Houston Fuel Oil Terminal Company

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes maintenance dredging and the discharge of dredged material.

Full Public Notice Proposed Project Plans PROJECT DESCRIPTION: The applicant proposes to maintenance dredge an area beginning at the mouth of Carpenters Bayou and continuing west to conclude at the turning basin. The discharge of an estimated 120,000 cubic yards of dredged material into wetlands and waters adjacent to Carpenters Bayou is also proposed to construct a dredged material placement cell and an above ground storage tank facility.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas