED015
61.9
61.8
62
62.2
62.1
!
!
!
!
!
!
!
!
!
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 77 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SJEY011
SJED013
RF101
62.4
62.3
62.7
62.6
62.5
RF098
TAR-37.4
SJEB017
RF100
RF102
RF099
SJED012
WJEB004E
62.8
62.9
63
!
63.1
!
!
!
!
!
!
!
!
!
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 78 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF091
RF092
!
SJEY011
64.2
SJED005
SJED006
64
63.9
63.8
!
!
!
!
64.1
!
63.7
!
!
!
63.4
!
63.3
63.2
SJED011
RF097
Beauregard
RF093
SJED007
SJED008
SJED010
RF096
Allen
Evangeline
St. Landry
ð
Ú
!
!
Acadia
Cameron
SJED009
RF095
!
Calcasieu
63.5
RF094
((
!
63.6
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 79 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
65.2
!
65.1
!
!
!
!
!
!
64.4
!
SJED004
64.5
64.3
RF090
!
64.9
64.8
64.7
!
64.6
65
RF088
RF089
SJED003
WJEB003F
WJEB003F
SJEB015
SJEB016
WJEB003F
RF091
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 80 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
66.2
SJEB003
RF086
!
!
66.1
!
66
65.8
!
65.7
65.6
65.9
!
SJEB002
SJEB001
!
65.5
!
65.4
!
65.3
!
RF085
!
!
RF087
SJED001
SJED002
RF088
Contractor Yard 3 Mapping on Page 144
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 81 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
(
!!
!
!
!
!
66.8
!
66.7
!
66.6
!
66.5
!
66.4
!
66.3
!
67
67.1
66.9
NWI_26
NHD_65
RF084
RF085
TAR-37.7
Map Continues on Page 145
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 82 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WACB006E
WACB005E
WACB006E
WACB007E
68.1
68
WACB004S
!
!
!
NWI_27
(
!
!
!
67.7
67.8
67.9
WACB006S
SACB022
SACB020
67.3
!
SACB021
(
WACB005S
!!
67.2
NWI_26
SACB023
SACB027
NWI_27
WACB007F
SACB028
TAR-37.8
NHD_66
NHD_67
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis and Acadia Parishes, Louisiana
Page 83 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SACB025
WACB002S
WACB002E
SACB009
SACB010
SACB011
RF082
SACB010
SACB005
68.5
!
!
68.2
68.3
!
!
!
68.4
!
68.7
68.6
!
68.8
!
!
68.9
SACB007
WACB002F
SACB026
69.1
SACB008
WACB002S
WACB002F
!
69
RF083
SACB006
SACB024
NHD_69
TAR-37.8
NHD_68
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Acadia Parish, Louisiana
Page 84 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-28.0
Map Continue s on Page 130
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 131 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-28.0
Map Continues on Page 61
SJEX003
SJEX002
Map Continues on Page 60
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
PEM Wetland
PSS Wetland
Topographic Map
Farmed Rice
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC!
Jefferson Davis Parish, Louisiana
Waterbody
Parish Boundary
!
I
Feet
1,000
!
Page 132
! of 152
!
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 61
TAR-28.6
Map Continues on Page 134
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 133 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 133
TAR-28.6
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 134 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 136
NHD_54
TAR-30.0
NHD_53
Map Continues on Page 62
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
PEM Wetland
PSS Wetland
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
Topographic Map
Farmed Rice
Waterbody
Parish Boundary
I
!
!
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline !LLC
!
Jefferson Davis Parish,
Louisiana
!
Page 135 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
NHD_52
Map Continues on Page 137
TAR-30.0
WJEF003E
WJEF003F
WJEF004E
WJEF004F
Map Continues on Page 135
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 136 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 138
TAR-30.0
Map Continues on Page 136
NHD_51
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 137 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 139
NHD_51
TAR-30.0
Map Continues on Page 137
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 138 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-30.0
Map Continues on Page 138
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 139 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 141
TAR-31.0
NHD_55
Map Continues on Page 64
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 140 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 142
NHD_56
TAR-31.0
SJEA006
SJEA005
Map Continues on Page 140
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 141 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-31.0
Map Continues on Page 141
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 142 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-35.0
Map Continues on Page 71
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 143 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-37.6
NHD_63
NWI_25
Contractor Yard 3
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 144 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 82
TAR-37.7
NHD_64
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 145 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 87
SACB015
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Acadia Parish, Louisiana
Page 146 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Sulphur Park and Ride
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 147 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Lake Charles Park and Ride
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 148 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
NHD_119
Chenault Airport Site
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 149 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SJEH008
Pipe Yard
TAR-32.1
SJEH019
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 150 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-18.1
Contractor Yard 1
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 151 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Vinton Park and Ride
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 152 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
FYHQ
4
5
6
7
8
9
;
<
=
43
Hvmjx{ssh#PRK#Jegmpmx}
XSXEP#EGVIW
Egviw
7=;17
4761;
49<17
4=4
69416
841=
64;18
<471;
4<5=1<
;;41;
;<41<
8=5=15
Ftkhvyqqf!NPI!Hceknkv{
DWFO!Ctgc!4
DWFO!Ctgc!3
Ftgfig!
Rkrgnkpg!htqo!
RQD!.!Dqquvgt!
Rwor!
29-193!hggv!
)2-1;7!tqfu*
DWFO!Ctgc!;
DWFO!Ctgc!7
DWFO!Ctgc!21
DWFO!Ctgc!8
DWFO!Ctgc!5
Eqr{tkijv<¨!3124!Pcvkqpcn!Igqitcrjke!Uqekgv{-!k.ewdgf
Ngigpf
DWFO0!Gzkuvkpi!Eqpvckpogpv
Ftkhvyqqf!NPI!Hceknkv{
FTGFIG!R0N!TQWVG
¼
Ftkhvyqqf!NPI!Hceknkv{
UVTGCO!YGVNCPF!UGTXKEGU
RTQRQUGF!FTKHVYQQF!NPI!HCEKNKV[
DGPGHKEKCN!WUG!QH!FTGFIG!OCVGTKCN
CPF!OKVKICVKQP
ECNECUKGW!RCTKUJ-!NQWKUKCPC
1
Ujggv!#!qh!"*
Page
14 of 34
4-561
7-;11
24-911
Hggv
Page 15 of 34
Page 16 of 34
Page 17 of 34
Page 18 of 34
Page 19 of 34
Page 20 of 34
Sheet 21 of 34
Page 22 of 34
Page 23 of 34
Page 24 of 34
Page 25 of 34
Page 26 of 34
Page 27 of 34
Page 28 of 34
Page 29 of 34
Page 30 of 34
Page 31 of 34
Page 32 of 34
Page 33 of 34
Page 34 of 34
RF082
SACB005
69.2
69.3
!
!
SACB004
69.4
!
69.5
!
SACB002
SACB003
69.7
!
69.6
69.8
!
69.9
!
!
70
!
!
RF081
RF083
SACB001
SACB029
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
((
!
WACB001F
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Acadia Parish, Louisiana
Page 85 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
OACB002
70.1
70.2
!
70.3
!
70.4
!
Evangeline
St. Landry
ð
Ú
!
!
!
Acadia
Cameron
70.7
!
70.8
!
70.9
71
!
!
NHD_71
NWI_28
((
Allen
NWI_28
NHD_70
OACB001
Calcasieu
70.6
!
!
TAR-37.9
RF080
Beauregard
70.5
!
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Acadia Parish, Louisiana
Page 86 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SACB012
SACB013
PAR-11.0
WACC0
PAR-11.1
Interconnect
WACC002F
SACC003
!
SACC004
MS 08
SACB016
SACB019
SACB018
SACB017
!
71.2
71.1
!
!
71.3
!
!
71.7
71.6
!
71.5
!
72
WACC002F
71.8
!
71.9
!
!
WACC002E
71.4
SACB015
SACC005
CS 02
WACC002F
Map Continues on Page 146
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Acadia Parish, Louisiana
Page 87 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
72.9
RF077
!
SACE002
SACE002
PAR-12.0
TAR-38.0
MS 09
WACC002E
72.4
!
WACC002F
!
Tie In
72.3
!
PAR-11.9
72.2
!
!
RF078
!
72.8
72.7
SACC002
72.6
!
72.5
RF079
Interconnect
72.1
WACC002F
WACC002E
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
((
!
!
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Acadia Parish, Louisiana
Page 88 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
! 73.5
RF075
!
!
PAR-13.0
73.4
73.3
RF076
SACH001
73.1
!
73
!
73.2
!
MS 10 & MS 11
Interconnect
PAR-12.9
!
72.9
RF077
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Jefferson Davis
!
Cameron
Vermilion
MLV Site
HDD Exit
L2UBHh Wetland
Access Road
PFO Wetland
Milepost
!
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
!
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Aboveground Facilities
Permanent Easement
HDD Entry
!
0
72.8
DWLNG Facility
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Acadia Parish, Louisiana
Page 89 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WACA001E
74.3
74.2
SACA006
!
RF074
Interconnect
74
73.9
!
!
!
73.8
!
!
74.1
MS 12
PAR-14.0
TAR-38.1
RF073
!
73.7
PAR-14.1
! 73.6
RF075
!
Allen
St. Landry
ð
Ú
((
Beauregard
Evangeline
!
!
!
Acadia
Calcasieu
!
Jefferson Davis
Cameron
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Interconnect
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Acadia Parish, Louisiana
Page 90 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
! 74.9
RF071
WACC001F
!
74.8
!
74.7
RF072
!
74.6
!
74.5
74.4
!
WACA001E
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
0
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
!
!
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Feet
1,000
!
!
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Acadia Parish, Louisiana
Page 91 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
75.5
!
RF070
75.4
!
SEVC008
!
75.3
WEVC001E
NWI_29
75.2
NHD_72
RF071
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Calcasieu
Cameron
!
SEVC002
SEVC001
!
75
HDD Exit
0
L2UBHh Wetland
Access Road
PFO Wetland
Contractor/Pipeyard
Milepost
!
TWS
Park and Ride
Temporary Offsite Construction Area
Interconnect
Vermilion
Aboveground Facilities
Permanent Easement
HDD Entry
30" Lateral
Jefferson Davis
WEVC001F
75.1
MLV Site
Proposed Mainline
Acadia
!
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Acadia and Evangeline Parishes, Louisiana
Page 92 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
WEVC003F
76.2
76.1
WEVC004F
!
76
SEVC018
!
75.9
!
RF067
!
RF068
NHD_118
75.7
RF069
!
SEVY006
75.6
Allen
RF070
Evangeline
!
ð
Ú
((
TAR-39.0
!
!
St. Landry
!
Acadia
Calcasieu
Cameron
!
75.8
RF068
Beauregard
!
Jefferson Davis
!
0
Vermilion
MLV Site
HDD Exit
L2UBHh Wetland
Access Road
PFO Wetland
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Aboveground Facilities
Permanent Easement
HDD Entry
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 93 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
76.8
NWI_30
!
76.6
76.7
!
76.5 !
76.4 !
WEVC003E
76.3
WEVC003F
Evangeline
St. Landry
ð
Ú
!
((
Beauregard
Allen
!
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 94 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
TAR-39.1
!
77.3
77.4
RF066
! 77.2
!
77.1
NWI_30
!
!
77
76.9
NWI_30
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
!
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary
! Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 95 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
RF064
!
!
!
78
77.9
77.8
SEVC014
SEVC016
!
77.7
SEVC015
RF065
77.6
!
SEVC017
SEVC011
RF066
! 77.5
TAR-39.1
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Cameron
HDD Exit
Access Road
PFO Wetland
TWS
!
Park and Ride
Temporary Offsite Construction Area
Interconnect
Vermilion
L2UBHh Wetland
Contractor/Pipeyard
Milepost
30" Lateral
Jefferson Davis
Aboveground Facilities
Permanent Easement
HDD Entry
Proposed Mainline
Acadia
Calcasieu
MLV Site
77.4
DWLNG Facility
0
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 96 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF062
78.7
78.8
!
!
!
78.6
SEVB046
!
!
!
RF064
Beauregard
! Evangeline
St. Landry
ð
Ú
!
!
!
Acadia
!
Calcasieu
!
Cameron
Jefferson Davis
Vermilion
SEVB047
78.2
78.1
((
Allen
RF063
SEVB048
!
!
78.3
78.4
78.5
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 97 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
RF059
!
79.4
Interconnect
! 79.3
MS 13
PAR-15.0
!
RF061
SEVB045
79.1
!
RF062
((
Beauregard
ð
Ú
Evangeline
Allen
!
!
St. Landry
!
Acadia
Calcasieu
Cameron
!
Jefferson Davis
Vermilion
!
0
RF060
SEVB044
79
78.9
79.2
!
!
MLV Site
!
Aboveground Facilities
L2UBHh Wetland
HDD Exit
Access Road
PFO Wetland
Permanent Easement
HDD Entry
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 98 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
SEVA038
SEVA037
RF057
!
!
80
80.1
RF056
SEVA039
SEVB042
! 79.9
! 79.8
RF058
! 79.7
SEVB043
RF059
!
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
MLV Site
Vermilion
0
79.5
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
!
Proposed Mainline
TWS
Temporary Offsite Construction Area
Interconnect
Jefferson Davis
!
79.6
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 99 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF052
!
80.8
SEVB040
! 80.7
SEVA036
! 80.6
WEVA009F
RF149
SEVB041
RF053
SEVA035
WEVA009F
!
80.5
RF054
RF055
!
RF056
!
Evangeline
Allen
Beauregard
St. Landry
!
ð
Ú
!
!
!
Acadia
!
Calcasieu
Cameron
Jefferson Davis
Vermilion
80.3
!
((
80.2
80.4
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 100 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
RF050
81.4
!
RF049
SEVC010
SEVC009
!
81.3
RF051
81.2
!
81.1
!
81
RF052
!
80.9
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Cameron
HDD Exit
Vermilion
L2UBHh Wetland
Access Road
PFO Wetland
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
!
Temporary Offsite Construction Area
TWS
Interconnect
Jefferson Davis
!
Aboveground Facilities
Permanent Easement
HDD Entry
Proposed Mainline
Acadia
Calcasieu
MLV Site
DWLNG Facility
0
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 101 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
!
82.1
!
82
!
!
81.9
RF048
SEVB036
SEVB037
SEVB035
! 81.8
SEVB034
TAR-39.2
81.7 !
SEVB038
RF049
81.6
SEVB039
!
RF050
! 81.5
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
Aboveground Facilities
MLV Site
Permanent Easement
!
Access Road
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
L2UBHh Wetland
PEM Wetland
PFO Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 102 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF044
SEVB029
RF046
RF148
WEVB013F
WEVB013E
SEVB031
SEVB032
SEVB033
!
82.9
RF045
!
82.8
!
WEVB013F
82.7
!
WEVB013F
82.6
!
RF047
82.5
!
RF048
82.4
82.3
!
82.2
!
WEVB013E
!
82.1
!
82
Beauregard
Allen
Evangeline
St. Landry
!
ð
Ú
((
!
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
!
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 103 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
NHD_75
RF041
RF040
RF147
NHD_74
RF036
RF037
TAR-39.3
SEVB027
!
83.8
SEVB028
!
83.7
!
RF038
83.6
SEVB026
!
SEVB030
83.5
!
RF042
83.4
!
RF043
RF044
83.3
!
83.2
SEVB029
!
83.1
!
83
!
82.9
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 104 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
RF035
PAR-16.0
!
84.6
84.5
!
!
SEVB050
SEVB049
!
84.7
CS 03 & MS 14
84.4
PAR-16.1
84.3
!
SEVB020
SEVB022
!
SEVB021
84.2
RF147
84.1 !
84
!
83.9
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 105 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF034
RF152
85.1
!
!
!
!
RF035
PAR-16.0
ð
Ú
Evangeline
((
Beauregard
Allen
!
!
St. Landry
!
Acadia
Calcasieu
Cameron
Jefferson Davis
!
0
Vermilion
SEVB050
HDD Exit
L2UBHh Wetland
Access Road
PFO Wetland
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Feet
1,000
84.8
84.7
Aboveground Facilities
Milepost
84.9
CS 03 & MS 14
Permanent Easement
!
HDD Entry
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
!
SEVB049
MLV Site
!
84.6
84.5
!
85
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 106 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SEVB052
RF033
85.2
!
85.3
!
Beauregard
Evangeline
St. Landry
ð
Ú
!
!
!
Acadia
Calcasieu
Cameron
85.5
!
!
85.7
!
85.6
85.8
85.9
!
!
86
!
SEVB051
RF034
Allen
85.4
!
((
85.1
!
RF032
SEVB053
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 107 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF032
RF029
RF145
86.3
86.2
!
!
RF151
SEVB012
!
86.1
!
SEVB010
WEVB008E
!
SEVB011
86.4
87
!
86.9
SEVB013
!
86.5
SEVB015
86.6
!
RF146
SEVB014
!
86.7
86.8
!
!
RF030
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
((
!
RF031
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 108 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WEVB007F
WEVB006E
WEVB005F
RF027
!
!
87.8
87.7
SEVB004
WEVB004F
!
87.9
!
RF028
(
SEVB002
SEVB003
SEVB006
SEVB005
TAR-40.0
!
87.6
!
SEVB008
87.5
SEVB009
!
87.4
!
87.3
RF151
!
RF029
87.2
!
87.1
!
SEVB007
87
!
WEVB004E
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 109 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF024
NHD_76
TAR-40.1
88.7
!
88.6
NWI_109
WEVB001F
(
!
!
88.5
!
SEVB001
88.4
!
WEVB002F
WEVB007F
SEVA034
88.3
!
RF025
88.2
WEVB006E
!
88.1
!
WEVB005F
88
(
SEVB002
!
!
87.9
NWI_31
!
87.8
!
TAR-40.0
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 110 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
89.3
RF023
!
89.2
!
89.1
!
89
!
RF024
88.9
!
88.8
!
88.7
!
88.6
(
!
!
88.5
!
88.4
!
SEVA034
RF025
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
((
!
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 111 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
RF018
90.4
!
RF019
SEVA030
90.3
SEVA029
!
!
SEVA032
!
SEVA031
90
89.9
89.8
89.7
!
!
!
90.1
!
89.6
90.2
SEVY004
!
89.5
SEVY003
RF021
RF022
!
RF020
89.4
!
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 112 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WEVA007E
SEVA026
RF017
91.3
!
91.2
SEVA033
!
91.1
!
91
!
90.9
!
90.8
!
90.7
!
90.6
!
90.5
!
RF018
90.4
!
RF019
90.3
!
!
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
((
!
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 113 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF014
SEVA021
SEVA022
92.3
RF015
!
92.1
WEVA007E
92
SEVA024
SEVA025
!
92.2
!
!
SEVA023
91.9
WEVA007E
!
91.8
!
91.7
SEVA026
WEVA007E
!
91.6
!
91.5
RF016
!
91.4
!
!
RF017
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 114 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
RF012
SEVA015
SEVA020
WEVA003E
SEVA017
93.2
!
WEVA006E
SEVA019
93.1
RF014
!
93
92.9
92.8
!
92.7
!
!
RF013
!
92.6
!
92.5
92.4
93.3
SEVA016
SEVA018
OEVA003
!
!
!
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 115 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF009
RF012
RF010
SEVY001
SEVA011
SEVY002
93.4
WEVA001E
!
!
93.3
SEVA012
OEVA001
SEVA041
RF011
94
93.8
94.1
!
!
!
!
!
93.7
93.6
!
94.2
93.9
93.5
!
SEVA043
SEVA042
!
!
!
WEVA006E
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 116 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
RF005
!
95.2
95.1
SEVA005
RF009
SEVA007
SEVA010
RF006
SEVA008
SEVA006
RF008
94.8
SEVA009
!
!
!
94.5
!
94.4
!
94.9
!
!
!
94.7
94.6
94.3
95
!
RF007
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 117 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Interconnect
MS 15
RF002
95.9
SEVA004
95.8
RF004
95.5
95.6
!
!
!
RF003
!
Beauregard
SEVY005
Evangeline
St. Landry
ð
Ú
!
!
!
Acadia
Calcasieu
Cameron
!
SEVA003
RF005
Allen
PAR-17.0
!
SEVA001
((
95.3
95.94
!
!
95.7
95.4
RF001
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Evangeline Parish, Louisiana
Page 118 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 17
NHD_14
NHD_13
WCAG008E
WCAG007F
SCAG008
SCAG009
SCAG007
TAR-5.1
SCAG005
SCAG006
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
((
WCAG007E
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 119 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 49
TAR-22.0
WCAQ001S
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 120 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 124
Map Continues on Page 122
NHD_34
NHD_34
NHD_34
NHD_33
NHD_32
PAR-7.0
NHD_33
PAR-7.0
NHD_33
NHD_33
NHD_33
TAR-23.0
Map Continues on Page 50
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
NHD_36
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 121 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
NHD_34
PAR-7.0
NHD_34
Map Continues on Page 121
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 122 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
NHD_33
Map Continues on Page 124
PAR-7.0
NHD_33
NHD_41
Map Continues on Page 51
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
NHD_41
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu and Jefferson Davis Parishes, Louisiana
Page 123 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
NHD_33
NHD_33
NHD_33
NHD_33
PAR-7.0
Map Continues on Page 123
Map Continues on Page 121
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu and Jefferson Davis Parishes, Louisiana
Page 124 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 126
TAR-24.0
NHD_43
Map Continues on Page 52
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu and Jefferson Davis Parishes, Louisiana
Page 125 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-24.0
Map Continues on Page 125
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 126 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
TAR-24.1
Map Continues on Page 54
NHD_46
NWI_21
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 127 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 57
RF141
TAR-26.0
Map Continues on Page 129
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 128 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 128
RF141
TAR-26.0
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Jefferson Davis Parish, Louisiana
Page 129 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Map Continues on Page 132
Map Continues on Page 131
NHD_50
SJEA024
TAR-28.0
SJEA023
TAR-28.2
Map Continues on Page 59
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Cameron
HDD Exit
Vermilion
0
L2UBHh Wetland
Access Road
PFO Wetland
Milepost
Contractor/Pipeyard
30" Lateral
Park and
! Ride
!
Temporary Offsite Construction Area
TWS
Interconnect
Jefferson Davis
Aboveground Facilities
Permanent Easement
HDD Entry
Proposed Mainline
Acadia
Calcasieu
MLV Site
DWLNG Facility
500
!
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
!
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood
LNG LLC and Driftwood Pipeline LLC
!
!
!
Jefferson Davis Parish, Louisiana
Page 130 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Project End
Lat: 30.620808
Long: -92.254046
Evangeline Parish
Allen Parish
Beauregard Parish
X
X
Contractor Yard 1
Lat: 30.338098
Long: -93.295416
Vinton Park and Ride
Lat: 30.183101
Long: -93.564017
X
X
20
30
X
X
40
Lake Charles Park and Ride
Lat: 30.236319
Long: -93.225718
!
(
!
(
X
*
#
Sulphur Park and Ride
Lat: 30.185367
Long: -93.356534
Airport Park and Ride
Lat: 30.128996
Long: -93.368557
*
#
10
!
(
*
#
*
#
X
0
50
X
60
Jefferson Davis Parish
!
(
X
90
80
St. Landry Parish
70
Contractor Yard 3
Lat: 30.43834
Long: -92.643574
Acadia Parish
Pipeyard
Lat: 30.272103
Long: -92.972584
Lafayette Parish
Chenault Airport Site
Lat: 30.195548
Long: -93.142261
Calcasieu Parish
Project Start
Lat: 30.10275
Long: -93.331958
Vermilion Parish
Cameron Parish
Project Centerline
X
Parish Boundary
#
*
!
(
Proposed DWLNG Facility
0
5
Miles
10
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\1_Vicinity_PCN.mxd
Milepost
Park and Ride
Temporary Offsite Construction Area
I
Vicinity Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu, Jefferson Davis,
Acadia & Evangeline Parish, Louisiana
Page 1 of 1
NAD1983 LA S 1702 ft
Scale: 1:633,600
Date: August, 2017
Author: GIS
q
Legend
Facility Boundary
0
500 1,000
2,000
Feet
NOTES:
Topographic Imagery: ESRI USA Topo Maps
Reproduced under license in ArcGIS 10.4
LNG Facility Topographic Map
USACE Permit Application
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
q
Materials Offloading Facility
Switchyard
LNG Facility
Ship Turning Area
Marine Facilities
Legend
Facility Boundary
LNG Tanks
Process Flares/Marine
Flare
Coastal Zone Boundary
Berm
Other Facilities
LNG Plant
Dredge Area within
Channel
Wetland Type
Emergent
Emergent/Scrub Shrub
Estuarine Emergent
Forested
Mosaic
0
500 1,000
2,000
Feet
NOTES:
Aerial Imagery: ESRI World
Scrub Shrub/Forested Imagery (NAIP 2015)
Reproduced under license
in ArcGIS 10.4
Scrub Shrub
Plot Plan Aerial Map and Delineated
Wetlands
USACE Permit Application
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
q
Acreage of Dredge Channel Area: 29.1 acres
Acreage of Dredge Channel Area
within Coastal Zone Boundary: 21.0 acres
Dredge Material Amount: 1.2 million cubic yards
(within existing Coastal Zone Boundary)
Legend
Dredge Slope
Excavation/Dredge Area
Centerline
Coastal Zone Boundary
Structural Limit Line
Navigation Fairway
Dredge Area within Channel
0
250
500
1,000
Feet
NOTES:
Aerial Imagery: ESRI World Imagery (NAIP 2015)
Reproduced under license in ArcGIS 10.4
Dredge Impacts
USACE Permit Application
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Burton Shipyard Road Site
SCAA020
SCAA020
WCAA007F
WCAA007F
WCAA007F
WCAA007F
WCAA006F
!
0.6
Beauregard
! 0.5
Allen
Evangeline
St. Landry
! 0.4
ð
Ú
((
! 0.7
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
! 0.3
MLV Site
! 0.2
HDD Exit
Access Road
PFO Wetland
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
0.1
L2UBHh Wetland
Milepost
500
!
Aboveground Facilities
Permanent Easement
HDD Entry
*Note: Environmental features
impacted by the Facility are
depicted on the Facility maps.
Feet
1,000
!
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 1 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WCAA011S
SCAA023
WCAA007E
WCAA011E
!
WCAA007E
SCAA028
1.5
WCAA011E
WCAA007E
WCAA010S
1.4
SCAA020
WCAA007E
SCAA027
!
SCAA024
SCAA022
WCAA007F
SCAA021
WCAA007F
WCAA010E
WCAA010S
!
WCAA011E
TAR-1.0
!
1.2
1.3
!
!
1.1
1
!
WCAA010E
WCAA010E
WCAA010E
!
!
0.8
! 0.7
!
0.6
!
SCAA026
WCAA010E
WCAA010S
0.9
OCAA003
*Note: Environmental features
impacted by the Facility are
depicted on the Facility maps.
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 2 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WCAA011E
NWI_110
NWI_115
1.9
!
SCAA030
!
1.8
WCAA011S
MS 02
WCAA011S
SCAA029
PAR-2.0
!
1.7
WCAA011S
WCAA011E
Interconnect
1.6
!
1.5
!
WCAA011E
WCAA011E
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 3 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
!
!
WCAA013E
!
2.5
NHD_01
NHD_01
NHD_02
!
2.4
!
2.3
TAR-1.1
NWI_110
NWI_110
!
2.2
!
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
2.1
2
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
!
!
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 4 of 152
NAD1983 LA!S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
3.4
!
3.3 !
NHD_120
!
3.2
OCAA005
3.1
!
!
3
NHD_03
WCAA013E
!
2.9
WCAA013E
WCAA012E
WCAA013E
!
2.8
OCAA004
SCAA031
!
2.7
SCAA032
SCAA033
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
2.6
Feet
1,000
!
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
!
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 5 of 152
NAD1983 LA S 1702 ft
!
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
4
!
NWI_111
3.9 !
Airport Park and Ride
3.8 !
NWI_104
3.7
NHD_05
!
NHD_123
3.6
!
3.5 !
NHD_04
St. Landry
ð
Ú
((
Beauregard
Allen
Evangeline
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
Aboveground Facilities
MLV Site
!
Permanent Easement
HDD Entry
Access Road
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
!
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
L2UBHh Wetland
PEM Wetland
PFO Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 6 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
!
NWI_105
!
NHD_103
4.6
NHD_103
4.5
!
4.4
!
NHD_10
NHD_09
!
NHD_08
4.3
NHD_07
4.2
!
NWI_113
NWI_112
4.1
!
NWI_111
NHD_06
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
Aboveground Facilities
MLV Site
Permanent Easement
HDD Entry
Access Road
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
!
L2UBHh Wetland
PEM Wetland
PFO Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish !
Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 7 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
!
NWI_117
5.2
!
5.1
NWI_106
!
5
!
NHD_12
4.9
NWI_116
!
4.8
!
4.7
NHD_11
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
!
Aboveground Facilities
L2UBHh Wetland
Access Road
Permanent Easement
HDD Entry
PEM Wetland
Milepost
Contractor/Pipeyard
PFO Wetland
!
PSS Wetland
30" Lateral
Park and Ride
Waterbody
HDD Exit
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
Topographic Map
Farmed Rice
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Parish Boundary
I
!
Page 8 of 152
NAD1983 LA S 1702 ft
!
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
!
!
WCAE014F
5.8
WCAE014E
NHD_104
SCAE022
!
5.7
5.6
!
5.5
!
5.4
!
NWI_117
5.3
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
!
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Topographic Map
!
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Waterbody
Parish Boundary
I
Page 9 of 152
!
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
!
6.4
WCAE015E
6.3
!
WCAE015E
SCAE023
! 6.2
WCAE015S
!
6.1
WCAE015F
WCAE014F
!
6
WCAE014E
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
0
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Proposed Mainline
Contractor/Pipeyard
!
TWS
Interconnect
Temporary Offsite Construction Area
Milepost
Park and Ride
30" Lateral
Jefferson Davis
Vermilion
MLV Site
5.9
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 10 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
6.9
!
(
6.8 !
!
!
6.7
TAR-1.2
!
! 6.5
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
6.6
WCAE015E
!
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
!
Calcasieu Parish, Louisiana
I
Page 11 of 152
NAD1983 LA S 1702 ft
!
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
7.5
!
7.4
NHD_124
!
7.3
!
7.2
SCAE021
7.1
(
!
!
7.0
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
!
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
!
Farmed Rice
Waterbody
Parish Boundary
I
!
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 12 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
!
!
8
OCAE004
PAR-3.0
TAR-2.1
PAR-3.2
!
SJEZ014
SCAE016
7.9
SCAE016
PAR-3.1
ð
Ú
MS 04
SCAE018
7.8
!
SCAE017
MLV 02
OCAE005
Interconnect
Tie In
!
7.7
SCAE020
SCAE019
!
7.6
TAR-2.0
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
Aboveground Facilities
MLV Site
!
Permanent Easement
HDD Entry
PEM Wetland
Access Road
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
L2UBHh Wetland
PFO Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
!
I
Feet
1,000
!
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 13 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
(
!
!
8.5
TAR-3.0
!
OCAE003
WCAE010F
8.4
!
!
SCAE015
8.3
8.2
!
WCAE010F
TAR-2.1
8.1
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
HDD Exit
Milepost
0
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
Contractor/Pipeyard
!
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
Park and Ride
30" Lateral
Jefferson Davis
Vermilion
MLV Site
!
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 14 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
(
WCAA016E
!
!
WCAA016F
NWI_01
9.1
NHD_101
! 8.9
8.8
!
NHD_101
!
8.7
NHD_100
!
St. Landry
ð
Ú
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
Aboveground Facilities
MLV Site
L2UBHh Wetland
Permanent Easement
HDD Entry
Access Road
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
PEM Wetland
(
Evangeline
((
Beauregard
Allen
!
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
8.6
!
PFO Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Feet
1,000
!
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 15 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
!
(
10
!
!
WCAA016E
!
9.9
!
9.8
!
9.7
!
WCAA016E
9.6
WCAA016F
9.5
!
9.4
!
9.3
St. Landry
ð
Ú
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG
! LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
(
Evangeline
((
Beauregard
Allen
!
!
Page 16 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
10.6
(
!
!
!
NWI_03
!
Map Continues on Page 119
WCAC001F
WCAC001E
10.5
10.4
WCAG007F
TAR-5.0
10.3
WCAA016F
WCAA016E
!
WCAG007F
SCAG005
WCAG007E
WCAG007E
WCAG007F
WCAA016E
10.1 !
(
!Evangeline
ð
Ú
!
St. Landry
((
Beauregard
Allen
!
!
!
Cameron
HDD Exit
Vermilion
0
L2UBHh Wetland
Access Road
PFO Wetland
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
TWS
Temporary Offsite Construction Area
Interconnect
Jefferson Davis
Aboveground Facilities
Permanent Easement
HDD Entry
!
Proposed
Mainline
Acadia
Calcasieu
MLV Site
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 17 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WCAC001E
11.1
WCAC001F
!
11
!
10.9 !
10.8 !
10.7 !
Beauregard
(
!Evangeline
St. Landry
ð
Ú
((
!
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
!
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 18 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
WCAC005F
11.6
SCAC007
!
SCAC001
11.5
!
WCAC001F
TAR-6.0
!
WCAC001F
11.3
!
11.2
Beauregard
Allen
WCAC001E
!
Evangeline
!
St. Landry
ð
Ú
((
11.4
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
!
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 19 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
!
WCAA014F
!
12.4
WCAA015F
12.3
WCAA014E
SCAA036
WCAC005F
WCAC005E
!
12.2
WCAC005F
12.1
!
12
11.9
!
WCAA014F
!
SCAA034
NWI_118
11.8
!
SCAA035
WCAC005F
WCAC005F
WCAC005F
Beauregard
!
Evangeline
Allen
St. Landry
ð
Ú
((
11.7
!
!
!
!
Calcasieu
Cameron
Acadia
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 20 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
WCAC002E
WCAC002F
13.2
NHD_16
NWI_04
NHD_16
SCAC003
WCAC004F
SCAC005
!
!
!
WCAC002F
!
13
13.1
TAR-7.0
NWI_04
12.9
NHD_15
NWI_05
!
12.8
WCAC004F
!
12.7
WCAC004E
WCAC004E
SCAA037
WCAC004E
12.6
!
SCAC006
OCAC002
WCAA015F
WCAC004E
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
MLV Site
HDD Exit
Milepost
0
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
Contractor/Pipeyard
!
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
Park and Ride
30" Lateral
Jefferson Davis
Vermilion
12.5
DWLNG Facility
500
!
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 21 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
WCAA008F
SCAC002
WCAC002F
13.7
!
TAR-8.0
WCAC002F
13.6
!
WCAC002E
13.5
!
13.4
!
WCAC002E
!
13.3
WCAC002F
WCAC002F
!
St. Landry
((
Beauregard
ð
Ú
Evangeline
Allen
!
!
!
Acadia
Calcasieu
Cameron
!
Jefferson Davis
!
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
!
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 22 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
!
WCAA008F
14.3
!
14.2
TAR-9.0
! 14.1
!
!
14
13.9
!
13.8
WCAA008F
SCAC002
WCAC002F
!
St. Landry
ð
Ú
((
Beauregard
Allen
Evangeline
!
!
!
Cameron
Jefferson Davis
Vermilion
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
!
Interconnect
Park and Ride
TWS
Proposed Mainline
Acadia
Calcasieu
MLV Site
0
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 23 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
14.8
!
14.7
!
14.6
!
14.5
!
14.4
!
WCAA008F
14.3
14.2
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
TAR-9.0
MLV Site
0
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
!
Milepost
Contractor/Pipeyard
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
Park and Ride
30" Lateral
Jefferson Davis
Vermilion
!
!
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 24 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WCAA001F
!
15.2
NHD_105
SCAA002
WCAA001F
TAR-10.0
SCAA001
!
WCAA009F
15.1
SCAY002
(
WCAA008F
!
!
TAR-10.1
15
SCAY001
SCAY003
!
!
14.9
SCAY001
NHD_17
14.8
!
Beauregard
Evangeline
St. Landry
!
ð
Ú
((
Allen
!
!
!
Acadia
!
Calcasieu
Jefferson Davis
Cameron
Vermilion
0
MLV Site
HDD Exit
L2UBHh Wetland
Access Road
PFO Wetland
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Aboveground Facilities
Permanent Easement
HDD Entry
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 25 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
ð
Ú
WCAA001F
!
15.5
WCAA001F
WCAA001F
(
SCAA003
!
!
15.4
WCAA001F
15.3
!
WCAA001F
!
15.2
NHD_105
SCAA002
WCAA001F
TAR-10.0
SCAA001
!
15.1
WCAA009F
WCAA008F
St. Landry
ð
Ú
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
Aboveground Facilities
!
Permanent Easement
L2UBHh Wetland
Milepost
Contractor/Pipeyard
PSS Wetland
30" Lateral
Park and Ride
MLV Site
(
Evangeline
((
Beauregard
Allen
!
HDD Entry
Access Road
HDD Exit
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility!
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
SCAY002
TAR-10.1
PEM Wetland
PFO Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 26 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
16.1
!
WCAE001S
!
16
SCAA005
WCAE001S
!
15.9
SCAA005
SCAA006
!
PAR-4.0
!
15.8
OCAA002
15.7
MLV 03
NHD_18
!
ð
Ú
OCAA001
St. Landry
ð
Ú
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
!
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
!
(
Evangeline
((
Beauregard
Allen
15.6
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 27 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SCAE002
16.4
!
16.5
!
16.6
16.7
!
!
16.3
!
!
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
16.2
16.1
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
Feet
1,000
!
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 28 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WCAA002F
SCAA009A
SCAE003
SCAA100
WCAA002F
SCAE004
SCAE006
SCAA012
WCAE002F
WCAE003F
17.5
!
17.4
16.7
16.9
!
!
!
16.8
17
!
!
17.2
17.1
!
WCAA002E
WCAA002F
WCAE002F
TAR-11.0
SCAE007
WCAE001F
WCAE003E
WCAE003F
St. Landry
ð
Ú
((
Beauregard
Evangeline
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
SCAA008_EXT
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
WCAA002S
SCAA010
SCAA010
Allen
!
!
17.3
!
!
(
SCAE005
!
17.6
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
SCAA009B
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 29 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
TAR-11.1
WCAE004F
18.5
18.4
18.6
!
!
!
!
18.3
!
18.2
!
SCAE008
18.1
!
WCAE004F
18
!
WCAE004E
WCAE004F
!
17.9
!
17.8
!
17.7
NWI_114
SCAA100
NHD_106
NWI_06
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20171113_PCN_update\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 30 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: November, 2017
DRAWN: GIS
!
TAR-13.0
!
19.7
!
WCAE005E
!
TAR-12.0
WCAE004E
19.5
SCAE011
!
19.4
WCAE004F
!
WCAE011F
WCAE005F
WCAE011F
!
WCAE011F
WCAE006F
SCAE010
19.3
WCAE005F
WCAE004F
19.6
WCAE005F
19.2
WCAE011F
!
WCAE005F
19.1
WCAE005F
!
18.8
WCAE005E
19
WCAE005F
!
!
18.9
SCAE009
!
WCAE005F
WCAE011F
SCAE009
WCAE011E
Beauregard
Allen
Evangeline
St. Landry
ð
Ú
((
18.7
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 31 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
WCAE009E
!
20.8
!
TAR-13.1
20.7
!
20.6
!
20.5
!
WCAE009F
WCAE008F
20.4
WCAE009E
WCAE008F
WCAE008E
!
20.3
WCAE007F
WCAE008F
20.2
WCAE008F
!
20.1
!
TAR-13.0
WCAE007E
!
20
!
WCAE007F
19.9
!
19.8
TAR-14.0
WCAE007F
WCAE006F
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 32 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SCAA015
WCAE009F
SCAA016
21.7
21.6
21.5
!
!
21
20.9
!
21.1
!
21.2
!
!
21.3
SCAA017
!
21.4
!
!
!
WCAE009F
WCAE009F
WCAE009E
SCAA014
!
TAR-14.2
WCAA003F
SCAA019
WCAE009E
WCAE009F
TAR-14.0
TAR-14.0
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 33 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
SCAA017
WCAA003F
SCAA018
!
21.8
!
!
21.9
!
22
22.1
!
22.2
!
22.3
!
22.4
!
!
22.5
!
22.6
!
WCAA003F
NWI_07
WCAA003F
NHD_107
SCAA018
TAR-15.0
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 34 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
TAR-15.1
!
23
22.9
NWI_09
!
22.8
!
22.7
TAR-15.0
WCAA003F
TAR-16.0
WCAA003F
!
TAR-15.0
NWI_08
NWI_08
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 35 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
23.8
!
OCAG003
WCAG006F
NWI_11
WCAA004E
SCAA013
23.7
!
WCAA005E
NWI_102
WCAA003S
PAR-5.0
WCAA005F
MLV 04
23.6
!
WCAA003F
(
WCAA003S
!
23.3
!
23.2
ð
Ú
!
23.4
!
!
23.5
WCAA003F
!
23.1
TAR-15.1
!
23
22.9
NWI_09
!
22.8
!
WCAA003F
TAR-15.0
TAR-16.0
WCAA003F
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
PSS Wetland
Farmed Rice
Waterbody
Parish Boundary
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 36 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
24.2
!
24.1
!
24
!
23.9
NWI_11
!
23.8
WCAG006F
NWI_11
WCAA004E
SCAA013
!
!
!
St. Landry
!
Acadia
Calcasieu
Cameron
Jefferson Davis
0
Vermilion
MLV Site
HDD Exit
L2UBHh Wetland
Access Road
PFO Wetland
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
!
!
Aboveground Facilities
Permanent Easement
HDD Entry
PSS Wetland
Farmed Rice
Waterbody
!
Parish Boundary
I
Feet
1,000
!
23.7
PEM Wetland
!
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 37 of 152
! NAD1983 LA S 1702 ft
(
ð
Ú
Evangeline
((
Beauregard
Allen
OCAG003
!
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
!
! 24.7
NHD_108
24.6
!
NWI_12
NHD_21
NHD_23
NHD_22
24.5
!
24.4
(
TAR-17.0
!
!
!
24.3
SCAG004
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
Aboveground Facilities
L2UBHh Wetland
Access Road
PFO Wetland
Permanent Easement
HDD Entry
HDD Exit
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
Feet
1,000
PEM Wetland
!
PSS Wetland
Topographic Map
Farmed Rice
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Waterbody
Parish Boundary
I
!
Page 38 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS
Contractor Yard 1 Mapping on Page 151
!
25.3
TAR-18.0
!
!
25.2
25.1
25
!
24.9
!
!
Evangeline
St. Landry
ð
Ú
((
Beauregard
Allen
!
!
!
Acadia
Calcasieu
Cameron
Jefferson Davis
Vermilion
0
MLV Site
HDD Exit
L2UBHh Wetland
Access Road
PFO Wetland
Milepost
Contractor/Pipeyard
30" Lateral
Park and Ride
Proposed Mainline
TWS
Interconnect
Temporary Offsite Construction Area
DWLNG Facility
500
Document Path: P:\GIS\Client\Tellurian\Driftwood_LNG\Maps\ENV\PCN\20170801_PCN\MXD\2_Topo_PCN.mxd
24.8
Aboveground Facilities
Permanent Easement
HDD Entry
NHD_109
Feet
1,000
PEM Wetland
PSS
! Wetland
Farmed Rice
Waterbody
Parish Boundary
!
I
Topographic Map
Driftwood LNG and Pipeline Project
Driftwood LNG LLC and Driftwood Pipeline LLC
Calcasieu Parish, Louisiana
Page 39 of 152
NAD1983 LA S 1702 ft
Scale: 1:6,000
Date: August, 2017
DRAWN: GIS