Application for Permit Wilson Basin III Construction Project.

The City has submitted an application to permanently discharge fill within 1.68 acres of Waters of the United States (WOUS) associated with the construction and operation of the proposed Wilson Basin III Project (Project). The project includes construction of a flood control basin, stormwater recharge area, multi-use trails and appurtenant channel improvements upstream and downstream to convey 100-year storm event flows and to alleviate existing downstream flooding along Wilson and Oak Glen Creeks. The flood control basin would also function as a recreational lake.

PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT (CORPS)

BUILDING STRONG®

APPLICATION FOR PERMIT Wilson Basin III Construction Project Public Notice/Application No.: SPL-2016-00779-PKK Project: City of Yucaipa Wilson Basin III Construction Project Comment Period: March 19, 2018 through April 19, 2018 Project Manager(s): Pamela Kostka; (213) 452-3420; Pamela.K.Kostka@usace.army.mil

Applicant Fermin G. Preciado, P.E. Director of Public Works/City Engineer (909) 797-2489, Extension 240 City of Yucaipa 34272 Yucaipa Boulevard Yucaipa, California 92399

Contact(s) Michael R. Seal Special Projects & Maintenance Engineer (909) 797-2489, Extension 252 City of Yucaipa 34272 Yucaipa Boulevard Yucaipa, California 92399

Location The proposed project site is located at the confluence of Wilson and Oak Glen Creek, south of Oak Glen Road, east of 2nd Street and west of Bryan Street, in the City of Yucaipa, San Bernardino County, California (at: 34.044211, -117.043148). Activity The City has submitted an application to permanently discharge fill within 1.68 acres of Waters of the United States (WOUS) associated with the construction and operation of the proposed Wilson Basin III Project (Project) as depicted in the attached figures. The project includes construction of a flood control basin, stormwater recharge area, multi-use trails and appurtenant channel improvements upstream and downstream to convey 100-year storm event flows and to alleviate existing downstream flooding along Wilson and Oak Glen Creeks. The flood control basin would also function as a recreational lake. The project is located within the Oak Glen Creek Specific Plan which includes residential development, innovation areas, flood control and roadway improvements, and an 18.3-acre habitat preserve. For more information, please see information provided as part of this notice and the attached figures.

1

Interested parties are hereby notified an application has been received for a Department of the Army permit for the activity described herein and shown on the attached drawing(s). We invite you to review today's public notice and provide views on the proposed work. By providing substantive, site-specific comments to the Corps Regulatory Division, you provide information that supports the Corps' decision-making process. All comments received during the comment period become part of the record and will be considered in the decision. This permit will be issued, issued with special conditions, or denied under Section 404 of the Clean Water Act. Comments should be mailed to: Department of The Army Los Angeles District, U.S. Army Corps of Engineers Regulatory Division ATTN: Pamela Kostka (SPL-2016-779-PKK) Los Angeles District 915 Wilshire Boulevard Los Angeles, California 90017 Alternatively, comments can be sent electronically to: Pamela.K.Kostka@usace.army.mil. The mission of the U.S. Army Corps of Engineers Regulatory Program is to protect the Nation's aquatic resources, while allowing reasonable development through fair, flexible and balanced permit decisions. The Corps evaluates permit applications for essentially all construction activities that occur in the Nation's waters, including wetlands. The Regulatory Program in the Los Angeles District is executed to protect aquatic resources by developing and implementing short- and long-term initiatives to improve regulatory products, processes, program transparency, and customer feedback considering current staffing levels and historical funding trends. Corps permits are necessary for any work, including construction and dredging, in the Nation's navigable water and their tributary waters. The Corps balances the reasonably foreseeable benefits and detriments of proposed projects, and makes permit decisions that recognize the essential values of the Nation's aquatic ecosystems to the general public, as well as the property rights of private citizens who want to use their land. The Corps strives to make its permit decisions in a timely manner that minimizes impacts to the regulated public. During the permit process, the Corps considers the views of other Federal, state and local agencies, interest groups, and the general public. The results of this careful public interest review are fair and equitable decisions that allow reasonable use of private property, infrastructure development, and growth of the economy, while offsetting the authorized impacts to the waters of the United States. The permit review process serves to first avoid and then minimize adverse effects of projects on aquatic resources to the maximum practicable extent. Any remaining unavoidable adverse impacts to the aquatic environment are offset by compensatory mitigation requirements, which may include restoration, enhancement, establishment, and/or preservation of aquatic ecosystem system functions and services.

2

Evaluation Factors The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof. Factors that will be considered include conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food production and, in general, the needs and welfare of the people. In addition, if the proposal would discharge dredged or fill material, the evaluation of the activity will include application of the EPA Guidelines (40 CFR Part 230) as required by Section 404 (b)(1) of the Clean Water Act. The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Preliminary Review of Selected Factors EIS Determination- A preliminary determination has been made an environmental impact statement is not required for the proposed work. Water Quality- The applicant is required to obtain water quality certification, under Section 401 of the Clean Water Act, from the California Regional Water Quality Control Board. Section 401 requires any applicant for an individual Section 404 permit provide proof of water quality certification to the Corps of Engineers prior to permit issuance. Coastal Zone Management Act (CZMA)- This project is located outside the coastal zone and preliminary review indicates it would not affect coastal zone resources. After a review of the comments received on this public notice and in consultation with the California Coastal Commission, the Corps will make a final determination of whether this project affects coastal zone resources after review of the comments received on this Public Notice. Essential Fish Habitat- No Essential Fish Habitat (EFH), as defined by the Magnuson-Stevens Fishery Conservation and Management Act, occurs within the project area and no EFH is affected by the proposed project.

3

Cultural Resources- The latest version of the National Register of Historic Places has been consulted and there are no listed sites within the proposed projects vicinity. A Cultural Resources Inventory for the project was prepared by Cogstone in August 2011 and updated by Dudek in 2018. A total of four historic-era archaeological sites were observed and recorded on the site. These sites include a rock and dirt berm (P-36-023369), rock and concrete wall (P-36-023367), glass scatter (P-36--23367), and trash scatter (P-36-023366/CA-SBR-14756H). Field testing of the trash scatter (P-36-023366/CA-SBR14756H), consisting of shovel test pits, was conducted by Dudek in 2018. No prehistoric or paleontological resources were observed during the cultural resources survey. The Corps will determine whether the proposed activity would have any effect on historic properties listed on, or determined eligible for listing in the National Register. The Corps may initiate consultation with the State Historic Preservation Officer (SHPO) to determine the adequacy of the inventory and the Corps evaluation of any cultural resources that may be located within the project's Area of Potential Effect. If the Corps determines there may be an effect within our scope, the Corps may also consult with the appropriate Native American Tribes regarding the proposed impacts of the project. Mitigation measures may also be incorporated as part of project implementation to reduce potential impacts to cultural resources, if deemed appropriate. Endangered Species- Protocol surveys were conducted for the federal listed endangered San Bernardino kangaroo rat (Dipodomys merriami parvus [SBKR]) and federal listed threatened California gnatcatcher (Poliptila californica californica [CAGN]) were conducted within the project site in 2012 and 2017 with negative results. Focused botanical surveys were conducted on site in spring 2012 and 2017. No federally listed threatened or endangered plant species were observed. Additionally, there is no U.S. Fish and Wildlife designated critical habitat mapped within the project site. The Corps will determine whether the proposed activity would have any effect on ESA listed species and/or their critical habitat. The Corps may initiate consultation with the United States Fish and Wildlife Service (USFWS) to determine the adequacy of the biological assessment and the Corps evaluation of any listed species or critical habitat which may be located within the project's Area of Potential Effect. Mitigation measures may also be incorporated as part of project implementation to reduce potential impacts to ESA listed species and/or their critical habitat, if deemed appropriate. Public Hearing- Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state with particularity the reasons for holding a public hearing. Proposed Activity for Which a Permit is Required Basic Project Purpose- The basic project purpose comprises the fundamental, essential, or irreducible purpose of the proposed project, and is used by the Corps to determine whether the applicant's project is water dependent (i.e., requires access or proximity to or siting within the special aquatic site to fulfill its basic purpose). Establishment of the basic project purpose is necessary only when the proposed activity would discharge dredged or fill material into a special aquatic site (e.g., wetlands, pool and riffle complex, mudflats, coral reefs). Because no fills are proposed within special aquatic sites, identification of the basic project purpose is not necessary. 4

Overall Project Purpose- The overall project purpose serves as the basis for the Corps' 404(b)(1) alternatives analysis and is determined by further defining the basic project purpose in a manner that more specifically describes the applicant's goals for the project, and which allows a reasonable range of alternatives to be analyzed. The overall project purpose is to attenuate existing flood hazards to existing residential and commercial uses located along Wilson Creek and Oak Glen Creek, within the City of Yucaipa. Additional Project Information Baseline information: The project site incorporates a segment of two main drainages on-site: Oak Glen Creek and Wilson Creek. Wilson Creek currently extends through the project site from north to south and discharges onto the site through existing culverts at Oak Glen Road. The existing channel upstream of Oak Glen Road is a 15 foot wide, natural bottom, trapezoidal channel with 2:1 slopes. These drainages flow east to west, entering the easterly property boundary from Bryant Street and Oak Glen Road discharging off-site at the western site boundary. Alluvial fan terraces associated with these drainages extend through the project site. The site is relatively flat, with gently sloping terrain from the alluvial terraces to the Oak Glen Creek and Wilson Creek at approximately 2,548 feet to 2,763 feet above mean sea level (amsl). Vegetation identified within the Cadre Environmental Sensitive Species Survey Report (2012) included disturbed/ruderal, ruderal, ornamental, non-native grassland, alluvial fan sage scrub, California buckwheat scrub, California buckwheat scrub/non-native grassland ecotone, deerweed scrub, deerweed scrub/nonnative grassland sycamore ecotone, mixed sage scrub, chamise chaparral, chamise chaparral/burned, Eriodictyon chaparral, Eriodictyon chaparral/non-native grassland ecotone, northern mixed chaparral, northern mixed chaparral/non-native grassland ecotone, coast live oak, southern cottonwood riparian woodland, southern sycamore riparian woodland, southern willow scrub, mulefat scrub, and unvegeated wash. Project description: The proposed project involves the construction of a flood control basin, potential wetland recharge area, and appurtenant channel improvements upstream and downstream to convey 100-year even storm flows and to alleviate existing downstream flooding along Wilson and Oak Glen Creeks. The project proposes to realign the on-site segment of Wilson Creek, upstream of the proposed flood control basin/lake, and widen it to a width of 50 feet with 2:1 side slopes. Grade control structures would be constructed within the channel bottom to maintain a minimum slope. The realigned channel would enter the proposed flood control basin through an open channel section with rock riprap protection. The open channel inlet design would convey the upstream flows from Wilson Creek and Oak Glen Creek into the basin. The flood control basin/lake would have a side slope of 2:1 for the first 4 feet of depth and a 4:1 slope for the last 6 feet of depth. The embankment of the basin/lake would be surrounded by a trail that varies in width from 12 feet to 24 feet. The side slopes of the upper portion of the basin would be 2:1, with a bank height ranging from 28 to 80 feet. Two maintenance access ramps would be provided along the eastern/upstream end of the basin. Cut and fill would most likely balance on site. Sediment excavated onsite would be used to fill in the existing alignment of Wilson Creek. The project is located within the Oak Glen Creek Specific Plan which includes residential development, flood control and roadway improvements, and an 18.3-acre habitat preserve. The Inland Empire Resource Conservation District (IERCD) would manage the habitat preserve in perpetuity and would operate a facility in the southwest corner of the property for environmental educational purposes (referred to as "Innovation 5

Development"). Based upon the results of the Dudek 2017 Jurisdictional Delineation Update, implementation of the proposed project would result in permanent impacts to 1.68 acres of waters of the United States. The impacts to these resources are associated with the construction of the proposed flood control basin (0.24 acre), appurtenant channel improvements (1 acre), new roadway (0.03 acre) and filling in the existing alignment of Wilson Creek (0.42) (See Table 1). Table 1 Impacts to On-site Jurisdictional Waters Summary Feature ACOE/RWQCB Non-Wetland Waters

Total On-site Jurisdictional Waters 2.19 acres

Total Permanent Impacts to Jurisdictional Waters 1.68 acres

Total Jurisdictional Waters Avoided 0.51 acres

Proposed Mitigation­ The proposed mitigation may change as a result of comments received in response to this public notice, the applicant's response to those comments, and/or the need for the project to comply with the 404(b)(1) Guidelines. In consideration of the above, the proposed mitigation sequence (avoidance/minimization/compensation), as applied to the proposed project is summarized below: Avoidance: The applicant is avoiding a total of 0.51-acres of waters of the U.S. located within the project site. A total of 0.29-acres of waters of the U.S. is located upstream of the proposed lake within the 18.3-acre habitat preservation area. An additional 0.22-acres of waters of the U.S. is located downstream of the proposed lake/flood control basin would be avoided during construction of the project. Minimization: Potential impacts to waters of the U.S. will be minimized during construction through the use of staking or fencing to demarcate the limits of grading and prevent encroachment outside the grading limits, prevention of construction access, parking, and storage outside the limits of construction, and through the preparation and implementation of a stormwater pollution prevention plan to stabilize exposed surfaces and prevent downstream sedimentation and erosion. Compensation: The applicant has proposed to mitigate for direct impacts to non-wetland waters of the U.S. by providing on-site and off-site mitigation. The off-site location is known as the Oak Glen Creek Flood Corridor, located upstream of the project site. The on-site mitigation component consists of the preservation of the upper reach of Wilson Creek (0.29-acres) within an 18.3-acre on-site preserve through long-term management by the Inland Empire Resource Conservation District (IERCD). A total of 0.29-acres of preservation, 0.10-acres of re-establishment and 0.03-acres of enhancement (non-native removal) would be conducted within the segment of Wilson Creek proposed for preservation. In addition, a 0.5-acre wetland would be constructed adjacent to the proposed flood control basin/man-made fishing lake that is proposed within the project site. The marsh would be planted with native vegetation (non-woody) and is expected to provide habitat for nesting birds, amphibians and other aquatic species. The IERCD would utilize the marsh for environmental education programs. The remainder of the mitigation required would be satisfied at the Oak Glen Creek Flood Corridor, located upstream of the on-site reach of Oak Glen Creek. The mitigation for impacts to Waters of the 6

U.S. at this off-site location includes 0.27-acres of creation/re-establishment opportunities and 0.80acres of preservation of Waters of the U.S. Mitigation for permanent impacts to Waters of the U.S is summarized in Table 2, below. For additional information please call Pamela Kostka of my staff at (213) 452-3420 or via e-mail at Pamela.K.Kostka@usace.army.mil. This public notice is issued by the Chief, Regulatory Division. Regulatory Program Goals: To provide strong protection of the nation's aquatic environment, including wetlands. To ensure the Corps provides the regulated public with fair and reasonable decisions. To enhance the efficiency of the Corps' administration of its regulatory program.

DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, U.S. ARMY CORPS OF ENGINEERS Los Angeles District 915 Wilshire Boulevard Los Angeles, California 90017 WWW.SPL.USACE.ARMY.MIL/MISSIONS/REGULATORY

7

Approximate Project Boundary

VCS ENVIRONMENTAL 30900 Rancho Viejo Road, Suite 100 San Juan Capistrano, CA 92675 (949) 489-2700 Fax (949) 489-0309

NTS

Data Source: Thomas Guide

Wilson Creek Business Park Project Location Map

FIGURE 2

Approximate Project Boundary

VCS ENVIRONMENTAL 30900 Rancho Viejo Road, Suite 100 San Juan Capistrano, CA 92675 (949) 489-2700 Fax (949) 489-0309

NTS

Data Source: National Geographic

Wilson Creek Business Park USGS Topographical Map

FIGURE 3

Approximate Project Boundary

VCS ENVIRONMENTAL 30900 Rancho Viejo Road, Suite 100 San Juan Capistrano, CA 92675 (949) 489-2700 Fax (949) 489-0309

NTS

Data Source: National Geographic

Wilson Creek Business Park Aerial Overview Map

FIGURE 4

Project Boundary Impacts ! Data Station ( Transects (ACOE Width/CDFW Width) Jurisdictional Features ACOE Centerline ACOE/RWQCB !

! !

!

!

! !

!

!

! !

!

Previously Mapped ACOE/RWQCB Developed Areas Lake/Basin Stormdrain Channel

Da te :3/ 8 / 2 01 8-L asts ave db y :s l uc are l l i-Pa th: Z: \ Pro j ec ts \ j 103 73 00 \ MAPDOC\ USACE\ Wi l s o nBa si nI I IPro j e c t -I mp ac ts to Wate rs o fth eUS. mxd

Roadway

SOURCE: Bi n gMa ps, 2 0 1 7 .

n

0

1 0 0

2 0 0 F e e t

Wi l s o nBa si nI I I Pro j e c t­I mp a c ts to Wa te rs o f th eU. S. Ci tyo f Yuc a i p aOn Ca l l -Wi l s o nBa si nI I I

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas