Home

Philadelphia District

Run scraper

The applicant proposes to construct (1) a 230-kilovolt (kV) alternating current (AC) electric transmission line connecting the new Silver Run Substation and PSE&G Hope Creek Substation expansion and (2) the new Silver Run Substation

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct (1) a 230-kilovolt (kV) alternating current (AC) electric transmission line connecting the new Silver Run Substation and PSE&G Hope Creek Substation expansion and (2) the new Silver Run Substation, which would interconnect the proposed Hope Creek-Silver Run transmission line with two Delmarva Power and Light (DP&L) 230-kV overhead lines. The existing and proposed facilities are part of the electrical grid managed by the Pennsylvania New Jersey Maryland Interconnection, LLC (PJM), which ensures reliable electric service more than 65 million people across the eastern U.S. The proposed project is located between the proposed Silver Run Substation at 471 Silver Run Road, Middletown, Delaware 19709 in Appoquinimink Hundred, New Castle County, Delaware, and the Public Service Enterprise Group (PSE&G) Hope Creek Substation expansion on Artificial Island in Lower Alloways Creek Township, Salem County, New Jersey. More details are available in the "Public Notice & Plan Details" attachment. Public comment deadline is on April 18th, 2018.

The applicant proposes to construct (1) a 230-kilovolt (kV) alternating current (AC) electric transmission line connecting the new Silver Run Substation and PSE&G Hope Creek Substation expansion and (2) the new Silver Run Substation, which would interconnect the proposed Hope Creek-Silver Run transmission line with two Delmarva Power and Light (DP&L) 230-kV overhead lines. The existing and proposed facilities are part of the electrical grid managed by the Pennsylvania New Jersey Maryland Interconnection, LLC (PJM), which ensures reliable electric service more than 65 million people across the eastern U.S.The proposed project is located between the proposed Silver Run Substation at 471 Silver Run Road, Middletown, Delaware 19709 in Appoquinimink Hundred, New Castle County, Delaware, and the Public Service Enterprise Group (PSE&G) Hope Creek Substation expansion on Artificial Island in Lower Alloways Creek Township, Salem County, New Jersey. More details are available in the "Public Notice & Plan Details" attachment. Public comment deadline is on April 18th, 2018.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas