Home

Los Angeles District

Run scraper

The U.S. Army Corps of Engineers

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The U.S. Army Corps of Engineers, Los Angeles District, Operations Branch, Alamo Dam, announces the planned dates for the March 2018 multi-purpose flushing flow release.

The U.S. Army Corps of Engineers, Los Angeles District, Operations Branch, Alamo Dam, announces the planned dates for the March 2018 multi-purpose flushing flow release.

The Corps will release water from Alamo Dam in order to facilitate required maintenance activities. The release will conform to the following general parameters: 1) The release will begin on March 12, 2018. 2)Ascending limb of the hydrograph will be moderate. 3)Maximum release will not exceed 5,000 cfs. The maximum release will not occur for more than 12 hours and will begin starting the evening of March 14. 4)Descending limb of the hydrograph will initially drop steeply, followed by a gradual return to base flow. 5)The release will end on April 1, 2018. 6)The final target elevation of the lake will be between 1097 and 1102 ft. The proposed hydrograph is attached for your reference. The Corps can be reached for questions or concerns regarding Alamo Dam via email at: AlamoDamSPL@usace.army.mil The Alamo Dam Flushing Flow EA is available for review upon request. Please email your request to AlamoDamSPL@usace.army.mil

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas