Proposed Construction of Two Borrow Sites, Access Road, and Bridge over Wells Creek, Cumberland River Mile 102.9R, Barkley Reservoir, in Cumberland City, Stewart County, Tennessee

Nashville District Corps Application No. LRN-2017-00257 Date: March 16, 2018:Expires: April 16, 2018 Please address all comments to: Nashville District Corps of Engineers, Regulatory Division (Attn: Amy Robinson), 3701 Bell Road, Nashville, TN 37221 SUBJECT: Proposed Construction of Two Borrow Sites, Access Road, and Bridge over Wells Creek, Cumberland River Mile 102.9R, Barkley Reservoir, in Cumberland City, Stewart County, Tennessee

TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 10 of the Rivers and Harbor Act and Section 404 of the Clean Water Act (CWA). The proposed work would occur on portions of U.S. Government Tracts; therefore, the

project is concurrently being considered for approval to impact lands and waters upon which the U.S. Army Corps of Engineers (USACE) has real estate interests.

APPLICANT: Tennessee Valley Authority (TVA)

1101 Market Street, LP 5D-C Chattanooga, Tennessee 37402

LOCATION: TVA Cumberland Fossil Plant located at confluence of Wells Creek and Cumberland River Mile 102.9, right descending bank, Barkley Reservoir, in Cumberland City, Stewart County, TN (latitude 36.266621°, longitude - 87.067433°)

DESCRIPTION OF PROPOSED WORK: The proposed work would involve discharge of fill material into streams and wetlands identified as waters of the U.S. (WOUS) for construction of two borrow sites within the TVA Cumberland Fossil Plant. Associated with the project includes construction of an access road and bridge over Wells Creek for access from the plant to the proposed borrow sites. The project would be constructed partially on TVA-owned property and partially on USACE government lands. The project will involve grading and clearing of two areas identified by TVA to contain soils suitable for use as borrow material that are approximately 6 acres and 93 acres in size. The new borrow sites would involve fill of approximately 2,336 linear feet of ephemeral channel. The impacts of the access road would involve fill of 0.83 acres of wetlands and encapsulation of 201 linear feet of Scott Branch (STR-2) with a reinforced concrete box culvert for a road crossing. A new bridge over Wells Creek would be located approximately 30 feet downstream of an existing bridge that has been closed due to deteriorated conditions. The new bridge would span approximately 220 feet and consist of two sets of piers that will line up hydraulically with the piers of the existing upstream bridge. Riprap would be placed along approximately 196 linear feet of Wells Creek stream bank for stabilization. The proposed stream and wetland impacts from all components of the project are summarized in the below tables:

Table 1:

Stream ID:

Stream Type:

Impact Type:

Impact (Linear Feet):

Wells Creek

Perennial/ Reservoir influenced

Riprap Bank Stabilization

196

STR-2 (Scotts Branch)

Perennial

Encapsulation

201

WWC-1

Ephemeral

Fill

1,230

WWC-2

Ephemeral

Fill

800

WWC-4

Ephemeral

Fill

306

TOTAL:

2,753

Table 2:

Wetland ID:

Wetland Type:

Impact Type:

Impact Area (acres):

W-4

Palustrine Emergent/ Palustrine Shrub Scrub

Fill

0.80

W-12

Palustrine Forested

Fill

0.03

TOTAL:

0.83

USACE confirmed the applicant’s wetland and stream delineations via Preliminary Jurisdictional Determination (PJD) letter dated October 2, 2017, and via Approved Jurisdictional Determination (AJD) dated November 30, 2017 (on file, File No. LRN-2017-00257). The AJD verified PND-1 and PND-2 are geographically isolated with no hydrologic connection to any other WOUS.

Plans and location maps of the proposed project are provided in this notice. If you wish to view additional plans, please contact this office or visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx

ENVIRONMENTAL DOCUMENTATION: Pursuant to National Environmental Policy Act (NEPA), TVA prepared an Environmental Assessment (EA), dated August 2017, to address the environmental consequences of the proposed borrow area project. It states that the primary decision for TVA is whether to develop onsite borrow areas to support current and future construction and maintenance activities at the Cumberland Fossil Plant. The proposed wetland and stream impacts were addressed in the EA along with an alternatives analysis, affected environment, and potential environmental consequences. The EA also documents TVA’s consultations with the U.S. Fish and Wildlife Service, the State Historic Preservation Office, and other agencies as necessary.

PURPOSE AND NEED: The EA indicates that the Cumberland Fossil Plant is the largest coal-fired generating asset in the TVA coal fleet and generates enough energy to supply about 1.1 million homes. The plant generates coal combustion residuals (CCR) that consists of fly ash, bottom ash, commercial grade gypsum, and solids from the flue gas desulfurization process. It further states that TVA is planning to partially close the Fly Ash and Gypsum Stacks located on the fossil plant property in accordance with state of Tennessee, Department of Environment and Conservation (TDEC) regulations which state upon achieving final grade or as required, a final cover that meets the specifications set forth in the Dry Fly Ash and Gypsum stacks closure plans should be placed. TVA needs suitable cover soil, general fill, and topsoil material to support this action. In addition, the borrow sites and access road would be used to support other routine operation and maintenance activities of the fossil plant.

AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: TVA’s EA provides an Alternatives Analysis for the proposed action. It states that TVA considered several options to secure borrow material to support partial closure of the Dry Fly Ash and Gypsum stacks. A study performed by TVA identified soil resources available within 1,250 acres on TVA property (onsite) and from commercial borrow sites within a 20-mile radius of the fossil plant.

The results of the borrow study indicate that significant volumes of soil materials are available for potential future applications onsite, and the better source of borrow material within the 1,250 acres of TVA property from existing pasture areas located in the southeast portion of the property. The evaluation of commercial borrow sources in the region indicated that significant volumes of materials, similar to those available onsite, were available from the commercial sources in the surrounding region. TVA considered the study results and determined that the development of borrow areas onsite is preferred. This option would avoid the long-term transport of borrow on public roadways which eliminates the long-term impacts associated with air emissions, increased traffic

and associated long-term safety risks, and disruptions to the public that would be associated with such off-site transport. In addition, the use of borrow from TVA-owned property optimizes the use of TVA resources and minimizes costs. TVA then considered three alternative routes to provide access to and from the sites. TVA further optimized the location of the proposed borrow sites and access road by considering the impacts to cultural resources, surface waters and wetlands, sensitive species, existing roadways, and cost. In addition, the “no-action” alternative was evaluated. The EA states that in consideration of all factors that would meet the applicant’s purpose and need, the preferred alternative is to develop and operate two borrow sites, construct an access road and bridge on TVA’s Cumberland Fossil Plant property.

COMPENSATORY MITIGATION: The applicant has proposed compensatory mitigation for the stream and wetland impacts associated with the project. TVA proposes purchasing 201 credits for impacts to Scott Branch and 1,168 credits for impacts to ephemeral streams from the Cumberland River Compact

Stream Restoration In-Lieu Fee Program which is in the service area of the project. This number of stream credits is based on TVA’s proposed multiplier of 0.5:1 ratio for impacts to ephemeral channels and 1:1 ratio to perennial streams. TVA believes that the construction of the new bridge and bank stabilization activities will have only minimal impacts to the Wells Creek embayment is not proposing any mitigation for this activity.

As mitigation for wetland impacts, TVA proposed purchasing 1.7 advanced wetland mitigation credits from the Tennessee Mitigation Fund in the Lower Cumberland River Service Area.

PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a DA permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. As the proposed activity involves the discharge of fill material

into the waters of the U.S., the evaluation of the probable impacts on the public interest will include application of the guidelines promulgated by the Administrator of the U.S. Environmental Protection Agency at 40 CFR 230.

SOLICITATION OF COMMENTS: The U.S. Army Corps of Engineers, Nashville District (Corps) is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. In accordance with the Council on Environmental Quality (40 CFR 1500- 1508) and Corps (Engineer Regulation (ER) 200-2-2, dated 1988) regulations for implementing NEPA, this document serves as a scoping letter to notify the public of the proposed action and affording the public the opportunity to participate. Comments are used in the preparation of an EA and/or an Environmental Impact Statement pursuant to NEPA, if necessary. Comments are used to assess impacts on fish, wildlife, endangered species, water quality, historic properties, water supply, conservation, economics, aesthetics, wetlands, flood hazards, floodplain values, land use, navigation, shore erosion, sedimentation, recreation, energy needs, safety, climate change, considerations of property ownership, general environmental effects, cumulative effects, and in general, the needs and welfare of the people. Unless unusual circumstances and/or new information is obtained

concerning the proposed project, this office may adopt TVA’s NEPA document (EA dated August 2017) which addressed the proposed stream and wetland impacts.

TVA’s EA was posted on TVA’s website for a 14-day day public review period. The availability of the draft EA was announced in the local newspaper, The Stewart County Standard. TVA notified local, state, and federal agencies and federally recognized tribes of its availability through required consultation. Comments were accepted from July 21, 2017 through August 4, 2017. TVA stated that no substantive and relevant comments were received on the draft EA.

In addition, the Corps Planning Office will prepare environmental documents as necessary pursuant to NEPA for impacts on USACE government land. The Corps will consider any comments received prior to a final decision concerning the authorization of the project, i.e. the issuance, modification, or denial of the requested DA permit and/or real estate instrument.

HISTORIC AND CULTURAL RESOURCES: TVA is the lead federal agency for this project and has consulted with appropriate parties under Section 106 of the National Historic Preservation Act. TVA has surveyed the entirety of the project and a small number of sites have been determined eligible for or listed on the National Register of Historic Places are within the project area. Through consultation with the Tennessee State Historic Preservation Office (SHPO) as well as Native American Tribes and tribal governments that have indicated ancestral ties to the region, TVA has determined that the project would not adversely affect National Register of Historic Places listed or eligible cultural resources. Documentation of TVA’s coordination with SHPO regarding their determination and SHPO concurrence can be found in the EA. USACE has reviewed and concurs with this determination. A copy of this notice, along with copies of the report, are being sent to the office of the State Historic Preservation Officer for their comments and concurrence. This Public Notice also serves to initiate public involvement requirements of Section 106 of the National Historic Preservation Act of 1966, as amended. USACE invites responses to this notice from Native American Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and sites of religious and cultural significance at or near the project area.

ENDANGERED/THREATENED SPECIES REVIEW: The EA provides discussion and documentation of TVA’s review of federally listed threatened and endangered (T&E) species within the proposed project area. Field reviews to determine if suitable habitat for federally listed species were performed by TVA

biologists and their consultants in February 2017 and November 2016. No habitat for federally listed plant or aquatic species was found within the project footprint during these reviews. In addition, surveys for freshwater mussels conducted in October 2011 in the Cumberland River and Wells Creek did not encounter any T&E species. The habitat was determined to be degraded and of sub-optimal quality for federally listed mussels. TVA determined that the proposed actions would have no effect on Price’s potato-bean, clubshell, pink mucket, and rabbitsfoot. Phase 1 Habitat Assessments (2016 Range-Wide Indiana Bat Summer Survey Guidelines, April 2016) were conducted by TVA biologists and their consultant (February 2017 and November 2016). No caves were observed during field reviews. The nearest documented cave record is approximately 1.6 miles from the proposed project area. No other suitable winter roosting structures for gray bat, Indiana bat (Myotis sodalis) and northern long eared bat (Myotis septentrionalis) were identified within the action area. Suitable summer roosting habitat and foraging habitat for federally listed endangered Indiana bat and federally listed threatened NLEB was identified within the project area. In total, 11.9 acres of potentially suitable Indiana bat and NLEB roosting trees would be removed for the development of the borrow areas, access road,

bridge, and any other associated impact sites. The potential summer roosting habitat ranged from low to moderately suitable. As such, TVA determined that the area could present suitable summer roosting habitat for Indiana and NLEB due to the presence of some suitable roosting trees as well as the proximity to known records. The project would be cleared of all potentially suitable roosting habitat between August 16 and March 31. The EA documented that TVA proposes that a contribution of $110,075 to Tennessee’s Imperiled Bat Conservation Fund would be provided to promote the conservation and recovery of imperiled bats in Tennessee per the Tennessee Field Office’s Conservation Strategy for Forest-Dwelling Bats. The EA documents TVA’s consultation with

the U.S. Fish and Wildlife Service (USFWS) regarding the surveys, their determinations, and proposed compensatory mitigation. A response from USFWS

is provided in the EA stating that as a result of conservation measures implemented by the project, take of the NLEB is considered to have been adequately addressed by the 4(d) rule for this species. It further states that impacts to Indiana bat and NLEB habitat would be adequately covered by the conservation measures agreed upon and any incidental take of these species that will or could result from the forest habitat removal associated with this project would be authorized under the 2015 BO and they have determined that the proposed project is not likely to jeopardize the continued existence of the Indiana bat or NLEB or result in the destruction nor adverse modification of designated critical habitat for either species. A copy of this notice is being furnished to the USFWS for their review. We are requesting comments from the USFWS concerning potential impacts to threatened and/or endangered species pursuant to Section 7(a)(2) of the Endangered Species Act (ESA) of 1973, as amended.

OTHER APPROVALS: In addition to the DA permit, other federal, state, and/or local approvals may be required for the proposed work, including:

1. Before a permit can be issued, water quality certification must be provided by the State of Tennessee Department of the Environment and Conservation, pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341), that applicable water quality standards will not be violated.

2. The project requires Corps Real Estate Division approval for work on U.S. Government land. Therefore, prior to construction, the Corps Real Estate Division must grant approval for the project that impacts lands and waters upon which the government has real estate interests.

3. The project requires coordination with Corps Navigation Office, pursuant to 33 U.S.C. 408, for any approvals that may be necessary for activities that will alter or temporarily or permanently occupy or use a USACE federally authorized civil works project.

4. Other federal, state, and/or local approvals that may be required for the proposed work.

PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a hearing.

COMMENT PERIOD: Written statements received by April 16, 2018, will become a part of the record and considered in the determination. Any response to this notice should reference the Corps Application No. LRN-2017-00257, and be directed to the Regulatory Division, Attn: Amy Robinson, at the above

address or at amy.m.robinson@usace.army.mil.

Timothy C. Wilder Chief, West Branch Regulatory Division

U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas