Home

St. Paul District

Run scraper

City of Sun Prairie

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

LETTER OF PERMISSION: The applicant proposes to widen 2,100 linear feet of Reiner Road south of O’Keefe Avenue to accommodate the intersection with Innovation Way (extending west from Reiner Road).

PROJECT DESCRIPTION AND PURPOSE: The applicant proposes to widen 2,100 linear feet of Reiner Road south of O’Keefe Avenue to accommodate the intersection with Innovation Way (extending west from Reiner Road). The project proposal includes a 1,250 linear foot bike path on the west side of Reiner Road in the right-of-way, north from Innovation Way and a 1,000 linear foot temporary traffic lane for use during construction. The proposed project involves the discharge of fill material into 1.40 acres of wet meadow wetlands and 0.10 acre of forested wetlands, and the permanent conversion of 0.16 acre of forested wetlands to wet meadow.

Information for File # MVP-2018-00092-KJH Applicant:

City of Sun Prairie c/o Tom Veith

Corps Contact: Address:

Kerrie J. Hauser 1114 South Oak Street La Crescent, MN 55947

E-Mail:

Kerrie.j.hauser@usace.army.mil

Phone:

651-290-5903

Primary County:

Dane County, Wisconsin

Section:

13

Township:

08 North

Range:

10 East

Information Complete On: February 12, 2018 Posting Expires On:

April 5, 2018

Authorization Type: LOP-06-WI This application is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act identified in Regulatory Guidance Letter 08-02. Project Description and Purpose: The applicant proposes to widen 2,100 linear feet of Reiner Road south of O'Keefe Avenue to accommodate the intersection with Innovation Way (extending west from Reiner Road). The project proposal includes a 1,250 linear foot bike path on the west side of Reiner Road in the right-of-way, north from Innovation Way and a 1,000 linear foot temporary traffic lane for use during construction. Name, area and types of Waters (including wetlands) subject to Loss: The proposed project involves the discharge of fill material into 1.40 acres of wet meadow wetlands and 0.10 acre of forested wetlands, and the permanent conversion of 0.16 acre of forested wetlands to wet meadow. Alternatives Considered: The applicants preferred alternative is described above. The applicant also considered the following alternatives: 1. No-Build: The applicant considered not widening Reiner Road, this alternative would limit the traffic capacity of the intersection with Innovation Way. 2. Alternative Sidewalk and Bike Path: The applicant considered widening Reiner Road with a sidewalk on the east side and a bike path on the west side of Reiner Road, this alternative would result in an additional 0.35 acre of impacts for a total of 1.85 acres of permanent wetland impacts. Compensatory Mitigation: To compensate for the permanent unavoidable adverse impact to wetlands, the applicant proposes to purchase mitigation bank credits from an approved wetland mitigation bank. Drawings

See attached.

Page 1 of 1

REINER ROAD RECONSTRUCTION CITY OF SUN PRAIRIE DANE COUNTY, WISCONSIN UTILITIES CONT'D

LEGEND

SHEET INDEX

EXISTING WATER MAIN

G - GENERAL SHEETS TITLE SHEET G1 INTERSECTION DETAILS G 2-3 EROSION CONTROL DETAILS G4 ROADWAY & STORM SEWER DETAILS G5

EXISTING GATE VALVE & HYDRANT EXISTING WATER SERVICE & CURB STOP PROPOSED WATER MAIN, VALVE, & HYDRANT PROPOSED WATER SERVICE & CURB STOP EXISTING SANITARY SEWER & MANHOLE EXISTING FORCE MAIN

TYP - TYPICAL SECTIONS TYPICAL ROADWAY SECTIONS TYP 1-3

EXISTING STORM SEWER & INLET PROPOSED STORM SEWER & INLET

CITY OF SUN PRAIRIE 300 EAST MAIN ST. SUN PRAIRIE, WI 53590 POLICE (608) 837-7336

BURIED ELECTRIC BURIED GAS & VALVE

DIR. OF PUBLIC WORKS (608) 837-3050 FIRE (608) 837-5066 WATER POLLUTION CONTROL FACILITY 3040 BAILEY RD. (608) 837-6292

BURIED CABLE TELEVISION

EC - EROSION CONTROL EROSION CONTROL PLANS EC 1-4

BURIED TELEPHONE

R - ROAD CONSTRUCTION R 1-8 ROADWAY PLAN & PROFILE

BURIED FIBER OPTICS

CITY OFFICIALS

OVERHEAD UTILITY

ESSER, PAUL MAYOR

RAILROAD TRACKS EXISTING CURB & GUTTER PROPOSED CURB & GUTTER

STRM - STORM SEWER STRM 1-6 STORM SEWER PLANS

EXISTING SIDEWALK PROPOSED SIDEWALK EXISTING CULVERT PIPE

P - WATERMAIN P 1-2 WATERMAIN PLANS

PROPOSED CULVERT PIPE

STOCKER, STEVE DISTRICT 1 ALDERPERSON

O'KEEFFE AVE

IS IR

DRAINAGE ARROW

PM - PAVEMENT MARKING AND SIGNAGE PLANS PM 1-4 PAVEMENT MARKING & SIGNAGE PLANS

ST

SILT FENCE RIGHT-OF-WAY

SP - TRAFFIC SIGNAL

BASELINE

SP 1-9

PROPERTY LINE

TRAFFIC SIGNAL PLAN

TREE LINE REINER ROAD PROJECT LIMITS

REINER ROAD

1 15

BENCHMARK

TC 1-15

IRON PIPE

TRAFFIC CONTROL PLANS

IRON ROD

RO AD

HW Y

O'KEEFFE AVE

TC - TRAFFIC CONTROL

CS - CROSS SECTION SHEETS

CONTROL POINT

CONNORS, BILL DISTRICT 2 ALDERPERSON FREUND, JON DISTRICT 2 ALDERPERSON

CS 1-36

UTILITY POLE & GUY

CROSS SECTION SHEETS

RA

IL

1 000.00

SOIL BORING LIGHT POLE PEDESTAL STREET SIGN MAILBOX

Dial

LOCATION MAP

www.DiggersHotline.com

NOT TO SCALE

PROJECT NO.:

00036151 .

DRAWN BY:

F.B. :

.

CHECKED BY:

.

NO.

DATE

REVISION

BY

TJB

.

.

.

.

JD

.

.

.

.

.

.

.

.

SCALE: AS SHOWN

PROJECT DATE:

.

PLOT DATE: 2/8/18, P:\30s\36\00036151\CADD\C3D\South Expansion\00036151_SE Details.dwg

or (800) 242-8511

.

ARCHITECTURE | ENGINEERING | ENVIRONMENTAL FUNDING | PLANNING | SURVEYING 2901 International Ln Madison, WI 53704 (608) 242-7779 (800) 446-0679 www.msa-ps.com © MSA Professional Services, Inc.

FLAGPOLE TREE - DECIDUOUS TREE - CONIFEROUS TREE TO BE REMOVED

JACOBS, MIKE DISTRICT 3 ALDERPERSON GUYANT, AL DISTRICT 4 ALDERPERSON POLENSKE, MARY DISTRICT 4 ALDERPERSON SCHLEICHER, ADAM DIRECTOR OF PUBLIC SERVICES/CITY ENGINEER

OPPENHEIMER, AARON CITY ADMINISTRATOR VEITH, THOMAS ASSISTANT CITY ENGINEER

STORM SEWER CITY OF SUN PRAIRIE 300 E. MAIN ST. SUN PRAIRIE, WI 53590 ATTN. MR. ADAM SCHLEICHER PH: (608)-825-1170 ASCHLEICHER@CITYOFSUNPRAIRIE.COM

GAS WE ENERGIES 500 S. 116 STREET WEST ALLIS, WI 53214 ATTN. JOE DABLE JOE.DABLE@WE-ENERGIES.COM EMERGENCY PH: 1-800-261-5325

CROMBIE, MAUREEN DISTRICT 3 ALDERPERSON

IGL, LEE DIRECTOR OF PUBLIC WORKS

WATER & ELECTRIC SUN PRAIRIE UTILITIES 125 W. MAIN ST., PO BOX 867 SUN PRAIRIE, WI 53590 ATTN. MR. KARL DAHL PH: (608)-445-7036 KDAHL@SUNPRAIRIEUTILITIES.COM

WASTE WATER WASTE WATER TREATMENT PLANT 3040 BAILEY ROAD SUN PRAIRIE, WI 53590 ATTN. JOHN KRUG PH: (608) 825-6292 JKRUG@CITYOFSUNPRAIRIE.COM

LINDSEY, EMILY DISTRICT 1 ALDERPERSON

FENCE LINE

D IL W

FIBER LEVEL3 COMMUNICATIONS 3235 INTERTECH DR. SUITE 600 BROOKFIELD, WI 53045 ATTN: MS. SASHA DEMIAN PH: (414)-908-1090 SASHA.DEMIAN@CENTURYLINK.COM TELEPHONE FRONTIER 100 COMMUNICATIONS DR SUN PRAIRIE,WI 53590 ATTN. MS. DANA GILLETT PH: (608)-837-1605 @DANA.GILLETT@FTR.COM

CITY ENGINEER (608) 825-1170

PROPOSED SANITARY SEWER & MANHOLE

DM - DEMOLITION DEMOLITION PLANS DM 1-4 PROJECT LOCATION

UTILITIES FIBER CHARTER COMMUNICATIONS 2701 DANIELS ST. MADISON, WI 53718 ATTN. KIRK UPPERMAN PH: (608) 209-3206 KIRK.UPPERMAN@CHARTERCOM.COM

OVERHEAD ATC W234 N2000 RIDGEVIEW PARKWAY COURT PO BOX 47 WAUKESHA, WI 53718-0047 ATTN. TONY MARCINIAK PH: (262) 506-6814 AMARCINIAK@ATCLLC.COM OVERHEAD: ALLIANT ENERGY/WISCONSIN POWER & LIGHT 4902 N BALTIMORE LANE, SUITE 1000 MADISON, WI 53718 ATTN. JASON HOGAN PH: (608) 458-4871 JASONHOGAN@ALLIANTENERGY.COM

SUN PRAIRIE SCHOOLS 509 COMMERCIAL AVE. SUN PRAIRIE, WI 53590 ATTN: MR. KEVIN SUKOW PH: (608) 834-6567

NOTE: UTILITY LOCATIONS SHOWN ON PLANS ARE APPROXIMATE AND CONTRACTOR SHALL HAVE APPROPRIATE UTILITY MARK EXACT LOCATIONS PRIOR TO CONSTRUCTION. FILE NO.

REINER ROAD RECONSTRUCTION CITY OF SUN PRAIRIE DANE COUNTY, WISCONSIN

TITLE SHEET

00036151 SHEET

G1

2018-00092-KJH Page 1 of 2

28,474 sq ft Wet Meadow Filled

Capitol

27,135 sq ft Wet Meadow Filled

Areas outside of Distrubance Limits are not covered by this permit application

31 sq ft Wet Meadow Temporarily Disturbed

4,360 sq ft Forested Wetland Filled

265 sq ft Wet Meadow Temporarily Disturbed

5,306 sq ft Wet Ditch Filled

16 sq ft Wet Ditch Temporarily Disturbed

Reiner

Reiner

28,474 sq ft Wet Meadow Filled

6,838 sq ft Wet Ditch Temporarily Disturbed

4,360 sq ft Forested Wetland Filled

27,135 sq ft Wet Meadow Filled Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Disturbed Wetlands Reiner Road Reconstruction

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

City of Sun Prairie Dane County, WI Wetlands Covered Under Other Project Permit

Area Investigated for Wetlands

Disturbance Limits

Filled Wet Meadow

Proposed Bike Path Proposed Edge of Gravel

Temporarily Disturbed Wet Meadow Temporarily Disturbed Wet Ditch

Proposed Road

Existing Asphalt

Sidewalk By Others

Existing Edge of Gravel

Road By Others

Proposed Storm Sewer

Filled Forested Wetland

Existing 2 ft Contour-Minor

Filled Wet Ditch

Existing 2 ft Contour-Major

Undisturbed Wetland

Parcels

Printed By: jfelland, File: \\msa-ps.com\fs\Projects\30s\36\00036151\GIS\Wetland Area_20180220.mxd

0

100

2018-00092-KJH Page 2 of 2

200 Feet

Print Date: 2/21/2018

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas