You can copy from here when filling out the rest of the page.
The Papio-Missouri River Natural Resources District (PMRNRD) proposes to implement modifications to Federal Levee Systems R-616-613 and R-613. The PMRNRD is the local sponsor for maintenance and operation of these segments of the U.S. Army Corps of Engineers (USACE) Federal Levee System. Currently, the R-616-613 and R-613 Federal Levee Systems do not meet levee design standards set by the Federal Emergency Management Agency (FEMA) accreditation criteria to maintain a Zone X designation on Flood Insurance Rate Maps (FIRMs). The PMRNRD proposes improvements to the R-616-613 and R-613 Federal Levee Systems to bring the levee systems up to current design standards necessary to meet FEMA accreditation criteria. A Draft Environmental Assessment (Draft EA) has been prepared for the project. A detail project description can be found in section 2.6.1 of the Draft EA. The Draft EA contains wetland impact figures and maps identifying the impacts.
The Papio-Missouri River Natural Resources District (PMRNRD) proposes to implement modifications to Federal Levee Systems R-616-613 and R-613. The PMRNRD is the local sponsor for maintenance and operation of these segments of the U.S. Army Corps of Engineers (USACE) Federal Levee System. Currently, the R-616-613 and R-613 Federal Levee Systems do not meet levee design standards set by the Federal Emergency Management Agency (FEMA) accreditation criteria to maintain a Zone X designation on Flood Insurance Rate Maps (FIRMs). The PMRNRD proposes improvements to the R-616-613 and R-613 Federal Levee Systems to bring the levee systems up to current design standards necessary to meet FEMA accreditation criteria. A Draft Environmental Assessment (Draft EA) has been prepared for the project. A detail project description can be found in section 2.6.1 of the Draft EA. The Draft EA contains wetland impact figures and maps identifying the impacts.