Application for Permit Wilson Basin III Construction Project.
The City has submitted an application to permanently discharge fill within 1.68 acres of Waters of the United States (WOUS) associated with the construction and operation of the proposed Wilson Basin III Project (Project). The project includes construction of a flood control basin, stormwater recharge area, multi-use trails and appurtenant channel improvements upstream and downstream to convey 100-year storm event flows and to alleviate existing downstream flooding along Wilson and Oak Glen Creeks. The flood control basin would also function as a recreational lake.
PUBLIC NOTICE
U.S. ARMY CORPS OF ENGINEERS
LOS ANGELES DISTRICT (CORPS)
BUILDING STRONG®
APPLICATION FOR PERMIT
Wilson Basin III Construction
Project
Public Notice/Application No.: SPL-2016-00779-PKK
Project: City of Yucaipa Wilson Basin III Construction Project
Comment Period: March 19, 2018 through April 19, 2018
Project Manager(s): Pamela Kostka; (213) 452-3420; Pamela.K.Kostka@usace.army.mil
Applicant
Fermin G. Preciado, P.E.
Director of Public Works/City Engineer
(909) 797-2489, Extension 240
City of Yucaipa
34272 Yucaipa Boulevard
Yucaipa, California 92399
Contact(s)
Michael R. Seal
Special Projects & Maintenance Engineer
(909) 797-2489, Extension 252
City of Yucaipa
34272 Yucaipa Boulevard
Yucaipa, California 92399
Location
The proposed project site is located at the confluence of Wilson and Oak Glen Creek, south of Oak
Glen Road, east of 2nd Street and west of Bryan Street, in the City of Yucaipa, San Bernardino County,
California (at: 34.044211, -117.043148).
Activity
The City has submitted an application to permanently discharge fill within 1.68 acres of Waters of the
United States (WOUS) associated with the construction and operation of the proposed Wilson Basin
III Project (Project) as depicted in the attached figures. The project includes construction of a flood
control basin, stormwater recharge area, multi-use trails and appurtenant channel improvements
upstream and downstream to convey 100-year storm event flows and to alleviate existing downstream
flooding along Wilson and Oak Glen Creeks. The flood control basin would also function as a
recreational lake. The project is located within the Oak Glen Creek Specific Plan which includes
residential development, innovation areas, flood control and roadway improvements, and an 18.3-acre
habitat preserve. For more information, please see information provided as part of this notice and the
attached figures.
1
Interested parties are hereby notified an application has been received for a Department of the Army
permit for the activity described herein and shown on the attached drawing(s). We invite you to review
today's public notice and provide views on the proposed work. By providing substantive, site-specific
comments to the Corps Regulatory Division, you provide information that supports the Corps'
decision-making process. All comments received during the comment period become part of the
record and will be considered in the decision. This permit will be issued, issued with special
conditions, or denied under Section 404 of the Clean Water Act.
Comments should be mailed to:
Department of The Army
Los Angeles District, U.S. Army Corps of Engineers Regulatory Division
ATTN: Pamela Kostka (SPL-2016-779-PKK)
Los Angeles District
915 Wilshire Boulevard
Los Angeles, California 90017
Alternatively, comments can be sent electronically to: Pamela.K.Kostka@usace.army.mil.
The mission of the U.S. Army Corps of Engineers Regulatory Program is to protect the Nation's
aquatic resources, while allowing reasonable development through fair, flexible and balanced permit
decisions. The Corps evaluates permit applications for essentially all construction activities that occur
in the Nation's waters, including wetlands. The Regulatory Program in the Los Angeles District is
executed to protect aquatic resources by developing and implementing short- and long-term initiatives
to improve regulatory products, processes, program transparency, and customer feedback considering
current staffing levels and historical funding trends.
Corps permits are necessary for any work, including construction and dredging, in the Nation's
navigable water and their tributary waters. The Corps balances the reasonably foreseeable benefits
and detriments of proposed projects, and makes permit decisions that recognize the essential values
of the Nation's aquatic ecosystems to the general public, as well as the property rights of private
citizens who want to use their land. The Corps strives to make its permit decisions in a timely manner
that minimizes impacts to the regulated public.
During the permit process, the Corps considers the views of other Federal, state and local agencies,
interest groups, and the general public. The results of this careful public interest review are fair and
equitable decisions that allow reasonable use of private property, infrastructure development, and
growth of the economy, while offsetting the authorized impacts to the waters of the United States. The
permit review process serves to first avoid and then minimize adverse effects of projects on aquatic
resources to the maximum practicable extent. Any remaining unavoidable adverse impacts to the
aquatic environment are offset by compensatory mitigation requirements, which may include
restoration, enhancement, establishment, and/or preservation of aquatic ecosystem system functions
and services.
2
Evaluation Factors
The decision whether to issue a permit will be based on an evaluation of the probable impact including
cumulative impacts of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefit, which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof. Factors that will be considered include conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood
hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water
supply and conservation, water quality, energy needs, safety, food production and, in general, the needs
and welfare of the people. In addition, if the proposal would discharge dredged or fill material, the
evaluation of the activity will include application of the EPA Guidelines (40 CFR Part 230) as required
by Section 404 (b)(1) of the Clean Water Act.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this
proposed activity. Any comments received will be considered by the Corps of Engineers to determine
whether to issue, modify, condition or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties, water quality, general
environmental effects, and the other public interest factors listed above. Comments are used in the
preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to
the National Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity.
Preliminary Review of Selected Factors
EIS Determination- A preliminary determination has been made an environmental impact statement
is not required for the proposed work.
Water Quality- The applicant is required to obtain water quality certification, under Section 401 of
the Clean Water Act, from the California Regional Water Quality Control Board. Section 401 requires
any applicant for an individual Section 404 permit provide proof of water quality certification to the
Corps of Engineers prior to permit issuance.
Coastal Zone Management Act (CZMA)- This project is located outside the coastal zone and
preliminary review indicates it would not affect coastal zone resources. After a review of the comments
received on this public notice and in consultation with the California Coastal Commission, the Corps
will make a final determination of whether this project affects coastal zone resources after review of the
comments received on this Public Notice.
Essential Fish Habitat- No Essential Fish Habitat (EFH), as defined by the Magnuson-Stevens
Fishery Conservation and Management Act, occurs within the project area and no EFH is affected by
the proposed project.
3
Cultural Resources- The latest version of the National Register of Historic Places has been consulted
and there are no listed sites within the proposed projects vicinity. A Cultural Resources Inventory for the
project was prepared by Cogstone in August 2011 and updated by Dudek in 2018. A total of four
historic-era archaeological sites were observed and recorded on the site. These sites include a rock and
dirt berm (P-36-023369), rock and concrete wall (P-36-023367), glass scatter (P-36--23367), and trash
scatter (P-36-023366/CA-SBR-14756H). Field testing of the trash scatter (P-36-023366/CA-SBR14756H), consisting of shovel test pits, was conducted by Dudek in 2018. No prehistoric or
paleontological resources were observed during the cultural resources survey.
The Corps will determine whether the proposed activity would have any effect on historic properties
listed on, or determined eligible for listing in the National Register. The Corps may initiate consultation
with the State Historic Preservation Officer (SHPO) to determine the adequacy of the inventory and the
Corps evaluation of any cultural resources that may be located within the project's Area of Potential
Effect. If the Corps determines there may be an effect within our scope, the Corps may also consult with
the appropriate Native American Tribes regarding the proposed impacts of the project. Mitigation
measures may also be incorporated as part of project implementation to reduce potential impacts to
cultural resources, if deemed appropriate.
Endangered Species- Protocol surveys were conducted for the federal listed endangered San
Bernardino kangaroo rat (Dipodomys merriami parvus [SBKR]) and federal listed threatened
California gnatcatcher (Poliptila californica californica [CAGN]) were conducted within the
project site in 2012 and 2017 with negative results. Focused botanical surveys were conducted on
site in spring 2012 and 2017. No federally listed threatened or endangered plant species were
observed. Additionally, there is no U.S. Fish and Wildlife designated critical habitat mapped within
the project site.
The Corps will determine whether the proposed activity would have any effect on ESA listed species
and/or their critical habitat. The Corps may initiate consultation with the United States Fish and Wildlife
Service (USFWS) to determine the adequacy of the biological assessment and the Corps evaluation of
any listed species or critical habitat which may be located within the project's Area of Potential Effect.
Mitigation measures may also be incorporated as part of project implementation to reduce potential
impacts to ESA listed species and/or their critical habitat, if deemed appropriate.
Public Hearing- Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public hearing shall state
with particularity the reasons for holding a public hearing.
Proposed Activity for Which a Permit is Required
Basic Project Purpose- The basic project purpose comprises the fundamental, essential, or
irreducible purpose of the proposed project, and is used by the Corps to determine whether the
applicant's project is water dependent (i.e., requires access or proximity to or siting within the special
aquatic site to fulfill its basic purpose). Establishment of the basic project purpose is necessary only
when the proposed activity would discharge dredged or fill material into a special aquatic site (e.g.,
wetlands, pool and riffle complex, mudflats, coral reefs). Because no fills are proposed within special
aquatic sites, identification of the basic project purpose is not necessary.
4
Overall Project Purpose- The overall project purpose serves as the basis for the Corps' 404(b)(1)
alternatives analysis and is determined by further defining the basic project purpose in a manner that
more specifically describes the applicant's goals for the project, and which allows a reasonable range of
alternatives to be analyzed. The overall project purpose is to attenuate existing flood hazards to existing
residential and commercial uses located along Wilson Creek and Oak Glen Creek, within the City of
Yucaipa.
Additional Project Information
Baseline information: The project site incorporates a segment of two main drainages on-site: Oak Glen
Creek and Wilson Creek. Wilson Creek currently extends through the project site from north to south
and discharges onto the site through existing culverts at Oak Glen Road. The existing channel upstream
of Oak Glen Road is a 15 foot wide, natural bottom, trapezoidal channel with 2:1 slopes. These drainages
flow east to west, entering the easterly property boundary from Bryant Street and Oak Glen Road
discharging off-site at the western site boundary. Alluvial fan terraces associated with these drainages
extend through the project site. The site is relatively flat, with gently sloping terrain from the alluvial
terraces to the Oak Glen Creek and Wilson Creek at approximately 2,548 feet to 2,763 feet above mean
sea level (amsl). Vegetation identified within the Cadre Environmental Sensitive Species Survey Report
(2012) included disturbed/ruderal, ruderal, ornamental, non-native grassland, alluvial fan sage scrub,
California buckwheat scrub, California buckwheat scrub/non-native grassland ecotone, deerweed scrub,
deerweed scrub/nonnative grassland sycamore ecotone, mixed sage scrub, chamise chaparral, chamise
chaparral/burned, Eriodictyon chaparral, Eriodictyon chaparral/non-native grassland ecotone, northern
mixed chaparral, northern mixed chaparral/non-native grassland ecotone, coast live oak, southern
cottonwood riparian woodland, southern sycamore riparian woodland, southern willow scrub, mulefat
scrub, and unvegeated wash.
Project description: The proposed project involves the construction of a flood control basin, potential
wetland recharge area, and appurtenant channel improvements upstream and downstream to convey
100-year even storm flows and to alleviate existing downstream flooding along Wilson and Oak Glen
Creeks. The project proposes to realign the on-site segment of Wilson Creek, upstream of the proposed
flood control basin/lake, and widen it to a width of 50 feet with 2:1 side slopes. Grade control structures
would be constructed within the channel bottom to maintain a minimum slope.
The realigned channel would enter the proposed flood control basin through an open channel section with
rock riprap protection. The open channel inlet design would convey the upstream flows from Wilson Creek
and Oak Glen Creek into the basin. The flood control basin/lake would have a side slope of 2:1 for the first
4 feet of depth and a 4:1 slope for the last 6 feet of depth. The embankment of the basin/lake would be
surrounded by a trail that varies in width from 12 feet to 24 feet. The side slopes of the upper portion of the
basin would be 2:1, with a bank height ranging from 28 to 80 feet. Two maintenance access ramps would
be provided along the eastern/upstream end of the basin. Cut and fill would most likely balance on site.
Sediment excavated onsite would be used to fill in the existing alignment of Wilson Creek.
The project is located within the Oak Glen Creek Specific Plan which includes residential development,
flood control and roadway improvements, and an 18.3-acre habitat preserve. The Inland Empire Resource
Conservation District (IERCD) would manage the habitat preserve in perpetuity and would operate a facility
in the southwest corner of the property for environmental educational purposes (referred to as "Innovation
5
Development"). Based upon the results of the Dudek 2017 Jurisdictional Delineation Update,
implementation of the proposed project would result in permanent impacts to 1.68 acres of waters of the
United States. The impacts to these resources are associated with the construction of the proposed flood
control basin (0.24 acre), appurtenant channel improvements (1 acre), new roadway (0.03 acre) and
filling in the existing alignment of Wilson Creek (0.42) (See Table 1).
Table 1
Impacts to On-site Jurisdictional Waters Summary
Feature
ACOE/RWQCB
Non-Wetland
Waters
Total On-site
Jurisdictional Waters
2.19 acres
Total Permanent Impacts to
Jurisdictional Waters
1.68 acres
Total Jurisdictional Waters
Avoided
0.51 acres
Proposed Mitigation The proposed mitigation may change as a result of comments received in response
to this public notice, the applicant's response to those comments, and/or the need for the project to
comply with the 404(b)(1) Guidelines. In consideration of the above, the proposed mitigation sequence
(avoidance/minimization/compensation), as applied to the proposed project is summarized below:
Avoidance: The applicant is avoiding a total of 0.51-acres of waters of the U.S. located within the
project site. A total of 0.29-acres of waters of the U.S. is located upstream of the proposed lake within
the 18.3-acre habitat preservation area. An additional 0.22-acres of waters of the U.S. is located
downstream of the proposed lake/flood control basin would be avoided during construction of the
project.
Minimization: Potential impacts to waters of the U.S. will be minimized during construction through
the use of staking or fencing to demarcate the limits of grading and prevent encroachment outside the
grading limits, prevention of construction access, parking, and storage outside the limits of
construction, and through the preparation and implementation of a stormwater pollution prevention
plan to stabilize exposed surfaces and prevent downstream sedimentation and erosion.
Compensation: The applicant has proposed to mitigate for direct impacts to non-wetland waters of the
U.S. by providing on-site and off-site mitigation. The off-site location is known as the Oak Glen
Creek Flood Corridor, located upstream of the project site. The on-site mitigation component consists
of the preservation of the upper reach of Wilson Creek (0.29-acres) within an 18.3-acre on-site
preserve through long-term management by the Inland Empire Resource Conservation District
(IERCD). A total of 0.29-acres of preservation, 0.10-acres of re-establishment and 0.03-acres of
enhancement (non-native removal) would be conducted within the segment of Wilson Creek
proposed for preservation. In addition, a 0.5-acre wetland would be constructed adjacent to the
proposed flood control basin/man-made fishing lake that is proposed within the project site. The
marsh would be planted with native vegetation (non-woody) and is expected to provide habitat for
nesting birds, amphibians and other aquatic species. The IERCD would utilize the marsh for
environmental education programs.
The remainder of the mitigation required would be satisfied at the Oak Glen Creek Flood Corridor,
located upstream of the on-site reach of Oak Glen Creek. The mitigation for impacts to Waters of the
6
U.S. at this off-site location includes 0.27-acres of creation/re-establishment opportunities and 0.80acres of preservation of Waters of the U.S. Mitigation for permanent impacts to Waters of the U.S is
summarized in Table 2, below.
For additional information please call Pamela Kostka of my staff at (213) 452-3420 or via e-mail at
Pamela.K.Kostka@usace.army.mil. This public notice is issued by the Chief, Regulatory Division.
Regulatory Program Goals:
To provide strong protection of the nation's aquatic environment, including wetlands.
To ensure the Corps provides the regulated public with fair and reasonable decisions.
To enhance the efficiency of the Corps' administration of its regulatory program.
DEPARTMENT OF THE ARMY
LOS ANGELES DISTRICT, U.S. ARMY CORPS OF
ENGINEERS
Los Angeles District
915 Wilshire Boulevard
Los Angeles, California 90017
WWW.SPL.USACE.ARMY.MIL/MISSIONS/REGULATORY
7
Approximate Project Boundary
VCS ENVIRONMENTAL
30900 Rancho Viejo Road, Suite 100
San Juan Capistrano, CA 92675
(949) 489-2700
Fax (949) 489-0309
NTS
Data Source: Thomas Guide
Wilson Creek Business Park
Project Location Map
FIGURE 2
Approximate Project Boundary
VCS ENVIRONMENTAL
30900 Rancho Viejo Road, Suite 100
San Juan Capistrano, CA 92675
(949) 489-2700
Fax (949) 489-0309
NTS
Data Source: National Geographic
Wilson Creek Business Park
USGS Topographical Map
FIGURE 3
Approximate Project Boundary
VCS ENVIRONMENTAL
30900 Rancho Viejo Road, Suite 100
San Juan Capistrano, CA 92675
(949) 489-2700
Fax (949) 489-0309
NTS
Data Source: National Geographic
Wilson Creek Business Park
Aerial Overview Map
FIGURE 4
Project Boundary
Impacts
! Data Station
(
Transects (ACOE Width/CDFW Width)
Jurisdictional Features
ACOE Centerline
ACOE/RWQCB
!
! !
!
!
! !
!
!
! !
!
Previously Mapped ACOE/RWQCB
Developed Areas
Lake/Basin
Stormdrain Channel
Da
te
:3/
8
/
2
01
8-L
asts ave
db y
:s l
uc
are
l
l
i-Pa
th:
Z:
\
Pro j
ec
ts \
j
103
73
00
\
MAPDOC\
USACE\
Wi
l
s o nBa
si
nI
I
IPro j
e
c
t -I
mp ac
ts to Wate
rs o fth
eUS.
mxd
Roadway
SOURCE:
Bi
n
gMa
ps,
2
0
1
7
.
n
0
1
0
0
2
0
0
F
e
e
t
Wi
l
s o nBa
si
nI
I
I
Pro j
e
c
tI
mp a
c
ts to Wa
te
rs o f
th
eU.
S.
Ci
tyo f
Yuc
a
i
p aOn
Ca
l
l
-Wi
l
s o nBa
si
nI
I
I