INSTALLATION OF BARGE FLEETING AND SHIP ANCHORS ON THE MISSISSIPPI RIVER, LDB RM 207.8 IN IBERVILLE PARISH
NAME OF APPLICANT: Chem Carriers Mile 207 Fleeting, LLC, c/o Providence, 1201 Main Street, Baton Rouge, LA 70802.
LOCATION OF WORK: In the Mississippi River, LDB, River Mile 207.8 Section 15, T9S-R1W, approximately 2.6 miles west of Sunshine, Louisiana, in Iberville Parish, within the Mississippi River Basin in hydrologic unit (HUC 08070100), as shown on the attached drawings (Latitude 30.287601 N, Longitude -91.217838 W).
CHARACTER OF WORK: A portion of the work described herein was previously permitted under an authorization issued to Chem Carriers Mile 207 Fleeting, LLC on January 7, 2009. The applicant has requested Department of the Army authorization to modify an existing barge fleeting to include the extension of the existing 3 barge and ship anchors to 450’ from ordinary low water as well as the addition of three deadman anchors with chains and buoys placed above the ordinary low water line and a 40,000lb ship anchor and buoy to be placed approx. 450’ channelward therefrom. Approximately 666.7 cubic yards of material will be excavated and redistributed on site and approx. 42 cubic yards of concrete will be placed to install the deadman anchors. Approximately 1.27 acres of forested batture will be directly impacted to extend an existing access road.
It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore function deeming the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.
JOINT PUBLIC NOTICE
March 12, 2018
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Water Permits Division
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1545
Project Manager
S. Gail Gainey
Sandra.G.Gainey@usace.army.mil
MVN-2008-02681-CG
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 180308-03
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section
404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the
Clean Water Act.
INSTALLATION OF BARGE FLEETING AND SHIP ANCHORS ON THE
MISSISSIPPI RIVER, LDB RM 207.8 IN IBERVILLE PARISH
NAME OF APPLICANT: Chem Carriers Mile 207 Fleeting, LLC, c/o Providence, 1201
Main Street, Baton Rouge, LA 70802.
LOCATION OF WORK: In the Mississippi River, LDB, River Mile 207.8 Section 15, T9SR1W, approximately 2.6 miles west of Sunshine, Louisiana, in Iberville Parish, within the
Mississippi River Basin in hydrologic unit (HUC 08070100), as shown on the attached
drawings (Latitude 30.287601 N, Longitude -91.217838 W).
CHARACTER OF WORK: A portion of the work described herein was previously
permitted under an authorization issued to Chem Carriers Mile 207 Fleeting, LLC on
January 7, 2009. The applicant has requested Department of the Army authorization to
modify an existing barge fleeting to include the extension of the existing 3 barge and ship
anchors to 450' from ordinary low water as well as the addition of three deadman anchors
with chains and buoys placed above the ordinary low water line and a 40,000lb ship
anchor and buoy to be placed approx. 450' channelward therefrom. Approximately 666.7
cubic yards of material will be excavated and redistributed on site and approx. 42 cubic
yards of concrete will be placed to install the deadman anchors. Approximately 1.27 acres
of forested batture will be directly impacted to extend an existing access road.
2
It is presumed that the applicant has designed the project to avoid and minimize direct
and secondary adverse impacts to the maximum extent practicable. Any further reduction
would limit usage of the property and, therefore function deeming the project impracticable.
As compensation for unavoidable wetland impacts, the applicant proposes to mitigate inkind wetland credits from a Corps approved mitigation bank located in the watershed.
The comment period for the Department of Army will close in 30 days from the date of
this public notice. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons thereof, are being solicited from anyone having
interest in this permit and must be mailed so as to be received before or by the last day of
the comment period. Letters concerning the Corps of Engineers permit application must
reference the applicant's name and the Permit Application Number, and be mailed to the
Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH.
Similar letters concerning the Water Quality Certification must reference the applicant's
name and the WQC Application number and be mailed to the Louisiana Department of
Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
3
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical
sites, or data. Copies of this notice are being sent to the State Archeologist and the State
Historic Preservation Officer.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Interior. Utilizing Standard Local Operating
Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife
Service, Ecological Services Office, the Corps has determined that the proposed activity
would have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to 0 acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosures
--I
---Legend
2,000
0
+
+
1,000
0
2,000
Feet
s
s s
I
Site Location Map
40,000 lb Barge Anchor and Buoy (Permit No. MVN-2008-02681-CU)
40,000 lb Ship Anchors and Buoy (Permit No. MVN-2008-02681-CU)
Proposed 40,000 lb Ship Anchor and Buoy
Reference
~
~~
·
PROVIDENCE
Drawn By
LMM
08/11/17
Checked By
LMH
08/1 1/17
Approved By
TCK
08/11/1 7
Project Number
388-004
Drawing Number
1
388-004-AOO 1
Figure
450' from
OLW to Anchor
36 Barges _/
450' from
OLW to Anchor
36 Barges
~.Ss,.Ss·
48 Barges
~t>i)?,.
'"er
-- -- --
t=ert'f ctossin9- - - - - - - -
450' from
OLW to Anchor
36-48 Barges
40,000 lb Barge Anchor
'N)O'{
+
..,.
Oeadman Anchor and Chain (Permit No. MVN·'Z68--02681-CU)
c:=i
Barge Localion (Permit No. MVN·
Ocadman Anchor and Chain
c:=i
Proposed Barge Location
+
Proposed Dead man Anchor and Chain
Q
··
Barge Fleetlng Appllcatlon
~
Sunshine, Iberville Parish, Louisiana
~
Chem Carriers Mile 207 Fleeting, LLC
~
Anchor Buoy Installation
~
E
40,000 lb Barge Anchor and Buoy (Permit No. MVN-208-02681..CU)
Reference
~
§
~~s
40,000 lb Ship Anchor and Buoy (Permit No. MVN·1oo:o,2681-CU)
o.oe~
Proposed 40,000 lb Ship Anchor and Buoy
Site Plan
-02681..CU)
1,000
0
·.-----~
Scale: 1· = 1.000'
I
1,000
-
W/l:
PROVIDENCE
Drown By
LMM
Checked By
LMH
Approved By
TCK
I
08/11117
Project Number
388-004
~
~
a
Proposed Deadman Anchor and Chain
-,
Existing :
:--------_
Toe of Levee
40,000 Barge Anchor
Cross Section A-A'
Scale: 1· = 80'
Cross Section A-A'
Drawn By
LMM
I
08/11117
Checked By
LMH
I
j
08/11117
Approved By
80
0
Scale: 1·
TCK
08111117
-
PrOJOCI Number
80
= 80'
1
PROVIDENCE
I
388-004
OravAng Number
388-004-8003
I
3
Figure
- 10·
-20'
- 17'
Typical 40,000 lbs
Barge Anchor and Buoy
Pro1cct Number
PROVIDENCE
388-004
4
/I',
/
I
I
I
I
I
I
I
I
I
/
/
/
/
/
/
/
/
/
/
~
I ''I
'I
'-
''-
450' of Chain
"'"
'-
Hole is to be Filled
with Concrete
(9.5 cu.yds.)
" ''-
''1,'(~th~5
/
, '
"'
I
I
I
'
Hole is to be Filled
Co""""
''"'I
""
""
""
/
>
8'
/
..
/
/
/
/
""
/
/
""
/
"y
/
·r
/
/
l
8'
/
..
/
'·
/
/
~/
""
4'
""
"
""
""
Barge Side
""
"
2
0
2
Scale: 1" = 2'
Proposed Deadman Anchor
Maximum excavation hole per deadman anchor
is 20' W x 20' L x 15' D
SGG 2/8/18
Note
Proposed deadman anchors wi ll consist of an 8' x 8' piece of barge side
concreted below ground level with deadman chain wrapped around.
,..
PROVIDENCE
Drawn By
LMM
08111117
Checked By
LMH
08111117
Approved By
TCK
08/11117
Project Number
388-004
Drawing Number
5
388-004-AOOS
F ig urn