Home

Nashville District

Run scraper

Public Notice No. 18-09

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Proposed Riprap Bank Stabilization at Laurel Run Park, Holston River Mile 134,Left Bank, Holston River, Hawkins County, Tennessee

Public Notice No. 18-09 Nashville District Application No. LRN-2018-00193 Date: March 14, 2018;Expires: April 13, 2018 Please address all comments to: Nashville District Corps of Engineers, Regulatory Division (Attn: Aric Payne) 1301 Riverfront Parkway, Suite 206 Chattanooga, Tennessee 37402 SUBJECT: Proposed Riprap Bank Stabilization at Laurel Run Park, Holston River Mile 134,Left Bank, Holston River, Hawkins County, Tennessee TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 404 of the Clean Water Act (CWA) (33 U.S.C. 1344) and Section 10 of the Rivers and Harbors Act (33 U.S.C. 401). Application (ARAP NRS No. 16.185) has also been made to the State of Tennessee, Department of Environment and Conservation, Division of Water Resources for a water quality certification pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341). APPLICANT:County of Hawkins, Tennessee Attn: Alana Roberts 150 E. Washington Street, Suite 2 Rogersville, Tennessee 37857 AGENT:Natural Resource Conservation Service Attn: Daniel Horne 1401 E. Main Street Rogersville, Tennessee 37857 LEAD FEDERAL AGENCY: The Natural Resource Conservation Service (NRCS) is considered the lead federal agency for compliance with the National Environmental Policy Act (NEPA) and other applicable federal laws and regulations (e.g., the National Historic Preservation Act (NHPA) and the Endangered Species Act (ESA)) for the proposed work.

LOCATION: The proposed project is located in the Laurel Run Park on the left bank of the Holston River at river mile 134; HUC 12 – 060101040101 – Hord Creek Watershed; Latitude N. 36.49713°, Longitude W. -82.68429°; Laurel Run Park Road, Hawkins County, Tennessee.

DESCRIPTION OF PROPOSED WORK: The applicant proposes to install 1,888 linear feet of riprap bank stabilization within Laurel Run Park. In areas where riprap is proposed, the banks will be sloped as needed for stability and toe of riprap will be keyed in for further stability. Once the slope is prepared, geotextile fabric will be placed prior to riprap. Top of the rock armoring shall be worked into the bank to support existing heavy vegetation, where allowed, and tree removal will occur at locations due to damage or undercutting of the bank above riprap.Seasonal grass planting for erosion control and long term riparian plantings shall be as directed by the District Conservationist. Excavated material in excess of material required in designated backfill areas behind rock riprap armoring shall be removed from the site and disposed of out of the influence of river per permit requirements. Plans and location maps of the proposed project are provided in this notice. If you wish to view additional plans, please contact this office or visit our web site at:http://www.lrn.usace.army.mil/Media/PublicNotices.aspx AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: The applicant has avoided all wetland impacts. Impacts from riprap have been reduced after full evaluation of the shoreline characteristics and consideration of existing eroding conditions, activity, and slope. Additionally, the applicant has proposed that all disturbed areas along the channel shall be mulched with Erosion Control Blanket according to NRCS Practice Standard 484-Mulching. All disturbed areas shall be prepared, fertilized, limed, and seeded in accordance with a seeding plan prepared by the District Conservationist, with temporary seasonal grass planting for erosional control. All work will be conducted from the bank, with no equipment operating in the river channel or flowing water. All excavated material will be removed for the influence of the stream or placed behind armoring and vegetated. COMPENSATORY MITIGATION: The applicant has not proposed compensatory mitigation. The aquatic impacts are limited to the deposition of fill for the purpose of stabilizing an eroding shoreline.

PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a DA permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. As the proposed activity involves the discharge of fill material into the waters of the U.S., the evaluation of the probable impacts on the public interest will include application of the guidelines promulgated by the Administrator of the U.S. Environmental Protection Agency at 40 CFR 230. SOLICITATION OF COMMENTS: The USACE is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historical properties, water quality, and general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to NEPA. Comments are also used to determine the need for a public hearing and determine the overall public interest of the proposed activity. An EA will be prepared by this office prior to a final decision concerning issuance or denial of the requested DA Permit. HISTORIC AND CULTURAL RESOURCES: The Natural Resources Conservation Service, as the lead agency for determining compliance with Section 106 of the National Historic Preservation Act, has determined there will be “no historic properties affected” based on the Natural Resources Conservation Service and Tennessee State Historic Preservation Officer’s programmatic agreement. Copies of this notice are being sent to the office of the State Historic Preservation Officer and Native American Tribes as appropriate. ENDANGERED/THREATENED SPECIES REVIEW: The Endangered Species Act (ESA) requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7 of ESA on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or any designated critical habitat. The Natural Resources Conservation Service, as the lead agency for ESA consultation, has consulted with the USFWS as required under Section 7 of the ESA. They have determined that the project is not likely to adversely affect proposed and/or listed species and their designated critical habitat. The USFWS concurred with this determination via USFWS programmatic consultation FWS# 2014-I-0324, dated 8/27/2014. Copies of this notice are being sent to the office of the USFWS as appropriate. OTHER APPROVALS: In addition to the DA permit, other federal, state, and/or local approvals may be required for the proposed work, including: 1. Before a permit can be issued, water quality certification must be provided by the State of Tennessee, pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341), that applicable water quality standards will not be violated. 2. Other federal, state, and/or local approvals that may be required for the proposed work. 3. TVA approval is required under Section 26a of the TVA Act for the proposed work and will be processed separately. PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a hearing. COMMENT PERIOD: Written statements received by April 12, 2018, will become a part of the record and considered in the determination. Any response to this notice should reference the Corps Application No. LRN-2018-00193, and be directed to the Regulatory Division, Attention: Aric Payne, at the above address or at aric.j.payne@usace.army.mil.

Casey Ehorn Chief East Branch Regulatory Division U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas